Items with Index Term: acceleration
Adafin, J; Wilkinson, S; Rotimi, J O B; MacGregor, C; Tookey, J and Potangaroa, R (2022) Creating a case for innovation acceleration in the New Zealand building industry. Construction Innovation, 22(1), pp. 185-204. ISSN 1471-4175
Al-Gahtani, K S (2006) A comprehensive construction delay analysis technique: Enhanced with a float ownership concept. PhD thesis, State University of New York at Buffalo, USA.
Al-Suleiman, T I and Alatoom, Y I (2024) Development of pavement roughness regression models based on smartphone measurements. Journal of Engineering, Design and Technology, 22(4), pp. 1136-1157. ISSN 1726-0531
Al-Yami, A M H (2008) An integrated approach to value management and sustainable construction during strategic briefing in Saudi construction projects. PhD thesis, Loughborough University, UK.
Alamil, H M (2022) Knowledge sharing within the Kingdom of Saudi Arabia large construction organisations. PhD thesis, University of Wolverhampton, UK.
Alavipour, S M R and Arditi, D (2019) Maximizing expected contractor profit using an integrated model. Engineering, Construction and Architectural Management, 26(1), pp. 118-138. ISSN 0969-9988
Alhawamdeh, M (2020) An interpretivist approach for the development of a behavioural framework to support the adoption of waste minimisation behaviour of contractors: the case study of Jordan. PhD thesis, University of Salford, UK.
Alzanati, A (2021) Complex building construction projects: reducing rework through facilitation of craftspeople's motivation in United Arab Emirates. PhD thesis, Bournemouth University, UK.
Alzeraa, A (2018) Impact of project communications effectiveness on construction disputes. PhD thesis, Wayne State University, USA.
Anderson, S; Shane, J S and Schexnayder, C (2011) Strategies for planned project acceleration. Journal of Construction Engineering and Management, 137(5), pp. 372-381. ISSN 0733-9364
Antwi-Afari, M F; Li, H; Umer, W; Yu, Y and Xing, X (2020) Construction activity recognition and ergonomic risk assessment using a wearable insole pressure system. Journal of Construction Engineering and Management, 146(7): 04020077, ISSN 0733-9364
Apu, N and Sinha, R (2020) Seismic fragility assessment of ductile reinforced concrete building frames. International Journal of Disaster Resilience in the Built Environment, 12(4), pp. 425-442. ISSN 1759-5916
Arditi, D and Patel, B K (1989) Impact analysis of owner-directed acceleration. Journal of Construction Engineering and Management, 115(1), pp. 144-157. ISSN 0733-9364
Arditi, D; Tokdemir, O B and Suh, K (2002) Challenges in line-of-balance scheduling. Journal of Construction Engineering and Management, 128(6), pp. 545-556. ISSN 0733-9364
Asadi, E (2020) Risk-informed multi-criteria decision framework for resilience and sustainability assessment of building structures. PhD thesis, Case Western Reserve University, USA.
Asadi, S; Sharghi, A; Mottaki, Z and Salehsedghpour, B (2025) Housing reconstruction after traumatic events: A POE study of Bam housing after the 2003 earthquake, Iran. International Journal of Disaster Resilience in the Built Environment, 16(1), pp. 57-71. ISSN 1759-5908
Austin, R B; Pishdad-Bozorgi, P and De La Garza, J M (2016) Identifying and prioritizing best practices to achieve flash track projects. Journal of Construction Engineering and Management, 142(2): 04015077, ISSN 0733-9364
Barati, K; Shen, X; Li, N and Carmichael, D G (2022) Automatic mass estimation of construction vehicles by modeling operational and engine data. Journal of Construction Engineering and Management, 148(3): 4021208, ISSN 0733-9364
Battikha, M G and Davidson, C H (1996) Cause and effect 3-D model for measuring performance in construction acceleration: A decision support system. Building Research & Information, 24(6), pp. 351-357. ISSN 0961-3218
Beliveau, Y; Dixit, S and Dal, T (1993) Dynamic damping of payload motion for cranes. Journal of Construction Engineering and Management, 119(3), pp. 631-644. ISSN 0733-9364
Bhih, M and Hegazy, T (2021) Enhanced but-for method to apportion net delays and accelerations. Journal of Construction Engineering and Management, 147(7): 06021003, ISSN 0733-9364
Bhih, M and Hegazy, T (2023) Multiple-window modified but-for analysis of project delays and accelerations. International Journal of Construction Management, 23(4), pp. 686-696. ISSN 1562-3599
Calvetti, D (2021) Electronic productivity performance monitoring of construction workers. PhD thesis, Universidade do Porto, Portugal.
Champion, R (2005) Acceleration in construction and engineering contracts. PhD thesis, University of London, UK.
De La Garza, J M and Pishdad-Bozorgi, P (2018) Workflow process model for flash track projects. Journal of Construction Engineering and Management, 144(6): 06018001, ISSN 0733-9364
Diab, A A (2009) Risk management of building services modularisation: Knowledge management perspective. PhD thesis, University of Manchester, UK.
Duan, P; Zhou, J and Tao, S (2023) Risk events recognition using smartphone and machine learning in construction workers' material handling tasks. Engineering, Construction and Architectural Management, 30(8), pp. 3562-3582. ISSN 0969-9988
El-Gafy, M and Abdelhamid, T S (2015) Impact of I/D contracts used for expediting Michigan's road construction. Journal of Construction Engineering and Management, 141(7): 5015005, ISSN 0733-9364
El-Rayes, K A (1998) Optimized scheduling for repetitive construction projects. PhD thesis, Concordia University, Canada.
Emuze, F A (2011) Performance improvement in South African construction. PhD thesis, Nelson Mandela Metropolitan University, South Africa.
Ensar, A and Selin, G (2021) Individual and organisational level drivers and barriers to building information modelling. Journal of Construction in Developing Countries, 26(1), pp. 89-109. ISSN 1823-6499
Fan, C and Li, X (2025) Exploring effective incentive policies for sustainable development of green buildings in China: Based on evolutionary game theory and numerical simulation analysis. Engineering, Construction and Architectural Management, 32(5), pp. 3326-3348. ISSN 0969-9988
Fernandez-Solis, J L (2013) Building construction: A deterministic non-periodic flow-a case study of chaos theories in tracking production flow. Architectural Engineering and Design Management, 9(1), pp. 21-48. ISSN 1745-2007
Gabai, D S; Haronian, E; Sacks, R; Kennard, N S; Wong, N; Miera, M K and Cloyd, T D (2026) Doubling throughput and halving project durations: Lessons from intel's ocf strategy for project portfolio management. Journal of Construction Engineering and Management, 152(2): 04025256, ISSN 0733-9364
Gama, E C M and Sloan, S C W B (2010) Environmental sustainability in the construction industry in developing countries: A study of embodied energy of low-cost housing. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Ghorai, S (2017) Accelerated construction of roadways: Life cycle assessment and environmental impacts. PhD thesis, Syracuse University, USA.
Grady, K (1980) The provision of public buildings in the West Riding of Yorkshire, c.1600-1840. PhD thesis, University of Leeds, UK.
Gunning, J G and Moss, J (2002) Public private partnership procurement of educational facilities in the UK. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Hajiashrafi, R (2025) Streamlined shapley value models for contribution-based compensation allocation in scheduling networks in construction project management. PhD thesis, Catholic University of America, USA.
Hassanein, A and Moselhi, O (2005) Accelerating linear projects. Construction Management and Economics, 23(4), pp. 377-385. ISSN 01446193
Hegazy, T and Menesi, W (2008) Delay analysis under multiple baseline updates. Journal of Construction Engineering and Management, 134(8), pp. 575-582. ISSN 0733-9364
Heshmati, K; Shahabpoor, E; Walker, I; Ghanbari, S and Darby, A (2025) The effect of wind-induced vibrations in tall buildings on occupants' work performance. Building Research & Information, 53(8), pp. 949-964. ISSN 0961-3218
Hill, C and Rodgers, J (2000) Project partnering arrangement for delivery of a tight scheduled project. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Hindman, D P; Bamberg, C R and Nussbaum, M A (2014) Bracing of wood composite I-joists to resist lateral buckling from walking loads. Journal of Construction Engineering and Management, 140(9): 04014037, ISSN 0733-9364
Hulls, P M (2022) The epidemiology of health and wellbeing in the workplace: managing and measuring occupational stress and behavioural factors in a male-dominated industry. PhD thesis, University of Bristol, UK.
Ikudayisi, A E and Adegun, O B (2025) Pathways for green building acceleration in fast-growing countries: A case study on Nigeria. Built Environment Project and Asset Management, 15(3), pp. 450-466. ISSN 2044-124X
Innella, Filomena (2020) Performance of building modules production and transportation. PhD thesis, Monash University, Australia.
Jewell, C A (2011) A typology of construction professional service firms: A consulting engineering perspective. PhD thesis, University of Reading, UK.
Jukic, D and Carmichael, D G (2016) Emission and cost effects of training for construction equipment operators: A field study. Smart and Sustainable Built Environment, 5(2), pp. 96-110. ISSN 2046-6099
Jung, S (2010) Facility siting and layout optimization based on process safety. PhD thesis, Texas A&M University, USA.
Ke, Y (2020) Impact of trust on the performance of construction enterprises: analysis of the cooperative process mechanism in the context of Chaoshan culture. DProf thesis, Fordham University, USA.
Keane, C (2012) Essays in social policy and labour economics. PhD thesis, University College Dublin, Ireland.
Kerali, A G and Thomas, T H (2004) Simple durability test for cement stabilized blocks. Building Research & Information, 32(2), pp. 140-145. ISSN 0961-3218
Koch, C; Pedersen, T A and Fredslund, L (2024) Platforms of second-hand building material: A hub in the circular economy or fantasies of entrepreneurs? In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Kraiem, Z M and Diekmann, J E (1987) Concurrent delays in construction projects. Journal of Construction Engineering and Management, 113(4), pp. 591-602. ISSN 0733-9364
Kreitl, G and Oberndorfer, W J (2004) Motives for acquisitions among engineering consulting firms. Construction Management and Economics, 22(7), pp. 691-700. ISSN 01446193
Känsälä, K; Rantala, S; Kauppila, O and Leviäkangas, P (2018) Acceleration sensor technology for rail track asset condition monitoring. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(1), pp. 32-40. ISSN 17514304
Lamb, S and Kwok, K C S (2017) Sopite syndrome in wind-excited buildings: Productivity and wellbeing impacts. Building Research & Information, 45(3), pp. 347-358. ISSN 0961-3218
Li, Z; Zhang, Q; Fan, F and Shen, S (2020) Analysis of dynamic properties and vibration comfort of large-scale stands. Building Research & Information, 48(7), pp. 802-816. ISSN 0961-3218
Lim, T K; Park, S M; Lee, H C and Lee, D E (2016) Artificial neural network-based slip-trip classifier using smart sensor for construction workplace. Journal of Construction Engineering and Management, 142(2): 04015065, ISSN 0733-9364
Liu, T and Wilkinson, S (2011) Adopting innovative procurement techniques: Obstacles and drivers for adopting public private partnerships in New Zealand. Construction Innovation, 11(4), pp. 452-469. ISSN 1471-4175
Lombardi Filho, Pedro (2022) Management of small volumes of asbestos-cement materials in Brazil: From use to waste. PhD thesis, Universidade de São Paulo, Brazil.
Love, P E D; Davis, P; Kerry London, K and Jasper, T (2008) Causal modelling of construction disputes. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Machline, E; Pearlmutter, D; Cohen, C and Schwartz, M (2023) COVID-19: A catalyst for revitalizing mixed-use urban centers? The case of Paris. Building Research & Information, 51(1), pp. 39-55. ISSN 0961-3218
Mahdavian, S; Lu, M and Pereira, E (2023) Application framework for safety-centric construction acceleration planning. Engineering, Construction and Architectural Management, 30(4), pp. 1401-1422. ISSN 0969-9988
Marzouk, M and Moselhi, O (2004) Fuzzy clustering model for estimating haulers' travel time. Journal of Construction Engineering and Management, 130(6), pp. 878-886. ISSN 0733-9364
McDonald, P R (1984) Construction claims costing for owners and contractors. Construction Management and Economics, 2(1), pp. 1-12. ISSN 01446193
Miceli, A; Bevill, G and Simsiriwong, J (2025) Effect of additively manufactured polymeric inserts on impact response of construction safety helmets. Journal of Engineering, Design and Technology, 23(5), pp. 1653-1665. ISSN 1726-0531
Minchin, R E and Thomas, H R (2003) Validation of vibration-based onboard asphalt density measuring system. Journal of Construction Engineering and Management, 129(1), pp. 1-7. ISSN 0733-9364
Moradipour, P; Noorzaei, J; Jaafar, M S and Aziz, F N A A (2013) An improved computational method in structural dynamics. Journal of Engineering, Design and Technology, 11(3), pp. 288-315. ISSN 1726-0531
Muaz, Fagiar (2019) Forensic schedule information modeling for analysis of time claims in construction projects. PhD thesis, University of Alberta, Canada.
Nawfal, S and Ali, F (2018) The acceleration of 3D graphics transformations based on cuda. Journal of Engineering, Design and Technology, 16(6), pp. 925-937. ISSN 1726-0531
Oduori, M F; Mutuli, S M and Munyasi, D M (2015) Analysis of the single toggle jaw crusher kinematics. Journal of Engineering, Design and Technology, 13(2), pp. 213-239.
Ogunseiju, O R; Olayiwola, J; Akanmu, A A and Nnaji, C (2022) Recognition of workers' actions from time-series signal images using deep convolutional neural network. Smart and Sustainable Built Environment, 11(4), pp. 812-831. ISSN 2046-6099
Ottaviani, F M; De Marco, A; Narbaev, T and Ballesteros-Pérez, P (2026) Work rate-based indicators for improving project performance regression models. International Journal of Construction Management, 26(1), pp. 99-112. ISSN 1562-3599
Oztas, A (1995) The mitigation of the effects of delays in construction projects: A knowledge based system approach. PhD thesis, University of Manchester, UK.
Pishdad-Bozorgi, P; De La Garza, J M and Austin, R B (2016) Readiness assessment for flash tracking. Journal of Construction Engineering and Management, 142(12): 06016005, ISSN 0733-9364
Pomares, J C; Irles, R; Segovia, E and Ferrer, B (2014) Acceleration and deflection analysis for class C edge protection systems in construction work. Journal of Construction Engineering and Management, 140(8): 04014031, ISSN 0733-9364
Porter, K A (2000) Assembly-based vulnerability of buildings and its uses in seismic performance evaluation and risk-management decision-making. PhD thesis, Stanford University, USA.
Radu, A C (2015) Life-cycle estimates of structures subjected to seismic loads. PhD thesis, Cornell University, USA.
Reinschmidt, K and Trejo, D (2006) Economic value of building faster. Journal of Construction Engineering and Management, 132(7), pp. 759-766. ISSN 0733-9364
Revadigar, S P (1996) Automated analysis of building seismic records. PhD thesis, University of Houston, USA.
Riad, N I (1990) MODA: An expert system for managing owner-directed acceleration. PhD thesis, Illinois Institute of Technology, USA.
Riad, N I; Arditi, D and Mohammadi, J (1994) Integrated system for managing owner-directed project acceleration. Journal of Construction Engineering and Management, 120(1), pp. 77-95. ISSN 0733-9364
Russell, A D and Ranasinghe, M (1991) Decision framework for fast-track construction: A deterministic analysis. Construction Management and Economics, 9(5), pp. 467-479. ISSN 01446193
Ryu, J; Seo, J; Jebelli, H and Lee, S (2019) Automated action recognition using an accelerometer-embedded wristband-type activity tracker. Journal of Construction Engineering and Management, 145(1): 04018114, ISSN 0733-9364
Sadeh, H; Zhang, R; Gaedicke, C; Shahbodaghlou, F; Lee, M J and Todorov, D (2026) Embracing generative AI in construction through a quantitative analysis and weighted score ranking of perceptions, applications, and complexities. Journal of Construction Engineering and Management, 152(5): 04026041, ISSN 0733-9364
Saeed, S A A (2009) Delay to projects: Cause, effect and measures to reduce/eliminate delay by mitigation/acceleration. PhD thesis, British University in Dubai, UAE.
Shieh, E; Habibi, K; Torabi, K and Masoumi, H E (2014) Earthquake risk in urban street network: An example from region 6 of Tehran, Iran. International Journal of Disaster Resilience in the Built Environment, 5(4), pp. 413-426. ISSN 1759-5916
Singh, A (2003) Accelerated work-schedule design considering efficiency losses for overtime and overmanning. Engineering, Construction and Architectural Management, 10(5), pp. 312-321. ISSN 0969-9988
Tatangelo, Matteo (2025) Life-cycle management of new and existing construction based on a time-dependent reliability approach: Methodology, normative developments and applications on existing bridges. PhD thesis, Università degli Studi di Roma La Sapienza, Italy.
Tse, T-c (2009) The interoperability of building information models and document models in the Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Twinn, C (2013) Professionalism, sustainability and the public interest: What next? Building Research & Information, 41(1), pp. 123-128. ISSN 0961-3218
Twum, B A; Kabiri, S and Tutt, D (2023) Managing onsite production pressure and its impact on safety performance in construction: An activity theory analysis. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Vanichvatana, S (1993) Predicting consequential effects of construction project changes. PhD thesis, University of California, Berkeley, USA.
Wade, F and Visscher, H (2021) Retrofit at scale: Accelerating capabilities for domestic building stocks. Buildings & Cities, 2(1), pp. 800-811. ISSN 2632-6655
Wamuziri, S and Jiang, M (2008) Role of export credit agencies in PFI/PPP projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 163-169. ISSN 17514312
Wang, H; Shen, J and Gao, D (2019) Seismic damage of gravity abutment in liquefied ground. Journal of Engineering, Design and Technology, 17(1), pp. 53-76. ISSN 1726-0531
Wang, J; Han, J; Chen, J; Ding, G; Feng, G; Liu, T and Guo, B (2022) Experimental and numerical study on the dynamic response of a superthick backfill subgrade under high-speed railway loading: A case study of qianjiang-zhangjiajie-changde railway. Journal of Construction Engineering and Management, 148(12): 05022014, ISSN 0733-9364
Whaley, A; McAdam, B and Crowe, P (2015) The acceleration dilemma: Can English law accommodate constructive acceleration? International Journal of Law in the Built Environment, 7(3), pp. 248-267. ISSN 1756-1450
Yang, H; Chan, A P C; Yeung, J F Y and Li, Q (2012) Concentration effect on construction firms: Tests of resource partitioning theory in Jiangsu province (China) from 1989 to 2007. Journal of Construction Engineering and Management, 138(1), pp. 144-153. ISSN 0733-9364
Yao, Z; Zhang, L; Hua, Z and Luo, C (2025) Low-carbon multiobjective optimization for repetitive projects based on crew-based scheduling strategy. Journal of Construction Engineering and Management, 151(1): 04024183, ISSN 0733-9364
Zaryoun, M; Hosseini, M and Soleymani, K (2022) Sustainable architecture and earthquake resilience of vernacular zegalli houses in Northern Iran. Engineering, Construction and Architectural Management, 29(2), pp. 1061-1085. ISSN 0969-9988
Zhang, D and Ho, C H (2024) Distribution fitting and anova test to analyze pavement sensing patterns for condition assessments. Built Environment Project and Asset Management, 14(4), pp. 663-676. ISSN 2044-124X
Zhang, X (2018) Sustainable retrofitting of existing residential buildings at community scale in China. PhD thesis, Cardiff University, UK.
Zhang, Y; Chang, R; Mao, W; Zuo, J; Zhang, W E and Liu, L (2025) Low-cost ios-based automated detection of under-construction interior drywalls: An exploratory study. Journal of Construction Engineering and Management, 151(10): 05025012, ISSN 0733-9364
Zou, X; Zhang, L and Zhang, Q (2022) Time-cost optimization in repetitive project scheduling with limited resources. Engineering, Construction and Architectural Management, 29(2), pp. 669-701. ISSN 0969-9988
d'Apolito, L and Hong, H (2020) Forklift truck performance simulation and fuel consumption estimation. Journal of Engineering, Design and Technology, 18(3), pp. 689-703. ISSN 1726-0531
de Magalhães, F M R L (2010) Operational modal analysis for testing and monitoring of bridges and special structures. PhD thesis, Universidade do Porto, Portugal.
Up a level