Items with Index Term: Cairo

Number of items: 12.

Badawy, M; El-Sheikh, R and Hamdy, K (2025) Sensitivity analysis of key factors influencing concession period estimation in PPP wastewater treatment projects: A system dynamics approach. Construction Economics and Building, 25(3-4), pp. 65-89. ISSN 2204-9029

Bashat, I M; Gab-Allah, A A and Amer, M I (1995) Construction of ameria caisson in Egypt. Journal of Construction Engineering and Management, 121(1), pp. 13-19. ISSN 0733-9364

El-Deeb, K (2024) Energy performance assessment of venetian blinds in south-oriented residential spaces in hot arid desert climates. Construction Innovation, 24(6), pp. 1460-1482. ISSN 1471-4175

Elkhayat, Y O; Ibrahim, M G; Tokimatsu, K and Ali, A A M M (2020) Life cycle cost analysis on three high-performance glazing systems for an office building in New Cairo, Egypt. Architectural Engineering and Design Management, 17(1-2), pp. 131-145. ISSN 1745-2007

Elshaboury, N and Marzouk, M (2021) Optimizing construction and demolition waste transportation for sustainable construction projects. Engineering, Construction and Architectural Management, 28(9), pp. 2411-2425. ISSN 0969-9988

Gaber, B; Zhan, C; Han, X; Omar, M and Li, G (2024) Employing ANN for daylight and energy prediction of hot climate office buildings: A case study of new cairo, Egypt. Architectural Engineering and Design Management, 20(6), pp. 1752-1776. ISSN 1745-2007

Guirguis, T (2025) Potty politics: The biopolitical and bioeconomic implications of sanitation infrastructure mega-projects in Cairo, Mumbai, and Shanghai. PhD thesis, University of California, Santa Barbara, USA.

Marey Madi, H A (2024) Sustainability assessment of using green concrete materials for residential buildings in Egypt. PhD thesis, Debreceni Egyetem, Hungary.

Nadim, W (2016) Live-work and adaptable housing in Egypt: A zero commuting concept, lessons learnt from informal developments. Smart and Sustainable Built Environment, 5(3), pp. 289-302. ISSN 2046-6099

Nosair, I A R (1987) The relevance of computerised modelling techniques to construction management problems and training in Egypt. PhD thesis, University of Manchester, UK.

S. Shehata, A.; M. El-Kelesh, A. and El-Kasaby, E. S. (2026) Effects of ground conditions on utilization factor of slurry tbms in soft ground tunneling. Engineering, Construction and Architectural Management, 33(7), pp. 5275-5299. ISSN 0969-9988

Shams, A. and Marzouk, M. (2026) Leveraging BIM and time-cost-safety trade-off analysis for optimized decisions in construction projects. Engineering, Construction and Architectural Management, 33(7), pp. 5180-5209. ISSN 0969-9988

This list was generated on Sat Aug 22 02:08:37 2026 UTC.