Adegoke, A S; Oladokun, T T; Ayodele, T O; Agbato, S E and Jinadu, A A (2022) DEMATEL method of analysing the factors influencing the decision to adopt virtual reality technology by real estate firms in Lagos property market. Smart and Sustainable Built Environment, 11(4), pp. 891-917. ISSN 2046-6099
Liu, X; Zhu, T; Xue, Y; Huang, Z and Le, Y (2025) Analyzing the drivers of the low-carbon construction supply chain based on an integrated DEMATEL-ANP approach. Engineering, Construction and Architectural Management, 32(8), pp. 5132-5159. ISSN 0969-9988
Mohandes, S R; Kaddoura, K; Singh, A K; Elsayed, M Y; Banihashemi, S; Antwi-Afari, M F; Olawumi, T O and Zayed, T (2025) Application of a hybrid fuzzy-based algorithm to investigate the environmental impact of sewer overflow. Smart and Sustainable Built Environment, 14(6), pp. 1950-1990. ISSN 2046-6099
Parchami, J M and Shoar, S (2017) A hybrid SD-DEMATEL approach to develop a delay model for construction projects. Engineering, Construction and Architectural Management, 24(4), pp. 629-651. ISSN 0969-9988
Rostamnezhad, M; Nasirzadeh, F; Khanzadi, M; Jarban, M J and Ghayoumian, M (2020) Modeling social sustainability in construction projects by integrating system dynamics and fuzzy‐DEMATEL method: A case study of highway project. Engineering, Construction and Architectural Management, 27(7), pp. 1595-1618. ISSN 0969-9988
Sen, M K; Dutta, S and Kabir, G (2021) Evaluation of interaction between housing infrastructure resilience factors against flood hazard based on rough DEMATEL approach. International Journal of Disaster Resilience in the Built Environment, 12(5), pp. 555-575. ISSN 1759-5916
Sruthilaya, D; Vilventhan, A and Gopal, P R C (2024) Analysis of project complexity factors and their interdependencies in metro rail projects. Built Environment Project and Asset Management, 14(2), pp. 260-277. ISSN 2044-124X
Tajaddini, A; Paydar, A; Abbasianjahromi, H and Azami, Z (2023) Analysis of the damage indexes of construction projects using a hybrid fuzzy method. International Journal of Construction Management, 23(10), pp. 1694-1703. ISSN 1562-3599
Terzioglu, T and Polat, G (2026) Evaluating interactions between formwork system selection criteria for building construction projects: A rough DEMATEL approach. Journal of Construction Engineering and Management, 152(1): 04025225, ISSN 0733-9364
Özkan-Özen, Y D; Akcicek, C and Ozturkoglu, Y (2025) Machine learning applications in smart logistics: Analysing barriers for future practices. Journal of Engineering, Design and Technology, 23(6), pp. 2105-2123. ISSN 1726-0531