Items with Index Term: assembly line
Afifi, M; Fotouh, A; Al-Hussein, M and Abourizk, S (2022) Integrated lean concepts and continuous/discrete-event simulation to examine productivity improvement in door assembly-line for residential buildings. International Journal of Construction Management, 22(13), pp. 2423-2434. ISSN 1562-3599
Bashford, H H; Walsh, K D and Sawhney, A (2005) Production system loading-cycle time relationship in residential construction. Journal of Construction Engineering and Management, 131(1), pp. 15-22. ISSN 0733-9364
Bennett, F L (1966) Some approaches to the critical path scheduling resource allocation problem. PhD thesis, Cornell University, USA.
Bray Jr., H G (1994) Domestic construction contractors and ISO 9000 registration. DE thesis, Louisiana Tech University, USA.
Edouard, M B; Camille, J; Vincent, B and Améziane, A (2025) Design for mixed model final assembly line (dfmmfal): A new tool for assembly interface identification based on assembly process planning. Journal of Engineering, Design and Technology, 23(1), pp. 143-160. ISSN 1726-0531
Liu, Y; Zhao, J; Dimitrov, V; Irish, A; Jones, C; Kirk, S; Thomas, J and Welter, D (2010) An entertaining robot prototype for pets. Journal of Engineering, Design and Technology, 8(2), pp. 189-205. ISSN 1726-0531
Sabharwal, A; Syal, M and Hastak, M (2009) Impact of manufactured housing component assembly redesign on facility layout and production process. Construction Innovation, 9(1), pp. 58-71. ISSN 1471-4175
Yuan, Z; Li, Z; Lei, Z; Yang, Y; Zhang, W; Lin, W and Cao, L (2025) Enhancing the production performance of prefabricated buildings through the integrated optimization of precast component layout and worker allocation. Journal of Construction Engineering and Management, 151(2): 04024200, ISSN 0733-9364
Up a level