Items with Index Term: 4D simulation
Alashwal, A M and Chew, M Y (2017) Simulation techniques for cost management and performance in construction projects in Malaysia. Built Environment Project and Asset Management, 7(5), pp. 534-545. ISSN 2044-124X
Butkovic, B (2019) A framework for developing 4D level-of-detail on construction projects. PhD thesis, University of Wolverhampton, UK.
Heesom, D and Mahdjoubi, L (2004) Trends of 4D CAD applications for construction planning. Construction Management and Economics, 22(2), pp. 171-182. ISSN 01446193
Kunieda, Y; Codinhoto, R and Emmitt, S (2019) Increasing the efficiency and efficacy of demolition through computerised 4D simulation. Engineering, Construction and Architectural Management, 26(10), pp. 2186-2205. ISSN 0969-9988
Li, H; Chan, G; Skitmore, M and Huang, T (2015) A 4D automatic simulation tool for construction resource planning: A case study. Engineering, Construction and Architectural Management, 22(5), pp. 536-550. ISSN 0969-9988
Moore, N (2013) A model based system for contextual on-site construction planning in augmented reality. PhD thesis, University of Wolverhampton, UK.
Moore, N J (2013) A contextual AR model based system on-site construction planning. PhD thesis, University of Wolverhampton, UK.
Salhab, D; Pourrahimian, E; Lindhard, S M and Hamzeh, F (2025) Patterns, 4D simulations, and artificial intelligence-driven insights: Redefining construction workspace management. Journal of Construction Engineering and Management, 151(8): 04025099, ISSN 0733-9364
Swallow, M and Zulu, S (2020) Students’ awareness and perception of the value of BIM and 4D for site health and safety management. Journal of Engineering, Design and Technology, 18(2), pp. 414-430. ISSN 1726-0531
Xu, J (2021) A human-organization-technology fit model to harness the power of building information modeling in construction project organizations. PhD thesis, University of Hong Kong, Hong Kong.
Zhou, W (2009) An investigation into a distributed virtual reality environment for real-time collaborative 4D construction planning and simulation. PhD thesis, University of Wolverhampton, UK.
Up a level