Items with Index Term: PPC

Number of items: 27.

Ballard, H G (2000) The last planner system of production control. PhD thesis, University of Birmingham, UK.

Dupin, P (2021) Using pull and flow systems to improve production stability in real estate development projects. PhD thesis, Nottingham Trent University, UK.

Ezzeddine, A; Shehab, L; Lucko, G and Hamzeh, F (2022) Forecasting construction project performance with momentum using singularity functions in LPS. Journal of Construction Engineering and Management, 148(8): 04022063, ISSN 0733-9364

Fernández-Solís, J L; Rybkowski, Z K; Xiao, C; Lü, X and Chae, L S (2015) General contractor's project of projects: a meta-project: Understanding the new paradigm and its implications through the lens of entropy. Architectural Engineering and Design Management, 11(3), pp. 213-242. ISSN 1745-2007

Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.

Gledson, B; Williams, D and Littlemore, M (2018) Construction planning efficiency and delivery time performance: Analysing failure in task-level 'hit rates'. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Hamzeh, F R (2009) Improving construction workflow: The role of production planning and control. PhD thesis, University of California, Berkeley, USA.

Hamzeh, F R; Zankoul, E and Rouhana, C (2015) How can 'tasks made ready' during lookahead planning impact reliable workflow and project duration? Construction Management and Economics, 33(4), pp. 243-258. ISSN 01446193

He, Hailong (2017) Exploring the combined impact of project portfolio construction and steering on project portfolio performance. PhD thesis, University of Gloucestershire, UK.

Khan, S (2017) Using the last planner system and lean principles to improve workflow in BIM-based building design projects. PhD thesis, University of Huddersfield, UK.

Lagos, C I; Herrera, R F and Alarcón, L F (2019) Assessing the impacts of an IT LPS support system on schedule accomplishment in construction projects. Journal of Construction Engineering and Management, 145(10): 04019055, ISSN 0733-9364

Li, Y; Yao, Z; Wu, J; Zeng, S and Wu, G (2024) Toward ecological environmental risk for spoil ground group management in mega projects. Engineering, Construction and Architectural Management, 31(9), pp. 3706-3726. ISSN 0969-9988

Lin, J J and Golparvar-Fard, M (2021) Visual and virtual production management system for proactive project controls. Journal of Construction Engineering and Management, 147(7): 2045, ISSN 0733-9364

Majumdar, T (2024) Pmc: A classification of production metrics found useful by AEC professionals. PhD thesis, Stanford University, USA.

McCauley, Kathleen H (2020) Modeling construction management dynamics: A proxy estimation of percent planned complete. PhD thesis, Indiana State University, USA.

Nguyen, T Q; Yeoh, J K W and Angelia, N (2023) Predicting percent plan complete through time series analysis. Journal of Construction Engineering and Management, 149(6): 04023038, ISSN 0733-9364

Olivieri, Hylton (2016) Integrating production planning and controlling systems for construction projects. PhD thesis, Universidade Estadual de Campinas, Brazil.

Onitiri, M A and Adedayo, S M (2015) Compressive behaviour of polypropylene filled with iron ore tailings. Journal of Engineering, Design and Technology, 13(2), pp. 198-212.

Othman, A A; Rahman, S A; Sundram, V P K and Bhatti, M A (2015) Modelling marketing resources, procurement process coordination and firm performance in the Malaysian building construction industry. Engineering, Construction and Architectural Management, 22(6), pp. 644-668. ISSN 0969-9988

Power, W; Sinnott, D and Lynch, P (2024) Takt complementing Last Planner® system on residential construction projects. Construction Economics and Building, 24(4-5), pp. 58-80. ISSN 2204-9029

Reddy, A S; Kumar, P R and Raj, P A (2022) Entropy-based fuzzy TOPSIS framework for selection of a sustainable building material. International Journal of Construction Management, 22(7), pp. 1194-1205. ISSN 1562-3599

Retamal, F; Salazar, L A and Alarcón, L F (2022) Online monitoring and implementation of commitment management performance and its impact on project planning in four construction projects. Journal of Construction Engineering and Management, 148(10): 05022011, ISSN 0733-9364

Russell, M M; Liu, M; Howell, G and Hsiang, S M (2015) Case studies of the allocation and reduction of time buffer through use of the last planner system. Journal of Construction Engineering and Management, 141(2): 04014068, ISSN 0733-9364

Tennant, S and Fernie, S (2011) An alternative form of supply chain governance: Construction clans. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Vilventhan, A and Rajadurai, R (2020) 4D bridge information modelling for management of bridge projects: A case study from India. Built Environment Project and Asset Management, 10(3), pp. 423-435. ISSN 2044-124X

Yu, X; Mehmood, K; Paulsen, N; Ma, Z and Kwan, H K (2021) Why safety knowledge cannot be transferred directly to expected safety outcomes in construction workers: The moderating effect of physiological perceived control and mediating effect of safety behavior. Journal of Construction Engineering and Management, 147(1): 1965, ISSN 0733-9364

Zhou, Q and Deng, X (2025) A configuration analysis on knowledge transfer between projects: From horizontal and vertical perspectives. Engineering, Construction and Architectural Management, 32(5), pp. 3349-3374. ISSN 0969-9988