Items with Index Term: accuracy

Number of items: 1392.

Abadou, Y; Ghrieb, A; Bustamante, R and Faid, H (2020) Optimization by mixture design approach: Impact of marble and ceramic recycle on properties of mortar based on air lime. Journal of Engineering, Design and Technology, 18(6), pp. 1731-1747. ISSN 1726-0531

Abd-Elnaby, A-E H A and Reffat, R M (2024) Enhancing BIM-BEM integration: Solutions for efficient data exchange and energy performance assessment. Architectural Engineering and Design Management, 20(3), pp. 596-623. ISSN 1745-2007

AbdElMottaleb, Mohamed (2025) AI in project management: Machine learning application for construction scheduling. PhD thesis, University of Salford, UK.

Abdel-Galil, E; Ibrahim, A H and Alborkan, A (2022) Assessment of transaction costs for construction projects. International Journal of Construction Management, 22(9), pp. 1618-1631. ISSN 1562-3599

Abdel-Razek, R H (1987) Computerised analyses of estimating inaccuracy and tender variability: causes, evaluation and consequences. PhD thesis, Loughborough University, UK.

Abdelaty, A F A (2017) Data-driven algorithms for enhanced transportation infrastructure asset management. PhD thesis, Iowa State University, USA.

Abdelkader, E M; Moselhi, O; Marzouk, M and Zayed, T (2021) Integrative evolutionary-based method for modeling and optimizing budget assignment of bridge maintenance priorities. Journal of Construction Engineering and Management, 147(9): 04021100, ISSN 0733-9364

Abdelkhalek, S; Zayed, T and Eltoukhy, A E E (2025) Multifaceted optimization for bridge inspection process. Journal of Construction Engineering and Management, 151(5): 04025034, ISSN 0733-9364

Abdelkhalek, Sherif Ibrahim Farag Mohamed (2022) Managing the inspection process of concrete bridge decks. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Abdenour, J I (2021) A cost estimation model for improving the budget estimates of industrial plant construction projects. DEng thesis, George Washington University, USA.

Abdolrezaei, H; Siahkali, H and Olamaei, J (2021) Coordination of similar days and multi-objective posterior process to predict energy of transmission substation. Journal of Engineering, Design and Technology, 19(6), pp. 1556-1585. ISSN 1726-0531

Abdou, A; Lewis, J and Alzarooni, S (2004) Modelling risk for construction cost estimating and forecasting: A review. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Abdul Shukor, S (2013) A geometrical-based approach to recognise structure of complex interiors. PhD thesis, University of Warwick, UK.

Abotaleb, I S and El-Adaway, I H (2017) Construction bidding markup estimation using a multistage decision theory approach. Journal of Construction Engineering and Management, 143(1): 04016079, ISSN 0733-9364

Abu Dabous, S; Zadeh, T and Ibrahim, F (2024) A failure mode, effects and criticality analysis-based method for formwork assessment and selection in building construction. International Journal of Building Pathology and Adaptation, 42(5), pp. 1019-1040. ISSN 2398-4708

Abu Hanipah, A F F and Tahar, K N (2018) Development of the 3D dome model based on a terrestrial laser scanner. International Journal of Building Pathology and Adaptation, 36(2), pp. 122-136. ISSN 23984708

Abu-Mahfouz, E; Al-Dahidi, S; Gharaibeh, E and Alahmer, A (2025) A novel feature engineering-based hybrid approach for precise construction cost estimation using fuzzy-AHP and artificial neural networks. International Journal of Construction Management, 25(15), pp. 1800-1810. ISSN 1562-3599

Adafin, J; Rotimi, J O B and Wilkinson, S (2015) Why do the design stage elemental cost plan and final tender sum differ in New Zealand? Journal of Financial Management of Property and Construction, 20(2), pp. 116-131. ISSN 1366-4387

Adafin, J; Rotimi, J O B and Wilkinson, S (2020) Risk impact assessments in project budget development: Quantity surveyors' perspectives. International Journal of Construction Management, 20(1), pp. 13-28. ISSN 1562-3599

Adebisi, J and McArthur, J J (2025) HVAC characterisation of existing Canadian buildings for decarbonisation retrofit identification. Buildings & Cities, 6(1), pp. 729-746. ISSN 2632-6655

Adedokun, O; Egbelakin, T and Omotayo, T (2024) Random forest and path diagram taxonomies of risks influencing higher education construction projects. International Journal of Construction Management, 24(1), pp. 66-74. ISSN 1562-3599

Adeleye, T; Huang, M; Huang, Z and Sun, L (2013) Predicting loss for large construction companies. Journal of Construction Engineering and Management, 139(9), pp. 1224-1236. ISSN 0733-9364

Adinyira, E; Adjei, E A G; Agyekum, K and Fugar, F D K (2021) Application of machine learning in predicting construction project profit in Ghana using support vector regression algorithm (svra). Engineering, Construction and Architectural Management, 28(5), pp. 1491-1514. ISSN 0969-9988

Adjidjonu, D and Burgett, J (2021) Assessing the accuracy of unmanned aerial vehicles photogrammetric survey. International Journal of Construction Education and Research, 17(1), pp. 85-96. ISSN 1557-8771

Adoko, M T (2016) Developing a cost overrun predictive model for complex systems development projects. PhD thesis, George Washington University, USA.

Adul-Hamid, R (1996) Construction duration prediction using neural network methodology. PhD thesis, University of Manchester, UK.

Afetornu, C (2011) The influence of estimator attitude on project cost reliability. PhD thesis, Loughborough University, UK.

Afetornu, C and Edum-Fotwe, F T (2005) Characterising project contingency budget in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Afetornu, C; Edum-Fotwe, F T and McCaffer, R (2006) Estimating budget variability for road projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Afzal, Muneeb (2024) Improving request for information (RFI) processing in construction projects using natural language processing (NLP) techniques. PhD thesis, University of Technology Sydney, Australia.

Agapaki, E and Brilakis, I (2021) Cloi: An automated benchmark framework for generating geometric digital twins of industrial facilities. Journal of Construction Engineering and Management, 147(11): 04021145, ISSN 0733-9364

Aghajamali, K; Metvaei, S; Suliman, A; Lei, Z and Chen, Q (2025) Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes. Construction Management and Economics, 43(5), pp. 340-359. ISSN 0144-6193

Aghili, S. A.; Khanzadi, M.; Haji Mohammad Rezaei, A. and Rahbar, M. (2026) Data-driven approach to fault detection for hospital HVAC system. Smart and Sustainable Built Environment, 15(2), pp. 765-788. ISSN 2046-6099

Agyekum, B; Kissi, E; Yamoah Agyemang, D and Badu, E (2018) Examining barriers for the utilization of non-traditional cost estimating models in developing countries: Ghanaian quantity surveyors' perspectives. Journal of Engineering, Design and Technology, 16(6), pp. 814-827. ISSN 1726-0531

Agyekum-Mensah, G (2019) The degree of accuracy and factors that influence the uncertainty of SME cost estimates. International Journal of Construction Management, 19(5), pp. 413-426. ISSN 1562-3599

Ahadzie, D K (2007) A model for predicting the performance of project managers in mass house building projects in Ghana. PhD thesis, University of Wolverhampton, UK.

Ahadzie, D K; Proverbs, D G and Olomolaiye, P O (2008) Model for predicting the performance of project managers at the construction phase of mass house building projects. Journal of Construction Engineering and Management, 134(8), pp. 618-629. ISSN 0733-9364

Ahankoob, A.; Abbasnejad, B.; Nazareth, I.; Macasaet, P. and Wong, P. S. (2026) Optimising virtual site assessment process for mounted PV array design: An immersive BIM-based approach for existing buildings. Smart and Sustainable Built Environment, pp. 1-26. ISSN 2046-6099

Ahiaga-Dagbui, D D and Smith, S D (2014) Dealing with construction cost overruns using data mining. Construction Management and Economics, 32(7-8), pp. 682-694. ISSN 01446193

Ahiaga-Dagbui D D, S S D (2013) My cost runneth over: Data mining to reduce construction cost overruns. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Ahiaga-Dagbui D D, T O and Smith S D, W S (2013) A neuro-fuzzy hybrid model for predicting final cost of water infrastructure projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Ahmad Shazali, A S and Tahar, K N (2020) Virtual 3D model of canseleri building via close-range photogrammetry implementation. International Journal of Building Pathology and Adaptation, 38(1), pp. 217-227. ISSN 23984708

Ahmadi, Ehsan (2025) Memory-augmented llm agent for predicting locomotion modes in construction activities. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Ahmadian Fard Fini, A; Maghrebi, M; Forsythe, P J and Waller, T S (2022) Using existing site surveillance cameras to automatically measure the installation speed in prefabricated timber construction. Engineering, Construction and Architectural Management, 29(2), pp. 573-600. ISSN 0969-9988

Ahmadu, H A; Ibrahim, A D; Ibrahim, Y M and Adogbo, K J (2020) Incorporating aleatory and epistemic uncertainties in the modelling of construction duration. Engineering, Construction and Architectural Management, 27(9), pp. 2199-2219. ISSN 0969-9988

Ahmadu, H A; Ibrahim, Y M; Ibrahim, A D and Abdullahi, M (2015) Modelling building construction durations. Journal of Financial Management of Property and Construction, 20(1), pp. 65-84. ISSN 1366-4387

Ahmed, M O; Khalef, R; Ali, G G and El-Adaway, I H (2021) Evaluating deterioration of tunnels using computational machine learning algorithms. Journal of Construction Engineering and Management, 147(10): 04021125, ISSN 0733-9364

Ahmed, S S (2018) Innovation of building processes in Syria by using BIM. PhD thesis, Czech Technical University, Czech Republic.

Aibinu, A A and Pasco, T (2008) The accuracy of pre-tender building cost estimates in Australia. Construction Management and Economics, 26(12), pp. 1257-1269. ISSN 1466433X

Akampurira, E and Windapo, A (2019) Key quality attributes of design documentation: South African perspective. Journal of Engineering, Design and Technology, 17(2), pp. 362-382. ISSN 1726-0531

Akhavian, Reza (2015) Data-driven simulation modeling of construction and infrastructure operations using process knowledge discovery. PhD thesis, University of Central Florida, USA.

Akinradewo, O; Aigbavboa, C and Oke, A (2020) Accuracy of road construction preliminary estimate: Examining the influencing factors. Built Environment Project and Asset Management, 10(5), pp. 657-671. ISSN 2044-124X

Akinradewo, O I; Aigbavboa, C O and Oke, A E (2020) Improving accuracy of road projects' estimates in the Ghanaian construction industry. Journal of Financial Management of Property and Construction, 25(3), pp. 407-421. ISSN 1366-4387

Akinsola, A O (1997) An intelligent model of variations' contingency on constructions projects. PhD thesis, University of Wolverhampton, UK.

Akintoye, A and Skitmore, M (1994) Models of UK private sector quarterly construction demand. Construction Management and Economics, 12(1), pp. 3-13. ISSN 01446193

Akintoye, S A (1991) Construction tender price index: modelling and forecasting trends. PhD thesis, University of Salford, UK.

Akintoye, S A and Skitmore, R M (1994) A comparative analysis of three macro price forecasting models. Construction Management and Economics, 12(3), pp. 257-270. ISSN 01446193

Aktas, C B (2011) Impact of product lifetime on life cycle assessment results. PhD thesis, University of Pittsburgh, USA.

Al Jassmi, H; Al Ahmad, M and Ahmed, S (2021) Automatic recognition of labor activity: A machine learning approach to capture activity physiological patterns using wearable sensors. Construction Innovation, 21(4), pp. 555-575. ISSN 1471-4175

Al Juboori, A A (2021) Exploring project costs estimator practices that increase the budget estimate’s accuracy during the initial phase of construction project’s life cycle. DM thesis, Colorado Technical University, USA.

Al Omari, Mohammad K (2025) Application of the AI-enabled unmanned aerial systems in resolving highway construction claims. PhD thesis, University of Illinois at Chicago, USA.

Al-Aubaidy, N A (2015) Factors affecting underreporting of construction safety incidents on capital projects. PhD thesis, University of Texas at Austin, USA.

Al-Aubaidy, N A; Caldas, C H and Mulva, S P (2022) Assessment of underreporting factors on construction safety incidents in US construction projects. International Journal of Construction Management, 22(1), pp. 103-120. ISSN 1562-3599

Al-Hachami, Z (2020) Decision making in the oil and gas construction project management: structured VS discretionary. PhD thesis, University of Liverpool, UK.

Al-Hajj, A and Horner, M W (1998) Modelling the running costs of buildings. Construction Management and Economics, 16(4), pp. 459-470. ISSN 01446193

Al-Hajj, A N (1991) Simple cost-significant models for total life-cycle costing in buildings. PhD thesis, University of Dundee, UK.

Al-Harthi, A S A (2016) Modelling the relationship between client activities and construction procurement performance in Oman. PhD thesis, Loughborough University, UK.

Al-Hussein, M; Kumar, J; Sharma, V and Mah, D (2006) A knowledge-based automated development permit approval process in the housing industry. Engineering, Construction and Architectural Management, 13(3), pp. 290-306. ISSN 0969-9988

Al-Jibouri, S and Mawdesley, M J (2001) Development and application of a stochastic based cost prediction model for construction. Journal of Financial Management of Property and Construction, 6(1), pp. 61-69. ISSN 1366-4387

Al-Otaibi, S (2021) Assessing the impact of transport investment and railway accessibility on economic productivity. PhD thesis, Loughborough University, UK.

Al-Refaie, A; Alashwal, A; Abdul-Samad, Z; Salleh, H and Elshafie, A (2023) Evaluation of weather-productivity models of construction labour for tropics. Built Environment Project and Asset Management, 13(2), pp. 238-252. ISSN 2044-124X

Al-Remal, A M (2013) Risk-based design of structures for fire. PhD thesis, University of Edinburgh, UK.

Al-Sehali, J (2001) A framework for total quality management in the construction industry in Bahrain. PhD thesis, Loughborough University, UK.

Al-Sudairi, A A and Al-Motairi, M S (2010) Multi objective land use allocation model using priority-based goal programming technique. Construction Management and Economics, 28(2), pp. 151-161. ISSN 1466433X

Al-Suleiman, T I and Alatoom, Y I (2024) Development of pavement roughness regression models based on smartphone measurements. Journal of Engineering, Design and Technology, 22(4), pp. 1136-1157. ISSN 1726-0531

Al-Tawal, D R; Arafah, M and Sweis, G J (2021) A model utilizing the artificial neural network in cost estimation of construction projects in Jordan. Engineering, Construction and Architectural Management, 28(9), pp. 2466-2488. ISSN 0969-9988

Al-Zarrad, M A (2018) Multi-criteria decision-making model to improve linear repetitive projects time-cost trade-off in uncertain environment. PhD thesis, University of Alabama, USA.

Alaka, H; Oyedele, L; Toriola-Coker, O; Owolabi, H; Akinade, O; Bilal, M and Ajayi, S (2015) Methodological approach of construction businesses failure prediction studies: A review. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Alaka, H A (2017) 'Big data analytics' for construction firms insolvency prediction models. PhD thesis, University of the West of England, Bristol, UK.

Alaka, H A; Oyedele, L O; Owolabi, H A; Oyedele, A A; Akinade, O O; Bilal, M and Ajayi, S O (2017) Critical factors for insolvency prediction: Towards a theoretical model for the construction industry. International Journal of Construction Management, 17(1), pp. 25-49. ISSN 1562-3599

Alashwal, A M and Chew, M Y (2017) Simulation techniques for cost management and performance in construction projects in Malaysia. Built Environment Project and Asset Management, 7(5), pp. 534-545. ISSN 2044-124X

Algarni, S K (2022) Machine learning for improved detection and segmentation of building boundary. PhD thesis, Cardiff University, UK.

Alharbi, E A and Alsehaimi, A (2025) Machine learning model to predict the cooling load of mosque buildings during the design stage. International Journal of Construction Management, 25(8), pp. 965-979. ISSN 1562-3599

Alhasan, S; Amoudi, O; Tong, M and Kumar, B (2019) Effectiveness of adopting BIM on quantity surveying profession during the project life cycle. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Alhosani, Y (2017) An empirical investigation of the demographics of top management team (TMT) and its influence in forecasting organizational outcome in international architecture, engineering and construction (AEC) firms: A fuzzy set approach. DEng thesis, Ecole de Technologie Superieure, Canada.

Aliasgari, R; Fan, C; Li, X; Golabchi, A and Hamzeh, F (2024) MOCAP and ai-based automated physical demand analysis for workplace safety. Journal of Construction Engineering and Management, 150(7): 04024060, ISSN 0733-9364

Alipouri, Y; Bokharaeian, A and Monfared, E (2025) Construction labor activity recognition via an imu-implemented wristband. Journal of Construction Engineering and Management, 151(11): 04025182, ISSN 0733-9364

Aliu, J and Oke, A E (2023) Construction in the digital age: Exploring the benefits of digital technologies. Built Environment Project and Asset Management, 13(3), pp. 412-429. ISSN 2044-124X

Aljagoub, D (2025) Enhancing delamination detection and monitoring of concrete bridges through infrared thermography, deep learning, field data, and numerical simulations. PhD thesis, University of Delaware, USA.

Alkhard, A (2024) Leveraging digital asset management and meta-data integration for enhanced asset management. Construction Economics and Building, 24(3), pp. 76-94. ISSN 2204-9029

Allahaim, Fahad Saud Abdulaziz (2015) Improving cost contingency estimation for infrastructure projects based on the impact of cost overrun causes of similar projects – illustration using Saudi Arabia survey data. PhD thesis, University of Sydney, Australia.

Alleman, D and Lee, E B (2020) Mitigating the legal challenges of imposing disincentives on nonperforming transportation projects. Engineering, Construction and Architectural Management, 27(10), pp. 2859-2891. ISSN 0969-9988

Almohssen, Abdulaziz (2018) A new methodology for tracking the performance of subcontractors in the construction industry. PhD thesis, University of New South Wales, Australia.

Alnahari, Mohammed Saeed (2023) Exploring the potential of blockchain technology for improved management and safety of underground utilities. PhD thesis, Arizona State University, USA.

Alnaser, N W and Alnaser, W E (2022) Modelling the yield of 8.64 kw PV panels installed on a rooftop of a building in the Kingdom of Bahrain. Smart and Sustainable Built Environment, 11(1), pp. 162-174. ISSN 2046-6099

Alolote Ibim, A and Dimkpa, K (2022) Assessing the cost accuracy of electrical works towards sustainable procurement of building services. International Journal of Construction Management, 22(10), pp. 1974-1982. ISSN 1562-3599

Alqahtani, A and Whyte, A (2013) Artificial neural networks incorporating cost significant items towards enhancing estimation for (life-cycle) costing of construction projects. Construction Economics and Building, 13(3), pp. 51-64. ISSN 2204-9029

Alqahtani, A and Whyte, A (2016) Estimation of life-cycle costs of buildings: Regression vs artificial neural network. Built Environment Project and Asset Management, 6(1), pp. 30-43. ISSN 2044-124X

Alqahtani, A and Whyte, A (2016) Evaluation of non-cost factors affecting the life cycle cost: An exploratory study. Journal of Engineering, Design and Technology, 14(4), pp. 818-834.

Alruqi, W M (2019) Predicting construction safety performance. PhD thesis, University of Colorado at Boulder, USA.

Alshboul, O and Shehadeh, A (2026) Adaptive integration of BIM and Navisworks for real-time clash detection using the XGBoost algorithm. Journal of Construction Engineering and Management, 152(1): 04025232, ISSN 0733-9364

Alshboul, O; Shehadeh, A; Al-Kasasbeh, M; Al Mamlook, R E; Halalsheh, N and Alkasasbeh, M (2022) Deep and machine learning approaches for forecasting the residual value of heavy construction equipment: A management decision support model. Engineering, Construction and Architectural Management, 29(10), pp. 4153-4176. ISSN 0969-9988

Alshboul, O; Shehadeh, A and Tamimi, M (2025) Sustainability-focused pavement management under climate variability. Journal of Construction Engineering and Management, 151(7): 04025076, ISSN 0733-9364

Alsubaey, M H (2017) A hybrid machine learning and text-mining approach for the automated generation of early warnings in construction project management. PhD thesis, Cranfield University, UK.

Aluko, R O; Adenuga, O A; Kukoyi, P O; Soyingbe, A A and Oyedeji, J O (2016) Predicting the academic success of architecture students by pre-enrolment requirement: Using machine-learning techniques. Construction Economics and Building, 16(4), pp. 86-98. ISSN 2204-9029

Aluko, R O; Daniel, E I; Shamsideen Oshodi, O; Aigbavboa, C O and Abisuga, A O (2018) Towards reliable prediction of academic performance of architecture students using data mining techniques. Journal of Engineering, Design and Technology, 16(3), pp. 385-397. ISSN 1726-0531

Alvanchi, A; Lee, S and Abourizk, S (2012) Dynamics of working hours in construction. Journal of Construction Engineering and Management, 138(1), pp. 66-77. ISSN 0733-9364

Alwisy, A; Bu Hamdan, S; Barkokebas, B; Bouferguene, A and Al-Hussein, M (2019) A BIM-based automation of design and drafting for manufacturing of wood panels for modular residential buildings. International Journal of Construction Management, 19(3), pp. 187-205. ISSN 1562-3599

Alzubi, K. M.; Alaloul, W. S.; Al Salaheen, M.; Musarat, M. A.; Baarimah, A. O. and Mushtaha, A. W. (2025) Indoor construction productivity assessment using computer vision and mask region-based convolutional neural networks. Construction Innovation, 26(5), pp. 1523-1555. ISSN 1471-4175

Amadi, A and Higham, A (2016) Geotechnical characterization of cost overrun drivers in highway projects: Predicated on heterogeneous ground conditions in the Niger delta region of Nigeria. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Amini Khafri, Amin (2018) A framework for forecasting project estimate at completion using historical and current performance data. PhD thesis, University of Alberta, Canada.

Amirudin, R B (1998) The application of a knowledge-based engineering approach to the structural design of steel framed office buildings. PhD thesis, University of Reading, UK.

Ammar, T; Abdel-Monem, M and El-Dash, K (2025) Regression-based model predicting cost contingencies for road network projects. International Journal of Construction Management, 25(11), pp. 1273-1287. ISSN 1562-3599

Anagnostopoulos, I (2018) Generating as-is BIMs of existing buildings: from planar segments to spaces. PhD thesis, University of Cambridge, UK.

Anastasopoulos, P C; Haddock, J E and Peeta, S (2014) Cost overrun in public-private partnerships: Toward sustainable highway maintenance and rehabilitation. Journal of Construction Engineering and Management, 140(6): 4014018, ISSN 0733-9364

Andalib, M (2026) Predictive modelling for contract selection in construction through data mining and machine learning: Insights from agency theory. International Journal of Construction Education and Research, 22(1), pp. 138-163. ISSN 1557-8771

André, J P C G (2014) Determination of the main parameters affecting the performance of bridge falsework systems. PhD thesis, Oxford Brookes University, UK.

Antwi-Afari, M F; Li, H; Umer, W; Yu, Y and Xing, X (2020) Construction activity recognition and ergonomic risk assessment using a wearable insole pressure system. Journal of Construction Engineering and Management, 146(7): 04020077, ISSN 0733-9364

Anwer, S; Li, H; Umer, W; Antwi-Afari, M F; Mehmood, I; Yu, Y; Haas, C and Wong, A Y L (2023) Identification and classification of physical fatigue in construction workers using linear and nonlinear heart rate variability measurements. Journal of Construction Engineering and Management, 149(7): 04023057, ISSN 0733-9364

Apinayan, K.; Perera, B. A. K. S.; Weerasooriya, D. and Ranadewa, K. A. T. O. (2026) Adaptability of BIM technology for detailed cost estimation in Sri Lankan construction industry. Journal of Engineering, Design and Technology, 24(3), pp. 633-665. ISSN 1726-0531

Arab, M Z M (2011) A function-based cost model for early cost advice on new-build schools projects. PhD thesis, Heriot-Watt University, UK.

Arakawa Martins, L; Soebarto, V; Williamson, T and Pisaniello, D (2022) Personal thermal comfort models: A deep learning approach for predicting older people's thermal preference. Smart and Sustainable Built Environment, 11(2), pp. 245-270. ISSN 2046-6099

Arida, M A (2024) Enhancing thermal comfort in commercial buildings: Contributions of machine learning algorithms for optimizing predictive thermal comfort indices. PhD thesis, North Carolina Agricultural and Technical State University, USA.

Arif, F; Lodi, S H and Azhar, N (2015) Factors influencing accuracy of construction project cost estimates in Pakistan: Perception and reality. International Journal of Construction Management, 15(1), pp. 59-70. ISSN 1562-3599

Ariyachandra, M F (2021) Automating the generation of geometric information models to support digital twinning of existing rail infrastructure. PhD thesis, University of Cambridge, UK.

Arowoiya, V A; Oke, A E; Akanni, P O; Kwofie, T E and Enih, P I (2023) Augmented reality for construction revolution–analysis of critical success factors. International Journal of Construction Management, 23(11), pp. 1867-1874. ISSN 1562-3599

Asgari, S (2016) Modeling construction competitive bidding: An agent-based approach. PhD thesis, Columbia University, USA.

Asghari, V and Hsu, S C (2022) Upscaling complex project-level infrastructure intervention planning to network assets. Journal of Construction Engineering and Management, 148(1): 04021188, ISSN 0733-9364

Ashrafi, R M (1981) Risk analysis in management planning and project control: probabilistic techniques are applied to the estimation, planning, forecasting and control of large capital projects to ascertain and reduce the degree of inherent risk and uncertainty. PhD thesis, University of Bradford, UK.

Asiedu, R O; Frempong, N K and Nani, G (2016) Parametric time overrun estimation of building projects. Journal of Financial Management of Property and Construction, 21(3), pp. 253-268. ISSN 1366-4387

Asif, M (1988) Simple generic models for cost-significant estimating of construction project costs. PhD thesis, University of Dundee, UK.

Asmar, M E; Hanna, A S and Whited, G C (2011) New approach to developing conceptual cost estimates for highway projects. Journal of Construction Engineering and Management, 137(11), pp. 942-949. ISSN 0733-9364

Atherinis, D; Bakowski, B; Velcek, M and Moon, S (2018) Developing and laboratory testing a smart system for automated falsework inspection in construction. Journal of Construction Engineering and Management, 144(3): 04017119, ISSN 0733-9364

Atiq Ur Rehman, M; Chaabane, A and Khan, S A (2026) A novel decision support system for integrating supply chain and project management decisions to optimize multiple project performance: A case study in building renovation. International Journal of Construction Management, 26(1), pp. 29-53. ISSN 1562-3599

Attah, A (2019) The relationship between information quality and construction safety. PhD thesis, Walden University, USA.

Attalla, M and Hegazy, T (2003) Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression. Journal of Construction Engineering and Management, 129(4), pp. 405-411. ISSN 0733-9364

Attarzadeh, M; Nath, T and Tiong, R L K (2015) Identifying key factors for building information modelling adoption in Singapore. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(5), pp. 220-231. ISSN 17514304

Auchterlounie, A C (2004) A new quality theory for UK private housebuilding based on definable quality principles, impression management and the control of cognitive dissonance. PhD thesis, Heriot-Watt University, UK.

Auradkar, P K; Raykar, A; Agarwal, I; Sitaram, D and Manavalan R (2022) Accuracy assessment and performance analysis of raster to vector conversions on lulc data: India. Journal of Engineering, Design and Technology, 20(6), pp. 1787-1809. ISSN 1726-0531

Avci, A B (2026) Machine learning-based prediction of thermal comfort: Exploring building types, climate, ventilation strategies, and seasonal variations. Building Research & Information, 54(1), pp. 100-117. ISSN 0961-3218

Awad, A and Fayek, A R (2013) Adaptive learning of contractor default prediction model for surety bonding. Journal of Construction Engineering and Management, 139(6), pp. 694-704. ISSN 0733-9364

Awang, H and Wan Badaruzzaman, W H (2009) The bending behaviour of a 'reversed' profiled steel sheet dry board panel for application in a roofing system. Journal of Construction in Developing Countries, 14(2), pp. 21-35. ISSN 1823-6499

Awuku, B; Asa, E; Baffoe-Twum, E and Essegbey, A (2024) Conceptual cost estimation of highway bid items: a systematic literature review. Engineering, Construction and Architectural Management, 31(3), pp. 1187-1221. ISSN 0969-9988

Ayhan, B U and Tokdemir, O B (2020) Accident analysis for construction safety using latent class clustering and artificial neural networks. Journal of Construction Engineering and Management, 146(3): 04019114, ISSN 0733-9364

Ayhan, M (2019) Development of dispute prediction and resolution method selection models for construction disputes. PhD thesis, Middle East Technical University, Turkey.

Ayhan, M; Dikmen, I and Talat Birgonul, M (2021) Predicting the occurrence of construction disputes using machine learning techniques. Journal of Construction Engineering and Management, 147(4): 04021022, ISSN 0733-9364

Ayinla, K; Saka, A; Seidu, R and Madanayake, U (2023) The impact of artificial intelligence on construction costing practice. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Ayman Anwar, R (2022) Enhancing the integration of sustainability assessment within dynamic BIM enabled design projects. PhD thesis, Northumbria University, UK.

Azzouz, A (2018) Current perspectives and future directions of BIM assessment methods. PhD thesis, University of Bath, UK.

Baba, A (2013) Developing a decision support framework for low carbon housing design and delivery in the UK. PhD thesis, University of the West of England, Bristol, UK.

Baba, A; Mahjoubi, L; Olomoilaiye, P and Booth, C (2013) Decision support framework for low impact housing design in the UK. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Babalola, O and Adesanya, D A (2007) An evaluation of the level of accuracy of electrical services cost estimates in Nigeria. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Baby, S.; Talebi, S.; Lai, J. H. K.; Tien, P. W. and Kagioglou, M. M. (2026) Mitigating cost estimation challenges in bahrain's construction industry: A problem-solving approach. Built Environment Project and Asset Management, 16(3), pp. 542-560. ISSN 2044-124X

Baccarini, D (2004) Estimating project cost contingency: A model and exploration of research questions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Baccarini, D and Love, P E D (2014) Statistical characteristics of cost contingency in water infrastructure projects. Journal of Construction Engineering and Management, 140(3): 4013063, ISSN 0733-9364

Badalpur, M and Nurbakhsh, E (2021) An application of waspas method in risk qualitative analysis: A case study of a road construction project in Iran. International Journal of Construction Management, 21(9), pp. 910-918. ISSN 1562-3599

Bahadir, M (2025) Predicting construction project durations in Europe using regression analysis methodology. DEngr thesis, George Washington University, USA.

Baharfar, Y; Mohammadyan, M; Moattar, F; Nassiri, P and Behzadi, M H (2022) Indoor pm2.5 concentrations of pre-schools; determining the effective factors and model for prediction. Smart and Sustainable Built Environment, 11(4), pp. 1042-1059. ISSN 2046-6099

Bajaj, D; Oluwoye, J and Lenard, D (1997) An analysis of contractors' approaches to risk identification in New South Wales, Australia. Construction Management and Economics, 15(4), pp. 363-369. ISSN 01446193

Baker, T O (2021) An investigation into pricing anomalies and the influence of information processing constraints on forecasts derived from sports betting markets. PhD thesis, University of Southampton, UK.

Bakhshi Khayani, P (2011) A Bayesian model for controlling cost overrun in a portfolio of construction projects. PhD thesis, Northeastern University, USA.

Bakhtiari, S (2024) Multi-hazard risk assessment of the interconnected infrastructure systems. PhD thesis, University of Western Ontario, Canada.

Ballal, T M A (1999) The use of artificial neural networks for modelling buildability in preliminary structural design. PhD thesis, Loughborough University, UK.

Ballesteros-Pérez, P; Sanz-Ablanedo, E; Cerezo-Narváez, A; Lucko, G; Pastor-Fernández, A; Otero-Mateo, M and Contreras-Samper, J P (2020) Forecasting accuracy of in-progress activity duration and cost estimates. Journal of Construction Engineering and Management, 146(9), ISSN 0733-9364

Ballesteros-Pérez, P and Skitmore, M (2016) Estimating the number of new and repeated bidders in construction auctions. Construction Management and Economics, 34(12), pp. 919-934. ISSN 01446193

Ballesteros-Pérez, P; Skitmore, M; Das, R and Del Campo-Hitschfeld, M L (2015) Quick abnormal-bid-detection method for construction contract auctions. Journal of Construction Engineering and Management, 141(7): 4015010, ISSN 0733-9364

Banerjee, S (2007) Statistical, empirical and mechanistic fragility analysis of concrete bridges. PhD thesis, University of California, Irvine, USA.

Bangaru, S S (2021) Fatigue monitoring through wearable sensors for construction workers. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Bangaru, S S; Wang, C; Zhou, X; Jeon, H W and Li, Y (2020) Gesture recognition-based smart training assistant system for construction worker earplug-wearing training. Journal of Construction Engineering and Management, 146(12): 04020144, ISSN 0733-9364

Bao, S; Bu, H and Rui, N (2025) Computer vision-based recognition of spatial relevance between engineering vehicles and workers for monitoring struck-by accidents. Journal of Construction Engineering and Management, 151(11): 04025163, ISSN 0733-9364

Bapat, H; Sarkar, D and Gujar, R (2023) Application of multi-criteria decision making for evaluation of key performance indicators of integrated project delivery and BIM model for an infrastructure transportation project in Western India. International Journal of Construction Management, 23(12), pp. 2077-2086. ISSN 1562-3599

Barati, K; Shen, X; Li, N and Carmichael, D G (2022) Automatic mass estimation of construction vehicles by modeling operational and engine data. Journal of Construction Engineering and Management, 148(3): 4021208, ISSN 0733-9364

Barnes, N M L (1971) The design and use of experimental bills of quantities for civil engineering contracts. PhD thesis, University of Manchester, UK.

Barr, D W J (2004) The department of trade and industry key performance indicators: A critical appraisal. PhD thesis, University of Southampton, UK.

Barrientos-Orellana, A; Ballesteros-Pérez, P; Mora-Melia, D; González-Cruz, M C and Vanhoucke, M (2022) Stability and accuracy of deterministic project duration forecasting methods in earned value management. Engineering, Construction and Architectural Management, 29(3), pp. 1449-1469. ISSN 0969-9988

Bassioni, H; Emasry, M I; Ragheb, A M and Youssef, A A (2012) Time series analysis for the prediction of RC material components prices in Egypt. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Bastias, A (2006) Towards the application of learning systems for decision support in construction engineering and management. PhD thesis, University of Colorado at Boulder, USA.

Batarseh, Shadi (2024) Digital twin for digital asset management: Asset information model characteristics and digital capabilities for smart functions, sydney metro case study. PhD thesis, University of New South Wales, Australia.

Bates, W and Dawood, N N (1998) Development of a risk allocation strategy for construction in the process industry: A knowledge approach. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Bates, William (1999) A strategy for the development of a knowledge based system for predicting out-turn costs of heavy engineering works within a multi-national cost consultancy. PhD thesis, Teesside University, UK.

Batselier, J and Vanhoucke, M (2015) Empirical evaluation of earned value management forecasting accuracy for time and cost. Journal of Construction Engineering and Management, 141(11): 05015010, ISSN 0733-9364

Bavafa, M (2015) Enhancing information quality through building information modelling implementation within UK structural engineering organisations. PhD thesis, University of Salford, UK.

Bayram, S and Al-Jibouri, S (2016) Efficacy of estimation methods in forecasting building projects' costs. Journal of Construction Engineering and Management, 142(11): 05016012, ISSN 0733-9364

Bearup, W K (1995) An environment to support computer-assisted design review. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Bee-Hua, G (1999) An evaluation of the accuracy of the multiple regression approach in forecasting sectoral construction demand in Singapore. Construction Management and Economics, 17(2), pp. 231-241. ISSN 01446193

Bee-Hua, G (2000) Evaluating the performance of combining neural networks and genetic algorithms to forecast construction demand: The case of the Singapore residential sector. Construction Management and Economics, 18(2), pp. 209-217. ISSN 01446193

Beliveau, Y J; Michael Williams, J; Gerald King, M and Niles, A R (1995) Real-time position measurement integrated with CAD: Technologies and their protocols. Journal of Construction Engineering and Management, 121(4), pp. 346-354. ISSN 0733-9364

Bell, L C and McCullouch, B G (1988) Bar code applications in construction. Journal of Construction Engineering and Management, 114(2), pp. 263-278. ISSN 0733-9364

Benjamin, Neal B H (1969) Competitive bidding for building construction contracts. PhD thesis, Stanford University, USA.

Benjaoran, V; Dawood, N and Hobbs, B (2005) Flowshop scheduling model for bespoke precast concrete production planning. Construction Management and Economics, 23(1), pp. 93-105. ISSN 01446193

Bennett, J and Ormerod, R N (1984) Simulation applied to construction projects. Construction Management and Economics, 2(3), pp. 225-263. ISSN 01446193

Berawi, M A; Sari, M; Oktaviani, A D; Miraj, P; Susantono, B and Woodhead, R (2025) Impact of BIM and 3D printing technologies on production process and productivity of precast concrete in construction project. International Journal of Construction Management, 25(6), pp. 650-660. ISSN 1562-3599

Bernold, L E (2005) Automatic as-built generation with utility trenchers. Journal of Construction Engineering and Management, 131(6), pp. 740-747. ISSN 0733-9364

Bhargava, A (2009) A probabilistic evaluation of highway project costs. PhD thesis, Purdue University, USA.

Bhaurkar, V P and Thakur, A G (2019) Investigation of crack in beams using anti-resonance technique and FEA approach. Journal of Engineering, Design and Technology, 17(6), pp. 1266-1284. ISSN 1726-0531

Bi, L; Ren, B; Zhong, D and Hu, L (2015) Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a markov process. Journal of Construction Engineering and Management, 141(2): 04014076, ISSN 0733-9364

Birnie, J W (1993) A behavioural study using decision analysis of building cost prediction by chartered quantity surveyors. PhD thesis, Ulster University, UK.

Biswas, P K; Khan, S M; Piratla, K and Chowdhury, M (2023) Development and evaluation of statistical and machine-learning models for queue-length estimation for lane closures in freeway work zones. Journal of Construction Engineering and Management, 149(5): 04023023, ISSN 0733-9364

Bittner, Ksenia (2020) Building information extraction and refinement from vhr satellite imagery using deep learning techniques. PhD thesis, Osnabrück University, Germany.

Blackwood, D J; Sarkar, S and Price, A D F (1998) Modelling levels of accuracy in design cost estimation. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Blakey, L H (1990) Bar codes: Prescription for precision, performance, and productivity. Journal of Construction Engineering and Management, 116(3), pp. 468-479. ISSN 0733-9364

Blyth, K; Lewis, J and Kaka, A (2004) Predicting project and activity duration for buildings in the UK. Journal of Construction Research, 5(2), pp. 329-347. ISSN 1609-9451

Blyth, K A (2002) A computer model that forecasts the cash flow of building projects at the tender stage using stage payments. PhD thesis, University of Liverpool, UK.

Boo, J H S (2001) Improving the accuracy of approximate estimates of building projects. Building Research & Information, 29(4), pp. 312-318. ISSN 0961-3218

Bostan, B. B.; Çavka, H. B.; Citipitioglu, A. M. and Pehlivan, D. Z. (2026) Retrospective BIM performance analysis based on construction big data. Engineering, Construction and Architectural Management, 33(7), pp. 5991-6013. ISSN 0969-9988

Bourgeois, I.; Ferreira, V. and Rodrigues, H. (2026) From monitoring to forecasting: Predictive modelling of thermal-induced displacements in heritage masonry: The batalha monastery case study. International Journal of Building Pathology and Adaptation, 44(9), pp. 16-34. ISSN 2398-4708

Bourgeois, I.; Ferreira, V. and Rodrigues, H. (2026) From monitoring to forecasting: Predictive modelling of thermal-induced displacements in heritage masonry: The Batalha Monastery case study. International Journal of Building Pathology and Adaptation, 44(9), pp. 16-34. ISSN 2398-4708

Bourikas, L; Costanza, E; Gauthier, S; James, P A B; Kittley-Davies, J; Ornaghi, C; Rogers, A; Saadatian, E and Huang, Y (2018) Camera-based window-opening estimation in a naturally ventilated office. Building Research & Information, 46(2), pp. 148-16. ISSN 0961-3218

Boussabaine, A H; Kirkham, R J and Grew, R G (1999) Estimating the cost of energy usage in sport centres: A comparative modelling approach. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Boussabaine, A H; Thomas, R and Elhag, T M S (1999) Modelling cost-flow forecasting for water pipeline projects using neural networks. Engineering, Construction and Architectural Management, 6(3), pp. 213-224. ISSN 0969-9988

Brady, L and Hanmer-Dwight, R (2016) The management and control of energy at the design stage of buildings. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Bressan, Nicolò Maria (2024) VR as design management tool. PhD thesis, Università Iuav di Venezia, Italy.

Briggs, B (2021) An improved earned value management method integrating quality and safety. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Brown, B H J (1974) An econometric forecasting model for a segment of the construction market. PhD thesis, Oklahoma State University, USA.

Bugg, R; Collins, W and Gilbert, C (2018) Applying radio frequency identification tags to improve personnel safety in dredging construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Burleson, R C (1997) An analysis of multiskilled labor strategies in construction. PhD thesis, University of Texas at Austin, USA.

Bypaneni, S P K (2017) A Bayesian network-based decision framework for selecting project delivery methods in highway construction. PhD thesis, University of Kansas, USA.

Byrd, R H (1981) The mathematical modelling of the environmental performance of buildings as an aid in the design process. PhD thesis, Aston University, UK.

Cai, J (2020) Data-driven approach to holistic situational awareness in construction site safety management. PhD thesis, Purdue University, USA.

Cai, J; Yang, L; Zhang, Y; Li, S and Cai, H (2021) Multitask learning method for detecting the visual focus of attention of construction workers. Journal of Construction Engineering and Management, 147(7): 04021063, ISSN 0733-9364

Caldwell, Scott A (2024) Empirical decision-making tools as applied to seaports in the industry 4.0 paradigm. PhD thesis, Liverpool John Moores University, UK.

Calvetti, D (2021) Electronic productivity performance monitoring of construction workers. PhD thesis, Universidade do Porto, Portugal.

Candaş, A B and Tokdemir, O B (2022) Automated identification of vagueness in the FIDIC silver book conditions of contract. Journal of Construction Engineering and Management, 148(4): 04022007, ISSN 0733-9364

Cao, M T; Cheng, M Y and Wu, Y W (2015) Hybrid computational model for forecasting Taiwan construction cost index. Journal of Construction Engineering and Management, 141(4): 04014089, ISSN 0733-9364

Cao, S; Duan, H; Guo, S; Wu, J; Ai, T and Jiang, H (2024) BIM-based task planning method for wheeled-legged rebar binding robot. Architectural Engineering and Design Management, 20(3), pp. 656-672. ISSN 1745-2007

Catalina, A J (2016) Development of a statistical theory-based capital cost estimating methodology for light rail transit corridor evaluation under varying alignment characteristics. PhD thesis, University of Kentucky, USA.

Cebrat, K; Narożny, J; Baborska-Narozny, M and Smektała, M (2025) Modelling site-specific outdoor temperature for buildings in urban environments. Buildings & Cities, 6(1), pp. 490-510. ISSN 2632-6655

Chalhoub, J (2019) Benefits of using augmented reality in planning, construction and post-construction phases in specialty contracting. PhD thesis, Arizona State University, USA.

Chan, A P C; Chan, M W; Oppong, G D; Adabre, M A; Darko, A and Liu, W (2025) Developing a project surveillance system to monitor and control building projects: The case of Hong Kong. International Journal of Construction Management, 25(16), pp. 1952-1967. ISSN 1562-3599

Chan, Y K; Huang, C H; Chao Yi, N; Tseng, H H; Lin, C H; Chang, R F and Chan, M H (2026) A study of detection systems for safety guardrails at construction sites: Innovative applications of image processing and perspective correction. Journal of Construction Engineering and Management, 152(4): 04026018, ISSN 0733-9364

Chan, A P C; Chiang, Y H; Mak, S W K; Choy, L H T and James, M W W (2006) Forecasting the demand for construction skills in Hong Kong. Construction Innovation, 6(1), pp. 3-19. ISSN 1471-4175

Chan, C T W (2012) The principal factors affecting construction project overhead expenses: An exploratory factor analysis approach. Construction Management and Economics, 30(10), pp. 903-914. ISSN 01446193

Chan, D W M (1998) Modelling construction durations for public housing projects. PhD thesis, University of Hong Kong, Hong Kong.

Chan, T-W C (2007) Improving the estimation of project overheads in construction companies in Hong Kong. PhD thesis, Loughborough University, UK.

Chang, H-H (2002) N-dimensional construction management information system (NDCON): System design and performance modeling through the zero -buffered project management philosophy. PhD thesis, Columbia University, USA.

Changwang, S; Shaowei, H; Haifen, Z; Fuqu, P; Changxi, S and Hao, Q (2024) Automatic detection of water supply pipe defects based on underwater image enhancement and improved yolox. Journal of Construction Engineering and Management, 150(10): 04024134, ISSN 0733-9364

Chao, L C (2010) Estimating project overheads rate in bidding: DSS approach using neural networks. Construction Management and Economics, 28(3), pp. 287-299. ISSN 1466433X

Chao, L C and Chien, C F (2009) Estimating project S-curves using polynomial function and neural networks. Journal of Construction Engineering and Management, 135(3), pp. 169-177. ISSN 0733-9364

Chau, A D (2018) Conceptual cost estimation decision support system in university construction projects. PhD thesis, University of Alabama, USA.

Che Haron, R (2017) Systems thinking paradigm in construction cost estimating reliability. PhD thesis, University of Reading, UK.

Chen, J. H.; Shen, L. and Yu, T. (2026) Predicting manpower allocation for landscape construction projects using xgboost and shap. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988

Chen, J. H.; Shen, L. and Yu, T. (2026) Predicting manpower allocation for landscape construction projects using xgboost and shap. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988

Chen, C; Tang, L; Hancock, C M and Zhang, P (2019) Development of low-cost mobile laser scanning for 3D construction indoor mapping by using inertial measurement unit, ultra-wide band and 2D laser scanner. Engineering, Construction and Architectural Management, 26(7), pp. 1367-1386. ISSN 0969-9988

Chen, F-C (2021) Deep learning studies for vision-based condition assessment and attribute estimation of civil infrastructure systems. PhD thesis, Purdue University, USA.

Chen, H and Chan, I Y S (2024) Effects of automation and transparency on human psychophysiological states and perceived system performance in construction safety automation: An electroencephalography experiment. Journal of Construction Engineering and Management, 150(7): 04024055, ISSN 0733-9364

Chen, H; Feng, Z; Liu, Y; Chen, B; Deng, T; Qin, Y and Xu, W (2023) Multiobjective optimization of a 3D laser scanning scheme for engineering structures based on rf-NSGA-II. Journal of Construction Engineering and Management, 149(2): 4022169, ISSN 0733-9364

Chen, H L (2009) Model for predicting financial performance of development and construction corporations. Journal of Construction Engineering and Management, 135(11), pp. 1190-1200. ISSN 0733-9364

Chen, H L; O'Brien, W J and Herbsman, Z J (2005) Assessing the accuracy of cash flow models: The significance of payment conditions. Journal of Construction Engineering and Management, 131(6), pp. 669-676. ISSN 0733-9364

Chen, H-L (2002) Development of a systematic integration approach for multi-level cost flow prediction and management. PhD thesis, University of Florida, USA.

Chen, J H; Hayati, D W; Su, Y M; Wijatmiko, I and Purnamasari, R (2019) Improving preliminary cost estimation in Indonesia using support vector regression. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(1), pp. 25-33. ISSN 17514304

Chen, J H; Yang, L R; Chen, W H and Chang, C K (2008) Case-based allocation of onsite supervisory manpower for construction projects. Construction Management and Economics, 26(8), pp. 805-814. ISSN 01446193

Chen, Q; Long, D; Wang, S; Chen, Q and Yuan, B (2025) Real-time detection of personal protective equipment violations for construction workers using semisupervised learning and video clips. Journal of Construction Engineering and Management, 151(3): 04024213, ISSN 0733-9364

Chen, Q; Reichard, G and Beliveau, Y (2010) Object model framework for interface modeling and IT-oriented interface management. Journal of Construction Engineering and Management, 136(2), pp. 187-198. ISSN 0733-9364

Chen, Qian (2020) A systematic approach to enabling digital supply chain coordination in construction projects. PhD thesis, ETH Zürich, Switzerland.

Chen, W; Hu, C; Zou, R; Yang, Q; Chen, Y; Xing, J and Mou, C (2025) Evolutionary method of digital twin model for building physics mechanism. Architectural Engineering and Design Management, 21(2), pp. 356-378. ISSN 1745-2007

Chen, Xinyu (2025) Multimodal data fusion-based ergonomic assessment method for construction workers. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Chen, Y; Chen, S; Hu, C; Jin, L and Zheng, X (2020) Novel probabilistic cost estimation model integrating risk allocation and claim in hydropower project. Journal of Construction Engineering and Management, 146(8): 04020092, ISSN 0733-9364

Chen, Y and Yang, Z (2018) Validity and reliability of rating scales for subjective breathing resistance of wearing respirators. Journal of Engineering, Design and Technology, 16(6), pp. 837-849. ISSN 1726-0531

Chen, Z; Li, T; Qin, L and Jiang, Y (2025) Vision-guided autonomous block loading in a dual-robot collaborative handling framework. Journal of Construction Engineering and Management, 151(5): 04025035, ISSN 0733-9364

Cheng, M. Y.; Khitam, A. F. K.; Vu, Q. T. and Widjaja, D. D. (2026) Satellite-inspired time-frequency deep learning for predicting and assessing financial health in general contractors. Journal of Construction Engineering and Management, 152(8): 04026120, ISSN 0733-9364

Cheng, M Y; Vu, Q T; Dessalegn, M and Chen, J H (2025) Time-dependent rebar price prediction for procurement decision-making using bio-optimized deep machine learning. Engineering, Construction and Architectural Management, 32(12), pp. 7938-7971. ISSN 0969-9988

Cheng, E W L; Li, H and Fox, P (2007) Job performance dimensions for improving final project outcomes. Journal of Construction Engineering and Management, 133(8), pp. 592-599. ISSN 0733-9364

Cheng, J; Proverbs, D G and Oduoza, C F (2006) The satisfaction levels of UK construction clients based on the performance of consultants: Results of a case study. Engineering, Construction and Architectural Management, 13(6), pp. 567-583. ISSN 0969-9988

Cheng, J C P; Chen, K and Chen, W (2020) State-of-the-art review on mixed reality applications in the AECO industry. Journal of Construction Engineering and Management, 146(2): 03119009, ISSN 0733-9364

Cheng, M-Y (1992) Automated site layout of temporary construction facilities using geographic information systems (GIS). PhD thesis, University of Texas at Austin, USA.

Cheng, Y M; Yu, C H and Wang, H T (2011) Short-interval dynamic forecasting for actual S-curve in the construction phase. Journal of Construction Engineering and Management, 137(11), pp. 933-941. ISSN 0733-9364

Cheung, F K T (2005) Development and testing of a method for forecasting prices of multi-storey buildings during the early design stage: The storey enclosure method revisited. PhD thesis, Queensland University of Technology, Australia.

Cheung, F K T and Skitmore, M (2006) A modified storey enclosure model. Construction Management and Economics, 24(4), pp. 391-405. ISSN 01446193

Cheung, F K T; Wong, M W L and Skitmore, M (2008) A study of clients' and estimators' tolerance towards estimating errors. Construction Management and Economics, 26(4), pp. 349-362. ISSN 1466433X

Cheung, S-O (1998) Project dispute resolution satisfaction of construction clients in Hong Kong. PhD thesis, University of Wolverhampton, UK.

Ching-Lung, F (2024) Using convolutional neural networks to identify illegal roofs from unmanned aerial vehicle images. Architectural Engineering and Design Management, 20(2), pp. 390-410. ISSN 1745-2007

Cho, C; Kim, K; Park, J and Cho, Y K (2018) Data-driven monitoring system for preventing the collapse of scaffolding structures. Journal of Construction Engineering and Management, 144(8): 04018077, ISSN 0733-9364

Cho, N (2020) Using industry data to make an impact on construction practices over the project lifecycle. PhD thesis, Arizona State University, USA.

Cho, Sung Eun (2025) Machine learning approaches for improving construction materials and pavement systems. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Cho, Y; Wang, C and Zhuang, Z (2013) Framework for empirical process to improve nonnuclear gauge performance in hot-mix asphalt pavement construction. Journal of Construction Engineering and Management, 139(6), pp. 601-610. ISSN 0733-9364

Cho, Y-K (2000) Human-assisted rapid workspace modeling for construction equipment operations. PhD thesis, University of Texas at Austin, USA.

Choi, B; Lee, H S; Park, M; Cho, Y K and Kim, H (2014) Framework for work-space planning using four-dimensional BIM in construction projects. Journal of Construction Engineering and Management, 140(9): 04014041, ISSN 0733-9364

Choi, J (2006) Quantifying the effects of interference through use of an alternative method of productivity estimation. PhD thesis, University of Florida, USA.

Chokwitthaya, C (2020) A framework for augmenting building performance models using machine learning and immersive virtual environment. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Chong, H Y; Wang, T; Lee, C Y; Goh, C S and Li, S (2026) Integrating BIM, ar, GPS, and 5g for real-time construction management: Application to water infrastructure projects. Journal of Construction Engineering and Management, 152(5): 05026001, ISSN 0733-9364

Chong, W K O (2005) Construction production rate information system for highway projects. PhD thesis, University of Texas at Austin, USA.

Chong, W-h B (2016) A process-data supported input-output framework for delineating the embodied emissions of Hong Kong construction industry. PhD thesis, University of Hong Kong, Hong Kong.

Chou, J. S.; Yeh, P. C.; Liu, C. Y. and Chen, K. J. (2026) Improving detection of pollution fee declarations for environmental policy compliance through metaheuristic-optimized ensemble learning. Engineering, Construction and Architectural Management, 33(7), pp. 5820-5848. ISSN 0969-9988

Chowdary, B V and Jaglal, D (2023) 3D CAD model reconstruction and fast prototyping of rotational parts: A reverse engineering approach. Journal of Engineering, Design and Technology, 21(5), pp. 1520-1544. ISSN 1726-0531

Chui, K W (2010) Comparison of construction labor productivity between U.S. and China: Using on-site productivity measurement methods. PhD thesis, University of Kansas, USA.

Chuing, L S (2015) Modelling capability-based risk assessment for international construction project ventures. PhD thesis, University of Malaya, Malaysia.

Chung, T H; Abraham, D M and Gokhale, S B (2004) Decision support system for microtunneling applications. Journal of Construction Engineering and Management, 130(6), pp. 835-843. ISSN 0733-9364

Coffie, G H (2018) Development of a cost-predicting model for construction projects in Ghana. PhD thesis, University of Johannesburg, South Africa.

Collins, W and Redden, L (2021) Improving student’s estimating abilities through experiential learning. International Journal of Construction Education and Research, 17(2), pp. 117-132. ISSN 1557-8771

Commuri, S; Mai, A T and Zaman, M (2011) Neural network-based intelligent compaction analyzer for estimating compaction quality of hot asphalt mixes. Journal of Construction Engineering and Management, 137(9), pp. 634-644. ISSN 0733-9364

Conteh, Augustine (2023) Values of real assets: Focus on infrastructure and housing in Australia. PhD thesis, Griffith University, Australia.

Corbett, P and Rowley, P (1999) The use of bcis elemental cost data by quantity surveyors as part of cost planning techniques: The practitioners' perspective. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Crandell, D (2018) Enhancing traditional earned value management with three-point estimates to produce probability based performance forecasts and contingency funding projections for engineering-construction projects. DEngr thesis, George Washington University, USA.

Creedy, G D (2006) Risk factors leading to cost overrun in the delivery of highway construction projects. PhD thesis, Queensland University of Technology, Australia.

Crompton, L (2016) A standardised incorporated partnering model for the UK construction industry. PhD thesis, University of Central Lancashire, UK.

Cruywagen, J H H (2015) Towards the establishment of a relevant tender price index for the South African building industry. PhD thesis, University of Pretoria, South Africa.

Cuciniello, G; Inzerillo, G; Corazziari, L; Ciampini, A; Degni, R; Torresi, M and Leandri, P (2023) Modeling the tire-pavement noise as a regression function of speed, mixture properties, and age of the layer. Journal of Construction Engineering and Management, 149(9): 04023080, ISSN 0733-9364

Cui, B; Wang, C; Li, Y; Li, H; Li, C and Cui, B (2024) Image enhancement-based detection of concrete cracks under turbid water bodies. Architectural Engineering and Design Management, 20(6), pp. 1687-1708. ISSN 1745-2007

Cusack, M M (1981) Time cost models: their use in decision making in the construction industry, with particular reference to the use of the microcomputer. PhD thesis, University of Bath, UK.

Dada, J O and Musa, N A (2016) Key factors affecting the competence of quantity surveyors: Evidence from construction industry stakeholders in Nigeria. Journal of Engineering, Design and Technology, 14(3), pp. 461-474.

Dai, F (2010) Applied photogrammetry for 3D modeling, quantity surveying, and augmented reality in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Dai, F and Lu, M (2010) Assessing the accuracy of applying photogrammetry to take geometric measurements on building products. Journal of Construction Engineering and Management, 136(2), pp. 242-250. ISSN 0733-9364

Dai, F; Rashidi, A; Brilakis, I and Vela, P (2013) Comparison of image-based and time-of-flight-based technologies for three-dimensional reconstruction of infrastructure. Journal of Construction Engineering and Management, 139(1), pp. 69-79. ISSN 0733-9364

Dallasega, P; Schulze, F and Revolti, A (2023) Augmented reality to overcome visual management implementation barriers in construction: A mep case study. Construction Management and Economics, 41(3), pp. 232-255. ISSN 01446193

Damnjanovic, I (2006) A risk-based approach to modeling life-cycle costs associated with warranty specifications for transportation infrastructure. PhD thesis, University of Texas at Austin, USA.

Dandan, T H; Sweis, G; Sukkari, L S and Sweis, R J (2020) Factors affecting the accuracy of cost estimate during various design stages. Journal of Engineering, Design and Technology, 18(4), pp. 787-819. ISSN 1726-0531

Daniel, C and Neufville, E K (2025) An autogluon-enabled robust machine learning model for concrete tensile and compressive strength forecast. International Journal of Construction Management, 25(13), pp. 1636-1647. ISSN 1562-3599

Darko, A; Glushakova, I; Boateng, E B and Chan, A P C (2023) Using machine learning to improve cost and duration prediction accuracy in green building projects. Journal of Construction Engineering and Management, 149(8): 04023061, ISSN 0733-9364

Das, S (2009) Comprehensive maintainability scoring system (COMASS) for commercial buidings in tropical climate of Singapore. PhD thesis, National University of Singapore, Singapore.

David, D D (2007) Numerical platform to validate resistivity testing for NDE of civil engineering structures. PhD thesis, Wayne State University, USA.

Davis, W J (1997) An evaluation of life cycle factors for urban arterial roadways. PhD thesis, Georgia Institute of Technology, USA.

Davis II, D C E (2023) Algorithmic design in recommender systems: Expanding DBE participation in the U.S. construction industry. DBA thesis, University of South Florida, USA.

Dawood, N N and Bates, W (1998) Forecasting indices for construction activities in the heavy civil engineering industry: A joint approach methodology. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Dawood, N N and Neale, R H (1993) Forecasting the sales of precast concrete building products. Construction Management and Economics, 11(2), pp. 81-98. ISSN 01446193

De Azevedo, R C; De Oliveira Lacerda, R T; Ensslin, L; Jungles, A E and Ensslin, S R (2013) Performance measurement to aid decision making in the budgeting process for apartment-building construction: Case study using MCDA-c. Journal of Construction Engineering and Management, 139(2), pp. 225-235. ISSN 0733-9364

De Lapp, J A; Ford, D N; Bryant, J A and Horlen, J (2004) Impacts of CAD on design realization. Engineering, Construction and Architectural Management, 11(4), pp. 284-291. ISSN 0969-9988

Deepa, G; Niranjana, A J and Balu, A S (2025) A hybrid machine learning approach for early cost estimation of pile foundations. Journal of Engineering, Design and Technology, 23(1), pp. 306-322. ISSN 1726-0531

Defoe, P S (2018) The consideration of trees in rights of light cases part 2. International Journal of Building Pathology and Adaptation, 36(3), pp. 318-332. ISSN 23984708

Delghust, M; Roelens, W; Tanghe, T; De Weerdt, Y and Janssens, A (2015) Regulatory energy calculations versus real energy use in high-performance houses. Building Research & Information, 43(6), pp. 675-690. ISSN 0961-3218

Deng, H; Hong, H; Luo, D; Deng, Y and Su, C (2020) Automatic indoor construction process monitoring for tiles based on BIM and computer vision. Journal of Construction Engineering and Management, 146(1): 04019095, ISSN 0733-9364

Deng, T; Sharafat, A; Lee, S and Seo, J (2024) Automatic vision-based dump truck productivity measurement based on deep-learning illumination enhancement for low-visibility harsh construction environment. Journal of Construction Engineering and Management, 150(11): 04024154, ISSN 0733-9364

Deshapriya, L A M; Perera, B A K S; Ilangakoon, I W M A D and Weerasooriya, D (2025) Management of adverse effects of construction digitalization on the quantity surveying key roles: A qualitative Delphi study. Journal of Engineering, Design and Technology, 23(6), pp. 1815-1837. ISSN 1726-0531

Deshpande, S D (1988) Some facility planning techniques for construction site layouts. PhD thesis, Indian Institute of Technology Delhi, India.

Dias Barkokebas, R and Li, X (2021) Use of virtual reality to assess the ergonomic risk of industrialized construction tasks. Journal of Construction Engineering and Management, 147(3): 04020183, ISSN 0733-9364

Dikmen, I; Birgonul, M T; Ozorhon, B and Sapci, N E (2010) Using analytic network process to assess business failure risks of construction firms. Engineering, Construction and Architectural Management, 17(4), pp. 369-386. ISSN 0969-9988

Din, A (2020) Accounting for carbon impacts in buildings: a rating procedure. PhD thesis, London Metropolitan University, UK.

Dinesh, C P; Bari, A U; Dissanayake, R P G and Tamura, M (2013) Detecting and assessment of tsunami building damage using high-resolution satellite images with GIS data. International Journal of Disaster Resilience in the Built Environment, 4(2), pp. 132-144. ISSN 1759-5916

Dissanayake, N; Xia, B; Skitmore, M; Trigunarsyah, B and Menadue, V (2026) Developing a generic fuzzy multi-attribute analysis model for EPC contractor selection. Built Environment Project and Asset Management, 16(1), pp. 1-19. ISSN 2044-124X

Distefano, M J and O'Brien, W J (2009) Comparative analysis of infrastructure assessment methodologies at the small unit level. Journal of Construction Engineering and Management, 135(2), pp. 96-107. ISSN 0733-9364

Dmaidi, N (1995) Simplified estimating and control procedures for the offshore oil construction industry. PhD thesis, University of Dundee, UK.

Doğan, S Z (2005) Using machine learning techniques for early cost prediction of structural systems of buildings. PhD thesis, Izmir Institute of Technology, Turkey.

Dorward, D R (2006) The effect of selected output modifications on facilitating the assessment of PDM schedules. PhD thesis, Indiana State University, USA.

Dowse, G (2003) Qualitative residential market forecasts: The Auckland experience. Journal of Financial Management of Property and Construction, 8(3), pp. 193-201. ISSN 1366-4387

Doyle, A and Hughes, W P (2000) The influence of project complexity on estimating accuracy. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Dozzi, S P; Abourizk, S M and Schroeder, S L (1996) Utility-theory model for bid markup decisions. Journal of Construction Engineering and Management, 122(2), pp. 119-124. ISSN 0733-9364

Du, J; Kim, B C and Zhao, D (2016) Cost performance as a stochastic process: EAC projection by Markov chain simulation. Journal of Construction Engineering and Management, 142(6): 04016009, ISSN 0733-9364

Duan, P; Zhou, J and Tao, S (2023) Risk events recognition using smartphone and machine learning in construction workers' material handling tasks. Engineering, Construction and Architectural Management, 30(8), pp. 3562-3582. ISSN 0969-9988

Duan, P; Fu, X; Guo, H; Guo, P and Zhou, J (2025) Using graph attention network for causal reasoning of construction safety accidents. Journal of Construction Engineering and Management, 151(11): 04025167, ISSN 0733-9364

Dubler, C R (2011) Evaluating waste associated with building information exchange using lean theory. PhD thesis, Pennsylvania State University, USA.

Dudhee, V and Vukovic, V (2023) Building information model visualisation in augmented reality. Smart and Sustainable Built Environment, 12(4), pp. 919-934. ISSN 2046-6099

Duffy, G A; Oberlender, G D and Seok Jeong, D H (2011) Linear scheduling model with varying production rates. Journal of Construction Engineering and Management, 137(8), pp. 574-582. ISSN 0733-9364

Dursun, O and Stoy, C (2016) Conceptual estimation of construction costs using the multistep ahead approach. Journal of Construction Engineering and Management, 142(9): 04016038, ISSN 0733-9364

Dutta, A (2020) An in-depth investigation of the effects of work-related factors on the development of knee musculoskeletal disorders among construction roofers. PhD thesis, West Virginia University, USA.

Duvel, C S (1999) Establishing rule-based models to implement workflow within construction organizations. PhD thesis, University of Florida, USA.

Duzkale, A K (2013) Reducing uncertainty in bid preparation phase of cost estimating for structural steel. PhD thesis, Catholic University of America, USA.

Duzkale, A K and Lucko, G (2016) Exposing uncertainty in bid preparation of steel construction cost estimating: I. Conceptual framework and qualitative C-I-V-I-L classification. Journal of Construction Engineering and Management, 142(10): 04016049, ISSN 0733-9364

Duzkale, A K and Lucko, G (2016) Exposing uncertainty in bid preparation of steel construction cost estimating: II. Comparative analysis and quantitative C-I-V-I-L classification. Journal of Construction Engineering and Management, 142(10): 04016050, ISSN 0733-9364

Dyer, B; Goodrum, P M and Viele, K (2012) Effects of omitted variable bias on construction real output and its implications on productivity trends in the United States. Journal of Construction Engineering and Management, 138(4), pp. 558-566. ISSN 0733-9364

Dzokoto, F K (2016) Information behaviour of construction project actors. PhD thesis, Loughborough University, UK.

Economou, G S (1973) Sales forecasting in a sector of the construction industry: A statistical and econometric approach. PhD thesis, University of Manchester, UK.

Edirisinghe, R and Gunathilake, L (2025) IoT-based smart vest for heat stress management in construction. International Journal of Construction Management, 25(16), pp. 2137-2149. ISSN 1562-3599

Edwards, D J; Cabahug, R R and Nicholas, J (2003) The impact of training and education characteristics upon plant operator maintenance proficiency. Journal of Engineering, Design and Technology, 1(2), pp. 119-134. ISSN 1726-0531

Edwards, D J and Holt, G D (2001) Predicting construction plant maintenance expenditure. Building Research & Information, 29(6), pp. 417-427. ISSN 0961-3218

Edwards, D J; Yang, J; Cabahug, R and Love, P E D (2005) Intelligence and maintenance proficiency: An examination of plant operators. Construction Innovation, 5(4), pp. 243-254. ISSN 1471-4175

Edwards, D J; Yang, J; Wright, B C and Love, P E D (2007) Establishing the link between plant operator performance and personal motivation. Journal of Engineering, Design and Technology, 5(2), pp. 173-187. ISSN 1726-0531

Egbu, C O; Young, B A and Torrance, V B (1998) Planning and control processes and techniques for refurbishment management. Construction Management and Economics, 16(3), pp. 315-325. ISSN 01446193

Egwim, C N; Alaka, H; Egunjobi, O O; Gomes, A and Mporas, I (2024) Comparison of machine learning algorithms for evaluating building energy efficiency using big data analytics. Journal of Engineering, Design and Technology, 22(4), pp. 1325-1350. ISSN 1726-0531

Egwim, C N; Alaka, H; Pan, Y; Balogun, H; Ajayi, S; Hye, A and Egunjobi, O O (2025) Ensemble of ensembles for fine particulate matter pollution prediction using big data analytics and IoT emission sensors. Journal of Engineering, Design and Technology, 23(2), pp. 640-665. ISSN 1726-0531

Eizak Shiri, F (2015) Planning intentionality and its implications for project planned time. PhD thesis, University of Manchester, UK.

Ekstrom, M A (2002) Accounting for rater credibility when evaluating construction industry service providers. PhD thesis, Stanford University, USA.

El Sawalhi, N I H (2007) Developing a model for construction contractors pre-qualification in the Gaza Strip and West Bank. PhD thesis, University of Salford, UK.

El-Adaway, I H; Ali, G G; Abotaleb, I S and Barber, H M (2020) Studying the relationship between stock prices of publicly traded US construction companies and gross domestic product: Preliminary step toward construction-economy nexus. Journal of Construction Engineering and Management, 146(1): 04019087, ISSN 0733-9364

El-Omari, S and Moselhi, O (2009) Data acquisition from construction sites for tracking purposes. Engineering, Construction and Architectural Management, 16(5), pp. 490-503. ISSN 0969-9988

El-Rayes, K and Hyari, K (2005) Conlight: Lighting design model for nighttime highway construction. Journal of Construction Engineering and Management, 131(4), pp. 467-476. ISSN 0733-9364

El-Samadony, A A E-Y (1986) Development of an improved construction bidding model incorporating multiple objective functions. PhD thesis, University of Leeds, UK.

El-Sawalhi, N; Eaton, D and Rustom, R (2008) Forecasting contractor performance using a neural network and genetic algorithm in a pre-qualification model. Construction Innovation, 8(4), pp. 280-298. ISSN 1471-4175

ElAlem, M A; Mahdi, I M; Mohamadien, H A and Hosny, S (2025) Forecasting scope creep in Egyptian construction projects: An evaluation using artificial neural network (ANN) and random forest models. International Journal of Construction Management, 25(16), pp. 2082-2101. ISSN 1562-3599

Elavaar Kuzhali S and Pushpa M K, P (2024) Adaptive deep learning for deep COVID-19 diagnosis. Journal of Engineering, Design and Technology, 22(3), pp. 763-794. ISSN 1726-0531

Elgendi, E M O (2016) An automated dynamic site layout planning system: a case study of Egypt. PhD thesis, University of Salford, UK.

Elghaish, F; Matarneh, S; Abdellatef, E; Rahimian, F; Hosseini, M R and Farouk Kineber, A (2025) Multi-layers deep learning model with feature selection for automated detection and classification of highway pavement cracks. Smart and Sustainable Built Environment, 14(2), pp. 511-535. ISSN 2046-6099

Elghaish, F; Talebi, S; Abdellatef, E; Matarneh, S T; Hosseini, M R; Wu, S; Mayouf, M; Hajirasouli, A and Nguyen, T Q (2022) Developing a new deep learning CNN model to detect and classify highway cracks. Journal of Engineering, Design and Technology, 20(4), pp. 993-1014. ISSN 1726-0531

Elhag, T M S (2004) Tender price modelling: artificial neural networks and regression techniques. PhD thesis, University of Liverpool, UK.

Elhag, T M S and Boussabaine, A H (1998) An artificial neural system for cost estimation of construction projects. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Elkholosy, H; Ead, R; Hammad, A and AbouRizk, S (2024) Data mining for forecasting labor resource requirements: A case study of project management staffing requirements. International Journal of Construction Management, 24(5), pp. 561-572. ISSN 1562-3599

Elmousalami, H H; Elyamany, A H and Ibrahim, A H (2018) Predicting conceptual cost for field canal improvement projects. Journal of Construction Engineering and Management, 144(11): 04018102, ISSN 0733-9364

Emam, H (2021) Optimising project controls for construction using BIM and Big Data Analytics. PhD thesis, University of Bolton, UK.

Ensafi, Mahnaz (2022) Work order prioritization using neural networks to improve building operation. PhD thesis, Virginia Tech, USA.

Enshassi, A; Mohamed, S and Abdel-Hadi, M (2013) Factors affecting the accuracy of pre-tender cost estimates in the Gaza Strip. Journal of Construction in Developing Countries, 18(1), pp. 73-94. ISSN 1823-6499

Enshassi, A; Mohamed, S and Madi, I (2005) Factors affecting accuracy of cost estimation of building contracts in the Gaza Strip. Journal of Financial Management of Property and Construction, 10(2), pp. 115-125. ISSN 1366-4387

Erkan, I (2020) A system proposal for rapid detecting of anthropometric data and affecting design strategies. Journal of Engineering, Design and Technology, 18(6), pp. 1793-1822. ISSN 1726-0531

Eslamirad, N; Malekpour Kolbadinejad, S; Mahdavinejad, M and Mehranrad, M (2020) Thermal comfort prediction by applying supervised machine learning in green sidewalks of Tehran. Smart and Sustainable Built Environment, 9(4), pp. 361-374. ISSN 2046-6099

Esmaeili, I; Poças Martins, J and Castro, J M (2026) Computer vision-based CAD to BIM design change management: Case of building's lightings. International Journal of Construction Management, 26(2), pp. 234-255. ISSN 1562-3599

Evans, R C (2002) Dynamic cash flow forecasting model for construction contractors. PhD thesis, University of Liverpool, UK.

Evans, R C and Kaka, A P (1998) Analysis of the accuracy of standard/average value curves using food retail building projects as case studies. Engineering, Construction and Architectural Management, 5(1), pp. 58-67. ISSN 0969-9988

Evans, R C; Kaka, A P and Lewis, J (1997) Adopting a semi-ideographic approach to cash flow forecasting. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Everett, J G and Farghal, S H (1997) Data representation for predicting performance with learning curves. Journal of Construction Engineering and Management, 123(1), pp. 46-52. ISSN 0733-9364

Faircloth, Adam D (2022) Development of a non-destructive evaluation system for mass timber panels. MPhil thesis, Griffith University, Australia.

Fan, C L (2026) Crack identification and severity analysis via computer vision: Comparative study of rgb and grayscale imagery. Journal of Construction Engineering and Management, 152(3): 04026004, ISSN 0733-9364

Fan, S. L.; Lu, S. M.; Recha, F.; Ong, W. S. and Tseng, T. S. (2026) Automatic BIM-based formwork quantification system. Journal of Construction Engineering and Management, 152(7): 04026082, ISSN 0733-9364

Fan, C L (2025) Evaluation model for crack detection with deep learning: Improved confusion matrix based on linear features. Journal of Construction Engineering and Management, 151(3): 04024077, ISSN 0733-9364

Fan, X (2024) Artificial intelligence aided resilient and sustainable water infrastructure systems. PhD thesis, Case Western Reserve University, USA.

Fang, Y; Cho, Y K; Zhang, S and Perez, E (2016) Case study of BIM and cloud-enabled real-time RFID indoor localization for construction management applications. Journal of Construction Engineering and Management, 142(7): 5016003, ISSN 0733-9364

Farghal, S H and Everett, J G (1997) Learning curves: Accuracy in predicting future performance. Journal of Construction Engineering and Management, 123(1), pp. 41-45. ISSN 0733-9364

Farzaneh, A (2019) Development of BIM-BEM framework to support the design process. DEng thesis, Ecole de Technologie Superieure, Canada.

Farzin, A; Ghazi, M; Sotoodeh, A F and Nikian, M (2021) Economic optimization of heat exchanger networks based on geometric parameters using hybrid genetic-particle swarm algorithm technique. Journal of Engineering, Design and Technology, 19(4), pp. 989-1015. ISSN 1726-0531

Fateminia, Seyed Hamed (2023) Determining and managing contingency reserve throughout the lifecycle of construction projects. PhD thesis, University of Alberta, Canada.

Fayek, A R and Oduba, A (2005) Predicting industrial construction labor productivity using fuzzy expert systems. Journal of Construction Engineering and Management, 131(8), pp. 938-941. ISSN 0733-9364

Fazeli, A; Dashti, M S; Jalaei, F and Khanzadi, M (2021) An integrated BIM-based approach for cost estimation in construction projects. Engineering, Construction and Architectural Management, 28(9), pp. 2828-2854. ISSN 0969-9988

Felllows, R F (1988) Escalation management. PhD thesis, University of Reading, UK.

Fenais, A (2020) Developing an augmented reality solution for mapping underground infrastructure. PhD thesis, Arizona State University, USA.

Feng, Chen (2015) Camera marker networks for pose estimation and scene understanding in construction automation and robotics. PhD thesis, University of Michigan, USA.

Feng, H; Song, Q; Yin, C and Cao, D (2022) Adaptive impedance control method for dynamic contact force tracking of robotic excavators. Journal of Construction Engineering and Management, 148(11): 04022124, ISSN 0733-9364

Fernando, N; T.A, K D and Zhang, H (2024) An artificial neural network (ann) approach for early cost estimation of concrete bridge systems in developing countries: The case of Sri Lanka. Journal of Financial Management of Property and Construction, 29(1), pp. 23-51. ISSN 1366-4387

Fillingham, V L (2018) Assessing information management as a tool for the ongoing maintenance of built assets. EngD thesis, University of Reading, UK.

Finke, M R (1998) A better way to estimate and mitigate disruption. Journal of Construction Engineering and Management, 124(6), pp. 490-497. ISSN 0733-9364

Firouzi, A; Yang, W and Li, C Q (2016) Prediction of total cost of construction project with dependent cost items. Journal of Construction Engineering and Management, 142(12): 04016072, ISSN 0733-9364

Fischer, K; Leidel, K; Riemann, A and Alfen, H W (2010) An integrated risk management system (IRMS) for PPP projects. Journal of Financial Management of Property and Construction, 15(3), pp. 260-282. ISSN 1366-4387

Fitzgerald, E and Akintoye, A (1995) The accuracy and optimal linear correction of UK construction tender price index forecasts. Construction Management and Economics, 13(6), pp. 493-500. ISSN 01446193

Flanagan, R (1980) Tender price and time prediction for construction work. PhD thesis, Aston University, UK.

Flanagan, R and Norman, G (1983) The accuracy and monitoring of quantity surveyors' price forecasting for building work. Construction Management and Economics, 1(2), pp. 157-180. ISSN 01446193

Fobiri, Godfred (2024) A framework to apply reality capture technology for interim payment valuation of construction projects. PhD thesis, University of Johannesburg, South Africa.

Forbes, D R; McGurnaghan, H; Graham, L D and Smith, S D (2004) Concrete placing productivity using a novel neural network design. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Forsythe, P J and Sepasgozar, S M E (2019) Measuring installation productivity in prefabricated timber construction. Engineering, Construction and Architectural Management, 26(4), pp. 578-598. ISSN 0969-9988

Foster, P; Abdelal, G; Lim, J B P; Hajsadeghi, M and McCrum, D (2016) Finite element modelling of cyclic behaviour of cold-formed steel bolted moment-resisting connections. Journal of Construction in Developing Countries, 21(1), pp. 167-180. ISSN 1823-6499

Francart, N (2021) Decision support for the implementation of low-carbon measures in the building sector. PhD thesis, KTH Royal Institute of Technology, Sweden.

France-Mensah, J (2019) Integrated planning and budget allocation for highway maintenance, rehabilitation, and capital construction projects. PhD thesis, University of Texas at Austin, USA.

Freitas, J A; Sanquetta, C R; Iwakiri, S and de Mello Maron da Costa, M D R (2021) The use of wood construction materials as a way of carbon storage in residential buildings in Brazil. International Journal of Construction Management, 21(3), pp. 292-298. ISSN 1562-3599

Fuller, R J and Luther, M B (2003) Simulation of condensation problems in a roller-skating centre. Building Research & Information, 31(1), pp. 48-59. ISSN 0961-3218

Fung, W P (2015) Building information modeling (BIM) capabilities in quantity surveying practice during pre-construction stage: The relationship with project performance. PhD thesis, University of Malaya, Malaysia.

Gaikwad, S V; Calahorra-Jimenez, M; Molenaar, K R and Torres-Machi, C (2021) Challenges in engineering estimates for best value design-build highway projects. Journal of Construction Engineering and Management, 147(7): 04021065, ISSN 0733-9364

Galiano-Garrigós, A; García-Figueroa, A; Rizo-Maestre, C and González-Avilés, Á (2019) Evaluation of BIM energy performance and CO2 emissions assessment tools: A case study in warm weather. Building Research & Information, 47(7), pp. 787-812. ISSN 0961-3218

Gambo, N and Musonda, I (2021) Effect of the fourth industrial revolution on road transport asset management practice in Nigeria. Journal of Construction in Developing Countries, 26(1), pp. 19-43. ISSN 1823-6499

Gangrade, R (2021) Quantifying spatial geotechnical uncertainty to advance the practice of risk assessment and decision-making for tunnel projects. PhD thesis, Colorado School of Mines, USA.

Gao, Y.; Wang, C.; Huang, L.; Wang, D. and Chen, Z. (2026) SLAM-imu coupling-based construction personnel positioning in invalid scenario of satellite and aerial triangulation. Engineering, Construction and Architectural Management, 33(5), pp. 3599-3624. ISSN 0969-9988

Gao, N and Touran, A (2020) Cost overruns and formal risk assessment program in US rail transit projects. Journal of Construction Engineering and Management, 146(5): 05020004, ISSN 0733-9364

García de Soto, B (2014) A methodology to make accurate preliminary estimates of construction material quantities for construction projects. DSc thesis, ETH Zürich, Switzerland.

García de Soto, B; Adey, B T and Fernando, D (2017) A hybrid methodology to estimate construction material quantities at an early project phase. International Journal of Construction Management, 17(3), pp. 165-196. ISSN 1562-3599

Gardner, B J; Gransberg, D D and Jeong, H D (2016) Reducing data-collection efforts for conceptual cost estimating at a highway agency. Journal of Construction Engineering and Management, 142(11): 04016057, ISSN 0733-9364

Gatton, T M (1991) Designing for construction automation: Advanced automation technologies for computer integrated construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Gbadebo, A (2020) Understanding continuous professional development: An holistic examination of engineering students engagement with, and motivation towards, continuous professional development. PhD thesis, University of York, UK.

Geekiyanage, D and Ramachandra, T (2020) Nexus between running costs and building characteristics of commercial buildings: Hedonic regression modelling. Built Environment Project and Asset Management, 10(3), pp. 389-406. ISSN 2044-124X

Genc, O. (2026) Utilizing advanced language models to identify industrial symbiosis opportunities within the circular economy: Capabilities and challenges. Engineering, Construction and Architectural Management, 33(4), pp. 3076-3099. ISSN 0969-9988

Genc, O (2023) Identifying principal risk factors in Turkish construction sector according to their probability of occurrences: A relative importance index (rii) and exploratory factor analysis (EFA) approach. International Journal of Construction Management, 23(6), pp. 979-987. ISSN 1562-3599

George, M and Sekpe, V (2010) Inspection of insulated concrete form walls using ground penetrating radar. International Journal of Construction Education and Research, 6(4), pp. 303-317. ISSN 1557-8771

Ghanem, A (2023) Integrated framework for multi-hazard resilience assessment of infrastructures. PhD thesis, University of Hawai'i at Manoa, USA.

Ghannad, P and Lee, Y C (2023) Optimizing modularization of residential housing designs for rapid postdisaster mass production of housing. Journal of Construction Engineering and Management, 149(7): 04023046, ISSN 0733-9364

Ghimire, Prashna (2025) Framework for integrating industry knowledge into a large language model to assist construction cost estimation. PhD thesis, University of Nebraska - Lincoln, USA.

Gholami, E (2017) Exploiting BIM in energy efficient domestic retrofit: evaluation of benefits and barriers. PhD thesis, University of Liverpool, UK.

Ghosh, A (2015) Analyzing the impact of building information modeling (BIM) on labor productivity in retrofit construction: Case study at a semiconductor manufacturing facility. PhD thesis, Arizona State University, USA.

Ghosh, A; Edwards, D J; Hosseini, M R; Al-Ameri, R; Abawajy, J and Thwala, W D (2021) Real-time structural health monitoring for concrete beams: A cost-effective 'industry 4.0' solution using piezo sensors. International Journal of Building Pathology and Adaptation, 39(2), pp. 283-311. ISSN 23984708

Ghosh, B and Karmakar, S (2025) Development and application of a digitalized construction quality document management system for advanced construction using building information modeling. Journal of Construction Engineering and Management, 151(6): 04025053, ISSN 0733-9364

Gibson, G E; El Asmar, M; Yussef, A and Ramsey, D (2024) A novel approach for measuring the accuracy of front end engineering design. Engineering, Construction and Architectural Management, 31(7), pp. 2669-2696. ISSN 0969-9988

Giel, B K (2013) Framework for evaluating the BIM competencies of building owners. PhD thesis, University of Florida, USA.

Goh, B H (1998) Forecasting residential construction demand in Singapore: A comparative study of the accuracy of time series, regression and artificial neural network techniques. Engineering, Construction and Architectural Management, 5(3), pp. 261-275. ISSN 0969-9988

Goh, Y M and Chua, D (2013) Neural network analysis of construction safety management systems: A case study in Singapore. Construction Management and Economics, 31(5), pp. 460-470. ISSN 1466433X

Gong, J (2009) An object recognition, tracking, and contextual reasoning based video interpretation methodology for rapid productivity analysis of construction operations. PhD thesis, University of Texas at Austin, USA.

Gonsalves, N; Ogunseiju, O R and Akanmu, A A (2024) Activity recognition from trunk muscle activations for wearable and non-wearable robot conditions. Smart and Sustainable Built Environment, 13(6), pp. 1370-1385. ISSN 2046-6099

González-Cruz, M C; Ballesteros-Pérez, P; Lucko, G and Zhang, J X (2022) Critical duration index: Anticipating project delays from deterministic schedule information. Journal of Construction Engineering and Management, 148(11): 04022121, ISSN 0733-9364

Goto, Y (2012) Sustainable wooden building concept for central Japan. DSc thesis, ETH Zürich, Switzerland.

Govender, N; Laryea, S and Watermeyer, R (2022) A framework for assessing quality of tender documents. Built Environment Project and Asset Management, 12(4), pp. 573-589. ISSN 2044-124X

Govender, N; Laryea, S and Watermeyer, R (2025) Blueprint to success: Project managers' perspectives on key factors influencing construction document quality in South Africa. Journal of Construction Engineering and Management, 151(11): 05025015, ISSN 0733-9364

Graham, D; Smith, S D and Crapper, M (2006) Refining the case-based reasoning model of construction processes. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Graham, D P (2005) Stochastic modelling and analysis of construction processes. PhD thesis, University of Edinburgh, UK.

Graham, L D and Smith, S D (2003) A hybrid model to improve the estimation of concreting operations. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Graham, L D and Smith, S D (2004) A method for effectively implementing construction process productivity estimation models. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Gransberg, D D and Riemer, C (2009) Impact of inaccurate engineer's estimated quantities on unit price contracts. Journal of Construction Engineering and Management, 135(11), pp. 1138-1145. ISSN 0733-9364

Gravitt, D D (2004) The development and validation of a bar code based residential construction quality inspection procedure. PhD thesis, Indiana State University, USA.

Greenwood, D J and Shaglouf, A A (1997) Comparison between planned and actual durations in medium sized building projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Gregory, R A (1992) Development of a knowledge-based system approach for decision-making in construction projects. PhD thesis, University of Florida, USA.

Gunduz, M and Al-Ajji, I (2022) Employment of CHAID and crt decision tree algorithms to develop bid/no-bid decision-making models for contractors. Engineering, Construction and Architectural Management, 29(9), pp. 3712-3736. ISSN 0969-9988

Gunduz, M; Sirin, O and Al Nawaiseh, H M (2024) Assessment of critical project success factors for management of pavement construction using the Delphi approach. Journal of Construction Engineering and Management, 150(4): 04024020, ISSN 0733-9364

Gunner, J and Skitmore, M (1999) Comparative analysis of pre-bid forecasting of building prices based on Singapore data. Construction Management and Economics, 17(5), pp. 635-646. ISSN 01446193

Gunner, J and Skitmore, M (1999) Pre-bid building price forecasting accuracy: Price intensity theory. Engineering, Construction and Architectural Management, 6(3), pp. 267-275. ISSN 0969-9988

Gunner, J C (1997) A model of building price forecasting accuracy. PhD thesis, University of Salford, UK.

Gunning, J G (1999) A review of the application of risk assessment procedures in construction management and research. Journal of Financial Management of Property and Construction, 4(1), pp. 59-74. ISSN 1366-4387

Guo, H; Yu, Y; Ding, Q and Skitmore, M (2018) Image-and-skeleton-based parameterized approach to real-time identification of construction workers' unsafe behaviors. Journal of Construction Engineering and Management, 144(6): 04018042, ISSN 0733-9364

Guo, Q L (2001) Development of risk analysis models for decision-making in project management. PhD thesis, Edinburgh Napier University, UK.

Guo, Youheng (2025) Defect information modeling in intelligent civil infrastructure asset management. PhD thesis, University of New South Wales, Australia.

Gurmu, A. (2026) Forecasting building cost index with vecm: Integrating output-based indexes and macroeconomic indicators. Journal of Engineering, Design and Technology, 24(4), pp. 1012-1036. ISSN 1726-0531

Gurmu, A T (2026) Econometric analysis of macroeconomic factors influencing construction labour productivity at industry level: Evidence from Australia. Construction Management and Economics, 44(1), pp. 23-40. ISSN 0144-6193

Gurmu, A and Miri, M P (2025) Machine learning regression for estimating the cost range of building projects. Construction Innovation, 25(2), pp. 577-593. ISSN 1471-4175

Gurmu, A T and Ongkowijoyo, C S (2020) Stochastic-based model for setting formwork-productivity baseline. Journal of Construction Engineering and Management, 146(9): 04020099, ISSN 0733-9364

Guven, G and Ergen, E (2021) Tracking major resources for automated progress monitoring of construction activities: Masonry work case. Construction Innovation, 21(4), pp. 648-667. ISSN 1471-4175

Gyadu-Asiedu, W (2009) Assessing construction project performance in Ghana: modelling practitioners' and clients perspectives. PhD thesis, Eindhoven University of Technology, Netherlands.

Habibnezhad, M (2019) The impact of extreme virtual elevation above grade on construction workers' physiological responses, physical responses, and task performance. PhD thesis, University of Nebraska - Lincoln, USA.

Habyalimana, J-B (1989) Change orders and construction projects characteristics: A relational quantitative study. PhD thesis, University of Missouri - Columbia, USA.

Haidar, A; Naoum, S; Howes, R and Tah, J (1999) Genetic algorithms application and testing for equipment selection. Journal of Construction Engineering and Management, 125(1), pp. 32-38. ISSN 0733-9364

Hajiashrafi, R (2025) Streamlined shapley value models for contribution-based compensation allocation in scheduling networks in construction project management. PhD thesis, Catholic University of America, USA.

Hajji, A M (2013) Development of a productivity-based economic, energy, environmental model for heavy duty diesel construction equipment. PhD thesis, Oklahoma State University, USA.

Hajji, A M and Lewis, P (2013) Development of productivity-based estimating tool for energy and air emissions from earthwork construction activities. Smart and Sustainable Built Environment, 2(1), pp. 84-100. ISSN 2046-6099

Hakkarainen, M.; Oskierko-Jeznacki, E. and Braham, W. W. (2026) Evaluation of the potential of water vapor to be used as a tracer gas for determining air change rates. International Journal of Building Pathology and Adaptation, 44(9), pp. 1-15. ISSN 2398-4708

Hallowell, M R; Hardison, D and Desvignes, M (2016) Information technology and safety: Integrating empirical safety risk data with building information modeling, sensing, and visualization technologies. Construction Innovation, 16(3), pp. 323-347. ISSN 1471-4175

Hamed, O (2022) Developing a BIM-based tool to automate green buildings assessment: the case of Jordan Green Building Guide. PhD thesis, University of Sheffield, UK.

Hamida, M B; Hassanain, M A and Al-Hammad, A M (2022) Review and assessment of factors affecting adaptive reuse of commercial projects in Saudi Arabia. International Journal of Building Pathology and Adaptation, 40(1), pp. 1-19. ISSN 23984708

Hamide, M (2017) Schedule and cost performance analysis and prediction in Louisiana DOTD. PhD thesis, University of New Orleans, USA.

Hamilton-MacLaren, F; Loveday, D and Mourshed, M (2009) The calculation of embodied energy in new build UK housing. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Hamledari, H (2021) Impact assessment of blockchain-enabled smart contracts on the visibility of construction payments. PhD thesis, Stanford University, USA.

Hamoda, M F (2008) Modeling of construction noise for environmental impact assessment. Journal of Construction in Developing Countries, 13(1), pp. 79-89. ISSN 1823-6499

Han, J; Kim, J; Kim, S and Wang, S (2024) Effectiveness of image augmentation techniques on detection of building characteristics from street view images using deep learning. Journal of Construction Engineering and Management, 150(10): 04024129, ISSN 0733-9364

Han, S; Jiang, Y; Huang, Y; Wang, M; Bai, Y and Spool-White, A (2023) Scan2drawing: Use of deep learning for as-built model landscape architecture. Journal of Construction Engineering and Management, 149(5): 04023027, ISSN 0733-9364

Han, S H and Diekmann, J (2004) Judgment-based cross-impact method for predicting cost variance for highly uncertain projects. Journal of Construction Research, 5(2), pp. 171-192. ISSN 1609-9451

Han, Y; Yin, Z; Zhang, J; Jin, R and Yang, T (2020) Eye-tracking experimental study investigating the influence factors of construction safety hazard recognition. Journal of Construction Engineering and Management, 146(8): 04020091, ISSN 0733-9364

Hanna, A S (2012) Using the earned value management system to improve electrical project control. Journal of Construction Engineering and Management, 138(3), pp. 449-457. ISSN 0733-9364

Harding, A; Lowe, D; Hickson, A; Emsley, M and Duff, A R (1999) Implementation of a neural network model for the comparison of the cost of different procurement approaches. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Harinarain, N; Caluza, S and Dondolo, S (2021) Bricklaying robots in the South African construction industry: The contractor's perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Harmelink, D J (1995) Linear scheduling model: The development of a linear scheduling model with microcomputer applications for highway construction project control. PhD thesis, Iowa State University, USA.

Harode, A; Thabet, W and Leite, F (2024) Formulation of feature and label space using modified Delphi in support of developing a machine-learning algorithm to automate clash resolution. Journal of Construction Engineering and Management, 150(3): 04023173, ISSN 0733-9364

Harris, F C (1979) A model for evaluating the effects of weather on construction projects. PhD thesis, Loughborough University, UK.

Hasannejad, A; Sardrud, J M and Shirzadi Javid, A A (2023) BIM-based clash detection improvement automatically. International Journal of Construction Management, 23(14), pp. 2431-2437. ISSN 1562-3599

Hashemi, S; Ghaffarianhoseini, A; Ghaffarianhoseini, A; Naismith, N and Jamei, E (2026) A systematic review of microclimate and outdoor thermal comfort studies in Australia and New Zealand. Smart and Sustainable Built Environment, 15(1), pp. 156-181. ISSN 2046-6099

Hassan, Fahad Ul (2022) Digitalization of construction project requirements using natural language processing (NLP) techniques. PhD thesis, Clemson University, USA.

Hassan, M M and Gruber, S (2008) Application of discrete-event simulation to study the paving operation of asphalt concrete. Construction Innovation, 8(1), pp. 7-22. ISSN 1471-4175

Hassan, M M and Gruber, S (2008) Simulation of concrete paving operations on Interstate-74. Journal of Construction Engineering and Management, 134(1), pp. 2-9. ISSN 0733-9364

Hassim, S; Muniandy, R; Alias, A H and Abdullah, P (2018) Construction tender price estimation standardization (TPES) in Malaysia: Modeling using fuzzy neural network. Engineering, Construction and Architectural Management, 25(3), pp. 443-457. ISSN 0969-9988

Hatamleh, M T; Hiyassat, M; Sweis, G J and Sweis, R J (2018) Factors affecting the accuracy of cost estimate: Case of Jordan. Engineering, Construction and Architectural Management, 25(1), pp. 113-131. ISSN 0969-9988

He, J.; Chen, H.; Yang, H.; Li, P. and Zheng, Z. (2026) Text2Onto-Agent: An llm agent-based end-to-end automated ontology construction method anda case study of green building domain modeling. Journal of Construction Engineering and Management, 152(9): 04026153, ISSN 0733-9364

He, C; Liu, M; Hsiang, S M; Pierce, N; Megahed, S and Godfrey, A (2025) An ontological knowledge-driven smart contract framework for implicit bridge preservation decision making. Journal of Construction Engineering and Management, 151(4): 04025008, ISSN 0733-9364

He, P; Qin, L; Yuan, Y and Yuan, J (2025) Action reliability assessment framework for automated construction labor measurements: Case study on plastering operations. Journal of Construction Engineering and Management, 151(8): 05025006, ISSN 0733-9364

He, W; Li, W; Xu, S; Wang, W and An, X (2021) Time, cost, and energy consumption analysis on construction optimization in high-rise buildings. Journal of Construction Engineering and Management, 147(10): 04021128, ISSN 0733-9364

Hegab, M; Smith, G R and Salem, O M (2006) Soil penetration modeling in microtunneling projects. Journal of Construction Engineering and Management, 132(6), pp. 598-605. ISSN 0733-9364

Hegab, M Y and Smith, G R (2007) Delay time analysis in microtunneling projects. Journal of Construction Engineering and Management, 133(2), pp. 191-195. ISSN 0733-9364

Hegazy, T and Menesi, W (2008) Delay analysis under multiple baseline updates. Journal of Construction Engineering and Management, 134(8), pp. 575-582. ISSN 0733-9364

Helaly, H; El-Rayes, K; Ignacio, E J and Joan, H J (2025) Comparison of machine-learning algorithms for estimating cost of conventional and accelerated bridge construction methods during early design phase. Journal of Construction Engineering and Management, 151(3): 04025004, ISSN 0733-9364

Hendrickson, C; Martinelli, D and Rehak, D (1987) Hierarchical rule-based activity duration estimation. Journal of Construction Engineering and Management, 113(2), pp. 288-301. ISSN 0733-9364

Heravi, M Y; Jang, Y and Chauhan, H (2025) Comparative analysis of deep-learning approaches for automatic recognition of awkward postures in construction environments through wrist-worn biosensors. Journal of Construction Engineering and Management, 151(8): 04025108, ISSN 0733-9364

Herbsman, Z and Ellis, R (1990) Research of factors influencing construction productivity. Construction Management and Economics, 8(1), pp. 49-61. ISSN 01446193

Heydari Torkamani, M; Shahbazi, Y and Belali Oskoyi, A (2024) Explaining resilience model of historical bazaars using artificial neural network. Smart and Sustainable Built Environment, 13(6), pp. 1538-1559. ISSN 2046-6099

Hickey, P J (2023) A study of gender diversity in u.S. Architecture, engineering, and construction (AEC) industry leadership. PhD thesis, University of Maryland, College Park, USA.

Higgins, D M (2013) The black swan effect and the impact on Australian property forecasting. Journal of Financial Management of Property and Construction, 18(1), pp. 76-89. ISSN 1366-4387

Hildreth, J C (2020) Effect of period length on forecasting maintenance and repair costs for heavy equipment by the period cost based methodology. International Journal of Construction Education and Research, 16(3), pp. 167-179. ISSN 1557-8771

Hindmarch, H (2012) Design change management: Developing a software application to support the evaluation of construction design changes. DEng thesis, University of Manchester, UK.

Hinze, J and Parker, R (1988) Productivity study on extruded concrete curbing operations. Journal of Construction Engineering and Management, 114(2), pp. 256-262. ISSN 0733-9364

Holmlin, R M (2016) Pre-design methodology for establishing scope-budget and scope-duration alignment for capital projects. PhD thesis, George Washington University, USA.

Hong, Y; Tian, Z and Sun, X (2020) Dynamic evaluation for compaction quality of roller compacted concrete based on reliability metrics. Journal of Construction Engineering and Management, 146(10): 04020123, ISSN 0733-9364

Hornaday, W C; Haas, C T; O’Connor, J T and Wen, J (1993) Computer-aided planning for heavy lifts. Journal of Construction Engineering and Management, 119(3), pp. 498-515. ISSN 0733-9364

Hosny, F.; El-Damaty, M.; Mantha, B. R. K. and Abu Dabous, S. (2026) Analysis and modeling of delays during construction handover stage for building projects: A case study of United Arab Emirates. International Journal of Building Pathology and Adaptation, 44(3), pp. 658-684. ISSN 2398-4708

Hosseini, A.; Niknam, M.; Shafaat, A. and Fathi, A. (2026) A unified ontology framework for cross-domain integration of BIM, IoT, and maintenance services in smart facility management. Engineering, Construction and Architectural Management, 33(3), pp. 1784-1812. ISSN 0969-9988

Hou, H (2023) Understanding building and urban environment interactions: an integrated framework for building occupancy modelling. PhD thesis, Imperial College London, UK.

Hsiao, W T; Yu, W D and Shih, C C (2026) Proactive construction hazard prevention model using machine learning. Journal of Construction Engineering and Management, 152(2): 04025261, ISSN 0733-9364

Hu, Q; Bai, Y; He, L; Cai, Q; Tang, S; Ma, G; Tan, J and Liang, B (2020) Intelligent framework for worker-machine safety assessment. Journal of Construction Engineering and Management, 146(5): 04020045, ISSN 0733-9364

Hu, W and Panthi, K (2020) Project status reporting system (PSRS) for pipeline relocation programs. Built Environment Project and Asset Management, 10(5), pp. 693-708. ISSN 2044-124X

Hu, Y; Zhang, M; Ren, W; Li, H; Zhang, J; Wang, L and Shuai, S (2025) Detecting loss of balance in construction workers using millimeter wave sensing. Journal of Construction Engineering and Management, 151(12): 04025202, ISSN 0733-9364

Hua, G B (1996) Residential construction demand forecasting using economic indicators: A comparative study of artificial neural networks and multiple regression. Construction Management and Economics, 14(1), pp. 25-34. ISSN 01446193

Hua, G B and Pin, T H O (2000) Forecasting construction industry demand, price and productivity in Singapore: The Box-Jenkins approach. Construction Management and Economics, 18(5), pp. 607-618. ISSN 01446193

Hua, X; Zhang, S; Shi, X and Zhang, Y (2025) Differences in risk analysis between workers and managers: Study from the perspective of neuroscience. Journal of Construction Engineering and Management, 151(7): 04025079, ISSN 0733-9364

Huang, Y; Chen, R; Guo, P and Duan, Z (2025) Research on contractor claim strategy based on the principle of maximizing profits by using evolutionary game model. Engineering, Construction and Architectural Management, 32(12), pp. 8423-8444. ISSN 0969-9988

Huang, H; Hu, H; Xu, F and Zhang, Z (2024) Kinesiology-inspired assessment of intrusion risk based on human motion features. Journal of Construction Engineering and Management, 150(7): 04024072, ISSN 0733-9364

Huang, H; Zhang, C and Hammad, A (2021) Effective scanning range estimation for using tls in construction projects. Journal of Construction Engineering and Management, 147(9): 04021106, ISSN 0733-9364

Huang, J; Han, D; Zhang, H and Cui, W (2024) Framework and case study for the assembly accuracy prediction of prefabricated buildings using BIM and tls. Architectural Engineering and Design Management, 20(6), pp. 1427-1453. ISSN 1745-2007

Huang, S (2016) Model based technologies for enhancing building operation. PhD thesis, University of Miami, USA.

Huang, T (2009) Virtual prototyping technologies enhanced construction planning. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Huang, T; li, H; Guo, H; Chan, N; Kong, S; Chan, G and Skitmore, M (2009) Construction virtual prototyping: A survey of use. Construction Innovation, 9(4), pp. 420-433. ISSN 1471-4175

Huang, Y L (2009) Prediction of contractor default probability using structural models of credit risk: An empirical investigation. Construction Management and Economics, 27(6), pp. 581-596. ISSN 1466433X

Huh, Y (2004) Highway bridge construction production rates for time estimation. PhD thesis, University of Texas at Austin, USA.

Huynh, N M; Le-Hoai, L and Do, C D (2025) Assessing and improving labor productivity management in construction: A practical framework and measurement tool. Construction Economics and Building, 25(1), pp. 69-96. ISSN 2204-9029

Hwang, S Y (2007) Proactive planning and control of construction productivity and cost using time series data. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hyung, W G; Kim, S and Jo, J K (2020) Improved similarity measure in case-based reasoning: A case study of construction cost estimation. Engineering, Construction and Architectural Management, 27(2), pp. 561-578. ISSN 0969-9988

Ibrahim Khil, Mohammad Hashim (2025) Automated construction progress monitoring of buildings through mobile mapping and as-built modeling. PhD thesis, University of New South Wales, Australia.

Ignacio, J T S; Gotangco Gonzales, C K and Lee-Chua, Q (2024) A systems thinking approach to e-learning on climate change: Capacity-building for junior high school teachers in the Philippines. International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 409-424. ISSN 1759-5916

Igwe, U S; Mohamed, S F; Azwarie, M B M D; Nwofia, C M and Ihekweme, N M (2025) Assessment of post contract cost control issues in Nigeria: Quantity surveyors' perspective. International Journal of Construction Management, 25(14), pp. 1725-1735. ISSN 1562-3599

Ikerd II, W F (2021) Level of acceptance (LOA) for scan-to-BIM creation. PhD thesis, University of Denver, USA.

Iqbal, M.; Fan, Y.; Ahmad, N. and Altaf, M. (2026) DEMATEL-ML-ISM decision framework for prioritizing smart contract security risks in blockchain-enabled construction projects. Journal of Construction Engineering and Management, 152(8): 04026108, ISSN 0733-9364

Iqbal, M.; Fan, Y.; Ahmad, N. and Altaf, M. (2026) DEMATEL–ML–ISM decision framework for prioritizing smart contract security risks in blockchain-enabled construction projects. Journal of Construction Engineering and Management, 152(8): 04026108, ISSN 0733-9364

Islam, M H; Safayet, M A and Al Mamun, A (2024) Building performance analysis for optimizing the energy consumption of an educational building. International Journal of Building Pathology and Adaptation, 42(4), pp. 576-595. ISSN 23984708

Islam, M S; Mohandes, S R; Mahdiyar, A; Fallahpour, A and Olanipekun, A O (2022) A coupled genetic programming Monte Carlo simulation-based model for cost overrun prediction of thermal power plant projects. Journal of Construction Engineering and Management, 148(8): 04022073, ISSN 0733-9364

Islam, M S; Nepal, M P and Skitmore, M (2019) Modified fuzzy group decision-making approach to cost overrun risk assessment of power plant projects. Journal of Construction Engineering and Management, 145(2): 04018126, ISSN 0733-9364

Ismail, Noor Akmal Adillah Binti (2017) Construction cost estimating incorporating building information modelling in the Malaysian construction industry. PhD thesis, Queensland University of Technology, Australia.

Izzat, R M (1977) A computerised approach to bidding strategy in civil engineering. PhD thesis, Aston University, UK.

Jaafar, T (1992) A unified methodology for project planning risk. PhD thesis, Nottingham Trent University, UK.

Jacques de Sousa, L; Poças Martins, J; Sanhudo, L and Santos Baptista, J (2024) Automation of text document classification in the budgeting phase of the construction process: A systematic literature review. Construction Innovation, 24(7), pp. 292-318. ISSN 1471-4175

Jadevicius, A; Sloan, B and Brown, A (2010) Is 100 years of research on property cycles enough to predict the future of UK property market performance with accuracy? In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Jafari, A and Akhavian, R (2019) Driving forces for the US residential housing price: A predictive analysis. Built Environment Project and Asset Management, 9(4), pp. 515-529. ISSN 2044-124X

Jafary, P.; Shojaei, D.; Rajabifard, A. and Ngo, T. (2026) AI-augmented construction cost estimation: An ensemble natural language processing (NLP) model to align quantity take-offs with cost indexes. International Journal of Construction Management, 26(8), pp. 1508-1526. ISSN 1562-3599

Jafary, P; Shojaei, D; Rajabifard, A and Ngo, T (2024) BIM and real estate valuation: Challenges, potentials and lessons for future directions. Engineering, Construction and Architectural Management, 31(4), pp. 1642-1677. ISSN 0969-9988

Jaffal, I; Inard, C; Ghaddar, N and Ghali, K (2020) A metamodel for long-term thermal comfort in non-air-conditioned buildings. Architectural Engineering and Design Management, 16(6), pp. 441-472. ISSN 1745-2007

Jain, Nishesh (2021) Reducing the performance gap using calibrated simulation models. PhD thesis, University College London, UK.

Jang, W S and Skibniewski, M J (2009) Cost-benefit analysis of embedded sensor system for construction materials tracking. Journal of Construction Engineering and Management, 135(5), pp. 378-386. ISSN 0733-9364

Jang, Y; Jeong, I and Cho, Y K (2021) Identifying impact of variables in deep learning models on bankruptcy prediction of construction contractors. Engineering, Construction and Architectural Management, 28(10), pp. 3282-3298. ISSN 0969-9988

Jang, Y; Jeong, I B; Cho, Y K and Ahn, Y (2019) Predicting business failure of construction contractors using long short-term memory recurrent neural network. Journal of Construction Engineering and Management, 145(11): 04019067, ISSN 0733-9364

Javanmardi, A; Abbasian-Hosseini, S A; Liu, M and Hsiang, S M (2020) Improving effectiveness of constraints removal in construction planning meetings: Information-theoretic approach. Journal of Construction Engineering and Management, 146(4): 04020015, ISSN 0733-9364

Jayasekara, R U; Jayathilaka, G S; Siriwardana, C; Amaratunga, D; Haigh, R; Bandara, C and Dissanayake, R (2023) Identifying gaps in early warning mechanisms and evacuation procedures for tsunamis in Sri Lanka, with a special focus on the use of social media. International Journal of Disaster Resilience in the Built Environment, 14(1), pp. 1-20. ISSN 1759-5916

Jayawardane, A K W (1989) Optimising earthmoving by linear programming and computer simulation. PhD thesis, Loughborough University, UK.

Jebelli, H (2019) Wearable biosensors to understand construction workers' mental and physical stress. PhD thesis, University of Michigan, USA.

Jebelli, H; Choi, B and Lee, S (2019) Application of wearable biosensors to construction sites. II: Assessing workers' physical demand. Journal of Construction Engineering and Management, 145(12): 04019080, ISSN 0733-9364

Jebelli, H; Choi, B and Lee, S H (2019) Application of wearable biosensors to construction sites. I: Assessing workers' stress. Journal of Construction Engineering and Management, 145(12): 04019079, ISSN 0733-9364

Jeelani, I (2019) Improving safety performance in construction using visual data analytics and virtual reality. PhD thesis, North Carolina State University, USA.

Jeong, E; Jang, J; Kim, T W and Lee, S (2025) Divide-and-conquer-based stratified models for predicting precast concrete installation times. Journal of Construction Engineering and Management, 151(9): 05025011, ISSN 0733-9364

Ji, A; Xue, X; Zhang, L; Luo, X and Man, Q (2025) A transformer-based deep learning method for automatic pixel-level crack detection and feature quantification. Engineering, Construction and Architectural Management, 32(4), pp. 2455-2486. ISSN 0969-9988

Jiang, S; Zhang, J; Shi, J and Wu, Y (2026) Adaptive information retrieval for enhanced building safety management leveraging BIM. Engineering, Construction and Architectural Management, 33(1), pp. 336-360. ISSN 0969-9988

Jiang, A (2012) Negotiating construction contracts through practical cash flow planning and analysis model. International Journal of Construction Management, 12(2), pp. 23-33. ISSN 1562-3599

Jiang, H and Liu, C (2011) Forecasting construction demand: A vector error correction model with dummy variables. Construction Management and Economics, 29(9), pp. 969-979. ISSN 1466433X

Jiang, H; Xu, Y and Liu, C (2014) Market effects on forecasting construction prices using vector error correction models. International Journal of Construction Management, 14(2), pp. 101-112. ISSN 1562-3599

Jiang, Q (2020) Estimation of construction project building cost by back-propagation neural network. Journal of Engineering, Design and Technology, 18(3), pp. 601-609. ISSN 1726-0531

Jiang, S; Wang, S; Sun, H; Liu, W; Xiao, B; Cha, H S and Zhang, J (2025) Enhancing quality management: Lightweight detection and risk warning of concrete cracks and rebar exposure using improved YOLOv8. Journal of Construction Engineering and Management, 151(8): 04025087, ISSN 0733-9364

Jiang, Y (2020) Determination of elevations for excavation operations using drone technologies. PhD thesis, Marquette University, USA.

Jiang, Ziang (2025) Advancing scan-vs-BIM in progress monitoring of infrastructure construction. PhD thesis, University of New South Wales, Australia.

Jiang, Ziang (2025) Advancing scan-vs-bim in progress monitoring of infrastructure construction. PhD thesis, University of New South Wales, Australia.

Jin, R; Han, S; Hyun, C and Kim, J (2014) Improving accuracy of early stage cost estimation by revising categorical variables in a case-based reasoning model. Journal of Construction Engineering and Management, 140(7): 04014025, ISSN 0733-9364

Jin, Y (2018) Supervised learning for back analysis of excavations in the observational method. PhD thesis, University of Cambridge, UK.

Joao, Z R (2021) Road construction assessment model (RC-AM) to prevent contract overbilling in Angola. PhD thesis, George Washington University, USA.

Johansen, E and Wilson, B (2006) Investigating first planning in construction. Construction Management and Economics, 24(12), pp. 1305-1314. ISSN 1466433X

Johnson, B T (2007) Exploring the use of virtual construction to capture knowledge and reduce waste for residential projects. PhD thesis, Colorado State University, USA.

Joukar, A (2016) Analysis and management of the price volatility in the construction industry. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Jumas, D; Mohd-Rahim, F A; Zainon, N and Utama, W P (2018) Improving accuracy of conceptual cost estimation using MRA and ANFIS in Indonesian building projects. Built Environment Project and Asset Management, 8(4), pp. 348-357. ISSN 2044-124X

Jun, D H (2010) Multi-objective optimization for resource driven scheduling in construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Jung, Y and Kang, S (2007) Knowledge-based standard progress measurement for integrated cost and schedule performance control. Journal of Construction Engineering and Management, 133(1), pp. 10-21. ISSN 0733-9364

Kader, A S A (1997) Cost modelling for inland waterway transport systems. PhD thesis, Liverpool John Moores University, UK.

Kadry, M; Osman, H and Georgy, M (2017) Causes of construction delays in countries with high geopolitical risks. Journal of Construction Engineering and Management, 143(2): 04016095, ISSN 0733-9364

Kagan, Paula Brumer Franceschini (2024) Occupant behaviour modelling for building performance simulation of naturally ventilated school classrooms. PhD thesis, Universidade Estadual de Campinas, Brazil.

Kaka, A P (1999) The development of a benchmark model that uses historical data for monitoring the progress of current construction projects. Engineering, Construction and Architectural Management, 6(3), pp. 256-266. ISSN 0969-9988

Kaka, A P and Boussabaine, A H (1999) Updating techniques for cumulative cost forecasting on construction projects. Journal of Construction Procurement, 5(2), pp. 141-158. ISSN 1358-9180

Kaka, A P and Fortune, C (2002) Net cash flow models: Towards the black box approach. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kaka, A P; Lewis, J and Petros, H (2003) The effects of the variability of project planning on cost commitment curves: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 15-26. ISSN 0969-9988

Kaka, A P and Price, A D F (1993) Modelling standard cost commitment curves for contractors' cash flow forecasting. Construction Management and Economics, 11(4), pp. 271-283. ISSN 01446193

Kamal, P and Ahuja, S (2019) An ensemble-based model for prediction of academic performance of students in undergrad professional course. Journal of Engineering, Design and Technology, 17(4), pp. 769-781. ISSN 1726-0531

Kamardeen, I (2009) Strategic safety management information system for building projects in Singapore. Engineering, Construction and Architectural Management, 16(1), pp. 8-25. ISSN 0969-9988

Kamel Hedayat Abad, M E (2017) Integration and interoperability of building envelope information and energy modeling. PhD thesis, Pennsylvania State University, USA.

Kamma, R C and Jha, K N (2022) Quantifying building construction and demolition waste using permit data. Journal of Construction Engineering and Management, 148(9): 04022091, ISSN 0733-9364

Kantianis, D D (2022) Design morphology complexity and conceptual building project cost forecasting. Journal of Financial Management of Property and Construction, 27(3), pp. 387-414. ISSN 1366-4387

Karan, E P; Sivakumar, R; Irizarry, J and Guhathakurta, S (2014) Digital modeling of construction site terrain using remotely sensed data and geographic information systems analyses. Journal of Construction Engineering and Management, 140(3): 4013067, ISSN 0733-9364

Karatas, I and Budak, A (2024) Development and comparative of a new meta-ensemble machine learning model in predicting construction labor productivity. Engineering, Construction and Architectural Management, 31(3), pp. 1123-1144. ISSN 0969-9988

Karimi, H; Danesh Ashtiani, H A and Aghanajafi, C (2019) Study of mixed materials heat exchanger using optimization techniques. Journal of Engineering, Design and Technology, 17(2), pp. 414-433. ISSN 1726-0531

Karki, S and Hadikusumo, B (2023) Machine learning for the identification of competent project managers for construction projects in Nepal. Construction Innovation, 23(1), pp. 1-18. ISSN 1471-4175

Kasprowicz, T; Starczyk-Kołbyk, A and Wójcik, R R (2023) The randomized method of estimating the net present value of construction projects efficiency. International Journal of Construction Management, 23(12), pp. 2126-2133. ISSN 1562-3599

Kassem, M; Kelly, G; Dawood, N; Serginson, M and Lockley, S (2015) BIM in facilities management applications: A case study of a large university complex. Built Environment Project and Asset Management, 5(3), pp. 261-277. ISSN 2044-124X

Kempton, J; Nicol, S; Anumba, C J and Dickens, J (2000) Analysis of surveyor variability from data obtained from surveys of dwellings represented on video film. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Kenley, R (2001) In-project end-date forecasting: An idiographic, deterministic approach, using cash-flow modelling. Journal of Financial Management of Property and Construction, 6(3), pp. 209-216. ISSN 1366-4387

Kern, A P; Postay, R; Schneck, E R; Mancio, M; González, M A S and Guerra, G (2021) Cost and environmental impacts reduction through building compactness. Engineering, Construction and Architectural Management, 28(4), pp. 1176-1195. ISSN 0969-9988

Khajuria, A (1994) Quality assurance of concrete using a hybrid knowledge-based expert system. PhD thesis, Rutgers State University of New Jersey, School of Graduate Studies, USA.

Khan, L R (2014) Reliability estimation and risk-cost optimisation of underground pipelines. PhD thesis, University of Greenwich, UK.

Khan, M; Khalid, R; Anjum, S; Tran, S V T and Park, C (2022) Fall prevention from scaffolding using computer vision and IoT-based monitoring. Journal of Construction Engineering and Management, 148(7): 04022051, ISSN 0733-9364

Khanh, K D; Minh, N V and Dinh Thuc, L (2025) Enhancing the accuracy of construction project completion estimates by incorporating updated timing-based error margins (utems). International Journal of Construction Management, 25(15), pp. 1859-1868. ISSN 1562-3599

Khanh, H D; Kim, S Y and Linh, L Q (2023) Construction productivity prediction through Bayesian networks for building projects: Case from Vietnam. Engineering, Construction and Architectural Management, 30(5), pp. 2075-2100. ISSN 0969-9988

Khataei, S (2024) A BIM-integrated agent-based simulation method for time-space conflict detection among mobile resources in construction projects. PhD thesis, Middle East Technical University, Turkey.

Khorshid, E; Alfadli, A and Falah, A (2018) Application of constraint infeasibility detection methods in engineering design problems. Journal of Engineering, Design and Technology, 16(2), pp. 285-312. ISSN 1726-0531

Khosrowshahi, F (1999) Neural network model for contractors' pre-qualification for local authority projects. Engineering, Construction and Architectural Management, 6(3), pp. 315-328. ISSN 0969-9988

Khosrowshahi, F and Alani, A M (2003) A model for smoothing time-series data in construction. Construction Management and Economics, 21(5), pp. 483-494. ISSN 01446193

Khoury, H M (2009) Context-aware information access and retrieval for rapid on-site decision making in construction, inspection and maintenance of constructed facilities. PhD thesis, University of Michigan, USA.

Kiani, H (1998) A model for measuring effectiveness of building construction organisations: Owner's perspective. PhD thesis, University of Waterloo, USA.

Kiani Mavi, N; Brown, K; Fulford, R and Goh, M (2024) Forecasting project success in the construction industry using adaptive neuro-fuzzy inference system. International Journal of Construction Management, 24(14), pp. 1550-1568. ISSN 1562-3599

Kim, S; Makhmalbaf, A and Shahandashti, M (2025) Forecasting the architecture billings index (abi) using machine learning predictive models. Engineering, Construction and Architectural Management, 32(8), pp. 5371-5393. ISSN 0969-9988

Kim, B C (2007) Forecasting project progress and early warning of project overruns with probabilistic methods. PhD thesis, Texas A&M University, USA.

Kim, B C and Kim, H J (2014) Sensitivity of earned value schedule forecasting to S-curve patterns. Journal of Construction Engineering and Management, 140(7): 04014023, ISSN 0733-9364

Kim, B C and Reinschmidt, K F (2010) Probabilistic forecasting of project duration using Kalman filter and the earned value method. Journal of Construction Engineering and Management, 136(8), pp. 834-843. ISSN 0733-9364

Kim, B S and Hong, T (2012) Revised case-based reasoning model development based on multiple regression analysis for railroad bridge construction. Journal of Construction Engineering and Management, 138(1), pp. 154-162. ISSN 0733-9364

Kim, C (2004) Spatial information acquisition and its use for infrastructure operation and maintenance. PhD thesis, University of Texas at Austin, USA.

Kim, D and Xiong, S (2025) Enhancing worker safety: Real-time automated detection of personal protective equipment to prevent falls from heights at construction sites using improved yolov8 and edge devices. Journal of Construction Engineering and Management, 151(1): 04024187, ISSN 0733-9364

Kim, H; Lee, H S; Park, M; Ahn, C R and Hwang, S (2015) Productivity forecasting of newly added workers based on time-series analysis and site learning. Journal of Construction Engineering and Management, 141(9): 5015008, ISSN 0733-9364

Kim, J (2007) An investigation of activity duration input modeling by duration variance ratio for simulation-based construction scheduling. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.

Kim, J L and Ellis Jr, R D (2008) Permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling. Journal of Construction Engineering and Management, 134(11), pp. 904-913. ISSN 0733-9364

Kim, K and Cho, Y K (2021) Automatic recognition of workers' motions in highway construction by using motion sensors and long short-term memory networks. Journal of Construction Engineering and Management, 147(3): 04020184, ISSN 0733-9364

Kim, M (2017) Noncontact quality assessment of precast concrete elements using 3D laser scanning and building information modeling. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Kim, S (2013) Hybrid EVAS-CBR system for the preliminary cost estimation of high-rise buildings. PhD thesis, University of Reading, UK.

Kim, T and Chi, S (2019) Accident case retrieval and analyses: Using natural language processing in the construction industry. Journal of Construction Engineering and Management, 145(3): 04019004, ISSN 0733-9364

Kings, S (2002) Pricing documentation for contractors' estimators: Establishing a more effective approach. PhD thesis, Nottingham Trent University, UK.

Kirkham, R J and Boussabaine, A H (2001) Modelling probability distributions of facilities management costs for an NHS acute care hospital building. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Kirkham, R J and Boussabaine, A H (2005) Forecasting the residual service life of nhs hospital buildings: A stochastic approach. Construction Management and Economics, 23(5), pp. 521-529. ISSN 01446193

Kirkham, R J; Boussabaine, A H and Awwad, B H (2002) Probability distributions of facilities management costs for whole life cycle costing in acute care nhs hospital buildings. Construction Management and Economics, 20(3), pp. 251-261. ISSN 01446193

Kissi, E; Adjei-Kumi, T; Amoah, P and Gyimah, J (2018) Forecasting construction tender price index in Ghana using autoregressive integrated moving average with exogenous variables model. Construction Economics and Building, 18(1), pp. 70-82. ISSN 2204-9029

Klapa, P. and Mitka, B. (2026) UAV data for BIM-based building assessment across construction stages: Sensor utility evaluation. Building Research & Information, 54(5), pp. 552-572. ISSN 0961-3218

Ko, T; Jeong, H D and Lee, G (2021) Natural language processing-driven model to extract contract change reasons and altered work items for advanced retrieval of change orders. Journal of Construction Engineering and Management, 147(11): 04021147, ISSN 0733-9364

Konstantinou, E (2018) Vision-based construction worker task productivity monitoring. PhD thesis, University of Cambridge, UK.

Konstantinou, E and Brilakis, I (2018) Matching construction workers across views for automated 3D vision tracking on-site. Journal of Construction Engineering and Management, 144(7): 04018061, ISSN 0733-9364

Koo, H. J.; Guerra, B. C.; Saka, S. and Leite, F. (2026) Streamlining BIM coordination and clash resolution through risk and relevance analysis. Journal of Construction Engineering and Management, 152(7): 04026092, ISSN 0733-9364

Kou, J.; Zhou, Z.; Guo, L.; Yang, Y.; Han, Y.; Zhang, C. and Ni, X. (2026) Multiangle computer vision-based assessment of work-related musculoskeletal disorders in construction workers. Journal of Construction Engineering and Management, 152(9): 04026141, ISSN 0733-9364

Kulkarni, S S; Chapman, C; Shah, H and Edwards, D J (2018) A computational design method for bio-mimicked horizontal axis tidal turbines. International Journal of Building Pathology and Adaptation, 36(2), pp. 188-209. ISSN 23984708

Kumar, A (1994) Development of a model for determining workzone illumination requirements during nighttime highway construction. PhD thesis, University of Florida, USA.

Kumari, P; Reddy, S R N and Yadav, R (2024) Indoor occupancy detection and counting system based on boosting algorithm using different sensor data. Building Research & Information, 52(1-2), pp. 87-106. ISSN 0961-3218

Kuoribo, E; Amoah, P; Kissi, E; Edwards, D J; Gyampo, J A and Thwala, W D (2024) Analysing the effect of multicultural workforce/teams on construction productivity. Journal of Engineering, Design and Technology, 22(3), pp. 969-990. ISSN 1726-0531

Kuoribo, E; Owusu-Manu, D G; Yomoah, R; Debrah, C; Acheampong, A and Edwards, D J (2023) Ethical and unethical behaviour of built environment professionals in the Ghanaian construction industry. Journal of Engineering, Design and Technology, 21(3), pp. 840-861. ISSN 1726-0531

Kwofie, T E; Aigbavboa, C and Baiden-Amissah, A (2020) Ontology of the communication performance prospects of building information modelling adoption among project teams in construction project delivery. Journal of Construction in Developing Countries, 25(1), pp. 21-43. ISSN 1823-6499

Kwofie, T E; Amos-Abanyie, S; Fugar, F; Afram, S O; Aigbavboa, C O and Olympio, G F (2023) Nature of communication performance among multi-teams in mass housing project delivery: A fuzzy set theory approach. International Journal of Construction Management, 23(9), pp. 1506-1517. ISSN 1562-3599

Kwon, S-W (2003) Human-assisted fitting and matching of objects to sparse point clouds for rapid workspace modeling in construction automation. PhD thesis, University of Texas at Austin, USA.

Känsälä, K; Rantala, S; Kauppila, O and Leviäkangas, P (2018) Acceleration sensor technology for rail track asset condition monitoring. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(1), pp. 32-40. ISSN 17514304

Laing, Xiaoyun (2025) Communicate, understand, and collaborate: An AI-integrated human-robot collaboration approach to improve safety and productivity in construction. PhD thesis, The University of Texas at San Antonio, USA.

Lal, H (1999) The use of characteristic productivity modelling in the improvement of site performance and the evaluation of delay and disruption claims. PhD thesis, University of Dundee, UK.

Lam, K C and Oshodi, O S (2016) Forecasting construction output: A comparison of artificial neural network and Box-Jenkins model. Engineering, Construction and Architectural Management, 23(3), pp. 302-322. ISSN 0969-9988

Lam, K C; Song Hu, T I E; Ng, T; Yuen, R K K; Lo, S M and Wong, C T C (2001) Using an adaptive genetic algorithm to improve construction finance decisions. Engineering, Construction and Architectural Management, 8(1), pp. 31-45. ISSN 0969-9988

Lamb, C M (2017) Current construction management methodologies employed by front-line supervisors and degree of understanding of six sigma principles. PhD thesis, Northcentral University, USA.

Langston, Y L and Langston, C A (2008) Reliability of building embodied energy modelling: An analysis of 30 Melbourne case studies. Construction Management and Economics, 26(2), pp. 147-160. ISSN 1466433X

Lashford, C (2016) Modelling the role of SuDS management trains to minimise the flood risk of new-build housing developments in the UK. PhD thesis, Coventry University, UK.

Lasshof, B and Stoy, C (2016) Estimation models for heating energy and electricity costs. Construction Management and Economics, 34(9), pp. 622-640. ISSN 01446193

Lataniotis, C (2019) Data-driven uncertainty quantification for high-dimensional engineering problems. DSc thesis, ETH Zürich, Switzerland.

Lau, S C; Lu, M and Poon, C S (2014) Formalized approach to discretize a continuous plant in construction simulations. Journal of Construction Engineering and Management, 140(8): 04014032, ISSN 0733-9364

Laufer, A and Tucker, R L (1988) Competence and timing dilemma in construction planning. Construction Management and Economics, 6(4), pp. 339-355. ISSN 01446193

Laura-Portugal, C. and Hammad, A. (2026) Deep learning-based forecasting for construction project duration at completion. International Journal of Construction Management, 26(8), pp. 1543-1561. ISSN 1562-3599

Lawal, H S; Ahmadu, H A; Abdullahi, M; Yamusa, M A and Abdulrazaq, M (2023) Modeling duration of building renovation projects. Journal of Financial Management of Property and Construction, 28(3), pp. 423-438. ISSN 1366-4387

Lawal, Y S; Ibrahim, A M; Abubakar, M; Ishaq, Z H and Sa'ad, M M (2023) A simulation-based binomial model for building development appraisal. Journal of Engineering, Design and Technology, 21(1), pp. 75-107. ISSN 1726-0531

Lawther, P M and Edwards, P J (2001) Design cost modelling: the way forward. Construction Economics and Building, 1(1), pp. 32-42. ISSN 2204-9029

Lazarski, A (2014) The importance of contextual factors on the accuracy of estimates in project management: An emergence of a framework for more realistic estimation process. PhD thesis, University of Bradford, UK.

Le, A T H; Domingo, N; Rasheed, E and Park, K S (2018) Building maintenance cost planning and estimating: A literature review. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Le, C; Le, T; Jeong, H D and Lee, E B (2019) Geographic information system-based framework for estimating and visualizing unit prices of highway work items. Journal of Construction Engineering and Management, 145(8): 04019044, ISSN 0733-9364

Lee, B; Lee, H S; Park, M and Kim, H (2015) Influence factors of learning-curve effect in high-rise building constructions. Journal of Construction Engineering and Management, 141(8): 04015019, ISSN 0733-9364

Lee, C and Park, K K H (2022) Forecasting trading volume in local housing markets through a time-series model and a deep learning algorithm. Engineering, Construction and Architectural Management, 29(1), pp. 165-178. ISSN 0969-9988

Lee, C; Won, J and Lee, E B (2018) Method for predicting raw material prices for product production over long periods. Journal of Construction Engineering and Management, 145(1): 05018017, ISSN 0733-9364

Lee, C K; Yiu, T W and Cheung, S O (2021) Predicting intention to use alternative dispute resolution (ADR): An empirical test of theory of planned behaviour (TPB) model. International Journal of Construction Management, 21(1), pp. 27-40. ISSN 1562-3599

Lee, D; Nie, G Y and Han, K (2024) Automatic and real-time joint tracking and three-dimensional scanning for a construction welding robot. Journal of Construction Engineering and Management, 150(3): 04023165, ISSN 0733-9364

Lee, D E and Arditi, D (2006) Automated statistical analysis in stochastic project scheduling simulation. Journal of Construction Engineering and Management, 132(3), pp. 268-277. ISSN 0733-9364

Lee, G; Lee, G; Chi, S and Oh, S (2023) Automatic classification of construction work codes in bill of quantities of national roadway based on text analysis. Journal of Construction Engineering and Management, 149(2): 04022163, ISSN 0733-9364

Lee, J G; Lee, H S; Park, M and Seo, J (2022) Early-stage cost estimation model for power generation project with limited historical data. Engineering, Construction and Architectural Management, 29(7), pp. 2599-2614. ISSN 0969-9988

Lee, Jaeho (2007) A methodology for developing bridge condition rating models based on limited inspection records. PhD thesis, Griffith University, Australia.

Lee, S (2000) Spatial model and decentralized path planning for construction automation. PhD thesis, University of Wisconsin - Madison, USA.

Leung, A W T and Tam, C M (1999) Prediction of hoisting time for tower cranes for public housing construction in Hong Kong. Construction Management and Economics, 17(3), pp. 305-314. ISSN 01446193

Leung, M Y; Liu, A M M and Wong, M M K (2006) Impact of stress-coping behaviour on estimation performance. Construction Management and Economics, 24(1), pp. 55-67. ISSN 01446193

Leung, M Y; Yu, J and Chong, M L A (2016) Effects of stress and commitment on the performance of construction estimation participants in Hong Kong. Journal of Construction Engineering and Management, 142(2): 04015081, ISSN 0733-9364

Leung, M y; Wong, M k and Oloke, D (2003) Coping behaviours of construction estimators in stress management. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Ley, J D (2004) An environmental and material flow analysis of the UK steel construction sector. EngD thesis, Cardiff University, UK.

Li, J.; Chen, Z.; Li, Z.; Kong, L. and Zhang, H. (2026) Integrating computer vision and audio signals for concrete vibration activity recognition and assessment. Journal of Construction Engineering and Management, 152(7): 04026099, ISSN 0733-9364

Li, L; Cui, X; Wang, J; Jin, H and Xu, H (2026) Automated tracking of worker and heavy equipment on tunnel construction sites: Deep-learning framework. Journal of Construction Engineering and Management, 152(2): 04025237, ISSN 0733-9364

Li, H (1996) Neural network models for intelligent support of mark-up estimation. Engineering, Construction and Architectural Management, 3(1-2), pp. 69-81. ISSN 0969-9988

Li, H; Su, L; Zuo, J; An, X; Dong, G; Wang, L and Zhang, C (2023) The framework of data-driven and multi-criteria decision-making for detecting unbalanced bidding. Engineering, Construction and Architectural Management, 30(2), pp. 598-622. ISSN 0969-9988

Li, J; Zhou, G; Li, D; Zhang, M and Zhao, X (2023) Recognizing workers' construction activities on a reinforcement processing area through the position relationship of objects detected by faster r-CNN. Engineering, Construction and Architectural Management, 30(4), pp. 1657-1678. ISSN 0969-9988

Li, J and Zou, P X W (2011) Fuzzy AHP-based risk assessment methodology for PPP projects. Journal of Construction Engineering and Management, 137(12), pp. 1205-1209. ISSN 0733-9364

Li, M; Allinson, D and Lomas, K (2020) Estimation of building heat transfer coefficients from in-use data: Impacts of unmonitored energy flows. International Journal of Building Pathology and Adaptation, 38(1), pp. 38-50. ISSN 23984708

Li, M; Baek, M and Ashuri, B (2021) Forecasting ratio of low bid to owner's estimate for highway construction. Journal of Construction Engineering and Management, 147(1): 04020157, ISSN 0733-9364

Li, M; Zheng, Q and Ashuri, B (2024) Application of artificial intelligence in design automation: A two-stage framework for structure configuration and design. Journal of Construction Engineering and Management, 150(8): 04024083, ISSN 0733-9364

Li, P; Wang, Q; Guo, Z; Mei, T; Li, Q; Qiao, S and Zuo, W (2022) Identifying falling-from-height hazards in building information models: A voxelization-based method. Journal of Construction Engineering and Management, 148(2): 04021203, ISSN 0733-9364

Li, Q; Yang, Y; Yao, G; Wei, F; Xue, G and Qin, H (2024) Multiobject real-time automatic detection method for production quality control of prefabricated laminated slabs. Journal of Construction Engineering and Management, 150(3): 05023017, ISSN 0733-9364

Li, Shuyang (2020) Proactive design approaches for energy-efficient buildings. PhD thesis, University of California, USA.

Li, W (1995) Benefit and cost analysis: Three-dimensional computer models with integrated databases in the management of construction. PhD thesis, Columbia University, USA.

Li, X; Liu, X; Huang, Y; Li, J; He, J and Dai, J (2024) Evolutionary mechanism of green innovation behavior in construction enterprises: Evidence from the construction industry. Engineering, Construction and Architectural Management, 31(1), pp. 159-178. ISSN 0969-9988

Li, Y (2013) Developing a sustainable construction waste estimation and management system. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Liang, C-J (2021) Affecting fundamental transformation in future construction work through replication of the master-apprentice learning model in human-robot worker teams. PhD thesis, University of Michigan, USA.

Liang, R and Chong, H Y (2019) A hybrid group decision model for green supplier selection: A case study of megaprojects. Engineering, Construction and Architectural Management, 26(8), pp. 1712-1734. ISSN 0969-9988

Liang, R; Li, R and Chong, H Y (2023) Decision-making model for evaluating joint venture contractors in construction of complex infrastructure megaprojects. Journal of Construction Engineering and Management, 149(9): 04023071, ISSN 0733-9364

Liang, R; Li, R; Yan, X; Xue, Z and Wei, X (2023) Evaluating and selecting the supplier in prefabricated megaprojects using extended fuzzy TOPSIS under hesitant environment: A case study from China. Engineering, Construction and Architectural Management, 30(5), pp. 1902-1931. ISSN 0969-9988

Liang, X (2012) Development of a framework for real-time 3D positioning and visualization of construction resources. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Liang, X; Rasheed, U; Cai, J; Wibranek, B and Awolusi, I (2024) Impacts of collaborative robots on construction work performance and worker perception: Experimental analysis of human-robot collaborative wood assembly. Journal of Construction Engineering and Management, 150(8): 04024087, ISSN 0733-9364

Liang, Y; Ashuri, B and Li, M (2021) Forecasting the construction expenditure cash flow for transportation design-build projects with a case-based reasoning model. Journal of Construction Engineering and Management, 147(6): 04021043, ISSN 0733-9364

Liang, Y and Xu, Z (2025) Intelligent inspection of appearance quality for precast concrete components based on improved YOLO model and multi-source data. Engineering, Construction and Architectural Management, 32(3), pp. 1691-1714. ISSN 0969-9988

Lihakanga, R (2022) Generic wireless sensor network for dynamic monitoring of a new generation of building material. PhD thesis, Heriot-Watt University, UK.

Lim, B; Nepal, M P; Skitmore, M and Xiong, B (2016) Drivers of the accuracy of developers' early stage cost estimates in residential construction. Journal of Financial Management of Property and Construction, 21(1), pp. 4-20. ISSN 1366-4387

Lim, B T H; Ling, F Y Y; Ibbs, C W; Raphael, B and Ofori, G (2012) Mathematical models for predicting organizational flexibility of construction firms in Singapore. Journal of Construction Engineering and Management, 138(3), pp. 361-375. ISSN 0733-9364

Lin, J; Xing, R and Cai, Y (2026) Advancing safer construction hris: A multisourced approach for diagnosing unsafe behavior tendencies. Journal of Construction Engineering and Management, 152(2): 04025247, ISSN 0733-9364

Lin, Q; Zhang, C; Cai, H; Li, X and Xiao, H (2024) Urban night lighting evaluation system and case study: Blending popular contemporary elements, cultural traditions and advanced lighting technologies. Engineering, Construction and Architectural Management, 31(7), pp. 2916-2931. ISSN 0969-9988

Lin, Y; Wu, D; Wang, X; Wang, X and Gao, S (2012) Statics-based simulation approach for two-crane lift. Journal of Construction Engineering and Management, 138(10), pp. 1139-1149. ISSN 0733-9364

Lin, Y and Yang, W (2022) Tri-optimization of building shape and envelope properties using taguchi and constraint limit method. Engineering, Construction and Architectural Management, 29(3), pp. 1284-1306. ISSN 0969-9988

Lin Htet, N.; Peansupap, V. and Kaewmoracharoen, M. (2026) Influence of material attribute context and document layout variability on large language model performance in construction material specification. International Journal of Construction Management, 26(8), pp. 1669-1689. ISSN 1562-3599

Linares-Garcia, D A and Roofigari-Esfahan, N (2024) Practical deployment of BIM-interoperable voice-based intelligent virtual agent support construction worker productivity. Journal of Construction Engineering and Management, 150(11): 04024153, ISSN 0733-9364

Lindhard, S M (2024) Danish contractor's application of the budget: Identifying purpose and comparing the budgets application level across job-position. Construction Economics and Building, 24(4-5), pp. 1-17. ISSN 2204-9029

Ling, F Y Y; Low, S P; Wang, S and Egbelakin, T (2008) Models for predicting project performance in China using project management practices adopted by foreign AEC firms. Journal of Construction Engineering and Management, 134(12), pp. 983-990. ISSN 0733-9364

Liu, J.; Chen, J.; Li, Y. and Zhao, K. (2026) Optimizing constrained construction crew-task assignment with grey wolf optimizer. Journal of Construction Engineering and Management, 152(8): 04026118, ISSN 0733-9364

Liu, W; Chan, A P C; Debrah, C and Darko, A (2026) Evaluating project success for emergency healthcare infrastructure based on the cloud matter-element model. Journal of Construction Engineering and Management, 152(5): 04026038, ISSN 0733-9364

Liu, C; M.E. Sepasgozar, S; Shirowzhan, S and Mohammadi, G (2022) Applications of object detection in modular construction based on a comparative evaluation of deep learning algorithms. Construction Innovation, 22(1), pp. 141-159. ISSN 1471-4175

Liu, D; Hu, C; Guo, S and Yu, J (2022) Z -number-based quantitative expression of activity information in uncertain project scheduling. Journal of Construction Engineering and Management, 148(9): 04022098, ISSN 0733-9364

Liu, H (2013) Adaptive optimization methods in system-level bridge management. PhD thesis, University of California, Berkeley, USA.

Liu, H (2024) Enhancing accuracy and security in BIM-based construction cost management leveraging AI and blockchain technologies. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Liu, H; Zhang, F; Ma, R; Wang, L; Chen, Z; Zhang, Q and Guo, L (2024) Intelligent noncontact structural displacement detection method based on computer vision and deep learning. Journal of Construction Engineering and Management, 150(10): 04024127, ISSN 0733-9364

Liu, J; Li, J; Guo, D; Cui, Q; Yang, L and Wu, H (2025) Reliability evaluation of a shield tunnel waterproofing system in the life cycle stage based on a combination weighting method and cloud model. Journal of Construction Engineering and Management, 151(6): 04025068, ISSN 0733-9364

Liu, J; Liu, G; Wang, N; Pan, M and Jiang, Y (2025) Predicting structural deterioration of large-scale building clusters using snapshot data: An integrated Markov-LSTM model. Building Research & Information, 53(6), pp. 700-716. ISSN 0961-3218

Liu, J; Yan, X and Gao, W (2024) A dualistic perspective of opportunity and risk: The impact of head-mounted augmented reality on construction onsite hazard identification of workers. Journal of Construction Engineering and Management, 150(11): 04024160, ISSN 0733-9364

Liu, K and Golparvar-Fard, M (2015) Crowdsourcing construction activity analysis from jobsite video streams. Journal of Construction Engineering and Management, 141(11): 04015035, ISSN 0733-9364

Liu, L and Napier, Z (2010) The accuracy of risk-based cost estimation for water infrastructure projects: Preliminary evidence from Australian projects. Construction Management and Economics, 28(1), pp. 89-100. ISSN 1466433X

Liu, M (2019) Video-based human motion capture and force estimation for comprehensive on-site ergonomic risk assessment. PhD thesis, University of Michigan, USA.

Liu, M; Han, S and Lee, S (2016) Tracking-based 3D human skeleton extraction from stereo video camera toward an on-site safety and ergonomic analysis. Construction Innovation, 16(3), pp. 348-367. ISSN 1471-4175

Liu, M and Ling, Y Y (2005) Modeling a contractor's markup estimation. Journal of Construction Engineering and Management, 131(4), pp. 391-399. ISSN 0733-9364

Liu, M and Luo, M (2025) Cost estimation model of prefabricated construction for general contractors based on system dynamics. Engineering, Construction and Architectural Management, 32(1), pp. 621-638. ISSN 0969-9988

Liu, P (2024) Trustworthy civil infrastructure inspection through human-machine intelligence integration. PhD thesis, Carnegie Mellon University, USA.

Liu, W (2008) Systems theory based method for construction project planning. PhD thesis, University of Florida, USA.

Liu, Z; Li, X; Gao, Z; Zhang, Y; Teng, Y and Wu, C (2025) A hybrid and intuitive work packaging approach with multiple task relations, general work package precedence, and BIM in modular construction. Journal of Construction Engineering and Management, 151(4): 04025019, ISSN 0733-9364

Lopez de Ortigosa, D A (1993) Forecasting construction costs in hyper-inflated economies. PhD thesis, University of Texas at Austin, USA.

Lowe, D and Skitmore, M (1994) Experiential learning in cost estimating. Construction Management and Economics, 12(5), pp. 423-431. ISSN 01446193

Lowe, D J (1996) Experiental learning in design cost estimating. PhD thesis, University of Manchester, UK.

Lowe, D J and Parvar, J (2004) A logistic regression approach to modelling the contractor's decision to bid. Construction Management and Economics, 22(6), pp. 643-653. ISSN 01446193

Lowe, D J and Skitmore, M (2007) The learning climate of an organisation and practitioner competence. Journal of Financial Management of Property and Construction, 12(3), pp. 151-164. ISSN 1366-4387

Lowe, D J and Skitmore, R M (2001) Human effects in construction contract price forecasting: Experience and experiential learning styles. Journal of Construction Engineering and Management, 127(6), pp. 485-493. ISSN 0733-9364

Loy, W. W.; Belek Fialho Teixeira, M. and Franzè, A. P. (2026) Ar-guided modular robotic bricklaying: A proof-of-concept system for human-in-the-loop construction workflows. Construction Innovation, ISSN 1471-4175

Loyola, M (2019) A method for real-time error detection in low-cost environmental sensors data. Smart and Sustainable Built Environment, 8(4), pp. 338-350. ISSN 2046-6099

Lu, K.; Deng, X. and Zhai, X. (2026) Openbim-based simulation of building operational carbon under different information availability. Smart and Sustainable Built Environment, 15(5), pp. 1751-1780. ISSN 2046-6099

Lu, M (2000) Productivity studies using advanced ANN models. PhD thesis, University of Alberta, Canada.

Lu, M and Lam, H C (2008) Critical path scheduling under resource calendar constraints. Journal of Construction Engineering and Management, 134(1), pp. 25-31. ISSN 0733-9364

Lu, R (2010) Impacts of local item dependence of testlet items with the multistage tests for pass-fail decisions. PhD thesis, University of Maryland, College Park, USA.

Lundeen, K M (2019) Autonomous scene understanding, motion planning, and task execution for geometrically adaptive robotized construction work. PhD thesis, University of Michigan, USA.

Lundman, P (2011) Cost management for underground infrastructure projects a case study on cost increase and its causes. PhD thesis, Luleå University of Technology, Sweden.

Luo, Xiaowei (2013) Requirements, specifications and deployment models for autonomous jobsite safety proximity monitoring. PhD thesis, University of Texas at Austin, USA.

Luvara, V G M and Benjamin, M (2025) Unveiling factors influencing the duration of arbitration practice in the Tanzania construction industry. International Journal of Building Pathology and Adaptation, 43(6), pp. 1612-1633. ISSN 2398-4708

Lü, X; Liu, Z; Lü, X and Wang, X (2024) Design and study on the leveling mechanism of the tractor body in hilly and mountainous areas. Journal of Engineering, Design and Technology, 22(3), pp. 679-689. ISSN 1726-0531

Ma, G.; Chen, Y. and Du, C. (2026) Intelligent optimization framework for tunnel construction organization driven by multi-source data and process-level simulation. International Journal of Construction Management, 26(7), pp. 1299-1319. ISSN 1562-3599

Ma, L.; Chen, C.; Zhou, W. and Wang, B. (2026) A real-time high-accuracy framework for small-scale ppe detection in complex construction environments. Journal of Construction Engineering and Management, 152(8): 04026107, ISSN 0733-9364

Ma, G; Wu, M; Jia, J and Yang, W (2021) Two-level quality decision support system for building structural damage prediction and maintenance solution recommendation in the operation and maintenance phase. Journal of Construction Engineering and Management, 147(6): 04021044, ISSN 0733-9364

Ma, J; Jiang, X; Zheng, D; Liao, X; Lu, J and Zhao, Y (2024) Transwallnet: High-performance semantic segmentation of large-scale and multifeatured point clouds of building gables. Journal of Construction Engineering and Management, 150(8): 04024092, ISSN 0733-9364

Ma, J; Li, H; Yu, X; Fang, X; Fang, B; Zhao, Z; Huang, X; Anwer, S and Xing, X (2023) Sweat analysis-based fatigue monitoring during construction rebar bending tasks. Journal of Construction Engineering and Management, 149(9): 04023072, ISSN 0733-9364

Ma, J; Zhao, Y; Zheng, D; Liao, X and Lu, J (2025) CSADnet: Attention-based semantic segmentation method for spraying scene images of building gables. Journal of Construction Engineering and Management, 151(8): 04025109, ISSN 0733-9364

Ma, M; Tam, V W Y; Le, K N and Osei-Kyei, R (2024) A systematic literature review on price forecasting models in construction industry. International Journal of Construction Management, 24(11), pp. 1191-1200. ISSN 1562-3599

Ma, Z; Gu, J; Zhao, Q; Yang, M; Qian, C; He, M and Hei, X (2025) Intelligent optimization of blasting parameters in railroad tunnels based on blasting quality control. Journal of Construction Engineering and Management, 151(8): 04025094, ISSN 0733-9364

Ma, Z; Liu, W; Li, C; Sang, Y; Zhang, Y; Li, G and Xu, Y (2024) Research on energy-saving control strategy of loader based on intelligent identification of working stages. Journal of Construction Engineering and Management, 150(7): 04024075, ISSN 0733-9364

Maaz, Z. N.; Jamaludin, A. F.; Mohd Rahim, F. A.; Rashidi, A. and Darmansah, N. F. (2026) Artificial intelligence capabilities in project cost management in the Malaysian construction industry: An exploratory study. Engineering, Construction and Architectural Management, pp. 1-22. ISSN 0969-9988

Macchiarulo, V (2022) Integration of satellite radar interferometry and civil engineering procedures to assess building and infrastructure conditions. PhD thesis, University of Bath, UK.

Madenli, O; Atasoy, G and Dikmen, I (2026) Identification and categorization of defects in construction specifications utilizing natural language processing. Journal of Construction Engineering and Management, 152(5): 04026044, ISSN 0733-9364

Maghrebi, M; Sammut, C and Waller, S T (2015) Feasibility study of automatically performing the concrete delivery dispatching through machine learning techniques. Engineering, Construction and Architectural Management, 22(5), pp. 573-590. ISSN 0969-9988

Maghrebi, M; Travis Waller, S and Sammut, C (2014) Assessing the accuracy of expert-based decisions in dispatching ready mixed concrete. Journal of Construction Engineering and Management, 140(6): 6014004, ISSN 0733-9364

Mahamedi, E; Wonders, M; Gerami Seresht, N; Woo, W L and Kassem, M (2024) A reinforcing transfer learning approach to predict buildings energy performance. Construction Innovation, 24(1), pp. 242-255. ISSN 1471-4175

Mahami, H; Nasirzadeh, F; Hosseininaveh Ahmadabadian, A; Esmaeili, F and Nahavandi, S (2019) Imaging network design to improve the automated construction progress monitoring process. Construction Innovation, 19(3), pp. 386-404. ISSN 1471-4175

Mahamid, I (2011) Early cost estimating for road construction projects using multiple regression techniques. Construction Economics and Building, 11(4), pp. 87-101. ISSN 2204-9029

Mahamivanan, H; Ghassemi, N; Tayarani Darbandy, M; Shoeibi, A; Hussain, S; Nasirzadeh, F; Alizadehsani, R; Nahavandi, D; Khosravi, A and Nahavandi, S (2025) Material recognition for construction quality monitoring using deep learning methods. Construction Innovation, 25(3), pp. 732-760. ISSN 1471-4175

Mahdavian, A; Shojaei, A; Salem, M; Yuan, J S and Oloufa, A A (2021) Data-driven predictive modeling of highway construction cost items. Journal of Construction Engineering and Management, 147(3): 04020180, ISSN 0733-9364

Mahdjoubi, L and A-Rahman, M A (2012) Effects of multimedia characteristics on novice CAD learners practice performance. Architectural Engineering and Design Management, 8(3), pp. 214-225. ISSN 1745-2007

Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML). PhD thesis, Iowa State University, USA.

Mahmood, N A (2021) Real-time site safety risk assessment and intervention for on-foot building construction workers using RFID-based multi-sensor intelligent system. PhD thesis, Ohio State University, USA.

Mahmoudi, E; Stepien, M and König, M (2021) Optimisation of geotechnical surveys using a BIM-based geostatistical analysis. Smart and Sustainable Built Environment, 10(3), pp. 420-437. ISSN 2046-6099

Mahoney, J J and Tatum, C B (1994) Construction site applications of CAD. Journal of Construction Engineering and Management, 120(3), pp. 617-631. ISSN 0733-9364

Malekaee Ashtiyani, F.; Karimi Gavareshki, M. h and Gheidar-Kheljani, J. (2026) Real-time prediction of project duration deviation using CNN-LSTM-FIS. Built Environment Project and Asset Management, 16(2), pp. 304-320. ISSN 2044-124X

Malik, N; Ahmad, R; Chen, Y; Altaf, M S and Al-Hussein, M (2021) Minimizing joist cutting waste through dynamic waste allocation in panelized floor manufacturing. International Journal of Construction Management, 21(10), pp. 1011-1023. ISSN 1562-3599

Mane, K M; Kulkarni, D K and Prakash, K B (2021) Prediction of shear strength of concrete produced by using pozzolanic materials and partly replacing nfa by MS using ann. Journal of Engineering, Design and Technology, 19(2), pp. 578-587. ISSN 1726-0531

Mansoor, A; Liu, S; Ali, G M; Bouferguene, A and Al-Hussein, M (2023) A deep-learning classification framework for reducing communication errors in dynamic hand signaling for crane operation. Journal of Construction Engineering and Management, 149(2): 4022167, ISSN 0733-9364

Mansoor, A; Liu, S; Bouferguene, A and Al-Hussein, M (2024) Crane signalman hand-signal classification framework using sensor-based smart construction glove and machine-learning algorithms. Journal of Construction Engineering and Management, 150(8): 04024094, ISSN 0733-9364

Mansuri, L E and Patel, D A (2022) Artificial intelligence-based automatic visual inspection system for built heritage. Smart and Sustainable Built Environment, 11(3), pp. 622-646. ISSN 2046-6099

Mararo, I. M.; Babafemi, A. J. and Aigbavboa, C. (2026) Towards understanding the perceptions of 3D construction printing in Kenya. International Journal of Construction Management, 26(7), pp. 1320-1340. ISSN 1562-3599

Marchiori, Fernanda Fernandes (2009) Developing a method to prepare unit cost item nets for buildings estimating. PhD thesis, Universidade de São Paulo, Brazil.

Marinelli, M D L F N L S (2015) Non-parametric bill-of-quantities estimation of concrete road bridge superstructure: An artificial neural networks approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Marsh, L (1998) Portable datafiles in the construction supply chain. PhD thesis, University of Reading, UK.

Marsh, L and Finch, E (1998) Attitudes towards auto-ID technologies within the UK construction industry. Construction Management and Economics, 16(4), pp. 383-388. ISSN 01446193

Marzouk, M and Amin, A (2013) Predicting construction materials prices using fuzzy logic and neural networks. Journal of Construction Engineering and Management, 139(9), pp. 1190-1198. ISSN 0733-9364

Marzouk, M and Hassouna, M (2019) Quality analysis using three-dimensional modelling and image processing techniques. Construction Innovation, 19(4), pp. 614-628. ISSN 1471-4175

Marzouk, M and Moselhi, O (2004) Fuzzy clustering model for estimating haulers' travel time. Journal of Construction Engineering and Management, 130(6), pp. 878-886. ISSN 0733-9364

Marzouk, M and Zaher, M (2025) Integrated approach for facility management of existing buildings using point cloud segmentation. International Journal of Building Pathology and Adaptation, 43(6), pp. 1439-1465. ISSN 2398-4708

Masitenyane, L A (2020) Dimensions and outcomes of buyer-seller relationship intentions for concrete products in the construction environment. DTech thesis, Vaal University of Technology, South Africa.

Matarneh, S; Elghaish, F; Al-Ghraibah, A; Abdellatef, E and Edwards, D J (2025) An automatic image processing based on hough transform algorithm for pavement crack detection and classification. Smart and Sustainable Built Environment, 14(1), pp. 1-22. ISSN 2046-6099

Matel, E; Vahdatikhaki, F; Hosseinyalamdary, S; Evers, T and Voordijk, H (2022) An artificial neural network approach for cost estimation of engineering services. International Journal of Construction Management, 22(7), pp. 1274-1287. ISSN 1562-3599

Mattila, K G and Bowman, M R (2004) Accuracy of highway contractor's schedules. Journal of Construction Engineering and Management, 130(5), pp. 647-655. ISSN 0733-9364

Mayouf, M A A (2016) Improving the delivery of building performance using building information modelling (BIM). PhD thesis, Birmingham City University, UK.

Mbae, A M and Nwulu, N I (2020) Day-ahead load forecasting using improved grey Verhulst model. Journal of Engineering, Design and Technology, 18(5), pp. 1335-1348. ISSN 1726-0531

McCaffer, R (1976) Contractors' bidding behaviour and tender price prediction. PhD thesis, Loughborough University, UK.

McCluskey, W; Davis, P; Haran, M; McCord, M and McIlhatton, D (2012) The potential of artificial neural networks in mass appraisal: The case revisited. Journal of Financial Management of Property and Construction, 17(3), pp. 274-292. ISSN 1366-4387

McCord, M; Davis, P T; Haran, M; McGreal, S and McIlhatton, D (2012) Spatial variation as a determinant of house price: Incorporating a geographically weighted regression approach within the Belfast housing market. Journal of Financial Management of Property and Construction, 17(1), pp. 49-72. ISSN 1366-4387

McCullouch, B G (1988) Automatic identification technology applications in industrial construction. PhD thesis, Auburn University, USA.

McGowan, P H (1994) Integrated cost and time models for measuring, valuing and controlling construction projects. PhD thesis, University of Dundee, UK.

Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.

Mehdipoor, A; Iordanova, I and Al-Hussein, M (2025) Enhancing the manufacturing process in light-gauge steel off-site construction using semiautomation. Journal of Construction Engineering and Management, 151(6): 04025055, ISSN 0733-9364

Mehta, V and Thakur, M S (2025) Enhancing precision and efficiency in English bond brick masonry: Novel unified templates approach. Engineering, Construction and Architectural Management, 32(9), pp. 6325-6350. ISSN 0969-9988

Meiling, J (2010) Continuous improvement and experience feedback in off-site construction timber-framed module prefabrication. PhD thesis, Luleå University of Technology, Sweden.

Mejia Aguilar, G (2013) Improving accuracy of project outcome predictions. PhD thesis, University of Alabama, USA.

Mejlænder-Larsen, Ø (2019) A three-step process for reporting progress in detail engineering using BIM, based on experiences from oil and gas projects. Engineering, Construction and Architectural Management, 26(4), pp. 648-667. ISSN 0969-9988

Mekid, S and Shang, M (2015) Concept of dependent joints in functional reconfigurable robots. Journal of Engineering, Design and Technology, 13(3), pp. 400-418.

Meléndez, W; Saavedra, R; Garcés, G and Herrera, R (2026) Comparative analysis of quantity take-off in reinforcing steel bars in apartment buildings based on CAD and BIM method: A case study. International Journal of Construction Management, 26(5), pp. 751-771. ISSN 1562-3599

Meng, Q and Zhu, S (2022) Construction activity classification based on vibration monitoring data: A supervised deep-learning approach with time series randaugment. Journal of Construction Engineering and Management, 148(9): 04022090, ISSN 0733-9364

Meng X, H F (2013) The application of whole life costing in PFI/PPP projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Mensah, I; Adjei-Kumi, T and Nani, G (2016) Duration determination for rural roads using the principal component analysis and artificial neural network. Engineering, Construction and Architectural Management, 23(5), pp. 638-656. ISSN 0969-9988

Mhady, A A; Gürgün, A P; Budayan, C and Koc, K (2025) New hybrid models integrating the firefly optimization algorithm with the artificial neural networks and adaptive neuro-fuzzy inference systems to improve estimation at completion. Journal of Construction Engineering and Management, 151(11): 04025160, ISSN 0733-9364

Mhundwa, R and Simon, M (2021) Electrical energy prediction using a surface fitting model for an on-farm direct expansion bulk milk cooler (DXBMC) in South Africa. Journal of Engineering, Design and Technology, 19(3), pp. 778-794. ISSN 1726-0531

Migliaccio, G C; Guindani, M; D'Incognito, M and Zhang, L (2013) Empirical assessment of spatial prediction methods for location cost-adjustment factors. Journal of Construction Engineering and Management, 139(7), pp. 858-869. ISSN 0733-9364

Mills, A; Harris, D and Skitmore, M (2003) The accuracy of housing forecasting in Australia. Engineering, Construction and Architectural Management, 10(4), pp. 245-253. ISSN 0969-9988

Mirzabeigi, S (2024) Integrated building envelope assessment towards automation of energy retrofits: Drone-based data acquisition, automated thermal anomaly detection, and workflow development. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.

Miskawi, Z (1993) A numerical analysis method for computing schedule and resource forecasting for industrial projects. Construction Management and Economics, 11(6), pp. 411-420. ISSN 01446193

Mitropoulos, P and Guillama, V (2010) Analysis of residential framing accidents, activities, and task demands. Journal of Construction Engineering and Management, 136(2), pp. 260-269. ISSN 0733-9364

Mitropoulos, P and Guillama, V (2011) A framework of task demand factors for residential framing. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 19-27. ISSN 17514312

Moaveni, B (2007) System and damage identification of civil structures. PhD thesis, University of California, San Diego, USA.

Mohamed, S Y (2020) Stochastic performance and maintenance optimization models for pavement infrastructure management. PhD thesis, Purdue University, USA.

Mohamed Safith, A W and De Silva, L (2022) The techniques and challenges of GPS surveying for vertical alignments in high-rise buildings. International Journal of Building Pathology and Adaptation, 40(4), pp. 587-607. ISSN 23984708

Mohammadi, Masoud (2023) Development of bridge information model (brim) for digital twinning and management using tls technology. PhD thesis, Western Sydney University, Australia.

Mohammed, A; Bahatheq, A; Ghaithan, A; Alshibani, A; Mazher, K M and Alrashidi, A (2026) Predicting schedule delays of construction projects in the oil and gas industry: Comparative study. Built Environment Project and Asset Management, 16(2), pp. 286-303. ISSN 2044-124X

Mohammed Abdelkader, E (2022) On the hybridization of pre-trained deep learning and differential evolution algorithms for semantic crack detection and recognition in ensemble of infrastructures. Smart and Sustainable Built Environment, 11(3), pp. 740-764. ISSN 2046-6099

Mohsen, Osama (2021) A machine learning approach to predict production time in industrialized building construction. PhD thesis, University of Alberta, Canada.

Mohseni, H; Setunge, S; Zhang, G and Wakefield, R (2017) Markov process for deterioration modeling and asset management of community buildings. Journal of Construction Engineering and Management, 143(6): 04017003, ISSN 0733-9364

Mohsenijam, Arash (2019) Advancing regression based analytics for steel fabrication productivity modeling. PhD thesis, University of Alberta, Canada.

Mok, C K; Rao Tummala, V M and Leung, H M (1997) Practices, barriers and benefits of risk management process in building services cost estimation. Construction Management and Economics, 15(2), pp. 161-175. ISSN 01446193

Mok, K Y; Shen, G Q and Yang, R J (2017) A network theory-based analysis of stakeholder issues and their interrelationships in large construction projects: A case study. International Journal of Construction Management, 17(3), pp. 210-227. ISSN 1562-3599

Momade, M H; Shahid, S; Hainin, M R B; Nashwan, M S and Tahir Umar, A (2022) Modelling labour productivity using SVM and rf: A comparative study on classifiers performance. International Journal of Construction Management, 22(10), pp. 1924-1934. ISSN 1562-3599

Moncaster, A; Malmqvist, T; Forman, T; Pomponi, F and Anderson, J (2022) Embodied carbon of concrete in buildings, Part 2: Are the messages accurate? Buildings & Cities, 3(1), pp. 334-355. ISSN 2632-6655

Moore, W B (1989) Modeling the impact of large construction projects on surrounding communities. PhD thesis, University of Maryland, College Park, USA.

Moradipour, P; Noorzaei, J; Jaafar, M S and Aziz, F N A A (2013) An improved computational method in structural dynamics. Journal of Engineering, Design and Technology, 11(3), pp. 288-315. ISSN 1726-0531

Moragane, H P M N L B; Perera, B A K S; Palihakkara, A D and Ekanayake, B (2024) Application of computer vision for construction progress monitoring: A qualitative investigation. Construction Innovation, 24(2), pp. 446-469. ISSN 1471-4175

Morley, D; Lu, M and Abourizk, S (2014) Identification of invariant average weighted haul distance to simplify earthmoving simulation modeling in planning site grading operations. Journal of Construction Engineering and Management, 140(12): 04014057, ISSN 0733-9364

Morrison, N (1984) The accuracy of quantity surveyors' cost estimating. Construction Management and Economics, 2(1), pp. 57-75. ISSN 01446193

Moselhi, O and Lorterapong, P (1993) Near optimal solution for resource-constrained scheduling problems. Construction Management and Economics, 11(4), pp. 293-303. ISSN 01446193

Mostafavi, A; Valentin, V; Abraham, D M and Louis, J (2012) Assessment of the productivity of nighttime asphalt paving operations. Journal of Construction Engineering and Management, 138(12), pp. 1421-1432. ISSN 0733-9364

Mostofi, F; Tokdemir, O B and Toǧan, V (2023) Comprehensive root cause analysis of construction defects using semisupervised graph representation learning. Journal of Construction Engineering and Management, 149(9): 04023079, ISSN 0733-9364

Mostofi, F; Tokdemir, O B; Toǧan, V and Arditi, D (2024) Predicting the cost of rework in high-rise buildings using graph convolutional networks. Journal of Construction Engineering and Management, 150(8): 04024085, ISSN 0733-9364

Mostofi, F; Toǧan, V; Başaǧa, H B; Çltlpltloǧlu, A and Tokdemir, O B (2023) Multiedge graph convolutional network for house price prediction. Journal of Construction Engineering and Management, 149(11): 04023112, ISSN 0733-9364

Motawa, I A; Khosrowshahi, F and Kaka, A P (2005) Development and evaluation of a company-level budgeting technique incorporating future construction contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Motlagh, K C (1992) Algorithms for computerised surface modelling and highway alignment design. PhD thesis, University of Strathclyde, UK.

Mousavi, Milad (2025) Evolving and proactive risk modelling in underground working environments. PhD thesis, University of New South Wales, Australia.

Moussa, A; Ezzeldin, M and El-Dakhakhni, W (2025) Machine learning and optimization strategies for infrastructure projects risk management. Construction Management and Economics, 43(8), pp. 557-582. ISSN 0144-6193

Mujalli, R O; Marie, I and Al-Kasasbeh, M (2024) Consequences of COVID-19 on jordan's construction sector using data mining techniques. International Journal of Construction Management, 24(12), pp. 1339-1348. ISSN 1562-3599

Mun, H.; Jeong, J.; Jeong, J. and Kumi, L. (2026) Unsupervised learning approach for benchmark models to identify construction projects with high accident risk levels. Engineering, Construction and Architectural Management, 33(5), pp. 3777-3798. ISSN 0969-9988

Murray, M D; Tookey, J E; Langford, D A and Hardcastle, C (2000) Project communication variables: A comparative study of us and UK construction industry perceptions. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Musselwhite D, G B (2024) An analysis of activity-level predictability from UK construction projects. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Naderi, M; Nazari, A; Shafaat, A and Abrishami, S (2025) Enhancing accuracy in construction overhead cost estimation: A novel integration of activity-based costing and building information modelling. Smart and Sustainable Built Environment, 14(3), pp. 758-775. ISSN 2046-6099

Nageeb, M (2012) The effectiveness of the hybrid graphical representation method in visually combining and communicating logical and spatial relationships between scheduled activities. PhD thesis, Texas A&M University, USA.

Naghashian, M H (2015) Generalised cost benefit analysis for large infrastructure projects: the case of the Channel Tunnel rail link. PhD thesis, University of Birmingham, UK.

Naizghi, M S (2021) Factors affecting implementation of earned value management (EVM) in construction projects. PhD thesis, Wayne State University, USA.

Nakhi, A E (1995) Adaptive construction modelling within whole building dynamic simulation. PhD thesis, University of Strathclyde, UK.

Napolitan, C L (1995) Improvement to the forecast precision of the factor model for masonry productivity. PhD thesis, Pennsylvania State University, USA.

Narbaev, T and De Marco, A (2014) Combination of growth model and earned schedule to forecast project cost at completion. Journal of Construction Engineering and Management, 140(1): 04013038, ISSN 0733-9364

Nasirzadeh, F; Carmichael, D G; Jarban, M J and Rostamnezhad, M (2019) Hybrid fuzzy-system dynamics approach for quantification of the impacts of construction claims. Engineering, Construction and Architectural Management, 26(7), pp. 1261-1276. ISSN 0969-9988

Nassereddine, H M (2019) Design, development and validation of an augmented reality-enabled production strategy process for the construction industry. PhD thesis, University of Wisconsin - Madison, USA.

Navon, R and Goldschmidt, E (2003) Can labor inputs be measured and controlled automatically? Journal of Construction Engineering and Management, 129(4), pp. 437-445. ISSN 0733-9364

Navon, R and Shpatnitsky, Y (2005) Field experiments in automated monitoring of road construction. Journal of Construction Engineering and Management, 131(4), pp. 487-493. ISSN 0733-9364

Nelson, T N T (2024) Using socio-technical water systems in construction engineering to address water insecurity after hurricanes maria and fiona. PhD thesis, Iowa State University, USA.

Newell, G and Karantonis, A (2003) The predictive accuracy of investor sentiment for commercial property in Australia. Journal of Financial Management of Property and Construction, 8(3), pp. 117-128. ISSN 1366-4387

Newton, A J (1995) The planning and management of detailed building design. PhD thesis, Loughborough University, UK.

Neya, I; Yamegueu, D; Messan, A; Coulibaly, Y; Ouedraogo, A L S N and Ayite, Y M X D (2025) Effect of cement and geopolymer stabilization on the thermal comfort: Case study of an earthen building in Burkina Faso. International Journal of Building Pathology and Adaptation, 43(3), pp. 283-301. ISSN 2398-4708

Ng, S T; Cheung, S O; Skitmore, M and Wong, T C Y (2004) An integrated regression analysis and time series model for construction tender price index forecasting. Construction Management and Economics, 22(5), pp. 483-493. ISSN 01446193

Ng, S T; Fan, R Y C and Wong, J M W (2011) An econometric model for forecasting private construction investment in Hong Kong. Construction Management and Economics, 29(5), pp. 519-534. ISSN 1466433X

Nguyen, B K (2012) Developing a framework for assessing sustainability of tall-building projects. PhD thesis, University of Sheffield, UK.

Nguyen, T Q; Lou, E C W and Nguyen, B N (2024) A theoretical BIM-based framework for quantity take-off to facilitate progress payments: The case of high-rise building projects in Vietnam. International Journal of Building Pathology and Adaptation, 42(4), pp. 704-728. ISSN 23984708

Nguyen, T Q; Yeoh, J K W and Angelia, N (2023) Predicting percent plan complete through time series analysis. Journal of Construction Engineering and Management, 149(6): 04023038, ISSN 0733-9364

Nicholas, J; Holt, G D and Harris, P T (1998) Financial business relationships: A conceptual model for evaluating contractors' creditworthiness. Journal of Financial Management of Property and Construction, 3(3), pp. 17-36. ISSN 1366-4387

Nicholas, J; Holt, G D and Harris, P T (2000) An investigation into predicting materials suppliers' profits. Journal of Construction Procurement, 6(2), ISSN 1358-9180

Nicholas, J; Holt, G D and Mihsein, M (2000) Forecasting construction materials suppliers' financial turnover. Engineering, Construction and Architectural Management, 7(3), pp. 221-231. ISSN 0969-9988

Nik Bakht, M (2015) Analyzing social network discussions of infrastructure projects: towards a bottom-up decision making environment. PhD thesis, University of Toronto, Canada.

Ning, X; Shan, M; Li, Z and Nie, Z (2025) Prediction of construction material prices based on the sliding window catboost model. Journal of Construction Engineering and Management, 151(12): 04025196, ISSN 0733-9364

Nouh Meshref, A; Elkasaby, E and Wageh, O (2026) Innovative strategic multicriteria decision-making selection model of infrastructures projects delivery systems using multiobjective optimization, case of Egypt. Construction Innovation, 26(2), pp. 353-368. ISSN 1471-4175

Nuhu, B K; Aliyu, I; Adegboye, M A; Ryu, J K; Olaniyi, O M and Lim, C G (2021) Distributed network-based structural health monitoring expert system. Building Research & Information, 49(1), pp. 144-159. ISSN 0961-3218

Nwodo, M N (2020) Investigation of exergy-based life cycle assessment of buildings. PhD thesis, University of Florida, USA.

O'Connor, J T and Huh, Y (2005) Crew production rates for contract time estimation: Bent footing, column, and cap of highway bridges. Journal of Construction Engineering and Management, 131(9), pp. 1013-1020. ISSN 0733-9364

O'Connor, J T and Huh, Y (2006) Crew production rates for contract time estimation: Beam erection, deck, and rail of highway bridges. Journal of Construction Engineering and Management, 132(4), pp. 408-415. ISSN 0733-9364

Obasi, S N N; Pemberton, J and Awe, O O (2025) A comparative study of soil classification machine learning models for construction management. International Journal of Construction Management, 25(5), pp. 584-593. ISSN 1562-3599

Oberlender, G D and Trost, S M (2001) Predicting accuracy of early cost estimates based on estimate quality. Journal of Construction Engineering and Management, 127(3), pp. 173-182. ISSN 0733-9364

Odeh, I S M (2010) Evaluation of glare and lighting performance in nighttime highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Odeyinka, H; Lowe, J and Kaka, A (2012) Regression modelling of risk impacts on construction cost flow forecast. Journal of Financial Management of Property and Construction, 17(3), pp. 203-221. ISSN 1366-4387

Ofori, J. N. A.; Tomori, M. and Ogunseiju, O. (2026) A predictive framework for optimizing cognition during human-wearable robot interactions in the construction industry. Journal of Construction Engineering and Management, 152(10): 04026160, ISSN 0733-9364

Ogunlana, O (1991) Learning from experience in design cost estimating. Construction Management and Economics, 9(2), pp. 133-150. ISSN 01446193

Ogunlana, S O (1989) Accuracy in design cost estimating. PhD thesis, Loughborough University, UK.

Ogunseiju, O R; Gonsalves, N; Akanmu, A A; Abraham, Y and Nnaji, C (2024) Automated detection of learning stages and interaction difficulty from eye-tracking data within a mixed reality learning environment. Smart and Sustainable Built Environment, 13(6), pp. 1473-1489. ISSN 2046-6099

Ogunseiju, O R; Olayiwola, J; Akanmu, A A and Nnaji, C (2022) Recognition of workers' actions from time-series signal images using deep convolutional neural network. Smart and Sustainable Built Environment, 11(4), pp. 812-831. ISSN 2046-6099

Okudan, O; Cevikbas, M and Işık, Z (2025) Selection framework of disruption analysis methods for megaprojects: An integrated fuzzy multi-criteria decision-making approach. Engineering, Construction and Architectural Management, 32(1), pp. 59-86. ISSN 0969-9988

Omar, H (2020) Towards an automated photogrammetry-based approach for monitoring and controlling construction site activities. PhD thesis, University of the West of England, Bristol, UK.

Ongkowijoyo, C and Doloi, H (2017) Determining critical infrastructure risks using social network analysis. International Journal of Disaster Resilience in the Built Environment, 8(1), pp. 5-26. ISSN 1759-5916

Ongkowijoyo, C S; Doloi, H and Mills, A (2019) Participatory-based risk impact propagation and interaction pattern analysis using social network analysis. International Journal of Disaster Resilience in the Built Environment, 10(5), pp. 363-378. ISSN 1759-5916

Orabi, W (2010) Optimizing highway reconstruction and rehabilitation projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Oshidero, D. F. O. and Coley, D. A. (2026) Talking carbon: A lexical approach to predictive embodied carbon analysis via machine learning. Architectural Engineering and Design Management, 22(1), pp. 235-268. ISSN 1745-2007

Oshodi, O S; Thwala, W D; Odubiyi, T B; Abidoye, R B and Aigbavboa, C O (2019) Using neural network model to estimate the rental price of residential properties. Journal of Financial Management of Property and Construction, 24(2), pp. 217-230. ISSN 1366-4387

Othman, Z M Z (2007) Classifying the aptitude of Civil Engineering Project Managers using Multivariate Discriminant Analysis. PhD thesis, Loughborough University, UK.

Ottaviani, F M; De Marco, A; Narbaev, T and Ballesteros-Pérez, P (2026) Work rate-based indicators for improving project performance regression models. International Journal of Construction Management, 26(1), pp. 99-112. ISSN 1562-3599

Ouyang, Y and Luo, X (2024) Effects of physical fatigue on construction workers' visual search patterns during hazard identification. Journal of Construction Engineering and Management, 150(9): 04024120, ISSN 0733-9364

Oyenubi, A. and Oyeyipo, O. O. (2026) Overcoming GenAI adoption barriers in construction cost management: Evidence from Nigeria. Construction Innovation, pp. 1-26. ISSN 1471-4175

O’Connell, S; Reynders, G; Seri, F; Sterling, R and Keane, M M (2020) A standardised flexibility assessment methodology for demand response. International Journal of Building Pathology and Adaptation, 38(1), pp. 20-37. ISSN 23984708

Padala, S P S and Goyal, A (2025) Early stage cost prediction model for Indian building construction projects using artificial neural networks. Journal of Financial Management of Property and Construction, 30(3), pp. 377-397. ISSN 1366-4387

Paik, S; Kim, J; Kim, Y and Kim, H (2025) Safety analysis and localization of scaffold joints using uav-acquired images. Journal of Construction Engineering and Management, 151(12): 04025194, ISSN 0733-9364

Pakalapati, K; Khalafalla, M and Rueda-Benavides, J (2022) Using moving-window cross-validation algorithm to optimize bid-based cost estimating data usage. International Journal of Construction Management, 22(15), pp. 2855-2863. ISSN 1562-3599

Pal, A.; Lin, J. J.; Amer, F.; Hsieh, S. H. and Golparvar Fard, M. (2026) Automatic mapping of schedule activities and reality models for tracking construction progress. Engineering, Construction and Architectural Management, 33(3), pp. 1932-1958. ISSN 0969-9988

Panas, A and Pantouvakis, J P (2014) Simulation-based and statistical analysis of the learning effect in floating caisson construction operations. Journal of Construction Engineering and Management, 140(1): 04013033, ISSN 0733-9364

Pandey, P (2019) Lean scheduling in construction projects: realistic milestone planning. PhD thesis, Indian Institute of Technology Delhi, India.

Pandimani, M R; Ponnada, M R and Geddada, Y (2024) Finite-element modeling of partially prestressed concrete beams with unbonded tendon under monotonic loadings. Journal of Engineering, Design and Technology, 22(1), pp. 235-256. ISSN 1726-0531

Panella, Fabio (2023) Automating inspection of tunnels with photogrammetry and deep learning. PhD thesis, University College London, UK.

Pantelias, A (2009) A methodological framework for probabilistic evaluation of financial viability of transportation infrastructure under public private partnerships. PhD thesis, University of Texas at Austin, USA.

Pargieła, K; Jasińska, A; Malczewska, A; Grzelka, K; Koszyk, J and Ambroziński, Ł (2025) Application of mobile laser scanner to augment stationary collected point clouds. Building Research & Information, 53(6), pp. 675-699. ISSN 0961-3218

Parisi, L. and Donyavi, S. (2026) Advancing materials procurement processes in construction: A framework for optimising technology integration in SMEs' construction supply chains. International Journal of Construction Management, 26(7), pp. 1365-1389. ISSN 1562-3599

Parisi, F; Sangiorgio, V; Parisi, N; Mangini, A M; Fanti, M P and Adam, J M (2024) A new concept for large additive manufacturing in construction: Tower crane-based 3D printing controlled by deep reinforcement learning. Construction Innovation, 24(1), pp. 8-32. ISSN 1471-4175

Park, M-W (2012) Automated 3D vision-based tracking of construction entities. PhD thesis, Georgia Institute of Technology, USA.

Parry, A (2015) The improvement of delay analysis in the UK construction industry. PhD thesis, Northumbria University, UK.

Parvar, J (2003) Neural networks decision support system (decision to bid). PhD thesis, University of Manchester, UK.

Patel, P. and Sturgill, R. (2026) An interpretive structure modeling approach to assess the value of underground utility as-builts. Journal of Construction Engineering and Management, 152(10): 04026164, ISSN 0733-9364

Patel, T.; Guo, B. H. W.; van der Walt, J. D. and Bapat, H. (2026) Vision-based automated road construction progress monitoring: Improved u-net segmentation approach. International Journal of Construction Management, 26(10), pp. 2154-2175. ISSN 1562-3599

Patel, T; Guo, B H W; van der Walt, J D and Zou, Y (2025) Unmanned ground vehicle (ugv) based automated construction progress measurement of road using LSTM. Engineering, Construction and Architectural Management, 32(9), pp. 5764-5791. ISSN 0969-9988

Patel, T; Scheepbouwer, E and van der Walt, J D (2025) Optimizing infrastructure procurement: A predictive model for procurement delivery method selection in New Zealand context. International Journal of Construction Management, 25(14), pp. 1736-1748. ISSN 1562-3599

Patel, T D; Haupt, T C and Bhatt, T (2020) Fuzzy probabilistic approach for risk assessment of BOT toll roads in Indian context. Journal of Engineering, Design and Technology, 18(1), pp. 251-269. ISSN 1726-0531

Patil, S V; Balakrishna Rao, K and Nayak, G (2023) Prediction of recycled coarse aggregate concrete mechanical properties using multiple linear regression and artificial neural network. Journal of Engineering, Design and Technology, 21(6), pp. 1690-1709. ISSN 1726-0531

Payne, A S (2021) Impact of personality traits and team criteria on construction team performance. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Payne, B (1998) Project risk analysis. PhD thesis, Nottingham Trent University, UK.

Peiman, F; Khalilzadeh, M; Shahsavari-Pour, N and Ravanshadnia, M (2025) Estimation of building project completion duration using a natural gradient boosting ensemble model and legal and institutional variables. Engineering, Construction and Architectural Management, 32(4), pp. 2069-2104. ISSN 0969-9988

Pendlebury, M C (2000) Techniques and strategies to improve conceptual and schematic design. PhD thesis, Loughborough University, UK.

Peng, M (2006) Item-level quantity-based preliminary cost estimating system for highway structures and miscellaneous construction. PhD thesis, University of Texas at Austin, USA.

Peng, Min (2006) Item-level quantity-based preliminary cost estimating system for highways structures and miscellaneous construction. PhD thesis, University of Texas at Austin, USA.

Perez-Perez, Y; Golparvar-Fard, M and El-Rayes, K (2021) Scan2bim-net: Deep learning method for segmentation of point clouds for scan-to-BIM. Journal of Construction Engineering and Management, 147(9): 04021107, ISSN 0733-9364

Peter, E; Love, D and Heng, L I (2000) Quantifying the causes and costs of rework in construction. Construction Management and Economics, 18(4), pp. 479-490. ISSN 01446193

Petroutsatou, K; Georgopoulos, E; Lambropoulos, S and Pantouvakis, J P (2012) Early cost estimating of road tunnel construction using neural networks. Journal of Construction Engineering and Management, 138(6), pp. 679-687. ISSN 0733-9364

Pham, S V H and Nguyen, K V T (2025) Performance review of RTI IMS software for automatic road surface damages identification. International Journal of Construction Management, 25(4), pp. 439-455. ISSN 1562-3599

Pham, T Q D; Le-Hong, T and Tran, X V (2023) Efficient estimation and optimization of building costs using machine learning. International Journal of Construction Management, 23(5), pp. 909-921. ISSN 1562-3599

Philips-Ryder, M; Zuo, J and Jin, X H (2013) Evaluating document quality in construction projects: subcontractors' perspective. International Journal of Construction Management, 13(3), pp. 77-94. ISSN 1562-3599

Phillips, H C (2009) A proposed method to determine confidence in a construction schedule. PhD thesis, University of New Mexico, USA.

Pieterse, E I (2024) A cost model to improve short-term underinsurance of residential buildings in South Africa. PhD thesis, University of Pretoria, South Africa.

Pilechiha, P; Norouziasas, A; Ghorbani Naeini, H and Jolma, K (2022) Evaluation of occupant's adaptive thermal comfort behaviour in naturally ventilated courtyard houses. Smart and Sustainable Built Environment, 11(4), pp. 793-811. ISSN 2046-6099

Pilgrim, M J (2003) The application of visualisation techniques to the process of building performance analysis. PhD thesis, Loughborough University, UK.

Plemmons, J K (1995) Materials management process measures and benchmarking in the industrial construction industry. PhD thesis, Clemson University, USA.

Poh, Y P (2005) Knowledge-based integrated project duration-cost risk simulation model. PhD thesis, London South Bank University, UK.

Poshdar, M; González, V A; Raftery, G M and Orozco, F (2014) Characterization of process variability in construction. Journal of Construction Engineering and Management, 140(11): 5014009, ISSN 0733-9364

Poshdar, M; González, V A; Raftery, G M; Orozco, F; Romeo, J S and Forcael, E (2016) A probabilistic-based method to determine optimum size of project buffer in construction schedules. Journal of Construction Engineering and Management, 142(10): 04016046, ISSN 0733-9364

Poudel, O and Assaad, R H (2025) A real-time intelligent acoustic IoT-enabled embedded construction site monitoring and alert system: Integrating deep learning-based machine-listening algorithms, edge computing, and cloud computing. Journal of Construction Engineering and Management, 151(7): 04025075, ISSN 0733-9364

Pourrahimian, E; Eltahan, A; Salhab, D; Crawford, J; AbouRizk, S and Hamzeh, F (2026) Integrating expert insights and data analytics for enhanced construction productivity monitoring and control: A machine learning approach. Engineering, Construction and Architectural Management, 33(1), pp. 856-872. ISSN 0969-9988

Pourrahimian, E; Salhab, D; Hamzeh, F and Abourizk, S (2024) The need for a multidimensional project control perspective. Journal of Construction Engineering and Management, 150(12): 04024169, ISSN 0733-9364

Poveda, C A and Fayek, A R (2009) Predicting and evaluating construction trades foremen performance: Fuzzy logic approach. Journal of Construction Engineering and Management, 135(9), pp. 920-929. ISSN 0733-9364

Pozzer, A E; Rausch, C and Leite, F (2025) Methodology for evaluating the uncertainty of embodied carbon assessments in construction projects across project phases. Journal of Construction Engineering and Management, 151(10): 04025158, ISSN 0733-9364

Pradhan, A R (2009) An approach for fusing data from multiple sources to support construction productivity analyses. PhD thesis, Carnegie Mellon University, USA.

Pratomo, R A; Islamiah, Z and Bhaskara, B E (2024) A pathway to urban resilience: Investigating green open space priority areas to mitigate the urban heat island phenomenon in Samarinda City, Indonesia. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 591-616. ISSN 1759-5916

Prieto, A J; Torres-González, M and Carpio, M (2024) Virtual web-based instruments in the evaluation of functional degradation of heritage timber buildings. Building Research & Information, 52(1-2), pp. 181-193. ISSN 0961-3218

Proctor-Parker, C and Stopforth, R (2024) Radio frequency identification (RFID) stock control and geo-location data system from a moving vehicle. Journal of Engineering, Design and Technology, 22(1), pp. 159-181. ISSN 1726-0531

Pulket, T (2008) Universal prediction model for construction litigation. PhD thesis, Illinois Institute of Technology, USA.

Pulket, T and Arditi, D (2009) Construction litigation prediction system using ant colony optimization. Construction Management and Economics, 27(3), pp. 241-251. ISSN 1466433X

Pulugurta, H (2007) Development of pavement condition forecasting models. PhD thesis, University of Toledo, USA.

Puri, V (2012) Incorporation of continuous activities into activity cycle diagram based discrete event simulation for construction operations. PhD thesis, Purdue University, USA.

Puri, V and Martinez, J C (2013) Modeling of simultaneously continuous and stochastic construction activities for simulation. Journal of Construction Engineering and Management, 139(8), pp. 1037-1045. ISSN 0733-9364

Qi, K. and Lu, M. (2026) A data-driven framework for quantifying physical workload in construction using posture-hour metrics. Journal of Construction Engineering and Management, 152(7): 04026100, ISSN 0733-9364

Qi, L; Zhai, H and Shuang, Q (2026) Attention-driven multiobject tracking for proactive fall safety management in construction. Journal of Construction Engineering and Management, 152(5): 04026052, ISSN 0733-9364

Qiao, J; Wang, C; Guan, S and Shuran, L (2022) Construction-accident narrative classification using shallow and deep learning. Journal of Construction Engineering and Management, 148(9): 04022088, ISSN 0733-9364

Qin, Y and Bulbul, T (2023) An EEG-based mental workload evaluation for ar head-mounted display use in construction assembly tasks. Journal of Construction Engineering and Management, 149(9): 04023088, ISSN 0733-9364

Qiu, W; Ma, P; Peng, Q; Zhao, L; Liu, L and Zhou, F (2024) An evaluation method for multisource information fusion in tunneling water inrush disasters. Journal of Construction Engineering and Management, 150(10): 04024133, ISSN 0733-9364

Qu, T (2006) The usability of graphical user interfaces of mobile computing devices designed for construction foremen: Icons and pre-defined text lists compared. PhD thesis, University of Florida, USA.

Rafiei, M H and Adeli, H (2016) A novel machine learning model for estimation of sale prices of real estate units. Journal of Construction Engineering and Management, 142(2): 04015066, ISSN 0733-9364

Rafiei, M H and Adeli, H (2018) Novel machine-learning model for estimating construction costs considering economic variables and indexes. Journal of Construction Engineering and Management, 144(12): 04018106, ISSN 0733-9364

Rahman, Muzibur (2022) Constructors' decision-support framework for nzeb projects. PhD thesis, Oklahoma State University, USA.

Rai, H; Jagannathan, M and Venkata Santosh Kumar, D (2021) Claim tenability assessment in Indian real estate projects using ann and decision tree models. Built Environment Project and Asset Management, 11(3), pp. 468-487. ISSN 2044-124X

Raisbeck, P and Aibinu, A A (2010) Early stage cost estimation and the relationship of architects to quantity surveyors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Raja, P (2025) A building centric urban digital twin for resiliency planning. PhD thesis, Rutgers The State University of New Jersey, USA.

Rajak, S and Vimal, V (2024) LSTM-CNN architecture for construction activity recognition using optimal positioning of wearables. Journal of Construction Engineering and Management, 150(12): 04024179, ISSN 0733-9364

Rakesh Kumar, G (2025) Seismic vulnerability assessment of buildings using rapid visual screening for hybrid UMNN-RFO approach. International Journal of Construction Management, 25(10), pp. 1177-1185. ISSN 1562-3599

Ramalingam Rethnam, O. and Thomas, A. (2026) A physics-informed deep learning-based urban building thermal comfort modeling and prediction framework for identifying thermally vulnerable building stock. Smart and Sustainable Built Environment, 15(2), pp. 622-648. ISSN 2046-6099

Ranasinghe, M (1996) Total project cost: A simplified model for decision makers. Construction Management and Economics, 14(6), pp. 497-505. ISSN 01446193

Rashad, A; Hegazy, H; Zhang, J; Mahdi, I; Abdel-Rasheed, I and Ebid, A (2025) Developing preliminary cost estimates for foundation systems of high-rise buildings. International Journal of Construction Management, 25(6), pp. 682-698. ISSN 1562-3599

Rashidi, A; Jazebi, F and Brilakis, I (2011) Neurofuzzy genetic system for selection of construction project managers. Journal of Construction Engineering and Management, 137(1), pp. 17-29. ISSN 0733-9364

Rashidi, A; Yong, W Y; Maxwell, D and Fang, Y (2023) Construction planning through 4D BIM-based virtual reality for light steel framing building projects. Smart and Sustainable Built Environment, 12(5), pp. 1153-1173. ISSN 2046-6099

Rasoulimanesh, M.; Rahai, A. and Shahhosseini, V. (2025) An integrated decision support system for strategic budget/resource allocation in bridge infrastructure management based on digital technologies. Smart and Sustainable Built Environment, 15(5), pp. 1939-1966. ISSN 2046-6099

Rathnayake, A P (2021) A framework to enhance the adoption of building information modelling amongst Sri Lankan quantity surveying organisations to increase the accuracy of pre-tender cost estimates. PhD thesis, University of Salford, UK.

Rathnayake, B; Gunathilake, L; Edirisinghe, R and Perera, S (2025) Ecoconstruct: A blockchain-based system for carbon trading in construction projects. Construction Innovation, 25(7), pp. 213-234. ISSN 1471-4175

Rausch, C; Lu, R; Talebi, S and Haas, C (2023) Deploying 3D scanning based geometric digital twins during fabrication and assembly in offsite manufacturing. International Journal of Construction Management, 23(3), pp. 565-578. ISSN 1562-3599

Ravirala, V (1995) Multi-criteria optimization methodologies for highway program development. PhD thesis, Rensselaer Polytechnic Institute, USA.

Ray, U.; Arteaga, C.; Ahn, Y. and Park, J. (2026) Enhanced identification of equipment failures from descriptive accident reports using language generative model. Engineering, Construction and Architectural Management, 33(3), pp. 2298-2313. ISSN 0969-9988

Razavi, S N; Montaser, A and Moselhi, O (2012) RFID deployment protocols for indoor construction. Construction Innovation, 12(2), pp. 239-258. ISSN 1471-4175

Reymen, I M M J; Dewulf, G P M R and Blokpoel, S B (2008) Framework for managing uncertainty in property projects. Building Research & Information, 36(6), pp. 580-592. ISSN 0961-3218

Rezazadeh Azar, E; Dickinson, S and McCabe, B (2013) Server-customer interaction tracker: Computer vision-based system to estimate dirt-loading cycles. Journal of Construction Engineering and Management, 139(7), pp. 785-794. ISSN 0733-9364

Ribón, J G T M (2020) Advanced monitoring of construction safety using UAS and positioning technologies. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.

Rilett, L R (1998) Effect of variability on end product specifications. Journal of Construction Engineering and Management, 124(2), pp. 139-145. ISSN 0733-9364

Riverso, M E (1984) A life cycle cost system for value engineering in building design and construction (economic, cost-codes, database). PhD thesis, Purdue University, USA.

Rizaee, S and Lei, Z (2024) Duration estimation of a heavy industrial scaffolding project: A case study. Journal of Construction Engineering and Management, 150(4): 05024002, ISSN 0733-9364

Rodrigo, M N N; Perera, S; Senaratne, S and Jin, X (2022) Systematic development of a data model for the blockchain-based embodied carbon (bec) estimator for construction. Engineering, Construction and Architectural Management, 29(9), pp. 3311-3330. ISSN 0969-9988

Rodrigo, N; Perera, S; Senaratne, S and Jin, X (2024) Development of a blockchain-based embodied carbon estimator. Built Environment Project and Asset Management, 14(6), pp. 914-936. ISSN 2044-124X

Runeson, G (1988) An analysis of the accuracy of estimating and the distribution of tenders. Construction Management and Economics, 6(4), pp. 357-370. ISSN 01446193

Runeson, G r (1996) Models of construction price determination: A comparative appraisal. PhD thesis, Queensland University of Technology, Australia.

Runeson, K G (1988) Methodology and method for price-level forecasting in the building industry. Construction Management and Economics, 6(1), pp. 49-55. ISSN 01446193

Russell, A D (1993) Computerized daily site reporting. Journal of Construction Engineering and Management, 119(2), pp. 385-402. ISSN 0733-9364

Ryu, J; Seo, J; Jebelli, H and Lee, S (2019) Automated action recognition using an accelerometer-embedded wristband-type activity tracker. Journal of Construction Engineering and Management, 145(1): 04018114, ISSN 0733-9364

Saadi, A and Belhadef, H (2020) Deep neural networks for Arabic information extraction. Smart and Sustainable Built Environment, 9(4), pp. 467-482. ISSN 2046-6099

Sadeghi, S.; Niu, C.; Marjani, T. and Lotfi, R. (2026) Machine learning-enabled construction project management: Systematic review, comparative performance synthesis and implementation framework. Built Environment Project and Asset Management, 16(3), pp. 461-483. ISSN 2044-124X

Sadeghi, N; Dehghani, M S and Ingolfsson, A (2024) Choice of probability distributions for activity durations in project networks with limited sample size. Journal of Construction Engineering and Management, 150(3): 04024002, ISSN 0733-9364

Sadeghi, N; Fayek, A R and Seresht, N G (2016) A fuzzy discrete event simulation framework for construction applications: Improving the simulation time advancement. Journal of Construction Engineering and Management, 142(12): 04016071, ISSN 0733-9364

Sadick, A M; Hasan, A and Ahiaga-Dagbui, D D (2026) Modeling sustainability discourse in the construction industry: A deep-learning approach. Journal of Construction Engineering and Management, 152(4): 04026026, ISSN 0733-9364

Sadick, A M; Gurmu, A and Gunarathna, C (2025) Artificial intelligence-based pre-conception stage construction budget decision-making model and tool for residential buildings. Engineering, Construction and Architectural Management, 32(7), pp. 4552-4580. ISSN 0969-9988

Safari, K and Ghandehariun, S (2026) An integrative BIM-based life cycle assessment framework to address uncertainties: A mixed-methods study under real construction project context. International Journal of Construction Management, 26(1), pp. 54-75. ISSN 1562-3599

Said, H (2016) Modeling and likelihood prediction of prefabrication feasibility for electrical construction firms. Journal of Construction Engineering and Management, 142(2): 04015071, ISSN 0733-9364

Said, H M and Kandimalla, P (2018) Performance measurement of building sheet-metal ductwork prefabrication under batch production settings. Journal of Construction Engineering and Management, 144(2): 4017107, ISSN 0733-9364

Saidi, K (2002) Possible applications of handheld computers to quantity surveying. PhD thesis, University of Texas at Austin, USA.

Saket, M M (1986) Cost-significance applied to estimating and control of construction projects. PhD thesis, University of Dundee, UK.

Sakhakarmi, S; Park, J and Cho, C (2019) Enhanced machine learning classification accuracy for scaffolding safety using increased features. Journal of Construction Engineering and Management, 145(2): 04018133, ISSN 0733-9364

Sakpere, W E; Mlitwa, N B W and Oshin, M A (2017) Towards an efficient indoor navigation system: A near field communication approach. Journal of Engineering, Design and Technology, 15(4), pp. 505-527.

Salah, A and Moselhi, O (2015) Contingency modelling for construction projects using fuzzy-set theory. Engineering, Construction and Architectural Management, 22(2), pp. 214-241. ISSN 0969-9988

Salama, M; Al-Sharif, F; Kaka, A P and Leishman, C (2006) Cost modelling for standardised design projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Salem, O and Mohanty, S (2008) Project management practices and information technology research. Journal of Construction Engineering and Management, 134(7), pp. 501-508. ISSN 0733-9364

Salhab, D; Pourrahimian, E; Lindhard, S M and Hamzeh, F (2025) Patterns, 4D simulations, and artificial intelligence-driven insights: Redefining construction workspace management. Journal of Construction Engineering and Management, 151(8): 04025099, ISSN 0733-9364

Salmaninezhad, M and Jazayeri Moghaddas, S M (2023) A multi-attribute approach to select the best method for repairing river bridge columns. Engineering, Construction and Architectural Management, 30(1), pp. 1-18. ISSN 0969-9988

Samadi, S and Taslimi, M S (2024) Develop a situation-based prioritization program as a road map to enhance the pre-resilience in flood management using machine learning methods. International Journal of Disaster Resilience in the Built Environment, 15(1), pp. 101-115. ISSN 1759-5916

Sammour, F; Xu, J; Wang, X; Hu, M and Zhang, Z (2026) Responsible AI in construction safety: Systematic evaluation of large language models and prompt engineering. Journal of Construction Engineering and Management, 152(1): 04025217, ISSN 0733-9364

Sammour, F; Alkailani, H; Sweis, G J; Sweis, R J; Maaitah, W and Alashkar, A (2024) Forecasting demand in the residential construction industry using machine learning algorithms in Jordan. Construction Innovation, 24(5), pp. 1228-1254. ISSN 1471-4175

Sandy, T (2018) High-accuracy mobile manipulation for on-site robotic building construction. DSc thesis, ETH Zürich, Switzerland.

Sanhudo, L P N (2021) Artificial intelligence for an enhanced as-is BIM energy analysis: Enabling an efficient energy retrofit through the automation of the scan-to-BIM process. PhD thesis, Universidade do Porto, Portugal.

Sanni-Anibire, M O; Zin, R M and Olatunji, S O (2022) Machine learning model for delay risk assessment in tall building projects. International Journal of Construction Management, 22(11), pp. 2134-2143. ISSN 1562-3599

Sansakorn, P (2018) Development of a risk assessment methodology and safety management model for the building construction industry: case studies from Thailand. PhD thesis, University of Birmingham, UK.

Sanyal, A P and Bhattacharya, S P (2024) A comparative analysis between CBR based prediction models and mra models for high-rise construction delay prediction. International Journal of Construction Management, 24(2), pp. 124-136. ISSN 1562-3599

Sarihi, M; Shahhosseini, V and Banki, M T (2023) Development and comparative analysis of the fuzzy inference system-based construction labor productivity models. International Journal of Construction Management, 23(3), pp. 423-433. ISSN 1562-3599

Sarshar, M; Haigh, R; Finnemore, M; Aouad, G; Barrett, P; Baldry, D and Sexton, M (2000) Spice: A business process diagnostics tool for construction projects. Engineering, Construction and Architectural Management, 7(3), pp. 241-250. ISSN 0969-9988

Schexnayder, C J and David, S A (2002) Past and future of construction equipment: part iv. Journal of Construction Engineering and Management, 128(4), pp. 279-286. ISSN 0733-9364

Schuler, M. L.; Albertson, L.; Katz, L. E.; Armanios, D. E. and Faust, K. M. (2026) Drawn from experience: Coproducing a graphic guide with arctic water sector workers. Journal of Construction Engineering and Management, 152(9): 04026146, ISSN 0733-9364

Schönbeck, P (2022) Data based configuration decisions in hospital construction projects. PhD thesis, KTH Royal Institute of Technology, Sweden.

Scott, D and Anumba, C J (1996) An intelligent approach to the engineering management of subsidence cases. Engineering, Construction and Architectural Management, 3(3), pp. 233-248. ISSN 0969-9988

Selinger, S (1983) Payment timing as a factor in bid evaluation. Journal of Construction Engineering and Management, 109(3), pp. 335-341. ISSN 0733-9364

Selvam, G; Kamalanandhini, M; Velpandian, M and Shah, S (2025) Duration and resource constraint prediction models for construction projects using regression machine learning method. Engineering, Construction and Architectural Management, 32(9), pp. 5743-5763. ISSN 0969-9988

Senior, B A (1996) Electrical construction foreman task scheduling. Journal of Construction Engineering and Management, 122(4), pp. 363-369. ISSN 0733-9364

Seong, J; Kim, H s and Jung, H J (2025) Development of a robust hazardous area tracking algorithm for pan-tilt-zoom (ptz) cameras at construction sites under harsh conditions. Engineering, Construction and Architectural Management, 32(13), pp. 384-405. ISSN 0969-9988

Sepasgozar, S M E; Forsythe, P and Shirowzhan, S (2018) Evaluation of terrestrial and mobile scanner technologies for part-built information modeling. Journal of Construction Engineering and Management, 144(12): 04018110, ISSN 0733-9364

Seresht, N G (2022) Energy-smart buildings: A conceptual framework to improve building's energy performance. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Serpell, A F (2004) Towards a knowledge-based assessment of conceptual cost estimates. Building Research & Information, 32(2), pp. 157-164. ISSN 0961-3218

Serpell Bley, A F (1990) Improved conceptual estimating performance using a knowledge-based approach. PhD thesis, University of Texas at Austin, USA.

Shafaat, A (2016) Designing project systems in presence of variations. PhD thesis, Purdue University, USA.

Shafaat, A; Marbouti, F and Mahfouz, T (2023) Early warning system for highway construction projects using GA-SVM. International Journal of Construction Management, 23(14), pp. 2348-2357. ISSN 1562-3599

Shafabakhsh, G A; Kashi, E and Akbari, A (2016) A comparison effect of aircraft main gear configuration on runway damages by led and fe method. Journal of Engineering, Design and Technology, 14(2), pp. 362-372.

Shafi, J.; Ijaz, R.; Kumar, Y. and Ijaz, M. F. (2026) Prediction of air quality levels to support sustainable development goal 11 using multiple deep learning classifiers. Smart and Sustainable Built Environment, 15(5), pp. 1877-1916. ISSN 2046-6099

Shahedi, F; Etemadfard, H; Omrani, F and Ghalehnovi, M (2024) Cost performance modeling for steel fabrication shops with machine learning algorithms. Journal of Construction Engineering and Management, 150(9): 04024114, ISSN 0733-9364

Shao, B; Meng, J and Che, W (2025) Long-term energy usage prediction in public buildings using aggregated modal decomposition and gru. Journal of Construction Engineering and Management, 151(8): 04025092, ISSN 0733-9364

Sharifi, Y and Aviz, H (2016) Effect of outrigger-belt truss location on the dynamic response of high-rise building subjected to blast loading. Journal of Engineering, Design and Technology, 14(1), pp. 54-77.

Sharma, S; Bansal, V K and Parti, R (2016) Location-based highway construction planning using geographic information systems. International Journal of Construction Management, 16(4), pp. 299-314. ISSN 1562-3599

Shashwat, S; Zingre, K and Thurairajah, N (2022) Enhancing building energy efficiency estimation by integrating microclimate conditions. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Shayboun, M; Kifokeris, D and Koch, C (2020) Machine learning for analysis of occupational accidents registration data. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Shehab, T (2009) Automated measurement of earthwork volume in construction projects. Construction Innovation, 9(3), pp. 341-358. ISSN 1471-4175

Shehab, T and Farooq, M (2013) Neural network cost estimating model for utility rehabilitation projects. Engineering, Construction and Architectural Management, 20(2), pp. 118-126. ISSN 0969-9988

Shehab, T; Moselhi, O and Nasr, E (2009) Barcode-assisted system for document management of construction projects. International Journal of Construction Education and Research, 5(1), pp. 45-60. ISSN 1557-8771

Shehab-Eldeen, T (2002) An automated system for detection, classification and rehabilitation of defects in sewer pipes. PhD thesis, Concordia University, Canada.

Shelake, A G and Gogate, N G (2026) An integrated risk prioritization and determination of activity-wise delay (irpad) framework for enhancing schedule management in tunnel projects. Engineering, Construction and Architectural Management, 33(1), pp. 763-784. ISSN 0969-9988

Shen, J; Liu, S and Zhang, J (2024) Using text mining and Bayesian network to identify key risk factors for safety accidents in metro construction. Journal of Construction Engineering and Management, 150(6): 04024052, ISSN 0733-9364

Shen, K; Zhu, Y; Pan, J and Li, X (2023) An intelligent decision-making model for the design of precast slab joints based on case-based reasoning. Journal of Construction Engineering and Management, 149(5): 04023025, ISSN 0733-9364

Sherafat, Behnam (2022) Acoustical modeling of construction jobsites with multiple operational machines for activity recognition and productivity analysis. PhD thesis, University of Utah, USA.

Shi, M; Chen, C; Xiao, B and Seo, J (2024) Vision-based detection method for construction site monitoring by integrating data augmentation and semisupervised learning. Journal of Construction Engineering and Management, 150(5): 04024027, ISSN 0733-9364

Shi, W (2009) Framework for integration of BIM and RFID in steel construction. PhD thesis, University of Florida, USA.

Shi, Z (2024) A BIM-based and data-driven approach for comprehensive façade inspection guidance in cities. PhD thesis, New York University Tandon School of Engineering, USA.

Shided Keniwe, M S; Ali, A H; Abdelaal, M A; Yassin, A M; Kineber, A F; Nosier, I A R; El Monayeri, O D and Elsayad, M A (2025) Introducing a novel decision support system to enhance performance in infrastructure sanitation projects within the construction industry. Engineering, Construction and Architectural Management, 32(7), pp. 4581-4610. ISSN 0969-9988

Shin, D H (2007) Strategic development of AR systems for industrial construction. PhD thesis, Purdue University, USA.

Shoaib Khan, M; Kim, J; Park, S; Lee, S and Seo, J (2021) Methodology for voxel-based earthwork modeling. Journal of Construction Engineering and Management, 147(10): 04021111, ISSN 0733-9364

Shoieb, K; Serror, M H and Marzouk, M (2020) Web-based tool for interoperability among structural analysis applications. Journal of Construction Engineering and Management, 146(6): 04020058, ISSN 0733-9364

Shrestha, P and Behzadan, A H (2018) Chaos theory-inspired evolutionary method to refine imperfect sensor data for data-driven construction simulation. Journal of Construction Engineering and Management, 144(3): 04018001, ISSN 0733-9364

Shrestha, R; Ko, T and Lee, J (2025) Quantifying project uncertainties: Leveraging historical bid and change order data for automated detection of cost and schedule impacts in new projects. Journal of Construction Engineering and Management, 151(4): 04025017, ISSN 0733-9364

Shrestha, Rabin (2024) Prediction of cost and schedule changes in transportation projects through historical bid and change order document analysis – using Oklahoma dot project cases. PhD thesis, University of Nevada, Las Vegas, USA.

Shrivastava, S (2012) Development of an energy information system for the construction phase of buildings: A contractor’s perspective. PhD thesis, University of Florida, USA.

Shuang, Q; Liu, X; Wang, Z and Xu, X (2024) Automatically categorizing construction accident narratives using the deep-learning model with a class-imbalance treatment technique. Journal of Construction Engineering and Management, 150(9): 04024107, ISSN 0733-9364

Shurrab, J and Hussain, M (2018) An empirical study of the impact of lean on the performance of the construction industry in UAE. Journal of Engineering, Design and Technology, 16(5), pp. 694-710. ISSN 1726-0531

Siddula, M; Dai, F; Ye, Y and Fan, J (2016) Classifying construction site photos for roof detection: A machine-learning method towards automated measurement of safety performance on roof sites. Construction Innovation, 16(3), pp. 368-389. ISSN 1471-4175

Siham, E Y (2024) Towards a 3D property valuation model: Conceptualization and BIM-CIM based data integrability. PhD thesis, Universite de Liege, Belgium.

Simon, M and Meyer, E L (2012) Low cost I-V system employing variable power supply unit as an electronic load. Journal of Engineering, Design and Technology, 10(3), pp. 330-344. ISSN 1726-0531

Sing, M C P; Edwards, D J; Leung, A W T; Liu, H and Roberts, C J (2022) A theoretical framework for classifying project complexity at the preconstruction stage using cluster analysis techniques. Engineering, Construction and Architectural Management, 29(9), pp. 3754-3774. ISSN 0969-9988

Sing, M C P; Edwards, D J; Liu, H J X and Love, P E D (2015) Forecasting private-sector construction works: VAR model using economic indicators. Journal of Construction Engineering and Management, 141(11): 04015037, ISSN 0733-9364

Singh, J (2021) BIM-based automatic piping layout design and schedule optimization. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Singh, J; Cheng, J C P and Anumba, C J (2021) BIM-based approach for automatic pipe systems installation coordination and schedule optimization. Journal of Construction Engineering and Management, 147(11): 04021143, ISSN 0733-9364

Singh, V V (2024) Data-driven production planning and control using work density for on-site building construction. PhD thesis, University of California, Berkeley, USA.

Singla, H K and Sridharan, S (2022) Factors influencing the level of accuracy and compromise in overhead estimation for construction projects in India: An exploratory investigation. Engineering, Construction and Architectural Management, 29(10), pp. 4040-4060. ISSN 0969-9988

Sirimewan, Diani Chamathya (2025) Optimising construction and demolition waste handling using computer vision techniques. PhD thesis, Monash University, Australia.

Skitmore, M and Drew, D (2003) The analysis of pre-tender building price forecasting performance: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 36-42. ISSN 0969-9988

Skrzypczak, I; Oleniacz, G; Leśniak, A; Zima, K; Mrówczyńska, M and Kazak, J K (2022) Scan-to-BIM method in construction: Assessment of the 3D buildings model accuracy in terms inventory measurements. Building Research & Information, 50(8), pp. 859-880. ISSN 0961-3218

Sloan, B; McLeod, B N; Smith, R M and Goodall, W L (1996) A functional cost approach in the development and use of a project budget cost limit estimator (PBCLE) for capitol building works. Journal of Financial Management of Property and Construction, 1(1), pp. 89-100. ISSN 1366-4387

Smith, S D; Beausang, P; Moriarty, D and Campbell, J M (2008) Subjectivity in data extraction: A study based on construction hazard identification. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Smith, W N; Smith, J and Bingham, E D (2022) Current state of practice associated with the use of building information modeling (BIM) in the custom home building industry. International Journal of Construction Education and Research, 18(3), pp. 251-269. ISSN 1557-8771

Sodangi, M (2023) Towards attaining efficient joint ventures in international construction: The case of saudi Arabia. Engineering, Construction and Architectural Management, 30(6), pp. 2545-2563. ISSN 0969-9988

Sodeinde, O R (2024) Building damage assessment using remote sensing data and deep learning algorithms. PhD thesis, Tufts University, USA.

Soetanto, R (2002) Modelling satisfaction for main participants of the construction project coalition: a study of mutual performance assessment. PhD thesis, University of Wolverhampton, UK.

Sohn, T (2009) Determining durations for right-of-way acquisition and utility adjustment on highway projects. PhD thesis, University of Texas at Austin, USA.

Sohrabi, H and Noorzai, E (2024) Risk-supported case-based reasoning approach for cost overrun estimation of water-related projects using machine learning. Engineering, Construction and Architectural Management, 31(2), pp. 544-570. ISSN 0969-9988

Soleimanifar, Meimanat (2016) Integrated project management framework for a pipe spool fabrication shop. PhD thesis, University of Alberta, Canada.

Solomon, T (2021) Change blindness in the construction industry. PhD thesis, George Mason University, USA.

Soman, R K and Whyte, J K (2020) Codification challenges for data science in construction. Journal of Construction Engineering and Management, 146(7): 04020072, ISSN 0733-9364

Son, J; Khwaja, N and Milligan, D S (2019) Planning-phase estimation of construction time for a large portfolio of highway projects. Journal of Construction Engineering and Management, 145(4): 04019018, ISSN 0733-9364

Son, P V H and Hieu, H T (2023) Logistics model for precast concrete components using novel hybrid ant lion optimizer (ALO) algorithm. International Journal of Construction Management, 23(9), pp. 1560-1570. ISSN 1562-3599

Song, J; Haas, C T and Caldas, C H (2006) Tracking the location of materials on construction job sites. Journal of Construction Engineering and Management, 132(9), pp. 911-918. ISSN 0733-9364

Song, L (2004) Productivity modeling for steel fabrication projects. PhD thesis, University of Alberta, Canada.

Song, L and AbouRizk, S M (2005) Quantifying engineering project scope for productivity modeling. Journal of Construction Engineering and Management, 131(3), pp. 360-367. ISSN 0733-9364

Song, M H (2019) Formalization of smallest workface boundary (SWFB): Toward generating and operating level of development (LOD) 400-based daily bill of materials (BOM). PhD thesis, Stanford University, USA.

Song, R; Gao, X; Nan, H; Zeng, S and Tam, V W Y (2024) Ecological restoration for mega-infrastructure projects: a study based on multi-source heterogeneous data. Engineering, Construction and Architectural Management, 31(9), pp. 3653-3678. ISSN 0969-9988

Sonkor, M S and García de Soto, B (2025) Using ChatGPT in construction projects: unveiling its cybersecurity risks through a bibliometric analysis. International Journal of Construction Management, 25(7), pp. 741-749. ISSN 1562-3599

Sourav, M M I; Russedul Islam, M; Mohibur Rahman, S and Istiak Jahan, M (2025) Heterogeneity in stakeholder's perceptions on delays in infrastructure projects: Scenario of Bangladesh. Engineering, Construction and Architectural Management, 32(6), pp. 3883-3913. ISSN 0969-9988

Sousa, V; Almeida, N M and Dias, L A (2014) Role of statistics and engineering judgment in developing optimized time-cost relationship models. Journal of Construction Engineering and Management, 140(8): 04014034, ISSN 0733-9364

Soutos, M K (2006) Forecasting elemental building cost percentages using regression analysis and neural network techniques. PhD thesis, University of Manchester, UK.

Souza, Douglas Lopes de (2024) Natural language processing of technical standard for the construction sector the study of the nbr 15.575. PhD thesis, Universidade Estadual de Campinas, Brazil.

Spataru, C and Gauthier, S (2014) How to monitor people 'smartly' to help reducing energy consumption in buildings? Architectural Engineering and Design Management, 10(1-2), pp. 60-78. ISSN 1745-2007

Sridarran, P; Keraminiyage, K and Herszon, L (2017) Improving the cost estimates of complex projects in the project-based industries. Built Environment Project and Asset Management, 7(2), pp. 173-184. ISSN 2044-124X

Sruthilaya, D; Vilventhan, A and Gopal, P R C (2025) Development of a project complexity measurement model for metro rail projects. Engineering, Construction and Architectural Management, 32(4), pp. 2728-2744. ISSN 0969-9988

Staffa Junior, L B; Bastos Costa, D; Torres Nogueira, J L and Silva, A S (2025) Web platform for building roof maintenance inspection using uas and artificial intelligence. International Journal of Building Pathology and Adaptation, 43(1), pp. 4-28. ISSN 2398-4708

Stanic, N (2016) Assessment methods for structural and hydraulic properties of concrete sewer pipes. PhD thesis, Delft University of Technology, Netherlands.

Stephenson, P (1988) Estimating, planning and control systems based on production data in the construction industry. PhD thesis, Sheffield City Polytechnic, UK.

Stout, Timothy J (2023) Schedule forecast optimization for the construction and commissioning of nuclear power plants. DEngr thesis, George Washington University, USA.

Stover, B D (2004) Validation and evaluation of a disability measure for upper extremity musculoskeletal disorder screening in the workplace and prognostic factors of long-term disability. PhD thesis, University of Washington, USA.

Struck, C (2012) Uncertainty propagation and sensitivity analysis techniques in building performance simulation to support conceptual building and system design. PhD thesis, Eindhoven University of Technology, Netherlands.

Stundon, D; Spillane, J; Lim, J P B; Tansey, P and Tracey, M (2015) Building information modelling energy performance assessment on domestic dwellings: A comparative study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Su, Y.; Gao, X. and Zheng, Z. (2026) Unsupervised deep learning and Bayesian network-based identification of key risk factors in construction quality defects. Journal of Construction Engineering and Management, 152(7): 04026083, ISSN 0733-9364

Su, Y; Wang, J; Shou, W; Wu, P; Wu, C and Xu, S (2026) Intentions prediction for human–robot collaboration in utility tunnel maintenance. Engineering, Construction and Architectural Management, 33(15), pp. 1-21. ISSN 0969-9988

Su, X; Li, S; Yuan, C; Cai, H and Kamat, V R (2014) Enhanced boundary condition-based approach for construction location sensing using RFID and RTK GPS. Journal of Construction Engineering and Management, 140(10): 04014048, ISSN 0733-9364

Suchocki, C; Błaszczak-Bąk, W; Janicka, J and Dumalski, A (2021) Detection of defects in building walls using modified optd method for down-sampling of point clouds. Building Research & Information, 49(2), pp. 197-215. ISSN 0961-3218

Sudarsan, J S; Rajprasad, J; V. Gedam, V; A. Abhyankar, A; S. Sriram, N and Dharaskar, S (2026) Resilient and sustainable construction industry: Leveraging crisis and lean management. International Journal of Construction Management, 26(2), pp. 219-233. ISSN 1562-3599

Sullivan, S (2007) Construction and behavior of precast bridge deck panel systems. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Sun, N.; Wang, J. and Liao, P. C. (2026) EEG-based neural mechanisms of confidence and metacognition in construction safety hazard recognition. Journal of Construction Engineering and Management, 152(8): 04026127, ISSN 0733-9364

Sun, Y.; Lin, K.; Wang, J.; Zhu, F.; Wang, L. and Lu, L. (2026) Risk assessment of mountain tunnel entrance collapse based on pso-LSTM surface settlement prediction. Engineering, Construction and Architectural Management, 33(3), pp. 2586-2605. ISSN 0969-9988

Sun, Z (2020) Predictive control of interpersonal communication processes in civil infrastructure systems operations. PhD thesis, Arizona State University, USA.

Sutrisna, M; Tjia, D and Wu, P (2021) Developing a predictive model of construction industry-university research collaboration. Construction Innovation, 21(4), pp. 761-781. ISSN 1471-4175

Sutton, R M (2019) The development of a sustainable construction design process. PhD thesis, University of Liverpool, UK.

Swallow, M and Zulu, S (2020) Students’ awareness and perception of the value of BIM and 4D for site health and safety management. Journal of Engineering, Design and Technology, 18(2), pp. 414-430. ISSN 1726-0531

Syachrani, S (2010) Advanced sewer asset management using dynamic deterioration models. PhD thesis, Oklahoma State University, USA.

Tabatabai-Gargari, M and Elzarka, H M (1998) Integrated CAD/KBS approach for automating preconstruction activities. Journal of Construction Engineering and Management, 124(4), pp. 257-262. ISSN 0733-9364

Taemthong, W (2002) Accounting for the impact of learning and scheduled overtime: Developing dynamic models to estimate and control labor time and labor cost. PhD thesis, University of Michigan, USA.

Talbot, B (2021) A novel data-driven tool to improve construction schedule accuracy. DProf thesis, Anglia Ruskin University, UK.

Tam, C M and Tong, T K L (2005) Multiple gmdh models for estimating resource requirements. Construction Innovation, 5(2), pp. 115-131. ISSN 1471-4175

Tam, C M; Tong, T K L and Tse, S L (2004) Modelling hook times of mobile cranes using artificial neural networks. Construction Management and Economics, 22(8), pp. 839-849. ISSN 01446193

Tamimi, S T (1989) An influence diagramming based risk analysis system. PhD thesis, University of Colorado at Boulder, USA.

Tan, Y (2006) A case-based reasoning approach to improve risk identification in construction projects. PhD thesis, University of Leeds, UK.

Tan, Y; Smith, N J and Bower, D A (2003) Improving risk identification by utilizing hybrid intelligent reasoning. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Taneja, S; Akinci, B; Garrett, J H; Soibelman, L; Ergen, E; Pradhan, A; Tang, P; Berges, M; Atasoy, G; Liu, X; Shahandashti, S M and Anil, E B (2011) Sensing and field data capture for construction and facility operations. Journal of Construction Engineering and Management, 137, pp. 870-881. ISSN 0733-9364

Tang, L C M and Leung, A Y T (2009) An entropy-based financial decision support system (E-FDSS) for project analysis in construction SMEs. Construction Management and Economics, 27(5), pp. 499-513. ISSN 1466433X

Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.

Tang, Y; Lim, P G and Gan, S W (2012) Forecasting capability of a construction organization model: 10 years later. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Tangwe, S L; Simon, M and Meyer, E L (2016) Design of a heat pump water heater performance monitoring system: To determine performance of a split type system. Journal of Engineering, Design and Technology, 14(4), pp. 739-751.

Tanratanawong, S (2001) A neural network model to forecast construction output in the United Kingdom. PhD thesis, University of Newcastle upon Tyne, UK.

Tanratanawong, S and Scott, S (2000) A neural network model to forecast national construction output. Journal of Financial Management of Property and Construction, 5(1-2), pp. 65-77. ISSN 1366-4387

Tantiprabha, P (1990) Acquisition of strategic management concepts from construction project data: An inductive learning approach. PhD thesis, University of Texas at Austin, USA.

Tas, E and Yaman, H (2005) A building cost estimation model based on cost significant work packages. Engineering, Construction and Architectural Management, 12(3), pp. 251-263. ISSN 0969-9988

Tatum, M C and Terrell, F (2012) Hurricane reconstruction in the United States Gulf Coast. International Journal of Disaster Resilience in the Built Environment, 3(3), pp. 199-219. ISSN 1759-5916

Taylor, D A (2012) Featural and holistic processing in facial composite construction: The role of cognitive style and processing sets. PhD thesis, University of Westminster, UK.

Teizer, J (2006) Real-time spatial modeling to detect and track resources on construction sites. PhD thesis, University of Texas at Austin, USA.

Terblanche, R (2022) Understanding financial feasibility studies as an artefact in quantity surveying practice. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Thach, H. P.; Nguyen, L. D. and Nguyen, V. T. (2026) Integrating coastal segmentation on predictive modeling for data-driven bridge asset management. International Journal of Construction Management, 26(10), pp. 2228-2244. ISSN 1562-3599

Thakare, P and Ravi Sankar V (2024) Advanced pest detection strategy using hybrid optimization tuned deep convolutional neural network. Journal of Engineering, Design and Technology, 22(3), pp. 645-678. ISSN 1726-0531

Thomas, A (2017) Modeling occupant behavior, systems life cycle performance, and energy consumption nexus in buildings using multi-method distributed simulation. PhD thesis, University of Michigan, USA.

Thomas, S R; Tucker, R L and Kelly, W R (1998) Critical communications variables. Journal of Construction Engineering and Management, 124(1), pp. 58-66. ISSN 0733-9364

Thomas Ng, S; Skitmore, R M and Sharma, T (2001) Towards a human resource information system for Australian construction companies. Engineering, Construction and Architectural Management, 8(4), pp. 238-249. ISSN 0969-9988

Tian, D; Li, M; Han, S and Shen, Y (2022) A novel and intelligent safety-hazard classification method with syntactic and semantic features for large-scale construction projects. Journal of Construction Engineering and Management, 148(10): 04022109, ISSN 0733-9364

Titirla, M and Aretoulis, G (2019) Neural network models for actual duration of Greek highway projects. Journal of Engineering, Design and Technology, 17(6), pp. 1323-1339. ISSN 1726-0531

Toma, H. M.; Abdelazim, A. N. and Ibrahim, A. H. (2026) Assessment of estimation performance for activities' cost and time in construction projects using statistical process control. Engineering, Construction and Architectural Management, 33(4), pp. 2669-2695. ISSN 0969-9988

Toma, H M; Abdeen, A H and Ibrahim, A (2025) Predicting construction equipment resale price: Machine learning model. Engineering, Construction and Architectural Management, 32(5), pp. 3453-3464. ISSN 0969-9988

Tomrukcu, G; Kizildag, H; Avgan, G; Dal, O; Ganic Saglam, N; Ozdemir, E and Ashrafian, T (2026) A systematic approach to manual calibration and validation of building energy simulation. Smart and Sustainable Built Environment, 15(1), pp. 203-230. ISSN 2046-6099

Torres Calderon, W (2022) Video representation learning for vision-driven activity analysis in construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Touran, A and Wiser, E P (1992) Monte Carlo technique with correlated random variables. Journal of Construction Engineering and Management, 118(2), pp. 258-272. ISSN 0733-9364

Towles, C (2017) Maximizing economic returns for large, publicly funded road infrastructure investments through improved economic, engineering and construction information management. DEng thesis, Ecole de Technologie Superieure, Canada.

Toğan, V; Mostofi, F and Tokdemir, O B (2026) Evaluating the resilience of graph neural network architectures to adversarial and noisy data in high-stakes construction project management. Journal of Construction Engineering and Management, 152(4): 04026029, ISSN 0733-9364

Trifonov, N (2025) Build-up method for capitalization rate: Revisited. Journal of Financial Management of Property and Construction, 30(2), pp. 200-211. ISSN 1366-4387

Trinh, Hoang T (2021) Optimisation framework for sustainable design of concrete buildings. PhD thesis, Griffith University, Australia.

Trost, S M (1998) A quantitative model for predicting the accuracy of early cost estimates for construction projects in the process industry. PhD thesis, Oklahoma State University, USA.

Trost, S M and Oberlender, G D (2003) Predicting accuracy of early cost estimates using factor analysis and multivariate regression. Journal of Construction Engineering and Management, 129(2), pp. 198-204. ISSN 0733-9364

Truong-Hong, L; Lindenbergh, R and Nguyen, T A (2022) Structural assessment using terrestrial laser scanning point clouds. International Journal of Building Pathology and Adaptation, 40(3), pp. 345-379. ISSN 23984708

Tryggestad, K; Georg, S and Hernes, T (2010) Constructing buildings and design ambitions. Construction Management and Economics, 28(6), pp. 695-705. ISSN 1466433X

Tsehayae, A A and Fayek, A R (2016) Developing and optimizing context-specific fuzzy inference system-based construction labor productivity models. Journal of Construction Engineering and Management, 142(7): 4016017, ISSN 0733-9364

Tsehayae, A A and Fayek, A R (2016) System model for analysing construction labour productivity. Construction Innovation, 16(2), pp. 203-228. ISSN 1471-4175

Tseng, A A; Tanaka, M; Leeladharan, B and Choi, J G (2003) Rotating laser-based system for full profile measurement. Construction Innovation, 3(2), pp. 97-110. ISSN 1471-4175

Tsz Wai, C; Wai Yi, P; Ibrahim Olanrewaju, O; Abdelmageed, S; Hussein, M; Tariq, S and Zayed, T (2023) A critical analysis of benefits and challenges of implementing modular integrated construction. International Journal of Construction Management, 23(4), pp. 656-668. ISSN 1562-3599

Tu, H and Jin, S (2024) A group decision-making model for architectural programming in megaprojects. Engineering, Construction and Architectural Management, 31(13), pp. 342-368. ISSN 0969-9988

Turkan, Y; Bosché, F; Haas, C T and Haas, R (2013) Toward automated earned value tracking using 3D imaging tools. Journal of Construction Engineering and Management, 139(4), pp. 423-433. ISSN 0733-9364

Turkan, Y; Bosché, F; Haas, C T and Haas, R (2014) Tracking of secondary and temporary objects in structural concrete work. Construction Innovation, 14(2), pp. 145-167. ISSN 1471-4175

Turkoglu, H; Arditi, D and Polat, G (2025) Golden eagle optimizer-based multi-objective optimization model for scheduling construction projects. Construction Management and Economics, 43(9), pp. 704-722. ISSN 0144-6193

Uddin, W (2008) Airborne laser terrain mapping for expediting highway projects: Evaluation of accuracy and cost. Journal of Construction Engineering and Management, 134(6), pp. 411-420. ISSN 0733-9364

Umuhoza, E and An, S H (2024) Ann model predicting quality performance for building construction projects in Rwanda. International Journal of Construction Management, 24(15), pp. 1679-1688. ISSN 1562-3599

Uthai, T; Zhou, T; Ye, Y; You, H and Du, J (2025) Haptics-based robot teleoperation for soft object manipulation. Journal of Construction Engineering and Management, 151(5): 04025028, ISSN 0733-9364

Valinejadshoubi, M; Sacks, R; Valdivieso, F; Corneau-Gauvin, C and Kaptué, A (2025) Digital twin construction in practice: A case study of closed-loop production control integrating BIM, GIS, and IoT sensors. Journal of Construction Engineering and Management, 151(11): 05025014, ISSN 0733-9364

Valkonen, T; Lindberg, A; Alhava, O; Talebi, S; Koskela, L and Seppänen, O (2026) Tolerance management in prefabrication of mechanical, electrical, and plumbing installations. Construction Management and Economics, 44(4), pp. 279-299. ISSN 0144-6193

Vereen, S C (2013) Forecasting skilled labor demand in the US construction industry. PhD thesis, North Carolina State University, USA.

Vitiello, Umberto (2017) A sustainable framework for the optimization of retrofit strategies of existing buildings. PhD thesis, Università degli Studi di Napoli Federico II, Italy.

Wafa, M A (1986) An investigation into the factors influencing the success of decision support systems in the construction industry. PhD thesis, Clemson University, USA.

Wahab, A (2024) Integrating building information modeling (BIM) and blockchain technology in the pre-construction planning processes. PhD thesis, Mississippi State University, USA.

Wahab, A and Wang, J (2022) Factors-driven comparison between BIM-based and traditional 2D quantity takeoff in construction cost estimation. Engineering, Construction and Architectural Management, 29(2), pp. 702-715. ISSN 0969-9988

Wahab, A; Wang, J; Shojaei, A and Ma, J (2023) A model-based smart contracts system via blockchain technology to reduce delays and conflicts in construction management processes. Engineering, Construction and Architectural Management, 30(10), pp. 5052-5072. ISSN 0969-9988

Walters, R; Jaselskis, E; Zhang, J; Mueller, K and Kaewmoracharoen, M (2008) Using scanning lasers to determine the thickness of concrete pavement. Journal of Construction Engineering and Management, 134(8), pp. 583-591. ISSN 0733-9364

Wan, H P; Zhang, W J; Ge, H B; Luo, Y and Todd, M D (2023) Improved vision-based method for detection of unauthorized intrusion by construction sites workers. Journal of Construction Engineering and Management, 149(7): 04023040, ISSN 0733-9364

Wang, F.; Zhou, J. and Zheng, X. (2026) Identification of hydraulic engineering construction accident causes using instruction tuning and structured prompting in large language models. Journal of Construction Engineering and Management, 152(8): 04026122, ISSN 0733-9364

Wang, J.; Qu, Z.; Lee, C. Y. and Skitmore, M. (2025) Highway construction cost index forecasting: A hybrid VMD–LSTM–GRU method. Construction Management and Economics, 43(10), pp. 849-863. ISSN 0144-6193

Wang, J; Qu, Z and Skitmore, M (2026) Predicting construction cost index using a VMD-GRU framework with the mhsa mechanism. Journal of Construction Engineering and Management, 152(1): 04025236, ISSN 0733-9364

Wang, L.; Hwang, J.; Han, K. and Gupta, A. (2026) Generative AI-assisted compliance checking for construction requirements. Journal of Construction Engineering and Management, 152(8): 04026117, ISSN 0733-9364

Wang, L; Wang, J; Li, H; Han, S; Zhang, M; Yang, X and Guo, N (2026) Noncontact physiological evaluation of cognitive load among prolonged sitting workers using millimeter wave sensing. Journal of Construction Engineering and Management, 152(3): 04025280, ISSN 0733-9364

Wang, L.; Yuan, J.; Su, S.; Weng, S. and Hu, F. (2026) Vision-based progress compliance and worker health monitoring in concrete pouring and vibration. Journal of Construction Engineering and Management, 152(10): 04026162, ISSN 0733-9364

Wang, M.; Mahdiyar, A. and Mustafa Kamal, E. (2026) Risk assessment in digital twin implementation: A general cybernetic best-worst method approach. Engineering, Construction and Architectural Management, 33(7), pp. 5522-5539. ISSN 0969-9988

Wang, Y; Xiao, B; Mueller, S T and Yi, W (2026) Task–taxon–task framework for modeling and predicting the cognitive impact of collaborative robots on worker performance in modular construction. Journal of Construction Engineering and Management, 152(4): 04026033, ISSN 0733-9364

Wang, Z; Yan, X; Liu, Q; Ma, X and Li, H (2026) Vision-based collision prevention on construction sites: Integrating trajectory prediction and uncertainty modeling. Journal of Construction Engineering and Management, 152(1): 04025214, ISSN 0733-9364

Wang, C; Gao, F; Cui, B; Huang, M M; Wu, M; Mao, L and Zheng, A (2024) Geometric quality assessment of precast concrete (PC) elements based on 3D structural light scanning. Architectural Engineering and Design Management, 20(2), pp. 303-319. ISSN 1745-2007

Wang, C; Loo, S C; Yap, J B H and Abdul-Rahman, H (2019) Novel capability-based risk assessment calculator for construction contractors venturing overseas. Journal of Construction Engineering and Management, 145(10): 04019059, ISSN 0733-9364

Wang, D; Arditi, D and Damci, A (2017) Construction project managers' motivators and human values. Journal of Construction Engineering and Management, 143(4): 04016115, ISSN 0733-9364

Wang, D Y and Wang, X (2025) Can reputation system complement limited inspection accuracy in deterring opportunistic claims? Engineering, Construction and Architectural Management, 32(3), pp. 1435-1456. ISSN 0969-9988

Wang, H (2021) BIM-based knowledge management for the use of construction and facilities management knowledge in construction projects. PhD thesis, Queen's University Belfast, UK.

Wang, J (2004) Hybrid genetic algorithms for reliability assessment of structural system. PhD thesis, City University of New York, USA.

Wang, J and Ashuri, B (2017) Predicting ENR construction cost index using machine-learning algorithms. International Journal of Construction Education and Research, 13(1), pp. 47-63. ISSN 1557-8771

Wang, J; Li, H; Han, S; Wang, G and Ren, W (2025) Contactless vital-sign monitoring of construction machinery operators using millimeter-wave technology. Journal of Construction Engineering and Management, 151(1): 04024182, ISSN 0733-9364

Wang, J; Li, M; Moorhead, M and Skitmore, M (2025) Forecasting financial distress in listed Chinese construction firms: Leveraging ensemble learning and non-financial variables. Construction Management and Economics, 43(3), pp. 175-195. ISSN 0144-6193

Wang, J; Luo, H; Pena-Mora, F; Zhou, W and Fang, W (2024) An integrated BIM-IoT framework for real-time quality monitoring in construction site. Journal of Construction Engineering and Management, 150(11): 05024013, ISSN 0733-9364

Wang, J; Qu, Z; Lee, C Y and Skitmore, M (2025) Highway construction cost index forecasting: A hybrid VMD-LSTM-GRU method. Construction Management and Economics, 43(10), pp. 849-863. ISSN 0144-6193

Wang, Liannian (2025) Advancing construction requirements management through 4D BIM and generative AI. PhD thesis, North Carolina State University, USA.

Wang, N and Horner, M (2007) CSI model for estimating road maintenance projects. Construction Management and Economics, 25(12), pp. 1269-1281. ISSN 1466433X

Wang, N; Wang, H and Zhang, K (2022) The dynamics of changes in PPP projects: A meta-case analysis approach. Construction Management and Economics, 40(9), pp. 727-742. ISSN 01446193

Wang, P (2019) The aetiology and progression of construction disputes between client and contractor in the UK. PhD thesis, University of Manchester, UK.

Wang, P; Wang, K; Huang, Y and Fenn, P (2025) Probability, formation, and prediction of large-size construction cost overruns governed by a power-law distribution. Journal of Construction Engineering and Management, 151(6): 04025062, ISSN 0733-9364

Wang, P; Wang, K; Huang, Y; Fenn, P and Stewart, I (2022) Auditing construction cost from an in-process perspective based on a Bayesian predictive model. Journal of Construction Engineering and Management, 148(4): 04022003, ISSN 0733-9364

Wang, P; Wang, K; Huang, Y; Zhu, J; Fenn, P and Zhang, Y (2023) Payment issues in China's construction industry: Nature, causes, and a predictive model. Journal of Construction Engineering and Management, 149(1): 04022144, ISSN 0733-9364

Wang, Q (2017) Automated geometry quality assessment of precast concrete elements using 3D laser scan data. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Wang, Q; Guo, Z; Mintah, K; Li, Q; Mei, T and Li, P (2019) Cell-based transport path obstruction detection approach for 4D BIM construction planning. Journal of Construction Engineering and Management, 145(3): 04018141, ISSN 0733-9364

Wang, Q; Zuo, W; Guo, Z; Li, Q; Mei, T and Qiao, S (2020) BIM voxelization method supporting cell-based creation of a path-planning environment. Journal of Construction Engineering and Management, 146(7): 04020080, ISSN 0733-9364

Wang, R and Gong, D (2025) Abnormal behavior recognition algorithm in small sample scenarios for a utility tunnel project based on dcgan. Journal of Construction Engineering and Management, 151(6): 04025043, ISSN 0733-9364

Wang, S; Kim, M; Hae, H; Cao, M and Kim, J (2023) The development of a rebar-counting model for reinforced concrete columns: Using an unmanned aerial vehicle and deep-learning approach. Journal of Construction Engineering and Management, 149(11): 04023111, ISSN 0733-9364

Wang, S; Park, S; Kim, J and Kim, J (2025) Safety helmet monitoring on construction sites using yolov10 and advanced transformer architectures with surveillance and body-worn cameras. Journal of Construction Engineering and Management, 151(11): 04025186, ISSN 0733-9364

Wang, T and Feng, J (2023) Optimal review strategy for concurrent execution of design-construction tasks in DB mode. Journal of Construction Engineering and Management, 149(1): 04022139, ISSN 0733-9364

Wang, X (2022) Enabling human-robot partnerships in digitally-driven construction work through integration of building information models, interactive virtual reality, and process-level digital twins. PhD thesis, University of Michigan, USA.

Wang, Xi (2018) Assessing the application of the unmanned aerial systems (uas) in earthwork volume measurement. PhD thesis, University of Kentucky, USA.

Wang, Y (2015) Structured versus direct-mapping approaches to empirical modeling of civil engineering problems. PhD thesis, University of Florida, USA.

Wang, Y and Shao, L (2018) Understanding occupancy and user behaviour through Wi-Fi-based indoor positioning. Building Research & Information, 46(7), pp. 725-737. ISSN 0961-3218

Wang, Y; Zuo, J; Pan, M; Tu, B; Chang, R D; Liu, S; Xiong, F and Dong, N (2024) Cost prediction of building projects using the novel hybrid RA-ANN model. Engineering, Construction and Architectural Management, 31(6), pp. 2563-2582. ISSN 0969-9988

Wang, Y-P (2021) How level of detail of activity duration data influences look-ahead schedule performance in prefabricated construction. PhD thesis, Stanford University, USA.

Wanigarathna, N; Henjewele, C; Jones, K G; Pascale, F and Morga, M (2022) Modelling earthquake damage repair costs: Improving accuracy for preparedness decision making. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Wanigarathna, N; Sherratt, F; Price, A and Austin, S (2019) Design re-use: Critical application of healthcare building design evidence. Engineering, Construction and Architectural Management, 26(3), pp. 350-366. ISSN 0969-9988

Wanigarathna, N; Xie, Y; Henjewele, C; Morga, M and Jones, K (2025) Machine learning application to disaster damage repair cost modelling of residential buildings. Construction Management and Economics, 43(4), pp. 302-322. ISSN 0144-6193

Wanous, M; Boussabaine, H A and Lewis, J (2003) A neural network bid/no bid model: The case for contractors in Syria. Construction Management and Economics, 21(7), pp. 737-744. ISSN 01446193

Wantanakorn, D (2000) Effects of management errors on construction projects. PhD thesis, University of Nottingham, UK.

Ward, B (2015) Integrated asset management systems for water infrastructure. EngD thesis, University of Exeter, UK.

Waroonkun, Tanut (2007) Modelling international technology transfer in Thai construction projects. PhD thesis, Griffith University, Thailand.

Watson, A and McInnes, S (1997) Small/medium scale construction logistics: A study into the factors affecting planning accuracy. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Watters, J S J (1985) The number of bidders, concentration ratios and markets in the highway construction industry. PhD thesis, University of Missouri - Columbia, USA.

Wauters, M and Vanhoucke, M (2015) Study of the stability of earned value management forecasting. Journal of Construction Engineering and Management, 141(4): 04014086, ISSN 0733-9364

Weerasinghe, A; Ramachandra, T and Rotimi, J O B (2016) A simplified model for predicting running cost of office buildings in Sri Lanka. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Wei, C-L (2025) Data-centric AI solutions for built environment applications. PhD thesis, Arizona State University, USA.

Wei, L; Liu, G; Liu, W; Li, W and Yuan, Y (2023) Airborne infection risk in classrooms based on environment and occupant behavior measurement under COVID-19 epidemic. Building Research & Information, 51(6), pp. 701-716. ISSN 0961-3218

Weidner, T J (1999) Higher education vertical infrastructure maintenance planning. PhD thesis, Rensselaer Polytechnic Institute, USA.

Wenninger, S (2022) Data-driven support and risk modeling for a successful heat transition in the building sector. PhD thesis, Universitaet Bayreuth, Germany.

West, T and Worthington, A C (2006) Macroeconomic risk factors in Australian commercial real estate, listed property trust and property sector stock returns. Journal of Financial Management of Property and Construction, 11(2), pp. 105-116. ISSN 1366-4387

Westgate, S E (1986) An information system for estimating, targetting and planning in small building firms. PhD thesis, Sheffield Hallam University, UK.

Whitehead, R C (1995) Factors influencing labour productivity on construction sites. PhD thesis, University of Dundee, UK.

Wiethe, C (2022) Applying artificial intelligence and quantitative finance for a successful heat transition in the building sector. PhD thesis, Universitaet Bayreuth, Germany.

Williamson, T J (2010) Predicting building performance: The ethics of computer simulation. Building Research & Information, 38(4), pp. 401-410. ISSN 0961-3218

Willis, C J (2010) Measuring the performance of the construction industry through the use of project performance benchmarking metrics in conjunction with maturity modeling. PhD thesis, University of New Brunswick, Canada.

Wilmot, C G and Mei, B (2005) Neural network modeling of highway construction costs. Journal of Construction Engineering and Management, 131(7), pp. 765-771. ISSN 0733-9364

Windapo, A O and Goulding, J (2013) Value-based perspectives of stakeholders' building requirements in low cost and government subsidised housing projects in South Africa. Construction Innovation, 13(4), pp. 424-444. ISSN 1471-4175

Won, S J (2011) A general performance model for design-build highway pavement warranty decisions. PhD thesis, University of Colorado at Boulder, USA.

Wong, C H (2001) A discriminant model for classifying contractor performance on public works projects. PhD thesis, University of Wolverhampton, UK.

Wong, C H (2001) Investigation of contractor selection criteria and development of contractor classification model: a UK case. PhD thesis, University of Wolverhampton, UK.

Wong, J K W; Bameri, F; Ahmadian Fard Fini, A and Maghrebi, M (2025) Tracking indoor construction progress by deep-learning-based analysis of site surveillance video. Construction Innovation, 25(2), pp. 461-489. ISSN 1471-4175

Wong, J K W; Maghrebi, M; Ahmadian Fard Fini, A; Alizadeh Golestani, M A; Ahmadnia, M and Er, M (2024) Development of a refined illumination and reflectance approach for optimal construction site interior image enhancement. Construction Innovation, 24(2), pp. 470-491. ISSN 1471-4175

Wong, J M W; Chan, A P C and Chiang, Y H (2011) Construction manpower demand forecasting: A comparative study of univariate time series, multiple regression and econometric modelling techniques. Engineering, Construction and Architectural Management, 18(1), pp. 7-29. ISSN 0969-9988

Wong, J M W; Kong, H and Chiang, Y H (2004) A critical review of forecasting models to predict manpower demand. Construction Economics and Building, 4(2), pp. 43-56. ISSN 2204-9029

Wood, H L (2010) Modelling project complexity at the pre construction stage. PhD thesis, University of Brighton, UK.

Wu, X.; Schmidt, R.; Wilcockson, T. D.; Wang, W. and Liu, H. (2026) Eye-tracking and place attachment: Visual and emotional engagement in higher education atrium spaces. Building Research & Information, 54(5), pp. 652-669. ISSN 0961-3218

Wu, Z.; Liu, M.; Ma, G. and Jiang, S. (2026) A hybrid forecasting model to improve cost prediction accuracy in green building projects with machine learning. Engineering, Construction and Architectural Management, 33(4), pp. 3375-3402. ISSN 0969-9988

Wu, H; Han, Y; Zhang, M; Abebe, B D; Legesse, M B and Jin, R (2023) Identifying unsafe behavior of construction workers: A dynamic approach combining skeleton information and spatiotemporal features. Journal of Construction Engineering and Management, 149(11): 04023115, ISSN 0733-9364

Wu, J; Sadraddin, H L; Ren, R; Zhang, J and Shao, X (2021) Invariant signatures of architecture, engineering, and construction objects to support BIM interoperability between architectural design and structural analysis. Journal of Construction Engineering and Management, 147(1): 04020148, ISSN 0733-9364

Wu, R (2002) Computer -aided dimensional control in building construction. PhD thesis, Eindhoven University of Technology, Netherlands.

Wu, X and Xu, F (2021) Detection model for unbalanced bidding in railway construction projects: Considering the risk of quantity variation. Journal of Construction Engineering and Management, 147(7): 04021055, ISSN 0733-9364

Wu, Z; Jia, J; Xiao, L; Zhang, Y and Ma, G (2025) Accurate extraction of construction safety requirements tailored to project characteristics: Integrating multivariate NLP techniques. Journal of Construction Engineering and Management, 151(10): 04025140, ISSN 0733-9364

Xia, Y (2020) Research on dynamic data monitoring of steel structure building information using BIM. Journal of Engineering, Design and Technology, 18(5), pp. 1165-1173. ISSN 1726-0531

Xiahou, X; Li, Z; Xia, J; Zhou, Z and Li, Q (2023) A feature-level fusion-based multimodal analysis of recognition and classification of awkward working postures in construction. Journal of Construction Engineering and Management, 149(12): 04023138, ISSN 0733-9364

Xiang, Z; Rashidi, A and Ou, G (2021) Automated framework to translate rebar spatial information from GPR into BIM. Journal of Construction Engineering and Management, 147(10): 04021120, ISSN 0733-9364

Xiao, Y (2017) Three-dimensional reconstruction and modeling using low-precision vision sensors for automation and robotics applications in construction. PhD thesis, University of Michigan, USA.

Xie, X.; Liao, L.; Wen, Y.; Li, S. and Mo, L. (2026) Understanding safety hazard identification in construction: Role of emotion, gender, and regulatory focus. Journal of Construction Engineering and Management, 152(9): 04026136, ISSN 0733-9364

Xing, J (2024) Functional reasoning support for nuclear power plant field operators. PhD thesis, Carnegie Mellon University, USA.

Xiong, B; Newton, S; Li, V; Skitmore, M and Xia, B (2019) Hybrid approach to reducing estimating overfitting and collinearity. Engineering, Construction and Architectural Management, 26(10), pp. 2170-2185. ISSN 0969-9988

Xiong, R and Tang, P (2021) Machine learning using synthetic images for detecting dust emissions on construction sites. Smart and Sustainable Built Environment, 10(3), pp. 487-503. ISSN 2046-6099

Xiong, W; Zhang, X and Chen, H (2016) Early-termination compensation in public-private partnership projects. Journal of Construction Engineering and Management, 142(4): 04015098, ISSN 0733-9364

Xiong, Yunjie (2020) A BIM-based interoperability platform in support of building operation and energy management. PhD thesis, Virginia Tech, USA.

Xu, T.; Song, Z.; Fan, S. and Guo, D. (2026) Improved risk assessment model using the cloud theory of the existing tunnel in foundation pit construction environment. Engineering, Construction and Architectural Management, 33(5), pp. 3737-3760. ISSN 0969-9988

Xu, W.; Guo, X.; Proverbs, D. G. and Han, P. (2026) A GIS-based multi-criteria decision analysis of urban flood risk. International Journal of Building Pathology and Adaptation, 44(3), pp. 638-657. ISSN 2398-4708

Xu, Lichao (2019) Geometric, semantic, and system-level scene understanding for improved construction and operation of the built environment. PhD thesis, University of Michigan, USA.

Xu, N; Liang, Y; Guo, C; Meng, B; Zhou, X; Hu, Y and Zhang, B (2025) Entity recognition in the field of coal mine construction safety based on a pre-training language model. Engineering, Construction and Architectural Management, 32(4), pp. 2590-2613. ISSN 0969-9988

Xu, S; Wang, J; Wang, X; Shou, W and Ngo, T (2025) Defect modelling and correlation mapping for bridge inspection. Engineering, Construction and Architectural Management, 32(6), pp. 4174-4196. ISSN 0969-9988

Xu, Y; Shen, X; Lim, S and Li, X (2021) Three-dimensional object detection with deep neural networks for automatic as-built reconstruction. Journal of Construction Engineering and Management, 147(9): 04021098, ISSN 0733-9364

Xu, Yongzhi (2021) Automated and real-time scan-to-BIM through deep learning-based object detection. PhD thesis, University of New South Wales, Australia.

Xu, Z; Liang, Y; Lu, H; Kong, W and Wu, G (2023) An approach for monitoring prefabricated building construction based on feature extraction and point cloud segmentation. Engineering, Construction and Architectural Management, 30(10), pp. 5302-5332. ISSN 0969-9988

Xu, Z; Liang, Y; Xu, Y; Fang, Z and Stilla, U (2022) Geometric modeling and surface-quality inspection of prefabricated concrete components using sliced point clouds. Journal of Construction Engineering and Management, 148(9): 04022087, ISSN 0733-9364

Yalcinkaya, M and Singh, V (2019) Exploring the use of gestalt's principles in improving the visualization, user experience and comprehension of cobie data extension. Engineering, Construction and Architectural Management, 26(6), pp. 1024-1046. ISSN 0969-9988

Yamusa, M. A.; Lawal, H. S.; Abdulrahman, R. S.; Salisu, A. S.; Saka, A.; Abubakar, M. and Abdullahi, M. (2026) A machine-learning model for estimating construction renovation costs. International Journal of Building Pathology and Adaptation, 44(3), pp. 757-772. ISSN 2398-4708

Yan, H.; Liu, C.; Yang, X.; Li, X. and Li, J. (2026) Digital twin-enabled 3D near-misses prediction method based on trajectories and postures for proactive construction safety management. Engineering, Construction and Architectural Management, pp. 1-27. ISSN 0969-9988

Yan, S (1992) Intermodal pricing and operations using network flow techniques. PhD thesis, Massachusetts Institute of Technology, USA.

Yang, S.; Xiang, P.; Wang, Y.; Zhang, X. and Qian, Y. (2026) Emphasizing cross-regional matters: Interpreting the critical risks of cross-regional mega infrastructure projects from an interactional perspective. Engineering, Construction and Architectural Management, 33(7), pp. 5540-5564. ISSN 0969-9988

Yang, X; Zhong, H; Wang, Z; Du, P; Zhou, K; Zhou, H; Lai, X; Lau, Y L; Song, Y and Tang, L (2024) BEKG: A built environment knowledge graph. Building Research & Information, 52(1-2), pp. 19-37. ISSN 0961-3218

Yang, Y C; Park, C J; Kim, J H and Kim, J J (2007) Management of daily progress in a construction project of multiple apartment buildings. Journal of Construction Engineering and Management, 133(3), pp. 242-253. ISSN 0733-9364

Yang, Z; Yuan, Y; Zhang, M; Zhao, X and Tian, B (2019) Assessment of construction workers' labor intensity based on wearable smartphone system. Journal of Construction Engineering and Management, 145(7): 04019039, ISSN 0733-9364

Yao, F.; Tong, W.; Ji, Y.; Zhang, Y. and Li, H. X. (2026) Monitoring hoisting workers' negative emotions in prefabricated construction using galvanic skin response measurements. Journal of Construction Engineering and Management, 152(9): 04026150, ISSN 0733-9364

Yao, Z; Chen, Z and Lee, Y (2025) A construction site layout planning study for dust reduction. Journal of Construction Engineering and Management, 151(6): 04025066, ISSN 0733-9364

Ye, Z; Kapogiannis, G; Tang, S; Zhang, Z; Jimenez-Bescos, C and Yang, T (2025) Influence of an integrated value-based asset condition assessment in built asset management. Construction Innovation, 25(2), pp. 248-269. ISSN 1471-4175

Yeh, I C (1998) Quantity estimating of building with logarithm-neuron networks. Journal of Construction Engineering and Management, 124(5), pp. 374-380. ISSN 0733-9364

Yeung, D K L and Skitmore, M (2005) Data pooling for early-stage price forecasts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Yisa, S B (1995) A methodology for evaluating the marketing function in the UK construction industry. PhD thesis, University of Wolverhampton, UK.

Yiğit, A Y; Gamze Hamal, S N; Ulvi, A and Yakar, M (2024) Comparative analysis of mobile laser scanning and terrestrial laser scanning for the indoor mapping. Building Research & Information, 52(4), pp. 402-417. ISSN 0961-3218

Yong, G; Liu, M and Lee, S (2026) Pose-aware image captioning for ergonomic problem and solution identification. Journal of Construction Engineering and Management, 152(5): 04026043, ISSN 0733-9364

Yoon, S; Kang, K; Yoon, Y; Hastak, M and Ji, R (2018) Systematic decision-making process for composite pavement maintenance. Journal of Construction Engineering and Management, 144(6): 04018044, ISSN 0733-9364

You, H; Zhou, T; Wu, J and Du, J (2026) Tebi-llama: Temporal binding foundation model for material property recognition via tactile sequence perception. Journal of Construction Engineering and Management, 152(4): 04026024, ISSN 0733-9364

Yu, G; Li, Z; Zeng, R; Jin, Y; Hu, M and Sugumaran, V (2025) Predicting structure performance of urban critical infrastructure: An augmented attention-based LSTM model. Engineering, Construction and Architectural Management, 32(6), pp. 3914-3936. ISSN 0969-9988

Yu, M; Ruan, W; Zhou, Y and Zhao, Y (2025) Flow shop scheduling for prefabricated components production considering parallel machines and buffer constraints. Journal of Construction Engineering and Management, 151(4): 04025010, ISSN 0733-9364

Yu, X and Ergan, S (2021) Key variables in determining energy shaving capacity of buildings during demand response events. Journal of Construction Engineering and Management, 147(1): 04020146, ISSN 0733-9364

Yu, Y; Yang, X; Li, H; Luo, X; Guo, H and Fang, Q (2019) Joint-level vision-based ergonomic assessment tool for construction workers. Journal of Construction Engineering and Management, 145(5): 04019025, ISSN 0733-9364

Yuan, F; Tang, M and Hong, J (2020) Efficiency estimation and reduction potential of the Chinese construction industry via SE-DEA and artificial neural network. Engineering, Construction and Architectural Management, 27(7), pp. 1533-1552. ISSN 0969-9988

Yuan, W; Yang, R; Yu, J; Zeng, Q and Yao, Z (2023) Control method of spray curing system for cement concrete members based on the adaboost.M1 algorithm. Construction Innovation, 23(1), pp. 178-192. ISSN 1471-4175

Yuan, Z; Wang, H; Yang, Y; Chao, Y; Huang, D and Yu, D (2024) Improving the construction accuracy of precast components in prefabricated buildings by analyzing relevant factors from the perspective of supply chain: A system dynamics model. Architectural Engineering and Design Management, 20(2), pp. 230-248. ISSN 1745-2007

Yue, H; Wang, Q; Cui, L; Li, C; Fang, H and Cheng, J C P (2026) Transfer learning for deep learning-based point cloud tasks in construction scenes. Journal of Construction Engineering and Management, 152(6): 04026058, ISSN 0733-9364

Yue, H; Ye, G; Liu, Q; Yang, X; Xiang, Q and Luo, Y (2024) Impact of cognitive fatigue on attention and the implications for construction safety: A neuroscientific perspective. Journal of Construction Engineering and Management, 150(8): 04024102, ISSN 0733-9364

Yun, S and Caldas, C H (2009) Analysing decision variables that influence preliminary feasibility studies using data mining techniques. Construction Management and Economics, 27(1), pp. 73-87. ISSN 1466433X

Yung, P.; Saka, A. B. and Caborn, S. E. (2025) A macroeconomic analysis of insolvency in the UK construction industry. Engineering, Construction and Architectural Management, 33(5), pp. 3457-3484. ISSN 0969-9988

Yussef, A K (2019) Assessing the maturity and accuracy of front end engineering design (FEED) for large, complex industrial projects. PhD thesis, Arizona State University, USA.

Yıldız, B; Çağdaş, G and Zincir, I (2024) Architectural space classification considering topological and 3D visual spatial relations using machine learning techniques. Building Research & Information, 52(1-2), pp. 68-86. ISSN 0961-3218

Zakeri, M (1996) An evaluation of productivity and management practice in the Iranian construction industry. PhD thesis, University of Wolverhampton, UK.

Zakieh, R (1991) Quantity-significance and its application to construction project modelling. PhD thesis, University of Dundee, UK.

Zayed, T and Liu, Y (2014) Cash flow modeling for construction projects. Engineering, Construction and Architectural Management, 21(2), pp. 170-189. ISSN 0969-9988

Zayed, T; Sharifi, M R; Baciu, S and Amer, M (2008) Slip-form application to concrete structures. Journal of Construction Engineering and Management, 134(3), pp. 157-168. ISSN 0733-9364

Zayed, T M and Halpin, D W (2005) Deterministic models for assessing productivity and cost of bored piles. Construction Management and Economics, 23(5), pp. 531-543. ISSN 01446193

Zeng, C (2014) Automated building information extraction and evaluation from high-resolution remotely sensed data. PhD thesis, University of Western Ontario, Canada.

Zeng, C S (2025) Decision under intensity-based costs in large-scale systems. PhD thesis, Princeton University, USA.

Zeng, R; Shi, J J S; Wang, C and Lu, T (2024) Integrating as-built BIM model from point cloud data in construction projects. Engineering, Construction and Architectural Management, 31(9), pp. 3557-3574. ISSN 0969-9988

Zeng, S; Chung, F and Ashuri, B (2024) Forecasting right-of-way (ROW) acquisition timeline of transportation projects. Built Environment Project and Asset Management, 14(2), pp. 129-146. ISSN 2044-124X

Zhang, J and Jiang, S (2026) Unsafe behaviors in workers at heights: A spacetime-based coupling analysis method and its safety implications. Journal of Construction Engineering and Management, 152(1): 04025233, ISSN 0733-9364

Zhang, L. and Ge, Q. (2026) Offsite construction risk management agent: A gpts based analysis model. Engineering, Construction and Architectural Management, 33(7), pp. 5625-5644. ISSN 0969-9988

Zhang, M.; Cai, M.; Wang, Z. and Jia, L. (2026) Rag-for-cr: A retrieval-augmented generation framework for efficient, accurate, and traceable querying of construction regulations. Journal of Construction Engineering and Management, 152(9): 04026145, ISSN 0733-9364

Zhang, X.; Huang, J. and Wang, D. (2026) A quantitative method for indoor trajectory analysis of older adults for spatial evaluation and optimization. Building Research & Information, 54(6), pp. 753-774. ISSN 0961-3218

Zhang, Y.; Chang, R. D.; Omrany, H.; Zuo, J.; Li, L.; Bamborough, C. E. and Haeusler, H. M. (2026) Exploring professional attitudes on automated construction progress monitoring: A q methodology approach. Engineering, Construction and Architectural Management, 33(15), pp. 386-413. ISSN 0969-9988

Zhang, C; Shen, W and Ye, Z (2022) Technical feasibility analysis on applying ultra-wide band technology in construction progress monitoring. International Journal of Construction Management, 22(15), pp. 2951-2965. ISSN 1562-3599

Zhang, J and Jiang, S (2025) Construction safety decision-making system based on improved integration of case-based reasoning and rule-based reasoning. Journal of Construction Engineering and Management, 151(9): 04025130, ISSN 0733-9364

Zhang, J; Li, H; Golizadeh, H; Zhao, C; Lyu, S and Jin, R (2020) Reliability evaluation index for the integrated supply chain utilising BIM and lean approaches. Engineering, Construction and Architectural Management, 27(5), pp. 997-1038. ISSN 0969-9988

Zhang, M (2011) Uncertainty and imprecision in safety assessment of offshore structures. PhD thesis, National University of Singapore, Singapore.

Zhang, M; Cheng, W and Wang, Y (2018) Multiple-fault classification for hot-mix asphalt production by machine learning. Journal of Construction Engineering and Management, 144(5): 04018024, ISSN 0733-9364

Zhang, M and Ge, S (2022) Vision and trajectory-based dynamic collision prewarning mechanism for tower cranes. Journal of Construction Engineering and Management, 148(7): 04022057, ISSN 0733-9364

Zhang, M; Liu, X and Li, Y (2025) Identity-based proactive human intrusion management in hazardous areas at construction sites: A deep learning-based method. Journal of Construction Engineering and Management, 151(6): 04025045, ISSN 0733-9364

Zhang, P (2018) Mapping buried utilities in difficult environments. PhD thesis, University of Nottingham, UK.

Zhang, S; Bogus, S M; Lippitt, C D; Kamat, V and Lee, S (2022) Implementing remote-sensing methodologies for construction research: An unoccupied airborne system perspective. Journal of Construction Engineering and Management, 148(9): 03122005, ISSN 0733-9364

Zhang, S; Bogus, S M; Lippitt, C D and Migliaccio, G C (2017) Estimating location-adjustment factors for conceptual cost estimating based on nighttime light satellite imagery. Journal of Construction Engineering and Management, 143(1): 04016087, ISSN 0733-9364

Zhang, S; Hua, X and Shi, X (2024) Measurement for risk perception ability. Journal of Construction Engineering and Management, 150(5): 04024036, ISSN 0733-9364

Zhang, S; Liu, C; Feng, K; Xia, C; Wang, Y and Wang, Q (2025) Computer vision-based real-time monitoring for swivel construction of bridges: From laboratory study to a pilot application. Engineering, Construction and Architectural Management, 32(6), pp. 3630-3658. ISSN 0969-9988

Zhang, S; Migliaccio, G C; Zandbergen, P A and Guindani, M (2014) Empirical assessment of geographically based surface interpolation methods for adjusting construction cost estimates by project location. Journal of Construction Engineering and Management, 140(6): 4014015, ISSN 0733-9364

Zhang, X; Yu, Y; He, W and Chen, Y (2021) Bidding decision-support model for construction projects based on projection pursuit learning method. Journal of Construction Engineering and Management, 147(7): 04021054, ISSN 0733-9364

Zhang, Xutong (2025) Physics-guided machine learning for condition assessment of building structures in operational environments. PhD thesis, University of Technology Sydney, Australia.

Zhang, Y; Chang, R; Mao, W; Zuo, J; Zhang, W E and Liu, L (2025) Low-cost ios-based automated detection of under-construction interior drywalls: An exploratory study. Journal of Construction Engineering and Management, 151(10): 05025012, ISSN 0733-9364

Zhang, Y; Liu, L; Song, Z; Zhao, Y and He, S (2024) Enhancing tunnel boring machine penetration rate predictions through particle swarm optimization and elman neural networks. Journal of Construction Engineering and Management, 150(9): 04024116, ISSN 0733-9364

Zhang, Y; Ren, X; Zhang, J and Ma, Z (2024) A method for deformation detection and reconstruction of shield tunnel based on point cloud. Journal of Construction Engineering and Management, 150(3): 04024006, ISSN 0733-9364

Zhao, W.; Li, K.; Liu, G.; Chen, B.; Fan, M. and Yin, S. (2026) A three-stage intelligent crack detection method for concrete bridges based on deep neural networks. Journal of Construction Engineering and Management, 152(6): 04026067, ISSN 0733-9364

Zhao, J (2020) Towards a proactive real-time data-driven musculoskeletal disorders prevention approach in construction. PhD thesis, Pennsylvania State University, USA.

Zhao, J; Cao, Y and Xiang, Y (2024) Pose estimation method for construction machine based on improved alphapose model. Engineering, Construction and Architectural Management, 31(3), pp. 976-996. ISSN 0969-9988

Zhao, S; Lu, T F; Statsenko, L; Koch, B and Garcia, C (2022) A framework for near real-time rom stockpile modelling to improve blending efficiency. Journal of Engineering, Design and Technology, 20(2), pp. 497-515. ISSN 1726-0531

Zhao, X; Hwang, B-G and Low, S P (2016) An enterprise risk management knowledge-based decision support system for construction firms. Engineering, Construction and Architectural Management, 23(3), pp. 369-384. ISSN 0969-9988

Zhao, Y; Chen, W; Arashpour, M; Yang, Z; Shao, C and Li, C (2022) Predicting delays in prefabricated projects: Sd-bp neural network to define effects of risk disruption. Engineering, Construction and Architectural Management, 29(4), pp. 1753-1776. ISSN 0969-9988

Zheng, B; Hussain, M; Yang, Y; Chan, A P C and Chi, H L (2025) Trade-offs between accuracy and efficiency in BIM-LCA integration. Engineering, Construction and Architectural Management, 32(1), pp. 237-258. ISSN 0969-9988

Zhong, B; Hu, X; Pan, X; Chen, X and Liu, Z (2025) Construction quality hazard management with deep learning-based multimodal storage strategy-enabled blockchain. Journal of Construction Engineering and Management, 151(1): 04024184, ISSN 0733-9364

Zhong, B; Tian, J; Pan, X and Shen, L (2024) An online housing reputation assessment framework based on text mining and visualization technologies. Journal of Construction Engineering and Management, 150(8): 04024076, ISSN 0733-9364

Zhong, Yunshun (2025) Leveraging large language models for intelligent construction management systems. PhD thesis, University of Toronto, Canada.

Zhou, H; Zhou, L; Gao, B; Huang, W; Huang, W; Zuo, J and Zhao, X (2025) Intelligent identification of risks in construction contract clauses based on semantic reasoning. Engineering, Construction and Architectural Management, 32(10), pp. 6593-6626. ISSN 0969-9988

Zhou, S; Wang, H; Ng, S T; Li, D; Xie, S; Chen, K and Wang, W (2025) Building a construction law knowledge repository to enhance general-purpose large language model performance on domain question-answering: A case of China. Engineering, Construction and Architectural Management, 32(13), pp. 518-546. ISSN 0969-9988

Zhou, Y; Liang, H; Foo, Z L; Koh, Y Z and Yeoh, J K W (2026) Audio-based excavator preoperational checks using few-shot deep learning. Journal of Construction Engineering and Management, 152(1): 04025212, ISSN 0733-9364

Zhou, G (2021) Machine learning-based cost predictive model for better operating expenditure estimations of U.S. light rail transit projects. EngD thesis, George Washington University, USA.

Zhou, H; Gao, B; Tang, S; Li, B and Wang, S (2025) Intelligent detection on construction project contract missing clauses based on deep learning and NLP. Engineering, Construction and Architectural Management, 32(3), pp. 1546-1580. ISSN 0969-9988

Zhou, J; Zheng, X; Wang, F and Tian, D (2025) Intelligent identification approach for accident causation in hydraulic and hydropower engineering construction. Journal of Construction Engineering and Management, 151(12): 04025195, ISSN 0733-9364

Zhou, N; Chang-Richards, A; Wang, K I K and Dirks, K N (2022) Prototyping an IoT-based system for monitoring building indoor environment. Journal of Engineering, Design and Technology, 20(4), pp. 965-992. ISSN 1726-0531

Zhou, Y and Elhag, T (2007) Financial assessment using neural networks. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Zhu, X.; Ma, J.; Chen, W. and Tan, Y. (2026) Llm-querybc: An llm-based regulation query system for textual and tabular information in building codes. Journal of Construction Engineering and Management, 152(6): 04026075, ISSN 0733-9364

Zhu, J; Zhang, C; Yuan, J; Pan, W; Xue, J and Lou, F (2025) An improved model for precast component transportation scheduling under dynamic traffic and weather conditions. Journal of Construction Engineering and Management, 151(11): 04025181, ISSN 0733-9364

Zhu, Y; Brigham, J C and Fascetti, A (2025) Lidar-rgb data fusion for four-dimensional uav-based monitoring of reinforced concrete bridge construction: Case study of the fern hollow bridge reconstruction. Journal of Construction Engineering and Management, 151(1): 05024016, ISSN 0733-9364

Zuo, W; Li, Q; Wang, Q; Qiao, S; Mei, T and Guo, Z (2026) Lego voxelization method for arbitrary building information models to support path planning. Journal of Construction Engineering and Management, 152(2): 04025239, ISSN 0733-9364

al-Attar, H; Sweis, G; Tarawneh, B; Abu-Khader, W; Haddad, L and Sweis, R (2025) Enhanced construction project duration estimation using artificial neural networks: Initial design and planning stages. Construction Economics and Building, 25(2), pp. 168-191. ISSN 2204-9029

de Magalhães, F M R L (2010) Operational modal analysis for testing and monitoring of bridges and special structures. PhD thesis, Universidade do Porto, Portugal.

de Oliveira, R (1994) A methodology for housing design. PhD thesis, University of Waterloo, Canada.

de Silva, N; Ranasinghe, M and de Silva, C R (2013) Use of ANNs in complex risk analysis applications. Built Environment Project and Asset Management, 3(1), pp. 123-140. ISSN 2044-124X

ter Huurne, R (2021) The role of risk attitudes: Discrepancies between human and computer-based risk analysis in the utility sector. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

van Niekerk, J; Wium, J and de Koker, N (2022) The value of data from construction project site meeting minutes in predicting project duration. Built Environment Project and Asset Management, 12(5), pp. 738-753. ISSN 2044-124X

Özdemir, M (2015) A fuzzy structural equation model to analyze relationships between determinants of safety performance in construction sites: Development of a safety performance index assessment tool. PhD thesis, Middle East Technical University, Turkey.

This list was generated on Sat Aug 22 02:13:23 2026 UTC.