Items with Index Term: abandonment
Adebisi, E O; Ojo, S O and Alao, O O (2018) Assessment of factors influencing the failure and abandonment of multi-storey building projects in Nigeria. International Journal of Building Pathology and Adaptation, 36(2), pp. 210-231. ISSN 23984708
Adeyemi, B S and Aigbavboa, C O (2024) An evaluation of the impacts of construction professionals' conflict on performance in the Nigerian construction industry. International Journal of Building Pathology and Adaptation, 42(3), pp. 469-482. ISSN 23984708
Adigbo, F A (2020) Stakeholder engagement and construction project performance in Ghana. PhD thesis, Northcentral University, USA.
Akpan, E O P and Igwe, O (2001) Methodology for determining price variation in project execution. Journal of Construction Engineering and Management, 127(5), pp. 367-373. ISSN 0733-9364
Al Dinah, M (2022) Coordination issues and unethical practices in comparison with other determinants of delays and cost overruns in the construction industry: how do the participants respond? PhD thesis, University of Portsmouth, UK.
Al-Fadhali, N; Zainal, R; Kasim, N; Dodo, M; Kim Soon, N and Hasaballah, A H A (2019) The desirability of integrated influential factors (IIFS) model of internal stakeholder as a panacea to project completion delay in Yemen. International Journal of Construction Management, 19(2), pp. 128-136. ISSN 1562-3599
Alao, O O and Jagboro, G O (2017) Assessment of causative factors for project abandonment in Nigerian public tertiary educational institutions. International Journal of Building Pathology and Adaptation, 35(1), pp. 41-62.
Alao, O O; Jagboro, G O and Opawole, A (2018) Cost and time implications of abandoned project resuscitation: A case study of educational institutional buildings in Nigeria. Journal of Financial Management of Property and Construction, 23(2), pp. 185-201. ISSN 1366-4387
Alghamdi, A M (2022) A systemic approach for construction contract claims settlement in the Kingdom of Saudi Arabia. PhD thesis, University of Reading, UK.
Aminorlah, A I; Rahim, N A; Mohamed, Z and Mazlan, A N (2023) Critical delay factors in typical physical projects: The case of the ministry of home affairs in Malaysia. Journal of Construction in Developing Countries, 28(2), pp. 57-79. ISSN 1823-6499
Asiedu, R O; Frempong, N K and Alfen, H W (2017) Predicting likelihood of cost overrun in educational projects. Engineering, Construction and Architectural Management, 24(1), pp. 21-39. ISSN 0969-9988
Banwo, O (2016) The development of a procurement decision support system to enhance construction claims management practice. PhD thesis, Coventry University, UK.
Chritamara, S (2017) An application of the real option framework to large infrastructure projects: evidence for Thailand's transportation system. PhD thesis, University of Newcastle upon Tyne, UK.
Cieraad, F D; Schraven, D F J and de Bruijne, M L C (2018) Investments under pressure: A real options approach to prepare for emergency asylum shelter in a multi actor setting. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Damoah, I S (2015) An investigation into the causes and effects of project failure in government projects in developing countries: Ghana as a case study. PhD thesis, Liverpool John Moores University, UK.
Damoah, I S; Mouzughi, Y and Kumi, D K (2020) The effects of government construction projects abandonment: Stakeholders' perspective. International Journal of Construction Management, 20(5), pp. 462-479. ISSN 1562-3599
Damoah, I S; Tingbani, I; Kumi, D K; Akwei, C C and Amoako, I O (2022) Factors influencing school building construction projects abandonment. International Journal of Construction Management, 22(6), pp. 961-976. ISSN 1562-3599
Foruzanmehr, A and Vellinga, M (2011) Vernacular architecture: Questions of comfort and practicability. Building Research & Information, 39(3), pp. 274-285. ISSN 0961-3218
Gatti, M P (2018) Maintenance, reconstruction and prevention for the regeneration of historic towns and centers. International Journal of Disaster Resilience in the Built Environment, 9(1), pp. 96-111. ISSN 1759-5916
Huang, Y L and Lin, T C (2023) Compound deferrable options for the valuation of multi-stage infrastructure investment projects. Construction Management and Economics, 41(8), pp. 670-686. ISSN 01446193
Huang, Y L and Pi, C C (2009) Valuation of multi-stage BOT projects involving dedicated asset investments: A sequential compound option approach. Construction Management and Economics, 27(7), pp. 653-666. ISSN 1466433X
Israel, B (2023) The impact of clients' procurement challenges on the substance goals of roads construction projects in songwe, Tanzania. International Journal of Construction Management, 23(12), pp. 2144-2150. ISSN 1562-3599
Jia, B; Yang, Y; Xie, B and Yu, X (2021) Novel geometric control technology for precast segmental bridges. Journal of Construction Engineering and Management, 147(4): 04021006, ISSN 0733-9364
Jijingi, A T (2019) A BIM-enabled procurement framework in new buildings for the Nigerian architecture, engineering and construction industry. PhD thesis, University of Portsmouth, UK.
Jimoh, I (2021) What explains the efficiency of major public project delivery in Nigeria? PhD thesis, University of Cambridge, UK.
Johnson, A; Rotimi, J O B and Wilkinson, S (2021) An evaluation of risk factors impacting project budget performance in New Zealand. Journal of Engineering, Design and Technology, 19(1), pp. 41-61. ISSN 1726-0531
Kaiser, M J and Lledare, W O (2006) The gulf of Mexico decommissioning market. Journal of Construction Engineering and Management, 132(8), pp. 815-826. ISSN 0733-9364
Kaminsky, J (2013) Social sustainability of sanitation infrastructure in developing communities. PhD thesis, University of Colorado at Boulder, USA.
Kaminsky, J and Javernick-Will, A (2015) Theorizing the internal social sustainability of sanitation organizations. Journal of Construction Engineering and Management, 141(2): 04014071, ISSN 0733-9364
Khalid, M S (2010) Abandoned housing development: the Malaysian experience. PhD thesis, Heriot-Watt University, UK.
Kuoribo, E; Yomoah, R; Owusu-Manu, D G; Acheampong, A; John Edwards, D and Debrah, C (2023) Assessing the interactive effects of the ethics of construction professionals on project performance in the Ghanaian construction industry. Engineering, Construction and Architectural Management, 30(10), pp. 5233-5252. ISSN 0969-9988
Longhurst, Peta (2011) The foundations of madness: The role of the built environment in the mental institutions of New South Wales. PhD thesis, University of Sydney, Australia.
Martino, Antonello (2017) The historical landscape of ports: From the definition of a methodology for the risk assessment to the identification of guidelines for port heritage preservation. PhD thesis, Politecnico di Bari, Italy.
McDonald, P R (1984) Construction claims costing for owners and contractors. Construction Management and Economics, 2(1), pp. 1-12. ISSN 01446193
Nana-Addy, E; Musonda, I and Okoro, C (2022) Assessing causative characteristics of abandoned completed urban market projects in Ghana. Journal of Construction in Developing Countries, 27(2), pp. 147-161. ISSN 1823-6499
Nuako, F; Ghansah, F A and Adusei, T (2026) Critical success factors for cost overrun minimization in public construction projects in developing countries: The case of Ghana. Construction Innovation, 26(1), pp. 44-62. ISSN 1471-4175
Obunwo, C U C (2016) A framework for enhancing project quality and customer satisfaction in government road construction projects in Rivers State, Nigeria. PhD thesis, University of Wolverhampton, UK.
Ogunnusi, M; Salman, H and Laing, R (2023) TOPSIS analysis for sustainable redevelopment potential of abandoned infrastructure in Nigeria. Built Environment Project and Asset Management, 13(1), pp. 73-88. ISSN 2044-124X
Ogunsemi, D R and Aje, I O (2006) A model for contractors' selection in Nigeria. Journal of Financial Management of Property and Construction, 11(1), pp. 33-44. ISSN 1366-4387
Ojo, E O (2019) Project managers’ capacity-planning practices for infrastructure projects in qatar. PhD thesis, Walden University, USA.
Olanrewaju, A and Tan, S Y (2018) An exploration into design criteria for affordable housing in Malaysia. Journal of Engineering, Design and Technology, 16(3), pp. 360-384. ISSN 1726-0531
Olanrewaju, O I; Chileshe, N; Adekunle, E O and Salihu, C (2024) Modelling the environmental, economic and social impacts of coronavirus pandemic on the construction industry. International Journal of Construction Management, 24(14), pp. 1485-1498. ISSN 1562-3599
Opawole, A (2018) Penalty mechanisms for enforcing concessionaire performance in public-private partnership contracts in Nigeria. Journal of Engineering, Design and Technology, 16(1), pp. 161-191.
Osei-Asibey, D; Ayarkwa, J; Baah, B; Afful, A E; Anokye, G and Nkrumah, P A (2025) Impact of time-based delay on public-private partnership (PPP) construction project delivery: Construction stakeholders' perspective. Journal of Financial Management of Property and Construction, 30(1), pp. 88-110. ISSN 1366-4387
Oyegoke, A S (2006) Building competence to manage contractual claims in international construction environment: The case of Finnish contractors. Engineering, Construction and Architectural Management, 13(1), pp. 96-113. ISSN 0969-9988
Pan, W (2010) Strategies for managing innovation in UK housebuilding. Engineering, Construction and Architectural Management, 17(1), pp. 78-88. ISSN 0969-9988
Ramos, M A P (2023) Determining factors and strategies to promote construction and demolition waste management on a local scale. PhD thesis, Universidade NOVA de Lisboa, Portugal.
Rezakhani, P (2023) Empirical study of housing recovery and property abandonment following valley fire in California: Insights from neighborhood characteristics and building attributes. International Journal of Disaster Resilience in the Built Environment, 14(5), pp. 628-639. ISSN 1759-5916
Ross, D G (1970) The construction of the railroads of Central America. PhD thesis, University of California, Santa Barbara, USA.
Sanni-Anibire, M O; Mohamad Zin, R and Olatunji, S O (2022) Causes of delay in the global construction industry: A meta analytical review. International Journal of Construction Management, 22(8), pp. 1395-1407. ISSN 1562-3599
Sanni-Anibire, M O; Zin, R M and Olatunji, S O (2022) Machine learning model for delay risk assessment in tall building projects. International Journal of Construction Management, 22(11), pp. 2134-2143. ISSN 1562-3599
Shehu, Z; Holt, G D; Endut, I R and Akintoye, A (2015) Analysis of characteristics affecting completion time for Malaysian construction projects. Built Environment Project and Asset Management, 5(1), pp. 52-68. ISSN 2044-124X
Taimu, M (2020) A contractor-driven stakeholder relationship management framework for botswana's construction industry. DBL thesis, University of South Africa, South Africa.
Taylor, M D (2003) Economic appraisal and risk analysis of construction automation. PhD thesis, Edinburgh Napier University, UK.
Taylor, M D and Wamuziri, S C (2002) Strategic construction mechatronics valuation: A real option-pricing approach. Journal of Financial Management of Property and Construction, 7(2), pp. 75-90. ISSN 1366-4387
White, N J (2006) Destruction of the contract through material changes. International Journal of Construction Education and Research, 2(1), pp. 43-51. ISSN 1557-8771
Wyrick, D A and Eschenbach, T G (1989) Remote oil and gas facility construction. Journal of Construction Engineering and Management, 115(2), pp. 228-236. ISSN 0733-9364
Up a level