Items with Index Term: 4D modelling
Bansal, V K and Pal, M (2011) Construction projects scheduling using GIS tools. International Journal of Construction Management, 11(1), pp. 1-18. ISSN 1562-3599
Bosché, F; Turkan, Y; Haas, C T and Haas, R (2010) Fusing 4D modelling and laser scanning for construction schedule control. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Ganah, A A M and John, G A (2017) BIM and project planning integration for on-site safety induction. Journal of Engineering, Design and Technology, 15(3), pp. 341-354.
Gibbs, D-J (2017) Development of building information models (BIM) to support innovative time management and delay analysis. EngD thesis, Loughborough University, UK.
Guo, B H W; Gonzalez, V A; Puolitaival, T; Enegbuma, W and Zou, Y (2023) Bridging the gap between building information modelling education and practice: A competency-based education perspective. International Journal of Construction Management, 23(15), pp. 2558-2569. ISSN 1562-3599
Khatib, J M; Chileshe, N and Sloan, S (2007) Antecedents and benefits of 3D and 4D modelling for construction planners. Journal of Engineering, Design and Technology, 5(2), pp. 159-172. ISSN 1726-0531
Musselwhite, D; Gledson, B and Greenwood, D (2021) Matters affecting construction project-level planning effectiveness: A literature review. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Singh, J (2021) BIM-based automatic piping layout design and schedule optimization. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Singh, J; Cheng, J C P and Anumba, C J (2021) BIM-based approach for automatic pipe systems installation coordination and schedule optimization. Journal of Construction Engineering and Management, 147(11): 04021143, ISSN 0733-9364
Su, X (2013) A spatial temporal information model for construction planning. PhD thesis, Purdue University, USA.
Swallow, M and Zulu, S (2020) Students’ awareness and perception of the value of BIM and 4D for site health and safety management. Journal of Engineering, Design and Technology, 18(2), pp. 414-430. ISSN 1726-0531
Vilventhan, A and Rajadurai, R (2020) 4D bridge information modelling for management of bridge projects: A case study from India. Built Environment Project and Asset Management, 10(3), pp. 423-435. ISSN 2044-124X
Zhou, W; Heesom, D; Georgakis, P and Tah, J H M (2014) User-centred design for collaborative 4D modelling. Construction Innovation, 14(4), pp. 493-517. ISSN 1471-4175
olde Scholtenhuis, Léon Luc (2015) Enhancing mindful coordination in fragmented utility construction practices: By developing, implementing and evaluating virtual design and construction models. PhD thesis, University of Twente, Netherlands.
Up a level