Items with Descriptive Scope: 4 PCEA
Abadi, A A; Poerbo, H W; Yuwono, T and Isnandya, A R (2024) Balancing Act: Promoting Affordable Housing in Jakarta's Transit-Oriented Development through Public-Private Partnership. Journal of Construction in Developing Countries, 29(S1), pp. 287-314. ISSN 1823-6499
Abanomi, W M (2005) Environmental design of prototype school buildings in hot, arid regions with special reference to Riyadh, Saudi Arabia. PhD thesis, Cardiff University, UK.
Abarinda, J; Kibwami, N and Tutesigensi, A (2019) Towards improving schedule performance of construction projects in Uganda with lean construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Abd El-Razek, M E; Bassioni, H A and Mobarak, A M (2008) Causes of delay in building construction projects in Egypt. Journal of Construction Engineering and Management, 134(11), pp. 831-841. ISSN 0733-9364
Abd Jamil, A H and Fathi, M S (2020) Enhancing BIM-based information interoperability: Dispute resolution from legal and contractual perspectives. Journal of Construction Engineering and Management, 146(7): 05020007, ISSN 0733-9364
Abdalazeem, M E; Hassan, H; Asawa, T and Mahmoud, H (2024) Green roofs and thermal comfort: A comparative study of soil layers' seasonal thermal performance integrated with ventilation in hot climate. Architectural Engineering and Design Management, 20(2), pp. 358-389. ISSN 1745-2007
Abdalla, A (2007) Meeting housing needs in Libya: towards a responsive owner-built housing with particular reference to Benghazi City. PhD thesis, University of Newcastle upon Tyne, UK.
Abdalla, A; Li, X and Yang, F (2024) Expatriate construction professionals' performance in international construction projects: The role of cross-cultural adjustment and job burnout. Journal of Construction Engineering and Management, 150(3): 04024005, ISSN 0733-9364
Abdallah, A; Assaf, S and Hassanain, M A (2019) Assessment of the consequences of deficiencies in design documents in Saudi Arabia. Architectural Engineering and Design Management, 15(4), pp. 282-296. ISSN 1745-2007
Abdallah, F (2019) Agent-based models for residential energy consumption and intervention simulation. PhD thesis, Birmingham City University, UK.
Abdallah, M A A (2014) Optimizing the selection of sustainability measures for existing buildings. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Abdel Meguid, T A (1998) Managed claims procurement strategy (MCPS): A comparative study of the performance of alternate building procurement strategies. PhD thesis, Universite de Montreal, Canada.
Abdelaty, A; Jeong, H D; Dannen, B and Todey, F (2016) Enhancing life cycle cost analysis with a novel cost classification framework for pavement rehabilitation projects. Construction Management and Economics, 34(10), pp. 724-736. ISSN 0144-6193
Abdelghafar, A (2024) Identifying challenges, best practices, and potential solutions to NYCSCA project delays. DBA thesis, Touro University Worldwide, USA.
Abdelhamid, T S and Everett, J G (1999) Time series analysis for construction productivity experiments. Journal of Construction Engineering and Management, 125(2), pp. 87-95. ISSN 0733-9364
Abdelwahab, M A and Nassar, A H (2024) Legal barriers and associated solutions of BIM implementation in the Egyptian AEC industry. International Journal of Construction Management, 24(13), pp. 1431-1443. ISSN 1562-3599
Abdi, A (2014) Efficient winter road maintenance: A study of technical and contractual issues. PhD thesis, KTH Royal Institute of Technology, Sweden.
Abdi, A; Lind, H and Birgisson, B (2013) Payment mechanisms for winter road maintenance services. Construction Economics and Building, 13(4), pp. 18-31. ISSN 2204-9029
Abduh, M (2000) Utility assessment of electronic networking technologies for design -build projects. PhD thesis, Purdue University, USA.
Abdul Kareem, H I and Abu Bakar, A H (2013) Management procedures for realizing information technology benefits in Malaysia. International Journal of Construction Management, 13(3), pp. 1-13. ISSN 1562-3599
Abdul-Aziz, A R and Wong, S S (2010) Exploring the internationalization of Malaysian contractors: The international entrepreneurship dimension. Construction Management and Economics, 28(1), pp. 51-61. ISSN 1466433X
Abdul-Rashid, I; Bassioni, H and Bawazeer, F (2007) Factors affecting safety performance in large construction contractors in Egypt. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Abdulla, H and McCauley-Smith, C (2024) Contribution mechanisms of project managers' behavioural competencies towards the success of oil and gas projects. International Journal of Construction Management, 24(2), pp. 151-160. ISSN 1562-3599
Abdullah, R Z (1988) Integrated systems for site management. PhD thesis, Loughborough University, UK.
Abdullahi, I (2000) Development of a funding model for allocating capital grants to the federal universities in Nigeria. PhD thesis, Abertay University, UK.
Abdullahi Ahmed, U; Noor Amila Wan Abdullah, Z and Abdul-Rashid, A-A (2021) Malaysian regulators' ranking of PPP contract governance skills. Built Environment Project and Asset Management, 11(1), pp. 88-102. ISSN 2044-124X
Abed, A; Ali, H; Ibrahim, A and Wedyan, M (2023) Impact of setbacks on thermal comfort and visual privacy in detached houses in Jordan. Building Research & Information, 51(4), pp. 446-458. ISSN 0961-3218
Abideen, D; Yunusa-Kaltungo, A; Manu, P and Cheung, C (2023) Expert verification of information requirements for integrating building information modelling with operation and maintenance. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Abidin, N Z (2005) Using value management to improve the consideration of sustainability within construction. PhD thesis, Loughborough University, UK.
Abisuga, A O; Famakin, I O and Oshodi, O S (2016) Educational building conditions and the health of users. Construction Economics and Building, 16(4), pp. 19-34. ISSN 2204-9029
Aboelyousr, M; El-Sayegh, S and Ahmed, S (2025) Multi-criteria decision support model for selecting the appropriate construction management firm. International Journal of Construction Management, 25(5), pp. 552-561. ISSN 1562-3599
AbouRizk, S and Mather, K (2000) Simplifying simulation modeling through integration with 3D CAD. Journal of Construction Engineering and Management, 126(6), pp. 475-483. ISSN 0733-9364
Abouel-Enin, M A (1994) An empirical study of factors influencing the success of Egypt-United States of America joint ventures engaging in businesses in Egypt. PhD thesis, United States International University, USA.
Abu Arqoub, Muath (2022) Measuring end-user delight: Is success in project design and delivery enough? PhD thesis, Bond University, Australia.
Abu Dabous, S and Alkass, S (2008) Decision support method for multi-criteria selection of bridge rehabilitation strategy. Construction Management and Economics, 26(8), pp. 883-893. ISSN 01446193
Abu-Hijleh, S F (1991) A model for variance-based exception reporting with user-defined criteria. PhD thesis, University of California, Berkeley, USA.
Abubakar, S Y (1998) Investigation of factors affecting rural road maintenance: the case of Sokoto State, Nigeria. PhD thesis, Loughborough University, UK.
Abudu, Haruna Domanamwin; Mewomo, Cecilia Modupe; Adjei, Kofi Owusu and Bondinuba, Francis Kwesi (2026) The influence of technical and non-technical emergency response systems on infrastructure resilience. Journal of Construction Business and Management, 8(S1), pp. 30-47. ISSN 2521-0165
Abuimara, T; O’Brien, W; Gunay, B and Carrizo, J S (2019) Towards occupant-centric simulation-aided building design: A case study. Building Research & Information, 47(8), pp. 866-882. ISSN 0961-3218
Abukhder, J S A (2004) A study of the management process on construction projects, and the development of a new notation system. PhD thesis, University of Dundee, UK.
Aburas, M (2020) Critical success factors for implementing ISO 9001 in UK construction projects. PhD thesis, University of Salford, UK.
Acheamfour, V K; Adjei-Kumi, T and Kissi, E (2023) Contractor selection: A review of qualification and pre-qualification systems. International Journal of Construction Management, 23(2), pp. 338-348. ISSN 1562-3599
Acheampong, A; Owusu-Manu, D G; Kissi, E and Tetteh, P A (2023) Assessing the influence of emotional intelligence (EI) on project performance in developing countries: The case of Ghana. International Journal of Construction Management, 23(7), pp. 1163-1173. ISSN 1562-3599
Adade-Boateng, A O; Fugar, F and Adinyira, E (2021) Framework to improve the attitudes of construction workers towards safety helmets. Journal of Construction in Developing Countries, 26(2), pp. 65-86. ISSN 1823-6499
Adafin, J; Rotimi, J O B and Wilkinson, S (2016) Risk impact assessments in project budget development: Architects' perspectives. Architectural Engineering and Design Management, 12(3), pp. 189-204. ISSN 1745-2007
Adafin, J; Rotimi, J O B; Wilkinson, S and Mbachu, J (2019) An assessment of risk factors impacting budget variability in New Zealand commercial construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Adams, Olugboyega A (1993) Management training needs of Nigerian indigenous contractors and their preferred training delivery systems. PhD thesis, University College London, UK.
Adams-Tyler, L (2015) Examining community attitudes toward manufactured housing. DBA thesis, Walden University, USA.
Adamtey, S A (2021) A case study performance analysis of design-build and integrated project delivery methods. International Journal of Construction Education and Research, 17(1), pp. 68-84. ISSN 1557-8771
Adebowale, O J and Agumba, J N (2024) A systematic review of challenges undermining the efficacy of construction health and safety regulations in major African countries. Construction Economics and Building, 24(4-5), pp. 1-24. ISSN 2204-9029
Adedayo, O; Michieletto, M; Bamidele, E and Ntigulirwa, M (2020) Application of hybrid green fences for security in public building designs in Nigeria: Lessons from Kigali, Rwanda and Abuja, Nigeria. Journal of Construction in Developing Countries, 25(1), pp. 147-162. ISSN 1823-6499
Adedigba, A A (2022) Towards integrated sustainable solid waste management in Nigerian cities. PhD thesis, Northumbria University, UK.
Adedokun, O; Egbelakin, T and Omotayo, T (2024) Random forest and path diagram taxonomies of risks influencing higher education construction projects. International Journal of Construction Management, 24(1), pp. 66-74. ISSN 1562-3599
Adegoriola, M I; Yung, E H K; Lai, J H K; Chan, E H W and Yevu, S K (2023) Understanding the influencing factors of heritage building maintenance management: Findings from developed and developing regions. Building Research & Information, 51(5), pp. 605-624. ISSN 0961-3218
Adekunle, T O (2015) Thermal performance of low-carbon prefabricated timber housing in the UK. PhD thesis, University of Kent, UK.
Adeleke, A (2017) Linking effective project management to business strategy in oil and gas industry through decision-making processes. PhD thesis, Northcentral University, USA.
Adenuga, O A (2008) Evaluation of maintenance management practice in public hospital, buildings in South-West, Nigeria. PhD thesis, University of Lagos, Nigeria.
Adesiyan, B (2016) Exploring leadership strategies to maximize profitability in the Nigerian housing sector. DBA thesis, Walden University, USA.
Adewunmi, Y; Famuyiwa, F and Harrison, E (2009) Post occupancy evaluation of facilities in Nigerian private universities: A case study. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Adewunmi, Y; Omirin, M and Koleoso, H (2016) Prioritising facilities management services for benchmarking in selected cities in Nigeria. Journal of Construction in Developing Countries, 21(1), pp. 131-145. ISSN 1823-6499
Adeyeye, K (2024) From product to service–strategies for upscaling smart home performance monitoring. Building Research & Information, 52(1-2), pp. 107-128. ISSN 0961-3218
Adibzadeh, S; Adibzadeh, B and Akbari, A (2025) Environmental components affecting location in iran's national housing planning. International Journal of Construction Management, 25(16), pp. 2020-2029. ISSN 1562-3599
Adighibe, C; Skitmore, M and Wong, J (2010) The management of transport construction projects: A survey of public sector organisations in Queensland Australia. International Journal of Construction Management, 10(1), pp. 17-33. ISSN 1562-3599
Adjei, S D; Ankrah, N A; Adukpo, S E; Ndekugri, I and Searle, D (2024) Factors influencing the extent of waste management on construction sites. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Aduwo, E B; Ibem, E O; Afolabi, A O; Oluwnmi, A O; Tunji-Olayeni, P F; Ayo-Vaughan, E A; Uwakonye, U O and Oni, A A (2020) Exploring anti-corruption capabilities of e-procurement in construction project delivery in Nigeria. Construction Economics and Building, 20(1), pp. 56-76. ISSN 2204-9029
Adzande, P; Gyuse, T T and Atser, J (2018) Correlates of crime in urban Makurdi, Nigeria. African Journal of Built Environment Research, 2(1), pp. 21-40. ISSN 2414-0236
Afetornu, C (2011) The influence of estimator attitude on project cost reliability. PhD thesis, Loughborough University, UK.
Afetornu, C; Edum-Fotwe, F T and McCaffer, R (2006) Estimating budget variability for road projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Afieroho, P (2024) Project management by the people, for the people, and of the people: Context, challenges, and prospects for adoption of e-government tools to monitor execution of public infrastructure projects in Nigeria. PhD thesis, University of Alaska Fairbanks, USA.
Afolabi, A; Ibem, E; Aduwo, E and Tunji-Olayeni, P (2022) Digitizing the grey areas in the Nigerian public procurement system using e-procurement technologies. International Journal of Construction Management, 22(12), pp. 2215-2224. ISSN 1562-3599
Afolabi, A O; Oluwatayo, A; Oyeyipo, O; Ojelabi, R and Fagbenle, O (2018) Assessment of designers' perception of post conflict housing schemes for internally displaced persons. Construction Economics and Building, 18(1), pp. 27-47. ISSN 2204-9029
Afolayan, A S (2024) Gentrification-related buyouts and sustainable public low-income housing delivery in Lagos, Nigeria. Construction Economics and Building, 24(3), pp. 23-39. ISSN 2204-9029
Afxentiadis, D E (2010) Interpreting a major event organization's efforts to reliably manage information security risks: the case of the Athens 2004 Olympics. PhD thesis, London School of Economics and Political Science, UK.
Afzali Borujeni, S H; Zare, M and Adelzade Saadabadi, L (2024) Comparison of factors affecting the acceptance of the trenchless technology and open-trench method using ANP and AHP: Case study in Iran. Journal of Construction Engineering and Management, 150(1): 04023145, ISSN 0733-9364
Agapiou, A (2011) Scottish construction lawyers' awareness and experiences of alternative dispute resolution. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(4), pp. 181-192. ISSN 17514304
Agbo, B C D (2015) Human capital obsolescence in the building construction industry: Strategic imperatives for Nigeria. PhD thesis, University of Minnesota, USA.
Agbo, E A; Izam, Y D and Ayegba, C (2022) Quantifying the impact of work environment factors on the variability of labour productivity in wall plastering. Journal of Construction in Developing Countries, 27(2), pp. 109-125. ISSN 1823-6499
Agboola Abdulazeez, S; Faruq, M Y; Kolawole, M A; Abdulraheem, A A; Aliyu, H D and Zulfat, M O (2025) Impact of consultant performance indicators on project success in public construction projects. Journal of Construction Business and Management, 7(2), pp. 16-32.
Agee, P; Gao, X; Paige, F; McCoy, A and Kleiner, B (2021) A human-centred approach to smart housing. Building Research & Information, 49(1), pp. 84-99. ISSN 0961-3218
Agha, R H M (2016) The role of intelligent systems in traditional courtyard houses in Baghdad, Iraq. PhD thesis, University of Newcastle upon Tyne, UK.
Aghajamali, K; Metvaei, S; Suliman, A; Lei, Z and Chen, Q (2025) Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes. Construction Management and Economics, 43(5), pp. 340-359. ISSN 0144-6193
Aghimien, D; Aigbavboa, C; Meno, T and Ikuabe, M (2021) Unravelling the risks of construction digitalisation in developing countries. Construction Innovation, 21(3), pp. 456-475. ISSN 1471-4175
Agri, M. E.; Le, A. and Phung, Q. (2026) AI integration in architectural design and management: Professionals' perspectives. Architectural Engineering and Design Management, 22(1), pp. 67-82. ISSN 1745-2007
Agyekum, K; Adinyira, E and Amudjie, J (2021) Ethical misconducts within the invitation to tender and tender evaluation and award stages of construction contracts in Ghana. Journal of Engineering, Design and Technology, 19(5), pp. 1101-1123. ISSN 1726-0531
Agyekum, K; Hammond, S F and Salgin, B (2021) Occupants' perceived importance and satisfaction with the indoor environmental quality of a green building. Built Environment Project and Asset Management, 11(4), pp. 627-642. ISSN 2044-124X
Agyekum-Mensah, G (2019) The degree of accuracy and factors that influence the uncertainty of SME cost estimates. International Journal of Construction Management, 19(5), pp. 413-426. ISSN 1562-3599
Agyem-Bediako, S F (2007) Management commitment to safety among multinational construction companies in developing countries: A case of Ghana. DSc thesis, University of Massachusetts Lowell, USA.
Ahadzi, M and Bowles, G (2001) The private finance initiative: The procurement process in perspective. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Ahankoob, A; Manley, K and Abbasnejad, B (2022) The role of contractors' building information modelling (BIM) experience in realising the potential values of BIM. International Journal of Construction Management, 22(4), pp. 588-599. ISSN 1562-3599
Ahmad, A M (2014) The use of refurbishment, flexibility, standardisation and BIM to support the design of a change-ready healthcare facility. PhD thesis, Loughborough University, UK.
Ahmad, I U (1988) Bidding strategy: Multicriteria decision-making approach. PhD thesis, University of Cincinnati, USA.
Ahmadian, F F A; Akbarnezhad, A; Rashidi, T H and Waller, S T (2016) Accounting for transport times in planning off-site shipment of construction materials. Journal of Construction Engineering and Management, 142(1): 04015050, ISSN 0733-9364
Ahmed, S and El-Sayegh, S (2022) The challenges of sustainable construction projects delivery–evidence from the UAE. Architectural Engineering and Design Management, 18(3), pp. 299-312. ISSN 1745-2007
Ahmed, S and El-Sayegh, S (2024) Relevant criteria for selecting project delivery methods in sustainable construction. International Journal of Construction Management, 24(5), pp. 512-520. ISSN 1562-3599
Ahmed, V; Saboor, S; Almarzooqi, F A; Alshamsi, H A; Alketbi, M A and Al Marei, F A (2021) A comparative study of energy performance in educational buildings in the UAE. Construction Economics and Building, 21(3), pp. 33-57. ISSN 2204-9029
Ahmed, Y (2009) The impact of work placements on the development of transferable skills in engineering. PhD thesis, Loughborough University, UK.
Ahn, S; Crouch, L; Wan Kim, T and Rameezdeen, R (2020) Comparison of worker safety risks between onsite and offsite construction methods: A site management perspective. Journal of Construction Engineering and Management, 146(9): 0001890, ISSN 0733-9364
Ahsan, S; El-Hamalawi, A; Bouchlaghem, D and Ahmad, S (2007) Mobile technologies for improved collaboration on construction sites. Architectural Engineering and Design Management, 3(4), pp. 257-272. ISSN 1745-2007
Ahuja, R; Jain, M; Sawhney, A and Arif, M (2016) Adoption of BIM by architectural firms in India: Technology-organization-environment perspective. Architectural Engineering and Design Management, 12(4), pp. 311-330. ISSN 1745-2007
Aibinu, A A; Ling, F Y Y and Ofori, G (2011) Structural equation modelling of organizational justice and cooperative behaviour in the construction project claims process: Contractors' perspectives. Construction Management and Economics, 29(5), pp. 463-481. ISSN 1466433X
Aibinu, A A; Ofori, G and Ling, F Y Y (2008) Explaining cooperative behavior in building and civil engineering projects' claims process: Interactive effects of outcome favorability and procedural fairness. Journal of Construction Engineering and Management, 134(9), pp. 681-691. ISSN 0733-9364
Aibinu, A A and Pasco, T (2008) The accuracy of pre-tender building cost estimates in Australia. Construction Management and Economics, 26(12), pp. 1257-1269. ISSN 1466433X
Ainoo, F N Y (2025) Leveraging big data in AEC decision-making: A governance framework. PhD thesis, Capella University, USA.
Aiyetan, O A (2019) Influence of the management styles and quality of management on project delivery. Journal of Construction Business and Management, 3(1), pp. 38-44. ISSN 2521-0165
Aiyin, J and Yimin, Z (2010) A multi-stage approach to time-cost trade-off analysis using mathematical programming. International Journal of Construction Management, 10(3), pp. 13-27. ISSN 1562-3599
Ajayi, O O (2016) Maintenance management of prison facilities in South-West, Nigeria. PhD thesis, University of Lagos, Nigeria.
Ajayi, O O; Koleoso, H; Ajayi, M and Faremi, O (2019) Maintenance performance of prison facilities in Southwestern Nigeria. Journal of Construction Business and Management, 3(2), pp. 26-34. ISSN 2521-0165
Aje, I O; Oladinrin, T O and Nwaole, A N C (2016) Factors influencing success rate of contractors in competitive bidding for construction works in South-East, Nigeria. Journal of Construction in Developing Countries, 21(1), pp. 19-34. ISSN 1823-6499
Ajibike, W A; Adeleke, A Q; Muuka, G N; Bamgbade, J A; Darun, M R and Moshood, T D (2022) Impact of oil and gas internal risk factors on project success: Moderating role of government support. Construction Economics and Building, 22(1), pp. 47-69. ISSN 2204-9029
Akbiyikli, R and Eaton, D (2006) Operation and maintenance (O&M) management in PFI road projects in the UK. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Akeila, M; Preece, C and Kuok, K K K (2021) Evaluating the environmental performance of 3D printed shelters in Jordan. Journal of Construction in Developing Countries, 26(2), pp. 117-134. ISSN 1823-6499
Akerele, D and Gidado, K (2003) The risks and constraints in the implementation of PFI/PPP in Nigeria. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Akinradewo, O; Aigbavboa, C; Aghimien, D; Oke, A and Ogunbayo, B (2023) Modular method of construction in developing countries: The underlying challenges. International Journal of Construction Management, 23(8), pp. 1344-1354. ISSN 1562-3599
Akinsola, A O (1997) An intelligent model of variations' contingency on constructions projects. PhD thesis, University of Wolverhampton, UK.
Akintoye, A; Beck, M; Hardcastle, C; Chinyio, E A and Asenova, D (2000) Management of risks within the PFI project environment. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Akintoye, A and Fitzgerald, E (2000) A survey of current cost estimating practices in the UK. Construction Management and Economics, 18(2), pp. 161-172. ISSN 01446193
Akintoye, A; Taylor, C and Fitzgerald, E (1998) Risk analysis and management of private finance initiative projects. Engineering, Construction and Architectural Management, 5(1), pp. 9-21. ISSN 0969-9988
Akintoye, A S; Ajewole, O and Olomolaiye, P O (1992) Construction cost information management in Nigeria. Construction Management and Economics, 10(2), pp. 107-116. ISSN 01446193
Akinwale, A A and Olusanya, O A (2020) Influence of subcontracting processes on wages and workloads in the building construction industry in Nigeria. Journal of Construction Business and Management, 4(2), pp. 1-10. ISSN 2521-0165
Akoh, S R (2018) Risk management framework for highway construction projects in Nigeria. PhD thesis, Heriot-Watt University, UK.
Akomea-Frimpong, I; Jin, X and Osei-Kyei, R (2021) Developing a financial risk maturity model for public-private partnership projects. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Aksenova, G (2020) The dark side of ecosystem orchestration: an empirical investigation of building information management in the digital built environment sector. PhD thesis, University of Liverpool, UK.
Akuhe, G; Tutesigensi, A and Kayondo, M (2023) Consequences of poor management of acculturation on large infrastructure projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Al Ahbabi, M S (2014) Process protocol for the implementation of integrated project delivery in the UAE: A client perspective. PhD thesis, University of Salford, UK.
Al Ahbabi, M S M (2014) Process protocol for the implementation of integrated project delivery in the UAE: a client perspective. PhD thesis, University of Salford, UK.
Al Bunni, A (2020) Refurbishment of UK state school buildings: a strategy and framework for BIM-based digital twinning. PhD thesis, De Montfort University, UK.
Al Ghazal, H (2018) Post occupancy evaluation involving end users in Saudi Arabian office buildings through the use of a shortened quality function deployment method. PhD thesis, University of Manchester, UK.
Al Juboori, A A (2021) Exploring project costs estimator practices that increase the budget estimate’s accuracy during the initial phase of construction project’s life cycle. DM thesis, Colorado Technical University, USA.
Al Nasseri, H and Aulin, R (2016) Enablers and barriers to project planning and scheduling based on construction projects in Oman. Journal of Construction in Developing Countries, 21(2), pp. 1-20. ISSN 1823-6499
Al Nasseri, H and Aulin, R (2016) Understanding management roles and organisational behaviours in planning and scheduling based on construction projects in Oman. Journal of Construction in Developing Countries, 21(1), pp. 1-18. ISSN 1823-6499
Al Qady, M and Kandil, A (2013) Document management in construction: Practices and opinions. Journal of Construction Engineering and Management, 139(10): 06013002, ISSN 0733-9364
Al Shaiba Khamis Abdulla Al Sheryani, Y (2015) Project management leadership progression: a conceptual framework for Abu Dhabi. PhD thesis, University of Salford, UK.
Al Shalabi, F A (2016) BIM framework for energy and maintenance performance assessment for facility management. PhD thesis, Iowa State University, USA.
Al Sheryani, Y A S K A (2015) Project management leadership progression: A conceptual framework for Abu Dhabi. PhD thesis, University of Salford, UK.
Al Subaih, A (2016) A framework for implementation of IPD principles in oil & gas projects. PhD thesis, University of Salford, UK.
Al-Aubaidy, N A (2015) Factors affecting underreporting of construction safety incidents on capital projects. PhD thesis, University of Texas at Austin, USA.
Al-Bayati, A J and Panzer, L (2019) Reducing damage to underground utilities: Lessons learned from damage data and excavators in North Carolina. Journal of Construction Engineering and Management, 145(12): 04019078, ISSN 0733-9364
Al-Ghamdi, M (2000) The value of engineering design: a study of perceptions of the consulting engineer's contribution to building and civil engineering projects, and the marketing of consulting services. PhD thesis, University of Reading, UK.
Al-Harbi, K M; Johnston, D W and Fayadh, H (1994) Building construction detailed estimating practices in saudi arabia. Journal of Construction Engineering and Management, 120(4), pp. 774-784. ISSN 0733-9364
Al-Harthi, A S A (2016) Modelling the relationship between client activities and construction procurement performance in Oman. PhD thesis, Loughborough University, UK.
Al-Hasan, M A A (2007) A parametric model for the estimation of construction project labour productivity. PhD thesis, Liverpool John Moores University, UK.
Al-Kaisy, A and Nassar, K (2005) Nighttime construction issues revisited. Journal of Construction Research, 6(1), pp. 139-156. ISSN 1609-9451
Al-Khiami, M. I.; Lindhard, S. M. and Wandahl, S. (2026) Cross-cultural analysis of movement patterns and work-related musculoskeletal disorders in Danish and Kuwaiti construction: Implications for targeted exoskeleton design. International Journal of Construction Management, 26(8), pp. 1690-1706. ISSN 1562-3599
Al-Meshekeh, H S and Langford, D A (1999) Conflict management and construction project effectiveness: a review of the literature and development of a theoretical framework. Journal of Construction Procurement, 5(1), pp. 58-75. ISSN 1358-9180
Al-Momani, A H (2000) Structuring information on residential building: A model of preference. Engineering, Construction and Architectural Management, 7(2), pp. 179-190. ISSN 0969-9988
Al-Muqdadi, F (2020) Assessing the potentials of heritage building information modelling (HBIM) in damaged heritage reconstruction. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Al-Nammari, F and Alhanbali, F (2025) Housing adaptations for COVID-19 lockdowns in Amman and policy implications. Building Research & Information, 53(5), pp. 600-619. ISSN 0961-3218
Al-Omari, T (2004) Stochastic regression modelling of cost and duration overrun of construction projects implemented in Kuwait. PhD thesis, University of Liverpool, UK.
Al-Saggaf, A; Hegazy, T; Nasir, H and Taha, M (2022) Computerized DSS for evaluating design performance of residential buildings using additive weighting approach. Architectural Engineering and Design Management, 18(5), pp. 631-651. ISSN 1745-2007
Al-Saqer, K M (2001) An investigation into the development processes and project management practices of government construction projects in Saudi Arabia. PhD thesis, University of Birmingham, UK.
Al-Shammery, H A-H (2017) Improving the school building delivery process in post conflict Iraq. PhD thesis, University of Salford, UK.
Al-Sinan, F M (1986) Evaluation of construction management contracts in developing countries. PhD thesis, Purdue University, USA.
Al-Zarrad, M A (2018) Multi-criteria decision-making model to improve linear repetitive projects time-cost trade-off in uncertain environment. PhD thesis, University of Alabama, USA.
AlNasseri, H A (2015) Understanding applications of project planning and scheduling in construction projects. PhD thesis, Lund University, Sweden.
AlSehaimi, A (2011) Improving construction planning practice in Saudi Arabia by means of lean construction principles and techniques. PhD thesis, University of Salford, UK.
AlShamisi, H A; Chinyio, E; Ankrah, N; Kpamma, Z E; Mushatat, S; Oloke, D and Wilson, P (2019) Prevalence of leadership and management features amongst construction project managers in the UAE. African Journal of Built Environment Research, 3(1), pp. 41-55. ISSN 2414-0236
Alade, K; Oyebade, A and Nzewi, N (2018) Assessment of the use of locally available materials for building construction in Ado-Ekiti, Nigeria. Journal of Construction Business and Management, 2(2), pp. 36-41. ISSN 2521-0165
Alaghbari, W; Al-Sakkaf, A A and Sultan, B (2019) Factors affecting construction labour productivity in Yemen. International Journal of Construction Management, 19(1), pp. 79-91. ISSN 1562-3599
Alahmadi, N H (2018) Nudging contracting firms rivals within municipal road projects in Saudi Arabia to bid competitively. PhD thesis, University of Strathclyde, UK.
Alam, M (2009) Investigating the effectiveness of continuing professional development in project management. PhD thesis, University of Manchester, UK.
Alananga, S; Lucian, C and Kusiluka, M M (2015) Significant cost-push factors in owner-built incremental housing construction in Tanzania. Construction Management and Economics, 33(8), pp. 671-688. ISSN 01446193
Alarcón, L F; Ashley, D B; De Hanily, A S; Molenaar, K R and Ungo, R (2011) Risk planning and management for the Panama Canal expansion program. Journal of Construction Engineering and Management, 137(10), pp. 762-771. ISSN 0733-9364
Alarcón-Ramirez, D; Oliveros-Romero, J and Mahn, D (2026) Performance comparison of public–private partnerships and traditionally procured hospitals. Construction Management and Economics, 44(2), pp. 79-97. ISSN 0144-6193
Alashwal, A M; Fareed, N F and Al-Obaidi, K M (2017) Determining success criteria and success factors for international construction projects for Malaysian contractors. Construction Economics and Building, 17(2), pp. 62-80. ISSN 2204-9029
Alashwal, A M and Fong, P S W (2015) Empirical study to determine fragmentation of construction projects. Journal of Construction Engineering and Management, 141(7): 4015016, ISSN 0733-9364
Alazemi, T (2011) On the integration of value engineering in the procurement of public housing in the state of Kuwait. PhD thesis, University of Manchester, UK.
Alazemi, Talal Lafi (2012) On the integration of value engineering in the procurement of public housing in the state of Kuwait. PhD thesis, University of Manchester, UK.
Albassami, A A (2014) A framework for international commercialization of innovative products in residential construction: A case of structural insulated panels (SIPs) in the United States and Saudi Arabia. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Alencastro, J; Fuertes, A and de Wilde, P (2020) Quality management in UK social housing projects: Addressing thermal performance. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Alfar, E (2016) GIS-based pavement maintenance management model for local roads in the UK. PhD thesis, University of Salford, UK.
Alfred Olatunji, O (2016) Blending 'fair dinkum' into group assessment of construction students. International Journal of Construction Education and Research, 12(4), pp. 270-284. ISSN 1557-8771
Alharbi, Meshal Abdulaziz B (2022) Factors influencing project team effectiveness to achieve quality of building projects in the kingdom of Saudi Arabia. PhD thesis, Queensland University of Technology, Australia.
Alhusban, M (2018) Conceptual procurement framework for building information modelling uptake to enhance buildings' sustainability performance in the Jordanian public sector. PhD thesis, University of Portsmouth, UK.
Ali, A (2018) Development of a framework for sustainable construction waste management: a case study of three major Libyan cities. PhD thesis, University of Wolverhampton, UK.
Ali, Abdussalam (2018) Managing codesign in dynamic alliance networks. PhD thesis, University of Technology Sydney, Australia.
Ali, F H and Bandi, S (2024) Correlation between BIM data creation and big data attributes in construction. International Journal of Construction Management, 24(12), pp. 1295-1304. ISSN 1562-3599
Ali, K S (2006) Construction project planning: Improving effectiveness of resources allocation. PhD thesis, University College London, UK.
Ali, N (2018) A framework for designing energy efficient dwellings satisfying socio-cultural needs in hot climates. PhD thesis, De Montfort University, UK.
Alinaitwe, H; Apolot, R and Tindiwensi, D (2013) Investigation into the causes of delays and cost overruns in Uganda's public sector construction projects. Journal of Construction in Developing Countries, 18(2), pp. 33-47. ISSN 1823-6499
Aliu, J; Oke, A E and Oni, S B (2024) Evaluating strategies to promote mechatronics deployment in AECO projects: A Nigerian construction practitioners' perspectives. International Journal of Construction Management, 24(14), pp. 1540-1549. ISSN 1562-3599
Aliyu, A A (2014) Product stewardship as a novel sustainability pathway for the UK precast concrete industry. PhD thesis, Loughborough University, UK.
Alkass, S and Harris, F (1991) Development of an integrated system for planning earthwork operations in road construction. Construction Management and Economics, 9(3), pp. 263-289. ISSN 01446193
Alkhaldi, M (2019) Impact of human errors on accidents in the oil and gas industry in Bahrain. PhD thesis, University of Salford, UK.
Alkhathami, M M (2004) Examination of the correlation of critical success and delay factors in construction projects in the kingdom of Saudi Arabia. PhD thesis, University of Pittsburgh, USA.
Allahaim, Fahad Saud Abdulaziz (2015) Improving cost contingency estimation for infrastructure projects based on the impact of cost overrun causes of similar projects – illustration using Saudi Arabia survey data. PhD thesis, University of Sydney, Australia.
Allam, S I G (1986) Planning and scheduling: A new model for planning and scheduling construction projects. PhD thesis, Brunel University, UK.
Alleem, R (2012) A usability based model for suggestion system evaluation of infrastructure organisations in the UAE. PhD thesis, University of Salford, UK.
Allport, R J and Ward, S (2010) Operational risk: The focus for major infrastructure? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(3), pp. 121-127. ISSN 17514312
Almarri, K (2021) Comparative analysis of the value for money factors of PPPs between the UAE and the UK. International Journal of Construction Management, 21(4), pp. 416-426. ISSN 1562-3599
Almatared, M M S (2024) An integrated digital twin framework and evacuation simulation system for enhanced safety in smart buildings. PhD thesis, Western Michigan University, USA.
Almeida, Laura (2019) Energy-related occupant behaviour in green and non-rated buildings. PhD thesis, Western Sydney University, Australia.
Almeile, A M (2021) The role of political and economic stability on the success of public-private partnership (PPP) construction projects from a project management perspective. PhD thesis, University of Southampton, UK.
Almutiri, Y R (2016) Empirical investigation into development of a curricular framework to embed building information modelling with undergraduate architectural programmes within Saudi Arabia. PhD thesis, University of Salford, UK.
Alnuaimi, A S; Taha, R A; Al Mohsin, M and Al-Harthi, A S (2010) Causes, effects, benefits, and remedies of change orders on public construction projects in Oman. Journal of Construction Engineering and Management, 136(5), pp. 615-622. ISSN 0733-9364
Alnusairat, S and Abu Qadourah, J (2025) Moving to green technologies: Acceptance and perception of architectural solar photovoltaic technology for residential buildings. Architectural Engineering and Design Management, 21(2), pp. 338-355. ISSN 1745-2007
Alolote Ibim, A and Dimkpa, K (2022) Assessing the cost accuracy of electrical works towards sustainable procurement of building services. International Journal of Construction Management, 22(10), pp. 1974-1982. ISSN 1562-3599
Alomari, K A; Gambatese, J A and Tymvios, N (2018) Risk perception comparison among construction safety professionals: Delphi perspective. Journal of Construction Engineering and Management, 144(12): 04018107, ISSN 0733-9364
Alotaibi, A B (2019) Project management: the implication of project management practices on project success in Saudi Arabia. PhD thesis, University of Portsmouth, UK.
Aloyce, D; Monko, R J and Luvara, V G M (2024) Critical audit indicators for assessing construction projects performance (CPP) at pre-contract stage in Tanzania. International Journal of Construction Management, 24(5), pp. 530-539. ISSN 1562-3599
Alqahtani, A and Whyte, A (2013) Artificial neural networks incorporating cost significant items towards enhancing estimation for (life-cycle) costing of construction projects. Construction Economics and Building, 13(3), pp. 51-64. ISSN 2204-9029
Alrashed, F A (2015) Design and application of zero-energy homes in Saudi Arabia. PhD thesis, Glasgow Caledonian University, UK.
Alreshidi, E (2015) Towards facilitating team collaboration during construction project via the development of cloud-based BIM governance solution. PhD thesis, Cardiff University, UK.
Alruqi, W M (2019) Predicting construction safety performance. PhD thesis, University of Colorado at Boulder, USA.
Alruwaythi, O and Goodrum, P (2019) A difference in perspective: Impact of different formats of engineering information and spatial cognition on craft-worker eye-gaze patterns. Journal of Construction Engineering and Management, 145(11): 04019065, ISSN 0733-9364
Alsahly, F F M (2016) Improving the management of change requests in construction of large building projects in Saudi Arabia. PhD thesis, University of Hull, UK.
Alsamarraie, M. M. and Mohd Ghazali, F. E. (2026) A novel framework for sustainable contracting process in organisational public procurement. International Journal of Construction Management, 26(8), pp. 1653-1668. ISSN 1562-3599
Alsedairy, F S (2019) Dynamics of mega infrastructure decision-making in Saudi Arabia. PhD thesis, University of Edinburgh, UK.
Alshahrani, A Y (2020) Interpretive investigation into the implementation of sustainable business models within Saudi housing construction industry. PhD thesis, University of Salford, UK.
Alshboul, O (2019) Multi-objective optimization for heavy earthmoving construction equipment management based on time, cost, and pollutant emissions. PhD thesis, University of Central Florida, USA.
Alshibani, A (2008) Optimizing and controlling earthmoving operations using spatial technologies. PhD thesis, Concordia University, Canada.
Alsulaiman, Y; Bowles, G and Ogunlana, S (2014) Evaluating risk management in independent water and power plant projects in Saudi Arabia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Alsulaiman, Y S (2015) Risk management in Independent Water and Power Plant (IWPP) projects in Saudi Arabia: a grounded theory study to improve effectiveness. PhD thesis, Heriot-Watt University, UK.
Aluko, O R; Godwin Iroroakpo, I and Mewomo, M C (2021) Relationship between perceived service quality and client satisfaction indicators of engineering consultancy services in building projects. Journal of Engineering, Design and Technology, 19(2), pp. 557-577. ISSN 1726-0531
Alutaibi, A (2018) The impact of facility management practices on tenant satisfaction forresidential complexes in the Kingdom of Saudi Arabiaresidential complexes in the Kingdom of Saudi Arabia. PhD thesis, Loughborough University, UK.
Alvand, A; Mirhosseini, S M; Ehsanifar, M; Zeighami, E and Mohammadi, A (2023) Identification and assessment of risk in construction projects using the integrated FMEA-swara-waspas model under fuzzy environment: A case study of a construction project in Iran. International Journal of Construction Management, 23(3), pp. 392-404. ISSN 1562-3599
Alves, J. L.; Almeida Filho, A. T. D.; Bradaschia, F. and Palha, R. P. (2026) Solarisbim.AI: Smart sustainable building planning with BIM-based solar-production estimation using machine-learning radiation forecasts. Journal of Construction Engineering and Management, 152(6): 04026076, ISSN 0733-9364
Alzahrani, A (2015) Uncovering the emerging risks from climate change scenarios and related climate change risk management in the building sector in the UK. PhD thesis, University of Liverpool, UK.
Alzanati, A (2021) Complex building construction projects: reducing rework through facilitation of craftspeople's motivation in United Arab Emirates. PhD thesis, Bournemouth University, UK.
Alzara, M (2016) Measuring the construction performance in Saudi Arabia and proposing new procurement model based on BV PIPS (a university case study). PhD thesis, Arizona State University, USA.
Amakali, T R; Cook, G and Larsen, G D (2012) Striving for inclusive design in the built environment: Learning strategy adopted by policy implementers at local authorities in England. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Amakali, Tangi Rebekka (2017) Inclusive design policy implementation: an organizational knowledge creation perspective. PhD thesis, University of Reading, UK.
Amarachukwu Nnadozie, N and Wilkinson, S (2021) Building code amendment and building resilience: Perspective of building code users in New Zealand. Built Environment Project and Asset Management, 11(4), pp. 643-659. ISSN 2044-124X
Amaratunga, R D G (2001) Theory building in facilities management performance measurement: Application of some core performance measurement and management principles. PhD thesis, University of Salford, UK.
Ameen, J R M; Neale, R H and Abrahamson, M (2003) An application of regression analysis to quantify a claim for increased costs. Construction Management and Economics, 21(2), pp. 159-165. ISSN 01446193
Ameh, O J and Odusami, K T (2014) Nigerian construction professional's education and deficiencies in the area of project management. Journal of Construction in Developing Countries, 19(1), pp. 1-14. ISSN 1823-6499
Ameh, O J; Soyingbe, A A and Odusami, K T (2010) Significant factors causing cost overruns in telecommunication projects in Nigeria. Journal of Construction in Developing Countries, 15(2), pp. 49-67. ISSN 1823-6499
Ameyaw, E E; Edwards, D J; Kumar, B; Thurairajah, N; Owusu-Manu, D G and Oppong, G D (2023) Critical factors influencing adoption of blockchain-enabled smart contracts in construction projects. Journal of Construction Engineering and Management, 149(3): 04023003, ISSN 0733-9364
Amies, P; Jin, X and Senaratne, S (2023) Systematic literature review on success criteria for dam engineering projects. Journal of Construction Engineering and Management, 149(1): 03122012, ISSN 0733-9364
Amies, P; Jin, X and Senaratne, S (2025) Success in construction management of dams: An empirical study. International Journal of Construction Management, 25(10), pp. 1207-1217. ISSN 1562-3599
Amin, R A (2016) Condition-based maintenance: innovation in building maintenance management. PhD thesis, University College London, UK.
Amiril, A (2014) The importance and implementation of sustainability factors in Malaysian railway projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Amirtash, P; Majid Parchami, J and Jelodar, M B (2021) Integration of project management services for international engineering, procurement and construction projects. Built Environment Project and Asset Management, 11(2), pp. 330-349. ISSN 2044-124X
Ammar, M. A. and Alattyih, W. (2026) Lingo optimization modelling of construction scheduling. International Journal of Construction Management, 26(9), pp. 1746-1760. ISSN 1562-3599
Ammar, T; Abdel-Monem, M and El-Dash, K (2025) Regression-based model predicting cost contingencies for road network projects. International Journal of Construction Management, 25(11), pp. 1273-1287. ISSN 1562-3599
Amoah, C and Le Roux, L (2025) Students' challenges with online remote teaching and learning in South Africa. International Journal of Construction Education and Research, 21(4), pp. 533-553. ISSN 1557-8771
Amoah, A; Berbegal-Mirabent, J and Marimon, F (2023) National cultural dimensions and their impact on construction project management in developing countries: The case of Ghana. Journal of Construction in Developing Countries, 28(2), pp. 163-187. ISSN 1823-6499
Amoah, C; Kajimo-Shakantu, K and Van Shalkwyk, T (2022) The level of participation of the end-users in the construction of the rdp houses: The case study of manguang municipality. International Journal of Construction Management, 22(5), pp. 949-960. ISSN 1562-3599
Amorocho, J A P and Hartmann, T (2020) Decision-making process to select energy-efficient renovation alternatives for residential buildings: Two case studies. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Amos, D; Musa, Z N and Au-Yong, C P (2020) Performance measurement of facilities management services in Ghana's public hospitals. Building Research & Information, 48(2), pp. 218-238. ISSN 0961-3218
Amponsah, C T (2010) Public-private partnerships: Critical success factors for procurements of capital projects. PhD thesis, Capella University, USA.
Amsalu Workineh, N; Tarko Kassa, E and Dagnaw Bogale, D (2025) Factors affecting residential land market value: a case study of Injibara Town, Ethiopia. International Journal of Construction Management, 25(2), pp. 215-223. ISSN 1562-3599
Amuda-Yusuf, G (2018) Critical success factors for building information modelling implementation. Construction Economics and Building, 18(3), pp. 55-73. ISSN 2204-9029
Amunzu, I C (2020) A qualitative case study of construction managers’ understanding of lean thinking. PhD thesis, Grand Canyon University, USA.
An, X; Zheng, F; Wang, Z; Li, Z; Jiao, Y and An, H (2025) Dynamic risk assessment approach for deep foundation pit construction based on the integration of multisource data using D-S evidence theory. Journal of Construction Engineering and Management, 151(10): 04025155, ISSN 0733-9364
Anagnostou, E (2005) Investigation of risk management and uncertainty in Athens 2004 Olympic games: The Equestrian Centre case study. PhD thesis, University College London, UK.
Anand, K B and Ramamurthy, K (2003) Laboratory-based productivity study on alternative masonry systems. Journal of Construction Engineering and Management, 129(3), pp. 237-242. ISSN 0733-9364
Anbar, D. R.; Deng, X.; Taha Alqershy, M. and Ullah, S. (2026) Unveiling interpersonal distrust as a mediator between contingent employees and knowledge hiding in international construction projects in the gulf region. International Journal of Construction Management, 26(7), pp. 1390-1405. ISSN 1562-3599
Ancapi, F B (2023) Ex ante analysis of circular built environment policy coherence. Buildings & Cities, 4(1), pp. 575-593. ISSN 2632-6655
Anderson, S D; Patil, S S; Gibson Jr, G E and Sullivan, G R (2004) Owner-contractor work structures: Process approach. Journal of Construction Engineering and Management, 130(5), pp. 680-690. ISSN 0733-9364
Andi (2006) The importance and allocation of risks in Indonesian construction projects. Construction Management and Economics, 24(1), pp. 69-80. ISSN 01446193
Andrade de Alencar Loiola, F (2014) The formulation of Public-Private Partnership projects for infrastructure development in Brazil: an institutional analysis of the Municipality of Fortaleza. PhD thesis, University of Sheffield, UK.
Andreasen, M H; Agergaard, J; Kofie, R Y; Møller-Jensen, L and Oteng-Ababio, M (2022) Urban encroachment in ecologically sensitive areas: Drivers, impediments and consequences. Buildings & Cities, 3(1), pp. 920-938. ISSN 2632-6655
Ansari, S (2020) Investigating the energy performance of a multiuse venue building. EngD thesis, University of Reading, UK.
Anugwo, Iruka Chijindu; Appau, Williams Miller; Attakora-Amaniampong, Elvis and Simpeh, Frederick (2026) Smart, but not spontaneous? Exploring the satisfaction gap and drivers in smart lighting in student housing in Ghana. Journal of Construction Business and Management, 8(S1), pp. 88-98. ISSN 2521-0165
Anwer, S; Li, H; Antwi-Afari, M F; Mirza, A M; Rahman, M A; Mehmood, I; Guo, R and Wong, A Y L (2024) Evaluation of data processing and artifact removal approaches used for physiological signals captured using wearable sensing devices during construction tasks. Journal of Construction Engineering and Management, 150(1): 03123008, ISSN 0733-9364
Anwer, S; Li, H; Antwi-Afari, M F; Umer, W and Wong, A Y L (2021) Evaluation of physiological metrics as real-time measurement of physical fatigue in construction workers: State-of-the-art review. Journal of Construction Engineering and Management, 147(5): 03121001, ISSN 0733-9364
Apollo, M and Burkacki, D (2024) Key success factors for small design offices in the bidding process. Architectural Engineering and Design Management, 20(1), pp. 32-46. ISSN 1745-2007
Arabi, S; Eshtehardian, E and Shafiei, I (2022) Using Bayesian networks for selecting risk-response strategies in construction projects. Journal of Construction Engineering and Management, 148(8): 04022067, ISSN 0733-9364
Arai, K and Morimoto, E (2014) A comparative analysis of the desired and actual bidding behaviour of construction companies. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Arain, F M (2006) Knowledge-based decision support system (kbdss) for management of variation orders for school building projects in Singapore. PhD thesis, National University of Singapore, Singapore.
Aramali, V; Gibson, G E; El Asmar, M and Sanboskani, H (2023) Novel earned value management system maturity framework and its relation to project performance. Journal of Construction Engineering and Management, 149(6): 04023031, ISSN 0733-9364
Aranda, G and Finch, E (2003) Using repertory grids to measure changes in risk-taking behaviour. Journal of Construction Research, 4(1), pp. 101-114. ISSN 1609-9451
Arata, S; Sugiuchi, M; Ikaga, T; Shiraishi, Y; Hayashi, T; Ando, S and Kawakubo, S (2024) Office environment and employee differences by company health management certification. Buildings & Cities, 5(1), pp. 723-743. ISSN 2632-6655
Arditi, D and Chotibhongs, R (2005) Issues in subcontracting practice. Journal of Construction Engineering and Management, 131(8), pp. 866-876. ISSN 0733-9364
Arditi, D and Gunaydin, H M (1998) Factors that affect process quality in the life cycle of building projects. Journal of Construction Engineering and Management, 124(3), pp. 194-203. ISSN 0733-9364
Arditi, D and Gutierrez, A E (1991) Factors affecting U.S. Contractors' performance overseas. Journal of Construction Engineering and Management, 117(1), pp. 27-46. ISSN 0733-9364
Arif, F and Tahir, S (2025) Housing sector risk assessment using structural equation modeling for small-to-medium sized construction companies and builders in urban areas. International Journal of Construction Management, 25(9), pp. 1058-1071. ISSN 1562-3599
Ariyachandra, M F (2021) Automating the generation of geometric information models to support digital twinning of existing rail infrastructure. PhD thesis, University of Cambridge, UK.
Arogundade, S; Dulaimi, M and Ajayi, S (2024) Exploring the challenges impeding construction process carbon reduction in the UK. International Journal of Construction Management, 24(4), pp. 422-431. ISSN 1562-3599
Arroteia, Aline Valverde (2022) Critical success factors of BIM in the design and construction interface. PhD thesis, Universidade de São Paulo, Brazil.
Arrotéia, Aline Valverde (2022) Critical success factors for BIM in the design and construction interface. PhD thesis, Universidade de São Paulo, Brazil.
Arroyo, P (2014) Exploring decision-making methods for sustainable design in commercial buildings. PhD thesis, University of California, Berkeley, USA.
Arvanitis, L.; Al-Tarazi, D.; Agyekum, K.; Kissi, E.; Manu, P.; Mahamadu, A. M.; Booth, C.; Prabhakaran, A. and Pittri, H. (2025) BIM maturity and its influence on BIM implementation challenges: The perspectives of UK contractors. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(4), pp. 231-243. ISSN 1751-4304
Asadi, R; Wilkinson, S and Rotimi, J O B (2021) Towards contracting strategy usage for rework in construction projects: A comprehensive review. Construction Management and Economics, 39(12), pp. 953-971. ISSN 01446193
Asadian, E; Azeez, S; Leicht, R M and Asadi, S (2024) Exploring the barriers to women in construction and the opportunities presented through lean. Journal of Construction Engineering and Management, 150(5): 04024029, ISSN 0733-9364
Asgari Siahboomy, M; Sarvari, H; Chan, D W M; Nassereddine, H and Chen, Z (2021) A multi-criteria optimization study for locating industrial warehouses with the integration of BIM and GIS data. Architectural Engineering and Design Management, 17(5-6), pp. 478-495. ISSN 1745-2007
Ashkanani, S (2023) Project management of large and complex-projects: The case of “lng megaprojects in the state of Qatar”. PhD thesis, Hamad Bin Khalifa University, Qatar.
Ashton, P (2003) A system designed to improve site investigation procedures and for the reduction of risk associated with uncertain site conditions. PhD thesis, University of Brighton, UK.
Ashton, P and Gidado, K (2004) The practical application of a site investigation risk evaluation system. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Asianoah, R; Ayitey, A F and Brink, B (2025) Assessing financial and professional risks on commercial property development and investment in the Accra, Ghana enclave. Construction Economics and Building, 25(2), pp. 215-234. ISSN 2204-9029
Asiedu, R and Iddris, F (2022) Value co-creation approach to management of construction project stakeholders. Journal of Construction in Developing Countries, 27(1), pp. 1-23. ISSN 1823-6499
Asmone, A S (2020) Development of a bayesian based design-for-maintinability decision support framework. PhD thesis, National University of Singapore, Singapore.
Assaad, R; El-Adaway, I H; Hastak, M and Needy, K L (2020) Commercial and legal considerations of offsite construction projects and their hybrid transactions. Journal of Construction Engineering and Management, 146(12): 05020019, ISSN 0733-9364
Assaf, M; Al-Hussein, M and Li, X (2024) Critical review of virtual reality applications in offsite construction research. Journal of Construction Engineering and Management, 150(11): 03124007, ISSN 0733-9364
Ataei, S and Jafari, A (2026) Comparative environmental impact assessment of 3D concrete printing and precast techniques in bridge construction: A case study analysis. Journal of Construction Engineering and Management, 152(1): 05025018, ISSN 0733-9364
Atasoy, G; Ertaymaz, U; Dikmen, I and Talat Birgonul, M (2022) Empowering risk communication: Use of visualizations to describe project risks. Journal of Construction Engineering and Management, 148(5): 04022015, ISSN 0733-9364
Atef Elhamy Kamel, M (2013) Encouraging walkability in GCC cities: Smart urban solutions. Smart and Sustainable Built Environment, 2(3), pp. 288-310. ISSN 2046-6099
Atiq Ur Rehman, M; Chaabane, A and Khan, S A (2026) A novel decision support system for integrating supply chain and project management decisions to optimize multiple project performance: A case study in building renovation. International Journal of Construction Management, 26(1), pp. 29-53. ISSN 1562-3599
Atkin, B (1993) Stereotypes and themes in building designs: Insights for model builders. Construction Management and Economics, 11(2), pp. 119-130. ISSN 01446193
Atkinson, A R and Westall, R (2010) The relationship between integrated design and construction and safety on construction projects. Construction Management and Economics, 28(9), pp. 1007-1017. ISSN 1466433X
Atkinson, B (2000) Inca: A retrospective performance tool for project management. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Atout, M M M (2008) Causes of delays in construction projects & how the project manager can act to avoid delays. PhD thesis, University of South Wales, UK.
Attah, Tobenna Vincent (2025) GPA as a predictor of safety practices among U.S. College construction interns. PhD thesis, University of Arizona Global Campus, USA.
Attalla, M and Hegazy, T (2003) Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression. Journal of Construction Engineering and Management, 129(4), pp. 405-411. ISSN 0733-9364
Au-Yong, C P; Ali, A S and Pavaraj, A (2023) Prioritising the maintenance of university hostels to improve students' satisfaction. Journal of Construction in Developing Countries, 28(1), pp. 151-169. ISSN 1823-6499
Awakul, P and Ogunlana, S O (2002) The effect of attitudinal differences on interface conflicts in large scale construction projects: A case study. Construction Management and Economics, 20(4), pp. 365-377. ISSN 01446193
Awawdeh, S A (2010) The potential of building regulations to improve the energy efficiency of high-rise residential buildings in the Gulf Countries. PhD thesis, Queen's University Belfast, UK.
Awe, O O; Atofarati, E O; Adeyinka, M O; Musa, A P and Onasanya, E O (2024) Assessing the factors affecting building construction collapse casualty using machine learning techniques: A case of Lagos, Nigeria. International Journal of Construction Management, 24(3), pp. 261-269. ISSN 1562-3599
Axon, S and Morrissey, J (2020) Just energy transitions? Social inequities, vulnerabilities and unintended consequences. Buildings & Cities, 1(1), pp. 393-411. ISSN 2632-6655
Ayala Collazo, I C (2023) An analysis of governing factors affecting diversity in local government capital improvement program implementation. DPA thesis, University of Baltimore, USA.
Ayat, M; Rehman, H; Qureshi, S M and Kang, C W (2023) Assessing the causes of project overruns in tunnel construction projects in Pakistan. International Journal of Construction Management, 23(11), pp. 1856-1866. ISSN 1562-3599
Ayda Montaser, K and Heidari, S (2021) Optimizing window size by integrating energy and lighting analyses considering occupants' visual satisfaction. Built Environment Project and Asset Management, 11(4), pp. 673-686. ISSN 2044-124X
Aydin, Y C and Mirzaei, P A (2022) A novel mathematical model to measure individuals' perception of the symmetry level of building facades. Architectural Engineering and Design Management, 18(3), pp. 261-278. ISSN 1745-2007
Ayinla, K; Cheung, F and Towe, B (2025) Time-driven activity-based costing (TDABC) model for performance optimization of offsite manufacturing methods housebuilding. Construction Management and Economics, 43(8), pp. 637-656. ISSN 0144-6193
Ayoade, O A (2013) Measuring the impact of institutional and sustainability influences on renewed housing development strategies: implications for the shared equity housing model. PhD thesis, University of Salford, UK.
Ayodele, E O (2017) Development of a framework in minimising errors in construction documents in Nigeria. PhD thesis, University of Salford, UK.
Azhar, S and Brown, J (2009) Bim for sustainability analyses. International Journal of Construction Education and Research, 5(4), pp. 276-292. ISSN 1557-8771
Azhar, S; Lukkad, M Y and Ahmad, I (2013) An investigation of critical factors and constraints for selecting modular construction over conventional stick-built technique. International Journal of Construction Education and Research, 9(3), pp. 203-225. ISSN 1557-8771
Azila-Gbettor, E M; Novieto, D T; Tulasi, E E; Ahiabu, M K and Adzivor, E K (2024) Citizenship fatigue and employee commitment: Moderating role of psychological ownership among artisans of family-owned construction firms. International Journal of Construction Management, 24(9), pp. 975-985. ISSN 1562-3599
Azman, M A; Chuweni, N N; Halil, F M; Ku Mohammad Asyraf Ku, A; Lee, B L; Farah Nazira, J and Skitmore, M (2024) The impact of the change in institutional regulation on construction productivity: Firm-level evidence in a developing economy. Construction Management and Economics, 42(3), pp. 199-214. ISSN 01446193
Azmi, N A; Sweis, G; Sweis, R and Sammour, F (2023) Exploring blockchain-enabled smart contracts technology implementation within ready-mixed concrete plants industry in Saudi Arabia. International Journal of Construction Management, 23(14), pp. 2400-2408. ISSN 1562-3599
Azzazy, S; Ghaffarianhoseini, A; GhaffarianHoseini, A; Naismith, N; Doan, D T and Hollander, J B (2025) The significance of indoor thermal comfort on occupants' perception: In university buildings in auckland, New Zealand. Building Research & Information, 53(1-2), pp. 19-39. ISSN 0961-3218
Azzouz, A and Papadonikolaki, E (2020) Boundary-spanning for managing digital innovation in the AEC sector. Architectural Engineering and Design Management, 16(5), pp. 356-373. ISSN 1745-2007
Baba, A; Mahjoubi, L; Olomoilaiye, P and Booth, C (2013) Decision support framework for low impact housing design in the UK. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Babaeian Jelodar, M; Yiu, T W and Wilkinson, S (2022) Empirical modeling for conflict causes and contractual relationships in construction projects. Journal of Construction Engineering and Management, 148(5): 04022017, ISSN 0733-9364
Babu, A.; Krishnan, K.; Dutta, P. and Khan, T. (2026) Multistakeholder SEM-based evaluation of safety factors in road construction projects. Journal of Construction Engineering and Management, 152(7): 04026084, ISSN 0733-9364
Baccarini, D and Kraus, F (2005) Influences on risk taking behaviour of property developers in perth, western Australia. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Badalpur, M and Nurbakhsh, E (2021) An application of waspas method in risk qualitative analysis: A case study of a road construction project in Iran. International Journal of Construction Management, 21(9), pp. 910-918. ISSN 1562-3599
Badu, E; Owusu-Manu, D G; Edwards, D J; Adesi, M and Lichtenstein, S (2013) Rural infrastructure development in the volta region of Ghana: Barriers and interventions. Journal of Financial Management of Property and Construction, 18(2), pp. 142-159. ISSN 1366-4387
Bageis, A S and Fortune, C (2009) Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors. Construction Management and Economics, 27(1), pp. 53-71. ISSN 1466433X
Bai, S; Li, M; Song, L and Kong, R (2021) Developing a common library of prefabricated structure components through graphic media mapping to improve design efficiency. Journal of Construction Engineering and Management, 147(1): 1954, ISSN 0733-9364
Bai, Y (1996) Planning and control model for robotic bridge painting. PhD thesis, North Carolina State University, USA.
Baik, A H (2017) Heritage Building Information Modelling (HBIM) as a model of UNESCO's World Heritage Nomination File. PhD thesis, University College London, UK.
Baird, T. D.; Tural, E.; Kniola, D. J.; Pingel, T. J. and Abaid, N. (2026) Building as common property: Examining ostrom's model in an innovative university residence hall. Building Research & Information, 54(4), pp. 393-409. ISSN 0961-3218
Bajaj, D; Oluwoye, J and Lenard, D (1997) An analysis of contractors' approaches to risk identification in New South Wales, Australia. Construction Management and Economics, 15(4), pp. 363-369. ISSN 01446193
Bajracharya, A (2009) Implementation of innovation on construction projects: A behavioral perspective. PhD thesis, National University of Singapore, Singapore.
Bakatjan, S; Arikan, M and Tiong, R L K (2003) Optimal capital structure model for BOT power projects in Turkey. Journal of Construction Engineering and Management, 129(1), pp. 89-97. ISSN 0733-9364
Baker, L M (1984) A labor market model to manage costs risk in construction project management. PhD thesis, Colorado School of Mines, USA.
Bakis, N (2009) Product data sharing in architecture, engineering and construction: Assessment of middleware support and business benefits. PhD thesis, University of Salford, UK.
Balali, A; Moehler, R C and Valipour, A (2022) Ranking cost overrun factors in the mega hospital construction projects using Delphi-swara method: An Iranian case study. International Journal of Construction Management, 22(13), pp. 2577-2585. ISSN 1562-3599
Balasubramani, M; Mahalingam, A and Scott, W R (2020) Imitation and adaptation: Lessons from a case study of a metro rail project in India. Construction Management and Economics, 38(4), pp. 364-382. ISSN 01446193
Ballard, H G (2000) The last planner system of production control. PhD thesis, University of Birmingham, UK.
Ballesteros-Pérez, P (2017) M-PERT: Manual project-duration estimation technique for teaching scheduling basics. Journal of Construction Engineering and Management, 143(9): 04017063, ISSN 0733-9364
Ballesteros-Pérez, P; Sanz-Ablanedo, E; Cerezo-Narváez, A; Lucko, G; Pastor-Fernández, A; Otero-Mateo, M and Contreras-Samper, J P (2020) Forecasting accuracy of in-progress activity duration and cost estimates. Journal of Construction Engineering and Management, 146(9), ISSN 0733-9364
Bamgbade, J A; Fung, E S; Moshood, T D; Kamaruddeen, A M and Liew, S (2023) The dynamics of ecological sustainability in housing delivery: Developers' perspectives. Architectural Engineering and Design Management, 19(2), pp. 183-199. ISSN 1745-2007
Bandara, S G D K; Abdeen, F N; Disaratna, V and Perera, B A K S (2022) Employee welfare and job satisfaction in the Sri Lankan hotel industry. International Journal of Construction Management, 22(15), pp. 3045-3054. ISSN 1562-3599
Banks, M S (2012) Understanding information technology enabled social action networks: Construction, sustainability and user participation. PhD thesis, University of Memphis, USA.
Banks-Hunt, Joan Maria (2021) Exploring design thinking for instructional practice. PhD thesis, Virginia Tech, USA.
Banyte, J (2020) A framework development to facilitate the effective management of a sustainable commercial property market. PhD thesis, Liverpool John Moores University, UK.
Barajei, C; Kusi, E; Ackon, F; Osman, A M; Mohammed, A M Z; Simpeh, F and Gyimah, F (2024) Success factors of the consultant selection stage of the Ghanaian public construction projects: The road sector’s perspective. Construction Economics and Building, 24(1-2), pp. 144-162. ISSN 2204-9029
Barbosa, Ava Santana (2010) Use of performance indicators in Brazilian construction firms: Diagnoses and orientations for utilization. PhD thesis, Universidade de São Paulo, Brazil.
Barbosa, Elisabeti de Fátima Teixeira (2024) Influence of user's behavior on thermoenergetic performance in higher education buildings. PhD thesis, Universidade Estadual de Campinas, Brazil.
Barima, Oliver K B (2007) An examination of the critical variables in the use of the virtual concept in construction value delivery. PhD thesis, University of Hong Kong, Hong Kong.
Barnes, A F (2024) Maximizing the minimum: The advantages of repeated measures in construction management education research. International Journal of Construction Education and Research, 20(4), pp. 405-420. ISSN 1557-8771
Barnes, N M L (1971) The design and use of experimental bills of quantities for civil engineering contracts. PhD thesis, University of Manchester, UK.
Barros, Natalia Nakamura (2024) Integrative model of life cycle assessment with internet of things, BIM and machine learning. PhD thesis, Universidade Estadual de Campinas, Brazil.
Barutha, P J (2018) Integrated project delivery for industrial projects. PhD thesis, Iowa State University, USA.
Basheer, M; Elnour, Z; Siddig, K and Grethe, H (2025) Economic impacts of large dams on downstream brickmaking in developing countries. Construction Management and Economics, 43(3), pp. 213-225. ISSN 0144-6193
Batarseh, Shadi (2024) Digital twin for digital asset management: Asset information model characteristics and digital capabilities for smart functions, sydney metro case study. PhD thesis, University of New South Wales, Australia.
Batista Silveira Dos Santos, L F (2020) Efficient modeling strategies for performance-based building design supported by daylight and building energy simulations. PhD thesis, University of California, Berkeley, USA.
Battikha, M G (2008) Reasoning mechanism for construction nonconformance root-cause analysis. Journal of Construction Engineering and Management, 134(4), pp. 280-288. ISSN 0733-9364
Bau, Z (2022) Developing circularity of construction waste in emerging economies: an environmental Kuznets curve approach. PhD thesis, University of Hong Kong, Hong Kong.
Baumgärtner, C E (2000) Collaboration between engineering consultants and their clients: characteristics of success. PhD thesis, University of Cambridge, UK.
Baxendale, T (1984) Construction resource models by Monte Carlo simulation. Construction Management and Economics, 2(3), pp. 201-217. ISSN 01446193
Bayona, A; Hallowell, M R and Bhandari, S (2024) The things that hurt people are not the same as the things that kill people: Key differences in the proximal causes of low- and high-severity construction injuries. Journal of Construction Engineering and Management, 150(8): 04024089, ISSN 0733-9364
Bayraktar, M E; Arif, F; Ponder, D; Prozzi, J and Mahmoud, N V (2016) Opportunities for value extraction projects in highway rights-of-way and development of feasibility assessment tool. Journal of Construction Engineering and Management, 142(8): 4016023, ISSN 0733-9364
Bayram, S and Al-Jibouri, S (2016) Efficacy of estimation methods in forecasting building projects' costs. Journal of Construction Engineering and Management, 142(11): 05016012, ISSN 0733-9364
Bayram, S and Al-Jibouri, S (2018) Cost forecasting using RCF: A case study for planning public building projects costs in Turkey. International Journal of Construction Management, 18(5), pp. 405-417. ISSN 1562-3599
Beadle, K (2008) Analysis of the design process for low-energy housing. PhD thesis, De Montfort University, UK.
Beaver, R D (2009) Contributions by individual and group strategies for organizational learning in architecture, engineering and construction firms. PhD thesis, University of Central Florida, USA.
Becerik, B (2006) Implementation and value of online collaboration and project management systems in design and construction. DDes thesis, Harvard University, USA.
Becker, P E (2000) Modeling construction worker chemical exposures for compliance with OSHA permissible exposure limits: An investigation of lead exposures to highway bridge maintenance workers. DSc thesis, University of Massachusetts Lowell, USA.
Beheiry, S M A (2005) Examining the impact of corporate commitment to sustainability. PhD thesis, University of Texas at Austin, USA.
Bellizzi, J A (1978) A multivariate analysis of buying in the commercial construction industry. PhD thesis, University of Nebraska - Lincoln, USA.
Bello, N A; Agava, Y H and Olanrele, O O (2021) Investment property typology analysis; evidence from Nigerian urban property returns and macroeconomic variables. African Journal of Built Environment Research, 5(1), pp. 77-96. ISSN 2414-0236
Bello, N U; Jolaoso, A B and Olanrele, O O (2018) Comparative analysis of investment attributes of hotel and commercial property in South-Western Nigeria. African Journal of Built Environment Research, 2(1), pp. 1-20. ISSN 2414-0236
Belpoliti, V; Nassif, R; Alzaabi, E and Aljneibi, A (2020) Multi-criteria assessment for the functional-energy upgrade of the UAE school sector: A bottom-up approach promoting refurbishment versus new construction. Architectural Engineering and Design Management, 16(3), pp. 167-190. ISSN 1745-2007
Ben Mahmoud, B; Lehoux, N; Blanchet, P and Jobidon, G (2026) Towards a resilient project delivery system selection: Evaluating the impact of external environment criteria for public infrastructure in quebec. Construction Management and Economics, 44(3), pp. 159-182. ISSN 0144-6193
Bender, M J (1996) A framework for collaborative planning and investigations of decision support tools for hydro development. PhD thesis, University of Manitoba, Canada.
Benjaoran, V; Dawood, N and Scott, D (2004) Bespoke precast productivity estimation with neural network model. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Bennett, Brian Kevin (2023) Increasing knowledge of scheduling activity sequencing in construction management education using interactive 3D gaming models. PhD thesis, University of Florida, USA.
Berawi, M A; Sari, M; Oktaviani, A D; Miraj, P; Susantono, B and Woodhead, R (2025) Impact of BIM and 3D printing technologies on production process and productivity of precast concrete in construction project. International Journal of Construction Management, 25(6), pp. 650-660. ISSN 1562-3599
Berry, M J (2000) An investigation into the incidence effect and management of conflict arising out of the construction process: A case study based approach. PhD thesis, University of Wales, UK.
Besaiso, H and Fenn, P (2022) How international construction arbitrators make their decisions: Status of commercial norms and international construction law. Journal of Construction Engineering and Management, 148(9): 04022077, ISSN 0733-9364
Besiktepe, D; Sparkling, A; Debs, L and Manuel, R (2024) Digital technology applications in construction education: A systematic review of methodological pluralism. International Journal of Construction Education and Research, 20(4), pp. 421-443. ISSN 1557-8771
Bhavsar, V; Thomas Alex, S; Vaishnav, P K; Jose, A; Koshy, N G and Atiwadkar, S (2022) Investigation of critical factors influencing construction of airports: The case of India. International Journal of Construction Management, 22(15), pp. 2905-2913. ISSN 1562-3599
Bhurisith, I and Touran, A (2002) Case study of obsolescence and equipment productivity. Journal of Construction Engineering and Management, 128(4), pp. 357-361. ISSN 0733-9364
Bilbo, D; Bigelow, B; Escamilla, E and Lockwood, C (2015) Comparison of construction manager at risk and integrated project delivery performance on healthcare projects: A comparative case study. International Journal of Construction Education and Research, 11(1), pp. 40-53. ISSN 1557-8771
Bilgates, P and Raviteja, Y (2025) A holistic design approach for sustainable building environment: A case study of an educational building. International Journal of Construction Management, 25(16), pp. 1982-1997. ISSN 1562-3599
Bilge, E C and Yaman, H (2021) Information management roles in real estate development lifecycle: Literature review on BIM and IPD framework. Construction Innovation, 21(4), pp. 723-742. ISSN 1471-4175
Bilhaif, A (1990) The influence of high temperatures on the productivity of construction workers. PhD thesis, University of Reading, UK.
Bin Sh Said, S A A (2020) The adoption of building information modelling in facilities management. PhD thesis, Oxford Brookes University, UK.
Birchall, S J (2011) An appraisal of the performance of a 'green' office building. PhD thesis, University of Leeds, UK.
Birgonul, M T and Ozdogan, I D (2001) Risks borne by foreign contractors doing business in Turkey. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Blanc, F and Scanlon, K (2022) Sharing a home under lockdown in London. Buildings & Cities, 3(1), pp. 118-133. ISSN 2632-6655
Blanche, K G (1996) Personal and professional characteristics, perceptions of barriers, and strategies of women in different levels of the superintendency. EdD thesis, University of Maryland, College Park, USA.
Blay, K B (2017) Resilience in projects: definition, dimensions, antecedents and consequences. PhD thesis, Loughborough University, UK.
Blismas, N G; Pendlebury, M; Gibb, A and Pasquire, C (2005) Constraints to the use of off-site production on construction projects. Architectural Engineering and Design Management, 1(3), pp. 153-162. ISSN 1745-2007
Blomenkamp, M (2011) A program evaluation of the building construction of Bellevue Elementary School for the Bellevue Public Schools. EdD thesis, University of Nebraska at Omaha, USA.
Blyth, K and Kaka, A (1999) The industry's view of stage payments and the Latham recommendations. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Bo, X and Chan, A P C (2012) Investigation of barriers to entry into the design-build market in the people's republic of China. Journal of Construction Engineering and Management, 138(1), pp. 120-127. ISSN 0733-9364
Bohm, M (2025) Building performance simulation for sensemaking in architectural pedagogy. Buildings & Cities, 6(1), pp. 450-465. ISSN 2632-6655
Bon, R (1996) Whither global construction? Some results of the ECERU opinion survey, 1993-95. Building Research & Information, 24(2), pp. 81-85. ISSN 0961-3218
Bon, R and Crosthwaite, D (2001) The future of international construction: Some results of 1992-1999 surveys. Building Research & Information, 29(3), pp. 242-247. ISSN 0961-3218
Bonnar, I D (2007) Not as cool as fighter pilots: an exploration of identity and learning for full-time quantity surveying students. EdD thesis, University of Stirling, UK.
Boo, J H S (2001) Improving the accuracy of approximate estimates of building projects. Building Research & Information, 29(4), pp. 312-318. ISSN 0961-3218
Boothman, C; Higham, A and Scott, A (2014) Delivering school buildings using off- site construction: Stakeholders perceptions. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Borg, J; Scott-Young, C M and Maqsood, T (2025) Preparing project management professionals for construction careers: Australian stakeholders' perceptions of educators' role. International Journal of Construction Education and Research, 21(3), pp. 346-370. ISSN 1557-8771
Botti, A (2020) The development of an early stage design tool to assess the risk of overheating for UK residential buildings. PhD thesis, University of Surrey, UK.
Boutfskis, V and Fellows, R F (1997) Appraising the performance of long span sportshalls and swimming pools in Greece. Journal of Financial Management of Property and Construction, 2(2), pp. 39-58. ISSN 1366-4387
Bowen, P.; Govender, R.; Edwards, P. and Cattell, K. (2018) Work-related contact, work–family conflict, psychological distress and sleep problems experienced by construction professionals: An integrated explanatory model. Construction Management and Economics, 36(3), pp. 153-174. ISSN 0144-6193
Bowen, P; Cattell, K; Distiller, G and Edwards, P J (2008) Job satisfaction of South African quantity surveyors: An empirical study. Construction Management and Economics, 26(7), pp. 765-780. ISSN 1466433X
Bowen, P; Govender, R; Edwards, P and Cattell, K (2016) Demographic and lifestyle determinants of the HIV serostatus of construction workers. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Bowen, P; Govender, R; Edwards, P and Cattell, K (2017) The role of after-hours, work-related contact in work-to-family conflict and sleep problems experienced by construction professionals. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Bowen, P; Govender, R; Edwards, P; Cattell, K and Street, A (2015) Factors determining South African construction workers' prejudice towards and discrimination against HIV+ persons. Journal of Construction Engineering and Management, 141(7): 4015014, ISSN 0733-9364
Bowen, P and Zhang, R P (2020) Cross-boundary contact, work-family conflict, antecedents, and consequences: Testing an integrated model for construction professionals. Journal of Construction Engineering and Management, 146(3): 04020005, ISSN 0733-9364
Bowen, P A; Cattel, K S; Hall, K A; Edwards, P J and Pearl, R G (2002) Perceptions of time, cost and quality management on building projects. Construction Economics and Building, 2(2), pp. 48-56. ISSN 2204-9029
Bowen, P A and Edwards, P J (1998) Building cost planning and cost information management in South Africa. Journal of Construction Procurement, 4(1), pp. 16-26. ISSN 1358-9180
Bowen, P A; Pearl, R G and Edwards, P J (1999) Client briefing processes and procurement method selection: A South African study. Engineering, Construction and Architectural Management, 6(2), pp. 91-104. ISSN 0969-9988
Bowes, D and Arnold, S (2009) The engineering and construction contract and its implications for project programming procedures. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Bowles, Graeme (1995) Annual sinking fund modelling for housing association major repairs provision. PhD thesis, Abertay University, UK.
Boyd, D and Xiao, H (2010) Understanding Chinese and British construction: A problem of metaphors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Boyle F, T C (2013) Housing an ageing population: Implications for managing the social housing stock. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Brady, D A (2014) Using visual management to improve transparency in planning and control in construction. PhD thesis, University of Salford, UK.
Brager, G and Baker, L (2009) Occupant satisfaction in mixed-mode buildings. Building Research & Information, 37(4), pp. 369-380. ISSN 0961-3218
Brambilla, A; Candido, C; Sangiorgio, M F; Gocer, O and Gocer, K (2021) Can commercial buildings cope with Australian bushfires? An IAQ analysis. Buildings & Cities, 2(1), pp. 583-598. ISSN 2632-6655
Braz, João Carlos Rocha (2014) Technical and economic evaluation of structural systems to eight floors residential buildings. PhD thesis, Universidade Estadual de Campinas, Brazil.
Bresnen, M and Marshall, N (2000) Motivation, commitment and the use of incentives in partnerships and alliances. Construction Management and Economics, 18(5), pp. 587-598. ISSN 01446193
Brewer, G (2008) Innovation and attitude: mapping the profile of ICT decision-makers in architectural, engineering and construction firms. PhD thesis, University of Newcastle, Australia.
Bridgeman, J (2024) Can panoptic school infrastructure lead to disruptive and dangerous student behaviour which makes schools unsafe. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Brito, D M D; Ferreira, E D A M and Costa, D B (2021) Framework for building information modeling adoption based on critical success factors from Brazilian public organizations. Journal of Construction Engineering and Management, 147(7), ISSN 0733-9364
Brown, N; Malmqvist, T and Wintzell, H (2016) Owner organizations' value-creation strategies through environmental certification of buildings. Building Research & Information, 44(8), pp. 863-874. ISSN 0961-3218
Brown, N; Wright, A J; Shukla, A and Stuart, G (2010) Longitudinal analysis of energy metering data from non-domestic buildings. Building Research & Information, 38(1), pp. 80-91. ISSN 0961-3218
Bruce, R D; Gebken, R J and Strong, S D (2009) The impact of the leadership in energy and environmental design accredited professional (LEED-ap) credential on prime/general contractor employees. International Journal of Construction Education and Research, 5(3), pp. 182-196. ISSN 1557-8771
Bruce, R D; Gebken, R J and Strong, S D (2010) Evaluating self-perceived benefits of credentials in the building design and construction community: Cpc, LEED-ap, and dbia. International Journal of Construction Education and Research, 6(3), pp. 165-178. ISSN 1557-8771
Bruen, J; Spillane, J P and Brooks, T (2020) Post-disaster affordable and sustainable house design and delivery: An international non-governmental organisation (INGO) perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Bruen, J; Spillane, J P and Brooks, T (2021) Community orientated post-disaster sustainable housing recovery, rebuilding and community renewal: Sri Lanka case study. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Bryde, D J (2000) Project management: uses, structures, systems and influences. PhD thesis, Liverpool John Moores University, UK.
Bryde, D J and Schulmeister, R (2012) Applying lean principles to a building refurbishment project: Experiences of key stakeholders. Construction Management and Economics, 30(9), pp. 777-794. ISSN 1466433X
Bröchner, J (2010) Construction contractors as service innovators. Building Research & Information, 38(3), pp. 235-246. ISSN 0961-3218
Bröchner, J and Silfwerbrand, J (2019) Performance of performance specifications in design-build highway projects. Construction Economics and Building, 19(2), pp. 111-125. ISSN 2204-9029
Bu Jawdeh, H M (2013) Improving the integration of building design and facilities management. PhD thesis, University of Salford, UK.
Buckingham, H (2010) Accommodating change? An investigation of the impacts of government contracting processes on third sector providers of homelessness services in South East England. PhD thesis, University of Southampton, UK.
Buckman, A H (2016) An exploration of the applications of increased information availability in smart buildings. PhD thesis, University of Sheffield, UK.
Bulur, H G (2024) Analyzing decision making behaviour under risk and uncertainty with the help of computational cognitive modeling and neuroscience perspectives. PhD thesis, Middle East Technical University, Turkey.
Buonocore, C; Castro, L; De Vecchi, R; Lamberts, R and Güths, S (2025) Natural ventilation in Brazilian homes: Depicting perceptions, usage patterns and motivations in a questionnaire survey. Building Research & Information, 53(1-2), pp. 40-55. ISSN 0961-3218
Burgoon, J M; Roebuck, A and Elliott, J W (2024) Evidence of opportunity gaps in construction education: A longitudinal analysis of student success. International Journal of Construction Education and Research, 20(1), pp. 83-97. ISSN 15578771
Burley, J and Pan, W (2010) Adoption of air source heat pumps for low carbon homes. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Burman, E (2016) Assessing the operational performance of educational buildings against design expectations: a case study approach. PhD thesis, University College London, UK.
Burrell, P A (2017) Structural errors and failures in construction: is knowledge hidden? PhD thesis, Anglia Ruskin University, UK.
Butt, A A (2014) Life cycle assessment of asphalt roads: Decision support at the project level. PhD thesis, KTH Royal Institute of Technology, Sweden.
Bártolo, H M G and Bártolo, P J S (2001) Computer aided concurrent design. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Büsch, M P (2013) The role of procurement professionals in industrial projects: organisation, roles, and tasks for professional project procurement. PhD thesis, University of Gloucestershire, UK.
Cabahug, Ruel R (2003) A profile for classifying plant operator maintenance proficiency. PhD thesis, Loughborough University, UK.
Cai, Q; Hu, Q and Ma, G (2021) Improved hybrid reasoning approach to safety risk perception under uncertainty for mountain tunnel construction. Journal of Construction Engineering and Management, 147(9): 04021105, ISSN 0733-9364
Cai, S; Ma, Z; Skibniewski, M J; Bao, S and Wang, H (2020) Construction automation and robotics for high-rise buildings: Development priorities and key challenges. Journal of Construction Engineering and Management, 146(8): 04020096, ISSN 0733-9364
Caixeta, M C B F and Fabricio, M M (2013) A conceptual model for the design process of interventions in healthcare buildings: A method to improve design. Architectural Engineering and Design Management, 9(2), pp. 95-109. ISSN 1745-2007
Caldas, C H; Chou, C C and O'Connor, J (2008) Negotiation-based decision support model for utility relocations in transportation infrastructure projects. Construction Management and Economics, 26(10), pp. 1079-1090. ISSN 1466433X
Cambra-Rufino, L.; Solís-García, G.; Carrasco Pérez, A.; López Maestro, M.; De la Cruz Bértolo, J.; Moral Pumarega, M. T.; Pallás Alonso, C. R. and Piris Borregas, S. (2026) The physical environment of neonatal intensive care units: A descriptive survey in Spain. Architectural Engineering and Design Management, 22(2), pp. 325-339. ISSN 1745-2007
Campbell, J L (1999) A baseline study of practices and perceptions of marketing and aftermarketing activities among commercial general contractors. PhD thesis, University of Idaho, USA.
Candido, C; Kim, J; de Dear, R and Thomas, L (2016) BOSSA: A multidimensional post-occupancy evaluation tool. Building Research & Information, 44(2), pp. 214-228. ISSN 0961-3218
Candido, C; Thomas, L; Haddad, S; Zhang, F; Mackey, M and Ye, W (2019) Designing activity-based workspaces: Satisfaction, productivity and physical activity. Building Research & Information, 47(3), pp. 275-289. ISSN 0961-3218
Cao, T.; Zhang, L. and Qian, Q. (2026) For a rainy day: Preventing the escalation of threats into interorganizational relationship conflict through emotional regulation and boundary-spanning roles. Journal of Construction Engineering and Management, 152(7): 04026096, ISSN 0733-9364
Cardellicchio, L (2020) Self-cleaning and colour-preserving efficiency of photocatalytic concrete: Case study of the jubilee church in rome. Building Research & Information, 48(2), pp. 160-179. ISSN 0961-3218
Cardellicchio, L (2021) Building defects in new iconic structures: The technical challenge and the economic impact of restoring the Jubilee Church in Rome. Architectural Engineering and Design Management, 17(1-2), pp. 146-166. ISSN 1745-2007
Cardellino, P; Araneda, C and García Alvarado, R (2018) Interventions in the classroom–the influence of spatial organisation on educational interaction in Uruguay. Architectural Engineering and Design Management, 14(6), pp. 413-426. ISSN 1745-2007
Cardellino, P; Leiringer, R and Clements-Croome, D (2009) Exploring the role of design quality in the Building Schools for the Future programme. Architectural Engineering and Design Management, 5(4), pp. 249-262. ISSN 1745-2007
Carey, G (2017) An evaluation of how VfM can be achieved from a government's perspective in relation to school building projects in Ireland. PhD thesis, University of Salford, UK.
Carmichael, D G (1986) Shovel-truck queues: A reconciliation of theory and practice. Construction Management and Economics, 4(2), pp. 161-177. ISSN 01446193
Carpenter, N (2014) Comparison of the design-bid-build and construction manager at risk project delivery methods utilized for the construction of public schools. PhD thesis, Clemson University, USA.
Carrillo, P (1994) Technology transfer: A survey of international construction companies. Construction Management and Economics, 12(1), pp. 45-51. ISSN 01446193
Carrillo, P (2004) Managing knowledge: Lessons from the oil and gas sector. Construction Management and Economics, 22(6), pp. 631-642. ISSN 01446193
Carrillo, P M; Robinson, H S; Anumba, C J and Bouchlaghem, N M (2006) A knowledge transfer framework: The PFI context. Construction Management and Economics, 24(10), pp. 1045-1056. ISSN 1466433X
Carroll, Steven Paige (2005) Risk-based approach to on-site wastewater treatment system siting design and management. PhD thesis, Queensland University of Technology, Australia.
Carter, D J (2008) Tubular guidance systems for daylight: UK case studies. Building Research & Information, 36(5), pp. 520-535. ISSN 0961-3218
Carvalho, Karla Maria Paiva de (2020) Proposal of a systemic approach model in risk situations in the steel company. PhD thesis, Universidade Estadual de Campinas, Brazil.
Casamayor, J; Su, D and Sarshar, M (2015) Extending the lifespan of led-lighting products. Architectural Engineering and Design Management, 11(2), pp. 105-122. ISSN 1745-2007
Castaño-Rosa, R and Nerweyi, D (2025) Bringing post-occupancy evaluation up front to enhance energy efficiency in residential buildings. Building Research & Information, 53(8), pp. 1075-1091. ISSN 0961-3218
Castelblanco, G; Narbaev, T; Osei-Kyei, R; Serikbay, D; Mukashev, Y and Guevara, J (2025) Pandemic risks in PPPs: comparative analysis within developing countries. International Journal of Construction Management, 25(4), pp. 456-468. ISSN 1562-3599
Castro, L; De Vecchi, R and Lamberts, R (2025) Design process for an occupant survey system to assess satisfaction with indoor environmental quality. Building Research & Information, 53(1-2), pp. 242-260. ISSN 0961-3218
Castronovo, F; Van Meter, P N and Messner, J I (2022) Leveraging metacognitive prompts in construction educational games for higher educational gains. International Journal of Construction Management, 22(1), pp. 19-30. ISSN 1562-3599
Caven, V and Diop, M (2012) Architecture: A 'rewarding' career? An Anglo-French comparative study of intrinsic rewards in the architecture profession. Construction Management and Economics, 30(7), pp. 513-523. ISSN 1466433X
Cebrat, K; Narożny, J; Baborska-Narozny, M and Smektała, M (2025) Modelling site-specific outdoor temperature for buildings in urban environments. Buildings & Cities, 6(1), pp. 490-510. ISSN 2632-6655
Celoza, A; De Oliveira, D P and Leite, F (2023) Qualitative analysis of the impact of contracts on information management in AEC projects. Journal of Construction Engineering and Management, 149(3): 04022185, ISSN 0733-9364
Cemesova, A (2013) Enhancing BIM-based data transfer to support the design of low energy buildings. PhD thesis, Cardiff University, UK.
Ceran, N (2002) Private participation in infrastructure: A risk analysis of long-term contracts in power sector. PhD thesis, George Mason University, USA.
Cerimagic, Sabina (2012) Cross cultural characteristics and training of Australian project managers and working in the United Arab Emirates. PhD thesis, Bond University, Australia.
Chai, C; De Brito, J; Gaspar, P L and Silva, A (2014) Predicting the service life of exterior wall painting: Techno-economic analysis of alternative maintenance strategies. Journal of Construction Engineering and Management, 140(3): 4013057, ISSN 0733-9364
Chai, C S; Yusof, A M and Habil, H (2015) Delay mitigation in the Malaysian housing industry: A structural equation modelling approach. Journal of Construction in Developing Countries, 20(1), pp. 65-83. ISSN 1823-6499
Challender, J; Farrell, P and Sherratt, F (2014) Partnering practices: An investigation of influences on project success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Chan, A P C (1995) Towards an expert system on project procurement. Journal of Construction Procurement, 1(2), pp. 111-123. ISSN 1358-9180
Chan, A P C; Chan, D W M and Ho, K S K (2003) An empirical study of the benefits of construction partnering in Hong Kong. Construction Management and Economics, 21(5), pp. 523-533. ISSN 01446193
Chan, A P C; Ho, D C K and Tam, C M (2001) Design and build project success factors: Multivariate analysis. Journal of Construction Engineering and Management, 127(2), pp. 93-100. ISSN 0733-9364
Chan, A P C; Lam, P T I; Chan, D W M; Cheung, E and Ke, Y (2009) Drivers for adopting public private partnerships-empirical comparison between China and Hong Kong Special Administrative Region. Journal of Construction Engineering and Management, 135(11), pp. 1115-1124. ISSN 0733-9364
Chan, A P C; Lam, P T I; Chan, D W M; Cheung, E and Ke, Y (2010) Critical success factors for PPPs in infrastructure developments: Chinese perspective. Journal of Construction Engineering and Management, 136(5), pp. 484-494. ISSN 0733-9364
Chan, A P C; Tetteh, M O and Nani, G (2022) Drivers for international construction joint ventures adoption: A systematic literature review. International Journal of Construction Management, 22(8), pp. 1571-1583. ISSN 1562-3599
Chan, A P C; Yung, E H K; Lam, P T I; Tam, C M and Cheung, S O (2001) Application of Delphi method in selection of procurement systems for construction projects. Construction Management and Economics, 19(7), pp. 699-718. ISSN 01446193
Chan, A P L; Chan, A P C and Chan, D W M (2003) A study of managing healthcare projects in Hong Kong. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Chan, C T W (2012) The principal factors affecting construction project overhead expenses: An exploratory factor analysis approach. Construction Management and Economics, 30(10), pp. 903-914. ISSN 01446193
Chan, D W M (1998) Modelling construction durations for public housing projects. PhD thesis, University of Hong Kong, Hong Kong.
Chan, D W M; Chan, A P C; Lam, P T I and Wong, J M W (2010) Empirical study of the risks and difficulties in implementing guaranteed maximum price and target cost contracts in construction. Journal of Construction Engineering and Management, 136(5), pp. 495-507. ISSN 0733-9364
Chan, E H W and Au, M C Y (2008) Relationship between organizational sizes and contractors' risk pricing behaviors for weather risk under different project values and durations. Journal of Construction Engineering and Management, 134(9), pp. 673-680. ISSN 0733-9364
Chan, E H W and Au, M C Y (2009) Factors influencing building contractors' pricing for time-related risks in tenders. Journal of Construction Engineering and Management, 135(3), pp. 135-145. ISSN 0733-9364
Chan, I Y S and Liu, A M M (2012) Antecedents of innovation climate in construction firms in Hong Kong. International Journal of Construction Management, 12(4), pp. 37-46. ISSN 1562-3599
Chan, I Y S; Ma, P and Ho, T Y K (2025) Impacts of relational and formal governance on information sharing and project management performance in collaborative contracts: A mixed-method approach. Journal of Construction Engineering and Management, 151(7): 04025080, ISSN 0733-9364
Chan, M-W (1997) The relationship between project funding and construction systems. PhD thesis, University of Hong Kong, Hong Kong.
Chan, P and Kaka, A (2003) A blue-collar insight into improving construction labour productivity. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Chan, P W (2005) An interpretivistic approach to understand the factors that affect construction labour productivity. PhD thesis, Heriot-Watt University, UK.
Chan, P W and Cooper, R (2005) Passion for learning: Consider the project mission. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Chan, P W; Grantham, A; Kaplinsky, R; Mynors, D; Mohamed, S; Walsh, K and Coles, R (2006) A taxonomy of knowledge leakage: Some early developments. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Chan, S L and Park, M (2005) Project cost estimation using principal component regression. Construction Management and Economics, 23(3), pp. 295-304. ISSN 01446193
Chan, T-W C (2007) Improving the estimation of project overheads in construction companies in Hong Kong. PhD thesis, Loughborough University, UK.
Chang, L M and Borcherding, J D (1986) Craftsman questionnaire sampling. Journal of Construction Engineering and Management, 112(4), pp. 543-556. ISSN 0733-9364
Chang, L-M (1983) Evaluation and improvement of craftsman questionnaire in measuring construction productivity. PhD thesis, University of Texas at Austin, USA.
Chang, T; Chi, S and Im, S B (2022) Understanding user experience and satisfaction with urban infrastructure through text mining of civil complaint data. Journal of Construction Engineering and Management, 148(8): 04022061, ISSN 0733-9364
Chang, T; Deng, X; Hwang, B G and Zhao, X (2019) Improving quantitative assessment of political risk in international construction projects: The case of Chinese construction companies. Journal of Construction Engineering and Management, 145(12): 04019083, ISSN 0733-9364
Chang, W and Xue, C Q L (2021) Government and its aid buildings: The governmental influence on the design and management of China-aided stadium projects after 2000. Architectural Engineering and Design Management, 17(1-2), pp. 36-49. ISSN 1745-2007
Charalambous, N; Panayi, C; Mady, C; Augustinčić, T and Berc, D (2025) Youth engagement in urban living labs: Tools, methods and pedagogies. Buildings & Cities, 6(1), pp. 1061-1080. ISSN 2632-6655
Charbel, G; Assaad, R H; Tejada, T R and Karaa, F (2025) Modeling the interdependencies between the risk factors contributing to preconstruction delays in construction projects. Journal of Construction Engineering and Management, 151(4): 04025022, ISSN 0733-9364
Charles, Q W; Sospeter, N G; Kikwasi, G and Chileshe, N (2024) Attraction and retention factors for female students into construction-related programs in developing countries: The case of Tanzania. International Journal of Construction Education and Research, 20(3), pp. 263-283. ISSN 15578771
Charlson, J and Dimka, N (2021) Design, manufacture and construct procurement model for volumetric offsite manufacturing in the UK housing sector. Construction Innovation, 21(4), pp. 800-817. ISSN 1471-4175
Charlson J, C E (2013) A case study of joint procurement and provision of legal services to a group of a universities in the midlands. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Charoenngam, C and Maqsood, T (2001) A qualitative approach in problem solving process tracing of construction site engineers. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Chau, K W (1995) The validity of the triangular distribution assumption in Monte Carlo simulation of construction costs: Empirical evidence from Hong Kong. Construction Management and Economics, 13(1), pp. 15-21. ISSN 01446193
Chaurasia, S S and Verma, S (2020) Strategic determinants of big data analytics in the AEC sector: A multi-perspective framework. Construction Economics and Building, 20(4), pp. 63-81. ISSN 2204-9029
Che Ibrahim, C K I; Belayutham, S; Mohammad, M Z and Ismail, S (2022) Development of a conceptual designer's knowledge, skills, and experience index for prevention through design practice in construction. Journal of Construction Engineering and Management, 148(2): 04021199, ISSN 0733-9364
Che Ibrahim, C K I; Costello, S B and Wilkinson, S (2013) Development of a conceptual team integration performance index for alliance projects. Construction Management and Economics, 31(11), pp. 1128-1143. ISSN 1466433X
Chellappa, V and Ginda, G (2023) Application of multiple-criteria decision making methods for construction safety research. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(3), pp. 127-136. ISSN 17514304
Chen, G; Feng, Q; Ding, L; Li, Q and Yuan, M (2026) Revealing the impact of digital technology integration on prefabricated construction project performance. Journal of Construction Engineering and Management, 152(3): 04025271, ISSN 0733-9364
Chen, B; Yu, X; Dong, F; Zheng, C; Ding, G and Wu, W (2021) Compaction quality evaluation of asphalt pavement based on intelligent compaction technology. Journal of Construction Engineering and Management, 147(9): 04021099, ISSN 0733-9364
Chen, C (2005) Entry strategies for international construction markets. PhD thesis, Pennsylvania State University, USA.
Chen, C (2019) Heterogeneous integration of BIM with low-cost indoor mobile laser scanning method for building fabric maintenance in China. PhD thesis, University of Nottingham, UK.
Chen, C and Messner, J I (2005) An investigation of Chinese BOT projects in water supply: A comparative perspective. Construction Management and Economics, 23(9), pp. 913-925. ISSN 01446193
Chen, F-C (2021) Deep learning studies for vision-based condition assessment and attribute estimation of civil infrastructure systems. PhD thesis, Purdue University, USA.
Chen, G; Yan, Z; Hao, Y; Li, Q and Tian, Y (2025) BIM value creation through collaboration in construction projects: An empirical model with multiple collaborative behaviors. Journal of Construction Engineering and Management, 151(6): 04025048, ISSN 0733-9364
Chen, G X; Shan, M; Chan, A P C; Liu, X and Zhao, Y Q (2019) Investigating the causes of delay in grain bin construction projects: The case of China. International Journal of Construction Management, 19(1), pp. 1-14. ISSN 1562-3599
Chen, H (2006) Exploring the relationships between influencing factors and performance for construction joint ventures. PhD thesis, University of Hong Kong, Hong Kong.
Chen, J; Taylor, J E and Comu, S (2017) Assessing task mental workload in construction projects: A novel electroencephalography approach. Journal of Construction Engineering and Management, 143(8): 04017053, ISSN 0733-9364
Chen, K (2015) A strategic decision making framework for organisational BIM implementation. PhD thesis, Cardiff University, UK.
Chen, Q; Christy, A; Owens, M; Bortz, D; Greene, W and King, B (2012) Two-plus-two construction management programs and articulation agreements. International Journal of Construction Education and Research, 8(1), pp. 4-25. ISSN 1557-8771
Chen, Q and Jin, R (2013) Multilevel safety culture and climate survey for assessing new safety program. Journal of Construction Engineering and Management, 139(7), pp. 805-817. ISSN 0733-9364
Chen, X; Chang-Richards, A; Ling, F Y Y; Yiu, T W; Pelosi, A and Yang, N (2025) Digital technologies in the AEC sector: A comparative study of digital competence among industry practitioners. International Journal of Construction Management, 25(1), pp. 63-76. ISSN 1562-3599
Chen, Y (2008) Using mobile computing for construction site information management. PhD thesis, University of Newcastle upon Tyne, UK.
Chen, Y (2013) Measurement models of building information modeling maturity. PhD thesis, Purdue University, USA.
Chen, Y; McCabe, B and Hyatt, D (2017) Relationship between individual resilience, interpersonal conflicts at work, and safety outcomes of construction workers. Journal of Construction Engineering and Management, 143(8): 04017042, ISSN 0733-9364
Chen, Y E; Ahiaga-Dagbui, D; Thaheem, M and Shrestha, A (2022) Optimism bias in transport project cost appraisal: A review of the current body of knowledge. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Chen, Z; Abdullah, A B; Anumba, C J and Li, H (2014) Anp experiment for demolition plan evaluation. Journal of Construction Engineering and Management, 140(2): 06013005, ISSN 0733-9364
Chen, Z; Li, H; Ross, A; Khalfan, M M A and Kong, S C W (2008) Knowledge-driven ANP approach to vendors evaluation for sustainable construction. Journal of Construction Engineering and Management, 134(12), pp. 928-941. ISSN 0733-9364
Cheng, E W L; Li, H; Shen, L Y and Fong, P S W (2002) Ranking of construction information for various functions of the general contractors: A preliminary study. Journal of Construction Research, 3(1), pp. 181-191. ISSN 1609-9451
Cheng, M Y; Chang, Y H and Korir, D (2019) Novel approach to estimating schedule to completion in construction projects using sequence and nonsequence learning. Journal of Construction Engineering and Management, 145(11): 04019072, ISSN 0733-9364
Chester, M and Hendrickson, C (2005) Cost impacts, scheduling impacts, and the claims process during construction. Journal of Construction Engineering and Management, 131(1), pp. 102-107. ISSN 0733-9364
Cheung, C M; Bowen, P; Cattell, K and Davis, J (2020) Construction professionals' commitment to the organisation, work-life balance, and well-being. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Cheung, F K T; Kuen, J L F and Skitmore, M (2002) Multi-criteria evaluation model for the selection of architectural consultants. Construction Management and Economics, 20(7), pp. 569-580. ISSN 01446193
Cheung, F K T; Wong, M W L and Skitmore, M (2008) A study of clients' and estimators' tolerance towards estimating errors. Construction Management and Economics, 26(4), pp. 349-362. ISSN 1466433X
Cheung, S O and Suen, H C H (2002) A multi-attribute utility model for dispute resolution strategy selection. Construction Management and Economics, 20(7), pp. 557-568. ISSN 01446193
Cheung, S O; Tam, C M; Tam, V; Cheung, K and Suen, H (2004) A web-based performance assessment system for environmental protection: Wepass. Construction Management and Economics, 22(9), pp. 927-935. ISSN 01446193
Cheung, S O; Yiu, T W and Chan, H W (2010) Exploring the potential for predicting project dispute resolution satisfaction using logistic regression. Journal of Construction Engineering and Management, 136(5), pp. 508-517. ISSN 0733-9364
Chew, D A S and Liu, G (2004) Creating and sustaining international competitiveness of Chinese construction firms. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Chew, M Y L and Tan, S S (2004) A multivariate approach to maintenance prediction of wet areas. Construction Management and Economics, 22(4), pp. 395-407. ISSN 01446193
Chiara, N (2006) Real option methods for improving economic risk management in infrastructure project finance. PhD thesis, Columbia University, USA.
Chiara, N and Garvin, M (2008) Variance models for project financial risk analysis with applications to greenfield BOT highway projects. Construction Management and Economics, 26(9), pp. 925-939. ISSN 1466433X
Chileshe, N (2004) The application of TQM within small and medium sized construction related organisations. PhD thesis, Sheffield Hallam University, UK.
Chileshe, N and Kavishe, N (2021) Readiness assessment of public-private partnerships adoption in developing countries: The case of Tanzania. Built Environment Project and Asset Management, 11(1), pp. 71-87. ISSN 2044-124X
Chileshe, N; Rameezdeen, R; Lehmann, S and Hosseini, M r (2014) Reverse logistics (RL) implementation among contractors in Australia: Practices and barriers. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Chileshe, N and Watson, P (2004) The measurement of quality management levels within UK construction SMEs: Development and validation of TQ-SMART. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Chinazzo, G. and Wang, N. (2026) How buildings shape occupant movement: A systematic review and framework. Buildings & Cities, 7(1), pp. 504-522. ISSN 2632-6655
Chinazzo, G (2021) Investigating the indoor environmental quality of different workplaces through web-scraping and text-mining of glassdoor reviews. Building Research & Information, 49(6), pp. 695-713. ISSN 0961-3218
Ching, W C; Mohd-Rahim, F A and Chuing, L S (2021) Enterprise risk management and risk culture in construction public listed companies. Journal of Construction in Developing Countries, 26(2), pp. 17-36. ISSN 1823-6499
Chinyio, E; Gameson, R and Suresh, S (2011) The management of construction stakeholders by higher education institutions (HEIs) in the United Kingdom (UK): A pilot study. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Chiwuzie, A; Dabara, D I; Omotehinshe, O J; Prince, E M and Aiyepada, E G (2021) Changing macroeconomic indicators and the rental values of residential properties in Ede Nigeria. African Journal of Built Environment Research, 5(1), pp. 1-18. ISSN 2414-0236
Chiwuzie, A; Dabara, D I; Prince, E M; Ajiboye, B O and Olawuyi, S T (2020) Housing-related attributes and the changing structure of preferences. African Journal of Built Environment Research, 4(1), pp. 37-58. ISSN 2414-0236
Cho, Y (2000) The Korean housebuilding industry: aspects of growth, efficiency and diversification, 1980-1995. PhD thesis, London School of Economics and Political Science, UK.
Cho, Y; Kabassi, K; Pyeon, J H; Choi, K; Wang, C and Norton, T (2013) Effectiveness study of methods for removing temporary pavement markings in roadway construction zones. Journal of Construction Engineering and Management, 139(3), pp. 257-266. ISSN 0733-9364
Cho, Y K; Haas, C T; Sreenivasan, S V and Liapi, K (2004) Position error modeling for automated construction manipulators. Journal of Construction Engineering and Management, 130(1), pp. 50-58. ISSN 0733-9364
Cho, Y-K (2000) Human-assisted rapid workspace modeling for construction equipment operations. PhD thesis, University of Texas at Austin, USA.
Chong, D; Wang, Y; Zhao, K; Wang, D and Oeser, M (2018) Asphalt fume exposures by pavement construction workers: Current status and project cases. Journal of Construction Engineering and Management, 144(4): 05018002, ISSN 0733-9364
Chong, H Y; Fan, S L; Sutrisna, M; Hsieh, S H and Tsai, C M (2017) Preliminary contractual framework for BIM-enabled projects. Journal of Construction Engineering and Management, 143(7): 04017025, ISSN 0733-9364
Chou, C C; Caldas, C H; O'Connor, J T; Sroka, A W and Goldman, G K (2009) Identification of decision drivers for the strategy of incorporating utility relocations into highway construction contracts. Journal of Construction Engineering and Management, 135(9), pp. 812-818. ISSN 0733-9364
Choudhry, R M; Aslam, M A and Arain, F M (2014) Cost and schedule risk analysis of bridge construction in Pakistan: Establishing risk guidelines. Journal of Construction Engineering and Management, 140(7): 04014020, ISSN 0733-9364
Christen, M W (2018) The consideration of energy efficiency in the strategic planning of refurbishment in building portfolios. DSc thesis, ETH Zürich, Switzerland.
Christofferson, J P (1996) Computer-integrated specification information flow through the residential construction process. PhD thesis, Colorado State University, USA.
Chua, D K H and Li, D (2000) Key factors in bid reasoning model. Journal of Construction Engineering and Management, 126(5), pp. 349-357. ISSN 0733-9364
Chung, J Y (1984) Comparison of safety programs and employee attitudes within university of California facilities management departments. PhD thesis, University of California, Santa Barbara, USA.
Chung, T H; Mohamed, Y and Abourizk, S (2006) Bayesian updating application into simulation in the North Edmonton sanitary trunk tunnel project. Journal of Construction Engineering and Management, 132(8), pp. 882-894. ISSN 0733-9364
Cioffi, J; Wilkes, L and Hartcher-O'Brien, J (2002) Outdoor workers and sun protection: Knowledge and behaviour. Construction Economics and Building, 2(2), pp. 10-14. ISSN 2204-9029
Cirrincione, Laura (2021) Simulation and experimental methods for improving energy efficiency, environmental performance and resilience of single and clustered groups of buildings. PhD thesis, Università degli Studi di Palermo, Italy.
Clapp, D; Shuler, S; Nobe, M D; Demiranda, M and Nobe, M E C (2007) Capital equipment acquisition in heavy construction. International Journal of Construction Education and Research, 3(3), pp. 159-178. ISSN 1557-8771
Clarke, K (2021) A critical analysis of the gap between collaborative risk management policies and practice in construction projects in the Scottish Highlands. DProf thesis, University of Salford, UK.
Clarkson, Luke (2021) Comprehensive monitoring strategy for tailings dams. PhD thesis, University of Queensland, Australia.
Cline, R C (2008) Teaching key competencies of effective construction project managers to adults in higher education. PhD thesis, University of Idaho, USA.
Coates, S P (2013) BIM implementation strategy framework for small architectural practices. PhD thesis, University of Salford, UK.
Coelho Maran, A C (2010) Multicriteria decision support system to delineate water resources planning and management regions. PhD thesis, Colorado State University, USA.
Cokeham, M and Tutesigensi, A (2013) An investigation of construction accidents in Rwanda: Perspectives from Kigali. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(4), pp. 179-187. ISSN 17514312
Col Debella, D and Ries, R (2006) Construction delivery systems: A comparative analysis of their performance within school districts. Journal of Construction Engineering and Management, 132(11), pp. 1131-1138. ISSN 0733-9364
Colenberg, S; Jylhä, T and Arkesteijn, M (2021) The relationship between interior office space and employee health and well-being: A literature review. Building Research & Information, 49(3), pp. 352-366. ISSN 0961-3218
Collins, W and Redden, L (2021) Improving student’s estimating abilities through experiential learning. International Journal of Construction Education and Research, 17(2), pp. 117-132. ISSN 1557-8771
Collins, W; Salman, A; Olbina, S and Mosier, R (2024) Scientometric, thematic, and methodological analysis of IJCER construction education focused publications: 2004–2023. International Journal of Construction Education and Research, 20(4), pp. 383-404. ISSN 1557-8771
Comassetto Hamerski, D; Saurin, T A; Formoso, C T and Isatto, E L (2024) The Last Planner system as an emergent production planning and control method: The role of multiple representations. Journal of Construction Engineering and Management, 150(11): 04024155, ISSN 0733-9364
Comu, S (2013) Examining the impact of facilitation on the performance of global project networks collaborating in virtual workspaces. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Constantinou, C (2023) Assessment of the civil engineering graduate training scheme as part of the professional certification process in Cyprus. PhD thesis, Saint Louis University, USA.
Cook, E L (1997) Integration of total quality management with a project management approach for capital projects. PhD thesis, Texas A&M University, USA.
Cook, S J and English, C (1997) Overspecification of speculative UK commercial office building: An international comparison. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Cooper, L P (2008) How project teams conceive of and manage pre-quantitative risk. PhD thesis, University of Southern California, USA.
Corley, J and Deasley, P (2003) Factors affecting teamworking in construction service delivery projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Corona Suarez, G A (2007) Simulation-aided framework for assessing the effect of project quality management on construction performance. PhD thesis, University of Alberta, Canada.
Cottrell, D S (1995) Enhancing construction productivity through continuous process improvements. PhD thesis, Texas A&M University, USA.
Cottrell, W D (1999) Simplified program evaluation and review technique (PERT). Journal of Construction Engineering and Management, 125(1), pp. 16-22. ISSN 0733-9364
Counter, B J (2013) Development of innovative approaches for life extension of railway track systems. PhD thesis, University of South Wales, UK.
Cox, I D; Morris, J P; Rogerson, J H and Jared, G E (1999) A quantitative study of post contract award design changes in construction. Construction Management and Economics, 17(4), pp. 427-439. ISSN 01446193
Cox, R F; Issa, R R A and Frey, A (2006) Proposed subcontractor-based employee motivational model. Journal of Construction Engineering and Management, 132(2), pp. 152-163. ISSN 0733-9364
Craig, D (2002) A model for customer-focused culture change in the speculative house-building industry: Executive summary. EngD thesis, University of Warwick, UK.
Craigen, A (1990) Britain's school building estate: evaluation by life cycle for effective maintenance, with an illustrated study on Glasgow schools. PhD thesis, University of Strathclyde, UK.
Creagh, R; McGann, S; Jancey, J; Blackford, K; Tye, M; Tindall, R and Sal Moslehian, A (2025) Workplace circulation design and movement: a case study of three Australian campus buildings. Architectural Engineering and Design Management, 21(4), pp. 665-680. ISSN 1745-2007
Crespo Vallejo, L G (2018) Project manager strategies to improve the delivery of construction projects. PhD thesis, Walden University, USA.
Criado-Perez, C; Collins, C G; Jackson, C J; Oldfield, P; Pollard, B and Sanders, K (2020) Beyond an 'informed opinion': Evidence-based practice in the built environment. Architectural Engineering and Design Management, 16(1), pp. 23-40. ISSN 1745-2007
Crosthwaite, D (1998) The internationalization of British construction companies 1990-96: An empirical analysis. Construction Management and Economics, 16(4), pp. 389-395. ISSN 01446193
Crosthwaite, D (2001) The internationalisation of construction professional services: Consulting engineers overseas. PhD thesis, University of Reading, UK.
Crowther, J and Ajayi, S O (2021) Impacts of 4D BIM on construction project performance. International Journal of Construction Management, 21(7), pp. 724-737. ISSN 1562-3599
Cruz, N F D and Marques, R C (2012) Delivering local infrastructure through PPPs: Evidence from the school sector. Journal of Construction Engineering and Management, 138(12), pp. 1433-1443. ISSN 0733-9364
Cuciniello, G; Inzerillo, G; Corazziari, L; Ciampini, A; Degni, R; Torresi, M and Leandri, P (2023) Modeling the tire-pavement noise as a regression function of speed, mixture properties, and age of the layer. Journal of Construction Engineering and Management, 149(9): 04023080, ISSN 0733-9364
Cui, L Z; Liu, J; Luo, H; Wang, J; Zhang, X; Lv, G and Xie, Q (2024) Deformation measurement of tunnel shotcrete liner using the multiepoch lidar point clouds. Journal of Construction Engineering and Management, 150(6): 04024049, ISSN 0733-9364
Cui, Q; Davis, J S and Huang, H (2016) How happy are project managers in their jobs. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Da Silva, T F L; De Carvalho, M M and Vieira, D R (2022) BIM critical-success factors in the design phase and risk management: Exploring knowledge and maturity mediating effect. Journal of Construction Engineering and Management, 148(10): 04022104, ISSN 0733-9364
Dada, J O (2018) A career path framework for quantity surveyors in Nigeria private practice. Journal of Construction Business and Management, 2(2), pp. 15-23. ISSN 2521-0165
Dahalan, N H; Rahman, R A; Hassan, S H and Ahmad, S W (2024) Public assessment for environmental management plan implementation: Comparative study of performance indicators of road and highway construction projects. Journal of Construction Engineering and Management, 150(7): 05024006, ISSN 0733-9364
Dai, F and Lu, M (2010) Assessing the accuracy of applying photogrammetry to take geometric measurements on building products. Journal of Construction Engineering and Management, 136(2), pp. 242-250. ISSN 0733-9364
Dai, J; Goodrum, P M and Maloney, W F (2007) Analysis of craft workers' and foremen's perceptions of the factors affecting construction labour productivity. Construction Management and Economics, 25(11), pp. 1139-1152. ISSN 01446193
Dai, J; Goodrum, P M and Maloney, W F (2009) Construction craft workers' perceptions of the factors affecting their productivity. Journal of Construction Engineering and Management, 135(3), pp. 217-226. ISSN 0733-9364
Dai, J; Goodrum, P M; Maloney, W F and Srinivasan, C (2009) Latent structures of the factors affecting construction labor productivity. Journal of Construction Engineering and Management, 135(5), pp. 397-406. ISSN 0733-9364
Dainty, A R J; Cheng, M I and Moore, D R (2003) Redefining performance measures for construction project managers: An empirical evaluation. Construction Management and Economics, 21(2), pp. 209-218. ISSN 01446193
Dakas, A I I (2014) Management of project stakeholders: facilitating project success in public sector projects in Nigeria. PhD thesis, University of Leeds, UK.
Dakhil, A J (2017) Building information modelling (BIM) maturity-benefits assessment relationship framework for UK construction clients. PhD thesis, University of Salford, UK.
Dallasega, P; Schulze, F and Revolti, A (2023) Augmented reality to overcome visual management implementation barriers in construction: A mep case study. Construction Management and Economics, 41(3), pp. 232-255. ISSN 01446193
Dalton, M (2008) A risk breakdown structure for public sector construction projects. PhD thesis, University of Manchester, UK.
Damoah, I S (2015) An investigation into the causes and effects of project failure in government projects in developing countries: Ghana as a case study. PhD thesis, Liverpool John Moores University, UK.
Damoah, I S; Tingbani, I; Kumi, D K; Akwei, C C and Amoako, I O (2022) Factors influencing school building construction projects abandonment. International Journal of Construction Management, 22(6), pp. 961-976. ISSN 1562-3599
Dangana, Z; Pan, W and Goodhew, S (2012) Delivering sustainable buildings in retail construction. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Dania, A A (2017) Sustainable construction at the firm level: case studies from Nigeria. PhD thesis, University of Reading, UK.
Daniel, E I; Oshodi, O S and Marte Gomez, J (2025) Developing future skills for the engineering sector: evidence from the UK. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(2), pp. 65-75. ISSN 17514304
Dansoh, A; Frimpong, S; Ampratwum, G; Dennis Oppong, G and Osei-Kyei, R (2020) Exploring the role of traditional authorities in managing the public as stakeholders on PPP projects: A case study. International Journal of Construction Management, 20(6), pp. 628-641. ISSN 1562-3599
Dao, M A (2008) Determinants of firm compliance with environmental laws : A case study of Vietnam. PhD thesis, National University of Singapore, Singapore.
Daoud, A O; KhairEldin, M; Ibrahim, A H and Toma, H M (2026) Adaptive neuro-fuzzy inference system for Egyptian residential construction waste prediction. International Journal of Construction Management, 26(6), pp. 1059-1077. ISSN 1562-3599
Darko, A; Weerasinghe, L N K; Chan, A P C and Wu, L (2025) Partial least squares structural equation modeling of challenges to existing residential building net zero carbon retrofitting. Journal of Construction Engineering and Management, 151(8): 05025005, ISSN 0733-9364
Dartevelle, O; van Moeseke, G; Masy, G; Mlecnik, E and Altomonte, S (2024) On the effectiveness of passive controls for summer thermal comfort in highly insulated dwellings. Building Research & Information, 52(3), pp. 311-331. ISSN 0961-3218
Das, D K (2024) Conceptualising environmental justice in the construction of road transport infrastructure in the global South: An Indian context. International Journal of Construction Management, 24(4), pp. 400-410. ISSN 1562-3599
Das, D K (2025) Mitigating construction delays in Indian real estate projects through effective organizational and project management. International Journal of Building Pathology and Adaptation, 43(6), pp. 1423-1438. ISSN 2398-4708
Das, S (2009) Comprehensive maintainability scoring system (COMASS) for commercial buidings in tropical climate of Singapore. PhD thesis, National University of Singapore, Singapore.
Das, S; Chew, M Y L and Poh, K L (2010) Multi-criteria decision analysis in building maintainability using analytical hierarchy process. Construction Management and Economics, 28(10), pp. 1043-1056. ISSN 1466433X
Dasandara, M; Ernst, R; Kulatunga, U and Rathnasiri, P (2022) Investigation of issues in structural flood management measures in Sri Lanka. Journal of Construction in Developing Countries, 27(1), pp. 65-78. ISSN 1823-6499
Dash, A (2021) Determinants of evs adoption: A study on green behavior of consumers. Smart and Sustainable Built Environment, 10(1), pp. 125-137. ISSN 2046-6099
Daud, M N; Adnan, Y M; Mohd, I and Aziz, A A (2011) Developing a model for Malaysia's office classification. Building Research & Information, 39(3), pp. 301-313. ISSN 0961-3218
Dave, Malay (2019) High performance prefab housing: towards an evaluation framework for design, sustainability and affordability. PhD thesis, University of New South Wales, Australia.
Davies, P J; Emmitt, S and Firth, S K (2014) Challenges for capturing and assessing initial embodied energy: A contractor's perspective. Construction Management and Economics, 32(3), pp. 290-308. ISSN 01446193
Davies, R (1997) Intrinsic job satisfaction: An examination of United Kingdom construction trades operatives. PhD thesis, University of Manchester, UK.
Davies, R and Harty, C F (2012) Control, surveillance and the 'dark side' of BIM. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Davis, P R (2004) Relationship marketing techniques in construction projects: A case study approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Dawood, N N; Hobbs, B and Fanning, A (1999) Standardization of brickwork construction: Process identification. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Dawood, N N; Hobbs, B and Fanning, A (2001) Standardization of brickwork construction: Identification and measurement of standard processes. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Dawood, N N and Neale, R H (1990) A survey of current production planning practices in the precast concrete industry. Construction Management and Economics, 8(4), pp. 365-383. ISSN 01446193
Dawood, N N and Neale, R H (1993) Forecasting the sales of precast concrete building products. Construction Management and Economics, 11(2), pp. 81-98. ISSN 01446193
Dawson, J M (1996) We don't have an education; that's why we're here: Education and status in trades culture. PhD thesis, University of British Columbia, Canada.
De Blois, M; Herazo-Cueto, B; Latunova, I and Lizarralde, G (2011) Relationships between construction clients and participants of the building industry: Structures and mechanisms of coordination and communication. Architectural Engineering and Design Management, 7(1), pp. 3-22. ISSN 1745-2007
De Dear, R; Kim, J; Candido, C and Deuble, M (2015) Adaptive thermal comfort in Australian school classrooms. Building Research & Information, 43(3), pp. 383-398. ISSN 0961-3218
De Haan, J; Voordijk, H and Joosten, G J (2002) Market strategies and core capabilities in the building industry. Construction Management and Economics, 20(2), pp. 109-118. ISSN 01446193
De Lapp, J A; Ford, D N; Bryant, J A and Horlen, J (2004) Impacts of CAD on design realization. Engineering, Construction and Architectural Management, 11(4), pp. 284-291. ISSN 0969-9988
De Neyra, P L A and Celoza, A (2026) Identifying influential factors in end-of-life decision-making for buildings using the Delphi method. Journal of Construction Engineering and Management, 152(4): 04026015, ISSN 0733-9364
De Ridder, H A J (1994) Design and construct of complex civil engineering systems: A new approach to organization and contracts. PhD thesis, Delft University of Technology, Netherlands.
De Saram, D D (2002) Measuring the quality of contractors' co-ordination activities during the construction process. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
De Wilde, P; Augenbroe, G and Van Der Voorden, M (2002) Managing the selection of energy saving features in building design. Engineering, Construction and Architectural Management, 9(3), pp. 192-208. ISSN 0969-9988
De Wilde, P J C J (2004) Computational support for the selection of energy saving building components. PhD thesis, Delft University of Technology, Netherlands.
Debrah, C; Owusu-Manu, D G; Amonoo-Parker, L; Baiden, B K; Oduro-Ofori, E and Edwards, D J (2023) A factor analysis of the key sustainability content underpinning green cities development in Ghana. International Journal of Construction Management, 23(14), pp. 2469-2478. ISSN 1562-3599
Debrah, C; Owusu-Manu, D G; Darko, A; Oduro-Ofori, E; Acquah, P C and Asamoah, E (2023) Drivers for green cities development in developing countries: Ghanaian perspective. International Journal of Construction Management, 23(6), pp. 1086-1096. ISSN 1562-3599
Deep, S; Phillips, D; Agrawal, V; Vishnoi, S K; Lou, E and Sahoo, S (2026) Technology integration in india's real estate sector: Measuring awareness of virtual reality and closed-loop marketing. Building Research & Information, 54(2), pp. 135-157. ISSN 0961-3218
Deep, S; Gajendran, T; Jefferies, M and Jha, K N (2025) Defining the attributes of power and dependence in general contractor and subcontractor project-based relationships: Understanding the subcontractor's perspective. Journal of Construction Engineering and Management, 151(10): 04025149, ISSN 0733-9364
Deep, S; Sonkar, N; Yadav, P; Vishnoi, S; Bhoola, V and Kumar, A (2024) Factors influencing the mental health of white-collar construction workers in developing economies: Analytical study during the COVID-19 pandemic in India. Journal of Construction Engineering and Management, 150(7): 04024058, ISSN 0733-9364
Delghust, M; Roelens, W; Tanghe, T; De Weerdt, Y and Janssens, A (2015) Regulatory energy calculations versus real energy use in high-performance houses. Building Research & Information, 43(6), pp. 675-690. ISSN 0961-3218
Demirel, H Ç; Volker, L; Leendertse, W and Hertogh, M (2019) Dealing with contract variations in PPPs: Social mechanisms and contract management in infrastructure projects. Journal of Construction Engineering and Management, 145(11): 04019073, ISSN 0733-9364
Deng, F (2015) Performance measurement system: attributes, effects and context in UK construction firms. PhD thesis, University College London, UK.
Deng, Y (2015) Mapping of BIM and GIS for interoperable geospatial data management and analysis for the built environment. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Denicol, Juliano (2019) Designing client organisations and supply chain strategies to deliver megaprojects. PhD thesis, University College London, UK.
Denowitz, R M (1982) Industries and environments: A comparative study of housebuilding in two suburban areas. PhD thesis, University of Chicago, USA.
Desai, A (2012) Formulating an FM strategy for climate change mitigation and adaptation of commercial built assets. PhD thesis, University of Greenwich, UK.
Devapriya, K A K and Khu, F L (2004) Bond financing in private infrastructure projects in developing countries. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Dewagoda, K G; Perera, B and Senaratne, S (2021) A "knowledge value chain" framework for contractor organisations to maximise chances of winning tenders. Built Environment Project and Asset Management, 11(4), pp. 577-593. ISSN 2044-124X
Dharmapalan, V; O'Brien, W J; Morrice, D and Jung, M (2021) Assessment of visibility in industrial construction projects: A viewpoint from supply chain stakeholders. Construction Innovation, 21(4), pp. 782-799. ISSN 1471-4175
Diab, A A (2009) Risk management of building services modularisation: Knowledge management perspective. PhD thesis, University of Manchester, UK.
Dias Barkokebas, R; Al-Hussein, M and Li, X (2022) VR-MOCAP-enabled ergonomic risk assessment of workstation prototypes in offsite construction. Journal of Construction Engineering and Management, 148(8): 04022064, ISSN 0733-9364
Dias Barkokebas, R and Li, X (2021) Use of virtual reality to assess the ergonomic risk of industrialized construction tasks. Journal of Construction Engineering and Management, 147(3): 04020183, ISSN 0733-9364
Dickerson, D E (2024) Construction health hazard control innovations: A web-based intervention to change perceptions. International Journal of Construction Education and Research, 20(3), pp. 243-262. ISSN 15578771
Dickinson, H and Swaffield, L (2004) Implementing a segregation-based waste management system on site: Does it reduce site waste disposal costs? Journal of Financial Management of Property and Construction, 9(2), pp. 75-90. ISSN 1366-4387
Dikmen, I; Birgonul, M T and Arikan, A E (2006) Application of an integrated risk management system (IRMS) to an international construction project. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Dikmen, I; Birgonul, M T and Kiziltas, S (2005) Prediction of organizational effectiveness in construction companies. Journal of Construction Engineering and Management, 131(2), pp. 252-261. ISSN 0733-9364
Ding, G and Forsythe, P (2016) A comparative study of floor construction on sloping sites: An analysis of cumulative energy demand and greenhouse gas emissions. Construction Economics and Building, 16(1), pp. 33-49. ISSN 2204-9029
Ding, G K C (2005) Developing a multicriteria approach for the measurement of sustainable performance. Building Research & Information, 33(1), pp. 3-16. ISSN 0961-3218
Ding, Z and Ng, F (2007) Reliability and validity of the Chinese version of McAllister's trust scale. Construction Management and Economics, 25(11), pp. 1107-1117. ISSN 01446193
Direitinho, Romao Manuel Leitao Carrapato (2020) Civil construction waste (RCC) management model supported by the analytic hierarchy process (AHP) method. PhD thesis, Universidade Federal de São Carlos, Brazil.
Disney, O and Fahlstedt, O (2021) Site overheads: The lost dimension of improved productivity? In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Djebarni, R (1996) The impact of stress in site management effectiveness. Construction Management and Economics, 14(4), pp. 281-293. ISSN 01446193
Do, S T; Nguyen, V T; Tran, C N N and Aung, Z M (2023) Identifying and evaluating the key claim causes leading to construction delays. International Journal of Construction Management, 23(12), pp. 1999-2011. ISSN 1562-3599
Dobre, C C and Faldi, G (2025) Researchers' shifting roles in living labs for knowledge co-production. Buildings & Cities, 6(1), pp. 934-951. ISSN 2632-6655
Doczy, R (2018) Risk-benefit analysis and optimization of LEED-certified school buildings design and construction: Statisitical and machine learning approaches. PhD thesis, Florida State University, USA.
Doloi, H (2008) Analysing the novated design and construct contract from the client's, design team's and contractor's perspectives. Construction Management and Economics, 26(11), pp. 1181-1196. ISSN 1466433X
Doloi, H (2008) Application of AHP in improving construction productivity from a management perspective. Construction Management and Economics, 26(8), pp. 841-854. ISSN 01446193
Doloi, H (2009) Analysis of pre-qualification criteria in contractor selection and their impacts on project success. Construction Management and Economics, 27(12), pp. 1245-1263. ISSN 1466433X
Donato, V (2017) Towards design process validation integrating graph theory into BIM. Architectural Engineering and Design Management, 13(1), pp. 22-38. ISSN 1745-2007
Dong, N (2012) Automated look-ahead schedule generation and optimization for the finishing phase of complex construction projects. PhD thesis, Stanford University, USA.
Dong, R G; Pan, C S and Wu, J Z (2025) Safety design, use, and research of mast climbing work platforms. Journal of Construction Engineering and Management, 151(12): 03125009, ISSN 0733-9364
Dorward, D R (2006) The effect of selected output modifications on facilitating the assessment of PDM schedules. PhD thesis, Indiana State University, USA.
Dosumu, O S (2018) Perceived effects of prevalent errors in contract documents on construction projects. Construction Economics and Building, 18(1), pp. 1-26. ISSN 2204-9029
Doulabi, S H H; Seifi, A and Shariat, S Y (2011) Efficient hybrid genetic algorithm for resource leveling via activity splitting. Journal of Construction Engineering and Management, 137(2), pp. 137-146. ISSN 0733-9364
Dowse, G (2003) Qualitative residential market forecasts: The Auckland experience. Journal of Financial Management of Property and Construction, 8(3), pp. 193-201. ISSN 1366-4387
Dowsett, R M and Harty, C F (2014) The wider implementation issues of BIM within a multifaceted property and real estate consultancy. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Du, J; Zhao, D and Zhang, O (2019) Impacts of human communication network topology on group optimism bias in capital project planning: A human-subject experiment. Construction Management and Economics, 37(1), pp. 44-60. ISSN 01446193
Dubler, C R (2011) Evaluating waste associated with building information exchange using lean theory. PhD thesis, Pennsylvania State University, USA.
Duff, A R; Emsley, M; Gregory, M; Lowe, D and Masterman, J (1998) Development of a model of total building procurement costs for construction clients. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Duffield, Colin F (2001) An evaluation framework for privately funded infrastructure projects in Australia. PhD thesis, University of Melbourne, Australia.
Dulaimi, M F (2005) The influence of academic education and formal training on the project manager's behavior. Journal of Construction Research, 6(1), pp. 179-193. ISSN 1609-9451
Dulaimi, M F and Langford, D (1999) Job behavior of construction project managers: Determinants and assessment. Journal of Construction Engineering and Management, 125(4), pp. 256-264. ISSN 0733-9364
Dulaimi, M F; Ling, F Y Y and Bajracharya, A (2003) Organizational motivation and inter-organizational interaction in construction innovation in Singapore. Construction Management and Economics, 21(3), pp. 307-318. ISSN 01446193
Duncan, M J; Short, C; Rashid, M; Cutumisu, N; Vandelanotte, C and Plotnikoff, R C (2015) Identifying correlates of breaks in occupational sitting: A cross-sectional study. Building Research & Information, 43(5), pp. 646-658. ISSN 0961-3218
Dunston, P S and Bernold, L E (2000) Adaptive control for safe and quality rebar fabrication. Journal of Construction Engineering and Management, 126(2), pp. 122-129. ISSN 0733-9364
Dunston, P S; Gambatese, J A and McManus, J F (2005) Assessing state transportation agency constructability implementation. Journal of Construction Engineering and Management, 131(5), pp. 569-578. ISSN 0733-9364
Duodu, B and Rowlinson, S (2021) Opening up the innovation process in construction firms: External knowledge sources and dual innovation. Journal of Construction Engineering and Management, 147(8), ISSN 0733-9364
Duong, T B A; Pham, T; Truong, Q H; Nguyen, K; Pham, C H; Hoang, T H and Pham, T H (2023) Risk in sustainable construction supply chains: Construct development and measurement validation. Construction Management and Economics, 41(8), pp. 634-650. ISSN 01446193
Durdyev, S; Mohamed, S; Lay, M L and Ismail, S (2017) Key factors affecting construction safety performance in developing countries: Evidence from Cambodia. Construction Economics and Building, 17(4), pp. 48-65. ISSN 2204-9029
Durnall, T J and Proverbs, D (2009) An alternative model of motivation for steeplejacks within the petrochemical and power generation industries. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Dzeng, R J and Wang, S S (2008) An analysis of infrastructure development based on national competitiveness perspectives. Construction Management and Economics, 26(1), pp. 47-61. ISSN 1466433X
Dzitouo, M (2024) Project performance of relational contracting: A critical success factors perspective. PhD thesis, Capella University, USA.
Dzokoto, F K (2016) Information behaviour of construction project actors. PhD thesis, Loughborough University, UK.
Dzokoto, F K; Edum-Fotwe, F and Demian, P (2014) Conceptualising actors' information behaviour: An investigation into project information dynamics. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Eaves, S (2016) Building and maintaining healthy construction workers for longer working lives through better workplace design. PhD thesis, Loughborough University, UK.
Ebbert, T (2010) Re-face: Refurbishment strategies for the technical improvement of office façades. PhD thesis, Delft University of Technology, Netherlands.
Eberhardt, L C M; Birkved, M and Birgisdottir, H (2022) Building design and construction strategies for a circular economy. Architectural Engineering and Design Management, 18(2), pp. 93-113. ISSN 1745-2007
Ebiloma, D O (2024) A digital twin maintenance management model for public hospital buildings in Nigeria. PhD thesis, University of Johannesburg, South Africa.
Ebrahimigharehbaghi, S; Qian, Q K; de Vries, G and Visscher, H J (2022) Identification of the behavioural factors in the decision-making processes of the energy efficiency renovations: Dutch homeowners. Building Research & Information, 50(4), pp. 369-393. ISSN 0961-3218
Eccles, T S (2009) The English building industry in late modernity: an empirical investigation of the definition, construction and meaning of profession. PhD thesis, London School of Economics and Political Science, UK.
Echezona, O N (2011) Client perception of engineering and construction services management in present-day Iraq: An exploratory study and assessment. PhD thesis, Walden University, USA.
Edison, J C and Singla, H K (2020) Development of a scale for factors causing delays in infrastructure projects in India. Construction Economics and Building, 20(1), pp. 36-55. ISSN 2204-9029
Edwards, P J and Bowen, P A (1998) Practices, barriers and benefits of risk management process in building services costs estimation: Comment. Construction Management and Economics, 16(1), pp. 105-108. ISSN 01446193
Eeing, B T and Kruse, J B (2006) Valuing self-protection: Income and certification effects for safe rooms. Construction Management and Economics, 24(10), pp. 1057-1068. ISSN 1466433X
Egebjerg, C (2013) Learning from movie-sets coordination. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Ehrlich, M; Woodward, D and Tiong, R (2012) A state-of-practice survey on managing fx exposure in project companies, construction companies and SMEs. Journal of Financial Management of Property and Construction, 17(1), pp. 29-48. ISSN 1366-4387
Ehsanifar, M and Hemesy, M (2021) A new hybrid multi-criteria decision-making model to prioritize risks in the construction process under fuzzy environment (case study: The Valiasr Street Underpass Project). International Journal of Construction Management, 21(5), pp. 508-523. ISSN 1562-3599
Ekanayake, B J; Ysandanayake, Y and Ramachandra, T (2018) Application of value management to refurbishment projects: A Sri Lankan case study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Ekanayake, E M A C; Shen, G Q P; Kumaraswamy, M M and Owusu, E K (2022) Identifying supply chain vulnerabilities in industrialized construction: An overview. International Journal of Construction Management, 22(8), pp. 1464-1477. ISSN 1562-3599
Ekanayake, L L (2006) Interface conflicts and regulatory decision making process on power projects in Sri Lanka. PhD thesis, National University of Singapore, Singapore.
Ekung, S; Okonkwo, C and Nwosu, E (2021) Claims culture and client-contractors' willingness to engage in future projects: A multivariate analysis. African Journal of Built Environment Research, 5(1), pp. 19-40. ISSN 2414-0236
Ekung, S; Opoku, A and Okonkwo, C (2023) Organisational learning and sustainability of service-based firms: A canonical correlation analysis. International Journal of Construction Management, 23(13), pp. 2160-2170. ISSN 1562-3599
El Asmar, M (2012) Modeling and benchmarking performance for the integrated project delivery (IPD) system. PhD thesis, University of Wisconsin - Madison, USA.
El Asmar, M; Hanna, A S and Loh, W Y (2013) Quantifying performance for the integrated project delivery system as compared to established delivery systems. Journal of Construction Engineering and Management, 139(11): 4013012, ISSN 0733-9364
El Meouche, R; Abunemeh, M; Hijaze, I; Mebarki, A and Shahrour, I (2018) Developing optimal paths for evacuating risky construction sites. Journal of Construction Engineering and Management, 144(2): 04017099, ISSN 0733-9364
El Sawalhi, N I and Yazgi, A N (2021) House of quality: A method to identify landscape design requirements. Construction Innovation, 21(3), pp. 441-455. ISSN 1471-4175
El-Choum, M K (1994) Identification and modelling of construction cost overruns parameters for public infrastructure projects using multivariate statistical methods. PhD thesis, Stevens Institute of Technology, USA.
El-Diraby, T A and Gill, S M (2006) A taxonomy for construction terms in privatized-infrastructure finance: Supporting semantic exchange of project risk information. Construction Management and Economics, 24(3), pp. 271-285. ISSN 01446193
El-Gafy, M; Abdelhamid, T and Abdelrazig, Y (2010) Environmental impact analysis using hybrid decision support framework: A transportation project case study. International Journal of Construction Education and Research, 6(3), pp. 219-237. ISSN 1557-8771
El-Higzi, F A (2002) Foreign market selection factors in the Australian construction services sector. Construction Economics and Building, 2(1), pp. 107-120. ISSN 2204-9029
El-Kholy, A M (2022) A new technique for subcontractor selection by adopting choosing by advantages. International Journal of Construction Management, 22(7), pp. 1171-1193. ISSN 1562-3599
El-Sabek, L M and McCabe, B Y (2018) Framework for managing integration challenges of last planner system in IMPs. Journal of Construction Engineering and Management, 144(5): 04018022, ISSN 0733-9364
El-Sabek, L M and McCabe, B Y (2018) Coordination challenges of production planning in the construction of international mega-projects in the middle East. International Journal of Construction Education and Research, 14(2), pp. 118-40. ISSN 1557-8771
El-Saboni, M A (2011) Interaction between electronic communication and perceived success in UAE construction projects. PhD thesis, University of Salford, UK.
El-Sawalhi, N; Eaton, D and Rustom, R (2008) Forecasting contractor performance using a neural network and genetic algorithm in a pre-qualification model. Construction Innovation, 8(4), pp. 280-298. ISSN 1471-4175
El-Sawalhi, N I and Ajwa, H E A (2013) Mud building practices in construction projects in the Gaza Strip. International Journal of Construction Management, 13(2), pp. 13-26. ISSN 1562-3599
El-Sayegh, S M (1998) Linear construction planning model (LCPM): A new model for planning, and scheduling linear construction projects. PhD thesis, Texas A&M University, USA.
El-Sayegh, S M (2009) Multi-criteria decision support model for selecting the appropriate construction management at risk firm. Construction Management and Economics, 27(4), pp. 385-398. ISSN 1466433X
El-Sayegh, S M; Basamji, M; Haj Ahmad, A and Zarif, N (2021) Key contractor selection criteria for green construction projects in the UAE. International Journal of Construction Management, 21(12), pp. 1240-1250. ISSN 1562-3599
El-Sayegh, S M; Manjikian, S; Ibrahim, A; Abouelyousr, A and Jabbour, R (2021) Risk identification and assessment in sustainable construction projects in the UAE. International Journal of Construction Management, 21(4), pp. 327-336. ISSN 1562-3599
El. Reifi, M H and Emmitt, S (2013) Perceptions of lean design management. Architectural Engineering and Design Management, 9(3), pp. 195-208. ISSN 1745-2007
ElAlem, M A; Mahdi, I M; Mohamadien, H A and Hosny, S (2025) Forecasting scope creep in Egyptian construction projects: An evaluation using artificial neural network (ANN) and random forest models. International Journal of Construction Management, 25(16), pp. 2082-2101. ISSN 1562-3599
Elazhary, M and El-adaway, I H (2025) Enhancing management of transportation projects: Integration factors for using smart contracts. Journal of Construction Engineering and Management, 151(12): 04025201, ISSN 0733-9364
Elbehairy, H (2007) Bridge management system with integrated life cycle cost optimization. PhD thesis, University of Waterloo, Canada.
Elbeltagi, E; Hegazy, T; Hosny, A H and Eldosouky, A (2001) Schedule-dependent evolution of site layout planning. Construction Management and Economics, 19(7), pp. 689-697. ISSN 01446193
Elbeltagi, E; Hosny, O A; Elhakeem, A; Abd-Elrazek, M E and Abdullah, A (2011) Selection of slab formwork system using fuzzy logic. Construction Management and Economics, 29(7), pp. 659-670. ISSN 1466433X
Eldin, N N (1991) Management of engineering/design phase. Journal of Construction Engineering and Management, 117(1), pp. 163-175. ISSN 0733-9364
Eldin, N N and Egger, S (1990) Productivity improvement tool: Camcorders. Journal of Construction Engineering and Management, 116(1), pp. 100-111. ISSN 0733-9364
Elghaish, F A K (2020) An automated IPD cost management system: BIM and blockchain based solution. PhD thesis, University of Portsmouth, UK.
Elghamrawy, T; El-Rayes, K; Liu, L and Odeh, I (2012) Performance of temporary rumble strips at the edge of highway construction zones. Journal of Construction Engineering and Management, 138(8), pp. 923-930. ISSN 0733-9364
Elhag, T M S and Boussabaine, A H (1999) Evaluation of construction cost and time attributes. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Elias, R; Issa, R R A and Wu, W (2023) Progress on building information modeling education and talent acquisition. International Journal of Construction Education and Research, 19(4), pp. 363-382. ISSN 1557-8771
Elkadi, Karim (2024) BIM-enabled facility management framework and simulation. PhD thesis, George Mason University, USA.
Elliott, B R (2000) Investigation of the construction scheduling communication process: Problems, foreman's role, means of improvement and use of information technology. PhD thesis, University of Florida, USA.
Ellis Jr., R D (1989) Model for prediction of highway construction production rates. PhD thesis, University of Florida, USA.
Ellis Jr, R D and Lee, S H (2006) Measuring project level productivity on transportation projects. Journal of Construction Engineering and Management, 132(3), pp. 314-320. ISSN 0733-9364
Elmasry, M; Zayed, T and Hawari, A (2019) Multi-objective optimization model for inspection scheduling of sewer pipelines. Journal of Construction Engineering and Management, 145(2): 04018129, ISSN 0733-9364
Elshaboury, N; Attia, T and Marzouk, M (2020) Application of evolutionary optimization algorithms for rehabilitation of water distribution networks. Journal of Construction Engineering and Management, 146(7): 04020069, ISSN 0733-9364
Elsherbiny, A (2021) Prediction of design error rework cost in EPC industrial projects. DEng thesis, George Washington University, USA.
Emam, H; Farrell, P and Ahmed, S (2016) Formulating a linear scheduling development index. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(5), pp. 188-198. ISSN 17514304
Emsoff, J E (1994) An object-oriented environment for the visual integration of project scheduling data. PhD thesis, Texas A&M University, USA.
Emuze, F (2018) Foreseeing countermeasures for construction safety violations in South Africa. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Emuze, F (2023) An illustrative case study of workaround and its effects on construction site safety in South Africa. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Emuze, F; Linake, M and Seboka, L (2016) Construction work and the housekeeping challenge in Lesotho. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Emuze, F and Ravu, P (2014) Optimism bias, pathogens and cost overrun: The case of an RTS project in South Africa. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Emuze, F A (2022) Addressing violations of safe work procedures in South African construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(3), pp. 113-121. ISSN 17514304
Emuze, F A and Smallwood, J J (2013) Reducing 'non-value-adding activities' when building infrastructure in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(3), pp. 121-127. ISSN 17514312
Engebø, A; Klakegg, O J; Lohne, J; Bohne, R A; Fyhn, H and Lædre, O (2022) High-performance building projects: How to build trust in the team. Architectural Engineering and Design Management, 18(6), pp. 774-790. ISSN 1745-2007
Engström, S; Sardén, Y and Stehn, L (2009) Towards improving client-contractor communication in industrialised building. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Enshassi, A; Mohamed, S and Abdel-Hadi, M (2013) Factors affecting the accuracy of pre-tender cost estimates in the Gaza Strip. Journal of Construction in Developing Countries, 18(1), pp. 73-94. ISSN 1823-6499
Eom, C S J and Paek, J H (2009) Risk index model for minimizing environmental disputes in construction. Journal of Construction Engineering and Management, 135(1), pp. 34-41. ISSN 0733-9364
Eriksson, P E (2010) Partnering: What is it, when should it be used, and how should it be implemented? Construction Management and Economics, 28(9), pp. 905-917. ISSN 1466433X
Eriksson, P E and Pesämaa, O (2007) Modelling procurement effects on cooperation. Construction Management and Economics, 25(8), pp. 893-901. ISSN 1466433X
Eriksson, T (2015) Developing routines in large inter-organisational projects: A case study of an infrastructure megaproject. Construction Economics and Building, 15(3), pp. 4-18. ISSN 2204-9029
Ernest, K; Theophilus, A K; Amoah, P and Emmanuel, B B (2019) Identifying key economic indicators influencing tender price index prediction in the building industry: A case study of Ghana. International Journal of Construction Management, 19(2), pp. 106-112. ISSN 1562-3599
Erol, H; Dikmen, I; Atasoy, G and Birgonul, M T (2020) Exploring the relationship between complexity and risk in megaconstruction projects. Journal of Construction Engineering and Management, 146(12): 04020138, ISSN 0733-9364
Ershadi, M.; Jefferies, M.; Davis, P. and Mojtahedi, M. (2021) Achieving sustainable procurement in construction projects: The pivotal role of a project management office. Construction Economics and Building, 21(1), pp. 45-64. ISSN 2204-9029
Ershadi, M; Davis, P and Newaz, M T (2021) Important academic interventions for promoting resilience: The perception of construction management undergraduates. Construction Management and Economics, 39(4), pp. 340-355. ISSN 01446193
Esguicero, Fabio Jose (2020) Framework applied to process modeling in municipal management of construction waste. PhD thesis, Universidade Estadual Paulista Júlio de Mesquita Filho, Brazil.
Essa, R and Fortune, C (2006) Project price forecasting processes and pre-construction evaluation of sustainable housing association projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Evarist, C; G.M. Luvara, V and Chileshe, N (2025) Rethinking the recruitment and selection practices of indigenous building contractors in Dar es Salaam, Tanzania: criteria and methods. International Journal of Construction Management, 25(2), pp. 149-160. ISSN 1562-3599
Evirgen, T C (1995) Performance in international collaborative ventures: Case of the global construction industry. PhD thesis, Michigan State University, USA.
Ewart, K and Silcock, G (1987) An analysis of the cost of compliance with the fire services order, Northern Ireland, 1985. Construction Management and Economics, 5(1), pp. 3-12. ISSN 01446193
Exss, K.; Trebilcock, M.; Wegertseder-Martínez, P.; Schiavon, S. and Zhang, H. (2026) Personal comfort systems for adults with intellectual disabilities. Buildings & Cities, 7(1), pp. 523-540. ISSN 2632-6655
Faheem Haider, M.; Aslam, M.; Khan, R. W. A. and Malik, M. S. A. (2026) Exploring the factors to improve complaint management system in building management through a case study. International Journal of Construction Management, 26(9), pp. 1777-1798. ISSN 1562-3599
Fahkhri, H (2015) Public Participation in NHS Construction Projects. Unpublished PhD thesis, University of Reading, UK.
Faircloth, Adam D (2022) Development of a non-destructive evaluation system for mass timber panels. MPhil thesis, Griffith University, Australia.
Faisol, N; Dainty, A R J and Price, A D F (2006) Perceptions of construction organisations on developing successful inter-organisational relationships. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Fan, C L (2025) Evaluation model for crack detection with deep learning: Improved confusion matrix based on linear features. Journal of Construction Engineering and Management, 151(3): 04024077, ISSN 0733-9364
Fan, S L (2014) Intellectual property rights in building information modeling application in Taiwan. Journal of Construction Engineering and Management, 140(3): 4013058, ISSN 0733-9364
Fang, D; Fong, P S W and Li, M (2004) Risk assessment model of tendering for Chinese building projects. Journal of Construction Engineering and Management, 130(6), pp. 862-868. ISSN 0733-9364
Fang, D; Li, M; Fong, P S W and Shen, L (2004) Risks in Chinese construction market: contractors' perspective. Journal of Construction Engineering and Management, 130(6), pp. 853-861. ISSN 0733-9364
Fang, D; Wang, Y; Lim, H W; Ma, L; Gu, B and Huang, Y (2023) Construction of a Bayesian network based on leadership-culture-behavior model to improve owner safety management behavior. Journal of Construction Engineering and Management, 149(3): 04022177, ISSN 0733-9364
Farias, F (2013) Contemporary strategies for sustainable design. PhD thesis, Texas A&M University, USA.
Farooq, M. and Paracha, A. T. (2026) Cost prediction of road construction projects in Pakistan using machine learning. International Journal of Construction Management, 26(8), pp. 1442-1470. ISSN 1562-3599
Fattahi Tabasi, S; Rafizadeh, H R; Andaji Garmaroudi, A and Banihashemi, S (2024) Optimizing urban layouts through computational generative design: density distribution and shape optimization. Architectural Engineering and Design Management, 20(5), pp. 1164-1184. ISSN 1745-2007
Fauth, J; Nørkjær Gade, P; Kaiser, S; Raj, K; Goul Pedersen, J; Olsson, P O; Nisbet, N; Mastrolembo Ventura, S; Hirvensalo, A; Granja, J; Urban, H; Rutešić, S; Verstraeten, R; Raitviir, C R; Kallinen, A R; Schranz, C; Stojanov, T and Tekavec, J (2025) Investigating building permit processes across Europe: Characteristics and patterns. Building Research & Information, 53(4), pp. 417-434. ISSN 0961-3218
Fauth, J; Pasetti Monizza, G and Malacarne, G (2023) Understanding processes on digital building permits–a case study in South tyrol. Building Research & Information, 51(5), pp. 518-532. ISSN 0961-3218
Fawcett, T (2014) Exploring the time dimension of low carbon retrofit: Owner-occupied housing. Building Research & Information, 42(4), pp. 477-488. ISSN 0961-3218
Fay, R; Treloar, G and Iyer-Raniga, U (2000) Life-cycle energy analysis of buildings: A case study. Building Research & Information, 28(1), pp. 31-41. ISSN 0961-3218
Feige, A; Wallbaum, H and Krank, S (2011) Harnessing stakeholdermotivation: Towards a Swiss sustainable building sector. Building Research & Information, 39(5), pp. 504-517. ISSN 0961-3218
Felix, R (1988) The use of domestic building products by the owner-builder. PhD thesis, University of Leeds, UK.
Fellows, M (2022) Migrant workers as informal interpreters on construction sites. PhD thesis, University of Reading, UK.
Fellows, R; Liu, A and Storey, C (2009) Values, power and performance on construction projects: A preliminary investigation. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Feng, K; Wang, S; Lu, W; Liu, C and Wang, Y (2022) Planning construction projects in deep uncertainty: A data-driven uncertainty analysis approach. Journal of Construction Engineering and Management, 148(8): 04022060, ISSN 0733-9364
Fennell, P; Ruyssevelt, P and Smith, A Z P (2016) Financial viability of school retrofit projects for clients and ESCOs. Building Research & Information, 44(8), pp. 889-11. ISSN 0961-3218
Ferguson, L; Taylor, J; Zhou, K; Shrubsole, C; Symonds, P; Davies, M and Dimitroulopoulou, S (2021) Systemic inequalities in indoor air pollution exposure in London, UK. Buildings & Cities, 2(1), pp. 425-448. ISSN 2632-6655
Feriadi, H; Wong, N H; Chandra, S and Cheong, K W (2003) Adaptive behaviour and thermal comfort in Singapore's naturally ventilated housing. Building Research & Information, 31(1), pp. 13-23. ISSN 0961-3218
Fettermann, D C; Borriello, A; Pellegrini, A; Cavalcante, C G; Rose, J M and Burke, P F (2021) Getting smarter about household energy: The who and what of demand for smart meters. Building Research & Information, 49(1), pp. 100-112. ISSN 0961-3218
Fields, S (2022) Strategies for competitive advantage in small construction businesses. PhD thesis, Walden University, USA.
Fiener, Y (2011) An intelligent system for vulnerability and remediation assessment of flooded residential buildings. PhD thesis, Loughborough University, UK.
Fini, A A F and Forsythe, P (2020) Barriers to reusing and recycling office fit-out: An exploratory analysis of demolition processes and product features. Construction Economics and Building, 20(4), pp. 42-62. ISSN 2204-9029
Finnie, D; Ali, N A and Park, K (2018) Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 176-185. ISSN 17514304
Fisher, D J; Schluter, L and Toleti, P K (2005) Project management education and training process for career development. Journal of Construction Engineering and Management, 131(8), pp. 903-910. ISSN 0733-9364
Fitzpatrick, C (1992) Constructing lines-of-conduct: Theoretical explanations with empirical evidence. PhD thesis, Colorado State University, USA.
Flanagan, R (1980) Tender price and time prediction for construction work. PhD thesis, Aston University, UK.
Flanagan, R; Kendell, A; Norman, G and Robinson, G D (1987) Life cycle costing and risk management. Construction Management and Economics, 5(4), ISSN 01446193
Flory, J P (2025) The value of using prequalification scores for assessing contractor safety climate at chemical manufacturing sites. PhD thesis, Indiana University of Pennsylvania, USA.
Foju, B A (1993) The role of facilities management (maintenance) on office worker performance in Yaounde, Cameroon. ArchDr thesis, University of Michigan, USA.
Foliente, G and Seo, S (2012) Modelling building stock energy use and carbon emission scenarios. Smart and Sustainable Built Environment, 1(2), pp. 118-138. ISSN 2046-6099
Fong, P S W (2000) Facilitated team learning in value management teams. Journal of Construction Research, 1(2), pp. 99-107. ISSN 1609-9451
Fong, P S W and Choi, S K Y (2000) Final contractor selection using the analytical hierarchy process. Construction Management and Economics, 18(5), pp. 547-557. ISSN 01446193
Forcael, E (2010) Buffering strategies for managing transportation construction projects. PhD thesis, University of Florida, USA.
Forghani, R; Sher, W and Kanjanabootra, S (2023) Critical technical design principles for maximizing the reuse of building components. International Journal of Construction Management, 23(7), pp. 1187-1195. ISSN 1562-3599
Forman, M (2013) Inertia and change: Lean construction and health and safety work on construction sites. Construction Management and Economics, 31(6), pp. 647-660. ISSN 1466433X
Formoso, C T and Jobim, M S S (2006) Challenges in improving customer focus in small-sized house-building companies in Brazil. Journal of Construction in Developing Countries, 11(2), pp. 77-101. ISSN 1823-6499
Fortea, S M E (1989) An investigation of appropriateness relative to indigenous and modern housing in Libya. PhD thesis, Heriot-Watt University, UK.
Fosas, D; Moran, F; Natarajan, S; Orr, J and Coley, D (2020) The importance of thermal modelling and prototyping in shelter design. Building Research & Information, 48(4), pp. 379-400. ISSN 0961-3218
Foster, J A and Poston, A (2024) Occupant experience of domestic kitchen environments in low-energy social and affordable housing in Scotland. Building Research & Information, 52(7), pp. 799-816. ISSN 0961-3218
Francart, N; Höjer, M; Mjörnell, K; Orahim, A S; von Platten, J and Malmqvist, T (2020) Sharing indoor space: Stakeholders' perspectives and energy metrics. Buildings & Cities, 1(1), pp. 70-85. ISSN 2632-6655
Francis, A; Bibai, J and Miresco, E (2013) Simulation of scheduling logic using dynamic functions. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(3), pp. 145-158. ISSN 17514312
Francis, A and Skitmore, M (2005) Risk management within the electrical distribution supply industry in South East Queensland. Journal of Financial Management of Property and Construction, 10(1), pp. 45-54. ISSN 1366-4387
Franz, B W and Leicht, R M (2016) An alternative classification of project delivery methods used in the United States building construction industry. Construction Management and Economics, 34(3), pp. 160-173. ISSN 01446193
França, A J G L and Ornstein, S W (2022) The role of the built environment in updating design requirements in the post-pandemic scenario: A case study of selected diagnostic facilities in Brazil. Architectural Engineering and Design Management, 18(5), pp. 671-689. ISSN 1745-2007
Fraser, C (1999) A non-results-based effectiveness index for construction site managers. Construction Management and Economics, 17(6), pp. 789-798. ISSN 01446193
French, T R (2012) Evolutionary optimisation of network flow plans for emergency movement in the built environment. PhD thesis, University of Edinburgh, UK.
Frimpong, S; Sunindijo, R Y; Wang, C C and Boadu, E F (2023) The role of education and training to achieve positive mental health among young construction workers from the Global South. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Frimpong, Y and Oluwoye, J (2003) Significant factors causing delay and cost overruns in construction of groundwater projects in Ghana. Journal of Construction Research, 4(2), pp. 175-187. ISSN 1609-9451
Fugar, F D K and Agyakwah-Baah, A B (2010) Delays in building construction projects in Ghana. Construction Economics and Building, 10(1-2), pp. 103-116. ISSN 2204-9029
Fung, C K A (1996) Development of a TQM model for improving business performance based on surveys conducted in Hong Kong, Japan and the UK. PhD thesis, De Montfort University, UK.
Furber, A; Duncan, S; Smith, S D and Crapper, M (2012) The health and safety implications of socio-cultural context for community construction projects in developing countries. Construction Management and Economics, 30(10), pp. 857-867. ISSN 1466433X
Futcher, K and Thorpe, A (2001) Monte Carlo simulation and Pareto techniques for calculation of multi-project outturn-variance. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Galasiu, A D and Reinhart, C F (2008) Current daylighting design practice: A survey. Building Research & Information, 36(2), pp. 159-174. ISSN 0961-3218
Galbraith, G H; McLean, R C; Gillespie, I; Guo, J and Kelly, D (1998) Nonisothermal moisture diffusion in porous building materials. Building Research & Information, 26(6), pp. 330-339. ISSN 0961-3218
Galha, H M (1998) Quality in building design: A case study. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Galloway, P D (2006) Comparative study of university courses on critical-path method scheduling. Journal of Construction Engineering and Management, 132(7), pp. 712-722. ISSN 0733-9364
Galvin, R (2015) Integrating the rebound effect: Accurate predictors for upgrading domestic heating. Building Research & Information, 43(6), pp. 710-722. ISSN 0961-3218
Gamage, I S W; Osmani, M and Glass, J (2009) An investigation into the impact of procurement systems on waste generation: The contractors' perspective. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Gambatese, J A; Michael Toole, T and Abowitz, D A (2017) Owner perceptions of barriers to prevention through design diffusion. Journal of Construction Engineering and Management, 143(7): 04017016, ISSN 0733-9364
Gambatese, J A; Pestana, C and Lee, H W (2017) Alignment between lean principles and practices and worker safety behavior. Journal of Construction Engineering and Management, 143(1): 04016083, ISSN 0733-9364
Gambo, N; Inuwa, I I; Usman, N; Said, I and Shuaibu, U S (2021) Factors affecting budget implementation for successful delivery of primary health care building facilities within Nigerian health sector. International Journal of Construction Management, 21(5), pp. 476-489. ISSN 1562-3599
Gambo, N and Musonda, I (2021) Effect of the fourth industrial revolution on road transport asset management practice in Nigeria. Journal of Construction in Developing Countries, 26(1), pp. 19-43. ISSN 1823-6499
Gameson, R (1992) An investigation into the interaction between potential building clients and construction professionals. PhD thesis, University of Reading, UK.
Gameson, R and Sher, W (2009) An investigation into perceptions of client- professional interactions at project inception: An australian clients perspective: Pilot study results. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Gan, V J L (2022) BIM-based building geometric modeling and automatic generative design for sustainable offsite construction. Journal of Construction Engineering and Management, 148(10): 04022111, ISSN 0733-9364
Ganah, A A M; Anumba, C J and Bouchlaghem, N M (2000) The use of visualization to communicate design information to construction sites. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Ganguly, I (2008) Modeling alternatives and visualization of product adoption and usage in the residential construction industry. PhD thesis, University of Washington, USA.
Gannon, M J and Smith, N J (2011) An effective outline business case to facilitate successful decision-making. Construction Management and Economics, 29(2), pp. 185-197. ISSN 1466433X
Gao, H; Zhong, B; Luo, H and Chen, W (2022) Computational geometric approach for BIM semantic enrichment to support automated underground garage compliance checking. Journal of Construction Engineering and Management, 148(1): 05021013, ISSN 0733-9364
Gao, T (2014) Dynamic approach to stakeholder theory for temporary organizations. PhD thesis, Stevens Institute of Technology, USA.
Gao, X and Pishdad-Bozorgi, P (2020) A framework of developing machine learning models for facility life-cycle cost analysis. Building Research & Information, 48(5), pp. 501-525. ISSN 0961-3218
Garba, A; Kishk, M and Moore, D R (2016) A comparative study of biomass energy technologies for sustainable electricity in Nigerian rural areas. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Garcera, F C (2008) The rationale behind a small school district's decision to hire a facilities manager. EdD thesis, University of Pacific, USA.
Garmston H, F M and Pan W, d W P (2013) Multi-storey building retrofit with a focus on the façade selection process: A UK commercial office case study. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Garnett, N A (2001) Changing construction performance using lean construction: An action research approach. PhD thesis, University of Reading, UK.
Gasseloğlu, M A and Gonçalves, J E (2026) Reframing disaster recovery through spatial justice: An integrated framework. Buildings & Cities, 7(1), pp. 196-214. ISSN 2632-6655
Gasu, M B (2020) Residents' satisfaction with the use of green infrastructure in Osogbo, Osun State, Nigeria. African Journal of Built Environment Research, 4(1), pp. 1-19. ISSN 2414-0236
Gbadebo, A (2020) Understanding continuous professional development: An holistic examination of engineering students engagement with, and motivation towards, continuous professional development. PhD thesis, University of York, UK.
Gbadegesin, J T; Ojekalu, S O; Gbadegesin, F T; Kelani, O O and Omoniyi S (2023) Consumer's welfare in the retail environment: Implication for retail property development planning and policy. International Journal of Construction Management, 23(9), pp. 1518-1526. ISSN 1562-3599
Geekiyanage, D; Ramachandra, T and Rotimi, J O B (2017) A morphology-based model for forecasting cooling energy demand of condominium buildings in Sri Lanka. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
George, M and Sekpe, V (2010) Inspection of insulated concrete form walls using ground penetrating radar. International Journal of Construction Education and Research, 6(4), pp. 303-317. ISSN 1557-8771
George, R (2007) Information flow to support front end planning. PhD thesis, Clemson University, USA.
Georgy, M E (2000) Utility-based neurofuzzy approach for engineering performance assessment in industrial construction projects. PhD thesis, Purdue University, USA.
Georgy, M E; Chang, L M and Zhang, L (2005) Prediction of engineering performance: A neurofuzzy approach. Journal of Construction Engineering and Management, 131(5), pp. 548-557. ISSN 0733-9364
Gerding, D; Wamelink, H and Leclercq, E (2020) Implementation of circularity in the building process: A case study research into organizing the actor network and decision-making process. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Gerding, D P; Wamelink, H and Leclercq, E M (2021) Implementing circularity in the construction process: A case study examining the reorganization of multi-actor environment and the decision-making process. Construction Management and Economics, 39(7), pp. 617-635. ISSN 01446193
Gerges, M (2020) Building information modelling for fire evacuation in high-rise residential buildings. PhD thesis, Loughborough University, UK.
Ghaffari, M (2017) The impact of multitasking on critical chain portfolios. PhD thesis, University of Manchester, UK.
Ghafoori, M and Abdallah, M (2022) Simulation-based optimization model to minimize equivalent annual cost of existing buildings. Journal of Construction Engineering and Management, 148(2): 04021202, ISSN 0733-9364
Ghalenoei, N; Babaeian Jelodar, M; Paes, D; Sutrisna, M and Rahmani, D (2025) Offsite construction and BIM integration framework across project life cycle. Journal of Construction Engineering and Management, 151(7): 05025002, ISSN 0733-9364
Gharaie, Ehsan (2011) House completion time in Australia: Workflow planning approach. PhD thesis, RMIT University, Australia.
Gholami, E (2017) Exploiting BIM in energy efficient domestic retrofit: evaluation of benefits and barriers. PhD thesis, University of Liverpool, UK.
Ghomi, S G; Wedawatta, G; Ginige, K and Ingirige, B (2021) Living-transforming disaster relief shelter: A conceptual approach for sustainable post-disaster housing. Built Environment Project and Asset Management, 11(4), pp. 687-704. ISSN 2044-124X
Ghosh, B. and Karmakar, S. (2026) Development and application of a digitalised construction safety document management system for advanced constructions using building information modeling. International Journal of Construction Management, 26(8), pp. 1490-1507. ISSN 1562-3599
Ghosh, A (2015) Analyzing the impact of building information modeling (BIM) on labor productivity in retrofit construction: Case study at a semiconductor manufacturing facility. PhD thesis, Arizona State University, USA.
Ghumra, S; Glass, J; Frost, M W; Watkins, M and Mundy, J (2011) Validating a set of empirically weighted sustainability indicators for construction products. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Gidado, K (1993) Numerical index of complexity in building construction with particular consideration to its effect on production time. PhD thesis, University of Brighton, UK.
Gidado, K and Smilas, M (2004) Development of a model for implementation of PFI/PPP in Cyprus. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Giddings, B and Rogerson, R (2021) Compacting the city centre: Densification in two newcastles. Buildings & Cities, 2(1), pp. 185-202. ISSN 2632-6655
Gillen, M E (1996) Nonfatal falls in construction workers: Predictors of injury severity. PhD thesis, University of California, San Francisco, USA.
Gillette, J R (1986) The law and economics of the feasibility criterion as used in section 6(b)(5) of the occupational safety and health act and in the occupational noise standard (OSHA, occupational standards). PhD thesis, Texas A&M University, USA.
Gillich, A; Sunikka-Blank, M and Ford, A (2017) Lessons for the UK green deal from the US BBNP. Building Research & Information, 45(4), pp. 384-395. ISSN 0961-3218
Gillott, M; Holland, R; Riffat, S and Fitchett, J A (2006) Post-occupancy evaluation of space use in a dwelling using RFID tracking. Architectural Engineering and Design Management, 2(4), pp. 273-288. ISSN 1745-2007
Gilmour, D; Blackwood, D; Falconer, R; Isaacs, J and Simpson, E (2015) The role of sustainability assessment in sustainability management for urban redevelopment. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Gilmour, D; Simpson, E; Blackwood, D; McCallum, C and Logan, G (2016) Vocational training and knowledge development: A deeper understanding. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Gingue, N B (2022) The effects of the implementation of the use of data analytics on performance in the field of facilities management: A systematic review. DBA thesis, University of Maryland University College, USA.
Glagola, C R (1993) A model of current quality performance measurements for industrial construction. PhD thesis, Clemson University, USA.
Glavan, J R and Tucker, R L (1991) Forecasting design-related problems-case study. Journal of Construction Engineering and Management, 117(1), pp. 47-65. ISSN 0733-9364
Glendinning, M (1991) 'Give the people homes!': Britain's multi-storey housing drive. PhD thesis, University of Edinburgh, UK.
Gluch P, G M and Thuvander L, B H (2013) Corporate environmental strategies and performance: A longitudinal study. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Goedert, J D and Rokooei, S (2016) Project-based construction education with simulations in a gaming environment. International Journal of Construction Education and Research, 12(3), pp. 208-223. ISSN 1557-8771
Goh, Kai Chen (2011) Developing financial decision support for highway infrastructure sustainability. PhD thesis, Queensland University of Technology, Australia.
Golabchi, A; Han, S; Seo, J; Han, S; Lee, S and Al-Hussein, M (2015) An automated biomechanical simulation approach to ergonomic job analysis for workplace design. Journal of Construction Engineering and Management, 141(8): 04015020, ISSN 0733-9364
Goldenberg, M and Shapira, A (2007) Systematic evaluation of construction equipment alternatives: Case study. Journal of Construction Engineering and Management, 133(1), pp. 72-85. ISSN 0733-9364
Goldsmith, W and Flanagan, T (2017) Value methodology: case studies within climate resilience and sustainability policy application. Architectural Engineering and Design Management, 13(1), pp. 3-21. ISSN 1745-2007
Goldwyn, B (2022) Drawing from local, multi-hazard safety perceptions and engineering assessments for safer housing. PhD thesis, University of Colorado at Boulder, USA.
Golizadeh, H; Banihashemi, S; Sadeghifam, A N and Preece, C (2017) Automated estimation of completion time for dam projects. International Journal of Construction Management, 17(3), pp. 197-209. ISSN 1562-3599
Golparvar-Fard, M; Peña-Mora, F and Savarese, S (2011) Integrated sequential as-built and as-planned representation with D 4AR tools in support of decision-making tasks in the AEC/FM industry. Journal of Construction Engineering and Management, 137(12), pp. 1099-1116. ISSN 0733-9364
Gomez, C and Gambo, M (2016) Evaluation of special purpose vehicle organisation skill sets taxonomy for effective public-private partnership infrastructure project delivery. Journal of Construction in Developing Countries, 21(1), pp. 147-165. ISSN 1823-6499
Goncalves, Gustavo Henrique Vital (2022) Scenarios and support system for consortium management of construction waste applied to water resources management unit 12. PhD thesis, Universidade Federal de São Carlos, Brazil.
Gong, Z; Ejohwomu, O; Aminian, E and Abadi, M (2024) Risk analysis of building energy performance gap: Considering project complexity. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Goodarzi, M (2021) A post-construction evaluation of long-term success in LEED-certified residential communities. PhD thesis, Michigan State University, USA.
Goodrum, P M and Dai, J (2005) Differences in occupational injuries, illnesses, and fatalities among Hispanic and non-Hispanic construction workers. Journal of Construction Engineering and Management, 131(9), pp. 1021-1028. ISSN 0733-9364
Goodrum, P M; Miller, J; Sweany, J and Alruwaythi, O (2016) Influence of the format of engineering information and spatial cognition on craft-worker performance. Journal of Construction Engineering and Management, 142(9): 04016043, ISSN 0733-9364
Gordo-Gregorio, P; Alavi, H; Edwards, D J; Forcada, N and Guéna, F (2026) An occupant-centric approach on digital twins for building management. Building Research & Information, 54(1), pp. 59-78. ISSN 0961-3218
Gordon, C (2006) A formalism and a framework for planning of sensor-based construction inspections. PhD thesis, Carnegie Mellon University, USA.
Gormley, M and Kelly, D A (2019) Pressure transient suppression in drainage systems of tall buildings. Building Research & Information, 47(4), pp. 421-436. ISSN 0961-3218
Gorse, C A; Bates, M and Hudson-Tyreman, A (2006) Practicalities of delay analysis: Retrospective analysis. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Gorse, C A; Ellis, R and Hudson-Tyreman, A (2005) Prospective delay analysis and adjudication. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Gorse, C A; Emmitt, S and Lowis, M (1999) Problem solving and appropriate communication medium. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Gosling, J; Naim, M and Towill, D (2013) Identifying and categorizing the sources of uncertainty in construction supply chains. Journal of Construction Engineering and Management, 139(1), pp. 102-110. ISSN 0733-9364
Gouda Mohamed, A; Helmy Ammar, M and Nabawy, M (2023) Risks assessment using structural equation modeling: Mega housing projects construction in Egypt. International Journal of Construction Management, 23(16), pp. 2717-2728. ISSN 1562-3599
Govender, N; Laryea, S and Watermeyer, R (2025) Blueprint to success: Project managers' perspectives on key factors influencing construction document quality in South Africa. Journal of Construction Engineering and Management, 151(11): 05025015, ISSN 0733-9364
Gowthami, N R; Sridhar, C N V and Venkata Ramana, N (2022) An empirical implementation model of total quality management in construction: Southern India. International Journal of Construction Management, 22(15), pp. 3023-3033. ISSN 1562-3599
Graebert, R F (2015) The implementation of building energy management in commercial real estate and impacts on building energy performance. PhD thesis, Stanford University, USA.
Graham, B; Gahan, D and Thomas, K (2007) The application of knowledge management practices in the procurement and construction of cleanroom projects. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Graham, B; Gahan, D and Thomas, K (2008) An action research approach to sharing specialist construction knowledge. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Graham, B and Thomas, K (2008) Learning from experience: Aligning continuing professional development with knowledge management. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Graham, G (2016) Factors influencing and risk associated with the use of drones by specialty construction companies in the United States of America. PhD thesis, Indiana State University, USA.
Gransberg, Nils (2021) A critical analysis of construction manager-at-risk project delivery in public university capital projects. PhD thesis, University of Oklahoma, USA.
Grasso, B; Rasdorf, W and Bridgers, M (2008) Nature and extent of domestic construction program outsourcing. Journal of Construction Engineering and Management, 134(12), pp. 1002-1010. ISSN 0733-9364
Green, E; Lannon, S; Patterson, J; Variale, F and Iorwerth, H (2020) Decarbonising the welsh housing stock: From practice to policy. Buildings & Cities, 1(1), pp. 277-292. ISSN 2632-6655
Greene, A (2002) Group and individual decision-making in project risk management. PhD thesis, Loughborough University, UK.
Greenwood, D; Hogg, K and Kan, S (2005) Subcontractors' liability for project delay. Journal of Financial Management of Property and Construction, 10(2), pp. 107-114. ISSN 1366-4387
Greenwood, D J; Osborne, A N and Aggiag, M A (2001) A comparative analysis of administrative delays in hospital buildings. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Greer, Fiona Muriel (2021) Life-cycle environmental and economic management of airport infrastructure and operations. PhD thesis, University of California, USA.
Gregory, R A (1992) Development of a knowledge-based system approach for decision-making in construction projects. PhD thesis, University of Florida, USA.
Gremyr, I; Bäckstrand, J; Fredriksson, A; Gatenholm, G and Halldórsson, Á (2023) Blueprinting construction logistics services for quality improvement. Construction Management and Economics, 41(1), pp. 60-78. ISSN 01446193
Griffith, A (1996) Review of environmental assessment in UK building construction: Current awareness, concerns and issues. Engineering, Construction and Architectural Management, 3(3), pp. 205-217. ISSN 0969-9988
Grilo, L; Melhado, S; Silva, S A R; Edwards, P and Hardcastle, C (2007) International building design management and project performance: Case study in São Paulo, Brazil. Architectural Engineering and Design Management, 3(1), pp. 5-16. ISSN 1745-2007
Grimm, C T (1984) Facade topography in masonry failure investigation. Journal of Construction Engineering and Management, 110(2), pp. 145-151. ISSN 0733-9364
Grosse, H (2021) Developing teamwork skills: AEC students writing reflective journals and using action research. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Gruneberg, S and Hughes, W P (2004) Construction consortia: Do they serve any real purpose? In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Gu, T; Hao, E; Dirks, K; Kieu, M and Zhang, R (2026) Enhancing residents' satisfaction in old community renewal: Application and validation of an extended expectation-disconfirmation theory model. Journal of Construction Engineering and Management, 152(4): 04026023, ISSN 0733-9364
Guerra-Santin, O and Itard, L (2010) Occupants' behaviour: Determinants and effects on residential heating consumption. Building Research & Information, 38(3), pp. 318-338. ISSN 0961-3218
Guevara, M; Guevara, J; Vargas, H and Ozuna, A (2011) Promoting good design management practices in colombian construction projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Guha, P; Kar, S and Jha, K N (2025) Exploring leadership styles and their effect on the safety and quality performances in construction projects. Journal of Construction Engineering and Management, 151(9): 04025120, ISSN 0733-9364
Guha, P; Kar, S and Jha, K N (2025) Impact of construction leaders' emotional quotient on project safety and quality. Journal of Construction Engineering and Management, 151(10): 04025157, ISSN 0733-9364
Gunasekara, H G and Sridarran, P (2021) Barriers in blockchain technology adoption for facilities management procurement process in Sri Lanka. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Gunathilaka, S (2025) Enabling team resilience against calamities through sensemaking in global construction engineering projects. Construction Economics and Building, 25(3-4), pp. 163-185. ISSN 2204-9029
Gunathilaka, S; Lall, J and Sagoo, A (2026) Formation of collective sensemaking against calamities in global construction engineering projects. Construction Economics and Building, 26(1), pp. 1-22. ISSN 2204-9029
Gunduz, M and Elsherbeny, H A (2020) Operational framework for managing construction-contract administration practitioners' perspective through modified Delphi method. Journal of Construction Engineering and Management, 146(3): 04019110, ISSN 0733-9364
Gunduz, M; Sirin, O and Al Nawaiseh, H M (2024) Assessment of critical project success factors for management of pavement construction using the Delphi approach. Journal of Construction Engineering and Management, 150(4): 04024020, ISSN 0733-9364
Gunhan, S and Arditi, D (2005) Factors affecting international construction. Journal of Construction Engineering and Management, 131(3), pp. 273-282. ISSN 0733-9364
Gunning, J G and Moss, J (2002) Public private partnership procurement of educational facilities in the UK. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Guo, B H W; Gonzalez, V A; Puolitaival, T; Enegbuma, W and Zou, Y (2023) Bridging the gap between building information modelling education and practice: A competency-based education perspective. International Journal of Construction Management, 23(15), pp. 2558-2569. ISSN 1562-3599
Guo, S (2012) Pedagogical design in built environment distance education: A critical appraisal of students' learning strategies at postgraduate level. PhD thesis, Northumbria University, UK.
Gupta, R; Gregg, M; Manu, S; Vaidya, P and Dixit, M (2019) Customized performance evaluation approach for Indian green buildings. Building Research & Information, 47(1), pp. 56-74. ISSN 0961-3218
Gurdo, H (2016) Non-traditional construction management technology students: Overcoming barriers to degree completion. EdD thesis, Wilmington University (Delaware), USA.
Gurmu, A T (2019) Tools for measuring construction materials management practices and predicting labor productivity in multistory building projects. Journal of Construction Engineering and Management, 145(2): 4018139, ISSN 0733-9364
Gurmu, A T (2020) Construction materials management practices enhancing labour productivity in multi-storey building projects. International Journal of Construction Management, 20(1), pp. 77-86. ISSN 1562-3599
Gurmu, A T and Aibinu, A A (2017) Construction equipment management practices for improving labor productivity in multistory building construction projects. Journal of Construction Engineering and Management, 143(10): 04017081, ISSN 0733-9364
Gurmu, A T; Aibinu, A A and Chan, T K (2016) A study of best management practices for enhancing productivity in building projects: Construction methods perspectives. Construction Economics and Building, 16(3), pp. 1-19. ISSN 2204-9029
Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.
Guven, G and Ergen, E (2021) Tracking major resources for automated progress monitoring of construction activities: Masonry work case. Construction Innovation, 21(4), pp. 648-667. ISSN 1471-4175
Gyadu-Asiedu, W; Danso, H and Asubonteng, J A (2013) Assessment of the performance of local and foreign road construction firms in Ghana. International Journal of Construction Management, 13(4), pp. 53-73. ISSN 1562-3599
Gómez-Sirvent, J L; Fernández-Sotos, D; Fernández-Sotos, A; Sánchez-Reolid, R; López de la Rosa, F and Fernández-Caballero, A (2024) Exploring the impact of windows on musicians' experience: A neuroarchitecture perspective. Building Research & Information, 52(7), pp. 765-780. ISSN 0961-3218
Gül, L F (2009) Evaluating design behaviour when using emerging collaboration technologies. Architectural Engineering and Design Management, 5(3), pp. 107-123. ISSN 1745-2007
Gündoğan, H (2021) An exploratory study on features of intelligent office buildings and development of an assessment tool. PhD thesis, Middle East Technical University, Turkey.
Habibnezhad, M (2019) The impact of extreme virtual elevation above grade on construction workers' physiological responses, physical responses, and task performance. PhD thesis, University of Nebraska - Lincoln, USA.
Hacker, M E; Kaminsky, J and Faust, K M (2019) Legitimizing involvement in emergency accommodations: Water and wastewater utility perspectives. Journal of Construction Engineering and Management, 145(4): 04019013, ISSN 0733-9364
Hackett, J A (2011) The role of cost estimators in UK construction: a case for, and steps towards, an estimating profession. PhD thesis, University of Birmingham, UK.
Haddad, S; Osmond, P and King, S (2017) Revisiting thermal comfort models in Iranian classrooms during the warm season. Building Research & Information, 45(4), pp. 457-473. ISSN 0961-3218
Hadizade, S. (2026) Components of children's hospital architecture from the perspective of staff: A mixed-method case study from Iran. Architectural Engineering and Design Management, 22(2), pp. 295-307. ISSN 1745-2007
Hadjri, K (1992) The viability of 'no-fines' for the production of appropriate housing in Algeria. PhD thesis, CNAA, Oxford Polytechnic, UK.
Haj Seiyed Taghia, S A; Darvishvand, H R and Ebrahimi, M (2020) Economic analyses for low-strength concrete wrapped with CFRP to improve the mechanical properties and seismic parameters. Journal of Construction Engineering and Management, 146(3): 04019117, ISSN 0733-9364
Hajibabai, L (2014) Scheduling and routing of service trucks and planning of resource replenishment locations for winter roadway maintenance. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Hajikarimi, M H; Hajikarimi, A A and Ghalambor, M A (2009) Utilisation of knowledge management in decreasing waste of steel structure construction via increasing effectiveness of welding process. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Hajji, A M and Lewis, P (2013) Development of productivity-based estimating tool for energy and air emissions from earthwork construction activities. Smart and Sustainable Built Environment, 2(1), pp. 84-100. ISSN 2046-6099
Hakim, H (2011) Effective contract structures and value for money in PFI social housing projects. PhD thesis, University of Leeds, UK.
Hakkarainen, T E (2002) Studies on fire safety assessment of construction products. DSc(Tech) thesis, Tampereen Teknillinen Korkeakoulu, Finland.
Haksever, A M (1998) Information overload in construction project management. PhD thesis, University of Reading, UK.
Halder, S; Afsari, K and Akanmu, A (2026) Factors affecting the adoption of a robotic cyber-physical system in construction progress monitoring. Journal of Construction Engineering and Management, 152(3): 04026005, ISSN 0733-9364
Haliburton, J T (2016) Building information modeling and small architectural practice: An analysis of factors affecting BIM adoption. PhD thesis, Texas A&M University, USA.
Hall, M A (1999) International construction management: the cultural dimension. PhD thesis, Liverpool John Moores University, UK.
Hallowell, M R (2011) Risk-based framework for safety investment in construction organizations. Journal of Construction Engineering and Management, 137(8), pp. 592-599. ISSN 0733-9364
Hallowell, M R; Alexander, D and Gambatese, J A (2017) Energy-based safety risk assessment: Does magnitude and intensity of energy predict injury severity? Construction Management and Economics, 35(1-2), pp. 64-77. ISSN 01446193
Hallowell, M R and Gambatese, J A (2009) Activity-based safety risk quantification for concrete formwork construction. Journal of Construction Engineering and Management, 135(10), pp. 990-998. ISSN 0733-9364
Hallowell, M R; Hinze, J W; Baud, K C and Wehle, A (2013) Proactive construction safety control: Measuring, monitoring, and responding to safety leading indicators. Journal of Construction Engineering and Management, 139(10): 04013010, ISSN 0733-9364
Ham, N; Moon, S; Kim, J H and Kim, J J (2018) Economic analysis of design errors in BIM-based high-rise construction projects: Case study of Haeundae L project. Journal of Construction Engineering and Management, 144(6): 05018006, ISSN 0733-9364
Hamani, K (2019) Developing a corporate sustainability performance evaluation model of the UAE construction contractors. PhD thesis, Heriot-Watt University, UK.
Hamed, O (2022) Developing a BIM-based tool to automate green buildings assessment: the case of Jordan Green Building Guide. PhD thesis, University of Sheffield, UK.
Hamida, M B (2025) Circular and adaptable building transformation: Reconceptualization, practice exploration, framework co‑development and implementation. PhD thesis, Delft University of Technology, Netherlands.
Hamidavi, T (2020) Automatic integrated structural design and optimisation in BIM. PhD thesis, University of Portsmouth, UK.
Hamidpour, E (2025) Title: Risk factors hindering the application of value engineering in Iranian construction projects. International Journal of Construction Management, 25(16), pp. 1998-2006. ISSN 1562-3599
Hamilton, I G; Summerfield, A J; Lowe, R; Ruyssevelt, P; Elwell, C A and Oreszczyn, T (2013) Energy epidemiology: A new approach to end-use energy demand research. Building Research & Information, 41(4), pp. 482-497. ISSN 0961-3218
Hammad, A W; Grzybowska, H; Sutrisna, M; Akbarnezhad, A and Haddad, A (2020) A novel mathematical optimisation model for the scheduling of activities in modular construction factories. Construction Management and Economics, 38(6), pp. 534-551. ISSN 01446193
Hampton, G; Baldwin, A N and Holt, G D (2012) Project delays and cost: Stakeholder perceptions of traditional v. PPP procurement. Journal of Financial Management of Property and Construction, 17(1), pp. 73-91. ISSN 1366-4387
Hamza, N and Greenwood, D (2007) The impact of procurement methods on delivering environmentally sensitive buildings. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Han, F (2021) Measurement of resilience performance for infrastructure construction project delivery. PhD thesis, University of New Mexico, USA.
Han, F and Bogus, S M (2021) Resilience criteria for project delivery processes: An exploratory analysis for highway project development. Journal of Construction Engineering and Management, 147(11): 04021140, ISSN 0733-9364
Han, K; Degol, J and Golparvar-Fard, M (2018) Geometry- and appearance-based reasoning of construction progress monitoring. Journal of Construction Engineering and Management, 144(2): 04017110, ISSN 0733-9364
Han, S H and Diekmann, J (2004) Judgment-based cross-impact method for predicting cost variance for highly uncertain projects. Journal of Construction Research, 5(2), pp. 171-192. ISSN 1609-9451
Han, S H and Diekmann, J E (2001) Making a risk-based bid decision for overseas construction projects. Construction Management and Economics, 19(8), pp. 765-776. ISSN 01446193
Han, S H; Diekmann, J E and Ock, J H (2005) Contractor's risk attitudes in the selection of international construction projects. Journal of Construction Engineering and Management, 131(3), pp. 283-292. ISSN 0733-9364
Han, S H; Kim, D Y and Kim, H (2007) Predicting profit performance for selecting candidate international construction projects. Journal of Construction Engineering and Management, 133(6), pp. 425-436. ISSN 0733-9364
Han, Y; Soomro, M A; Li, Y; Garvin, M J and Xue, R (2024) Exploring farmers' willingness to engage in participatory irrigation infrastructure programs: Evidence from a water-stressed region. Journal of Construction Engineering and Management, 150(6): 04024040, ISSN 0733-9364
Han, Y; Yin, Z; Zhang, J; Jin, R and Yang, T (2020) Eye-tracking experimental study investigating the influence factors of construction safety hazard recognition. Journal of Construction Engineering and Management, 146(8): 04020091, ISSN 0733-9364
Handa, V K and Abdalla, O (1989) Forecasting productivity by work sampling. Construction Management and Economics, 7(1), pp. 19-28. ISSN 01446193
Hanna, A S (2012) Using the earned value management system to improve electrical project control. Journal of Construction Engineering and Management, 138(3), pp. 449-457. ISSN 0733-9364
Hanna, A S; Chang, C K; Lackney, J A and Sullivan, K T (2007) Impact of overmanning on mechanical and sheet metal labor productivity. Journal of Construction Engineering and Management, 133(1), pp. 22-28. ISSN 0733-9364
Hanna, A S; Peterson, P and Lee, M J (2002) Benchmarking productivity indicators for electrical/mechanical projects. Journal of Construction Engineering and Management, 128(4), pp. 331-337. ISSN 0733-9364
Hansen, K L (1993) How strategies happen: An investigation of the decision to upgrade CAD/CIE in architectural, engineering, and construction firms. PhD thesis, Stanford University, USA.
Haponava, T and Al-Jibouri, S (2010) Influence of process performance during the construction stage on achieving end-project goals. Construction Management and Economics, 28(8), pp. 853-869. ISSN 1466433X
Haque, S M M (2004) Success factors in collaborative relationships (alliancing and partnering) in the UK upstream oil and gas industry, and perception of trust. PhD thesis, Robert Gordon University, UK.
Haran, M; McCord, M; Hutchison, N; McGreal, S; Adair, A; Berry, J and Kashyap, A (2013) Financial structure of PPPs deals post-GFC: An international perspective. Journal of Financial Management of Property and Construction, 18(2), pp. 184-203. ISSN 1366-4387
Hardie, M (2016) Vectors of technical innovation delivery by small and medium Australian construction firms. Construction Economics and Building, 16(3), pp. 59-70. ISSN 2204-9029
Hardie, M; Khan, S; O'Donnell, A and Miller, G (2007) The efficacy of waste management plans in Australian commercial construction refurbishment projects. Construction Economics and Building, 7(2), pp. 26-36. ISSN 2204-9029
Hare, B; Cameron, I; Real, K J and Maloney, W F (2013) Exploratory case study of pictorial aids for communicating health and safety for migrant construction workers. Journal of Construction Engineering and Management, 139(7), pp. 818-825. ISSN 0733-9364
Hare, W J (2006) Integration of health and safety planning in construction project management through the development of a best practice gateway model. PhD thesis, Glasgow Caledonian University, UK.
Hargreaves, T; Wilson, C and Hauxwell-Baldwin, R (2018) Learning to live in a smart home. Building Research & Information, 46(1), pp. 127-139. ISSN 0961-3218
Harkin, F and Gunning, J G (1999) Evaluating quality in construction. Journal of Financial Management of Property and Construction, 4(3), pp. 65-80. ISSN 1366-4387
Harode, A; Thabet, W and Leite, F (2024) Formulation of feature and label space using modified Delphi in support of developing a machine-learning algorithm to automate clash resolution. Journal of Construction Engineering and Management, 150(3): 04023173, ISSN 0733-9364
Harre-Young, S B L D A R J G J (2012) Incorporating security measures into the built environment. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Harris, F C (1979) A model for evaluating the effects of weather on construction projects. PhD thesis, Loughborough University, UK.
Harris, Michael Samuel (2019) Competitive precinct projects: An evaluation of competitively positioned mixed-use megaprojects. PhD thesis, University of Sydney, Australia.
Harris, P T and Holt, G D (1999) The management of sustainable social housing refurbishment strategies in the West Midlands region of the UK. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Harris, R; Romer, J; Kelly, O and Johnson, S (2003) Design and construction of the downland gridshell. Building Research & Information, 31(6), pp. 427-454. ISSN 0961-3218
Harrison, B W (1982) Socially responsive professional behavior of architectural firms: A social psychological perspective. PhD thesis, University of Michigan, USA.
Hartman, F and Snelgrove, P (1996) Risk allocation in lump-sum contracts: concept of latent dispute. Journal of Construction Engineering and Management, 122(3), pp. 291-296. ISSN 0733-9364
Hasan, M and Lu, M (2024) Mitigating project schedule risks by identifying subcritical paths and variance-critical activities. Journal of Construction Engineering and Management, 150(8): 04024096, ISSN 0733-9364
Hasan, M R; Sagar, M S I and Ray, B C (2023) Barriers to improving construction and demolition waste management in Bangladesh. International Journal of Construction Management, 23(14), pp. 2333-2347. ISSN 1562-3599
Hasanzade, M P; van Oel, C J and Pazhouhanfar, M (2023) Passengers' preferences for architectural design characteristics in the design of airport terminals. Architectural Engineering and Design Management, 19(6), pp. 586-601. ISSN 1745-2007
Hasanzadeh, S; Dao, B; Esmaeili, B and Dodd, M D (2019) Role of personality in construction safety: Investigating the relationships between personality, attentional failure, and hazard identification under fall-hazard conditions. Journal of Construction Engineering and Management, 145(9): 04019052, ISSN 0733-9364
Hashemi, R and Shahbandarzadeh, H (2024) A fuzzy goal programming model for time, cost, and quality trade-off problem in metro construction projects considering sustainable development. International Journal of Construction Management, 24(3), pp. 323-330. ISSN 1562-3599
Hassan, A; El-Rayes, K and Attalla, M (2023) Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost. International Journal of Construction Management, 23(9), pp. 1447-1456. ISSN 1562-3599
Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Hassan, M M and Gruber, S (2008) Simulation of concrete paving operations on Interstate-74. Journal of Construction Engineering and Management, 134(1), pp. 2-9. ISSN 0733-9364
Hassan, N M and Alashwal, A (2025) Developing a model for the implementation of designing out waste in construction. Architectural Engineering and Design Management, 21(1), pp. 154-170. ISSN 1745-2007
Hassan, T M and McCaffer, R (2003) Virtual Enterprises in Construction: ICT, Social and Legal Dimensions. Journal of Construction Procurement, 9(1), ISSN 1358-9180
Hassanain, M A; Alamoudi, A; Al-Hammad, A M and Abdallah, A (2020) Barriers to the implementation of poe practices in the Saudi Arabian building industry. Architectural Engineering and Design Management, 16(2), pp. 150-165. ISSN 1745-2007
Hassanain, M A; Mathar, H and Aker, A (2016) Post-occupancy evaluation of a university student cafeteria. Architectural Engineering and Design Management, 12(1), pp. 67-77. ISSN 1745-2007
Hassanein, A A G (1996) Factors affecting the bidding behaviour of contractors in Egypt. Building Research & Information, 24(4), pp. 228-236. ISSN 0961-3218
Hatmoko, J U D and Scott, S (2010) Simulating the impact of supply chain management practice on the performance of medium-sized building projects. Construction Management and Economics, 28(1), pp. 35-49. ISSN 1466433X
Hatush, Z and Skitmore, M (1997) Criteria for contractor selection. Construction Management and Economics, 15(1), pp. 19-38. ISSN 01446193
Hayette, F; Abadou, Y and Ghrieb, A (2021) Bio-waste influence on air lime mortar performance corrosion: optimization using the surface response method. Journal of Engineering, Design and Technology, 19(5), pp. 1124-1137. ISSN 1726-0531
He, S; Li, J; Li, M and Antwi-Afari, M F (2026) Modeling and analyzing workers' hazard perception in construction equipment operations: A hierarchical Bayesian cognitive modeling approach integrating multisource data. Journal of Construction Engineering and Management, 152(5): 04026054, ISSN 0733-9364
Heaton, J (2020) Development of asset information requirements to support asset management. PhD thesis, University of Cambridge, UK.
Hedborg, S (2022) ”It’s in the between”: Inter-project organising in project ecologies. PhD thesis, KTH Royal Institute of Technology, Sweden.
Hefferan, Michael (2006) An examination of the interface between commercial property assets and contemporary knowledge-intensive firms: Demands, responses and priorities. PhD thesis, Queensland University of Technology, Australia.
Heffernan, E E (2015) Delivering zero carbon homes and sustainable communities: The potential of group self-build housing in England. PhD thesis, University of Plymouth, UK.
Hegab, M and Smith, G R (2009) Labor performance analysis for microtunneling projects. Journal of Construction Engineering and Management, 135(5), pp. 432-435. ISSN 0733-9364
Hegazy, T and Kassab, M (2003) Resource optimization using combined simulation and genetic algorithms. Journal of Construction Engineering and Management, 129(6), pp. 698-705. ISSN 0733-9364
Heger, P; Bieber, C; Hendawy, M and Shooshtari, A (2025) Co-creating urban transformation: A stakeholder analysis for germany's heat transition. Buildings & Cities, 6(1), pp. 1046-1060. ISSN 2632-6655
Hemalattha, S and Vidjeapriya, R (2021) Developing an integrated framework for optimization of spatial requirements of construction equipment. Built Environment Project and Asset Management, 11(5), pp. 903-917. ISSN 2044-124X
Henao, Y; Grubert, E; Korey, M; Bank, L C and Gentry, R (2024) Life cycle assessment and life cycle cost analysis of repurposing decommissioned wind turbine blades as high-voltage transmission poles. Journal of Construction Engineering and Management, 150(5): 05024004, ISSN 0733-9364
Hendrickson, Thomas Peter (2013) Carbon and water resource management for water distribution systems. PhD thesis, University of California, USA.
Henjewele, C (2010) Modelling client's value for money uncertainties in PFI projects. PhD thesis, University of the West of England, Bristol, UK.
Henjewele, C; Sun, M and Fewings, P (2011) Value for money optimisation and sustainability in PFI projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Henjewele, C; Sun, M and Fewings, P (2012) Analysis of factors affecting value for money in UK PFI projects. Journal of Financial Management of Property and Construction, 17(1), pp. 9-28. ISSN 1366-4387
Heravi Torbati, Amir Hossein (2014) Improving construction management: An investigation into the influences of effective stakeholder involvement on project quality outcomes. PhD thesis, Queensland University of Technology, Australia.
Herazo, Benjamin (2017) The influence of sustainability in project management practices in the building sector. PhD thesis, Université de Montréal, Canada.
Heredia Rojas, Boris Fabrizio (2017) The contingent effects of value creation processes on project value: An empirical analysis from project managers' perspective. PhD thesis, University of Sydney, Australia.
Hernández, J M A (2024) Essays on public policy evaluation: The case of spain's supplier payment plan. PhD thesis, University of Exeter, UK.
Hewitt, E L; Andrews, C J; Senick, J A; Wener, R E; Krogmann, U and Sorensen Allacci, M (2016) Distinguishing between green building occupants' reasoned and unplanned behaviours. Building Research & Information, 44(2), pp. 119-134. ISSN 0961-3218
Heywood, C; Missingham, G and Kenley, R (2002) Strategic issues for facility provision: A re-examination of the nimby phenomenon. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Hezel, Claudia Regina (2014) Impact assessment of the requirements of the contractor in integrated management systems for industrial assembly companies in the oil industry. PhD thesis, Universidade Estadual de Campinas, Brazil.
Higgins, D M (2013) The black swan effect and the impact on Australian property forecasting. Journal of Financial Management of Property and Construction, 18(1), pp. 76-89. ISSN 1366-4387
Higham, A and Fortune, C (2011) Sustainable asset management (SAM) decision making: An exploration of current practice. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Hill, C (2009) Re-evaluating the placement experience of built environment undergraduates. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Hindle, B and Strasheim, B (2012) Developmental intervention impact on project environments. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(2), pp. 129-136. ISSN 17514304
Hindmarch, H (2012) Design change management: Developing a software application to support the evaluation of construction design changes. DEng thesis, University of Manchester, UK.
Hinze, J W (1976) The effect of middle management on safety in construction. PhD thesis, Stanford University, USA.
Hiyassat, M A; Hiyari, M A and Sweis, G J (2016) Factors affecting construction labour productivity: A case study of Jordan. International Journal of Construction Management, 16(2), pp. 138-149. ISSN 1562-3599
Ho, M F C and Ng, C W V (2003) Quantity surveyors' background and training, and their ethical concepts, conceptions and interests considerations. Construction Management and Economics, 21(1), pp. 43-67. ISSN 01446193
Hochstatter, Kirk (2025) Collaborative project delivery governance and shared leadership in AEC building virtual teams. PhD thesis, University of Washington, USA.
Hollick, F; Humphrey, D; Oreszczyn, T; Elwell, C and Huebner, G (2024) Building energy use in COVID-19 lockdowns: Did much change? Buildings & Cities, 5(1), pp. 182-198. ISSN 2632-6655
Hollis, M and Bright, K (1999) Surveying the survey. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Holtzhower, D L (2015) Decision model to optimize wastewater treatment in the built environment. PhD thesis, University of Florida, USA.
Hong, J (2006) A study on analytic approaches to intelligent buildings assessment. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Hong, T; Cho, K; Hyun, C and Han, S (2011) Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building. Journal of Construction Engineering and Management, 137(6), pp. 393-402. ISSN 0733-9364
Hong, X and Proverbs, D (2003) Contractor relationships: A comparison in Japan, the UK and the US. Journal of Construction Procurement, 9(2), pp. 52-64. ISSN 1358-9180
Hong, Y; Hammad, A; Zhong, X; Wang, B and Akbarnezhad, A (2020) Comparative modeling approach to capture the differences in BIM adoption decision-making process in Australia and China. Journal of Construction Engineering and Management, 146(2): 04019099, ISSN 0733-9364
Hong, Y; Tian, Z and Sun, X (2020) Dynamic evaluation for compaction quality of roller compacted concrete based on reliability metrics. Journal of Construction Engineering and Management, 146(10): 04020123, ISSN 0733-9364
Hongsheng, T; Changwen, H and Chenye, G (2021) Development of a rotatable similar simulation experimental system for steep coal seam mining. Journal of Engineering, Design and Technology, 19(6), pp. 1373-1386. ISSN 1726-0531
Honsa, J; Versele, A; van de Kerckhove, T and Piccardo, C (2025) Circularity at the neighbourhood scale: Co-creative living lab lessons. Buildings & Cities, 6(1), pp. 800-818. ISSN 2632-6655
Hopfe, C J (2009) Uncertainty and sensitivity analysis in building performance simulation for decision support and design optimization. PhD thesis, Eindhoven University of Technology, Netherlands.
Hopkin, T; Lu, S L; Rogers, P and Sexton, M (2015) Detecting defects in the UK new-build housing sector: A learning perspective. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Hopkin, T; Lu, S L; Rogers, P and Sexton, M G (2014) Placing defects at the heart of high quality new homes: The learning perspective. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Hornaday, W C; Haas, C T; O’Connor, J T and Wen, J (1993) Computer-aided planning for heavy lifts. Journal of Construction Engineering and Management, 119(3), pp. 498-515. ISSN 0733-9364
Horne, K A; Gibb, A G F; Pavitt, T C and Haslam, R A (2003) D4h: Influences on designing for health: Results from interviews and questionnaires. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Hoseini, E; Bosch-Rekveldt, M and Hertogh, M (2020) Cost contingency and cost evolvement of construction projects in the preconstruction phase. Journal of Construction Engineering and Management, 146(6): 05020006, ISSN 0733-9364
Hosseinian, S M; Younesi, S; Razini, S and Carmichael, D G (2022) Intelligent stochastic agent-based model for predicting truck production in construction sites by considering learning effect. Journal of Construction Engineering and Management, 148(5): 04022018, ISSN 0733-9364
Hou, K; Guan, X; Wang, H; Hu, S; Lu, M and Liu, N (2024) Influence of functional boundary for corridor spaces in elderly facilities in China. Building Research & Information, 52(6), pp. 658-679. ISSN 0961-3218
Hou, Shan (2014) An investigation into the development of low/zero carbon design training programmes for the purpose of disseminating the knowledge and skills of low/zero carbon design to architects in practice in England and Wales. PhD thesis, Cardiff University, UK.
Howard, M A (2022) Integration strategies for mergers and acquisitions in the United Kingdom housing sector. DBA thesis, Walden University, USA.
Howarth, T; Stoneman, G and Hill, C (2000) A review of the construction (design and management) regulations. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Hoxie, C; Berkebile, R and Todd, J A (2012) Stimulating regenerative development through community dialogue. Building Research & Information, 40(1), pp. 65-80. ISSN 0961-3218
Hsie, M (1994) Computer-aided acceptance planning: Generating quality acceptance parameters and stratified sampling plans through neural network learning ability and CAD modeling. PhD thesis, Purdue University, USA.
Hu, D; Mohamed, Y; Taghaddos, H and Hermann, U (2018) A simulation-based method for effective workface planning of industrial construction projects. Construction Management and Economics, 36(6), pp. 328-347. ISSN 01446193
Hu, M (2023) An evaluation of the retrofit net zero building performances: Life cycle energy, emissions and cost. Building Research & Information, 51(2), pp. 179-191. ISSN 0961-3218
Hu, Y; Liu, M; Le, Y and Skitmore, M (2022) External consultant involvement for organizational capability building in complex construction projects: A perspective from interorganizational learning process. Journal of Construction Engineering and Management, 148(1): 04021181, ISSN 0733-9364
Hua, X; Zhang, S; Shi, X and Zhang, Y (2025) Differences in risk analysis between workers and managers: Study from the perspective of neuroscience. Journal of Construction Engineering and Management, 151(7): 04025079, ISSN 0733-9364
Huang, C; Wang, Z K; Li, B; Wang, C; Xu, L S; Jiang, K; Liu, M; Guo, C X; Zhao, X F and Yang, H (2023) Discretized cell modeling for optimal layout of multiple tower cranes. Journal of Construction Engineering and Management, 149(8): 04023068, ISSN 0733-9364
Huang, H; Hu, H; Xu, F and Zhang, Z (2024) Kinesiology-inspired assessment of intrusion risk based on human motion features. Journal of Construction Engineering and Management, 150(7): 04024072, ISSN 0733-9364
Huang, J (2020) Infrastructure, the economy and policy. PhD thesis, University of Oxford, UK.
Huang, J; Abadi, M; Manu, P and Cheung, C (2022) The impact of sustainability rating systems on health and safety in building projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(2), pp. 49-64. ISSN 17514304
Huang, P-D (1988) Impact of CADD technology on the architectural community. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Huang, R Y (2006) A performance-based bridge LCCA model using visual inspection inventory data. Construction Management and Economics, 24(10), pp. 1069-1081. ISSN 1466433X
Huang, R Y and Halpin, D W (1995) Graphical-based method for transient evaluation of construction operations. Journal of Construction Engineering and Management, 121(2), pp. 222-229. ISSN 0733-9364
Huang, S (2016) Model based technologies for enhancing building operation. PhD thesis, University of Miami, USA.
Huangfu, D; Chang, Y F; Lim, S L and Li, L (2025) Gap analysis between industry expectations and competencies of fresh quantity surveying graduates in China. International Journal of Construction Management, 25(16), pp. 2121-2136. ISSN 1562-3599
Huber, A; Heinrichs, H and Jaeger-Erben, M (2024) Promoting neighbourhood sharing: Infrastructures of convenience and community. Buildings & Cities, 5(1), pp. 349-367. ISSN 2632-6655
Huberty, L L (2013) Using leadership in energy and environmental design (LEED) certification to solicit sponsorships: A strategic framework for public sport facility marketers. PhD thesis, University of Minnesota, USA.
Hughes, W P and Shinoda, H (1999) Achieving satisfactory contractual terms for the engineer's role. In: Hughes, W P (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Hulathdoowage, N D; Karunasena, G; Udawatta, N and Liu, C (2024) Essential parameters in stepwise retrofitting for long-term emission reduction in residential buildings. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Hulett, D A (2001) The disintegration and reintegration of building contractors' management systems. PhD thesis, University of Salford, UK.
Hung, Yu-Hsiu (2010) How technology diffuses through construction user culture: An innovation design to improve safety technology adoption. PhD thesis, Virginia Tech, USA.
Hunter, K and Kelly, J (2003) An investigation of commonality of issues at different project stages using a three-stage project model. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Huo, T; Ren, H; Cai, W; Shen, G Q; Liu, B; Zhu, M and Wu, H (2018) Measurement and dependence analysis of cost overruns in megatransport infrastructure projects: Case study in Hong Kong. Journal of Construction Engineering and Management, 144(3): 05018001, ISSN 0733-9364
Huo, X; Xu, X; Zhang, Y and Jiao, L (2024) Insight into the mechanism of noncompliance tasks in construction workers' unsafe behaviors. Journal of Construction Engineering and Management, 150(8): 04024101, ISSN 0733-9364
Hussain, R S; Ruikar, K; Enoch, M P; Brien, N and Gartside, D (2017) Process mapping for road works planning and coordination. Built Environment Project and Asset Management, 7(2), pp. 157-172. ISSN 2044-124X
Hussey, H; Thurairajah, N; Ginige, K and Goulding, J (2019) Establishing descriptions of building work in UK. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Hutcheson, John M (1979) Administration of building contracts with particular reference to the builder's financial control. PhD thesis, University of New South Wales, Australia.
Hutchings, D M (2002) An investigation of management practices used in small-volume home building companies of the United States. PhD thesis, Texas A&M University, USA.
Hutchings, D M and Eggett, D L (2006) Management practices as predictors of success for small-volume home builders in the United States. International Journal of Construction Education and Research, 2(3), pp. 217-230. ISSN 1557-8771
Huynh, N. M.; Bui, P. T.; Le-Hoai, L. and Tang, M. N. (2026) Prioritizing actions to mitigate causes of material waste in construction using quality function deployment. Construction Economics and Building, 26(2), ISSN 2204-9029
Huynh, N M; Le-Hoai, L; Chuong Nguyen, V H and Tran, C (2025) An assessment framework for underground construction methods in the pre-construction stage: a technical perspective. International Journal of Construction Management, 25(3), pp. 265-277. ISSN 1562-3599
Hwang, B-G; Zhao, X and Chin, E W Y (2017) International construction joint ventures between Singapore and developing countries: Risk assessment and allocation preferences. Engineering, Construction and Architectural Management, 24(2), pp. 209-228. ISSN 0969-9988
Hwang, S (2022) Framework for implementing integrated service-learning. International Journal of Construction Management, 22(7), pp. 1260-1273. ISSN 1562-3599
Hwang, S; Jebelli, H; Choi, B; Choi, M and Lee, S (2018) Measuring workers' emotional state during construction tasks using wearable EEG. Journal of Construction Engineering and Management, 144(7): 04018050, ISSN 0733-9364
Håkansson, H and Ingemansson, M (2013) Industrial renewal within the construction network. Construction Management and Economics, 31(1), pp. 40-61. ISSN 1466433X
Ibarra, G (2016) The meaning of 'social' in Mexican social housing: A study of housing developments in Mazatlán, Mexico. PhD thesis, University of Sheffield, UK.
Ibbs, W and Liu, M (2005) Improved measured mile analysis technique. Journal of Construction Engineering and Management, 131(12), pp. 1249-1256. ISSN 0733-9364
Ibem, E O; Aduwo, E B; Tunji-Olayeni, P; Ayo-Vaughan, E A and Uwakonye, U O (2016) Factors influencing e-procurement adoption in the Nigerian building industry. Construction Economics and Building, 16(4), pp. 54-67. ISSN 2204-9029
Ibem, E O; Onyemaechi, P C and Ayo-Vaughan, E A (2018) Project selection and transparency factors in housing public-private partnerships in Nigeria. Construction Economics and Building, 18(2), pp. 15-40. ISSN 2204-9029
Ibironke, O T; Oladinrin, T O; Adeniyi, O and Eboreime, I V (2013) Analysis of non-excusable delay factors influencing contractors' performance in Lagos State, Nigeria. Journal of Construction in Developing Countries, 18(1), pp. 53-72. ISSN 1823-6499
Ibiyemi, A; Adnan, Y M and Daud, M N (2014) An examination of the structure of sustainable facilities planning scale for user satisfaction in Nigerian universities. Construction Economics and Building, 14(3), pp. 58-73. ISSN 2204-9029
Ibrahim, A D; Price, A D F and Dainty, A R J (2006) The analysis and allocation of risks in public private partnerships in infrastructure projects in Nigeria. Journal of Financial Management of Property and Construction, 11(3), pp. 149-164. ISSN 1366-4387
Ibrahim, A D; Price, A D F and Dainty, A R J (2008) Is the local improvement finance trust (LIFT) procurement initiative delivering the expected economies of scale? Results from three case studies. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Ibrahim, K; Adebowale, O J; Dodo, M; Zailani, B M; Lukman, O and Kajimo-Shakantu, K (2024) Challenges and coping strategies of built environment students during students industrial work experience scheme (siwes): Perspective from Nigeria. International Journal of Construction Education and Research, 20(2), pp. 157-176. ISSN 15578771
Ibrahim, K; Oshodi, O S; Osuizugbo, I C; Owusu, E K; Ibrahim, A and Shakantu, K K (2024) The usage of social media for learning and teaching in the built environment: A perspective from students. International Journal of Construction Management, 24(8), pp. 902-910. ISSN 1562-3599
Ibrahim, K I; Costello, S B and Wilkinson, S (2015) Validation of a model for assessing alliance team integration. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Ibrahim, M N (2022) Risk management in construction of megahousing projects in Egypt. PhD thesis, London South Bank University, UK.
Idoro, G (2012) Comparing levels of use of project plans and performance of traditional contract and design-build construction projects in Nigeria. Journal of Engineering, Design and Technology, 10(1), pp. 7-33. ISSN 1726-0531
Idoro, G I (2011) Influence of in-sourcing and outsourcing of consultants on construction project performance in Nigeria. Construction Economics and Building, 11(4), pp. 45-58. ISSN 2204-9029
Idoro, G I (2012) Influence of project plans on the outcome of construction projects procured by design-build in Nigeria. Journal of Construction in Developing Countries, 17(2), pp. 81-103. ISSN 1823-6499
Idoro, G I (2012) Influence of the monitoring and control strategies of indigenous and expatriate Nigerian contractors on project outcome. Journal of Construction in Developing Countries, 17(1), pp. 51-69. ISSN 1823-6499
Idoro, G I (2012) The influence of project documents on the outcome of construction projects procured by traditional contracts in Nigeria. Journal of Construction in Developing Countries, 17(1), pp. 1-19. ISSN 1823-6499
Idoro, G I and Okun, B O (2009) Evaluating the contribution of project team members to time-overrun in Nigerian federal government projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Iftikhar, Rehab (2017) Crisis management in project based organizations and mega projects: An integrated approach. PhD thesis, Luiss Guido Carli, Italy.
Igwe, U S; Mohamed, S F; Azwarie, M B M D; Nwofia, C M and Ihekweme, N M (2025) Assessment of post contract cost control issues in Nigeria: Quantity surveyors' perspective. International Journal of Construction Management, 25(14), pp. 1725-1735. ISSN 1562-3599
Ihuah, P W (2015) Conceptual framework for the sustainable management of social (public) housing estates in the Niger Delta region of Nigeria. PhD thesis, University of Salford, UK.
Ijaola, I A (2017) Training practices and task performance of professionals in construction firms in Lagos and Abuja, Nigeria. PhD thesis, University of Lagos, Nigeria.
Ijaola, I A and Idoro, G I (2020) Modelling the relationship between task characteristics and training of site supervisors in Nigerian construction firms. African Journal of Built Environment Research, 4(1), pp. 59-80. ISSN 2414-0236
Ijaola, I A; Idoro, G I and Oladokun, M G (2023) Developing key indicators for site supervisors' task performance in construction firms. International Journal of Construction Management, 23(2), pp. 349-357. ISSN 1562-3599
Ijasan, K and Ahmed, V (2010) The participatory roles of black and minority ethnic (BME) in community regeneration. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Ikediashi, D and Aigbavboa, C (2019) Outsourcing as a strategy for facilities management provision in Nigerian universities. International Journal of Construction Management, 19(4), pp. 281-290. ISSN 1562-3599
Ikediashi, D I and Okolie, K C (2022) An assessment of risks associated with contractor's cash flow projections in South-South, Nigeria. International Journal of Construction Management, 22(11), pp. 2051-2058. ISSN 1562-3599
Ilter, D (2012) Identification of the relations between dispute factors and dispute categories in construction projects. International Journal of Law in the Built Environment, 4(1), pp. 45-59. ISSN 1756-1450
Indergård, K and Hansen, G K (2025) The impact of workplace design on academic staff: A systematic literature review. Building Research & Information, 53(4), pp. 479-491. ISSN 0961-3218
Ingraham, A T (2001) Bidder-auctioneer cheating in sealed-bid auctions. PhD thesis, University of Maryland, College Park, USA.
Invernizzi, D C; Locatelli, G and Brookes, N J (2020) Characterising nuclear decommissioning projects: An investigation of the project characteristics that affect the project performance. Construction Management and Economics, 38(10), pp. 947-963. ISSN 01446193
Inyang, E D (1983) Some aspects of risk analysis for decision making in engineering projects management. PhD thesis, University of Manchester, UK.
Inyang, N I (2013) A framework for ergonomic assessment of residential construction tasks. PhD thesis, University of Alberta, Canada.
Irizarry, J and Abraham, D M (2006) Assessment of risk perception of ironworkers. Journal of Construction Research, 7(1), pp. 111-132. ISSN 1609-9451
Iroham, C O; Misra, S; Emebo, O C and Okagbue, H I (2023) Predictive rental values model for low-income earners in slums: The case of Ijora, Nigeria. International Journal of Construction Management, 23(8), pp. 1426-1435. ISSN 1562-3599
Isa, C M M; Saman, H M; Preece, C N and Ibrahim, C K C (2016) Factors influencing Malaysian construction firm's entry mode decisions into international markets. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Isaacs, N and Hills, A (2014) Understanding the newzealand non-domestic building stock. Building Research & Information, 42(1), pp. 95-108. ISSN 0961-3218
Isaton, Camila (2023) A collaborative risk identification model with cost risk simulation: A case study of a port logistics storage yard. PhD thesis, Universidade Federal de Santa Catarina, Brazil.
Ishak, N and Abdul-Aziz, A R (2014) Malaysian construction professionals: Why are they leaving? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Ishtiaque, T A and Klakegg, O J (2025) Effects of early contractor involvement in small construction projects: Lessons from Norway. Built Environment Project and Asset Management, 15(4), pp. 879-893. ISSN 2044-124X
Islam, M Z (2018) Resourcing for post-disaster housing reconstruction: the case of Cyclones Sidr and Aila in Bangladesh. PhD thesis, London South Bank University, UK.
Ismaeel, W S E (2021) Material selection for sustainable buildings. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Ismail, M Z; Mohamad Ramly, Z; Darmansah, N F and Misnan, M S (2025) Rail construction cost risk management with bow-tie analysis: Contractor’s perspective. Built Environment Project and Asset Management, 15(4), pp. 753-771. ISSN 2044-124X
Ismail, N M M I (2015) Factors in building design that improve building maintainability in Malaysia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Issa, M H (2011) The Canadian green building initiative: Post occupancy evaluation of Canadian green schools. PhD thesis, University of New Brunswick, Canada.
Isuri Anuradha, A; Soorige, D and Geekiyanage, D (2021) Comparative study on life cycle assessment of buildings in developed countries and Sri Lanka. Built Environment Project and Asset Management, 11(2), pp. 304-329. ISSN 2044-124X
Ive, G (2006) Re-examining the costs and value ratios of owning and occupying buildings. Building Research & Information, 34(3), pp. 230-245. ISSN 0961-3218
Iyer, K C and Jha, K N (2003) Analysis of critical coordination activities of Indian construction projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Iyer, K C and Jha, K N (2006) Critical factors affecting schedule performance: Evidence from Indian construction projects. Journal of Construction Engineering and Management, 132(8), pp. 871-881. ISSN 0733-9364
Iyer-Raniga, U; Arcari, P and Wong, J P C (2010) Education for sustainability in the built environment: What are students telling us? In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Izzudin Mohd Ali, M Y (1994) Critical investigation of joint ventures by UK contractors with other European partners. PhD thesis, Loughborough University, UK.
Jaafar, M; Nuruddin, A R and Abu Bakar, S P S (2014) Business success and psychological traits of housing developers. Construction Economics and Building, 14(2), pp. 57-72. ISSN 2204-9029
Jabbari, A (2020) Project planning algorithms: Lowering cost and improving delivery time in capital projects. PhD thesis, University of California, Berkeley, USA.
Jackson, B J (2005) Design-build education at associated schools of construction undergraduate programs. International Journal of Construction Education and Research, 1(2), pp. 75-88. ISSN 1557-8771
Jacobs, C and Miller, S (2003) An integrated approach to project work: An exploration of assessment practices from lecturer perspectives. Journal of Engineering, Design and Technology, 1(1), pp. 75-87. ISSN 1726-0531
Jacobsson, M and Linderoth, H C J (2012) User perceptions of ICT impacts in Swedish construction companies: 'It's fine, just as it is'. Construction Management and Economics, 30(5), pp. 339-357. ISSN 1466433X
Jacobsson, M; Linderoth, H C J and Rowlinson, S (2017) The role of industry: An analytical framework to understand ICT transformation within the AEC industry. Construction Management and Economics, 35(10), pp. 611-626. ISSN 01446193
Jacomit, A M and Granja, A D (2011) An investigation into the adoption of target costing on Brazilian public social housing projects. Architectural Engineering and Design Management, 7(2), pp. 113-127. ISSN 1745-2007
Jadidoleslami, S. and Saghatforoush, E. (2026) Interdependencies unveiled: MICMAC analysis of BIM-AI synergies in construction. Journal of Construction Engineering and Management, 152(7): 04026086, ISSN 0733-9364
Jadidoleslami, S. and Saghatforoush, E. (2026) Unveiling interdependencies across phases: MICMAC analysis of BIM and AI integration challenges in construction. Architectural Engineering and Design Management, 22(4), pp. 1188-1210. ISSN 1745-2007
Jafari Ramiani, A; Sarvari, H; Chan, D W M; Nassereddine, H and Lotfata, A (2024) Critical success factors for private sector participation in accomplishing abandoned public sports facilities projects in Iran. International Journal of Construction Management, 24(6), pp. 586-600. ISSN 1562-3599
Jahan, Israt (2024) Life-cycle sustainability analysis of construction and demolition wood waste to achieve circular economy. PhD thesis, RMIT University, Australia.
Jaillon, L and Poon, C S (2010) Design issues of using prefabrication in Hong Kong building construction. Construction Management and Economics, 28(10), pp. 1025-1042. ISSN 1466433X
Jallow, A K (2011) Integrated lifecycle requirements information management in construction. PhD thesis, Loughborough University, UK.
Jallow, A K; Demian, P; Baldwin, A and Anumba, C (2008) Life cycle approach to requirements information management in construction projects: State-of-the-art and future trends. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Janda, K B; Bright, S; Patrick, J; Wilkinson, S and Dixon, T J (2016) The evolution of green leases: Towards inter-organizational environmental governance. Building Research & Information, 44(5-6), pp. 660-674. ISSN 0961-3218
Jang, J (2008) Improving the make-ready process and forecasting project performance using performance of the make-ready process. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.
Jaselskis, E J and Russell, J S (1992) Risk analysis approach to selection of contractor evaluation method. Journal of Construction Engineering and Management, 118(4), pp. 814-821. ISSN 0733-9364
Jaselskis, E J and Suazo, G A R (1994) A survey of construction site safety in Honduras. Construction Management and Economics, 12(3), pp. 245-255. ISSN 01446193
Jassim, H S H (2019) Assessing energy use and carbon emissions to support planning of environmentally sustainable earthmoving operations. PhD thesis, Luleå University of Technology, Sweden.
Jay, I and Bowen, P (2011) What residents value in low-cost housing schemes: Some South African concepts. Building Research & Information, 39(6), pp. 574-588. ISSN 0961-3218
Jayalath, C and Perera, B A K S (2022) Exploring a shared comprehension between judicial approaches and scholar views pertaining to concurrent delays. International Journal of Construction Management, 22(3), pp. 400-412. ISSN 1562-3599
Jean, A T; Wang, X and Suntu, S (2020) Corporate social responsibility in madagascar: An investigation on Chinese companies. International Journal of Construction Management, 20(1), pp. 29-38. ISSN 1562-3599
Jeary, A P and Jeary, I P M (2001) The influence of flooding risk on infrastructure development in Western sydney. Construction Economics and Building, 1(2), pp. 57-64. ISSN 2204-9029
Jegard, L; Castaño-Rosa, R; Kilpeläinen, S and Pelsmakers, S (2024) Finnish glazed balconies: Residents’ experience, wellbeing and use. Buildings & Cities, 5(1), pp. 540-561. ISSN 2632-6655
Jennings, P and Holt, G D (1998) Prequalification and multi-criteria selection: A measure of contractors' opinions. Construction Management and Economics, 16(6), pp. 651-660. ISSN 01446193
Jeon, J; Lee, J and Ham, Y (2019) Quantifying the impact of building envelope condition on energy use. Building Research & Information, 47(4), pp. 404-420. ISSN 0961-3218
Jeong, H S; Abraham, D M and Lew, J J (2004) Evaluation of an emerging market in subsurface utility engineering. Journal of Construction Engineering and Management, 130(2), pp. 225-234. ISSN 0733-9364
Jeong, J S; Ramírez-Gómez, Á and González-Gómez, D (2017) A web-based scaffolding-learning tool for design students' sustainable spatial planning. Architectural Engineering and Design Management, 13(4), pp. 262-277. ISSN 1745-2007
Jeong, K S; Lu, S L and Sexton, M G (2010) Good practice transfer within small construction specialist trade contractors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Jepson, A S (2009) Investigating cultural relationships within the festival planning and construction process in a local community festival context. PhD thesis, University of Derby, UK.
Jepson, J; Kirytopoulos, K and London, K (2020) Insights into the application of risk tools and techniques by construction project managers. International Journal of Construction Management, 20(8), pp. 848-866. ISSN 1562-3599
Jergeas, G F and Revay, S O (1993) Quantifying construction claims using the differential cost method. Construction Management and Economics, 11(2), pp. 163-166. ISSN 01446193
Jewell, C; Flanagan, R and Anac, C (2010) Understanding UK construction professional services exports: Definitions and characteristics. Construction Management and Economics, 28(3), pp. 231-239. ISSN 1466433X
Jeyakumar, R (2013) The implementation and effectiveness of value engineering in the United Arab Emirates. PhD thesis, University of Glamorgan, UK.
Jha, K N (2004) Factors for the success of a construction project: empirical study. PhD thesis, Indian Institute of Technology Delhi, India.
Jha, K N (2005) Attributes of a project coordinator. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Jha, K N and Chockalingam, C T (2011) Prediction of schedule performance of Indian construction projects using an artificial neural network. Construction Management and Economics, 29(9), pp. 901-911. ISSN 1466433X
Jha, K N and Misra, S (2007) Ranking and classification of construction coordination activities in Indian projects. Construction Management and Economics, 25(4), pp. 409-421. ISSN 1466433X
Ji, W and Abourizk, S M (2018) Data-driven simulation model for quality-induced rework cost estimation and control using absorbing Markov chains. Journal of Construction Engineering and Management, 144(8): 04018078, ISSN 0733-9364
Ji, W; Abourizk, S M; Zaïane, O R and Li, Y (2018) Complexity analysis approach for prefabricated construction products using uncertain data clustering. Journal of Construction Engineering and Management, 144(8): 04018063, ISSN 0733-9364
Jiang, F; Lyu, Y; Zhang, Y and Guo, Y (2023) Research on the differences between risk-factor attention and risk losses in PPP projects. Journal of Construction Engineering and Management, 149(9): 04023090, ISSN 0733-9364
Jiang, W; Jiang, J; Martek, I and Jiang, W (2025) Critical risk management strategies for the operation of public-private partnerships: A vulnerability perspective of infrastructure projects. Engineering, Construction and Architectural Management, 32(7), pp. 4771-4795. ISSN 0969-9988
Jimenez, A; Engstroöm, S and Stehn, L (2019) Why (not) measuring productivity in house-building companies? In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Jimoh, I (2021) What explains the efficiency of major public project delivery in Nigeria? PhD thesis, University of Cambridge, UK.
Jin, X; Ekanayake, E M A C and Shen, G Q P (2022) Critical policy drivers for modular integrated construction projects in Hong Kong. Building Research & Information, 50(4), pp. 467-484. ISSN 0961-3218
Jin, Z and Gambatese, J (2020) Exploring the potential of technological innovations for temporary structures: A survey study. Journal of Construction Engineering and Management, 146(6): 04020049, ISSN 0733-9364
Jirojanakul, P (2000) The quality of life of construction workers' children in Bangkok Metropolis, Thailand. PhD thesis, University of Bath, UK.
Johnson, A; Rotimi, J O B and Wilkinson, S (2021) An evaluation of risk factors impacting project budget performance in New Zealand. Journal of Engineering, Design and Technology, 19(1), pp. 41-61. ISSN 1726-0531
Johnsson, H (2013) Production strategies for pre-engineering in house-building: Exploring product development platforms. Construction Management and Economics, 31(9), pp. 941-958. ISSN 1466433X
Johnsson H, J G J P (2013) Modularization in a housing platform for mass customization. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Johnston, M; Guaralda, M and Sawang, S (2014) Sustainable innovation for Queensland's housing design: A case study. Construction Economics and Building, 14(4), pp. 11-31. ISSN 2204-9029
Johnston, Nicole R (2017) An examination of how conflicts of interest detract from developers upholding governance responsibilities in the transition phase of multi-owned developments: A grounded theory approach. PhD thesis, Griffith University, Australia.
Jonker-Hoffrén, P (2023) Policy tensions in demolition: Dutch social housing and circularity. Buildings & Cities, 4(1), pp. 405-421. ISSN 2632-6655
Jordan Srour, F; Kiomjian, D and Srour, I M (2018) Automating the use of learning curve models in construction task duration estimates. Journal of Construction Engineering and Management, 144(7): 04018055, ISSN 0733-9364
Joseph, A and Hamilton, D K (2008) The Pebble Projects: Coordinated evidence-based case studies. Building Research & Information, 36(2), pp. 129-145. ISSN 0961-3218
Ju, Q; Zheng, R; Liu, H and Shen, Z (2025) Exploring the effect of interface management on project success in complex capital projects: The moderating role of relational capital. Journal of Construction Engineering and Management, 151(8): 04025104, ISSN 0733-9364
Julayhe, N and Rahman, M M (2021) Dwellers' perception on challenges and motivators of greening existing buildings in Brunei darussalam. Built Environment Project and Asset Management, 11(5), pp. 870-887. ISSN 2044-124X
Jun, J B (2008) Valuation of governmental guarantee in BOT project finance with real option analysis. PhD thesis, Texas A&M University, USA.
Jung, M; Park, M; Lee, H S and Kim, H (2016) Weather-delay simulation model based on vertical weather profile for high-rise building construction. Journal of Construction Engineering and Management, 142(6): 04016007, ISSN 0733-9364
K'Akumu, O A (2015) Application of artisanal dimension stone in the building industry: Factor analysis of the regulatory environment in Nairobi, Kenya. Architectural Engineering and Design Management, 11(3), pp. 198-212. ISSN 1745-2007
Kabo, F W (2006) Low-cost housing design and provision: A case study of Kenya. PhD thesis, University of Michigan, USA.
Kabundu, E K (2020) A housing affordability and tenure of choice quantum deliverable model in South Africa. PhD thesis, Nelson Mandela Metropolitan University, South Africa.
Kadefors, A (2005) Trust in construction: Cognitive traps as obstacles to collaborative contracting strategies. Journal of Construction Procurement, 11(2),
Kaka, A P (1996) Decision support system for plant-hirers' financial strategies. Journal of Financial Management of Property and Construction, 1(1), pp. 21-36. ISSN 1366-4387
Kaka, A P; Lewis, J and Petros, H (2003) The effects of the variability of project planning on cost commitment curves: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 15-26. ISSN 0969-9988
Kaka, A P and Price, A D (1994) A survey of contractors' corporate planning and financial budgeting: Contractors lack effective and accurate methods of corporate planning, financial budgeting and cashflow forecasting identified in survey of 15 british construction companies. Building Research & Information, 22(3), pp. 174-182. ISSN 0961-3218
Kale, S and Arditi, D (2001) General contractors' relationships with subcontractors: A strategic asset. Construction Management and Economics, 19(5), pp. 541-549. ISSN 01446193
Kale, S and Karaman, E A (2011) Evaluating the knowledge management practices of construction firms by using importance-comparative performance analysis maps. Journal of Construction Engineering and Management, 137(12), pp. 1142-1152. ISSN 0733-9364
Kalil, A J (2002) Use of a work sampling method (TVEA) to characterize determinants of particulate exposure in heavy and highway construction. DSc thesis, University of Massachusetts Lowell, USA.
Kaluarachchi, M; Waidyasekara, K and Rameezdeen, R (2022) Antecedents of noise pollution control behaviour of employees of construction companies. Built Environment Project and Asset Management, 12(2), pp. 277-292. ISSN 2044-124X
Kalutara, P; Zhang, G; Setunge, S and Wakefield, R (2023) Decision-making model for sustainable management of Australian community buildings: Combined approach using analytical hierarchy process and neuro-fuzzy system. International Journal of Construction Management, 23(8), pp. 1299-1310. ISSN 1562-3599
Kamal Mohammad Attia, M (2013) LEED as a tool for enhancing affordable housing sustainability in Saudi Arabia:The case of Al-Ghala project. Smart and Sustainable Built Environment, 2(3), pp. 224-250. ISSN 2046-6099
Kamardeen, I (2014) Stimulating learning with integrated assessments in construction education. Construction Economics and Building, 14(3), pp. 86-98. ISSN 2204-9029
Kaming, P F; Olomolaiye, P O; Holt, G D and Harris, F C (1997) Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15(1), pp. 83-94. ISSN 01446193
Kaminsky, J (2015) Institutionalizing infrastructure: Photo-elicitation of cultural-cognitive knowledge of development. Construction Management and Economics, 33(11-12), pp. 942-956. ISSN 01446193
Kamma, R C and Jha, K N (2026) Significant causes of construction waste in road projects. International Journal of Construction Management, 26(6), pp. 944-959. ISSN 1562-3599
Kang, J H; Anderson, S D and Clayton, M J (2007) Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling. Journal of Construction Engineering and Management, 133(6), pp. 447-461. ISSN 0733-9364
Kang, Y; Kim, C; Son, H; Lee, S and Limsawasd, C (2013) Comparison of preproject planning for green and conventional buildings. Journal of Construction Engineering and Management, 139(11): 4013018, ISSN 0733-9364
Kapoor, P (2022) Exploratory study of the SMES of manufacturers of construction products in Uttar Pradesh. PhD thesis, Amity University, Noida, India.
Kapote, M M and Pimplikar, S S (2025) Identification of challenges and shortcomings in the selection of bidders on road projects in India: a study. International Journal of Construction Management, 25(7), pp. 760-769. ISSN 1562-3599
Kar, S and Jha, K N (2023) Examining the effect of material management practices on material availability and waste reduction in construction projects. Journal of Construction Engineering and Management, 149(8): 04023065, ISSN 0733-9364
Karakhan, A A; Rajendran, S; Gambatese, J and Nnaji, C (2018) Measuring and evaluating safety maturity of construction contractors: Multicriteria decision-making approach. Journal of Construction Engineering and Management, 144(7): 04018054, ISSN 0733-9364
Karami, H and Olatunji, O A (2019) Key value engineering protocols in marine projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(1), pp. 21-31. ISSN 17514304
Karaz, Mahmoud Abdel Fattah Abdel Athim (2024) Construction waste management model for contractors using lean and BIM tools. PhD thesis, Universidade do Minho, Portugal.
Karnasuta, P (2004) An examination of the effects of web-based virtual working environments on team effectiveness within construction projects. PhD thesis, University of Reading, UK.
Karshenas, S (1997) Strength variability of conventional slab formwork systems. Journal of Construction Engineering and Management, 123(3), pp. 324-330. ISSN 0733-9364
Karthik, D and Kameswara Rao, C B (2022) Identifying the significant factors affecting the masonry labour productivity in building construction projects in India. International Journal of Construction Management, 22(3), pp. 464-472. ISSN 1562-3599
Karunasena, G; Wijeratne, W M P U; Gajanayake, A; Udawatta, N and Perera, S (2025) Stakeholder analysis of construction liquid waste management in Victoria, Australia. International Journal of Construction Management, 25(14), pp. 1691-1702. ISSN 1562-3599
Karunasena, G I (2012) Capacity building for post disaster waste management: Construction and demolition waste. PhD thesis, University of Salford, UK.
Karunyasopon, P; Park, D Y; Le, D M and Chang, S (2024) Performance analysis of transparent BIPV/T double skin façades integrated with the decision-making algorithm for mixed-mode building ventilation. Architectural Engineering and Design Management, 20(5), pp. 1141-1163. ISSN 1745-2007
Kasabreh, N S S and Tarawneh, S A (2021) Investigating the impact of contractor's performance on the success of Jordanian residential construction projects. International Journal of Construction Management, 21(5), pp. 468-475. ISSN 1562-3599
Kasbar, M; Staub-French, S; Pilon, A; Poirier, E; Teshnizi, Z and Froese, T (2021) Construction productivity assessment on brock commons tallwood house. Construction Innovation, 21(4), pp. 951-968. ISSN 1471-4175
Kashiwagi, D; Parmar, D and Savicky, J (2003) Case study of the impact of specifications, construction management and inspection on construction performance. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Kasimu, S; Chodokufa, K; Ntshabeleng, B M and Sophia, N (2025) Participative leadership and success of government construction projects in Uganda: Testing the participative leadership dimensions. Journal of Construction Business and Management, 7(2), pp. 33-44.
Kauffold, P V (1977) Critical resource allocation in stochastic project networks. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kavishe, N and Chileshe, N (2017) Joint venture housing projects in dar es salaam city: An analysis of challenges and effectiveness. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Kavishe, N and Chileshe, N (2019) Readiness assessment of public-private partnerships implementation within Tanzanian housing projects: Challenges, strategies and approaches. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Kavishe, N and Chileshe, N (2020) Driving forces for adopting public-private partnerships in Tanzanian housing projects. International Journal of Construction Management, 20(8), pp. 912-927. ISSN 1562-3599
Kazar, G and Comu, S (2021) Effectiveness of serious games for safety training: A mixed method study. Journal of Construction Engineering and Management, 147(8): 04021091, ISSN 0733-9364
Kazar, G; Doǧan, N B; Ayhan, B U and Tokdemir, O B (2022) Quality failures-based critical cost impact factors: Logistic regression analysis. Journal of Construction Engineering and Management, 148(12): 04022138, ISSN 0733-9364
Kazemi, Hamidreza (2014) Evaluating the effectiveness and hydrological performance of green infrastructure stormwater control measures. PhD thesis, University of Louisville, USA.
Kazemian, R and Ronn, M (2009) Finnish architectural competitions: Structure, criteria and judgement process. Building Research & Information, 37(2), pp. 176-186. ISSN 0961-3218
Ke, Y; Hao, W; Ding, H and Wang, Y (2017) Factors influencing the private involvement in urban rail public-private partnership projects in China. Construction Economics and Building, 17(1), pp. 90-106. ISSN 2204-9029
Keenan, J M (2016) From sustainability to adaptation: Goldman Sachs' corporate real estate strategy. Building Research & Information, 44(4), pp. 407-422. ISSN 0961-3218
Keenan, M and Rostami, A (2021) The impact of quality management systems on construction performance in the North West of England. International Journal of Construction Management, 21(9), pp. 871-883. ISSN 1562-3599
Kelly, J (2007) Making client values explicit in value management workshops. Construction Management and Economics, 25(4), pp. 435-442. ISSN 1466433X
Kelly, J R (2005) Managing client value at the strategic briefing stage of construction projects. PhD thesis, Heriot-Watt University, UK.
Kempton, J (2007) Mixed versus mono tenure estates: Is there a difference in asset management needs? In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Kempton, J; Nicol, S; Anumba, C J and Dickens, J (2000) Analysis of surveyor variability from data obtained from surveys of dwellings represented on video film. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Kenley, R (2001) In-project end-date forecasting: An idiographic, deterministic approach, using cash-flow modelling. Journal of Financial Management of Property and Construction, 6(3), pp. 209-216. ISSN 1366-4387
Kermanshachi, S; Dao, B; Rouhanizadeh, B; Shane, J and Anderson, S (2020) Development of the project complexity assessment and management framework for heavy industrial projects. International Journal of Construction Education and Research, 16(1), pp. 24-42. ISSN 1557-8771
Kern, A P and Formoso, C T (2006) A model for integrating cost management and production planning and control in construction. Journal of Financial Management of Property and Construction, 11(2), pp. 75-90. ISSN 1366-4387
Keskin, B; Salman, B and Koseoglu, O (2022) Architecting a BIM-based digital twin platform for airport asset management: A model-based system engineering with sysml approach. Journal of Construction Engineering and Management, 148(5): 04022020, ISSN 0733-9364
Kestle, L; London, K; Bodger, P and Storey, B (2002) The development of a typology for remote construction projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Kestle, L and Potangaroa, R (2012) Identifying the added-value of various roles in the post-disaster response and recovery of christchurch. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Kesuma, P A; Rohman, M A and Arif Prastyanto, C (2022) Analysing the root cause of the damage risk in heavy vehicles to reduce traffic congestion. International Journal of Construction Management, 22(10), pp. 1872-1883. ISSN 1562-3599
Khadour, L; Ramsay-Dawber, P and Morledge, R (2009) Case studies on the implementation of TQEM in the UK building contractors. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Khaemba, P (2013) Adoption of green building practices and rating system in Kenya: Potentials and barriers. PhD thesis, North Carolina Agricultural and Technical State University, USA.
Khajehzadeh, I and Vale, B (2017) How house size impacts type, combination and size of rooms: A floor plan study of New Zealand houses. Architectural Engineering and Design Management, 13(4), pp. 291-307. ISSN 1745-2007
Khalid, A G (1992) Hedonic price estimation of the financial impact of obsolescence on commercial property buildings. PhD thesis, University of Reading, UK.
Khalil, N (2016) Incorporating risk mitigation into building performance rating tools (BPRTS) for Malaysia’s higher education building. PhD thesis, University of Malaya, Malaysia.
Khalilzadeh, M; Kebriyaii, O and Rezaei, R (2023) Identification and selection of stakeholder engagement strategies: Case study of an Iranian oil and gas construction project. International Journal of Construction Management, 23(3), pp. 484-494. ISSN 1562-3599
Khallaf, R (2016) Interactional risks associated with parties to a PPP project. PhD thesis, Purdue University, USA.
Khallaf, Z; Alshibani, A; Alsawafy, O; Mohammed, A and Bubshait, A (2024) Dynamic fleet configuration model for optimizing earthmoving operations using mixed integer linear programming. Journal of Construction Engineering and Management, 150(11): 04024152, ISSN 0733-9364
Khamkanya, T (2011) A holistic approach to workplace environments, management systems and new technologies in meeting corporate end-user requirements. PhD thesis, University of Ulster, UK.
Khan, A H; Herman, S S and Jaafar, M F Z (2021) The influence of wind effects on architectural buildings heights in Iraqi residential buildings based on computational fluid dynamics simulations. Journal of Construction in Developing Countries, 26(1), pp. 63-87. ISSN 1823-6499
Khanh, H D; Minh, N V and Tu, N T (2026) Measuring the overall impact of barriers to BIM adoption in prefabricated construction using a fuzzy synthetic evaluation approach. Construction Economics and Building, 26(1), ISSN 2204-9029
Khanh, H D; Kim, S Y; Khoa, N V and Tu, N T (2023) The relationship between workers' experience and productivity: A case study of brick masonry construction. International Journal of Construction Management, 23(4), pp. 596-605. ISSN 1562-3599
Khanzadi, M; Sheikhkhoshkar, M and Banihashemi, S (2020) BIM applications toward key performance indicators of construction projects in Iran. International Journal of Construction Management, 20(4), pp. 305-320. ISSN 1562-3599
Kheel, M (2024) The impact of risk and uncertainty on healthcare project delivery and its effect on intra-group conflict in the context of Saudi Arabia. PhD thesis, University of Manchester, UK.
Kheni, N A; Dainty, A R J and Gibb, A G F (2007) Influence of political and socio-cultural environments on health and safety management within SMEs: A Ghana case study. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Kheni, N A; Gibb, A G F and Dainty, A R J (2010) Health and safety management within small- and medium-sized enterprises (SMEs) in developing countries: Study of contextual influences. Journal of Construction Engineering and Management, 136(10), pp. 1104-1115. ISSN 0733-9364
Khodabocus, S and Seyis, S (2024) Multi-criteria decision-making model for risk management in modular construction projects. International Journal of Construction Management, 24(2), pp. 240-250. ISSN 1562-3599
Khoshfetrat, R; Sarvari, H; Chan, D W M and Rakhshanifar, M (2022) Critical risk factors for implementing building information modelling (BIM): A Delphi-based survey. International Journal of Construction Management, 22(12), pp. 2375-2384. ISSN 1562-3599
Khoshgoftar, M; Bakar, A H A and Osman, O (2010) Causes of delays in Iranian construction projects. International Journal of Construction Management, 10(2), pp. 53-69. ISSN 1562-3599
Khosrowshahi, F (1999) Neural network model for contractors' pre-qualification for local authority projects. Engineering, Construction and Architectural Management, 6(3), pp. 315-328. ISSN 0969-9988
Khoza, R B M (2021) Performance measurements on concession periods to forecast water infrastructure investment returns. PhD thesis, Walden University, USA.
Khurana, Mayank (2021) Investigation of contractual specification and implementation of relational approaches in public private partnership (PPP) projects. PhD thesis, Virginia Tech, USA.
Kian Manesh Rad, E (2016) Development of a project complexity assessment method for energy megaprojects. PhD thesis, Heriot-Watt University, UK.
Kibwami, N (2016) Enhancing sustainable construction in the building sector of Uganda using embodied carbon accounting. PhD thesis, University of Leeds, UK.
Kibwami, N and Tutesigensi, A (2015) Exploring the potential of accounting for embodied carbon emissions in building projects in Uganda. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Kifokeris, D; Bahnariu, B and Koch, C (2022) A mapping of Swedish lean construction variants in practice: Review and survey. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Kifokeris, D and Koch, C (2019) Blockchain in building logistics: Emerging knowledge, and related actors in Sweden. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Kifokeris, D and Koch, C (2020) Swedish lean construction practices identified in the last decade of research. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Kim, A and Arditi, D (2010) Performance of minority firms providing construction management services in the US transportation sector. Construction Management and Economics, 28(8), pp. 839-851. ISSN 1466433X
Kim, A and Arditi, D (2010) Performance of MBE/DBE/WBE construction firms in transportation projects. Journal of Construction Engineering and Management, 136(7), pp. 768-777. ISSN 0733-9364
Kim, B; Lee, H; Park, H and Kim, H (2012) Framework for estimating greenhouse gas emissions due to asphalt pavement construction. Journal of Construction Engineering and Management, 138(11), pp. 1312-1321. ISSN 0733-9364
Kim, B; Lee, H; Park, H and Kim, H (2012) Greenhouse gas emissions from onsite equipment usage in road construction. Journal of Construction Engineering and Management, 138(8), pp. 982-990. ISSN 0733-9364
Kim, B C and Reinschmidt, K F (2011) Combination of project cost forecasts in earned value management. Journal of Construction Engineering and Management, 137(11), pp. 958-966. ISSN 0733-9364
Kim, H-s (1998) Value for money in building design: Modelling the cost-quality relationships. PhD thesis, University of Reading, UK.
Kim, I (2007) Development and implementation of an engineering productivity measurement system (EPMS) for benchmarking. PhD thesis, University of Texas at Austin, USA.
Kim, J; Ham, Y; Chung, Y and Chi, S (2019) Systematic camera placement framework for operation-level visual monitoring on construction jobsites. Journal of Construction Engineering and Management, 145(4): 04019019, ISSN 0733-9364
Kim, J; Hyun, J-Y; Chong, W K and Ariaratnam, S (2017) Understanding the effects of environmental factors on building energy efficiency designs and credits: Case studies using data mining and real-time data. Journal of Engineering, Design and Technology, 15(3), pp. 270-285.
Kim, J and Philips, P (2012) Determinants of quits and dismissals on a long-lasting unionized industrial construction project. Journal of Construction Engineering and Management, 138(5), pp. 661-669. ISSN 0733-9364
Kim, J H (2003) An approach to facilitate knowledge streams of occasional individual building industry clients at the pre-project stage. PhD thesis, University of Reading, UK.
Kim, J L and Ellis, R D (2010) Comparing schedule generation schemes in resource-constrained project scheduling using elitist genetic algorithm. Journal of Construction Engineering and Management, 136(2), pp. 160-169. ISSN 0733-9364
Kim, S (2008) Development of a wireless real-time productivity measurement system for rapid construction operations. PhD thesis, University of Kansas, USA.
Kim, S; Hwang, S and Son, J (2022) Safety management guidelines for precast concrete production plants using importance-performance analysis. Journal of Construction Engineering and Management, 148(7): 04022038, ISSN 0733-9364
Kim, T H; Lee, H W and Hong, S W (2016) Value engineering for roadway expansion project over deep thick soft soils. Journal of Construction Engineering and Management, 142(2): 05015014, ISSN 0733-9364
Kineber, A F; Ali, A H; Elshaboury, N; Oke, A E and Arashpour, M (2024) A multi-criteria evaluation and stationary analysis of value management implementation barriers for sustainable residential building projects. International Journal of Construction Management, 24(2), pp. 199-212. ISSN 1562-3599
King-Lewis, A; Shan, Y and Ivey, M (2021) Gender bias and its impact on self-concept in undergraduate and graduate construction education programs in the United States. Journal of Construction Engineering and Management, 147(11): 04021155, ISSN 0733-9364
Kishan, R; Jayakodi, S and Asmone, A S (2024) Causal relationships of human errors in building maintenance: Findings from Sri Lanka. Building Research & Information, 52(4), pp. 431-445. ISSN 0961-3218
Kishk, M; Pollock, R and Okhuahesogie, E (2004) Sensitivity of simulated whole-life costs to input probability distributions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Kivrak, S; Ross, A; Arslan, G and Tuncan, M (2009) Impacts of cultural d1 fferences on project success 1 n construct1 on. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Kjeldsen, L and Stender, M (2022) Bringing social sustainability into the mix: Framing planning dilemmas in mixed-tenure regeneration. Building Research & Information, 50(7), pp. 709-721. ISSN 0961-3218
Klocko, Barbara A (2009) Superintendents as sensemakers in the design of sustainable schools. PhD thesis, Oakland University, USA.
Klotz, L (2008) Process transparency for sustainable building delivery. PhD thesis, Pennsylvania State University, USA.
Knauseder, I (2007) Organisational learning capabilities in Swedish construction projects. PhD thesis, Chalmers Tekniska Hogskola, Sweden.
Ko, T; Lee, J and David Jeong, H (2024) Project requirements prioritization through NLP-driven classification and adjusted work items analysis. Journal of Construction Engineering and Management, 150(3): 04023171, ISSN 0733-9364
Koc, K and Okudan, O (2021) Assessment of life cycle risks of deconstruction in urban regeneration projects. Journal of Construction Engineering and Management, 147(10): 04021137, ISSN 0733-9364
Koch, C and Roenn, M (2023) Building companies in design build competitions aiming at circularity. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Koch, C and Urup, L (2017) Project performance: An emerging constellation of multiple institutions. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Koksal, A (2002) Predicting the development of decline in construction companies. PhD thesis, Illinois Institute of Technology, USA.
Koksal, A and Arditi, D (2004) Predicting construction company decline. Journal of Construction Engineering and Management, 130(6), pp. 799-807. ISSN 0733-9364
Kometa, S T (1995) An evaluation of client-generated risks in construction consultancies. PhD thesis, University of Wolverhampton, UK.
Kometa, S T; Olomolaiye, P O and Harris, F C (1994) Attributes of UK construction clients influencing project consultants' performance. Construction Management and Economics, 12(5), pp. 433-443. ISSN 01446193
Kometa, S T; Olomolaiye, P O and Harris, F C (1995) An evaluation of clients' needs and responsibilities in the construction process. Engineering, Construction and Architectural Management, 2(1), pp. 57-76. ISSN 0969-9988
Konanahalli, A and Oyedele, L O (2016) Emotional intelligence and British expatriates' cross-cultural adjustment in international construction projects. Construction Management and Economics, 34(11), pp. 751-768. ISSN 01446193
Kongsmobath, B (2021) Enterprise risk management and board decision making: context of Laos construction and tourism industry. PhD thesis, University of the West of Scotland, UK.
Koo, K-J (2000) Organizational program management for multiple maintenance projects under multi-trade capacity constraints. PhD thesis, University of Wisconsin - Madison, USA.
Kordestani Ghalenoeei, N; Saghatforoush, E; Athari Nikooravan, H and Preece, C (2021) Evaluating solutions to facilitate the presence of operation and maintenance contractors in the pre-occupancy phases: A case study of road infrastructure projects. International Journal of Construction Management, 21(2), pp. 140-152. ISSN 1562-3599
Kori, S i (2017) BIM business value creation for SME architectural firms in Nigeria using intellectual capital development. PhD thesis, University of Liverpool, UK.
Koskelo, T M (2005) A method for strategic technical life cycle management of real estates. DSc(Tech) thesis, Teknillinen Korkeakoulu (Helsinki), Finland.
Kotzé, M and Nkado, R N (2001) An investigation into the use of facilities management in institutions of higher learning in South Africa. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Kouch, K A; Panuwatwanich, K; Sancharoen, P and Sahachaisaree, S (2021) Development of augmented reality application for onsite inspection of expressway structures using microsoft hololens. Journal of Construction in Developing Countries, 26(2), pp. 87-116. ISSN 1823-6499
Kramer, S W and Sommer, J (2013) An initial look at motivations & personality traits of American construction professionals working for international firms. International Journal of Construction Education and Research, 9(1), pp. 39-60. ISSN 1557-8771
Kreitl, G and Oberndorfer, W J (2004) Motives for acquisitions among engineering consulting firms. Construction Management and Economics, 22(7), pp. 691-700. ISSN 01446193
Kretzschmar, D and Schiller, G (2023) Non-domestic building stock: Linking dynamics and spatial distributions. Buildings & Cities, 4(1), pp. 727-748. ISSN 2632-6655
Ku, S; Jo, H; Sim, J and Moon, W S (2024) Competitive performance of public–private partnerships: unsolicited proposal projects and tendering rules in South Korea. Construction Management and Economics, 42(8), pp. 714-740. ISSN 01446193
Kula, B and Ergen, E (2021) Implementation of a BIM-FM platform at an international airport project: Case study. Journal of Construction Engineering and Management, 147(4): 05021002, ISSN 0733-9364
Kulaksiz, T (2019) Analysis of factors influencing return on investment (ROI) for building information modeling (BIM) implementation. PhD thesis, Wayne State University, USA.
Kulatunga, U and Rameezdeen, R (2014) Use of clickers to improve student engagement in learning: Observations from the built environment discipline. International Journal of Construction Education and Research, 10(1), pp. 3-18. ISSN 1557-8771
Kulczak-Dawkins, R P (2021) Managing sustainability through architectural design decision processes: influences of values and frames. PhD thesis, University of Brighton, UK.
Kumar, R; Chandrashekhar, I K and Singh, S P (2017) Quantification of construction project risks by analysis of past dispute cases. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Kumar, S and Bansal, V K (2021) GIS-based locational evaluation of infrastructure facilities in hilly regions: A case study of an institute campus. International Journal of Construction Management, 21(11), pp. 1165-1184. ISSN 1562-3599
Kumarasiri, B and Dissanayake, P (2021) Barriers to implementing waste-to-energy projects in Sri Lanka: A pestel analysis. Built Environment Project and Asset Management, 11(4), pp. 544-558. ISSN 2044-124X
Kumaraswamy, M M (1996) The pursuit of quality in Hong Kong construction. Engineering, Construction and Architectural Management, 3(4), pp. 289-306. ISSN 0969-9988
Kumaraswamy, M M and Chan, D W M (1995) Determinants of construction duration. Construction Management and Economics, 13(3), pp. 209-217. ISSN 01446193
Kumaraswamy, M M and Chan, D W M (1999) Factors facilitating faster construction. Journal of Construction Procurement, 5(2), pp. 88-98. ISSN 1358-9180
Kumaraswamy, M M; Ling, F Y Y; Rahman, M M and Phng, S T (2005) Constructing relationally integrated teams. Journal of Construction Engineering and Management, 131(10), pp. 1076-1086. ISSN 0733-9364
Kumaraswamy, M M; Nadarajah, R; Palaneeswaran, E and Rahman, M M (2001) Dealing with delays in evaluating extensions of time. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Kumaraswamy, M M; Rahman, M M; Ling, F Y Y and Phng, S T (2005) Reconstructing cultures for relational contracting. Journal of Construction Engineering and Management, 131(10), pp. 1065-1075. ISSN 0733-9364
Kunkcu, H.; Koc, K. and Gurgun, A. P. (2026) Technology-enhanced communication and contract management in construction projects. International Journal of Construction Education and Research, 22(2), pp. 254-283. ISSN 1557-8771
Kuntz, K A (1994) A construction crew evaluation model to improve craft productivity. PhD thesis, Pennsylvania State University, USA.
Kurkela, M; Maksimainen, M; Julin, A; Virtanen, J P; Männistö, I; Vaaja, M T and Hyyppä, H (2022) Applying photogrammetry to reconstruct 3D luminance point clouds of indoor environments. Architectural Engineering and Design Management, 18(1), pp. 56-72. ISSN 1745-2007
Kurniawan, F (2013) An integrated project evaluation tool for public-private partnership projects. PhD thesis, Heriot-Watt University, UK.
Kurniawan, F; Ogunlana, S and Motawa, I (2010) An integrated project evaluation tool for PFI seaport projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Kurwi, S (2019) Integrating BIM and GIS for design collaboration in railway projects. PhD thesis, Loughborough University, UK.
Kwafo, D G (2021) Strategies for improving performance of project managers in Ghana to reduce delays. PhD thesis, Walden University, USA.
Kwawu, W; Elhag, T and Ballal, T (2010) Knowledge transfer processes in PFI/PPP: Critical success factors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Kwawu, W and Elmualim, A (2011) Sustainability in facilities management: A review of drivers and policy issues. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Kwawu, W and Laryea, S (2014) Governance structures in collaborative working practices. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Kwofie, T E; Adinyira, E and Fugar, F (2016) Modelling the effect of housing design unit contract packaging on mass housing project team communication performance. Journal of Construction in Developing Countries, 21(1), pp. 35-50. ISSN 1823-6499
La, Anh Tuan (2016) Principal factors for public-private partnership (ppp) implementation in Vietnam: A mixed methods study. PhD thesis, University of Technology Sydney, Australia.
La Fleur, L (2019) Energy renovation of multi-family buildings in Sweden an evaluation of life cycle costs, indoor environment and primary energy use, and a comparison with constructing a new building. PhD thesis, Linköping University, Sweden.
Lad, V H; Patel, D A; Chauhan, K A and Patel, K A (2021) Development of a causal loop diagram for bridge resilience. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Laepple, E S (2005) Exploring project collaboration systems in the building industry. PhD thesis, Texas A&M University, USA.
Lai, H Y and Chiang, W H (2024) Generative design of terraced concert hall: A case study of Taipei music and library centre. Building Research & Information, 52(1-2), pp. 49-67. ISSN 0961-3218
Lai, J H-k (2005) Economic, management and contractual considerations in outsourcing operation and maintenance work for commercial buildings. PhD thesis, Cardiff University, UK.
Laishram, B and Sood, R (2024) Challenges in implementation of 7D-BIM for infrastructure asset management: A systematic review. Construction Economics and Building, 24(3), pp. 95-117. ISSN 2204-9029
Lam, K A and Runeson, G (1999) Modelling financial decisions in construction firms. Construction Management and Economics, 17(5), pp. 589-602. ISSN 01446193
Lam, K C and Chow, W S (1999) The significance of financial risks in BOT procurement. Building Research & Information, 27(2), pp. 84-95. ISSN 0961-3218
Lam, K C; Hu, T; Cheung, S O; Yuen, R K K and Deng, Z M (2001) Multi-project cash flow optimization: Non-inferior solution through neuro-multiobjective algorithm. Engineering, Construction and Architectural Management, 8(2), pp. 130-144. ISSN 0969-9988
Lam, K C; So, A T P; Hu, T; Ng, T; Yuen, R K K; Lo, S M; Cheung, S O and Yang, H (2001) An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making. Construction Management and Economics, 19(1), pp. 63-76. ISSN 01446193
Lam, K C; Song Hu, T I E; Ng, T; Yuen, R K K; Lo, S M and Wong, C T C (2001) Using an adaptive genetic algorithm to improve construction finance decisions. Engineering, Construction and Architectural Management, 8(1), pp. 31-45. ISSN 0969-9988
Lam, K Y (2017) The role of tacit knowledge in knowledge intensive project management. PhD thesis, Heriot-Watt University, UK.
Lam, P T I; Kumaraswamy, M M and Ng, T S T (2003) A comparative study of user perceptions on prescriptive specifications versus performance-based specifications. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Lam, P T I and Wong, F W H (2009) Improving building project performance: How buildability benchmarking can help. Construction Management and Economics, 27(1), pp. 41-52. ISSN 1466433X
Lam, T Y M; Brock, T and Gale, K S (2025) Is "design and build" suitable for social housing projects in the UK housing crisis? Built Environment Project and Asset Management, 15(4), pp. 863-878. ISSN 2044-124X
Lambers, R; Cheung, F and Skitmore, M (2024) Risk management strategies for common residential construction defects: The case of Queensland, Australia. International Journal of Construction Management, 24(10), pp. 1126-1135. ISSN 1562-3599
Lambert, E L (2015) Complex factors related to capital construction project success: A case study. PhD thesis, Capella University, USA.
Lan, R; Adenuga, O and Awolusi, I (2025) Impact of construction project failure on key project stakeholders: Assessing the perspectives of professionals in Lagos metropolis. Construction Economics and Building, 25(3-4), pp. 90-120. ISSN 2204-9029
Lan, R; Adenuga, O and Awolusi, I (2026) Professionals' perspectives on the factors causing construction project failures in developing countries: A case study of Lagos metropolis. International Journal of Construction Management, 26(3), pp. 511-535. ISSN 1562-3599
Langdon, M (2021) Towards a shift of values in rail infrastructure project evaluation. PhD thesis, University of Nottingham, UK.
Langston, C (2013) The role of coordinate-based decision-making in the evaluation of sustainable built environments. Construction Management and Economics, 31(1), pp. 62-77. ISSN 1466433X
Langston, C and Crowley, C (2021) Evaluation of transportation infrastructure: A case study of Gold Coast Light Rail stage 1&2. Construction Economics and Building, 21(4), pp. 1-20. ISSN 2204-9029
Langston, Y L and Langston, C (2009) The inherent building energy-cost relationship: An analysis of thirty Melbourne case studies. Construction Economics and Building, 9(1), pp. 9-18. ISSN 2204-9029
Laovisutthichai, V; Lu, W and Low, S P (2025) Design for excellence (DfX) for high-rise modular buildings: from DfX considerations to module design guidelines using the case of Hong Kong. Architectural Engineering and Design Management, 21(3), pp. 430-449. ISSN 1745-2007
Lappalainen, E; Uusitalo, P; Seppänen, O; Peltokorpi, A; Ainamo, A and Reinbold, A (2024) User experiences of situational awareness systems in infrastructure construction. Construction Management and Economics, 42(11-12), pp. 1012-1025. ISSN 01446193
Laptali, E (1996) Application of optimisation techniques to planning and estimating decisions in the building process. PhD thesis, University of Glamorgan, UK.
Laroza, F A R (2025) Investigating construction delays in cold storage projects in the Philippines. International Journal of Construction Management, 25(6), pp. 661-671. ISSN 1562-3599
Larsen, J K; Lindhard, S M; Brunoe, T D and Jensen, K N (2018) The relation between pre-planning, commissioning and enhanced project performance. Construction Economics and Building, 18(2), pp. 1-14. ISSN 2204-9029
Larsson, J; Lu, W; Krantz, J and Olofsson, T (2016) Discrete event simulation analysis of product and process platforms: A bridge construction case study. Journal of Construction Engineering and Management, 142(4): 04015097, ISSN 0733-9364
Larsson, J and Simonsson, P (2012) Barriers and drivers for increased use of off-site bridge construction in Sweden. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Larsson, N and Clark, J (2000) Incremental costs within the design process for energy efficient buildings. Building Research & Information, 28(5-6), pp. 413-418. ISSN 0961-3218
Larsson, R (2021) Modelling and simulation of factors influencing on-site construction of concrete frameworks: Studying the effects of resource allocation, weather conditions, and climate-improved concrete. PhD thesis, Lund University, Sweden.
Laryea, S (2009) Subcontract and supply enquiries in the tender process of contractors. Construction Management and Economics, 27(12), pp. 1219-1230. ISSN 1466433X
Laryea, S (2011) Quality of tender documents: Case studies from the UK. Construction Management and Economics, 29(3), pp. 275-286. ISSN 1466433X
Laryea, S (2013) Nature of tender review meetings. Journal of Construction Engineering and Management, 139(8), pp. 927-940. ISSN 0733-9364
Laryea, S and Hughes, W (2009) How contractors in Ghana include risk in their bid prices. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Laryea, S and Lubbock, A (2014) Tender pricing environment of subcontractors in the United Kingdom. Journal of Construction Engineering and Management, 140(1): 04013029, ISSN 0733-9364
Laryea, S and Watermeyer, R (2016) Early contractor involvement in framework contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(1), pp. 4-16. ISSN 17514304
Laryea, S and Watermeyer, R (2020) Managing uncertainty in fast-track construction projects: Case study from South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(2), pp. 49-63. ISSN 17514304
Latiff, A M A; Jaapar, A and Isa, C M M (2020) Project governance practices in urban public housing projects: A case study of public housing in Malaysia. Construction Economics and Building, 20(4), pp. 120-136. ISSN 2204-9029
Latiff, A M A; Jaapar, A and Isa, C M M (2022) Factors influencing governance practices in rural development projects: A case study of rural road projects in Malaysia. Journal of Construction in Developing Countries, 27(2), pp. 1-16. ISSN 1823-6499
Latorre, V (2009) Construction manager's influence on project success. PhD thesis, University of Plymouth, UK.
Latorre, V and Riley, M (2010) Utilizing analytical hierarchy process to prioritize critical success factors in construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Laufer, A (1985) On site performance improvement programs. Journal of Construction Engineering and Management, 111(1), pp. 82-97. ISSN 0733-9364
Laurell-Stenlund, K and Eriksson, P E (2010) Design factors' influence on value creation when building houses of culture. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Lavy, S and Nixon, J L (2017) Applications, enrolment, attendance, and student performance in rebuilt school facilities: A case study. International Journal of Construction Education and Research, 13(2), pp. 125-41. ISSN 1557-8771
Lawani, K; Thomson, C; Hare, B and Duplicki, A (2024) Unpacking the perceptions of high-density living and zoning laws: A case of Philadelphia area, USA. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Lazo, A G; Çidik, M S; Addyman, S and Rillie, I (2024) Perspectives on project management and asset management integration: A systematic review. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Le, A T H; Domingo, N; Rasheed, E and Park, K (2022) Maturity model of building maintenance management for New Zealand's state schools. Building Research & Information, 50(4), pp. 438-451. ISSN 0961-3218
Le, A T H; Domingo, N; Rasheed, E and Park, K (2022) Strategic collaboration in managing existing buildings in New Zealand's state schools: School managers' perspectives. Construction Management and Economics, 40(3), pp. 173-185. ISSN 01446193
Le, C; Jeong, H D; Damnjanovic, I and Bukkapatnam, S (2022) Pareto principle in scoping-phase cost estimating: A multiobjective optimization approach for selecting and applying optimal major work items. Journal of Construction Engineering and Management, 148(8): 04022076, ISSN 0733-9364
Le, P T; Kirytopoulos, K; Chileshe, N and Rameezdeen, R (2022) Taxonomy of risks in PPP transportation projects: A systematic literature review. International Journal of Construction Management, 22(2), pp. 166-181. ISSN 1562-3599
Le, Y; Shan, M; Chan, A P C and Hu, Y (2014) Investigating the causal relationships between causes of and vulnerabilities to corruption in the Chinese public construction sector. Journal of Construction Engineering and Management, 140(9): 05014007, ISSN 0733-9364
Le-Hoai, L; Dang, C N; Lee, S B and Lee, Y D (2019) Benchmarking claim causes against contractors in emerging markets: Empirical case study. International Journal of Construction Management, 19(4), pp. 307-316. ISSN 1562-3599
Leblanc, H (2012) Knowledge mapping and process modelling to develop a sustainability-related knowledge management strategy for Scottish housing association planned works. PhD thesis, Glasgow Caledonian University, UK.
Lee, C Y-H (2010) A probabilistic approach to the life-cycle cost assessment of preventive maintenance strategies on flexible pavements. PhD thesis, University of California, Davis, USA.
Lee, F K S (2016) Construction contractor selection criteria: the effects of relational norms, price and prequalification. PhD thesis, University of Reading, UK.
Lee, H S; Lee, J Y and Lee, J S (1999) Nonshored formwork system for top-down construction. Journal of Construction Engineering and Management, 125(6), pp. 392-399. ISSN 0733-9364
Lee, H S; Shin, J W; Park, M and Ryu, H G (2009) Probabilistic duration estimation model for high-rise structural work. Journal of Construction Engineering and Management, 135(12), pp. 1289-1298. ISSN 0733-9364
Lee, H S; Yu, J H and Kim, S K (2004) Impact of labor factors on workflow. Journal of Construction Engineering and Management, 130(6), pp. 918-923. ISSN 0733-9364
Lee, H W (2012) Application of target value design to energy efficiency investments. PhD thesis, University of California, Berkeley, USA.
Lee, J (2005) Value analysis of Wi-Fi agent functions in construction. PhD thesis, North Carolina State University, USA.
Lee, J S (2021) Life cycle costing for exterior materials on building façade. Journal of Construction Engineering and Management, 147(7): 2068, ISSN 0733-9364
Lee, K (1994) Software options for support of three-dimensional CAD in the architectural design process: A critical evaluation by practitioners and educators. PhD thesis, Texas A&M University, USA.
Lee, S (2007) Entry decision for unsolicited build-operate-transfer (BOT) highway projects: Real options approach. PhD thesis, University of Colorado at Boulder, USA.
Lee, S H (2009) Computational fieldwork support for efficient operation and maintenance of mechanical, electrical and plumbing systems. PhD thesis, Carnegie Mellon University, USA.
Lees, M A (2009) Measuring the value of engagement between higher education and industry and practice in the built environment. PhD thesis, University of Salford, UK.
Lehtinen, J and Aaltonen, K (2024) Community stakeholders' online engagement in infrastructure projects: a theory-testing single-case study. Construction Management and Economics, 42(8), pp. 758-786. ISSN 01446193
Lehtonen, T J T (2006) Partnering relations: Justification and success factors from facilities management services perspective. DScTech thesis, Teknillinen Korkeakoulu (Helsinki), Finland.
Lei, Z; Han, S; Bouferguène, A; Taghaddos, H; Hermann, U and Al-Hussein, M (2015) Algorithm for mobile crane walking path planning in congested industrial plants. Journal of Construction Engineering and Management, 141(2): 05014016, ISSN 0733-9364
Lekan, A; Aigbavboa, C and Emetere, M (2023) Managing quality control systems in intelligence production and manufacturing in contemporary time. International Journal of Construction Management, 23(8), pp. 1436-1446. ISSN 1562-3599
Leo-olagbaye, F and Odeyinka, H A (2018) Evaluation of risk factors and their impact on road projects. Journal of Construction Business and Management, 2(2), pp. 24-35. ISSN 2521-0165
Leoto, R and Lizarralde, G (2019) Challenges for integrated design (ID) in sustainable buildings. Construction Management and Economics, 37(11), pp. 625-642. ISSN 01446193
Lerche, J; Enevoldsen, P and Seppänen, O (2022) Application of takt and kanban to modular wind turbine construction. Journal of Construction Engineering and Management, 148(2), ISSN 0733-9364
Lester, E (2022) An exploration of mentorship as a resource for knowledge sharing in the built environment. PhD thesis, University of Salford, UK.
Leung, M Y; Chan, Y S and Yu, J (2009) Integrated model for the stressors and stresses of construction project managers in Hong Kong. Journal of Construction Engineering and Management, 135(2), pp. 126-134. ISSN 0733-9364
Leung, M Y; Chen, D and Yu, J (2008) Demystifying moderate variables of the interrelationships among affective commitment, job performance, and job satisfaction of construction professionals. Journal of Construction Engineering and Management, 134(12), pp. 963-971. ISSN 0733-9364
Leung, M Y and Liu, A M M (2003) Analysis of value and project goal specificity in value management. Construction Management and Economics, 21(1), pp. 11-19. ISSN 01446193
Leung, M Y; Skitmore, M and Chan, Y S (2007) Subjective and objective stress in construction cost estimation. Construction Management and Economics, 25(10), pp. 1063-1075. ISSN 1466433X
Leung, M Y; Yu, J and Chong, M L A (2016) Effects of stress and commitment on the performance of construction estimation participants in Hong Kong. Journal of Construction Engineering and Management, 142(2): 04015081, ISSN 0733-9364
Leung, M Y; Zhang, H and Skitmore, M (2008) Effects of organizational supports on the stress of construction estimation participants. Journal of Construction Engineering and Management, 134(2), pp. 84-93. ISSN 0733-9364
Leung, M y; Wong, M k and Oloke, D (2003) Coping behaviours of construction estimators in stress management. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Leung, M-K and Shing, G T-y (1999) The growing mortgage market in China. Journal of Financial Management of Property and Construction, 4(2), pp. 33-48. ISSN 1366-4387
Levander, E and Sardén, Y (2009) Maintenance and operating costs in off-site timber framed housing. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Levis, James William (2013) A mathematical programming life-cycle assessment model for solid waste management decision making. PhD thesis, North Carolina State University, USA.
Lewis, A (2013) A framework for improving building operations decisions for energy efficiency. PhD thesis, University of Reading, UK.
Lewis, A and Elmualim, A (2011) Development of a decision support system for proactive energy and maintenance management decisions. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Li, B; Akintoye, A; Edwards, P and Hardcastle, C (2004) Risk treatment preferences for PPP/PFI construction projects in the UK. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Li, B; Akintoye, A; Edwards, P J and Hardcastle, C (2004) Value for money factors in the development of PPP/PFI Construction projects. Journal of Financial Management of Property and Construction, 9(1), pp. 43-52. ISSN 1366-4387
Li, B; Akintoye, A and Hardcastle, C (2002) Risks and risk treatments in public private partnership projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Li, Chenyang (2022) A model for developing retrofitting strategies for office buildings. PhD thesis, University of Technology Sydney, Australia.
Li, Guokai (2024) A research on construction and demolition waste management. PhD thesis, Università degli Studi di Padova, Italy.
Li, J; Huang, W; Song, D; Zhou, L and Yang, B (2025) A constrained planning method: Considering storage space limitations and soft logic for cruise cabin assembly scheduling. Journal of Construction Engineering and Management, 151(8): 04025102, ISSN 0733-9364
Li, J; Zhu, J and Guan, C (2024) Mitigating fatigue in tunnel construction through illumination: Evidence from virtual reality. Journal of Construction Engineering and Management, 150(11): 04024165, ISSN 0733-9364
Li, K and Cheung, S O (2019) Unveiling cognitive biases in construction project dispute resolution through the lenses of third-party neutrals. Journal of Construction Engineering and Management, 145(11): 04019070, ISSN 0733-9364
Li, M and Yang, J (2014) Analysis of interrelationships between critical waste factors in office building retrofit projects using interpretive structural modelling. International Journal of Construction Management, 14(1), pp. 15-27. ISSN 1562-3599
Li, Q (2009) Energy efficiency design of residential buildings in North China cities. PhD thesis, Cardiff University, UK.
Li, Q; Jiang, M; Tao, S; Hao, J and Chong, H Y (2023) The integrated problem of construction project scheduling and multiskilled staff assignment with learning effect. Journal of Construction Engineering and Management, 149(8): 04023064, ISSN 0733-9364
Li, S (2010) Strategies for international construction related consultancy firms to compete in China. PhD thesis, National University of Singapore, Singapore.
Li, X; Lu, W; Xue, F; Wu, L; Zhao, R; Lou, J and Xu, J (2022) Blockchain-enabled IoT-BIM platform for supply chain management in modular construction. Journal of Construction Engineering and Management, 148(2): 0002229, ISSN 0733-9364
Li, Y; Liu, J; Du, X and Zhong, R Y (2025) Creating value from data resources: Research on a service ecosystem symbiosis model of digital transportation infrastructure. Journal of Construction Engineering and Management, 151(9): 05025009, ISSN 0733-9364
Li, Y and Ning, Y (2022) Mitigating opportunistic behaviors in consulting projects: Evidence from the outsourced architectural and engineering design. Journal of Construction Engineering and Management, 148(7): 04022044, ISSN 0733-9364
Li, Y; Ning, Y and Rowlinson, S (2023) Social control in outsourced architectural and engineering design consulting projects: Behavioral consequences and motivational mechanism. Journal of Construction Engineering and Management, 149(4): 04023004, ISSN 0733-9364
Li, Y Y; Chen, P H; Chew, D A S; Teo, C C and Ding, R G (2011) Critical project management factors of AEC firms for delivering green building projects in Singapore. Journal of Construction Engineering and Management, 137(12), pp. 1153-1163. ISSN 0733-9364
Li, Z; Zhang, Q; Fan, F and Shen, S (2020) Analysis of dynamic properties and vibration comfort of large-scale stands. Building Research & Information, 48(7), pp. 802-816. ISSN 0961-3218
Liang, C (2016) Development of a multifunctional building information modelling (BIM) maturity model. PhD thesis, University of Hong Kong, Hong Kong.
Liang, Q and Li, Q (2021) Investigating the influence of facilities management factors in community area on quality of life of the elderly. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Liang, R; Xue, Z and Chong, H Y (2023) Risk evaluation of logistics park projects' lifecycle during the COVID-19 pandemic: Failure mode and effects analysis. Journal of Construction Engineering and Management, 149(1): 04022153, ISSN 0733-9364
Liang, X; Rasheed, U; Cai, J; Wibranek, B and Awolusi, I (2024) Impacts of collaborative robots on construction work performance and worker perception: Experimental analysis of human-robot collaborative wood assembly. Journal of Construction Engineering and Management, 150(8): 04024087, ISSN 0733-9364
Lim, J N (2007) Stimulating construction innovation in Singapore by developing the national system of innovation. PhD thesis, National University of Singapore, Singapore.
Lim, J N and Ofori, G (2007) Classification of innovation for strategic decision making in construction businesses. Construction Management and Economics, 25(9), pp. 963-978. ISSN 1466433X
Lim, M S H (2022) The practice of DFS review in Singapore: Industry and organisational level interventions. PhD thesis, National University of Singapore, Singapore.
Lim, Soon Kam (2009) Framework and processes for enhancing sustainability deliverables in Australian road infrastructure projects. PhD thesis, Queensland University of Technology, Australia.
Lim, T H B (2009) Organizational flexibility management in construction. PhD thesis, National University of Singapore, Singapore.
Lim, Y S; Xia, B; Skitmore, M; Gray, J and Bridge, A (2015) Education for sustainability in construction management curricula. International Journal of Construction Management, 15(4), pp. 321-331. ISSN 1562-3599
Lin, Z; Petzold, F and Ma, Z (2026) Uncovering the timeline hidden in tower crane operation navigation for better lifting activities in construction site. Journal of Construction Engineering and Management, 152(4): 04026011, ISSN 0733-9364
Lin, C H; Chih, Y Y and Tsay, Y S (2022) Determinants of the adoption of green building simulation technologies in architectural design practices in Taiwan. Journal of Construction Engineering and Management, 148(1): 04021190, ISSN 0733-9364
Lin, G (2011) Decision model for determination of adaptation potential and renewal action for public housing in Singapore. PhD thesis, National University of Singapore, Singapore.
Lindhard, S M (2024) Danish contractor's application of the budget: Identifying purpose and comparing the budgets application level across job-position. Construction Economics and Building, 24(4-5), pp. 1-17. ISSN 2204-9029
Ling, F Y Y (1999) Multi-attribute decision making model for evaluation and selection of consultants for design-and-build projects in Singapore. PhD thesis, National University of Singapore, Singapore.
Ling, F Y Y (2004) Key determinants of performance of design-bid-build projects in Singapore. Building Research & Information, 32(2), pp. 128-139. ISSN 0961-3218
Ling, F Y Y; Hartmann, A; Kumaraswamy, M and Dulaimi, M (2007) Influences on innovation benefits during implementation: Client's perspective. Journal of Construction Engineering and Management, 133(4), pp. 306-315. ISSN 0733-9364
Ling, F Y Y; Heng, G T H; Chang-Richards, A; Chen, X and Yiu, T W (2023) Impact of digital technology adoption on the comparative advantage of architectural, engineering, and construction firms in Singapore. Journal of Construction Engineering and Management, 149(12): 04023125, ISSN 0733-9364
Ling, F Y Y; Ibbs, C W and Cuervo, J C (2005) Entry and business strategies used by international architectural, engineering and construction firms in China. Construction Management and Economics, 23(5), pp. 509-520. ISSN 01446193
Ling, F Y Y; Ibbs, C W and Hoo, W Y (2006) Determinants of international architectural, engineering, and construction firms' project success in China. Journal of Construction Engineering and Management, 132(2), pp. 206-214. ISSN 0733-9364
Ling, F Y Y and Li, S (2016) Business models for foreign firms offering construction-related consultancy services in China. Construction Management and Economics, 34(4-5), pp. 218-235. ISSN 01446193
Ling, F Y Y and Sim, W X L (2025) Mediating role of vocational interest in the relationship between personality and job satisfaction: Insights from cost engineers. Journal of Construction Engineering and Management, 151(6): 04025057, ISSN 0733-9364
Ling, F Y Y and Tran, P Q (2012) Effects of interpersonal relations on public sector construction contracts in Vietnam. Construction Management and Economics, 30(12), pp. 1087-1101. ISSN 1466433X
Ling, Y Y (2000) A theoretical framework for selection of consultants by design-build contractors. Journal of Construction Procurement, 6(2), ISSN 1358-9180
Ling, Y Y; Khee, H Y and Lim, K S G (2000) The reasons why clients prefer to procure more projects based on design-bid-build than design-and-build. Journal of Construction Procurement, 6(2), ISSN 1358-9180
Lingard, H (2004) Work and family sources of burnout in the Australian engineering profession: Comparison of respondents in dual- and single-earner couples, parents, and nonparents. Journal of Construction Engineering and Management, 130(2), pp. 290-298. ISSN 0733-9364
Lingard, H; Cooke, T and Blismas, N (2012) Do perceptions of supervisors' safety responses mediate the relationship between perceptions of the organizational safety climate and incident rates in the construction supply chain? Journal of Construction Engineering and Management, 138(2), pp. 234-241. ISSN 0733-9364
Lingard, H; Gilbert, G and Graham, P (2001) Improving solid waste reduction and recycling performance using goal setting and feedback. Construction Management and Economics, 19(8), pp. 809-817. ISSN 01446193
Lingard, H; Graham, P and Smithers, G (2000) Employee perceptions of the solid waste management system operating in a large Australian contracting organization: Implications for company policy implementation. Construction Management and Economics, 18(4), pp. 383-393. ISSN 01446193
Liou, F S and Borcherding, J D (1986) Work sampling can predict unit rate productivity. Journal of Construction Engineering and Management, 112(1), pp. 90-103. ISSN 0733-9364
Liu, Y.; Schmidt, S.; Li, H. and Cao, Y. (2026) A study on the moisture risk assessment path for exterior wall of existing residential building in Shanghai based on hygrothermal simulation analysis. Architectural Engineering and Design Management, 22(2), pp. 340-364. ISSN 1745-2007
Liu, C; González, V A; Lee, G; Davies, R; Cabrera-Guerrero, G and Zou, Y (2025) Assessing an immersive virtual reality-based simulation game capability to study the social mechanisms enabled by the Last Planner system in projects. Journal of Construction Engineering and Management, 151(9): 04025111, ISSN 0733-9364
Liu, D; Sun, J; Zhong, D and Song, L (2012) Compaction quality control of earth-rock dam construction using real-time field operation data. Journal of Construction Engineering and Management, 138(9), pp. 1085-1094. ISSN 0733-9364
Liu, F (2015) Integrated change and knowledge management for energy efficient retrofit projects. PhD thesis, Pennsylvania State University, USA.
Liu, J; Low, S P and Wang, L F (2018) Critical success factors for eco-city development in China. International Journal of Construction Management, 18(6), pp. 497-506. ISSN 1562-3599
Liu, J; Zhao, X and Yan, P (2016) Risk paths in international construction projects: Case study from Chinese contractors. Journal of Construction Engineering and Management, 142(6): 05016002, ISSN 0733-9364
Liu, L and Napier, Z (2010) The accuracy of risk-based cost estimation for water infrastructure projects: Preliminary evidence from Australian projects. Construction Management and Economics, 28(1), pp. 89-100. ISSN 1466433X
Liu, Li (2003) Models of enterprise-level project performance: Comparative studies of organizational form, control mode and feedback mechanisms in the construction and it services industries. PhD thesis, University of New South Wales, Australia.
Liu, M (2007) Work flow variability and labor productivity loss for construction projects. PhD thesis, University of California, Berkeley, USA.
Liu, Margaret Ze-Yu (2016) Energy efficiency retrofits of tertiary education buildings: An investigation of case studies in New South Wales. PhD thesis, University of Sydney, Australia.
Liu, Q (2025) The impact of funnel sales management on sales performance in engineering construction companies: An empirical study based on CE company data. DBA thesis, Arizona State University, USA.
Liu, Q; Feng, Y; London, K and Zhang, P (2023) Influence of personal characteristics and environmental stressors on mental health for multicultural construction workplaces in Australia. Construction Management and Economics, 41(2), pp. 116-137. ISSN 01446193
Liu, Q; Feng, Y; London, K and Zhang, P (2023) Coping strategies for work and cultural stressors in multicultural construction workplaces: A study in Australia. Construction Management and Economics, 41(7), pp. 537-553. ISSN 01446193
Liu, Q; Ye, G; Yang, J; Xiang, Q and Liu, Q (2022) Construction workers' representativeness heuristic in decision making: The impact of demographic factors. Journal of Construction Engineering and Management, 148(4): 04022005, ISSN 0733-9364
Liu, S (2016) An investigation of how information processing impacts boundary spanning activities in managing construction design changes from the perspective of contractors. PhD thesis, University of Hong Kong, Hong Kong.
Liu, W; Zhang, J and Liu, W (2021) Heuristic methods for finance-based and resource-constrained project scheduling problem. Journal of Construction Engineering and Management, 147(11): 04021141, ISSN 0733-9364
Liu, Y (2009) Critical factors for managing project communication among participants at the construction stage. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Liu, Y; Jarvamardi, A; Zhang, Y; Liu, M; Hsiang, S M; Yang, S; Yu, X and Jiang, Z (2021) Comparative study on perception of causes for construction task delay in China and the United States. Journal of Construction Engineering and Management, 147(3): 04020176, ISSN 0733-9364
Liu, Y; Wang, X and Wang, D (2021) How leaders and coworkers affect construction workers' safety behavior: An integrative perspective. Journal of Construction Engineering and Management, 147(12): 04021176, ISSN 0733-9364
Liu, Y; Xiang, Q; Goh, Y M; Ye, G; Shao, Z and Safiena, S (2025) Exploring the mechanism of hazard detection failure of construction workers from a capability-demand matching perspective. Journal of Construction Engineering and Management, 151(9): 04025115, ISSN 0733-9364
Liu, Yu Ming (2005) A holistic approach to developing generic vs. regionally specific frameworks for sustainable building tools. PhD thesis, University of New South Wales, Australia.
Livesey, P V (2017) Goleman-Boyatzis model of emotional intelligence for dealing with problems in project management. Construction Economics and Building, 17(1), pp. 20-45. ISSN 2204-9029
Livesey, P V (2020) Further insights by project managers into the problems in project management. Construction Economics and Building, 20(4), pp. 137-153. ISSN 2204-9029
Liyanawatta, T N; Francis, M and Ranadewa, K A T O (2024) Avoiding construction disputes: A comprehensive framework for pre-contract planning. International Journal of Construction Management, 24(12), pp. 1282-1294. ISSN 1562-3599
Llale J, C-M O (2023) Potential benefits of close proximity of taxi ranks to retail developments. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Lo, W and Yan, M R (2009) Evaluating qualification-based selection system: A simulation approach. Journal of Construction Engineering and Management, 135(6), pp. 458-465. ISSN 0733-9364
Lo, Y; Zhang, C; Ye, Z and Cui, C (2023) Monitoring road base course construction progress by photogrammetry-based 3D reconstruction. International Journal of Construction Management, 23(12), pp. 2087-2101. ISSN 1562-3599
Lobo, Y and Wilkinson, S (2006) The effects of occupational licensing on skills needs in the building industry: Evidence from New Zealand. Construction Economics and Building, 6(2), pp. 55-63. ISSN 2204-9029
Locay, A (2012) An examination of collective behavior, optimism, uncertainty and their effects on corporate strategies in the home building industry. PhD thesis, Nova Southeastern University, USA.
Longstaff, D and Johansen, E (2009) Mobile phones in project management: The pendulum of professionalism. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Loosemore, M (1994) Problem behaviour. Construction Management and Economics, 12(6), pp. 511-520. ISSN 01446193
Loosemore, M; Phua, F; Dunn, K and Ozguc, U (2010) Operatives' experiences of cultural diversity on Australian construction sites. Construction Management and Economics, 28(2), pp. 177-188. ISSN 1466433X
Lopez, R and Love, P E D (2012) Design error costs in construction projects. Journal of Construction Engineering and Management, 138(5), pp. 585-593. ISSN 0733-9364
Lord, A M (1989) An investigation into the role of the project manager: A comparative study of project leadership, organisation and culture in UK defence contractors and engineering constructors. PhD thesis, Henley Business School, UK.
Loria Arcila, J H (2002) Major issues impacting affordable housing developments in Mexico. PhD thesis, Georgia Institute of Technology, USA.
Love, P E D (2002) Influence of project type and procurement method on rework costs in building construction projects. Journal of Construction Engineering and Management, 128(1), pp. 18-29. ISSN 0733-9364
Love, P E D; Ackermann, F; Teo, P and Morrison, J (2015) From individual to collective learning: A conceptual learning framework for enacting rework prevention. Journal of Construction Engineering and Management, 141(11): 05015009, ISSN 0733-9364
Love, P E D; Edwards, D J; Watson, H and Davis, P (2010) Rework in civil infrastructure projects: Determination of cost predictors. Journal of Construction Engineering and Management, 136(3), pp. 275-282. ISSN 0733-9364
Love, P E D; Skitmore, M and Earl, G (1998) Selecting a suitable procurement method for a building project. Construction Management and Economics, 16(2), pp. 221-233. ISSN 01446193
Lovesmith, D M (2009) Areas of knowledge needed by superintendents and architects to enhance their collaboration in the school design process. EdD thesis, Texas A&M University, USA.
Low, S P; Gao, S and Mohdari, M M (2016) Marketing importance and marketing performance measurement of architecture firms in Singapore: An exploratory study. Construction Management and Economics, 34(11), pp. 739-750. ISSN 01446193
Low, W W and Wong, K S (2023) The status quo of facebook usage among young generations in civil engineering education. International Journal of Construction Management, 23(9), pp. 1471-1483. ISSN 1562-3599
Low, W W; Wong, K S and Lee, J L (2022) Cost-influencing risk factors in infrastructure projects on soft soils. International Journal of Construction Management, 22(2), pp. 229-241. ISSN 1562-3599
Lowe, D (2003) The development of early stage design cost estimating expertise: Effective feedback and systematic reflection for quantity surveyors. Journal of Financial Management of Property and Construction, 8(2), pp. 79-88. ISSN 1366-4387
Lowe, D J (1996) Experiental learning in design cost estimating. PhD thesis, University of Manchester, UK.
Lowe, D J (1998) Effective feedback and systematic reflection in design cost estimating. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Lowe, D J and Skitmore, R M (2001) Human effects in construction contract price forecasting: Experience and experiential learning styles. Journal of Construction Engineering and Management, 127(6), pp. 485-493. ISSN 0733-9364
Lowe, J (1993) Construction productivity: an input-output approach. PhD thesis, Glasgow Caledonian University, UK.
Lozon, J P (2008) Evaluating value improving practices for large scale projects. PhD thesis, University of Calgary, Canada.
Lu, H and Juan, Y K (2023) Applying the DQI-based kano model and QFD to develop design strategies for visitor centers in national parks. Architectural Engineering and Design Management, 19(3), pp. 215-232. ISSN 1745-2007
Lu, M (2000) Productivity studies using advanced ANN models. PhD thesis, University of Alberta, Canada.
Lu, M (2002) Enhancing project evaluation and review technique simulation through artificial neural network-based input modeling. Journal of Construction Engineering and Management, 128(5), pp. 438-445. ISSN 0733-9364
Lu, M and AbouRizk, S M (2000) Simplified CPM/PERT simulation model. Journal of Construction Engineering and Management, 126(3), pp. 219-226. ISSN 0733-9364
Lu, M; Poon, C S and Wong, L C (2006) Application framework for mapping and simulation of waste handling processes in construction. Journal of Construction Engineering and Management, 132(11), pp. 1212-1221. ISSN 0733-9364
Lu, W; Zhang, L and Li, Z (2015) Influence of negotiation risk attitude and power on behaviors and outcomes when negotiating construction claims. Journal of Construction Engineering and Management, 141(2): 04014069, ISSN 0733-9364
Lu, Y; Scott, A; Kim, J; Curi, C B; McCarty, J; Pardy, A; Rysanek, A; Girling, C and Kellett, R (2021) Integration of an energy-economy model with an urban energy model. Buildings & Cities, 2(1), pp. 114-133. ISSN 2632-6655
Lu, Y; Sood, T; Chang, R and Liao, L (2022) Factors impacting integrated design process of net zero energy buildings: An integrated framework. International Journal of Construction Management, 22(9), pp. 1700-1712. ISSN 1562-3599
Lu, Z (2018) Feasibility assessment framework for financing public-private partnership infrastructure projects through asset-backed security. PhD thesis, Columbia University, USA.
Lu, Z; Rodiek, S; Shepley, M M and Tassinary, L G (2015) Environmental influences on indoor walking behaviours of assisted living residents. Building Research & Information, 43(5), pp. 602-615. ISSN 0961-3218
Lucko, G; Helinski, P O and Ballesteros-Pérez, P (2026) Universal model for performance and delay tracking of linear construction schedules. Journal of Construction Engineering and Management, 152(5): 04026035, ISSN 0733-9364
Ludlow, J E (1976) Assessment and prediction of noise from construction sites. PhD thesis, University of Southampton, UK.
Lukhele, T; Botha, B and Mbanga, S (2021) Exploring project complexity relations to scope changes in construction projects: A case study of NEC projects in South Africa. Construction Economics and Building, 21(2), pp. 18-33. ISSN 2204-9029
Lundman, P (2011) Cost management for underground infrastructure projects a case study on cost increase and its causes. PhD thesis, Luleå University of Technology, Sweden.
Lundström, A; Savolainen, J and Kostiainen, E (2016) Case study: Developing campus spaces through co-creation. Architectural Engineering and Design Management, 12(6), pp. 409-426. ISSN 1745-2007
Luo, Z; Jiang, Y; Li, X; Wu, R and Pan, H (2026) Financing mode selection and key success factors in area comprehensive development projects based on if-multimoora. Journal of Construction Engineering and Management, 152(4): 04026032, ISSN 0733-9364
Luo, J and Santoso, D S (2024) Critical factors affecting Chinese construction expatriates' living and working conditions in Thailand: A Delphi study. International Journal of Construction Management, 24(10), pp. 1066-1076. ISSN 1562-3599
Luo, L; Wu, X; Hong, J and Wu, G (2022) Fuzzy cognitive map-enabled approach for investigating the relationship between influencing factors and prefabricated building cost considering dynamic interactions. Journal of Construction Engineering and Management, 148(9): 04022081, ISSN 0733-9364
Lutz, J D and Hijazi, A (1993) Planning repetitive construction: Current practice. Construction Management and Economics, 11(2), pp. 99-110. ISSN 01446193
Lyu, H M; Sun, W J; Shen, S L and Zhou, A N (2020) Risk assessment using a new consulting process in fuzzy AHP. Journal of Construction Engineering and Management, 146(3): 04019112, ISSN 0733-9364
Löfgren, P and Eriksson, P E (2009) Effects of collaboration in projects on construction project performance. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Löwstedt, M; Fasth, J and Styhre, A (2021) Leadership under construction: A qualitative exploration of leadership processes in construction companies in sweden. Journal of Construction Engineering and Management, 147(12): 05021010, ISSN 0733-9364
M.E. Sepasgozar, S; Shirowzhan, S and Loosemore, M (2021) Information asymmetries between vendors and customers in the advanced construction technology diffusion process. Construction Innovation, 21(4), pp. 857-874. ISSN 1471-4175
Ma, H; Lv, K; Zeng, S; Lin, H and Shi, J J (2022) Climbing the pyramid of megaproject social responsibility: Impacts of external stakeholders and project complexity. Journal of Construction Engineering and Management, 148(11): 04022116, ISSN 0733-9364
Ma, X; Chan, A P C; Li, Y; Zhang, B and Xiong, F (2020) Critical strategies for enhancing BIM implementation in AEC projects: Perspectives from Chinese practitioners. Journal of Construction Engineering and Management, 146(2): 05019019, ISSN 0733-9364
Ma, X; Darko, A; Chan, A P C; Wang, R and Zhang, B (2022) An empirical analysis of barriers to building information modelling (BIM) implementation in construction projects: Evidence from the Chinese context. International Journal of Construction Management, 22(16), pp. 3119-3127. ISSN 1562-3599
Maali, M; Orhan, S N; Sagiroglu, M and Cirpici, B K (2023) Analyzing of bolted joints for connecting rectangular hollow sections in reticulated shells. Architectural Engineering and Design Management, 19(5), pp. 550-566. ISSN 1745-2007
MacAskill, K and Guthrie, P (2014) Application of sustainability principles in post-disaster reconstruction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Macintosh, A and Steemers, K (2005) Ventilation strategies for urban housing: Lessons from a PoE case study. Building Research & Information, 33(1), pp. 17-31. ISSN 0961-3218
Macmillan, S; Steele, J; Kirby, P; Spence, R and Austin, S (2002) Mapping the design process during the conceptual phase of building projects. Engineering, Construction and Architectural Management, 9(3), pp. 174-180. ISSN 0969-9988
Macpherson, S J; Kelly, J R and Webb, R S (1993) How designs develop: Insights from case studies in building engineering services. Construction Management and Economics, 11(6), pp. 475-485. ISSN 01446193
Maddah, R (2019) An analysis of risks faced by foreign construction firms in India and their effect on project performance. PhD thesis, Indian Institute of Technology Delhi, India.
Madushika, U G D and Lu, W (2026) Policy strategies for green retrofitting adoption: A systematic review and future directions. International Journal of Construction Management, 26(5), pp. 805-824. ISSN 1562-3599
Magent, C S (2005) A process and competency-based approach to high performance building design. PhD thesis, Pennsylvania State University, USA.
Magent, C S; Korkmaz, S; Klotz, L E and Riley, D R (2009) A design process evaluation method for sustainable buildings. Architectural Engineering and Design Management, 5(1-2), pp. 62-74. ISSN 1745-2007
Mah, D E (2011) Framework for rating the sustainability of the residential construction practice. PhD thesis, University of Alberta, Canada.
Mahadkar, S; Mills, G and Price, A D F (2012) Stakeholder consultation practices within healthcare infrastructure planning: A conceptual approach to strategic asset management. Built Environment Project and Asset Management, 2(2), pp. 127-145. ISSN 2044-124X
Mahamadu, A-M; Mahdjoubi, L and Booth, C A (2017) Critical BIM qualification criteria for construction pre-qualification and selection. Architectural Engineering and Design Management, 13(5), pp. 326-343. ISSN 1745-2007
Maharjan, R (2017) Effects of contract procurement factors on performance of transportation projects. PhD thesis, University of Nevada, Las Vegas, USA.
Mahdi, I M; Arafat, H; Ebid, A M and El-Kadi, A F (2023) Decision model to identify the optimum retaining wall type for restricted highway projects sites. International Journal of Construction Management, 23(8), pp. 1387-1394. ISSN 1562-3599
Mahdi, I M; Khalil, A H; Mahdi, H A and Mansour, D M M (2022) Decision support system for optimal bridge' maintenance. International Journal of Construction Management, 22(3), pp. 342-356. ISSN 1562-3599
Mahdiputra, Suyanto (2007) Organisational learning in UK construction companies. PhD thesis, Northumbria University, UK.
Mahdjoubi, L (2001) An investigation of computer-generated architectural representations on design decision-tasks. PhD thesis, University of Newcastle upon Tyne, UK.
Mahmood, A (1992) Educational interests and needs of owner-managers of small building firms. PhD thesis, Heriot-Watt University, UK.
Mahmoud, H M (1998) Applying a fuzzy logic expert system in the selection of bridge deck joints. PhD thesis, University of Central Florida, USA.
Mahmud, A T; Ogunlana, S O and Hong, W T (2021) Key driving factors of cost overrun in highway infrastructure projects in Nigeria: A context-based perspective. Journal of Engineering, Design and Technology, 19(6), pp. 1530-1555. ISSN 1726-0531
Maiti, S and Choi, J H (2021) An evidence-based approach to health and safety management in megaprojects. International Journal of Construction Management, 21(10), pp. 997-1010. ISSN 1562-3599
Mak, S and Wong, L (1997) Estimating using risk analysis for construction. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Malabi Eberhardt, L C; Kuittinen, M; Häkkinen, T; Moinel, C; Nibel, S and Birgisdottir, H (2024) Carbon handprint: A review of potential climate benefits of buildings. Building Research & Information, 52(6), pp. 708-723. ISSN 0961-3218
Malek, M S and Bhatt, V (2023) Examine the comparison of CSFs for public and private sector's stakeholders: A SEM approach towards PPP in Indian road sector. International Journal of Construction Management, 23(13), pp. 2239-2248. ISSN 1562-3599
Malek, M S and Gundaliya, P J (2023) Negative factors in implementing public-private partnership in Indian road projects. International Journal of Construction Management, 23(2), pp. 234-242. ISSN 1562-3599
Malge, A M and Pawar, P M (2021) Wind tunnel and numerical study of multi-storey vertical axis wind turbines with different configurations. Journal of Engineering, Design and Technology, 19(6), pp. 1358-1372. ISSN 1726-0531
Malla, V and Delhi, V S K (2022) Determining interconnectedness of barriers to interface management in large construction projects. Construction Economics and Building, 22(2), pp. 69-101. ISSN 2204-9029
Mallawaarachchi, V T; Senanayake, S M A H; Disaratna, V and Perera, B A K S (2024) Application of subcontracting as a quality improvement tool for building constructions in Sri Lanka. International Journal of Construction Management, 24(1), pp. 44-56. ISSN 1562-3599
Malmqvist, T and Brismark, J (2023) Embodied carbon savings of co-living and implications for metrics. Buildings & Cities, 4(1), pp. 386-404. ISSN 2632-6655
Manewa, R M A S (2012) Economic considerations for adaptability in buildings. PhD thesis, Loughborough University, UK.
Mangu, S; Thillai Rajan, A and Deep, A (2021) Comparison of toll and annuity PPPs: A case study of highway projects in India. Built Environment Project and Asset Management, 11(1), pp. 103-120. ISSN 2044-124X
Mangvwat, J S; Spillane, J P and Bradley, J G (2023) Instrumentality of procurement laws to implement social sustainability in Nigeria. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Manley, S and de Graft-Johnson, A (2013) Towards inclusion: Rethinking architectural education. Construction Management and Economics, 31(8), pp. 914-927. ISSN 1466433X
Manninen, D L (1981) Labor force migration associated with nuclear power plant construction. PhD thesis, University of Washington, USA.
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) A training guide for the reinforcement of continuous professional development of engineers and project managers on performance and productivity improvement practices in construction. International Journal of Construction Management, 24(13), pp. 1475-1484. ISSN 1562-3599
Mansour, H; Aminudin, E; Omar, B and Al-Sarayreh, A (2022) Development of an impact-on-performance index (ipi) for construction projects in Malaysia: A Delphi study. International Journal of Construction Management, 22(11), pp. 2003-2012. ISSN 1562-3599
Mansouri, S; Castronovo, F and Akhavian, R (2020) Analysis of the synergistic effect of data analytics and technology trends in the AEC/FM industry. Journal of Construction Engineering and Management, 146(3): 04019113, ISSN 0733-9364
Manu, E; Ankrah, N; Chinyio, E A and Proverbs, D (2016) Functional consequences of trust in the construction supply chain: A multi-dimensional view. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Manzoni, B; Morris, P and Smyth, H (2010) Managing architectural competitions: Empirical evidence from practices in the UK and Italy. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Maqsoom, A and Charoenngam, C (2014) Determinants of successful international expansion of construction contracting firms: A case study of Pakistani firms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Maqsoom, A; Hammad, M; Umer, M; Salman, A and Ashraf, H (2024) From intentions to actions: unveiling the socio-psychological drivers of solar home system adoption in developing nations. Architectural Engineering and Design Management, 20(5), pp. 1019-1036. ISSN 1745-2007
Marasini, R and Dawood, N (2002) Integration of genetic algorithms and simulation for stockyard layout planning. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Marasini, R and Dawood, N (2006) Innovative managerial control system (IMCS): An application in precast concrete building products industry. Construction Innovation, 6(2), pp. 97-120. ISSN 1471-4175
Marasini, R and Quinnell, P (2010) Investigation of quality management practices in building construction sites in the UK. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Marey Madi, H A (2024) Sustainability assessment of using green concrete materials for residential buildings in Egypt. PhD thesis, Debreceni Egyetem, Hungary.
Markos, P A and Dentsoras, A J (2013) A heuristic approach for the positioning of elevator hoistways based on the utilization intensity index. Architectural Engineering and Design Management, 9(4), pp. 209-228. ISSN 1745-2007
Marocco, M; Cacciaguerra, E and Garofolo, I (2024) An operational framework for implementing digital systems in public administrations' processes in the design phase. Architectural Engineering and Design Management, 20(3), pp. 411-430. ISSN 1745-2007
Marquardt, G (2017) Economic analysis of contract choice, feelings of entitlement and contract enforcement in relationships governed by incomplete contracts. PhD thesis, University of Edinburgh, UK.
Marsh, D B (2017) Building information modelling (BIM) and the UK quantity surveying organisation: A framework for value creation. PhD thesis, Liverpool John Moores University, UK.
Martin, H; Garner, M; Manewa, A and Chadee, A (2025) Validating the relative importance of technology diffusion barriers– exploring modular construction design-build practices in the UK. International Journal of Construction Education and Research, 21(1), pp. 3-23. ISSN 1557-8771
Martin, H; Koylass, J and Welch, F (2018) An exploration of the consistency limits of the analytical hierarchy process and its impact on contractor selection. International Journal of Construction Management, 18(1), pp. 14-25. ISSN 1562-3599
Martinez, J G; Yeung, T; Sacks, R; Shahaf, Y and Sharoni, L O (2023) Situational awareness in construction using a serious game. Journal of Construction Engineering and Management, 149(3): 04022183, ISSN 0733-9364
Martinez-Soto, A and Jentsch, M F (2020) A transferable energy model for determining the future energy demand and its uncertainty in a country's residential sector. Building Research & Information, 48(6), pp. 587-612. ISSN 0961-3218
Mashi, I H (2023) Emotional intelligence among Nigerian construction project leaders during periods of uncertainty. PhD thesis, Walden University, USA.
Masoumi, R (2015) A framework for project portfolio formation using a hybrid of multicriteria decision-making methods. PhD thesis, Northeastern University, USA.
Mat Isa, C M; Saman, H M and Preece, C N (2015) Determining significant factors influencing Malaysian construction business performance in international markets. Journal of Construction in Developing Countries, 20(2), pp. 1-23. ISSN 1823-6499
Matarneh, S T (2019) BIM-based information exchange framework to support facilities management systems. PhD thesis, University of Portsmouth, UK.
Matos, R; Rodrigues, H; Costa, A; Requejo, C and Rodrigues, F (2023) Facility manager perspectives on building condition assessment for Portuguese higher education institutions. Building Research & Information, 51(8), pp. 949-964. ISSN 0961-3218
Matsumoto, I T; Thorpe, A; Baldwin, A and McWilliams, R (2002) Linking process mapping and technology: A case study of teamwork 2001. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Maurya, K K and Biswas, A (2021) Performance assessment of governance in Indian smart city development. Smart and Sustainable Built Environment, 10(4), pp. 653-680. ISSN 2046-6099
Mavrogianni, A; Davies, M; Chalabi, Z; Wilkinson, P; Kolokotroni, M and Milner, J (2009) Space heating demand and heatwave vulnerability: London domestic stock. Building Research & Information, 37(5-6), pp. 583-597. ISSN 0961-3218
Mavrogianni, A; Pathan, A; Oikonomou, E; Biddulph, P; Symonds, P and Davies, M (2017) Inhabitant actions and summer overheating risk in London dwellings. Building Research & Information, 45(1-2), pp. 119-142. ISSN 0961-3218
Mavroudhis, V G (2017) Understanding one institutions' process in preparing civil engineering students to be globally competent. EdD thesis, Northeastern University, USA.
Maxwell, Duncan William (2018) The case for design-value in industrialised house building platforms: Product to ecosystem. PhD thesis, University of Sydney, Australia.
May, Margaret Gabrielle (2016) An unusual shade of green: Greenfield cases and greenfield agreements in Australia 2006-2012. PhD thesis, Griffith University, Australia.
Mayouf, M; Boyd, D and Cox, S (2014) Perceiving space from multiple perspectives for buildings using BIM. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Mbachu, J and Nkado, R (2006) Conceptual framework for assessment of client needs and satisfaction in the building development process. Construction Management and Economics, 24(1), pp. 31-44. ISSN 01446193
Mbachu, J and Nkado, R (2007) Factors constraining successful building project implementation in South Africa. Construction Management and Economics, 25(1), pp. 39-54. ISSN 1466433X
Mbadugha, L C; Ozumba, A O U and Shakantu, W (2021) Prospects for integrated design process (IDP) in implementing construction waste prevention (CWP) practices. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
McArdle, K; Gunning, J G and Spillane, J P (2012) Effectiveness of the construction management courses. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
McCahill, D F and Bernold, L E (1993) Resource-oriented modeling and simulation in construction. Journal of Construction Engineering and Management, 119(3), pp. 590-606. ISSN 0733-9364
McDermot, E; Agdas, D; Rodríguez Díaz, C R; Rose, T and Forcael, E (2022) Improving performance of infrastructure projects in developing countries: An ecuadorian case study. International Journal of Construction Management, 22(13), pp. 2469-2483. ISSN 1562-3599
McElroy, D J and Rosenow, J (2019) Policy implications for the performance gap of low-carbon building technologies. Building Research & Information, 47(5), pp. 611-623. ISSN 0961-3218
McErlane, A; Haran, M; McClements, S and McCord, J (2018) Modelling the drivers for public-private partnerships (PPP) provision of United Kingdom (UK) social infrastructure. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
McIntyre, C (1996) A decision support system for the residential land development site selection process. PhD thesis, Pennsylvania State University, USA.
McKim, R; Hegazy, T and Attalla, M (2000) Project performance control in reconstruction projects. Journal of Construction Engineering and Management, 126(2), pp. 137-141. ISSN 0733-9364
McLaren, Matthew (2018) An investigation of swift trust formation in disaster management teams. PhD thesis, University of New South Wales, Australia.
McLarnon, C; Spillane, J P; Bradley, J; McCartan, N and Nelson, M (2020) Open innovation within loughview timber: How knowledge transfer is opening doors to new markets. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
McLeish, D C A (1978) House building productivity: A study of labour requirements on Scottish house building sites using activity sampling methods. PhD thesis, Aston University, UK.
McMahon, E; Spillane, J P and Bradley, J G (2022) Factors influencing built environment apprenticeship completion rates: A systematic literature review. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Mdibi, L; Van Zyl, R; Kosch, M and Ward, J (2021) A land-based hf transmitter for ionospheric propagation studies using superdarn radars. Journal of Engineering, Design and Technology, 19(6), pp. 1648-1659. ISSN 1726-0531
Meacham, B J (2000) A process for identifying, characterizing, and incorporating risk concepts into performance-based building and fire regulation development. PhD thesis, Clark University, USA.
Meier, J R and Russell, J S (2000) Model process for implementing maintainability. Journal of Construction Engineering and Management, 126(6), pp. 440-450. ISSN 0733-9364
Meijon Morêda Neto, H; Bastos Costa, D and Coelho Ravazzano, T (2019) Recommendations for target value design implementation for real estate development in Brazil. Architectural Engineering and Design Management, 15(1), pp. 48-65. ISSN 1745-2007
Melete, Refiloe (2024) An analysis of the effectiveness of the infrastructure delivery management system in the South African government. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Melgarejo, J A (1987) A decision model for human error in the design and construction process. PhD thesis, University of Michigan, USA.
Melhem, N N; Maher, R A and Sundermeier, M (2021) Waste-based management of steel reinforcement cutting in construction projects. Journal of Construction Engineering and Management, 147(7): 04021056, ISSN 0733-9364
Memari, S; Kocaturk, T; Lozanovska, M; Andrews, F and Tucker, R (2023) Future proofing for hospital building design: From research to practice. Architectural Engineering and Design Management, 19(6), pp. 681-700. ISSN 1745-2007
Memon, F A (2023) Stakeholder engagement in managing scope change during the execution phase of UK construction projects. PhD thesis, University of Bedfordshire, UK.
Men, Y (2023) Investigation into sustainable solutions for improving small and medium sized museums in China. PhD thesis, De Montfort University, UK.
Meng, C; Qu, D and Lei, T (2025) Compliance risk formation and evolution mechanisms of the international operations of construction enterprises. Journal of Construction Engineering and Management, 151(11): 04025180, ISSN 0733-9364
Mer'Eb, M M (2008) GREENOMETER-7: A tool to assess the sustainability of a building's life cycle at the conceptual design phase. DEng thesis, Cleveland State University, USA.
Metham, M; Benjaoran, V and Sedthamanop, A (2022) An evaluation of green road incentive procurement in road construction projects by using the AHP. International Journal of Construction Management, 22(3), pp. 501-513. ISSN 1562-3599
Michael Gbolagade, O; Inimbom Walter, I and Emuze, F (2021) Towards sustainability practices deployment in building construction projects in Nigeria. Smart and Sustainable Built Environment, 10(4), pp. 759-780. ISSN 2046-6099
Mickovski S B, B J D S M J (2013) Innovative use of ECC (NEC) for procurement and management of infrastructure projects with limited funding: Bervie Braes case study. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Miedema, E (2020) Health-promotive building design: Exploring perspectives on building design for health promotion in healthcare settings. PhD thesis, Chalmers University of Technology, Sweden.
Miles-Shenton, D; Parker, J; Glew, D and Thomas, F (2025) Quantifying inter-dwelling air exchanges during fan pressurisation tests. Buildings & Cities, 6(1), pp. 239-254. ISSN 2632-6655
Milion, R N; Alves, T d C L and Paliari, J C (2017) Impacts of residential construction defects on customer satisfaction. International Journal of Building Pathology and Adaptation, 35(3), pp. 218-232.
Milion, Raphael Negri (2019) Method for managing defects in residential buildings. PhD thesis, Universidade Federal de São Carlos, Brazil.
Mills, F T and Glass, J (2009) The construction design manager's role in delivering sustainable buildings. Architectural Engineering and Design Management, 5(1-2), pp. 75-90. ISSN 1745-2007
Mills, G R W; Phiri, M; Erskine, J and Price, A D F (2015) Rethinking healthcare building design quality: An evidence-based strategy. Building Research & Information, 43(4), pp. 499-515. ISSN 0961-3218
Mills, G R W and Razmdoost, K (2016) Managing value co-creation/destruction: A longitudinal education capital programme/project case study. Construction Management and Economics, 34(4-5), pp. 286-301. ISSN 01446193
Mintah, Kwabena (2019) Is there value in waiting? An empirical study of real options application to Australian property developments. PhD thesis, RMIT University, Australia.
Mirzabeigi, S (2024) Integrated building envelope assessment towards automation of energy retrofits: Drone-based data acquisition, automated thermal anomaly detection, and workflow development. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.
Mishmish, M and El-Sayegh, S M (2018) Causes of claims in road construction projects in the UAE. International Journal of Construction Management, 18(1), pp. 26-33. ISSN 1562-3599
Miura, K (2017) International joint ventures in the US military construction programs in Japan: An exploratory case study investigation. PhD thesis, Northcentral University, USA.
Mlecnik, E (2013) Improving passive house certification: Recommendations based on end-user experiences. Architectural Engineering and Design Management, 9(4), pp. 250-264. ISSN 1745-2007
Moeti, M; Jacques, E; Feng, W and North, C (2021) Modelling the effect of computation sampling on insight error in computational fluid dynamics scientific simulation. Journal of Engineering, Design and Technology, 19(1), pp. 263-290. ISSN 1726-0531
Moezzi, M and Goins, J (2011) Text mining for occupant perspectives on the physical workplace. Building Research & Information, 39(2), pp. 169-182. ISSN 0961-3218
Moghaddaszadeh Kermani, M (2016) Criticality-based strategic decision-making model for maintenance and asset management. PhD thesis, University of Manchester, UK.
Mohamad, M I; Nekooie, M A and Al-Harthy, A B S (2012) Design changes in residential reinforced concrete buildings: The causes, sources, impacts and preventive measures. Journal of Construction in Developing Countries, 17(2), pp. 23-44. ISSN 1823-6499
Mohamed, S (2002) Safety climate in construction site environments. Journal of Construction Engineering and Management, 128(5), pp. 375-384. ISSN 0733-9364
Mohamed, S (2003) Performance in international construction joint ventures: Modeling perspective. Journal of Construction Engineering and Management, 129(6), pp. 619-626. ISSN 0733-9364
Mohamed, S F (2006) Improving construction site management practices through knowledge management. PhD thesis, Loughborough University, UK.
Mohammadi, P; Asgari, S; Rashidi, A and Alder, R (2025) Culvert inspection framework using hybrid xgboost and risk-based prioritization: Utah case study. Journal of Construction Engineering and Management, 151(6): 04025052, ISSN 0733-9364
Mohammadpour, A (2014) Retrofitting healthcare facilities to enhance patient safety and energy efficiency. PhD thesis, Pennsylvania State University, USA.
Moharrami, S; Taghaddos, M; RazaviAlavi, S R and AbouRizk, S (2021) A hybrid simulation approach for microtunneling construction planning. Construction Innovation, 21(3), pp. 363-378. ISSN 1471-4175
Mohd Hafir, N H B (2019) The investigation of the interplay between professional identity and attitudes towards sustainability for more sustainability practices in the built environment sector. PhD thesis, University of Reading, UK.
Mohjah Mohammed, A; Al-Naim, M and El-Wakeel, H (2024) Developing a tool to assess the performance of educational built environments for students with multiple sclerosis. Architectural Engineering and Design Management, 20(3), pp. 494-509. ISSN 1745-2007
Mohseni, H; Setunge, S; Zhang, G and Wakefield, R (2017) Markov process for deterioration modeling and asset management of community buildings. Journal of Construction Engineering and Management, 143(6): 04017003, ISSN 0733-9364
Mojtahedi, Seyed Mohammad Hossein (2014) Stakeholder attributes and approaches in natural disaster risk management in the built environment: The case of flood risk management in transport infrastructure. PhD thesis, University of Sydney, Australia.
Mok, K Y; Shen, G Q and Yang, R J (2017) A network theory-based analysis of stakeholder issues and their interrelationships in large construction projects: A case study. International Journal of Construction Management, 17(3), pp. 210-227. ISSN 1562-3599
Molaei, P; Hashempour, P and Tang, L M (2022) Semi-open spaces of apartments considering COVID-19 pandemic: General expectations of balcony design in the post-pandemic world. Architectural Engineering and Design Management, 18(5), pp. 705-722. ISSN 1745-2007
Molwus, J J; Erdogan, B and Ogunlana, S O (2014) A study of the current practice of stakeholder management in construction projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Momade, M H; Shahid, S; Hainin, M R B; Nashwan, M S and Tahir Umar, A (2022) Modelling labour productivity using SVM and rf: A comparative study on classifiers performance. International Journal of Construction Management, 22(10), pp. 1924-1934. ISSN 1562-3599
Momtaz, M (2023) Damage life cycle analysis for present and future condition assessments using statistical and machine learning techniques. PhD thesis, George Mason University, USA.
Monahan, J (2013) Housing and carbon reduction: can mainstream 'eco-housing' deliver on its low carbon promises? PhD thesis, University of East Anglia, UK.
Montes Victorio, Shani A (2024) A comprehensive framework for stakeholder management in utility coordination on highway projects. PhD thesis, Iowa State University, USA.
Monticelli, C and Zanelli, A (2021) Material saving and building component efficiency as main eco-design principles for membrane architecture: Case: studies of etfe enclosures. Architectural Engineering and Design Management, 17(3-4), pp. 264-280. ISSN 1745-2007
Montoya, R E (2019) Exploring the strategies, ODC managers need to improve knowledge management in a multigenerational construction organization. DM thesis, Colorado Technical University, USA.
Moore, D R (1997) An analysis of experimental data to determine the validity of aspects of tolerance requirement general theory. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Moradi, S; Hirvonen, J and Sormunen, P (2024) A qualitative and life cycle-based study of the energy performance gap in building construction: Perspectives of Finnish project professionals and property maintenance experts. Building Research & Information, 52(5), pp. 564-576. ISSN 0961-3218
Moradi, S; Kähkönen, K; Klakegg, O J and Aaltonen, K (2021) Profile of project managers' competencies for collaborative construction projects. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Morais, Marcelo de (2016) Method for implementing BIM and target costing in social housing. PhD thesis, Universidade Estadual de Campinas, Brazil.
Morales-Beltran, M and Yildiz, B (2020) Integrating configuration-based seismic design principles into architectural education: Teaching strategies for lecture courses. Architectural Engineering and Design Management, 16(4), pp. 310-328. ISSN 1745-2007
Morbitzer, C A (2003) Towards the integration of simulation into the building design process. PhD thesis, University of Strathclyde, UK.
Moret, Y and Einstein, H H (2012) Experience in expert estimation of probabilities and correlations for rail line construction. Journal of Construction Engineering and Management, 138(9), pp. 1103-1106. ISSN 0733-9364
Moret, Y and Einstein, H H (2012) Modeling correlations in rail line construction. Journal of Construction Engineering and Management, 138(9), pp. 1075-1084. ISSN 0733-9364
Morkan, B (2020) Unexpected events in mega construction projects: Responding to unexpected events through multi-stakeholder strategies. PhD thesis, Stevens Institute of Technology, USA.
Morledge, R and Adnan, H (2006) Critical success factors in construction joint venture projects in Malaysia. Journal of Construction Procurement, 12(1),
Morrow, S (2012) Balancing a safer and healthier frame to designing: A grounded theory. PhD thesis, Glasgow Caledonian University, UK.
Moscati, A and Engström, S (2019) Digitalization and industrialization: Exploration of the current and future challenges in the Swedish built environment sector. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Moskowitz, J M and McCranie, J B (2026) Investigating the impact of army safety and occupational health management system implementation on safety performance indices: Case study of a U.S. Army corps of engineers district. International Journal of Construction Management, 26(5), pp. 840-856. ISSN 1562-3599
Mostafa, S and Chileshe, N (2015) Discrete-event simulation model for offsite manufacturing in Australia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Mostavi, E (2018) Development of multiple criteria decision making instrument in designing of high performance commercial buildings. PhD thesis, Pennsylvania State University, USA.
Motaleb, O and Kishk, M (2010) An investigation into causes and effects of construction delays in UAE. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Motil, M M (2015) Project duration, budget, individual role, and burnout among construction managers. PhD thesis, Walden University, USA.
Moura, H and Teixeira, J C (2007) Types of construction claims: A Portuguese survey. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Mourgues, C (2009) Method to produce field instructions from product and process models. PhD thesis, Stanford University, USA.
Mousapour, B (2024) Assessment of biophilic design’s impact on citizens' residential satisfaction to enhance pro-environmental behavior. Architectural Engineering and Design Management, 20(4), pp. 761-775. ISSN 1745-2007
Mousavi, Milad (2025) Evolving and proactive risk modelling in underground working environments. PhD thesis, University of New South Wales, Australia.
Moustafa, I M M (2001) A decision support system for the selection of the optimum contractor. PhD thesis, University of Southampton, UK.
Moyo, T and Chigara, B (2023) Factors affecting the competence of quantity surveying professionals in Zimbabwe. Journal of Construction in Developing Countries, 28(2), pp. 1-17. ISSN 1823-6499
Mudiyanselage, A C E E; Shen, G Q P and Kumaraswamy, M M (2019) Managing vulnerabilities and capabilities for supply chain resilience in industrialised construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Mugabi, J and Marin, P (2008) PPP in urban water: Lessons from Yerevan, Armenia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 171-178. ISSN 17514312
Muhammad, Z and Johar, F (2019) Critical success factors of public-private partnership projects: A comparative analysis of the housing sector between Malaysia and Nigeria. International Journal of Construction Management, 19(3), pp. 257-269. ISSN 1562-3599
Mukherjee, K (2025) Cognitive abstractions for visual communication. PhD thesis, University of Wisconsin - Madison, USA.
Mukoki, P S (2022) Infrastructure financing and bond markets development in Sub-Saharan Africa. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Mukwanason, D E; Tutesigensi, A; Kayondo, M and Mutikanga, H E (2023) Impact of project quality culture on defects in infrastructure projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Mulenga, C Z (2020) Construction project performance in Zambia: A case study of public high schools. PhD thesis, University of Bolton, UK.
Muleya, F (2014) Modelling wheeled construction plant performance in clay and sandy terrain: a terramechanics perspective. PhD thesis, Anglia Ruskin University, UK.
Muleya, F; Zulu, S and Nanchengwa, P C (2020) Investigating the role of the public private partnership act on private sector participation in PPP projects: A case of Zambia. International Journal of Construction Management, 20(6), pp. 598-612. ISSN 1562-3599
Mulhorn, W L (1987) Sources of conflict as perceived by architects and New Jersey public school officials when involved in a building project. EdD thesis, Temple University, USA.
Mullens, M A and Arif, M (2006) Structural insulated panels: Impact on the residential construction process. Journal of Construction Engineering and Management, 132(7), pp. 786-794. ISSN 0733-9364
Mulowayi, E; Coffey, V; Bunker, J and Trigunarsiah, B (2015) The influence of critical infrastructure interdependencies on post-disaster reconstruction: Elements of infrastructure interdependency that impede the post-disaster recovery effort. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Muniandy, Meenachi (2016) Assessing the economic impact of public investment in Malaysia: A case study on myrapid transit project using a dynamic computable general equilibrium model. PhD thesis, Monash University, Australia.
Munir, M; Kiviniemi, A; Jones, S and Finnegan, S (2020) BIM-based operational information requirements for asset owners. Architectural Engineering and Design Management, 16(2), pp. 100-114. ISSN 1745-2007
Munthali, N C (2022) Project management strategies for success: The case of Zambia. DBA thesis, Walden University, USA.
Murata, F M (2013) Cross-cultural leadership for global construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(5), pp. 240-248. ISSN 17514312
Murguia, D (2021) A model of systemic BIM adoption. PhD thesis, Loughborough University, UK.
Mushtaha, E; Alsyouf, I; Hamad, R; Elmualim, A; Maksoud, A and Yahia, M W (2022) Developing design guidelines for university campus in hot climate using quality function deployment (QFD): The case of the University of sharjah, UAE. Architectural Engineering and Design Management, 18(5), pp. 593-613. ISSN 1745-2007
Mushtaha, E; Shamsuzzaman, M; Abdouli, S A; Hamdan, S and Soares, T G (2020) Application of the analytic hierarchy process to developing sustainability criteria and assessing heritage and modern buildings in the UAE. Architectural Engineering and Design Management, 16(5), pp. 329-355. ISSN 1745-2007
Musonda, I; Zulu, S L; Zulu, E and Kavishe, N (2025) Understanding clients' role in community stakeholder participation and influence on infrastructure sustainability—a stakeholder theory lens. International Journal of Construction Management, 25(4), pp. 419-427. ISSN 1562-3599
Mutai, A (2009) Factors influencing the use of building information modeling (BIM) within leading construction firms in the United States of America. PhD thesis, Indiana State University, USA.
Muthelo, R G (2022) An integrated decision-making model for evaluating public sector construction bids. PhD thesis, University of Johannesburg, South Africa.
Muya, M; Price, A D F and Edum-Fotwe, F T (2006) Overview of funding for construction craft skills training in Sub-Saharan Africa: A case study of Zambia. Construction Management and Economics, 24(2), pp. 197-208. ISSN 01446193
Muzir, A K K (2017) School buildings maintenance in Malaysia: Current practices, key challenges and implications. PhD thesis, University of Newcastle upon Tyne, UK.
Müller, J M (2026) Living labs: A systematic review of success parameters and outcomes. Buildings & Cities, 7(1), pp. 92-109. ISSN 2632-6655
Nada, D (2013) Project approval decisions: Exploring success factors. PhD thesis, University of Calgary, Canada.
Nadhim, Evan Alaa (2019) Investigating the relationship between safety climate and safety performance of retrofitting works. PhD thesis, Queensland University of Technology, Australia.
Nadi, E (2019) Construction labor productivity benchmarking: A comparison between on-site construction and prefabrication. PhD thesis, Marquette University, USA.
Naji, K K; Gunduz, M and Maki, O (2023) Development of a campus facility management operational framework using a modified Delphi method. Journal of Construction Engineering and Management, 149(7): 04023052, ISSN 0733-9364
Naji, K K; Gunduz, M and Mansour, M M (2024) Development of an integrated hybrid risk assessment system for construction disputes during the preconstruction phase using the Delphi method. Journal of Construction Engineering and Management, 150(7): 04024068, ISSN 0733-9364
Naji Almassi, A (2011) Credit value adjusted real options based valuation of multiple-exercise government guarantees for infrastructure projects. PhD thesis, University of Toronto, Canada.
Najib, T (2005) Investigation of success factors for smaller engineering firms. PhD thesis, Wayne State University, USA.
Nam, T-J (2001) Investigations of collaborative design environments: a framework for real-time collaborative 3D CAD. PhD thesis, Brunel University, UK.
Namini, Seyed Saeed Banihashemi (2017) Active BIM with artifical intelligence for energy optimisation in buildings. PhD thesis, University of Technology Sydney, Australia.
Namo, F and Fellows, R F (1993) The role of advertising in marketing civil/structural engineering consultancy firms. Construction Management and Economics, 11(6), pp. 431-441. ISSN 01446193
Nanang, Rustanto (2019) Development of asset optimisation strategy for the public sector in Indonesia. PhD thesis, Queensland University of Technology, Australia.
Naoum, S and Hackman, J O N (1996) Do site managers and the head office perceive productivity factors differently? Engineering, Construction and Architectural Management, 3(1-2), pp. 147-160. ISSN 0969-9988
Naoum, S G and Mustapha, F H (1995) Relationship between the building team, procurement methods and project performance. Journal of Construction Procurement, 1(1), pp. 50-63. ISSN 1358-9180
Nash, S; Chinyio, E; Gameson, R and Suresh, S (2010) The dynamism of stakeholders' power in construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Nasir, D; McCabe, B and Hartono, L (2003) Evaluating risk in construction-schedule model (ERIC-S): Construction schedule risk model. Journal of Construction Engineering and Management, 129(5), pp. 518-527. ISSN 0733-9364
Navabian, N (2020) Development of an automated structural health monitoring system based on wireless sensor network for civil structures. PhD thesis, Auckland University of Technology, New Zealand.
Ndekugri, I (2016) Late disputes and the NEC3 Engineering and Construction Contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(2), pp. 65-76. ISSN 17514304
Nepal, M P; Park, M and Son, B (2006) Effects of schedule pressure on construction performance. Journal of Construction Engineering and Management, 132(2), pp. 182-188. ISSN 0733-9364
Nesan, L J (1997) A generic model for effective implementation of empowerment in construction contractor organisations. PhD thesis, University of Wolverhampton, UK.
Nesan, L J (2006) Project finance model for small contractors in USA. Construction Economics and Building, 6(1), pp. 25-41. ISSN 2204-9029
Neshat, N (2013) Conceptualization, measurement and empirical exploration of selected supply chain risk constructs. DSc thesis, ETH Zürich, Switzerland.
New, K; Tyler, A; Friday, A; Hazas, M and Gormally, A (2023) Space temperature policy towards net-zero: Recommendations from a systematic review of UK HEI heating policies. Building Research & Information, 51(2), pp. 223-239. ISSN 0961-3218
Newaz, M T; Davis, P; Jefferies, M and Pillay, M (2020) Examining the psychological contract as mediator between the safety behavior of supervisors and workers on construction sites. Journal of Construction Engineering and Management, 146(1): 04019094, ISSN 0733-9364
Newell, G and Karantonis, A (2003) The predictive accuracy of investor sentiment for commercial property in Australia. Journal of Financial Management of Property and Construction, 8(3), pp. 117-128. ISSN 1366-4387
Newman, W M (1968) An investigation of methods of using computers for processing and storing architectural designs. PhD thesis, Imperial College London, UK.
Newton, L A (2004) The impact of quality on building life cycle costs. PhD thesis, University of New Brunswick, Canada.
Ng, A K W and Price, A D F (2010) Optimizing the time performance of subcontractors in building projects. Construction Economics and Building, 10(1-2), pp. 90-102. ISSN 2204-9029
Ng, S T and Tang, Z (2008) Delineating the predominant criteria for subcontractor appraisal and their latent relationships. Construction Management and Economics, 26(3), pp. 249-259. ISSN 1466433X
Ngoma, S; Mundia, M and Kaliba, C (2014) Benefits, constraints and risks in infrastructure development via public-private partnerships in Zambia. Journal of Construction in Developing Countries, 19(1), pp. 15-33. ISSN 1823-6499
Ngoy, Kabemba Steve; Daweti, Esona; Molise, Relebohile; Chinasamy, Darmarajan and Windapo, Abimbola (2026) Evaluation of sustainable building technologies adoption in housing construction across socio-economic contexts in Cape Town, South Africa. Journal of Construction Business and Management, 8(S1), pp. 140-154. ISSN 2521-0165
Nguyen, V T; Do, S T; Tran, C N N and van Pham, L (2025) Analysis of interrelationships among constructs of cost overrun causes in consortium projects between construction contractors. International Journal of Construction Management, 25(13), pp. 1596-1608. ISSN 1562-3599
Nguyen, D M; Ding, G and Runeson, G (2020) Energy and economic analysis of environmental upgrading of existing office buildings. Construction Economics and Building, 20(4), pp. 82-102. ISSN 2204-9029
Nguyen, Dinh Manh (2017) Maintenance practices: Improving sustainability performance of existing office buildings: An Australian case study. PhD thesis, University of Technology Sydney, Australia.
Nguyen, H D; Dang, C N; Le-Hoai, L and Luu, Q T (2023) Exploratory analysis of legal risk causes in tourism real estate projects in emerging economies: Empirical study from Vietnam. International Journal of Construction Management, 23(5), pp. 830-842. ISSN 1562-3599
Nguyen, H D; Nguyen, L D; Chih, Y Y and Le-Hoai, L (2017) Influence of participants' characteristics on sustainable building practices in emerging economies: Empirical case study. Journal of Construction Engineering and Management, 143(8): 05017014, ISSN 0733-9364
Nguyen, H V (2010) Process-based cost modeling to support target value design. PhD thesis, University of California, Berkeley, USA.
Nguyen, L D; Nguyen, T K N; Tran, D Q and Villiers, C (2014) Productivity in daytime and nighttime construction of urban sewer systems. Journal of Construction Engineering and Management, 140(7): 04014021, ISSN 0733-9364
Nguyen, L D; Phan, D H and Tang, L C M (2013) Simulating construction duration for multistory buildings with controlling activities. Journal of Construction Engineering and Management, 139(8), pp. 951-959. ISSN 0733-9364
Nguyen, L d (2007) The dynamics of float, logic, resource allocation, and delay timing in forensic schedule analysis and construction delay claims. PhD thesis, University of California, Berkeley, USA.
Nguyen, M V and Duy Ha, K (2025) Old building reconstruction initiatives: how community information dissemination and community involvement mitigate the project complexity. International Journal of Construction Management, 25(8), pp. 955-964. ISSN 1562-3599
Nguyen, N H; Skitmore, M and Wong, J K W (2009) Stakeholder impact analysis of infrastructure project management in developing countries: A study of perception of project managers in state-owned engineering firms in Vietnam. Construction Management and Economics, 27(11), pp. 1129-1140. ISSN 1466433X
Nguyen, P H D; Lines, B C and Tran, D Q (2018) Best-value procurement in design-bid-build construction projects: Empirical analysis of selection outcomes. Journal of Construction Engineering and Management, 144(10): 04018093, ISSN 0733-9364
Nguyen, T; Nguyen, L H; Chileshe, N and Hallo, L (2023) Investigating critical risk factors of selecting joint venture contractors for infrastructure projects implementation in Vietnam. International Journal of Construction Management, 23(14), pp. 2438-2451. ISSN 1562-3599
Nguyen, T; Tran, Q P; Chileshe, N; Thao Huynh, T Y and Hallo, L (2024) Risk prioritization using analytic process network for metro rail implementation projects in developing countries: A typical case study of Vietnam. International Journal of Construction Management, 24(10), pp. 1077-1089. ISSN 1562-3599
Nguyen, T H D; Chileshe, N and Rameezdeen, R (2018) External stakeholder strategic actions in construction projects: A Vietnamese study. Construction Management and Economics, 36(8), pp. 443-458. ISSN 01446193
Nguyen, T T T (2010) EDDE: A framework to explore, design, develop and evaluate technology-enhanced instruction for construction. PhD thesis, University of Texas at Austin, USA.
Nguyen, V T and Do, S T (2023) Assessing the relationship chain among causes of variation orders, project performance, and stakeholder performance in construction projects. International Journal of Construction Management, 23(9), pp. 1592-1602. ISSN 1562-3599
Nguyen, V T; Do, S T; Tran, C N N and Aung, Z M (2025) Developing a Bayesian belief network model for quantifying and predicting claim causes-related schedule delays. International Journal of Construction Management, 25(1), pp. 32-45. ISSN 1562-3599
Nguyen, V T; Do, S T; Tran, C N N and Vo, M D (2024) Assessing the impact of the traits of payment delay causes on subcontractor's business performance in construction projects: A case study in Vietnam. International Journal of Construction Management, 24(11), pp. 1259-1269. ISSN 1562-3599
Nguyen Van, D; Le Dinh, T and Tran, H-B (2022) Assessing stakeholder satisfaction in PPP transport projects in developing countries: Evidence from Vietnam. Built Environment Project and Asset Management, 12(2), pp. 309-324. ISSN 2044-124X
Nicholas, J; Holt, G D and Harris, P T (2000) An investigation into predicting materials suppliers' profits. Journal of Construction Procurement, 6(2), ISSN 1358-9180
Nicholas, J; Holt, G D and Mihsein, M (2000) Forecasting construction materials suppliers' financial turnover. Engineering, Construction and Architectural Management, 7(3), pp. 221-231. ISSN 0969-9988
Nicholls, C (2014) Energy use in non-domestic buildings: The UK government's new evidence base. Building Research & Information, 42(1), pp. 109-117. ISSN 0961-3218
Nicol, J F; Hacker, J; Spires, B and Davies, H (2009) Suggestion for new approach to overheating diagnostics. Building Research & Information, 37(4), pp. 348-357. ISSN 0961-3218
Nicol, L A (2011) The role of institutional regimes in motivating change for sustainable housing. Building Research & Information, 39(5), pp. 459-472. ISSN 0961-3218
Nikyema, G A B (2020) Barriers to the adoption of green building materials and technologies in developing countries: The case of Burkina Faso. PhD thesis, Clemson University, USA.
Ning, Y (2013) Boosting public construction project outcomes through relational transactions in Singapore. PhD thesis, National University of Singapore, Singapore.
Ning, Y and Ling, F Y Y (2014) Boosting public construction project outcomes through relational transactions. Journal of Construction Engineering and Management, 140(1): 04013037, ISSN 0733-9364
Nishiyama, D and Radosavljevic, M (2009) Mathematical modelling of decision making processes in construction projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Nkado, R and Meyer, T (2001) Competencies of professional quantity surveyors: A South African perspective. Construction Management and Economics, 19(5), pp. 481-491. ISSN 01446193
Nkado, R N (1991) A construction time information system for the building industry. PhD thesis, University of Reading, UK.
Nkado, R N (2000) Competencies required by quantity surveyors in South Africa. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Nkado, R N (1992) Construction time information system for the building industry. Construction Management and Economics, 10(6), pp. 489-509. ISSN 01446193
Nkeleme, E I; Mbamali, I and Shakantu, W (2022) A measure of combustion-generated pollutants in university laboratories and their effects on the indoor air quality. Journal of Construction Business and Management, 5(2), pp. 44-53. ISSN 2521-0165
Noganta, A (2019) Key challenges faced by main contractors in coordinating the works of their subcontractors: A case study of kusile power station project. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Nolla, Ieda Maria (2023) HBIM in the management of cultural assets. PhD thesis, Universidade de São Paulo, Brazil.
Noor, I (1992) A study of the variability of labour productivity in building trades. PhD thesis, University of Dundee, UK.
Noorizadeh, A; Rashidi, K and Peltokorpi, A (2018) Categorizing suppliers for development investments in construction: Application of DEA and rfm concept. Construction Management and Economics, 36(9), pp. 487-506. ISSN 01446193
Nordwall, U and Olofsson, T (2013) Architectural caring. Architectural qualities from a residential property perspective. Architectural Engineering and Design Management, 9(1), pp. 1-20. ISSN 1745-2007
Norell, M; Stehn, L and Engström, D (2020) Architectural design of vertical extensions of buildings: A risk perspective on complexity. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Nourah, B T K (2013) Development of strategic mark up decision by contractors in Saudi Arabia. PhD thesis, University of Manchester, UK.
Ntiyakunze, S K (2011) Conflicts in building projets in Tanzania: Analysis of causes and management approaches. PhD thesis, KTH Royal Institute of Technology, Sweden.
Nwal, S S; Panuwatwanich, K and Naing, M (2024) Critical factors influencing the performance of public housing construction projects in Myanmar. Journal of Construction in Developing Countries, 29(1), pp. 163-190. ISSN 1823-6499
Nwodo, M N (2020) Investigation of exergy-based life cycle assessment of buildings. PhD thesis, University of Florida, USA.
Nyagormey, J J; Baiden, B K; Nani, G and Adinyira, E (2020) Review on criteria for evaluating unsolicited public-private partnership PPP proposals from 2004 to 2018. International Journal of Construction Management, 22(12), pp. 2243-2257. ISSN 1562-3599
Nyakala, S; Pretorius, J and Vermeulen, A (2020) Construction quality process implementation as a source of competitive advantage in small and medium-sized construction projects. Journal of Construction Business and Management, 4(2), pp. 46-54. ISSN 2521-0165
Nyalungu, Jey; Mbona, Sizwe; Ogunsola, Sijuwade and Sibuyi, Venus (2026) The effectiveness of supply chain management in enhancing project management outcomes. Journal of Construction Business and Management, 8(2), pp. 54-64. ISSN 2521-0165
Nyamagere Gladys, S; Rwelamila, P D and Gimbi, J J (2022) A conceptual framework for managing post-disaster reconstruction projects in emerging economies: The case of Angola. Built Environment Project and Asset Management, 12(2), pp. 205-222. ISSN 2044-124X
Nyando, C K and van Breda Strasheim, J A (2012) Assessing labour-based construction works management processes. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(4), pp. 239-251. ISSN 17514312
Nyongesa, H O; Musumba, G W and Chileshe, N (2017) Partner selection and performance evaluation framework for a construction-related virtual enterprise: A multi-agent systems approach. Architectural Engineering and Design Management, 13(5), pp. 344-364. ISSN 1745-2007
Nystrom, J (2006) The naivety of partnering assessments. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Nóbrega Júnior, Claudino Lins (2012) Building projects coordinator: Study and proposal for profile, activities and autonomy. PhD thesis, Universidade de São Paulo, Brazil.
O'Neill, T; Spillane, J P and Carmody, S (2022) The composition and classification of interpersonal conflict in Irish construction small and medium-sized enterprises: A case study. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Oates, D and Sullivan, K T (2012) Postoccupancy energy consumption survey of Arizona's LEED new construction population. Journal of Construction Engineering and Management, 138(6), pp. 742-750. ISSN 0733-9364
Obeidat, B and Jaradat, E A R (2022) The influence of virtual human representations on first-year architecture students' perceptions of digitally designed spaces: A pilot study. Building Research & Information, 50(8), pp. 845-858. ISSN 0961-3218
Oberlender, G D and Trost, S M (2001) Predicting accuracy of early cost estimates based on estimate quality. Journal of Construction Engineering and Management, 127(3), pp. 173-182. ISSN 0733-9364
Obi, L I; Arif, M; Awuzie, B; Islam, R; Gupta, A D and Walton, R (2021) Critical success factors for cost management in public-housing projects. Construction Innovation, 21(4), pp. 625-647. ISSN 1471-4175
Obondi, Kennedy Christopher (2020) The relationship between project risk monitoring, control practices, and project success in construction projects. DBA thesis, Northcentral University, USA.
Obunwo, C; Chinyio, E and Suresh, S (2015) Relative contributions of project quality to customer satisfaction in Nigerian road construction projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Ocloo, William K (2023) Relationships between team composition, team climate and team effectiveness in engineering teams. PhD thesis, Texas Tech University, USA.
Odeh, I S M (2010) Evaluation of glare and lighting performance in nighttime highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Odesola, I A and Idoro, G I (2014) Influence of labour-related factors on construction labour productivity in the South-South geo-political zone of Nigeria. Journal of Construction in Developing Countries, 19(1), pp. 93-109. ISSN 1823-6499
Odeyinka, H; Lowe, J and Kaka, A (2012) Regression modelling of risk impacts on construction cost flow forecast. Journal of Financial Management of Property and Construction, 17(3), pp. 203-221. ISSN 1366-4387
Odeyinka, H A (2003) The development and validation of models for assessing risk impacts on construction cash flow forecast. PhD thesis, Glasgow Caledonian University, UK.
Odeyinka, H A (2007) Modelling risk impacts on the budgeted cost of traditionally procured building projects. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Odeyinka, H A and Kaka, A (2005) An evaluation of contractors' satisfaction with payment terms influencing construction cash flow. Journal of Financial Management of Property and Construction, 10(3), pp. 171-180. ISSN 1366-4387
Odeyinka, H A; Kaka, A and Marledge, R (2003) An evaluation of construction cash flow management approaches in contracting oraganizations. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Odeyinka, H A; Lowe, J and Kaka, A P (2013) Artificial neural network cost flow risk assessment model. Construction Management and Economics, 31(5), pp. 423-439. ISSN 01446193
Odeyinka, H A and Lowe, J G (2000) An assessment of risk factors involved in modelling cash flow forecasting. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Odeyinka, H A; Lowe, J G and Kaka, A P (2002) A construction cost flow risk assessment model. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Odongo, N H and Motari, W O (2022) Consumers' perceptiveness towards store brands within supermarkets. International Journal of Construction Management, 22(13), pp. 2459-2468. ISSN 1562-3599
Oduyemi, O; Okoroh, M and Dean, A (2014) Barriers to life cycle costing usage. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Ofori, G and Lean Chan, S (2000) Growth paths of construction enterprises in Singapore, 1980-98. Engineering, Construction and Architectural Management, 7(3), pp. 307-321. ISSN 0969-9988
Ofori, G; Zhang, Z and Ling, F Y Y (2021) Initiatives that enable Singapore contractors to improve construction productivity. Built Environment Project and Asset Management, 11(5), pp. 785-803. ISSN 2044-124X
Ogbu, C P (2017) Building quality condition and maintenance cost: The case of public low income housing in Abia State, Nigeria. Journal of Construction Business and Management, 1(2), pp. 24-34. ISSN 2521-0165
Ogbu, C P and Olatunde, N (2019) Relationship between organisational effectiveness and project performance of SME contractors: A developing country perspective. Journal of Construction Business and Management, 3(2), pp. 1-16. ISSN 2521-0165
Ogunbayo, O T (2019) Respondents' perception of risk factors on residential property development in Abuja, Nigeria. Journal of Construction Business and Management, 3(1), pp. 18-26. ISSN 2521-0165
Ogunlana, S O (1989) Accuracy in design cost estimating. PhD thesis, Loughborough University, UK.
Ogunmakinde, O E (2025) Achieving zero waste: Circular economy strategies in Australian higher education. Construction Economics and Building, 25(2), pp. 1-23. ISSN 2204-9029
Ogwueleka, A C and Ikediashi, D I (2021) Exploring the effects of positive organizational behaviour models on occupational eustress amongst construction employees. Journal of Construction Business and Management, 5(1), pp. 38-46. ISSN 2521-0165
Ohueri, C C; Bamgbade, J A; Chuin, A L S; Hing, M W N and Enegbuma, W I (2022) Best practices in building information modelling process implementation in green building design: Architects' insights. Journal of Construction in Developing Countries, 27(1), pp. 79-93. ISSN 1823-6499
Ojebode, A J (2016) Public-private partnership (PPP) as a mechanism for the provision of affordable housing delivery in Nigeria. PhD thesis, University of Brighton, UK.
Ojelabi, R A; Oyeyipo, O O; Afolabi, A O and Omuh, I O (2022) Evaluating barriers inhibiting investors participation in public-private partnership project bidding process using structural equation model. International Journal of Construction Management, 22(16), pp. 3055-3064. ISSN 1562-3599
Okehielem, N (2011) A benchmark for impact assessment of affordable housing. PhD thesis, University of Wolverhampton, UK.
Okoro, C; Muleya, F and Musonda, I (2022) Assessing the role of planning and considerations in the sustainability of brt-PPP projects: A South African case. Journal of Construction in Developing Countries, 27(2), pp. 205-234. ISSN 1823-6499
Okoro, C; Nnaji, C; Chileshe, N and Tembo, J (2023) Perceptions of public-private partnerships transportation project success factors in developing countries: An explanatory sequential investigation. Journal of Construction in Developing Countries, 28(2), pp. 295-327. ISSN 1823-6499
Okoro, C S; Musonda, I and Agumba, J N (2019) Validity and reliability of a transportation infrastructure sustainable performance framework: A study of transport projects in South Africa. Construction Economics and Building, 19(2), pp. 126-143. ISSN 2204-9029
Okoro, C S; Musonda, I and Agumba, J N (2022) Exploring the underlying structures of sustainability performance measures: A study of transportation projects in South Africa. International Journal of Construction Management, 22(8), pp. 1550-1558. ISSN 1562-3599
Okoroh, M I; Goulding, J S and Walker, S (2006) Outsourcing local authorities housing stocks. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Okoye, P U (2018) Occupational health and safety risk levels of building construction trades in Nigeria. Construction Economics and Building, 18(2), pp. 92-109. ISSN 2204-9029
Okoye, P U; Okolie, K C and Odesola, I A (2022) Risks of implementing sustainable construction practices in the Nigerian building industry. Construction Economics and Building, 22(1), pp. 21-46. ISSN 2204-9029
Okpala, I; Nnaji, C and Gambatese, J (2023) Assessment tool for human-robot interaction safety risks during construction operations. Journal of Construction Engineering and Management, 149(1): 04022145, ISSN 0733-9364
Okudan, O and Çevikbaş, M (2022) Alternative dispute resolution selection framework to settle disputes in public-private partnership projects. Journal of Construction Engineering and Management, 148(9): 04022086, ISSN 0733-9364
Oladiran, O J (2009) Innovative waste management through the use of waste management plans on construction projects in Nigeria. Architectural Engineering and Design Management, 5(3), pp. 165-176. ISSN 1745-2007
Oladokun, T T (2016) Effects of climate change on commercial properties in Lagos state, Nigeria. African Journal of Built Environment Research, 1(1), pp. 15-27. ISSN 2414-0236
Oladokun, T T and Komolafe, M O (2017) Drivers of rural housing development in Edo State, Nigeria. Journal of Construction Business and Management, 1(2), pp. 35-46. ISSN 2521-0165
Olajide, J F; Ajayi, O O; Kudirat Ibilola, Z and Adenuga, O A (2021) Climatic conditions and the resilience of buildings along Lagos coastline. Built Environment Project and Asset Management, 11(4), pp. 738-749. ISSN 2044-124X
Olatunji, A; Adama, U; Adoga, A; Ojetunde, I; Adewale, S and Nwuba, C C (2020) Valuing an underperforming agricultural entity in Minna, Nigeria as a specialised property. African Journal of Built Environment Research, 4(1), pp. 97-115. ISSN 2414-0236
Olawale, O; Oyedele, L; Owolabi, H; Gbadamosi, A Q and Kusimo, H (2022) Project reputation in construction: A process-based perspective of construction practitioners in the UK. International Journal of Construction Management, 22(12), pp. 2267-2278. ISSN 1562-3599
Olawale, Y (2015) The employability skills provision within a construction project management degree programme. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Olayinka, R; Suresh, S and Chinyio, E (2015) Impact of knowledge management on the cost of poor quality. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(4), pp. 177-188. ISSN 17514304
Olbina, S; Grosskopf, K; Johns, T and Scicchitano, M (2008) Perceptions of scholarly standards in technical publication. International Journal of Construction Education and Research, 4(3), pp. 210-226. ISSN 1557-8771
Olimat, H.; Abudayyeh, O.; Liu, H. and Alwashah, Z. (2026) Safety performance evaluation model for off-site construction through the integration of key leading and lagging factors. Journal of Construction Engineering and Management, 152(6): 04026077, ISSN 0733-9364
Oliveira, Otávio José de (2005) Management model for small building design firms. PhD thesis, Universidade de São Paulo, Brazil.
Oliveira, S and Flynn, P (2015) Towards an understanding of building energy management education – users' expectations of a UK distance learning course. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Olowoake, M A O (2015) A theoretical framework to support facilities maintenance management of higher education institutions buildings in Nigeria. PhD thesis, University of Salford, UK.
Olubodun, F and Mole, T (1997) The impact of tenants on public housing stock maintenance expenditure in the UK. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Olubodun, O F (1996) An empirical approach to the evaluation of factors in local authority housing maintenance requirements in the City of Manchester. PhD thesis, University of Salford, UK.
Oluseye, R; Odeyinka, H and Leo-Olagbaye, F (2024) The effect of leadership style on the survival of quantity surveying firms. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Omar, H and Dulaimi, M (2023) Solutions for effective diffusion of BIM for BIM late adopters: Case study of UAE AEC industry. International Journal of Construction Management, 23(9), pp. 1484-1493. ISSN 1562-3599
Omole, O and Ghosh, S (2025) Application of data science in the us commercial construction industry: Current trends and future opportunities. International Journal of Construction Education and Research, 21(1), pp. 50-73. ISSN 1557-8771
Omoregie, A (2006) Blueprints for infrastructure and service delivery in Sub-Saharan Africa. PhD thesis, De Montfort University, UK.
Onalaja, A A (2023) Improving costing in infrastructure projects to accommodate uncertainties. PhD thesis, Northumbria University, UK.
Ong, H C (2003) A new model of public private partnerships for affordable housing in Malaysia. PhD thesis, University of Salford, UK.
Ong, H Y; Wang, C and Zainon, N (2018) Developing a quality-embedded EVM tool to facilitate the iron triangle in architectural, construction, and engineering practices. Journal of Construction Engineering and Management, 144(9): 04018079, ISSN 0733-9364
Ongel, B; Tanyer, A M and Dikmen, I (2024) A network-based model for the assessment of success in PPP healthcare projects. International Journal of Construction Management, 24(8), pp. 875-887. ISSN 1562-3599
Ono, Eikichi (2025) Occupant-centric design for functional and thermal zoning at activity-based workspaces. PhD thesis, National University of Singapore, Singapore.
Onubi, H O; Yusof, N A and Hassan, A S (2019) Green site practices and environmental performance: How project complexity moderates the relationship. Construction Economics and Building, 19(1), pp. 75-95. ISSN 2204-9029
Onukwube, H N (2012) Correlates of job satisfaction amongst quantity surveyors in consulting firms in Lagos, Nigeria. Construction Economics and Building, 12(2), pp. 43-54. ISSN 2204-9029
Onukwube, H N (2012) Leader influences on training effectiveness of construction professionals: The case of Nigeria. Journal of Construction in Developing Countries, 17(2), pp. 67-79. ISSN 1823-6499
Onukwugha, V C (1991) Optimising the constructional and technological aspects of management for mass housing schemes in Nigeria. PhD thesis, University of Lagos, Nigeria.
Onyenobi, T; Hudson, J and Ormerod, M (2006) Impact of building geometry on fire spread rate. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Oo, B L (2007) Modelling individual contractors' bidding decisions in different competitive environments. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Oo, B L; Drew, D S and Lo, H P (2007) Applying a random coefficients logistic model to contractors' decision to bid. Construction Management and Economics, 25(4), pp. 387-398. ISSN 1466433X
Opiyo, Neema George (2022) Analysis of user (dis)engagement in the provision of affordable housing: Cases in the UK housing sector. PhD thesis, University of Manchester, UK.
Opoku, A (2016) Sdg2030: A sustainable built environment's role in achieving the post-2015 united nations Sustainable Development Goals. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Opoku, A; Cruickshank, H; Guthrie, P and Georgiadou, M C (2014) Stakeholder engagement in research: The case of retrofit 2050 research project. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Oppong, G D; Chan, A P C; Ameyaw, E E; Frimpong, S and Dansoh, A (2021) Fuzzy evaluation of the factors contributing to the success of external stakeholder management in construction. Journal of Construction Engineering and Management, 147(11): 04021142, ISSN 0733-9364
Osei-Kyei, R. and Chan, A. P. C. (2019) Model for predicting the success of public–private partnership infrastructure projects in developing countries: A case of Ghana. Architectural Engineering and Design Management, 15(3), pp. 213-232. ISSN 1745-2007
Osei-Kyei, R and Chan, A P C (2019) Model for predicting the success of public-private partnership infrastructure projects in developing countries: A case of Ghana. Architectural Engineering and Design Management, 15(3), pp. 213-232. ISSN 1745-2007
Osipova, E and Eriksson, P E (2009) The effects of procurement procedures on joint risk management. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Osman, K K; Claveria, J B; Faust, K M and Hernandez, S (2019) Temporal dynamics of willingness to pay for alternatives that increase the reliability of water and wastewater service. Journal of Construction Engineering and Management, 145(7): 04019041, ISSN 0733-9364
Osterberg, R (2003) Contracting out public services: An evaluation of the public consequences of opening up routine road maintenance to competition. PhD thesis, Kungliga Tekniska Hogskolan, Sweden.
Osuizugbo, I. C.; Oyeyipo, O. O.; Ojelabi, R. A. and Oshodi, O. S. (2021) Factors inhibiting corporate social responsibility initiatives among construction companies. Construction Economics and Building, 21(1), pp. 83-99. ISSN 2204-9029
Osunsanmi, T O; Aigbavboa, C O; Oke, A and Onyia, M E (2022) Making a case for smart buildings in preventing corona-virus: Focus on maintenance management challenges. International Journal of Construction Management, 22(16), pp. 3109-3118. ISSN 1562-3599
Oswald D, S F S S (2013) Exploring factors affecting unsafe behaviours in construction. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Otasowie, O.; Aigbavboa, C.; Oke, A. and Adekunle, P. (2026) Redefining key activities in construction organisations: Towards the adoption of circular economy business model. International Journal of Construction Management, 26(8), pp. 1428-1441. ISSN 1562-3599
Otasowie, K and Oke, A (2022) An assessment of exhibited drivers of mentoring in construction professional firms: A case of Nigerian quantity surveying firms. Journal of Construction in Developing Countries, 27(2), pp. 63-86. ISSN 1823-6499
Otegbulu, A C and N.Onukwube, H (2007) Enhancing real estate investment through tero- value technology. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Oteifa, S A (1991) An investigation into civil engineering estimators' decision making and expertise. PhD thesis, Loughborough University, UK.
Othman, A A E and Alamoudy, F O (2021) Optimising building performance through integrating risk management and building information modelling during the design process. Journal of Engineering, Design and Technology, 19(6), pp. 1233-1267. ISSN 1726-0531
Othman, A A E and Khalil, M H M (2020) A lean talent management framework for maximizing creativity in architectural design firms. International Journal of Construction Management, 20(5), pp. 520-533. ISSN 1562-3599
Ottou, J A; Baiden, B K; Nani, G and Martin Morgan, T (2021) Benefits of implementing six sigma in competitive tendering process. Built Environment Project and Asset Management, 11(2), pp. 214-230. ISSN 2044-124X
Ouga, A D; Alinaitwe, H M and Mwesige, G (2020) Modelling block laying productivity on building sites in Kampala. Journal of Construction in Developing Countries, 25(1), pp. 109-128. ISSN 1823-6499
Outcault, S; Alston-Stepnitz, E; Sanguinetti, A; DePew, A N and Magaña, C (2022) Building lower-carbon affordable housing: Case studies from California. Building Research & Information, 50(6), pp. 646-661. ISSN 0961-3218
Ovrawah, Victor (2025) Automated prefabrication in the Australian residential building sector: Current state of development and adoption barriers. PhD thesis, Bond University, Australia.
Oxman, R (2007) A performance-based model in digital design: Per-formative: design beyond aesthetic. Architectural Engineering and Design Management, 3(3), pp. 169-180. ISSN 1745-2007
Oyedele, L; Jaiyeoba, B and Fadeyi, M (2003) Design factors influencing quality of building projects in Nigeria: Consultants' perception. Construction Economics and Building, 3(2), pp. 25-32. ISSN 2204-9029
Oyedele, L O; Wai Tham, K; Jaiyeoba, B E and Fadeyi, M O (2003) Model for predicting architect's performance in building delivery process. Journal of Engineering, Design and Technology, 1(2), pp. 168-186. ISSN 1726-0531
Oyegoke, A S (2007) Specialist task organisations procurement approach for re-engineering construction project processes. DSc thesis, Teknillinen Korkeakoulu (Helsinki), Finland.
Oyegoke, A S; McDermott, P; Aouad, G and Cleary, M (2009) Skill competency development strategies by a contractor. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(3), pp. 121-130. ISSN 17514312
Oyekunle Oyewobi, L; Olukemi Windapo, A and Cattell, K S (2013) Impact of business diversification on South African construction companies' corporate performance. Journal of Financial Management of Property and Construction, 18(2), pp. 110-127. ISSN 1366-4387
Oyewobi L O, W A R J O B (2013) The effects of business environments on corporate strategies and performance of construction organisations. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Oyeyipo, O; Adeyemi, B; Osuizugbo, I and Ojelabi, R (2022) Service quality of building services consultants in building project delivery; clients' perspectives. International Journal of Construction Management, 22(15), pp. 2886-2894. ISSN 1562-3599
Ozorhon, B; Arditi, D; Dikmen, I and Birgonul, M T (2011) Toward a multidimensional performance measure for international joint ventures in construction. Journal of Construction Engineering and Management, 137(6), pp. 403-411. ISSN 0733-9364
Ozorovskaja, R; Voordijk, J T and Wilderom, C P M (2007) Leadership and cultures of lithuanian and Dutch construction firms. Journal of Construction Engineering and Management, 133(11), pp. 900-911. ISSN 0733-9364
Pacheco-Torres, R; Etxebarria-Berrizbeitia, S and Gago, E J (2024) Influence of urban density on energy retrofit of building stock: Case study of Spain. Architectural Engineering and Design Management, 20(6), pp. 1832-1855. ISSN 1745-2007
Padala, S P S (2020) Matrix-based framework for modeling changes across multiple entity types in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Pala, M; Edum-Fotwe, F; Ruikar, K; Peters, C and Doughty, N (2016) Implementing commercial information exchange: A construction supply chain case study. Construction Management and Economics, 34(12), pp. 898-918. ISSN 01446193
Palaneeswaran, E and Kumaraswamy, M M (2003) Knowledge mining of information sources for research in construction management. Journal of Construction Engineering and Management, 129(2), pp. 182-191. ISSN 0733-9364
Paliari, José Carlos (2008) Method for the prognosis of productivity and the unitary consumption of materials: Hydraulic building systems. PhD thesis, Universidade de São Paulo, Brazil.
Pall, G K; Bridge, A J; Washington, S; Gray, J and Skitmore, M (2022) Critical delay factors in power transmission projects: A structural equation modeling approach. International Journal of Construction Management, 22(6), pp. 1158-1170. ISSN 1562-3599
Pallyyaguru, Roshani Sandika (2010) Influence of integrating disaster risk reduction within post-disaster infrastructure reconstruction on socio-economic development. PhD thesis, University of Salford, UK.
Palm, J; Ellegård, K and Hellgren, M (2018) A cluster analysis of energy-consuming activities in everyday life. Building Research & Information, 46(1), pp. 99-113. ISSN 0961-3218
Pan, M and Pan, W (2020) Understanding the determinants of construction robot adoption: Perspective of building contractors. Journal of Construction Engineering and Management, 146(5): 04020040, ISSN 0733-9364
Pan, W; Gibb, A F and Dainty, A R J (2007) Perspective of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics, 25(2), pp. 183-194. ISSN 1466433X
Pan, W; Sidwell, R and Soetanto, R (2009) A longitudinal investigation into utilising crosswall construction for multi-storey residential buildings. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Papadonikolaki, E; Vrijhoef, R and Wamelink, H (2015) BIM adoption in integrated supply chains: A multiple case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Pardalis, G; Mahapatra, K and Mainali, B (2020) Swedish construction MSEs: Simply renovators or renovation service innovators? Building Research & Information, 48(1), pp. 67-83. ISSN 0961-3218
Pareek, P; Han, S and Misra, S (2016) Application of Bayesian updating for real-time schedule estimation in a concreting operation. International Journal of Construction Management, 16(1), pp. 54-66. ISSN 1562-3599
Paris, D E (2002) A residential satisfaction decision support system for affordable housing. PhD thesis, Georgia Institute of Technology, USA.
Park, S H (2009) Whole life performance tender evaluation for design-build in the Korean public sector. PhD thesis, University of Reading, UK.
Park, S H (2009) Whole life performance assessment: Critical success factors. Journal of Construction Engineering and Management, 135(11), pp. 1146-1161. ISSN 0733-9364
Park, Y J; Gwak, H S and Lee, D E (2017) Dozer workability estimation method for economic dozing. Journal of Construction Engineering and Management, 143(2): 04016096, ISSN 0733-9364
Parkinson, T and De Dear, R (2015) Thermal pleasure in built environments: Physiology of alliesthesia. Building Research & Information, 43(3), pp. 288-301. ISSN 0961-3218
Parmar, D; Kashiwagi, D and Savicky, J (2003) Case study of the dallas independent school district’s construction value. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Parra, H A; Zuñiga-Collazos, A and Cruz-Caicedo, L F (2023) Impact of external risks on international construction projects success: Evidence from commonwealth caribbean islands. Journal of Construction in Developing Countries, 28(1), pp. 113-132. ISSN 1823-6499
Parthasarathy, M K; Murugasan, R and Murugesan, K (2017) A critical review of factors affecting manpower and equipment productivity in tall building construction projects. Journal of Construction in Developing Countries, 22(S1), pp. 1-18. ISSN 1823-6499
Pasqual, I R and Ekanayake, L (2025) Win–win approach to subcontracting in building construction: Sri Lankan perspective. Construction Economics and Building, 25(3-4), pp. 339-357. ISSN 2204-9029
Patching, A; Skitmore, M; Rusch, R and Lester, D (2024) Case study of the collaborative design of an integrated BIM, IPD and lean university education program. International Journal of Construction Management, 24(7), pp. 799-808. ISSN 1562-3599
Patel, P. and Sturgill, R. (2026) An interpretive structure modeling approach to assess the value of underground utility as-builts. Journal of Construction Engineering and Management, 152(10): 04026164, ISSN 0733-9364
Patel, A J (1996) Development of fatigue based pay adjustment factors in performance-related specifications for full-depth asphalt concrete pavements. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Patel, D A and Jha, K N (2015) Neural network model for the prediction of safe work behavior in construction projects. Journal of Construction Engineering and Management, 141(1): 04014066, ISSN 0733-9364
Patel, K R (2024) Comparative assessment of interior wall construction: A life cycle thinking based evaluation. PhD thesis, University of Windsor, Canada.
Paul, B; Cattell, K; Edwards, P J and Marks, J (2010) Perceptions of HIV/AIDS policies and treatment programmes by Western Cape construction firms. Construction Management and Economics, 28(9), pp. 997-1006. ISSN 1466433X
Paula, Nathalia de (2016) The management of design firms and the environmental sustainability of buildings. PhD thesis, Universidade de São Paulo, Brazil.
Paula, Nathália de (2016) Design firms management and environmental sustainability of buildings. PhD thesis, Universidade de São Paulo, Brazil.
Paulson, B C; Chan, W T and Koo, C C (1987) Construction operations simulation by microcomputer. Journal of Construction Engineering and Management, 113(2), pp. 302-314. ISSN 0733-9364
Paulson, B C and Fondahl, J W (1983) Craft jurisdiction impact on construction. Journal of Construction Engineering and Management, 109(4), pp. 369-386. ISSN 0733-9364
Paunikar, A (1983) Performance constraints of housing prefabricators in India: 3 case studies. ArchD thesis, University of Michigan, USA.
Payne, S R; Mackrill, J; Cain, R; Strelitz, J and Gate, L (2015) Developing interior design briefs for health-care and well-being centres through public participation. Architectural Engineering and Design Management, 11(4), pp. 264-279. ISSN 1745-2007
Peansupap, V and Walker, D (2005) Exploratory factors influencing information and communication technology diffusion and adoption within Australian construction organizations: A micro analysis. Construction Innovation, 5(3), pp. 135-157. ISSN 1471-4175
Pearce, A R; Smith, S A; Saxton, M and De Soto, A (2018) Sustainability boot camp: Bridging disciplines to create a sustainable future. International Journal of Construction Education and Research, 14(1), pp. 59-73. ISSN 1557-8771
Pearl, R G; Bowen, P A and Hall, K A (1998) The compilation of a tender submission: The role of method statements and construction planning charts. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Pearl, R G; Bowen, P A and Nkado, R N (1997) A communication-based examination of construction planning and tendering. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Pearson, J (2014) Effective employer engagement in full time construction-related foundation degrees, with particular emphasis on workplace learning. PhD thesis, Northumbria University, UK.
Peckham, G E (1971) The systems approach to school construction: the potential benefits, the necessary conditions, and the implications for Michigan schools. PhD thesis, Michigan State University, USA.
Pellegrino, R (2021) Effects of public supports for mitigating revenue risk in public-private partnership projects: Model to choose among support alternatives. Journal of Construction Engineering and Management, 147(12), ISSN 0733-9364
Pemsel, S (2012) Knowledge processes and capabilities in project-based organizations. PhD thesis, Lund University, Sweden.
Pendlebury, M C (2000) Techniques and strategies to improve conceptual and schematic design. PhD thesis, Loughborough University, UK.
Pereira, E; Han, S; Abourizk, S and Hermann, U (2017) Empirical testing for use of safety related measures at the organizational level to assess and control the on-site risk level. Journal of Construction Engineering and Management, 143(6): 05017004, ISSN 0733-9364
Perera, A A D A J and Imriyas, K (2004) An integrated construction project cost information system using MS accesstm and MS projecttm. Construction Management and Economics, 22(2), pp. 203-211. ISSN 01446193
Perera, B A K S; Ekanayake, B J; Jayalath, C and Jayathilaka, G R H (2021) A study on variation-specific disputes that arise in road projects in Sri Lanka: A qualitative approach. International Journal of Construction Management, 21(6), pp. 571-581. ISSN 1562-3599
Perera, B A K S; Perera, C S R and Jayalath, C (2022) Contractor’s perspective on key performance indicators of cost control in Asian, middle eastern, and European construction projects. International Journal of Construction Education and Research, 18(3), pp. 217-233. ISSN 1557-8771
Perera, B A K S and Shandraseharan, A (2023) A framework for aggregate base course waste control in road construction projects. International Journal of Construction Management, 23(6), pp. 1009-1020. ISSN 1562-3599
Perera, B A K S; Sirimewan, D C and Senadeera, A D (2021) Management of variations in the public-sector building construction projects in Sri Lanka. Journal of Engineering, Design and Technology, 19(6), pp. 1601-1619. ISSN 1726-0531
Perera, B A K S; Wijewickrama, M K C S; Ranaweera, W R S C and Gamage, I S W (2021) Significant factors influencing the bid mark-up decision of infrastructure projects in Sri Lanka. International Journal of Construction Management, 21(8), pp. 769-783. ISSN 1562-3599
Perera, T G U P (2019) Achieving sustainable housing affordability through an institutionalist approach to communicative planning: a case study of a new settlements and sustainable urban extensions in England. PhD thesis, University of Birmingham, UK.
Perera, U T G; Haigh, R and Amaratunga, D (2023) Incorporating public health impacts in the impact assessment process during road projects: Weaknesses and challenges. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Perera, Weebadda Arachchilage Salinda (2018) An investigation into developing productive construction environments to improve quality performance in Australian building construction. PhD thesis, University of New South Wales, Australia.
Perez, D; Gray, J and Skitmore, M (2017) Perceptions of risk allocation methods and equitable risk distribution: A study of medium to large southeast Queensland commercial construction projects. International Journal of Construction Management, 17(2), pp. 132-141. ISSN 1562-3599
Perng, Y H and Chang, C L (2004) Data mining for government construction procurement. Building Research & Information, 32(4), pp. 329-338. ISSN 0961-3218
Pettit, J H (2000) Clients: their role in the procurement of infrastructure projects. PhD thesis, Loughborough University, UK.
Peveler, E (2018) The supply of building materials to construction projects in Roman Oxfordshire: Logistics, economics, and social significance. PhD thesis, University of Oxford, UK.
Pham, H T; Pham, T; Truong Quang, H and Dang, C N (2023) Supply chain risk management research in construction: A systematic review. International Journal of Construction Management, 23(11), pp. 1945-1955. ISSN 1562-3599
Phillips, R E (2020) Occupant centric dynamic modeling of sustainability analyses in buildings. PhD thesis, Northeastern University, USA.
Phillips, S; Price, A and Dainty, A (2004) Achieving best value in social housing procurement. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Phua, F T T (2005) Determining the relationship between fee structure and project performance between firms: An empirical study based on institutional and task environment perspectives. Construction Management and Economics, 23(1), pp. 45-56. ISSN 01446193
Phung, Q; Erdogan, B and Nielsen, Y (2026) Influence of sustainability adoption on the success of construction projects. Building Research & Information, 54(3), pp. 345-358. ISSN 0961-3218
Phyu, H. T. (2026) A systematic review of transparency in public-private partnerships: Current trends and future research directions. International Journal of Construction Management, 26(9), pp. 1905-1924. ISSN 1562-3599
Piao, Y; Xu, W; Wang, T K and Chen, J H (2021) Dynamic fall risk assessment framework for construction workers based on dynamic Bayesian network and computer vision. Journal of Construction Engineering and Management, 147(12): 04021171, ISSN 0733-9364
Pidomson, G B (2016) Unexpected events in Nigerian construction projects: A case of four construction companies. PhD thesis, Walden University, USA.
Pietroforte, R (1992) Communication and information in the building delivery process. PhD thesis, Massachusetts Institute of Technology, USA.
Piroozfar, P; Pomponi, F and Farr, E R P (2016) Life cycle assessment of domestic hot water systems: A comparative analysis. International Journal of Construction Management, 16(2), pp. 109-125. ISSN 1562-3599
Pirzadeh, P; Lingard, H and Zhang, R P (2022) Job quality and construction workers' mental health: Life course perspective. Journal of Construction Engineering and Management, 148(12): 04022132, ISSN 0733-9364
Pirzadeh, P; Zhang, R P and Lingard, H (2016) Safety climate as a multi-level and dynamic concept: Exploring the variance at different levels over time. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Pivo, G (2014) Unequal access to energy efficiency in us multifamily rental housing: Opportunities to improve. Building Research & Information, 42(5), pp. 551-573. ISSN 0961-3218
Pocobelli, D P (2021) Heritage building information model (BIM) for scientific data. PhD thesis, University College London, UK.
Poirier, E; Staub-French, S; Pilon, A; Fallahi, A; Teshnizi, Z; Tannert, T and Froese, T (2022) Design process innovation on brock commons tallwood house. Construction Innovation, 22(1), pp. 23-40. ISSN 1471-4175
Polat, G (2008) Factors affecting the use of precast concrete systems in the United States. Journal of Construction Engineering and Management, 134(3), pp. 169-178. ISSN 0733-9364
Polson, D R (2020) Assessment of applications of optimisation to building design and energy modelling. PhD thesis, University of London, University College London, UK.
Poon, J (2019) Examining graduate built environment student satisfaction in the UK. What matters the most? International Journal of Construction Education and Research, 15(3), pp. 179-197. ISSN 1557-8771
Poon, J L K (2001) Development of a process model for the design stage of building projects. PhD thesis, University of Wolverhampton, UK.
Portas, J and AbouRizk, S (1997) Neural network model for estimating construction productivity. Journal of Construction Engineering and Management, 123(4), pp. 399-410. ISSN 0733-9364
Porteous, C D A; Sharpe, T R; Menon, R A; Shearer, D; Musa, H; Baker, P H; Sanders, C H; Strachan, P A; Kelly, N J and Markopoulos, A (2012) Energy and environmental appraisal of domestic laundering appliances. Building Research & Information, 40(6), pp. 679-699. ISSN 0961-3218
Porto Valente, C; Morris, A and Wilkinson, S J (2022) Energy poverty, housing and health: The lived experience of older low-income australians. Building Research & Information, 50(1-2), pp. 6-18. ISSN 0961-3218
Poshdar, M; González, V A; Raftery, G M and Orozco, F (2014) Characterization of process variability in construction. Journal of Construction Engineering and Management, 140(11): 5014009, ISSN 0733-9364
Poshdar, M; González, V A; Raftery, G M; Orozco, F; Romeo, J S and Forcael, E (2016) A probabilistic-based method to determine optimum size of project buffer in construction schedules. Journal of Construction Engineering and Management, 142(10): 04016046, ISSN 0733-9364
Potts, K and Wall, M (2002) Managing the commissioning of building services. Engineering, Construction and Architectural Management, 9(4), pp. 336-344. ISSN 0969-9988
Pourghazian, H (2008) Industrial construction methods for cost-effective and sustainable multi-storey buildings. PhD thesis, KTH Royal Institute of Technology, Sweden.
Powell, A (2009) The (un)balancing act: The impact of culture on women engineering students' gendered and professional identities. PhD thesis, Loughborough University, UK.
Power, W; Sinnott, D and Lynch, P (2021) Evaluating the efficacy of a dedicated last planner® system facilitator to enhance construction productivity. Construction Economics and Building, 21(3), pp. 142-158. ISSN 2204-9029
Powmya, A; Nazirah, Z A and Nurul Sakina, M A (2023) Determination of contractor strategies in delivering construction projects in Oman. Journal of Construction in Developing Countries, 28(1), pp. 293-316. ISSN 1823-6499
Prabhakaran, A; Mahamadu, A M; Mahdjoubi, L; Andric, J; Manu, P and Mzyece, D (2021) An investigation into macro BIM maturity and its impacts: A comparison of qatar and the United Kingdom. Architectural Engineering and Design Management, 17(5-6), pp. 496-515. ISSN 1745-2007
Prakash, A and Phadtare, M (2019) Exploration of logic in project marketing using interpretive structural modeling. Journal of Construction Engineering and Management, 145(11): 04019066, ISSN 0733-9364
Prasanna, M and Vinodh, S (2013) Lean six sigma in SMEs: An exploration through literature review. Journal of Engineering, Design and Technology, 11(3), pp. 224-250. ISSN 1726-0531
Prasertrungruang, T and Hadikusumo, B H W (2009) Study of factors influencing the efficient management and downtime consequences of highway construction equipment in Thailand. Journal of Construction Engineering and Management, 135(1), pp. 2-11. ISSN 0733-9364
Pratas, J D G (2000) Comparison of the use and success of budgetary and schedule-based management information systems (MIS) in construction. PhD thesis, University of Manchester, UK.
Prateapusanond, Apirath (2003) A comprehensive practice of total float pre-allocation and management for the application of a CPM-based construction contract. PhD thesis, Virginia Tech, USA.
Praticò, F G; Antonio, C and Domenico, T (2012) Influence of dispersion and location on pay adjustment in construction engineering. Journal of Construction Engineering and Management, 138(10), pp. 1125-1130. ISSN 0733-9364
Prayogo, A; Teophilea, H S; Nugraha, P; Sunindijo, R Y; Maharani, C F and Yang, K (2025) Noise disturbance increases negative emotions and unsafe behaviour among construction workers. International Journal of Construction Management, 25(8), pp. 932-939. ISSN 1562-3599
Price, A D F and Shawa, H H (1997) Risk and risk management in project related finance. Journal of Construction Procurement, 3(3), pp. 27-46. ISSN 1358-9180
Price, D A (2003) Community involvement in the design of social housing. PhD thesis, University of Sheffield, UK.
Price, M (2005) State prevailing wage laws and construction labor markets. PhD thesis, University of Utah, USA.
Price, S J (2012) To deliver a sustainable built estate: The management and operationalisation of sustainable facilities management. PhD thesis, University of London, University College London, UK.
Proverbs, D G and Faniran, O O (2001) International construction performance comparisons: A study of European' and Australian contractors. Engineering, Construction and Architectural Management, 8(4), pp. 284-291. ISSN 0969-9988
Proverbs, D G; Holt, G D and Olomolaiye, P O (1997) Factors influencing the choice of concrete supply methods. Building Research & Information, 25(3), pp. 176-184. ISSN 0961-3218
Pulaski, M H (2005) The alignment of sustainability and constructability: A continuous value enhancement process. PhD thesis, Pennsylvania State University, USA.
Pushpakumara, B H J and Thusitha, G A (2021) Development of a structural health monitoring tool for underwater concrete structures. Journal of Construction Engineering and Management, 147(10): 04021135, ISSN 0733-9364
Pérez, D; Lagos, C and Fernando Alarcón, L (2022) Key last planner system metrics to assess project performance in high-rise building and industrial construction projects. Journal of Construction Engineering and Management, 148(1): 04021179, ISSN 0733-9364
Qasim, M (2018) Improving highways construction processes using computer-based simulation techniques. PhD thesis, University of Salford, UK.
Qi, K. and Lu, M. (2026) A data-driven framework for quantifying physical workload in construction using posture-hour metrics. Journal of Construction Engineering and Management, 152(7): 04026100, ISSN 0733-9364
Qi, F; Jiang, L; Chen, Y; Zhu, L and Jiang, Y (2024) Identifying Chinese students' perceptions of smart classrooms and their relationships with design features. Building Research & Information, 52(7), pp. 781-798. ISSN 0961-3218
Qi, J K; Yang, J Y; Oliver Hoon Leh, L; Edwards, R and Jamalunlaili, A (2021) Thermal comfort prediction of air-conditioned and passively cooled engineering testing centres in a higher educational institution using CFD. Smart and Sustainable Built Environment, 10(1), pp. 18-36. ISSN 2046-6099
Qiao, S; Wang, Q; Guo, Z and Guo, J (2021) Collaborative innovation activities and BIM application on innovation capability in construction supply chain: Mediating role of explicit and tacit knowledge sharing. Journal of Construction Engineering and Management, 147(12): 04021168, ISSN 0733-9364
Qin, Y and Bulbul, T (2023) An EEG-based mental workload evaluation for ar head-mounted display use in construction assembly tasks. Journal of Construction Engineering and Management, 149(9): 04023088, ISSN 0733-9364
Qu, Yingying (2017) An investigation of opportunistic behaviour in public-private partnerships. PhD thesis, University of New South Wales, Australia.
Quintana, F C (2016) Cybersecurity capabilities in a critical infrastructure sector of a developing nation. PhD thesis, Carnegie Mellon University, USA.
Rad, Mahyar Habibi (2022) Impact of lean construction on contractor performance and organisational resilience in post-disaster infrastructure projects. PhD thesis, University of New South Wales, Australia.
Radtke, M W and Russell, J S (1993) Project-level model process for implementing constructability. Journal of Construction Engineering and Management, 119(4), pp. 813-831. ISSN 0733-9364
Radzi, A R; Azmi, N F; Kamaruzzaman, S N and Rahman, R A (2025) Modeling the critical assessment criteria for construction readiness of BIM-based projects: PLS-SEM approach. Journal of Construction Engineering and Management, 151(6): 04025063, ISSN 0733-9364
Rafaat, R; Osman, H; Georgy, M and Elsaid, M (2020) Preferred risk allocation in egypt's water sector PPPs. International Journal of Construction Management, 20(6), pp. 585-597. ISSN 1562-3599
Rafieyan, A; Sarvari, H; Beer, M and Chan, D W M (2024) Determining the effective factors leading to incidence of human error accidents in industrial parks construction projects: Results of a fuzzy Delphi survey. International Journal of Construction Management, 24(7), pp. 748-760. ISSN 1562-3599
Rafique, M; Ahmed, S and Ismail, M (2021) Impact of safety climate on safety behaviour in construction projects: Mediating mechanism and interacting effect. Journal of Construction in Developing Countries, 26(2), pp. 163-181. ISSN 1823-6499
Raghib, A T; Belayutham, S; Mohammad, M Z and Ibrahim, C K I C (2023) Causes, effects and potential measures of cost deviations in high-rise building projects in Egypt. International Journal of Construction Management, 23(11), pp. 1875-1885. ISSN 1562-3599
Rahim, A A and Samad, N A A (2010) Accessible built environment for the elderly and disabled in Malaysia: Hotels as case studies. Journal of Construction in Developing Countries, 15(2), pp. 1-21. ISSN 1823-6499
Rahimi, Y; Tavakkoli-Moghaddam, R; Iranmanesh, S H and Vaez-Alaei, M (2018) Hybrid approach to construction project risk management with simultaneous FMEA/ISO 31000/evolutionary algorithms: Empirical optimization study. Journal of Construction Engineering and Management, 144(6): 04018043, ISSN 0733-9364
Rahman, M M and Kumaraswamy, M M (2005) Relational selection for collaborative working arrangements. Journal of Construction Engineering and Management, 131(10), pp. 1087-1098. ISSN 0733-9364
Rahmani Asl, M (2015) A building information model (BIM) based framework for performance optimization. PhD thesis, Texas A&M University, USA.
Raidén, A B; Williams, H and Dainty, A (2008) Human resource information systems in construction: A review seven years on. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Raisbeck, P (2013) Time keeps on slippin', slippin', slippin' into the future: BIM, imaging and time on construction sights. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Rajak, S. and Vimal, K. E. K. (2026) Blockchain-based time impact analysis method for sustainable delay management in EPC projects. Journal of Construction Engineering and Management, 152(6): 04026074, ISSN 0733-9364
Ramanathan, C; Narayanan, S P and Idrus, A B (2012) Construction delays causing risks on time and cost: a critical review. Construction Economics and Building, 12(1), pp. 37-57. ISSN 2204-9029
Ramayah, T and Jaafar, M (2008) Technology usage among construction students the moderating role of gender. Journal of Construction in Developing Countries, 13(1), pp. 63-77. ISSN 1823-6499
Ranasinghe, M and Russell, A D (1993) Elicitation of subjective probabilities for economic risk analysis: An investigation. Construction Management and Economics, 11(5), pp. 326-340. ISSN 01446193
Rapp, R R and Pan, J (2010) Disaster restoration professional body of knowledge. International Journal of Construction Education and Research, 6(3), pp. 202-218. ISSN 1557-8771
Rashdan, W. and Ashour, A. F. (2026) A conceptual framework linking biophilic interior design to sustainability criteria. Building Research & Information, 54(6), pp. 775-800. ISSN 0961-3218
Rasheed, N; Shahzad, W M and Rotimi, J O B (2024) Factor analysis of risk allocation criteria (rac) in public-private partnership (PPP) projects: A case of New Zealand. Construction Economics and Building, 24(4-5), pp. 142-159. ISSN 2204-9029
Rashidian, S; Drogemuller, R and Omrani, S (2024) An integrated building information modelling, integrated project delivery and lean construction maturity model. Architectural Engineering and Design Management, 20(6), pp. 1454-1470. ISSN 1745-2007
Rastegar, H; Arbab Shirani, B; Mirmohammadi, S H and Akhondi Bajegani, E (2021) Stochastic programming model for bidding price decision in construction projects. Journal of Construction Engineering and Management, 147(4): 02008, ISSN 0733-9364
Rathnayake, A and Middleton, C (2023) Systematic review of the literature on construction productivity. Journal of Construction Engineering and Management, 149(6): 03123005, ISSN 0733-9364
Rathnayake, A; Murguia, D and Middleton, C (2024) Measuring activity-level construction productivity. Journal of Construction Engineering and Management, 150(8): 04024099, ISSN 0733-9364
Rausch, C; Sanchez, B and Haas, C (2021) Topology optimization of architectural panels to minimize waste during fabrication: Algorithms for panel unfolding and nesting. Journal of Construction Engineering and Management, 147(7): 2089, ISSN 0733-9364
Raviv, G; Shapira, A and Sacks, R (2022) Empirical investigation of the applicability of constructability methods to prevent design errors. Built Environment Project and Asset Management, 12(1), pp. 53-69. ISSN 2044-124X
Rayburn, L M (1989) Productivity database and job cost control using microcomputers. Journal of Construction Engineering and Management, 115(4), pp. 585-601. ISSN 0733-9364
Rayhan, D S A and Bhuiyan, I U (2025) A framework for evaluation of construction and demolition waste management alternatives using MCDA techniques in the context of Dhaka City. International Journal of Construction Management, 25(4), pp. 481-493. ISSN 1562-3599
Reddrick, L A (2023) Leadership strategies for modeling ethical behavior in the real estate industry. DBA thesis, Walden University, USA.
Redmond, A and West, R (2012) The use of cloud enabled building information models: an expert analysis. Construction Economics and Building, 12(4), pp. 53-67. ISSN 2204-9029
Rees, S W; Zhou, Z and Thomas, H R (2006) Multidimensional simulation of earth-contact heat transfer. Building Research & Information, 34(6), pp. 565-572. ISSN 0961-3218
Reilly, R (2022) Development of a management framework to improve the building services engineering design process: a case study of engineering management in an Irish consultancy practice. DProf thesis, University of Salford, UK.
Reja, V. K.; Yin, M.; Davletshina, D.; Wei, R.; Fauth, J.; Perrotta, F. and Brilakis, I. (2026) Establishing and fulfilling information requirements for computer vision-enabled digital twin-based control of roadside vegetation. Journal of Construction Engineering and Management, 152(9): 04026147, ISSN 0733-9364
Renault, B Y; Agumba, J N and Ansary, N (2020) Correlation analysis between risk measurement and project success of small and medium contractors in Gauteng, South Africa. Journal of Construction Business and Management, 4(2), pp. 34-45. ISSN 2521-0165
Renuka, S M and Umarani, C (2019) Effect of critical risk factors causing cost deviation in medium sized construction projects. Journal of Construction in Developing Countries, 23(2), pp. 63-85. ISSN 1823-6499
Renukappa, S; Egbu, C; Suresh, S and Mushatat, S (2015) Drivers for managing sustainability-related knowledge. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(2), pp. 66-75. ISSN 17514304
Rickaby, M; Glass, J; Mills, G and McCarthy, S (2017) Exploring alignment of personal values in a complex, multi-organisation construction project environment. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Riggio, M and Dilmaghani, M (2020) Structural health monitoring of timber buildings: A literature survey. Building Research & Information, 48(8), pp. 817-837. ISSN 0961-3218
Rihani, R A (2006) An investigation of critical success factors for robotic masonry. PhD thesis, North Carolina State University, USA.
Rijal, H B; Humphreys, M A and Nicol, J F (2017) Towards an adaptive model for thermal comfort in Japanese offices. Building Research & Information, 45(7), pp. 717-729. ISSN 0961-3218
Rivas, R A; Borcherding, J D; Gonzlez, V and Alarcn, L F (2011) Analysis of factors influencing productivity using craftsmen questionnaires: Case study in a Chilean construction company. Journal of Construction Engineering and Management, 137(4), pp. 312-320. ISSN 0733-9364
Robert, O K; Dansoh, A and Ofori-Kuragu, J K (2014) Reasons for adopting public-private partnership (PPP) for construction projects in Ghana. International Journal of Construction Management, 14(4), pp. 227-238. ISSN 1562-3599
Robinson, A; Gibb, A G and Austin, S A (2012) Standardisation of specification driven buildings with serial and repeat order designs. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Robinson, A C (2017) ISBU modular construction and building design prototypes. EngD thesis, Loughborough University, UK.
Robinson, H S and Scott, J (2009) Service delivery and performance monitoring in PFI/PPP projects. Construction Management and Economics, 27(2), pp. 181-197. ISSN 1466433X
Rodger, D; Callaghan, N and Thomson, C S (2020) The loosening control of social housing: Creating a holistic retrofit system for an ageing population through the lens of governmentality. Construction Management and Economics, 38(12), pp. 1101-1121. ISSN 01446193
Rodrigo, G A; Perera, B A K S and Ekanayake, B J (2022) Occupant perceptions on the thermal comfort guidelines in air-conditioned offices in Colombo, Sri Lanka. International Journal of Construction Management, 22(4), pp. 579-587. ISSN 1562-3599
Rodrigues Aragao, R (2018) Using network theory to manage knowledge from unstructured data in construction projects: Application to a collaborative analysis of the energy consumption in the construction of oil and gas facilities. PhD thesis, University of Toronto, Canada.
Rodriguez Diaz, C R (2012) Development of a framework and a rating system tool, for sustainable infrastructure certification in developing countries, case study for Ecuador. PhD thesis, University of Florida, USA.
Rodriguez-Ramos, W E (1982) Quantitative techniques for construction site layout planning. PhD thesis, University of Florida, USA.
Rodríguez-Labajos, L; Thomson, C S and O’Brien, G (2021) Applying constructivist grounded theory in co-production research: A case study exploring its potential and lessons for construction management research. Construction Management and Economics, 39(5), pp. 369-382. ISSN 01446193
Roffe, M and Trop, T (2025) Willingness to purchase and to pay a price premium for apartments with exterior green walls. Building Research & Information, 53(7), pp. 892-911. ISSN 0961-3218
Rogers, P (2024) Influence of carbon tax on office buildings in South Africa. PhD thesis, University of Pretoria, South Africa.
Root, D and Blismas, N G (2003) Increasing questionnaire responses from industry: Practices surrounding the use of postal questionnaires. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Rose, T and Manley, K (2010) Motivational misalignment on an iconic infrastructure project. Building Research & Information, 38(2), pp. 144-156. ISSN 0961-3218
Rose, T M and Manley, K (2014) Revisiting the adoption of innovative products on Australian road infrastructure projects. Construction Management and Economics, 32(9), pp. 904-917. ISSN 01446193
Rosenbaum, S; Toledo, M and González, V (2014) Improving environmental and production performance in construction projects using value-stream mapping: Case study. Journal of Construction Engineering and Management, 140(2): 04013045, ISSN 0733-9364
Ross, A D and Goulding, J S (2006) The construction estimator's approach to the collection and assessment of supply chain price information. Journal of Construction Procurement, 12(1),
Ross, N; Bowen, P A and Lincoln, D (2010) Sustainable housing for low-income communities: Lessons for South Africa in local and other developing world cases. Construction Management and Economics, 28(5), pp. 433-449. ISSN 1466433X
Roulet, C A; Johner, N; Foradini, F; Bluyssen, P; Cox, C; De Oliveira Fernandes, E; Müller, B and Aizlewood, C (2006) Perceived health and comfort in relation to energy use and building characteristics. Building Research & Information, 34(5), pp. 467-474. ISSN 0961-3218
Roussac, A C and Bright, S (2012) Improving environmental performance through innovative commercial leasing: An Australian case study. International Journal of Law in the Built Environment, 4(1), pp. 6-22. ISSN 1756-1450
Rowlinson, S (2007) The temporal nature of forces acting on innovative IT in major construction projects. Construction Management and Economics, 25(3), pp. 227-238. ISSN 1466433X
Roy, R and Cochrane, S P (1999) Development of a customer focused strategy in speculative house building. Construction Management and Economics, 17(6), pp. 777-787. ISSN 01446193
Roza, C (2006) Environmental assessment: The Eden project. PhD thesis, University College London, UK.
Ruddock, S (2009) Assessment of the built environment for healthcare: A case study in the development of an evaluation framework. PhD thesis, University of Salford, UK.
Rudeli, N; Santilli, A; Puente, I and Viles, E (2017) Statistical model for schedule prediction: Validation in a housing-cooperative construction database. Journal of Construction Engineering and Management, 143(11): 04017083, ISSN 0733-9364
Ruhl, V R (1997) Computer-aided design and manufacturing of complex-shaped concrete formwork. DDes thesis, Harvard University, USA.
Russell, J S (1988) A knowledge-based system approach to the contractor prequalification process. PhD thesis, Purdue University, USA.
Russell, J S; Gugel, J G and Radtke, M W (1994) Comparative analysis of three constructability approaches. Journal of Construction Engineering and Management, 120(1), pp. 180-195. ISSN 0733-9364
Russell, J S and Jaselskis, E J (1992) Predicting construction contractor failure prior to contract award. Journal of Construction Engineering and Management, 118(4), pp. 791-811. ISSN 0733-9364
Russell, M M; Liu, M and Hsiang, S M (2015) Planning for uncertainty: Use of structural equation modelling to determine the causal structure of time buffer allocation. Construction Management and Economics, 33(10), pp. 783-798. ISSN 01446193
Russell, R C (2016) The development of a design and construction process protocol to support occupational therapists in delivering effective home modifications. PhD thesis, University of Salford, UK.
Rwelamila, P D and Asalan, R (2010) Understanding of project management good practices by construction project managers: The case of ABCD. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Rwelamila, P D; Talukhaba, A A and Ngowi, A B (1999) Tracing the African project failure syndrome: The significance of 'ubuntu'. Engineering, Construction and Architectural Management, 6(4), pp. 335-346. ISSN 0969-9988
Ryu, J; Seo, J; Jebelli, H and Lee, S (2019) Automated action recognition using an accelerometer-embedded wristband-type activity tracker. Journal of Construction Engineering and Management, 145(1): 04018114, ISSN 0733-9364
Ryu, S R; Rhee, K N; Yeo, M S and Kim, K W (2008) Strategies for flow rate balancing in radiant floor heating systems. Building Research & Information, 36(6), pp. 625-637. ISSN 0961-3218
Sachs, T; Tiong, R and Wagner, D (2007) Political risk quantification using fuzzy set approach. Journal of Financial Management of Property and Construction, 12(2), pp. 107-126. ISSN 1366-4387
Sadafi, N and Sharifi, M (2019) A study of the concept of Iranian traditional architecture in bazaars and shopping centres. Journal of Construction in Developing Countries, 23(2), pp. 151-165. ISSN 1823-6499
Sadat, H and Thomas, N (2025) An integrated approach to investigate the causes of time delays and cost overruns in Afghanistan construction projects. International Journal of Construction Management, 25(6), pp. 624-634. ISSN 1562-3599
Sadeghi, H; Cheung, C M; Yunusa-Kaltungo, A and Manu, P (2024) Occupational safety and health in modular integrated construction: A systematic literature review. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Sadeghifar, M; Pazhouhanfar, M and Farrokhzad, M (2019) An exploration of the relationships between urban building façade visual elements and people's preferences in the city of Gorgan, Iran. Architectural Engineering and Design Management, 15(6), pp. 445-458. ISSN 1745-2007
Sadek, A H and Willis, J (2023) Forms of environmental support: The roles that contemporary outpatient oncology settings play in shaping patient experience. Building Research & Information, 51(4), pp. 481-500. ISSN 0961-3218
Saeb, A; Mohd Danuri, M S B; Zakaria, N B and Mohamed, O B (2020) A case study of dispute resolution methods pertaining to the construction standard form in Iran. International Journal of Construction Education and Research, 16(3), pp. 211-230. ISSN 1557-8771
Safari, K and Ghandehariun, S (2026) An integrative BIM-based life cycle assessment framework to address uncertainties: A mixed-methods study under real construction project context. International Journal of Construction Management, 26(1), pp. 54-75. ISSN 1562-3599
Safari, M (2019) A regenerative approach to development and construction of building energy retrofit projects. PhD thesis, Pennsylvania State University, USA.
Safizadeh, M (2024) Simulation of the circulation complexity in student residence buildings using space syntax analyses (Case studies: Highland hall, Rita Atkinson, Rutgers University and Tooker Residences, USA). Architectural Engineering and Design Management, 20(4), pp. 741-760. ISSN 1745-2007
Safour, A and Egbu, C (2010) City centre road user charging; real schemes and field-based experimental studies: State of art. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Saghafi, M R and Mirzaei, B (2021) The spatial configuration analysis of a high school through a participatory approach. Architectural Engineering and Design Management, 17(1-2), pp. 17-35. ISSN 1745-2007
Sagoo, A S (2014) A decision support system for evaluating local authority housing maintenance strategies in the United Kingdom. PhD thesis, University of Derby, UK.
Said, H (2015) Prefabrication best practices and improvement opportunities for electrical construction. Journal of Construction Engineering and Management, 141(12): 04015045, ISSN 0733-9364
Saied al Surf, M; Trigunarsyah, B and Susilawati, C (2013) Saudi Arabia's sustainable housing limitations: The experts' views. Smart and Sustainable Built Environment, 2(3), pp. 251-271. ISSN 2046-6099
Saka, A B and Chan, D W M (2020) Knowledge, skills and functionalities requirements for quantity surveyors in building information modelling (BIM) work environment: An international Delphi study. Architectural Engineering and Design Management, 16(3), pp. 227-246. ISSN 1745-2007
Sakhakarmi, S (2022) Automated approach for the enhancement of scaffolding structure monitoring with strain sensor data. PhD thesis, University of Nevada, Las Vegas, USA.
Salah, M; Elbeltagi, E and Elsheikh, A (2024) Optimization of construction site layout using BIM generative design. International Journal of Construction Management, 24(3), pp. 314-322. ISSN 1562-3599
Salam, M A; Sarkar, S; Blackwood, D J and Staines, H J (1999) High-rise building construction in Bangladesh: Experience of questionnaire development and on-site data collection. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Salam, M A; Staines, H J; Blackwood, D J and Sarkar, S (2001) Analysis of the relationships between causes of delay in construction projects in Bangladesh. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Salam, Md Abdus (2007) Time and cost overruns on high-rise building construction in Bangladesh. PhD thesis, Abertay University, UK.
Salama, M; El Hamid, M A and Keogh, B (2008) Investigating the causes of delay within oil and gas projects in the UAE. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Salama, M; Keogh, W and Tabunshchikova, O (2007) Universities' role in enhancing generic competencies in multicultural students. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Salamati, A A (2001) Urban housing design in Iran in response to socio-cultural and environmental conditions. PhD thesis, University of Strathclyde, UK.
Salat, S (2009) Energy loads, CO2 emissions and building stocks: Morphologies, typologies, energy systems and behaviour. Building Research & Information, 37(5-6), pp. 598-609. ISSN 0961-3218
Salazar-Kish, J M (2001) Modeling concurrency tradeoffs and their effects on project duration and rework. PhD thesis, Stanford University, USA.
Saleem, M; Elshami, M M and Najjar, M (2017) Development, testing, and implementation strategy of a translucent concrete-based smart lane separator for increased traffic safety. Journal of Construction Engineering and Management, 143(5): 04016129, ISSN 0733-9364
Salem, M R A S K K R R A (2009) The gcc real estate markets: An initial investigation into their attractiveness to global real estate investors. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Salem, O; Shahin, A and Khalifa, Y (2007) Minimizing cutting wastes of reinforcement steel bars using genetic algorithms and integer programming models. Journal of Construction Engineering and Management, 133(12), pp. 982-992. ISSN 0733-9364
Salgin, B; Mersky, R L and Agyekum, K (2025) Exploring waste reduction approaches in the architectural design stage of university buildings in the United States. International Journal of Construction Management, 25(5), pp. 510-518. ISSN 1562-3599
Salman, A F M; Skibniewski, M J and Basha, I (2007) BOT viability model for large-scale infrastructure projects. Journal of Construction Engineering and Management, 133(1), pp. 50-63. ISSN 0733-9364
Salmi, A; Jussila, J and Hämäläinen, M (2022) The role of municipalities in transformation towards more sustainable construction: The case of wood construction in Finland. Construction Management and Economics, 40(11-12), pp. 934-954. ISSN 01446193
Salter, M (1989) Planning systems for small firms. PhD thesis, Sheffield Hallam University, UK.
Samarghandi, H; Tabatabaei, S M M; Taabayan, P; Hashemi, A M and Willoughby, K (2016) Studying the reasons for delay and cost overrun in construction projects: The case of Iran. Journal of Construction in Developing Countries, 21(1), pp. 51-84. ISSN 1823-6499
Samasoni, J and Rotimi, J O B (2016) Perceptions of regulatory building inspectors and designers on the proposed risk-based inspection regime in New Zealand. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Sameh, R; Ismaeel, W S E and Othman, F (2021) Sustainable building renovation and indoor environmental quality. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Sanboskani, H and Srour, I (2022) Using advanced statistical methods to identify the drivers of knowledge sharing intention among construction workers. Journal of Construction Engineering and Management, 148(2): 04021201, ISSN 0733-9364
Sanda, Y N; Anigbogu, N A; Izam, Y D and Nuhu, L Y (2022) Managing stakeholder opportunism in public-private partnership (PPP) housing projects. Journal of Construction in Developing Countries, 27(1), pp. 213-228. ISSN 1823-6499
Sands, K S and Suh, M J (2026) Roofers' perceptions on topics of heat safety. International Journal of Construction Education and Research, 22(1), pp. 53-71. ISSN 1557-8771
Sanga, S A and Lucian, C (2016) Cost shares and factor-cost ratios in owner-built incremental housing in Dar es Salaam, Tanzania. Journal of Construction in Developing Countries, 21(1), pp. 113-130. ISSN 1823-6499
Sanni, A A and Windapo, A O (2008) Evaluation of contractor’s quality control practices on construction sites in Nigeria. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Sanni-Anibire, M O and Hassanain, M A (2016) Quality assessment of student housing facilities through post-occupancy evaluation. Architectural Engineering and Design Management, 12(5), pp. 367-380. ISSN 1745-2007
Sanni-Anibire, M O; Zin, R M and Olatunji, S O (2022) Machine learning model for delay risk assessment in tall building projects. International Journal of Construction Management, 22(11), pp. 2134-2143. ISSN 1562-3599
Santoso, D S; Ogunlana, S O and Minato, T (2003) Assessment of risks in high rise building construction in Jakarta. Engineering, Construction and Architectural Management, 10(1), pp. 43-55. ISSN 0969-9988
Sapian, A R (2009) Validation of the computational fluid dynamics method for predicting wind flow around a high-rise building in an urban boundary layer condition. Journal of Construction in Developing Countries, 14(2), pp. 1-20. ISSN 1823-6499
Sarvari, H; Chan, D W M; Banaitiene, N; Norhazilan Md, N and Beer, M (2021) Barriers to development of private sector investment in water and sewage industry. Built Environment Project and Asset Management, 11(1), pp. 52-70. ISSN 2044-124X
Satwiko, P; Prasetya, A and Suhedi, F (2019) Noise-reducing vents for windows in warm, humid, tropical countries. Architectural Engineering and Design Management, 15(2), pp. 141-158. ISSN 1745-2007
Saunders, F C; Sherry, A H and Gale, A W (2016) Dualities and dilemmas: Contending with uncertainty in large-scale safety-critical projects. Construction Management and Economics, 34(9), pp. 657-675. ISSN 01446193
Savaş, S; Acar, E and Acar, D (2024) A project management model for architectural restoration projects. International Journal of Construction Management, 24(15), pp. 1698-1707. ISSN 1562-3599
Sayce, S; Ellison, L and Parnell, P (2007) Understanding investment drivers for UK sustainable property. Building Research & Information, 35(6), pp. 629-643. ISSN 0961-3218
Sayed, M; Abdel-Hamid, M and El-Dash, K (2023) Improving cost estimation in construction projects. International Journal of Construction Management, 23(1), pp. 135-143. ISSN 1562-3599
Schmidt, M; Crawford, R H and Warren-Myers, G (2020) Integrating life-cycle GHG emissions into a building's economic evaluation. Buildings & Cities, 1(1), pp. 361-378. ISSN 2632-6655
Schmidt Iii, R; Vibaek, K S and Austin, S (2014) Evaluating the adaptability of an industrialized building using dependency structure matrices. Construction Management and Economics, 32(1-2), pp. 160-182. ISSN 01446193
Schmieg, P A (1990) The politics of school board-community interaction: A case study of a high school construction project. EdD thesis, Temple University, USA.
Schoenwitz, M (2014) Aligning product and processes to customer needs in prefabricated house building. PhD thesis, Cardiff University, UK.
Schoenwitz M, G J and Naim M, P A (2013) How to build what buyers want: Unveiling customer preferences for prefabricated homes. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Schofield, L N (2011) The role of stakeholders in building self-sustaining capacity in housing development projects in marginalised communities: case of Odi and Kaduna South communities in Nigeria. PhD thesis, University of Salford, UK.
Schultz, C S; Jørgensen, K; Bonke, S and Rasmussen, G M G (2015) Building defects in Danish construction: Project characteristics influencing the occurrence of defects at handover. Architectural Engineering and Design Management, 11(6), pp. 423-439. ISSN 1745-2007
Schweber, L. and Green, M. (2026) Negotiating net-zero carbon: An ant analysis of two buildings. Buildings & Cities, 7(1), pp. 791-807. ISSN 2632-6655
Schönbeck, P; Löfsjögård, M and Ansell, A (2022) Framework for change control in healthcare construction projects compared to current practice. International Journal of Construction Management, 22(12), pp. 2405-2412. ISSN 1562-3599
Scott, D (1984) Economic evaluation of minor roading projects. Construction Management and Economics, 2(1), pp. 77-90. ISSN 01446193
Scott, L and Fortune, C (2011) Formative assessment practices in built environment higher education programmes and the enhancement of the student learning experience. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Scott, L and Kanjanabootra, S (2018) The acquisition of knowledge and expertise in construction: Understanding construction professionals. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Scott, S (1991) Project plans and record-keeping on construction sites in the United Kingdom. PhD thesis, University of Newcastle upon Tyne, UK.
Scott, S (1995) Checking the project plan. Construction Management and Economics, 13(2), pp. 127-136. ISSN 01446193
Scott, S (1997) Delay claims in UK contracts. Journal of Construction Engineering and Management, 123(3), pp. 238-244. ISSN 0733-9364
Scott, S and Harris, R A (2004) United Kingdom construction claims: Views of professionals. Journal of Construction Engineering and Management, 130(5), pp. 734-741. ISSN 0733-9364
Seaden, G; Guolla, M; Doutriaux, J and Nash, J (2003) Strategic decisions and innovation in construction firms. Construction Management and Economics, 21(6), pp. 603-612. ISSN 01446193
Sebastian, R (2006) Evaluating a proposed approach for managing collaborative design in the conceptual design phase. Architectural Engineering and Design Management, 2(3), pp. 216-224. ISSN 1745-2007
Seboni, L (2016) Improving the existing project manager-to-project practice of a specific organization (organization A) in Botswana. PhD thesis, University of Leeds, UK.
Seboni, L and Tutesigensi, A (2014) Allocating project managers to projects in a multi-project environment. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Seboni, L and Tutesigensi, A (2015) Project manager-to-project allocations in practice: An empirical study of the decision-making practices of a multi-project based organization. Construction Management and Economics, 33(5-6), pp. 428-443. ISSN 01446193
Seddiki, M; Bennadji, A and Tehami, M (2020) Barriers to the adoption of energy efficiency measures in Mostaganem, Algeria. Journal of Construction in Developing Countries, 25(2), pp. 39-61. ISSN 1823-6499
Seek, Ngee Huat (1981) Modification of the existing housing stock: A study of housing adjustments through home improvement. PhD thesis, Australian National University, Australia.
Seethapathy, S and Henderson, J H (2017) Management of construction waste in nuclear and thermal power plant projects in India. Journal of Construction in Developing Countries, 22(S1), pp. 19-46. ISSN 1823-6499
Sehic, A (2014) Decision support tool for interface management. PhD thesis, Polytechnic Institute of New York University, USA.
Sehrawy, A; Amoudi, O; Tong, M and Callaghan, N (2022) Mobilising theory and practice for the enhancement of building information modelling based building sustainability assessment: An exploratory study and a conceptual framework. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Selcuk, O; Turkoglu, H; Polat, G and Hajdu, M (2024) An integrative literature review on the causes of delays in construction projects: Evidence from developing countries. International Journal of Construction Management, 24(6), pp. 610-622. ISSN 1562-3599
Selman, A D and Gade, A N (2020) Barriers of incorporating circular economy in building design in a Danish context. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Senaratne, S and Kuruwita, S (2010) Resistance to organisational change: A case study in Sri Lankan construction organisation. International Journal of Construction Management, 10(1), pp. 61-73. ISSN 1562-3599
Senaratne, S and Sexton, M G (2004) Managing construction project change in the knowledge age: A case study. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Senaratne, S and Udawatta, N (2013) Managing intragroup conflicts in construction project teams: Case studies in Sri Lanka. Architectural Engineering and Design Management, 9(3), pp. 158-175. ISSN 1745-2007
Seneviratne, K and Michael, G V (2020) Disputes in time bar provisions for contractors' claims in standard form of contracts. International Journal of Construction Management, 20(4), pp. 335-346. ISSN 1562-3599
Sengonzi, R (2011) A framework for achieving whole life value of healthcare facilities through briefing and optioneering. PhD thesis, Loughborough University, UK.
Sengupta Dasgupta, P (2013) Interventions to reduce ergonomic exposures during drywall installation. ScD thesis, University of Massachusetts Lowell, USA.
Senouci, A B and Adeli, H (2001) Resource scheduling using neural dynamics model of adeli and park. Journal of Construction Engineering and Management, 127(1), pp. 28-34. ISSN 0733-9364
Seo, J (1998) Graphical interface design for equipment control in unstructured environments. PhD thesis, University of Texas at Austin, USA.
Sepasgozar, S M E (2023) Construction digital technology assimilation and absorption capability using measurement invariance of composite modeling. Journal of Construction Engineering and Management, 149(7): 04023041, ISSN 0733-9364
Serag, E (2006) Change orders and productivity loss quantification using verifiable site data. PhD thesis, University of Central Florida, USA.
Seraphim, D l (2006) Implementing TQM principles in a construction company in the UAE. PhD thesis, University of South Wales, UK.
Sergeeva, N and Radosavljevic, M (2009) The influence of individual characteristics on employee creative participation. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Serugga, J (2020) A decision support system for benefits realisation in front end design of construction projects in dynamic contexts. PhD thesis, University of Huddersfield, UK.
Setiawan, H (2015) Corporate entrepreneurship capability model for contractors. PhD thesis, Heriot-Watt University, UK.
Setiawan, H and Erdogan, B (2020) Key factors for successful corporate entrepreneurship: A study of Indonesian contractors. International Journal of Construction Management, 20(3), pp. 252-268. ISSN 1562-3599
Seward, D W (2002) Automating the construction workplace: Positioning and navigational factors. Construction Innovation, 2(3), pp. 167-189. ISSN 1471-4175
Sexton, M; Barrett, P and Aouad, G (2006) Motivating small construction companies to adopt new technology. Building Research & Information, 34(1), pp. 11-22. ISSN 0961-3218
Seyis, S (2019) Pros and cons of using building information modeling in the AEC industry. Journal of Construction Engineering and Management, 145(8): 04019046, ISSN 0733-9364
Seyis, S; Ergen, E and Pizzi, E (2016) Identification of waste types and their root causes in green-building project delivery process. Journal of Construction Engineering and Management, 142(2): 04015059, ISSN 0733-9364
Seyis, S and Ozkan, S (2024) Benefits and challenges of implementing the common data environments in the construction phase of BIM-based projects. Journal of Construction Engineering and Management, 150(8): 04024091, ISSN 0733-9364
Seymour-Jones, Trevor (2017) An assessment of international leading practice in the integrated management of public sector property assets, and its application to the Australian public sector. PhD thesis, University of Sydney, Australia.
Sha'ar, K. Z.; Assaf, S. A.; Bambang, T.; Babsail, M. and Fattah, A. M. A. E. (2017) Design-construction interface problems in large building construction projects. International Journal of Construction Management, 17(3), pp. 238-250. ISSN 1562-3599
Sha'ar, K Z; Assaf, S A; Bambang, T; Babsail, M and Fattah, A M A E (2017) Design–construction interface problems in large building construction projects. International Journal of Construction Management, 17(3), pp. 238-250. ISSN 1562-3599
Shabbir, A (2015) Corruption in infrastructure procurement: a study based on procurement of infrastructure projects in Pakistan. PhD thesis, University of Manchester, UK.
Shafiee, S; Piroozfar, P; Hvam, L; Farr, E R P; Huang, G Q; Pan, W; Kudsk, A; Rasmussen, J B and Korell, M (2020) Modularisation strategies in the AEC industry: A comparative analysis. Architectural Engineering and Design Management, 16(4), pp. 270-292. ISSN 1745-2007
Shafik, M and Martin, P (2006) The impact of procurement methods on the Scottish housebuilding industry. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Shah, K L (1969) Techniques for estimating construction costs of waste treatment plants. PhD thesis, University of Oklahoma, USA.
Shahruddin, S; Zairul, M and Haron, A T (2021) Redefining the territory and competency of architectural practitioners within a BIM-based environment: A systematic review. Architectural Engineering and Design Management, 17(5-6), pp. 376-410. ISSN 1745-2007
Shams, A. and Marzouk, M. (2026) Integrated time-cost-safety trade-off analysis and visual safety heat maps for enhanced construction performance. Journal of Construction Engineering and Management, 152(8): 04026114, ISSN 0733-9364
Shamsai, M; Whitlatch, E and Sezen, H (2007) Economic evaluation of reinforced concrete structures with columns reinforced with prefabricated cage system. Journal of Construction Engineering and Management, 133(11), pp. 864-870. ISSN 0733-9364
Shandraseharan, A and Kulatunga, U (2023) Social media for disaster management: The Sri Lankan context. International Journal of Construction Management, 23(4), pp. 648-655. ISSN 1562-3599
Shanika, V G; Jayawickrama, T S and Perera, B A K S (2023) The adaptability of sustainability education in quantity surveying degree programs in Sri Lanka: The industry perception. International Journal of Construction Education and Research, 19(3), pp. 299-320. ISSN 1557-8771
Sharma, A and Kumar, A (2024) Adaptive thermal comfort of residential buildings in the composite climatic region of India: a field study. Architectural Engineering and Design Management, 20(5), pp. 1238-1259. ISSN 1745-2007
Sharma, K and Trivedi, M K (2022) Latin hypercube sampling-based nsga-iii optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects. International Journal of Construction Management, 22(16), pp. 3158-3168. ISSN 1562-3599
Sharma, S K and Singh, A P (2023) Urban logistics stakeholder priority assessment to improve urban planning policy. International Journal of Construction Management, 23(16), pp. 2869-2878. ISSN 1562-3599
Sharma, V; Al-Hussein, M and Abourizk, S M (2006) Residential construction lot grading approval process optimization: Case study of city of Edmonton. Journal of Construction Engineering and Management, 132(12), pp. 1225-1233. ISSN 0733-9364
Shash, A A (1993) Factors considered in tendering decisions by top UK contractors. Construction Management and Economics, 11(2), pp. 111-118. ISSN 01446193
Shash, A A (2005) Financial analysis for replacement of construction equipment in Saudi Arabia. Construction Economics and Building, 5(1), pp. 16-22. ISSN 2204-9029
Shash, A A and AbuAlnaja, F M (2023) Causes of material delays in capital projects in Saudi Arabia. International Journal of Construction Management, 23(7), pp. 1109-1117. ISSN 1562-3599
Shawa, H H (1995) Project related finance for construction contractors operating in the United Arab Emirates. PhD thesis, Loughborough University, UK.
Shayan, S; Pyung Kim, K and Tam, V W Y (2022) Critical success factor analysis for effective risk management at the execution stage of a construction project. International Journal of Construction Management, 22(3), pp. 379-386. ISSN 1562-3599
Shayboun, M; Kifokeris, D and Koch, C (2019) Construction planning with machine learning. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Shen, Z; Wang, G; Ali, A; Wei, X; Zang, X and Ye, Y (2025) Study on the cooperation model of infrastructure projects in the third-party market of the belt and road. International Journal of Construction Management, 25(13), pp. 1609-1625. ISSN 1562-3599
Shen, K; Li, X; Cao, X and Zhang, Z (2022) Prefabricated construction process optimization based on rework risk. Journal of Construction Engineering and Management, 148(6): 04022031, ISSN 0733-9364
Shen, L Y; Zhao, Z Y and Drew, D S (2006) Strengths, weaknesses, opportunities, and threats for foreign-invested construction enterprises: A China study. Journal of Construction Engineering and Management, 132(9), pp. 966-975. ISSN 0733-9364
Shen, X; Lu, M and Chen, W (2011) Tunnel-boring machine positioning during microtunneling operations through integrating automated data collection with real-time computing. Journal of Construction Engineering and Management, 137(1), pp. 72-85. ISSN 0733-9364
Sherif, A and Iskandar, M (2025) Design of hospitals for the post-pandemic era: an international survey of design professionals on infection control design strategies. Architectural Engineering and Design Management, 21(4), pp. 705-720. ISSN 1745-2007
Sherif, E and Kaka, A (2003) Factors influencing the selection of payment systems in construction projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Sheriff, A M; Bouchlaghem, D; El-Hamalawi, A and Yeomans, S (2011) Developing a metadata standard for multimedia content management: A case study. Architectural Engineering and Design Management, 7(3), pp. 157-176. ISSN 1745-2007
Shi, G; Lu, D; Liu, Z; Du, X; Zhang, Q; Zhao, L and Wang, Z (2024) Material distribution planning method and experimental verification under multinode and multivehicle scene. Journal of Construction Engineering and Management, 150(11): 04024161, ISSN 0733-9364
Shin, J and Lim, H (2024) Enhancing work commitment through workplace design: development and prioritization of evaluation criteria in South Korea. Building Research & Information, 52(8), pp. 887-904. ISSN 0961-3218
Shiratuddin, M F (2009) Framework for context-aware information processing for design review in a virtual environment. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Shirazi, D H and Toosi, H (2023) Deep multilayer perceptron neural network for the prediction of Iranian dam project delay risks. Journal of Construction Engineering and Management, 149(4): 04023011, ISSN 0733-9364
Shiromani, J P A G T (2014) Conceptual framework for environmental rating systems for infrastructure projects in sri lanka: Application to small hydropower projects. PhD thesis, National University of Singapore, Singapore.
Shohet, I M (2006) Key performance indicators for strategic healthcare facilities maintenance. Journal of Construction Engineering and Management, 132(4), pp. 345-352. ISSN 0733-9364
Shohet, I M; Lavy-Leibovich, S and Bar-On, D (2003) Integrated maintenance monitoring of hospital buildings. Construction Management and Economics, 21(2), pp. 219-228. ISSN 01446193
Shojaei Kol Kachi, A (2017) Extending the portfolio and strategic planning horizon by the stochastic forecasting of unknown future projects: A FDOT case study. PhD thesis, University of Florida, USA.
Shokoohi, F. and Vosoughifar, H. (2026) Multi-dimensional sensitivity analysis of lean and sustainable construction: A novel modified trapezoidal DEMATEL–ANP (mtda) approach for integrated project management. International Journal of Construction Management, 26(10), pp. 1999-2017. ISSN 1562-3599
Shook, S R (1997) Innovation and the United States residential construction industry: An integrated model of determinants of firm innovativeness for engineered wood products. PhD thesis, University of Washington, USA.
Shrestha, A; Chan, T K; Aibinu, A A; Chen, C and Martek, I (2017) Risks in PPP water projects in China: Perspective of local governments. Journal of Construction Engineering and Management, 143(7): 05017006, ISSN 0733-9364
Shrestha, Asheem (2015) Risk allocation in public private partnerships: A principal agent approach. PhD thesis, University of Melbourne, Australia.
Shrestha, B (2024) Assessment of success factors and comparative analysis of public private partnership (P3) project performances against design-build and design-bid-build project delivery. PhD thesis, University of Nevada, Las Vegas, USA.
Shrestha, K (2016) Framework of performance-based contracting for chip seal and striping maintenance activities. PhD thesis, University of Nevada, Las Vegas, USA.
Shrestha, K and Shrestha, P P (2022) Framework to implement performance-based contracting for chip-seal road maintenance. Journal of Construction Engineering and Management, 148(1): 04021183, ISSN 0733-9364
Shrestha, K K (2016) Causes of change orders and its impact on road maintenance contracts. PhD thesis, University of Nevada, Las Vegas, USA.
Shrestha, R; Ko, T and Lee, J (2025) Quantifying project uncertainties: Leveraging historical bid and change order data for automated detection of cost and schedule impacts in new projects. Journal of Construction Engineering and Management, 151(4): 04025017, ISSN 0733-9364
Shrivastava, R (2020) Development of risk management model for construction of railway project in India. PhD thesis, University of Petroleum and Energy Studies, India.
Shuaib, Salem Mohammed S (2016) Project management performance in Saudi Arabia: An exploratory study into the constructs that most influence project success. PhD thesis, University of Adelaide, Australia.
Sia, M K; Yew, V W C and Siew, C L (2018) Influence of feng shui factors on house buying intention of Malaysian Chinese. Architectural Engineering and Design Management, 14(6), pp. 427-439. ISSN 1745-2007
Sidawi, B (2010) The use of advanced electronic management systems to manage remote projects in the kingdom of Saudi Arabia. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Siddiqui, A A (2019) An investigation into data sharing between building information modelling and fire safety engineering, with potential applications to smart buildings. PhD thesis, University of Greenwich, UK.
Sidwell, N C (1957) A critical examination of new constructional techniques and their influence on productivity in the building industry, with special reference to housing in south-east Scotland. PhD thesis, University of Edinburgh, UK.
Siebert, M (2019) Concrete and the barriers to innovation in UK housebuilding. PhD thesis, University of Nottingham, UK.
Sierra, L A; Pellicer, E and Yepes, V (2016) Social sustainability in the lifecycle of Chilean public infrastructure. Journal of Construction Engineering and Management, 142(5): 05015020, ISSN 0733-9364
Simatupang, T M and Sridharan, R (2016) A critical analysis of supply chain issues in construction heavy equipment. International Journal of Construction Management, 16(4), pp. 326-338. ISSN 1562-3599
Simon, M (2010) The commitment to corporate social responsibility of construction companies in the United Kingdom and Germany. PhD thesis, University of Dundee, UK.
Simpeh, E and Smallwood, J (2018) Field diagnosis of challenges and facilitators to the adoption of green building principles in multi-purpose office facilities. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Simpeh, F and Amoah, C (2023) Assessment of measures instituted to curb the spread of COVID-19 on construction site. International Journal of Construction Management, 23(3), pp. 383-391. ISSN 1562-3599
Simushi, S and Wium, J (2020) Time and cost overruns on large projects: Understanding the root cause. Journal of Construction in Developing Countries, 25(1), pp. 129-146. ISSN 1823-6499
Sinesilassie, E G (2017) Determinants of success of public construction projects in Ethiopia. PhD thesis, Indian Institute of Technology Delhi, India.
Singh, A (2017) Corporate social responsibility in construction firms operating in the UK. PhD thesis, University of Reading, UK.
Siraj, N B and Fayek, A R (2019) Risk identification and common risks in construction: Literature review and content analysis. Journal of Construction Engineering and Management, 145(9): 03119004, ISSN 0733-9364
Sirajuddin, A M Y (1991) An automated project planner. PhD thesis, University of Nottingham, UK.
Sirimewan, D C; Mendis, A; Damitha, R; Samaraweera, A and Naiduwa Handi Chathuri, M (2021) Analysis of issues in sustainable water management of irrigation systems: Case of a developing country. Built Environment Project and Asset Management, 11(4), pp. 529-543. ISSN 2044-124X
Siriwardana, C S A (2016) An integrated framework for worker planning and supervision in construction. PhD thesis, University of Calgary, Canada.
Siriwardena, N (2012) Managing stakeholder needs and expectations in a post-disaster housing reconstruction scenario. PhD thesis, University of Salford, UK.
Sistos-Sescosse, G; Atuahene, B T; Ajulo, O and Adams, I (2025) Examining the decision criteria for BIM–LCA: A case study. Construction Economics and Building, 25(1), pp. 203-220. ISSN 2204-9029
Siva Rama Krishna, U and Naga Satish Kumar, C (2022) A case study on maintenance of bituminous concrete pavement considering life cycle cost analysis and carbon footprint estimation. International Journal of Construction Management, 22(9), pp. 1756-1764. ISSN 1562-3599
Skea, J (2012) Research and evidence needs for decarbonisation in the built environment: A UK case study. Building Research & Information, 40(4), pp. 432-445. ISSN 0961-3218
Skinner, D W H (1974) An investigation of the contractor's use of bills of quantities. PhD thesis, Aston University, UK.
Skitmore, M and Ng, S T (2002) Analytical and approximate variance of total project cost. Journal of Construction Engineering and Management, 128(5), pp. 456-460. ISSN 0733-9364
Sleymann, A A (2006) A study on perceptions of civil engineers regarding mandatory continuing education. PhD thesis, Western Michigan University, USA.
Smallwood, J and Allen, C (2020) The impact of a first-year orientation team building exercise. Construction Economics and Building, 20(3), pp. 142-159. ISSN 2204-9029
Smallwood, J and Venter, D (2002) The influence of project managers on construction health and safety in South Africa. Construction Economics and Building, 2(1), pp. 57-69. ISSN 2204-9029
Smallwood, J J; Allen, C J and Deacon, C H (2020) The role of industry 4.0 in construction occupational health (OH). In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Smallwood, J J and Cumberlege, R (2016) Construction management and quantity surveying students perceptions towards production analysis and measuring quantities for construction purposes. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Smith, G R and Bohn, C M (1999) Small to medium contractor contingency and assumption of risk. Journal of Construction Engineering and Management, 125(2), pp. 101-108. ISSN 0733-9364
Smith, J and Wyatt, R (1999) Strategic needs analysis: Preliminary results. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Smith, R E; Griffin, G; Rice, T and Hagehofer-Daniell, B (2018) Mass timber: Evaluating construction performance. Architectural Engineering and Design Management, 14(1-2), pp. 127-138. ISSN 1745-2007
Smith, S D (1994) Production estimation of earthmoving operations using a discrete-event simulation model. PhD thesis, University of Edinburgh, UK.
Smyth, H (2010) Construction industry performance improvement programmes: The UK case of demonstration projects in the 'continuous improvement' programme. Construction Management and Economics, 28(3), pp. 255-270. ISSN 1466433X
Smyth, H (2016) The business development manager as a value creation worker. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Smyth, H and Fitch, T (2009) Application of relationship marketing and management: A large contractor case study. Construction Management and Economics, 27(4), pp. 399-410. ISSN 1466433X
Sobieraj, J and Metelski, D (2023) Identification of the key investment project management factors in the housing construction sector in Poland. International Journal of Construction Management, 23(1), pp. 1-12. ISSN 1562-3599
Soetanto, R (2002) Modelling satisfaction for main participants of the construction project coalition: a study of mutual performance assessment. PhD thesis, University of Wolverhampton, UK.
Soetanto, R; Dainty, A R J; Glass, J and Price, A D F (2006) Empirical evaluation of structural frame performance criteria: Realizing the potential of hybrid concrete construction. Journal of Construction Engineering and Management, 132(3), pp. 278-290. ISSN 0733-9364
Soetanto, R; Dainty, A R J; Glass, J and Price, A D F (2006) Towards an explicit design decision process: The case of the structural frame. Construction Management and Economics, 24(6), pp. 603-614. ISSN 1466433X
Soetanto, R; Poh, P; Austin, S; Hao, J and Katsanis, C (2012) Communication modes and performance of virtual design teams in an undergraduate building project. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Soetanto, R and Proverbs, D G (2001) Modelling client satisfaction levels: A comparison of multiple regression and artificial neural network techniques. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Soetanto, R and Proverbs, D G (2004) Intelligent models for predicting levels of client satisfaction. Journal of Construction Research, 5(2), pp. 233-253. ISSN 1609-9451
Soh, C C and Ong, S E (1999) Motivation and risk perception in foreign and domestic real estate investments. Journal of Financial Management of Property and Construction, 4(3), pp. 47-64. ISSN 1366-4387
Soh, I (2003) The acquisition and analysis of time management perception in the architectural domain. PhD thesis, Texas A&M University, USA.
Sohail, M (1997) An investigation into the procurement of urban infrastructure in developing countries. PhD thesis, Loughborough University, UK.
Soleimani, N (2022) Earthquake risk to civil infrastructure systems. PhD thesis, University of Delaware, USA.
Soleimanifar, Meimanat (2016) Integrated project management framework for a pipe spool fabrication shop. PhD thesis, University of Alberta, Canada.
Solnosky, R L (2013) Integrated structural process model: An inclusive non-material specific approach to determining the required tasks and information exchanges for structural building information modeling. PhD thesis, Pennsylvania State University, USA.
Soltani, Z (2018) Investigating the persuasiveness of forensic information models for jurors in construction disputes. PhD thesis, Texas A&M University, USA.
Somboonpisan, J and Limsawasd, C (2021) Environmental weight for bid evaluation to promote sustainability in highway construction projects. Journal of Construction Engineering and Management, 147(4): 04021013, ISSN 0733-9364
Song, J; Haas, C T and Caldas, C H (2006) Tracking the location of materials on construction job sites. Journal of Construction Engineering and Management, 132(9), pp. 911-918. ISSN 0733-9364
Soo, Alexander (2015) The effect of construction demand on inexperienced bidders' bidding behaviour. PhD thesis, University of Sydney, Australia.
Soon, C D (2009) Managing risk and uncertainty in transportation megaprojects. PhD thesis, University of Hawai'i at Manoa, USA.
Sospeter, N G and Awuzie, B O (2024) Capital budgeting implementation by public sector construction firms in tanzania's housebuilding industry: An exploratory study. Journal of Construction in Developing Countries, 29(1), pp. 87-109. ISSN 1823-6499
Sospeter, N G; Kikwasi, G J and Chileshe, N (2022) Barriers to mentoring of graduates in quantity surveying firms in Tanzania: A factor analysis approach. International Journal of Construction Education and Research, 18(4), pp. 295-314. ISSN 1557-8771
Sospeter, N G; Rwelamila, P D and Gimbi, J (2020) Critical success factors for managing post-disaster reconstruction projects: The case of Angola. Construction Economics and Building, 20(3), pp. 37-55. ISSN 2204-9029
Soto Muñoz, J; Trebilcock Kelly, M; Flores-Alés, V and Ramírez-Vielma, R (2022) Understanding the perceived productivity of office occupants in relation to workspace thermal environment. Building Research & Information, 50(1-2), pp. 152-170. ISSN 0961-3218
Souchoroukov, P (2004) Improvement of cost estimating internal practice. PhD thesis, Cranfield University, UK.
Soudbaksh, K; Etminan, M; Hakimazari, M and Salavatian, S (2022) Impacts of window factors and building orientation on energy consumption in residential buildings of humid temperate climatic zone in Iran. Journal of Construction in Developing Countries, 27(2), pp. 235-262. ISSN 1823-6499
Sourani, A and Sohail, M (2013) Enabling sustainable construction in UK public procurement. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(6), pp. 297-312. ISSN 17514312
Soutos, M K (2006) Forecasting elemental building cost percentages using regression analysis and neural network techniques. PhD thesis, University of Manchester, UK.
Souza, M P D and Fabricio, M M (2024) BIM and virtual reality for pre-design evaluation of building performance. Architectural Engineering and Design Management, 20(5), pp. 1260-1279. ISSN 1745-2007
Spearing, L A; Bakchan, A; Hamlet, L C; Stephens, K K; Kaminsky, J A and Faust, K M (2022) Comparing qualitative analysis techniques for construction engineering and management research: The case of arctic water infrastructure. Journal of Construction Engineering and Management, 148(7): 04022058, ISSN 0733-9364
Speer, S T (2023) Understanding the significance of building a school in Belize through action research. PhD thesis, University of Incarnate Word, USA.
Spencer, Carolyn (2004) Cognitive schemata and project manager regulation of unplanned change: Categorical analysis of structured interview reports. PhD thesis, Griffith University, Australia.
Spiteri, J (1998) A critical analysis of occupational and organisational strategy in UK: architectural and quantity surveying practices. PhD thesis, University of Leeds, UK.
Sporrong, J (2011) Criteria in consultant selection: Public procurement of architectural and engineering services. Construction Economics and Building, 11(4), pp. 59-76. ISSN 2204-9029
Sporrong, J (2014) Selecting architectural and engineering consultants: Municipal practices in Sweden. PhD thesis, Chalmers University of Technology, Sweden.
Sprau Coulter, T L (2014) Improving energy audit process and report outcomes through planning initiatives. PhD thesis, Pennsylvania State University, USA.
Sprenger, G (2018) Pay flexibility in an ageing workforce: A model of pay for the German building trade. PhD thesis, University of Gloucestershire, UK.
Srithongrung, A (2006) The impact of state capital budget and management programs on state capital budget decisions and economic performance. DPA thesis, University of Illinois at Springfield, USA.
Stanic, N (2016) Assessment methods for structural and hydraulic properties of concrete sewer pipes. PhD thesis, Delft University of Technology, Netherlands.
Stanitsas, M and Kirytopoulos, K (2022) Underlying factors for successful project management to construct sustainable built assets. Built Environment Project and Asset Management, 12(2), pp. 129-146. ISSN 2044-124X
Stankos, M A (2020) The nature of evidence utilized in healthcare architectural design decisions at five Midwestern critical access hospitals. PhD thesis, University of Missouri - Columbia, USA.
Staub-French, S; Pilon, A; Poirier, E; Fallahi, A; Kasbar, M; Calderon, F; Teshnizi, Z and Froese, T (2022) Construction process innovation on brock commons tallwood house. Construction Innovation, 22(1), pp. 1-22. ISSN 1471-4175
Steadman, P; Evans, S and Batty, M (2009) Wall area, volume and plan depth in the building stock. Building Research & Information, 37(5-6), pp. 455-467. ISSN 0961-3218
Steemers, K and Yun, G Y (2009) Household energy consumption: A study of the role of occupants. Building Research & Information, 37(5-6), pp. 625-637. ISSN 0961-3218
Steenhausen, P D (2003) Negotiating among mediators: Multiparty mediation in international politics. PhD thesis, University of Southern California, USA.
Stephens, P (1974) Builders' and plumbers' merchanting: an attribute study of organization, functions and performance. PhD thesis, University of Manchester, UK.
Sterner, E (2002) Green procurement of buildings: Estimation of environmental impact and life-cycle cost. PhD thesis, Luleå University of Technology, Sweden.
Stone, A; Shipworth, D; Biddulph, P and Oreszczyn, T (2014) Key factors determining the energy rating of existing English houses. Building Research & Information, 42(6), pp. 725-738. ISSN 0961-3218
Stoneman, G; Hill, C J; Howarth, T and McNamara, T (1999) Construction planning software selection for improving the planning process. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Stoy, C; Pollalis, S and Schalcher, H R (2008) Drivers for cost estimating in early design: Case study of residential construction. Journal of Construction Engineering and Management, 134(1), pp. 32-39. ISSN 0733-9364
Struck, C (2012) Uncertainty propagation and sensitivity analysis techniques in building performance simulation to support conceptual building and system design. PhD thesis, Eindhoven University of Technology, Netherlands.
Stundon, D; Spillane, J; Lim, J P B; Tansey, P and Tracey, M (2015) Building information modelling energy performance assessment on domestic dwellings: A comparative study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Su, X (2013) A spatial temporal information model for construction planning. PhD thesis, Purdue University, USA.
Su, X and Cai, H (2014) Life cycle approach to construction workspace modeling and planning. Journal of Construction Engineering and Management, 140(7): 04014019, ISSN 0733-9364
Su, X; Li, S; Yuan, C; Cai, H and Kamat, V R (2014) Enhanced boundary condition-based approach for construction location sensing using RFID and RTK GPS. Journal of Construction Engineering and Management, 140(10): 04014048, ISSN 0733-9364
Su, Y-Y (2010) Construction crew productivity monitoring supported by location awareness technologies. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Subprasom, K (2004) Multi-party and multi-objective network design analysis for the build-operate-transfer scheme. PhD thesis, Utah State University, USA.
Sumner, S and Farrell, P (2003) The influence of clients on health and safety standards in construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Sun, C; Ahn, S and Ahn, C R (2020) Identifying workers' safety behavior-related personality by sensing. Journal of Construction Engineering and Management, 146(7): 04020078, ISSN 0733-9364
Sun, Jing (2020) Green infrastructure design and evaluation model for resilient sponge city program transitional construction. PhD thesis, University of Nottingham, UK.
Sun, M; Vidalakis, C and Oza, T (2009) A change management maturity model for construction projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Sun, M; Liu, M; Guan, J; Zhu, F and Zhang, Z (2025) Influence of the fit between the receiving and giving of helping behavior on construction professionals' workplace well-being: Self-determination perspective. Journal of Construction Engineering and Management, 151(12): 04025192, ISSN 0733-9364
Sunday, O A (2010) Impact of variation orders on public construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Sunindijo, R Y and Zou, P X W (2013) Conceptualizing safety management in construction projects. Journal of Construction Engineering and Management, 139(9), pp. 1144-1153. ISSN 0733-9364
Sutrisna, M (2004) Developing a knowledge based system for the valuation of variations on civil engineering works. PhD thesis, University of Wolverhampton, UK.
Suárez, J L; Gosselin, L and Lehoux, N (2023) Optimizing modularity of prefabricated residential plumbing systems for construction in remote communities. Journal of Construction Engineering and Management, 149(1): 05022017, ISSN 0733-9364
Svatoš-Ražnjević, H; Boeva, Y; Kropp, C and Menges, A (2025) Trajectories from standard to incremental and pioneering innovation in timber construction: Multi-storey timber buildings in Germany, Austria, and Switzerland. Building Research & Information, 53(6), pp. 734-758. ISSN 0961-3218
Swaffield, L M (1998) Improving early cost advice for mechanical and electrical services. PhD thesis, Loughborough University, UK.
Swaffield, L M and Johnson, G A (2005) The financial benefits of implementing ISO 14001 within construction contracting organizations. Architectural Engineering and Design Management, 1(3), pp. 197-210. ISSN 1745-2007
Swallow, M and Zulu, S (2024) Enhancing collaboration and engagement using virtual reality within site safety planning. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 223-231. ISSN 17514304
Swarts, K M; Lehman, K and Lewis, G K (2016) The use of social customer relationship management by building contractors: Evidence from Tasmania. Construction Management and Economics, 34(4-5), pp. 302-316. ISSN 01446193
Swarup, L; Korkmaz, S and Riley, D (2011) Project delivery metrics for sustainable, high-performance buildings. Journal of Construction Engineering and Management, 137(12), pp. 1043-1051. ISSN 0733-9364
Sweis, R K (1988) Construction insurance in the Arab Gulf area: an analysis of cover and contracts. PhD thesis, City, University of London, UK.
Sylvester, K E (1999) An analysis of the benefits of photovoltaic-coated glazing on owning and operating costs of high rise commercial buildings. PhD thesis, Texas A&M University, USA.
Symonds, P; Taylor, J; Mavrogianni, A; Davies, M; Shrubsole, C; Hamilton, I and Chalabi, Z (2017) Overheating in English dwellings: Comparing modelled and monitored large-scale datasets. Building Research & Information, 45(1-2), pp. 195-208. ISSN 0961-3218
Sze, E; Kumaraswamy, M; Fung, A; Palaneeswaran, E and Wong, S (2004) Partnering with the tenants- Hong Kong experience. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Sørensen, N L; Rasmussen, F N; Øien, T B and Frandsen, A K (2020) Holistic sustainability: Advancing interdisciplinary building design through tools and data in Denmark. Construction Economics and Building, 20(2), pp. 25-44. ISSN 2204-9029
Tabatabaei Sameni, S (2019) Overheating investigation in UK social housing flats built to the Passivhaus standard. PhD thesis, Coventry University, UK.
Tabish, S Z S and Jha, K N (2011) Analyses and evaluation of irregularities in public procurement in India. Construction Management and Economics, 29(3), pp. 261-274. ISSN 1466433X
Tadayon, M; Jaafar, M and Nasri, E (2012) An assessment of risk identification in large construction projects in Iran. Journal of Construction in Developing Countries, 17(S1), pp. 57-69. ISSN 1823-6499
Taggart, M; Koskela, L and Rooke, J (2012) Collaborative supply chain practices during severe economic downturn in the republic of Ireland. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Tah, J H M (1989) Integrated microcomputer applications in formwork design. PhD thesis, Loughborough University, UK.
Tait, P D and Swaffield, L M (2003) Construction site waste: The real cost and benefits available from waste reduction. Journal of Financial Management of Property and Construction, 8(1), pp. 3-16. ISSN 1366-4387
Tajaddini, A; Pirooznezhad, L; Ravanshadnia, M and Coley, D (2024) Fuzzy inference decision model to quantify the effectiveness of incentives on delivering green buildings. International Journal of Construction Management, 24(15), pp. 1599-1616. ISSN 1562-3599
Takim, R; Akintoye, A and Kelly, J (2004) Analysis of measures of construction project success in Malaysia. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Talbot, B (2021) A novel data-driven tool to improve construction schedule accuracy. DProf thesis, Anglia Ruskin University, UK.
Taleb, H M and Abumoeilak, L (2021) An assessment of different courtyard configurations in urban communities in the United Arab Emirates. Smart and Sustainable Built Environment, 10(1), pp. 67-89. ISSN 2046-6099
Taleb, M S; Belayutham, S and Ibrahim, C K I C (2023) Applications of serious games in construction: The current state, classifications and a proposed process framework. International Journal of Construction Management, 23(10), pp. 1726-1736. ISSN 1562-3599
Tam, C M and Fung, I W H (1998) Effectiveness of safety management strategies on safety performance in Hong Kong. Construction Management and Economics, 16(1), pp. 49-55. ISSN 01446193
Tam, C M; Tong, T K L; Lau, T C T and Chan, K K (2005) Selection of vertical formwork system by probabilistic neural networks models. Construction Management and Economics, 23(3), pp. 245-254. ISSN 01446193
Tamate, S; Suemasa, N and Katada, T (2005) Analyses of instability in mobile cranes due to ground penetration by outriggers. Journal of Construction Engineering and Management, 131(6), pp. 689-704. ISSN 0733-9364
Tan, Y; Deng, T; Zhou, J and Zhou, Z (2024) Lidar-based automatic pavement distress detection and management using deep learning and BIM. Journal of Construction Engineering and Management, 150(7): 04024069, ISSN 0733-9364
Tanaka, M (2008) Essays on durability and the Japanese housing market. PhD thesis, Johns Hopkins University, USA.
Tang, C M; Wong, C W Y; Leung, A Y T and Lam, K C (2006) Selection of funding schemes by a borrowing decision model: A Hong Kong case study. Construction Management and Economics, 24(4), pp. 349-365. ISSN 01446193
Tang, Z (2005) Developing complete conditional probability tables from fractional data for Bayesian belief networks in engineering decision making. PhD thesis, University of Toronto, Canada.
Tanguy, A; Breton, C; Blanchet, P and Amor, B (2020) Characterising the development trends driving sustainable neighborhoods. Buildings & Cities, 1(1), pp. 164-181. ISSN 2632-6655
Tao, S; Yu, J; Zhu, J; Chen, S and Li, X (2026) Precast component production scheduling considering outsourcing and multiskilled resources. Journal of Construction Engineering and Management, 152(5): 04026040, ISSN 0733-9364
Tarekegn Gurmu, A and Mahmood, M N (2024) Critical factors affecting quality in building construction projects: Systematic review and meta-analysis. Journal of Construction Engineering and Management, 150(3): 04024004, ISSN 0733-9364
Tarhuni, S M (2013) An investigation into the management of knowledge in a historic building conservation organisation in Tripoli, Libya. PhD thesis, University of Newcastle upon Tyne, UK.
Tariq, H; Pathirage, C and Fernando, T (2021) Measuring community disaster resilience using q-methods: A physical resilience perspective. Built Environment Project and Asset Management, 11(4), pp. 722-737. ISSN 2044-124X
Tariq, S and Zhang, X (2021) Critical analysis of the private sector roles in water PPP failures. Journal of Construction Engineering and Management, 147(4): 04021015, ISSN 0733-9364
Tatum, C B (2018) Construction engineering research: Integration and innovation. Journal of Construction Engineering and Management, 144(3): 04018005, ISSN 0733-9364
Tavassolirizi, M; Sarvari, H; Chan, D W M and Olawumi, T O (2022) Factors affecting delays in rail transportation projects using analytic network process: The case of Iran. International Journal of Construction Management, 22(14), pp. 2712-2723. ISSN 1562-3599
Taylor, J; Salmela, A; Täubel, M; Heimlander, A; Karvonen, A M; Pakkala, T; Lahdensivu, J and Pekkanen, J (2023) Risk factors for moisture damage presence and severity in Finnish homes. Buildings & Cities, 4(1), pp. 708-726. ISSN 2632-6655
Tchumtcha Wembe, P (2022) Managing stakeholders in epcm projects in Africa by Western project managers. International Journal of Construction Management, 22(12), pp. 2279-2289. ISSN 1562-3599
Tchumtcha Wembe, P (2023) Managing stakeholders in engineering procurement construction management projects in Africa by Chinese project managers. International Journal of Construction Management, 23(2), pp. 329-337. ISSN 1562-3599
Teebken, J (2024) Disrupt and unlock? The role of actors in urban adaptation path-breaking. Buildings & Cities, 5(1), pp. 162-181. ISSN 2632-6655
Teli, D; James, P A B and Jentsch, M F (2013) Thermal comfort in naturally ventilated primary school classrooms. Building Research & Information, 41(3), pp. 301-316. ISSN 0961-3218
Tembo Silungwe, C K and Khatleli, N (2020) An analysis of the allocation of pertinent risks in the Zambian building sector using Pareto analysis. International Journal of Construction Management, 20(4), pp. 321-334. ISSN 1562-3599
Tennant, S and Fernie, S (2010) A contemporary examination of framework agreements. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Teo, E A L; Chan, S L and Tan, P H (2007) Empirical investigation into factors affecting exporting construction services in SMEs in Singapore. Journal of Construction Engineering and Management, 133(8), pp. 582-591. ISSN 0733-9364
Teo, E A L and Feng, Y (2011) Costs of construction accidents to Singapore contractors. International Journal of Construction Management, 11(3), pp. 79-92. ISSN 1562-3599
Terblanche, R; Root, D and Vosloo, R (2021) Actants influencing the successful compilation of economic feasibility studies: The quantity surveyors' perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Tetik, M; Peltokorpi, A; Seppänen, O; Leväniemi, M and Holmström, J (2021) Kitting logistics solution for improving on-site work performance in construction projects. Journal of Construction Engineering and Management, 147(1): 05020020, ISSN 0733-9364
Tetteh, M O and Chan, A P C (2019) Review of concepts and trends in international construction joint ventures research. Journal of Construction Engineering and Management, 145(10): 04019057, ISSN 0733-9364
Tetteh, M O; Chan, A P C; Darko, A; Torku, A and Nani, G (2021) Critical barriers to international construction joint ventures success: Multiexpert views and contextual disparities. Journal of Construction Engineering and Management, 147(8): 04021081, ISSN 0733-9364
Tews, T; Skulmoski, G; Langston, C and Patching, A (2020) Innovation in project management education: let's get serious! Construction Economics and Building, 20(3), pp. 124-141. ISSN 2204-9029
Tews, T; Skulmoski, G; Langston, C and Patching, A (2020) Innovation in project management education: Let's get serious! Construction Economics and Building, 20(3), pp. 124-141. ISSN 2204-9029
Tezel, A and Koskela, L (2023) Off-site construction in highways projects: Management, technical, and technology perspectives from the United Kingdom. Construction Management and Economics, 41(6), pp. 475-499. ISSN 01446193
Thajudeen, S; Lennartsson, M and Elgh, F (2019) Challenges and critical success factors for the design phase in Swedish industrialised house building. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Thannon, A Y (1989) The appraisal and management of multistorey dwelling blocks using large concrete panel systems. PhD thesis, Aston University, UK.
Theodorakopoulos, T F (2017) Integrated cost management system for delivering construction projects. PhD thesis, Loughborough University, UK.
Thneibat, M M and Al-Shattarat, B (2023) Critical success factors for value management techniques in construction projects: Case in Jordan. International Journal of Construction Management, 23(4), pp. 669-678. ISSN 1562-3599
Thomas, A V; Kalidindi, S N and Ananthanarayanan, K (2003) Risk perception analysis of BOT road project participants in India. Construction Management and Economics, 21(4), pp. 393-407. ISSN 01446193
Thomas, A V and Sudhakumar, J (2014) Modelling masonry labour productivity using multiple regression. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Thomas, H R (1991) Labor productivity and work sampling: The bottom line. Journal of Construction Engineering and Management, 117(3), pp. 423-444. ISSN 0733-9364
Thomas, H R and Ellis, R D (2007) Contractor prebid planning principles. Journal of Construction Engineering and Management, 133(8), pp. 542-552. ISSN 0733-9364
Thomas, H R and Sanvido, V E (2000) Role of the fabricator in labor productivity. Journal of Construction Engineering and Management, 126(5), pp. 358-365. ISSN 0733-9364
Thomas, S R; Lee, S H; Spencer, J D; Tucker, R L and Chapman, R E (2004) Impacts of design/information technology on project outcomes. Journal of Construction Engineering and Management, 130(4), pp. 586-597. ISSN 0733-9364
Thomas Ng, S; Skitmore, R M and Smith, N J (1999) Decision-makers' perceptions in the formulation of pre-qualification criteria. Engineering, Construction and Architectural Management, 6(2), pp. 155-165. ISSN 0969-9988
Thomsen, J; Berker, T; Lappegard Hauge, Å; Denizou, K; Wågø, S and Jerkø, S (2013) The interaction between building and users in passive and zero-energy housing and offices:The role of interfaces, knowledge and user commitment. Smart and Sustainable Built Environment, 2(1), pp. 43-59. ISSN 2046-6099
Thomson, C P H (2016) From point cloud to building information model: capturing and processing survey data towards automation for high quality 3D models to aid a BIM process. PhD thesis, University College London, UK.
Thomson, C S and El-Haram, M A (2019) Is the evolution of building sustainability assessment methods promoting the desired sharing of knowledge amongst project stakeholders? Construction Management and Economics, 37(8), pp. 433-460. ISSN 01446193
Thomson, Esmeralda (2017) Adoptive governance in distributed agile development projects. PhD thesis, University of New South Wales, Australia.
Thoradeniya, D; Jayasinghe, C; Ariyaratne, I E and Basnayake, G B M A (2026) Construction quality framework for school buildings: Damage detection and rectification prioritization. International Journal of Construction Management, 26(4), pp. 660-678. ISSN 1562-3599
Tian, L; Stuart, G and Ozawa-Meida, L (2026) Smart faces: Using communication strategies to optimize technical information flow in middle-out facilities management. Building Research & Information, 54(1), pp. 44-58. ISSN 0961-3218
Tian, L; Wright, A; Painter, B and Pazhoohesh, M (2023) Factors influencing BIM use in green building construction project management in the UK and China. Building Research & Information, 51(7), pp. 853-870. ISSN 0961-3218
Tian, Y (2022) Financing infrastructure through blockchain tokenization. PhD thesis, University of Florida, USA.
Tijani, B; Jin, X and Osei-Kyei, R (2021) Critical analysis of mental health research among construction project professionals. Journal of Engineering, Design and Technology, 19(2), pp. 467-496. ISSN 1726-0531
Tilford, K R; Jaselskis, E J and Smith, G R (2000) Impact of environmental contamination on construction projects. Journal of Construction Engineering and Management, 126(1), pp. 45-51. ISSN 0733-9364
Tiwari, R (2015) A decision-support framework for design of non-residential net-zero energy buildings. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Tokdemir, O B; Erol, H and Dikmen, I (2019) Delay risk assessment of repetitive construction projects using line-of-balance scheduling and Monte Carlo simulation. Journal of Construction Engineering and Management, 145(2): 04018132, ISSN 0733-9364
Tokede, O and Ahiaga-Dagbui, D (2016) Evaluating the whole-life cost implication of revocability and disruption in office retrofit building projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Tokede, O; Ahiaga-Dagbui, D and Morrison, J (2022) Attenuating disruptions in knowledge flows in construction projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Tokede, O O (2016) Developing whole-life cost models for retrofit options in office buildings. PhD thesis, Edinburgh Napier University, UK.
Toledo, L; Wright, A and Cropper, P (2025) Case study investigation of overheating in low-energy homes: Insights from a post-occupancy evaluation in England. Building Research & Information, 53(1-2), pp. 139-164. ISSN 0961-3218
Tombesi, P (1997) Travels from flatland: The Walt Disney concert hall and the specialization of design knowledge in the building sector. PhD thesis, University of California, Los Angeles, USA.
Tomlinson, J (1998) A premises occupancy cost forecasting model. PhD thesis, University of Liverpool, UK.
Tommelein, I D; Riley, D R and Howell, G A (1999) Parade game: Impact of work flow variability on trade performance. Journal of Construction Engineering and Management, 125(5), pp. 304-310. ISSN 0733-9364
Tone, K; Skitmore, M and Wong, J K W (2009) An investigation of the impact of cross-cultural communication on the management of construction projects in Samoa. Construction Management and Economics, 27(4), pp. 343-361. ISSN 1466433X
Toor, S U R and Ogunlana, S (2008) Problems causing delays in major construction projects in Thailand. Construction Management and Economics, 26(4), pp. 395-408. ISSN 1466433X
Torres, A S; Sriraman, V and Ortiz, A M (2019) Implementing project based learning pedagogy in concrete industry project management. International Journal of Construction Education and Research, 15(1), pp. 62-79. ISSN 1557-8771
Tozzi, M G; Tam, V W Y; Evangelista, A; Chinelli, C; Haddad, A and Soares, C (2024) Drivers for increasing attractiveness of commercial centers. International Journal of Construction Management, 24(14), pp. 1569-1580. ISSN 1562-3599
Tramontini, L M (2024) Towards the integration of additive manufacturing for freeform steel and glass façade construction. PhD thesis, Delft University of Technology, Netherlands.
Tran, D (2013) A risk-based model to select delivery methods for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.
Tran, D H; Tran, K N and Nguyen, N H (2025) A novel hybrid multiple objective optical microscope algorithm for fuzzy time, cost, and quality tradeoff in project management. International Journal of Construction Management, 25(10), pp. 1141-1153. ISSN 1562-3599
Tran, D Q; Diraviam, G and Minchin, R E (2018) Performance of highway design-bid-build and design-build projects by work types. Journal of Construction Engineering and Management, 144(2): 04017112, ISSN 0733-9364
Tran, H and Carmichael, D G (2012) The likelihood of subcontractor payment: Downstream progression via the owner and contractor. Journal of Financial Management of Property and Construction, 17(2), pp. 135-152. ISSN 1366-4387
Traylor, C; Zhao, W and Tao, Y X (2019) Utilizing modulating-temperature setpoints to save energy and maintain alliesthesia-based comfort. Building Research & Information, 47(2), pp. 190-201. ISSN 0961-3218
Triana-Granados, K V; Bernard, I R; Merlin, A; Lucko, G and Ballesteros-Pérez, P (2024) Graphical delay tracking for linear and repetitive schedules. Journal of Construction Engineering and Management, 150(8): 04024090, ISSN 0733-9364
Trigunarsyah, B (2004) Project owners' role in improving constructability of construction projects: An example analysis for Indonesia. Construction Management and Economics, 22(8), pp. 861-876. ISSN 01446193
Trimpe, D L (2015) Critical thinking and self-directed learning as predictors of sales performance for sales professionals in the home building industry. PhD thesis, Capella University, USA.
Trinh, M T (2018) Developing resilient safety culture for construction projects in Vietnam. PhD thesis, Western Sydney University, Australia.
Trinh, M T; Feng, Y and Mohamed, S (2019) Framework for measuring resilient safety culture in Vietnam's construction environment. Journal of Construction Engineering and Management, 145(2): 04018127, ISSN 0733-9364
Trinh, T T P and Sharif, N (1996) Assessing construction technology by integrating constructed product and construction process complexities: A case study of embankment dams in Thailand. Construction Management and Economics, 14(6), pp. 467-484. ISSN 01446193
Tripathi, K K; Hasan, A and Neeraj Jha, K (2021) Evaluating performance of construction organizations using fuzzy preference relation technique. International Journal of Construction Management, 21(12), pp. 1287-1300. ISSN 1562-3599
Troiani, E; Mahamadu, A M; Manu, P; Kissi, E; Aigbavboa, C and Oti, A (2020) Macro-maturity factors and their influence on micro-level BIM implementation within design firms in Italy. Architectural Engineering and Design Management, 16(3), pp. 209-226. ISSN 1745-2007
Tseladikae, T.; Agumba, J.; Ochieng, G.; Adebowale, O. J. and Edwards, D. (2026) Correlation analysis of project management practices and performance outcomes in social housing projects. International Journal of Construction Management, 26(10), pp. 2085-2100. ISSN 1562-3599
Tseng, C-H (2006) Safety performance analyzer for constructed environments (SPACE). PhD thesis, Ohio State University, USA.
Tsenkova, S (1998) Private housebuilding and housing markets in transitional economies: The case of Bulgaria. PhD thesis, University of Toronto, Canada.
Tshatshu, Q.; Ndandani, Z. and Gwabavu, M. (2026) The effect of leadership styles on the professional development of project managers in South Africa. International Journal of Construction Management, 26(7), pp. 1264-1283. ISSN 1562-3599
Tsionas, I; Llaguno-Munitxa, M and Stephan, A (2025) Environmental effects of urban wind energy harvesting: A review. Buildings & Cities, 6(1), pp. 1-24. ISSN 2632-6655
Tu, J; Liu, Y; Zhou, M and Li, R (2021) Prediction and analysis of compressive strength of recycled aggregate thermal insulation concrete based on GA-bp optimization network. Journal of Engineering, Design and Technology, 19(2), pp. 412-422. ISSN 1726-0531
Tuan Son, N; Sherif, M and Mostafa, S (2021) Project stakeholder's engagement and performance: A comparison between complex and non-complex projects using SEM. Built Environment Project and Asset Management, 11(5), pp. 804-818. ISSN 2044-124X
Tucker, J R; Pearce, A R; Bruce, R D; McCoy, A P and Mills, T H (2012) The perceived value of green professional credentials to credential holders in the US building design and construction community. Construction Management and Economics, 30(11), pp. 963-979. ISSN 1466433X
Tucker, R R (2014) Influence of individual perceptions on engineering team performance within design-build infrastructure projects. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Tugrul Okbaz, F (2025) Evaluation of space efficiency criteria in high-rise buildings based on functions: A case study of türkiye. Architectural Engineering and Design Management, 21(1), pp. 60-77. ISSN 1745-2007
Tunji-Olayeni, P F; Mosaku, T O; Fagbenle, O I and Amusan, L M (2016) Project management competencies of indigenous contractors in Nigeria. African Journal of Built Environment Research, 1(1), pp. 49-58. ISSN 2414-0236
Turcu, C (2017) Unequal spatial distribution of retrofits in bucharest's apartment buildings. Building Research & Information, 45(8), pp. 892-909. ISSN 0961-3218
Turcu, C; Crane, M; Hutchinson, E; Lloyd, S; Belesova, K; Wilkinson, P and Davies, M (2021) A multi-scalar perspective on health and urban housing: An umbrella review. Buildings & Cities, 2(1), pp. 734-758. ISSN 2632-6655
Turner, M; Holdsworth, S; Scott-Young, C M and Sandri, K (2021) Resilience in a hostile workplace: The experience of women onsite in construction. Construction Management and Economics, 39(10), pp. 839-852. ISSN 01446193
Turner, M and Lingard, H (2015) Identification of demand and resource typologies within a systems framework. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Turner, M and Lingard, H (2016) Work-life fit: Identification of demand and resource typologies within a systems framework. Construction Management and Economics, 34(6), pp. 377-392. ISSN 0144-6193
Turner, M; Scott-Young, C M and Holdsworth, S (2017) Promoting wellbeing at university: The role of resilience for students of the built environment. Construction Management and Economics, 35(11-12), pp. 707-718. ISSN 01446193
Turrell, P (2001) Making the link between teaching and research and consultancy. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Tuuli, M and Acquah, S (2012) Do you feel what i feel? Empowerment contagion in project teams. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Tuuli, M M and Rowlinson, S (2010) Impact of leadership style and team context on psychological empowerment in construction project teams. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Tzortzopoulos, P and Sexton, M (2007) An investigation on the implementation of product development process models in construction companies. Construction Management and Economics, 25(11), pp. 1153-1164. ISSN 01446193
Uddin, M N; Anwer, S; Wei, H H; Chi, H L; Ni, M and Tamanna, N (2021) Energy efficient behavioural trends in residential sectors for low-income cultural background: A case-study of slums in chittagong, Bangladesh. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Uddin, S M J; Albert, A and Karakhan, A A (2024) Leveraging YouTube to aid Construction Hazard Prevention through Design (CHPtD). Construction Management and Economics, 42(9), pp. 847-865. ISSN 01446193
Uddin, S M J; Albert, A; Pradhananga, N; Ganapati, N E and Prajapati, J (2023) Health and safety challenges among post-disaster reconstruction workers. Construction Economics and Building, 23(1-2), pp. 4-30. ISSN 2204-9029
Ullal, A (2023) Construction conditions and practices during war in Afghanistan. Journal of Construction Engineering and Management, 149(5): 05023005, ISSN 0733-9364
Ullal, André (2018) Clear, Hold and Build: Conditions and practices characterising construction in conflict and post-conflict settings. PhD thesis, University of Melbourne, Australia.
Ulrich de Alencastro, J P (2019) The impact of quality management on the thermal performance of social housing in the United Kingdom. PhD thesis, University of Plymouth, UK.
Ulubeyli, S; Kazaz, A; Soycopur, B and Er, B (2015) Quality function deployment in the speculative house-building market: How to satisfy high-income customers. International Journal of Construction Management, 15(2), pp. 148-156. ISSN 1562-3599
Umeokafor, N I (2017) Realities of construction health and safety regulation in Nigeria. PhD thesis, University of Greenwich, UK.
Umer, W; Yu, Y and Antwi Afari, M F (2022) Quantifying the effect of mental stress on physical stress for construction tasks. Journal of Construction Engineering and Management, 148(3): 04021204, ISSN 0733-9364
Umuhoza, E and An, S H (2024) Ann model predicting quality performance for building construction projects in Rwanda. International Journal of Construction Management, 24(15), pp. 1679-1688. ISSN 1562-3599
Umuhoza, E; Bitamba, B F and An, S H (2023) Causes and preventive strategies of scope creep for building construction projects in democratic republic of Congo and Rwanda. International Journal of Construction Management, 23(7), pp. 1264-1275. ISSN 1562-3599
Ur Rehman, H S; Raza, M A; Masood, R; Khan, M A; Alamgir, S; Javed, M A; Roy, K and Lim, J B P (2023) A multi-facet BIM based approach for green building design of new multi-family residential building using LEED system. International Journal of Construction Management, 23(12), pp. 2024-2038. ISSN 1562-3599
Urme, S A; Radia, M A; Alam, R; Chowdhury, M U; Hasan, S; Ahmed, S; Sara, H H; Islam, M S; Jerin, D T; Hema, P S; Rahman, M; Islam, A K M M; Hasan, M T and Quayyum, Z (2021) Dhaka landfill waste practices: Addressing urban pollution and health hazards. Buildings & Cities, 2(1), pp. 700-716. ISSN 2632-6655
Urquhart, S and Whyte, A (2018) Contractor tendering research: Going beyond bid/no-bid and markup models. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(6), pp. 255-262. ISSN 17514304
Urup, L (2016) Integrated design-build management: studying institutional processes to understand project coordination & performance. PhD thesis, Chalmers University of Technology, Sweden.
Usman, W. I.; Mazher, K. M.; Umer, W.; Wuni, I. Y.; Alshibani, A.; Ghaithan, A.; Nasir, A. R. and Mohammed, A. (2026) BIM-based construction accidents knowledge database management system: Centralized accessible information repository for enhanced learning from the past. Journal of Construction Engineering and Management, 152(9): 04026149, ISSN 0733-9364
Utama, W; Chan, A; Zahoor, H; Gao, R and Peli, M (2018) Exploring the strategic motivation of internationalisation: Indonesian contractors' perspectives. Construction Economics and Building, 18(4), pp. 64-83. ISSN 2204-9029
Uusitalo, P; Lappalainen, E; Seppänen, O; Pikas, E; Peltokorpi, A; Menzhinskii, N and Piitulainen, M (2021) To trust or not to trust: Is trust a prerequisite for solving design quality problems? Construction Management and Economics, 39(4), pp. 279-297. ISSN 01446193
Vaglica, J (2018) Investigation of factors contributing to building code violations in residential construction. PhD thesis, Wayne State University, USA.
Vakili-Ardebili, A and Boussabaine, A H (2010) Ecological building design determinants. Architectural Engineering and Design Management, 6(2), pp. 111-131. ISSN 1745-2007
Valero-Silva, N and Jones, A (2011) An evaluation of the customer satisfaction monitoring system in a decent homes programme. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Valkonen, T; Lindberg, A; Alhava, O; Talebi, S; Koskela, L and Seppänen, O (2026) Tolerance management in prefabrication of mechanical, electrical, and plumbing installations. Construction Management and Economics, 44(4), pp. 279-299. ISSN 0144-6193
Van Dijken, F; Van Bronswijk, J E M H and Sundell, J (2006) Indoor environment and pupils' health in primary schools. Building Research & Information, 34(5), pp. 437-446. ISSN 0961-3218
Van Mossel, H J and Straub, A (2009) The need for customizing maintenance services in social housing. Construction Management and Economics, 27(2), pp. 135-151. ISSN 1466433X
Van Tam, N. (2026) Evaluating risk distribution: A stakeholder-driven causal analysis of genai adoption risks in construction project management. Journal of Construction Engineering and Management, 152(7): 04026098, ISSN 0733-9364
Van der Heijden, J J (2009) Building regulatory enforcement regimes: Comparative analysis of private sector involvement in the enforcement of public building regulations. PhD thesis, Delft University of Technology, Netherlands.
Venkatesan, R; Varghese, K and Ananthanarayanan, K (2009) Motivation and demotivation cause factors for engineers in construction organisations. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Venkateswaran, C B and Murugasan, R (2017) Time delay and cost overrun of road over bridge construction projects in India. Journal of Construction in Developing Countries, 22(S1), pp. 79-96. ISSN 1823-6499
Ventovuori, T (2007) Elements of sourcing strategy in facilites management services : decision categories and choices. PhD thesis, Helsinki University of Technology, Finland.
Verheij, J M (2005) Process-mediated planning of AEC projects through structured dialogues. PhD thesis, Georgia Institute of Technology, USA.
Verma, S; Mandal, S N; Robinson, S; Bajaj, D and Saxena, A (2021) Investment appraisal and financial benefits of corporate green buildings: A developing economy case study. Built Environment Project and Asset Management, 11(2), pp. 392-408. ISSN 2044-124X
Vernikos, V K; Goodier, C I; Broyd, T W; Robery, P C and Gibb, A G F (2014) Building information modelling and its effect on off-site construction in UK civil engineering. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(3), pp. 152-159. ISSN 17514304
Verwey, J; Cumberlege, R and Crafford, G J (2023) Exploring the interplay between quantity surveyors' conflict-handling styles and personality traits. Journal of Construction Business and Management, 6(2), pp. 38-49. ISSN 2521-0165
Vesali Mahmoud, N (2016) A comprehensive decision support framework in the front-end phase of major transportation projects. PhD thesis, Florida International University, USA.
Veshosky, D A (1992) An investigation of factors that influence decisions by engineering firms concerning adoption of CAD/CAE systems. PhD thesis, Lehigh University, USA.
Vestin, A (2020) Smart manufacturing for the wooden single-family house industry. PhD thesis, Jönköping University, Sweden.
Victoria, M; Perera, S and Davies, A (2015) Developing an early design stage embodied carbon prediction model: A case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Vilasini, N and Neitzert, T (2012) Improving project performance through worker participation in alliance projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Vilasini, N; Neitzert, T and Rotimi, J (2014) Developing and evaluating a framework for process improvement in an alliance project: A New Zealand case study. Construction Management and Economics, 32(6), pp. 625-640. ISSN 01446193
Villa, S B; Vasconcellos, P B; De Bortoli, K C R and De Araujo, L B (2022) Lack of adaptability in Brazilian social housing: Impacts on residents. Buildings & Cities, 3(1), pp. 376-397. ISSN 2632-6655
Vinci, F (2022) Project-based networks in the delivery of infrastructure projects and programmes. PhD thesis, University College London, UK.
Visscher, H; Suddle, S and Meijer, F (2008) Quantitative risk analysis as a supporting tool for safety protocols at multi-functional urban locations. Construction Innovation, 8(4), pp. 269-279. ISSN 1471-4175
Viswanathan, S K; Tripathi, K K and Jha, K N (2020) Influence of risk mitigation measures on international construction project success criteria: A survey of Indian experiences. Construction Management and Economics, 38(3), pp. 207-222. ISSN 01446193
Vohmann, B (2019) Enhancing assessment to prepare undergraduates as effective built environment industry practitioners. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Volker, L and Lauche, K (2008) Decision making during a tendering procedure: Case studies of restricted European tenders in architecture. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Von Kluge, P. N.; Doumia, B. and Sengha, G. G. (2026) Nonlinear soil-structure interaction effects on eccentric seismic pounding and torsional response of adjacent buildings: Experimental validation and reduced-order modelling. Architectural Engineering and Design Management, 22(3), pp. 809-843. ISSN 1745-2007
Voordijk, H and Adriaanse, A (2016) Engaged scholarship in construction management research: The adoption of information and communications technology in construction projects. Construction Management and Economics, 34(7-8), pp. 536-551. ISSN 01446193
Votano, S and Sunindijo, R Y (2014) Client safety roles in small and medium construction projects in Australia. Journal of Construction Engineering and Management, 140(9): 04014045, ISSN 0733-9364
Votto, R; Lee Ho, L and Berssaneti, F (2021) Earned duration management control charts: Role of control limit width definition for construction project duration monitoring. Journal of Construction Engineering and Management, 147(9): 04021108, ISSN 0733-9364
Vrijhoef, R (2019) Studying time presence on site as an indicator of productive time use by construction workers. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Wagner, H; Kim, A J and Gordon, L (2013) Relationship between personal protective equipment, self-efficacy, and job satisfaction of women in the building trades. Journal of Construction Engineering and Management, 139(10): 04013005, ISSN 0733-9364
Wai, S H; Aminah, M Y and Syuhaida, I (2013) Social infrastructure project success criteria: an exploratory study. International Journal of Construction Management, 13(3), pp. 95-104. ISSN 1562-3599
Waibel, C (2018) Simulation-based optimization of buildings and multi-energy systems. DSc thesis, ETH Zürich, Switzerland.
Walker, D and Lloyd-Walker, B (2011) Knowledge, skills and attributes of project alliances managers in Australasia. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Walker, D H T and Vines, M W (1997) Construction time performance in multi-unit residential construction: Insight into the role of procurement methods. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Walsh, A J (2021) Cultural dissonance as a risk factor in the construction of megaprojects: The experience of western consultants working in the gulf cooperation council. DProf thesis, University of Salford, UK.
Walters, J P (2015) A systems approach to sustainable rural water infrastructure in developing countries. PhD thesis, University of Colorado at Boulder, USA.
Wambeke, B W; Hsiang, S M and Liu, M (2011) Causes of variation in construction project task starting times and duration. Journal of Construction Engineering and Management, 137(9), pp. 663-677. ISSN 0733-9364
Wambeke, B W; Liu, M and Hsiang, S M (2012) Using last planner and a risk assessment matrix to reduce variation in mechanical related construction tasks. Journal of Construction Engineering and Management, 138(4), pp. 491-498. ISSN 0733-9364
Wandahl, S and Skovbogaard, J (2017) Towards improving productivity on refurbishment projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Wang, Z.; Li, J.; Yan, X.; Li, H. and Li, J. (2026) Dynamic collision risk warning in construction sites for nonlinear movements: A visual-spatial fusion multimodal prediction method. Journal of Construction Engineering and Management, 152(10): 04026170, ISSN 0733-9364
Wang, C; Mohd-Rahim, F A; Chan, Y Y and Abdul-Rahman, H (2017) Fuzzy mapping on psychological disorders in construction management. Journal of Construction Engineering and Management, 143(2): 04016094, ISSN 0733-9364
Wang, C; Zhang, S; Gao, Y and Li, B (2022) Trust repair in the aftermath of conflict occurrence in construction subcontracting: An intergroup contact perspective. Construction Management and Economics, 40(10), pp. 781-795. ISSN 01446193
Wang, D; Arditi, D and Damci, A (2017) Construction project managers' motivators and human values. Journal of Construction Engineering and Management, 143(4): 04016115, ISSN 0733-9364
Wang, D; Dai, F; Ning, X; Dong, R G and Wu, J Z (2017) Assessing work-related risk factors on low back disorders among roofing workers. Journal of Construction Engineering and Management, 143(7): 04017026, ISSN 0733-9364
Wang, J (2023) Direct policy search for adaptive management of flood risk. PhD thesis, Purdue University, USA.
Wang, J; Liu, J; Liao, Z and Tang, P (2009) Identification of key liability risks of supervision engineers in China. Construction Management and Economics, 27(12), pp. 1157-1173. ISSN 1466433X
Wang, J; Xu, Y; Fang, D and Liao, P C (2025) How project-based learning improves construction contract management training: Evidence from eye-tracking searching strategies for contract risk recognition performance. Journal of Construction Engineering and Management, 151(9): 04025125, ISSN 0733-9364
Wang, L; Lee, J; Nimawat, J; Han, K and Gupta, A (2024) Integrated 4D design change management model for construction projects. Journal of Construction Engineering and Management, 150(5): 04024023, ISSN 0733-9364
Wang, Li (2014) Knowledge formalization and reuse in BIM-based mechanical, electrical and plumbing design coordination in new construction projects using data mining techniques. PhD thesis, University of Texas at Austin, USA.
Wang, M; Yao, G; Yang, Y; Li, R and Deng, R (2025) A decision support tool for dust prevention and control in construction. Journal of Construction Engineering and Management, 151(5): 04025037, ISSN 0733-9364
Wang, N; Wang, H and Zhang, K (2022) The dynamics of changes in PPP projects: A meta-case analysis approach. Construction Management and Economics, 40(9), pp. 727-742. ISSN 01446193
Wang, P; Mohamed, Y; Abourizk, S M and Rawa, A R T (2009) Flow production of pipe spool fabrication: Simulation to support implementation of lean technique. Journal of Construction Engineering and Management, 135(10), pp. 1027-1038. ISSN 0733-9364
Wang, Rui (2015) The virtual learning experience: Learning styles, task complexity and presence in the context of emerging VR technologies. PhD thesis, University of New South Wales, Australia.
Wang, T; Chan, A P C; He, Q and Xu, J (2022) Identifying the gaps in construction megaproject management research: A bibliographic analysis. International Journal of Construction Management, 22(9), pp. 1585-1596. ISSN 1562-3599
Wang, X; Huang, X; Luo, Y; Pei, J and Xu, M (2018) Improving workplace hazard identification performance using data mining. Journal of Construction Engineering and Management, 144(8): 04018068, ISSN 0733-9364
Wang, Xi (2018) Assessing the application of the unmanned aerial systems (uas) in earthwork volume measurement. PhD thesis, University of Kentucky, USA.
Wang, Y (2024) Towards automated contract analysis: Applying language models to risk identification in the context of public-private partnerships. PhD thesis, University of Maryland, College Park, USA.
Wang, Y-P (2021) How level of detail of activity duration data influences look-ahead schedule performance in prefabricated construction. PhD thesis, Stanford University, USA.
Wang, Zhimin (2014) Housing pathways and homeownership determinants of the young middle class in Beijing, China. PhD thesis, University of New South Wales, Australia.
Wanigarathna, N (2014) Evidence-based design for healthcare buildings in England and wales. PhD thesis, Loughborough University, UK.
Wanigarathna, N; Sherratt, F; Price, A and Austin, S (2016) Healthcare designers' use of prescriptive and performance-based approaches. Architectural Engineering and Design Management, 12(6), pp. 427-441. ISSN 1745-2007
Wanigarathna N, P A D F A S A (2013) Improvement opportunities for evidence-based design: An application of a critical realist's perspective. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Wanous, M; Boussabaine, A H and Lewis, J (1998) Tendering factors considered by Syrian contractors. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Wao, J O and Flood, I (2016) The role of quantity surveyors in the international construction arena. International Journal of Construction Management, 16(2), pp. 126-137. ISSN 1562-3599
Ward, M; Poleacovschi, C; Faust, K and Svec, J (2021) Modeling public support for utility expansions in displacement situations. Journal of Construction Engineering and Management, 147(6): 04021039, ISSN 0733-9364
Warille, J B (2016) Sustainable compensation methods for construction companies operating in turbulent environments: A case of South Sudan. PhD thesis, University of Liverpool, UK.
Warsame, A; Song, H S and Lind, H (2014) Quality of road construction projects in sweden between 1990 and 2010. Construction Economics and Building, 14(1), pp. 78-87. ISSN 2204-9029
Wasi, D and Skitmore, M (2001) Factors affecting the performance of small indigenous contractors in Papau New Guinea. Construction Economics and Building, 1(1), pp. 80-90. ISSN 2204-9029
Wasim, M; Vaz Serra, P and Ngo, T D (2022) Design for manufacturing and assembly for sustainable, quick and cost-effective prefabricated construction–a review. International Journal of Construction Management, 22(15), pp. 3014-3022. ISSN 1562-3599
Watchman, M; Demers, C M H and Potvin, A (2022) Biophilia in school buildings: Towards a simplified assessment method based on spatial geometry. Architectural Engineering and Design Management, 18(4), pp. 434-452. ISSN 1745-2007
Watson, N (2016) Developing material selection strategies to improve the embodied impacts of buildings. EngD thesis, University of Bath, UK.
Watt, David (2012) Critical contractor selection factors for major projects. PhD thesis, University of New South Wales, Australia.
Watts, J H (2003) Women in civil engineering: continuity and change. PhD thesis, Middlesex University, UK.
Wauters, M and Vanhoucke, M (2015) Study of the stability of earned value management forecasting. Journal of Construction Engineering and Management, 141(4): 04014086, ISSN 0733-9364
Waziri, B S (2018) Pareto analysis of critical risk factors of build operate and transfer projects in Nigeria. Journal of Construction Business and Management, 2(1), pp. 33-40. ISSN 2521-0165
Weber, I and Isatto, E L (2025) Performance metrics for the corrective building maintenance of hospital facilities. Building Research & Information, 53(5), pp. 582-599. ISSN 0961-3218
Weber, J R (2023) Commercial construction ethical decision making: Authentic case studies. PhD thesis, Colorado State University, USA.
Weerasekara, D T; Disaratna, V; Withanage, K T and Perera, B A K S (2023) Procurement management in the foreign-funded construction projects implemented in Sri Lanka. International Journal of Construction Management, 23(7), pp. 1118-1130. ISSN 1562-3599
Weerasinghe, A; Ramachandra, T and Rotimi, J O B (2016) A simplified model for predicting running cost of office buildings in Sri Lanka. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Weerasinghe, A S; Rasheed, E O and Rotimi, J O B (2021) A dilemma between building indoor environment preferences and occupant energy behaviours. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Weerasooriya, D; Perera, B A K S; Ranadewa, K A T O and Gallage, S D (2025) Scrutinizing the shift: investigating quantity surveyors' adaptability to cyber-physical systems. International Journal of Construction Management, 25(2), pp. 139-148. ISSN 1562-3599
Wei, B (2021) Value creation, value sensing, value delivery, and value capturing mechanism of green building: A value network. PhD thesis, Temple University, USA.
Wei, F; Hwang, B G; Zainal, N S B and Zhu, H (2024) Trust, team effectiveness, and strategies: A comparative study between virtual and face-to-face teams. Journal of Construction Engineering and Management, 150(7): 04024065, ISSN 0733-9364
Wei, Y (2019) Data-driven approaches for analysis of building energy consumption and indoor occupancy behavior. PhD thesis, University of Nottingham, UK.
Weidman, J; Dickerson, D E and Koebel, C T (2015) Intervention to improve purchasing decision-maker perceptions of ventilated tools. Journal of Construction Engineering and Management, 141(6): 04015007, ISSN 0733-9364
Weitkamp, T K B (2024) Uncharted territory: Mapping diverse and dispersed smallholder irrigation in Sub-Saharan Africa through remote sensing. PhD thesis, Wageningen University and Research, Netherlands.
Welege, N M H; Pan, W and Kumaraswamy, M M (2021) Constraints to delivering low carbon buildings in high-rise high-density cities. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Wenchi, S; Wang, J; Wang, X and Chong, H Y (2015) An application of value stream mapping for turnaround maintenance in oil and gas industry: Case study and lessions learned. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Wentzel, L; Wentzel, T and Emuze, F A (2014) The construction SMEs development debate in South Africa: Contributions from fet colleges. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Wenzelberger, J P (1987) The economic analysis of tall buildings (Milwaukee, Wisconsin; Boston, Massachusetts; Kansas City, Missouri). DSc thesis, George Washington University, USA.
Westgate, S E (1986) An information system for estimating, targetting and planning in small building firms. PhD thesis, Sheffield Hallam University, UK.
Westmoreland, G (1979) Electric utilities' accounting for construction work in progress the effects of alternative methods on the financial statements, utility rates and market to book ratio. PhD thesis, University of Florida, USA.
Weththasinghe, K K and Wong, P S P (2023) Towards developing partnership models for leveraging design for manufacture and assembly for school buildings. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(2), pp. 75-90. ISSN 17514304
Wetzel, E M (2016) The use of a BIM-based framework to support safe facility management processes. PhD thesis, Virginia Tech, USA.
Whang, S W; Flanagan, R; Kim, S and Kim, S (2017) Contractor-led critical design management factors in high-rise building projects involving multinational design teams. Journal of Construction Engineering and Management, 143(5): 06016009, ISSN 0733-9364
Wheeler, A and Malekzadeh, M (2015) Exploring the use of new school buildings through post-occupancy evaluation and participatory action research. Architectural Engineering and Design Management, 11(6), pp. 440-456. ISSN 1745-2007
Whitla, P; Walters, P and Davies, H (2006) The use of global strategies by British construction firms. Construction Management and Economics, 24(9), pp. 945-954. ISSN 1466433X
Whittaker, S and Jespersen, K (2022) Stretching or conforming? Financing urban climate change adaptation in Copenhagen. Buildings & Cities, 3(1), pp. 974-999. ISSN 2632-6655
Whyte, J; Bouchlaghem, N; Thorpe, A and McCaffer, R O N (1999) A survey of CAD and virtual reality within the house building industry. Engineering, Construction and Architectural Management, 6(4), pp. 371-379. ISSN 0969-9988
Wibowo, A and Hartiati, D (2023) Value-for-money drivers in public-private partnerships in affordable housing in Indonesia: An analytic network process perspective. Journal of Construction in Developing Countries, 28(2), pp. 101-119. ISSN 1823-6499
Wibowo, A and Kochendörfer, B (2005) Financial risk analysis of project finance in Indonesian toll roads. Journal of Construction Engineering and Management, 131(9), pp. 963-972. ISSN 0733-9364
Wiguna, I P A (2005) The influence of risk on project performance in Indonesian building contracts. PhD thesis, University of Newcastle upon Tyne, UK.
Wiguna, I P A and Scott, S (2005) Nature of the critical risk factors affecting project performance in Indonesian building contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wiguna, I P A and Scott, S (2006) Relating risk to project performance in Indonesian building contracts. Construction Management and Economics, 24(11), pp. 1125-1135. ISSN 1466433X
Wijekoon, C; Manewa, A; Ross, A and Davies, C (2016) Evaluating the ability of BIM to enhance value in facilities information management. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Wijesekera, S (2022) Adaptation of green value chain strategy in industry sustainability of the cement manufacturing sector of Sri Lanka. DBA thesis, University of Wales Trinity Saint David, UK.
Wijnia, Y C (2016) Processing risk in asset management: Exploring the boundaries of risk based optimization under uncertainty for an energy infrastructure asset manager. PhD thesis, Delft University of Technology, Netherlands.
Wikberg, F; Olofsson, T and Ekholm, A (2014) Design configuration with architectural objects: Linking customer requirements with system capabilities in industrialized house-building platforms. Construction Management and Economics, 32(1-2), pp. 196-207. ISSN 01446193
Wiliem, Leonard (2008) Incorporating interdependence in risk likelihood analysis to enhance diagnostics in condition monitoring. PhD thesis, Queensland University of Technology, Australia.
Willar, D; Estrellita Varina Yanti, W; Daisy Debora Grace, P and Rudolf Estephanus Golioth, M (2021) Sustainable construction practices in the execution of infrastructure projects: The extent of implementation. Smart and Sustainable Built Environment, 10(1), pp. 106-124. ISSN 2046-6099
Willems, S; Saelens, D and Heylighen, A (2022) Patient well-being, adaptation of and to indoor conditions, and hospital room design: Two mixed methods case studies. Building Research & Information, 50(1-2), pp. 105-133. ISSN 0961-3218
Willems, S; Saelens, D and Heylighen, A (2024) How to investigate differences in indoor environmental comfort and adaptation? Mixed methods research with patients. Building Research & Information, 52(8), pp. 851-869. ISSN 0961-3218
Williams, A (2004) Industry engagement in uk built environment higher education courses. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Williams, J M (1991) Interfaces: Integrating product design and process engineering in manufacturing and construction. PhD thesis, Stanford University, USA.
Williams, R C; Hildreth, J C and Vorster, M C (2009) Highway construction data collection and treatment in preparation for statistical regression analysis. Journal of Construction Engineering and Management, 135(12), pp. 1299-1306. ISSN 0733-9364
Williams T, W M R P (2013) Target cost contracts: Adopting innovative incentive mechanisms to improve the project delivery process. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Williamson, A; Williams, C and Gameson, R (2010) The consideration of maintenance issues during the design process in the UK public sector. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Winarno, S; Griffith, A and Stephenson, P (2008) Earthquake risk reduction to non-engineered buildings: A study of practice in Indonesia. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Winch, G and Carr, B (2001) Benchmarking on-site productivity in France and the UK: A CALIBRE approach. Construction Management and Economics, 19(6), pp. 577-590. ISSN 01446193
Windapo, A (2013) Relationship between degree of risk, cost and level of compliance to occupational health and safety regulations in construction. Construction Economics and Building, 13(2), pp. 67-82. ISSN 2204-9029
Windapo, A; Matshidze, L and Alade, K (2025) Artisan development in the AEC industry: strategies for attracting, transitioning and retaining workers. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(3), pp. 151-159. ISSN 17514304
Wing, C K (1997) The ranking of construction management journals. Construction Management and Economics, 15(4), pp. 387-398. ISSN 01446193
Wirba, E N; Tah, J H M and Howes, R (1996) Risk interdependencies and natural language computations. Engineering, Construction and Architectural Management, 3(4), pp. 251-269. ISSN 0969-9988
Won, J; Lee, G; Dossick, C and Messner, J (2013) Where to focus for successful adoption of building information modeling within organization. Journal of Construction Engineering and Management, 139(11): 4013014, ISSN 0733-9364
Wondimu, P A; Klakegg, O J; Lohne, J and Lædre, O (2020) Experiences with best-value procurement in Norway and the Netherlands. Journal of Construction Engineering and Management, 146(5): 05020001, ISSN 0733-9364
Wong, F P K; Oldfield, P and Osmond, P (2024) Industry perceptions of mass engineered timber (met) construction: A comparison of South-East Asia with other regions. Architectural Engineering and Design Management, 20(6), pp. 1543-1565. ISSN 1745-2007
Wong, Florence (2025) Mass engineered timber construction in Southeast Asia: An analysis of obstacles, drivers and opportunities in hot and humid cities. PhD thesis, University of New South Wales, Australia.
Wong, Francis Michael Wai-Ling (1965) The relation between cost, performance and comfort conditions in 58 office buildings in Sydney. PhD thesis, University of Sydney, Australia.
Wong, J T Y and Hui, E C M (2006) Construction project risks: Further considerations for constructors' pricing in Hong Kong. Construction Management and Economics, 24(4), pp. 425-438. ISSN 01446193
Wong, K W J (2007) Development of selection evaluation and system intelligence analytic models for the intelligent building control systems. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Wong, M O; Zhang, Z and Pan, W (2024) Multiuser virtual reality-enabled collaborative heavy lift planning in construction. Journal of Construction Engineering and Management, 150(4): 04024022, ISSN 0733-9364
Wong, P S P; Cheung, S O and Chan, L L Y (2004) Enhancing construction value chain effectiveness in Hong Kong. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Wong, P S P; Cheung, S O and Fan, K L (2009) Examining the relationship between organizational learning styles and project performance. Journal of Construction Engineering and Management, 135(6), pp. 497-507. ISSN 0733-9364
Wong, P S P; Keough, J; Holdsworth, S and Kenny, D (2020) How may the organisations' readiness to change affect the uptake of off-site construction? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(1), pp. 16-26. ISSN 17514304
Wong, P S P and Lam, K Y (2012) Facing turbulence: Driving force for construction organizations to regain unlearning and learning traction. Journal of Construction Engineering and Management, 138(10), pp. 1202-1211. ISSN 0733-9364
Wong, P S P; Whelan, B and Holdsworth, S (2021) Are contractors ready for greater use of prefabrication in projects? An empirical analysis on the role of unlearning and counter-knowledge. International Journal of Construction Management, 21(4), pp. 353-368. ISSN 1562-3599
Wong, T; Wei, Y; Zeng, Y; Jie, Y and Zhao, X (2025) A novel real-time torque prediction of epb shield in mixed ground using machine learning method based on geological knowledge fusion. Journal of Construction Engineering and Management, 151(3): 04025005, ISSN 0733-9364
Wong, T K (1985) The effects of cyclical construction demand on the performance and operation of construction firms. PhD thesis, Massachusetts Institute of Technology, USA.
Wongbumru, T and Dewancker, B (2016) Post-occupancy evaluation of user satisfaction: A case study of "old" and "new" public housing schemes in Bangkok. Architectural Engineering and Design Management, 12(2), pp. 107-124. ISSN 1745-2007
Woo, J; Rajagopalan, P; Francis, M and Garnawat, P (2021) An indoor environmental quality assessment of office spaces at an urban Australian university. Building Research & Information, 49(8), pp. 842-858. ISSN 0961-3218
Woo, J-H (2005) Sharing tacit design knowledge in a distributed design environment. PhD thesis, Texas A&M University, USA.
Wood, G and Ellis, R (2001) An exploration of approaches to risk management applications within UK construction projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Wood, G D and Ellis, R C T (2003) Risk management practices of leading UK cost consultants. Engineering, Construction and Architectural Management, 10(4), pp. 254-262. ISSN 0969-9988
Wood, H L and Ashton, P (2007) An investigation to identify the role of pre-construction site investigative information used by small medium sized enterprises (SME). In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Wood, X; Ghimire, P; Kim, S; Barutha, P and Jeong, H D (2024) Framework for evaluating the success of integrated project delivery in the industrial construction sector: A mixed methods approach & machine learning application. Construction Economics and Building, 24(1-2), pp. 94-118. ISSN 2204-9029
Workineh, N; Terefe, B and Nigussie, W (2025) Nonconformity in social service space use: A case study of injibara town's plan implementation. International Journal of Construction Management, 25(14), pp. 1755-1768. ISSN 1562-3599
Wu, X.; Schmidt, R.; Wilcockson, T. D.; Wang, W. and Liu, H. (2026) Eye-tracking and place attachment: Visual and emotional engagement in higher education atrium spaces. Building Research & Information, 54(5), pp. 652-669. ISSN 0961-3218
Wu, Chee Shien Jeremy (2008) A comparative study of three international construction firms: Knowledge management infrastructures for optimising organisations' learning. PhD thesis, University of Sydney, Australia.
Wu, K (2019) Robotic assembly: A generative architectural design strategy through component arrangements in highly-constrained design spaces. PhD thesis, Princeton University, USA.
Wu, L; Lu, W and Chen, C (2024) Strengths and weaknesses of client-server and peer-to-peer network models in construction projects. International Journal of Construction Management, 24(12), pp. 1349-1363. ISSN 1562-3599
Wu, R W K and Hadipriono, F C (1994) Fuzzy modus ponens deduction technique for construction scheduling. Journal of Construction Engineering and Management, 120(1), pp. 162-179. ISSN 0733-9364
Wu, S; Xie, H; Zeng, Z; Wang, M; Zhao, H and Liu, Y (2023) Influence of pea-gravel layer on segment ring support performance in shield TBM tunnels: A discrete-continuous coupling simulation and model test. Journal of Construction Engineering and Management, 149(10): 04023097, ISSN 0733-9364
Wu, W; Mayo, G; McCuen, T L; Issa, R R A and Smith, D K (2018) Building information modeling body of knowledge. I: Background, framework, and initial development. Journal of Construction Engineering and Management, 144(8): 04018065, ISSN 0733-9364
Wu, X and Xu, F (2021) Detection model for unbalanced bidding in railway construction projects: Considering the risk of quantity variation. Journal of Construction Engineering and Management, 147(7): 04021055, ISSN 0733-9364
Wubet, W A; Burrow, M and Ghataora, G (2023) Risks affecting the performance of Ethiopian domestic road construction contractors. International Journal of Construction Management, 23(4), pp. 639-647. ISSN 1562-3599
Wuni, I Y and Shen, G Q (2022) Towards a decision support for modular integrated construction: An integrative review of the primary decision-making actors. International Journal of Construction Management, 22(5), pp. 929-948. ISSN 1562-3599
Wuni, I Y; Shen, G Q and Osei-Kyei, R (2022) Quantitative evaluation and ranking of the critical success factors for modular integrated construction projects. International Journal of Construction Management, 22(11), pp. 2108-2120. ISSN 1562-3599
Wuni, I Y; Shen, G Q P and Mahmud, A T (2022) Critical risk factors in the application of modular integrated construction: A systematic review. International Journal of Construction Management, 22(2), pp. 133-147. ISSN 1562-3599
Wuni, I Y; Wu, Z and Shen, G Q (2023) Exploring the challenges of implementing design for excellence in industrialized construction projects in China. Building Research & Information, 51(3), pp. 301-315. ISSN 0961-3218
Xia, B and Chan, A P C (2012) Measuring complexity for building projects: A Delphi study. Engineering, Construction and Architectural Management, 19(1), pp. 7-24. ISSN 0969-9988
Xia, B; Chan, A P C and Yeung, J F Y (2009) Identification of key competences of design-builders in the construction market of the people's Republic of China (PRC). Construction Management and Economics, 27(11), pp. 1141-1152. ISSN 1466433X
Xia, B; Molenaar, K; Chan, A; Skitmore, M and Zuo, J (2013) Determining optimal proportion of design in design-build request for proposals. Journal of Construction Engineering and Management, 139(6), pp. 620-627. ISSN 0733-9364
Xiahou, X; Yuan, J; Xie, H; Skibniewski, M J and Li, Q (2022) Exploring driving factors of smart city development under the physical-human society-cyber (p-h-c) space model. International Journal of Construction Management, 22(14), pp. 2753-2763. ISSN 1562-3599
Xiang, Jianjun (2014) Extreme heat and workers' health in South Australia: Association, perceptions, and adaptations in the workplace. PhD thesis, University of Adelaide, Australia.
Xiang, Q; Liu, Y; Goh, Y M; Ye, G and Safiena, S (2024) Investigating the impact of hazard perception failure on construction workers' unsafe behavior: An eye-tracking and thinking-aloud approach. Journal of Construction Engineering and Management, 150(7): 04024066, ISSN 0733-9364
Xiao, H and Boyd, D (2007) A cross-culture analysis of construction practice through knowledge events. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Xiao, H and Proverbs, D (2002) An investigation into factors influencing construction costs based on Japanese, UK and US contractor practice. Construction Economics and Building, 2(2), pp. 27-35. ISSN 2204-9029
Xiao, H and Proverbs, D (2002) Construction time performance: An evaluation of contractors from Japan, the UK and the US. Engineering, Construction and Architectural Management, 9(2), pp. 81-89. ISSN 0969-9988
Xiao, H; Proverbs, D G; Shaw, T and Holt, G D (2000) A new approach to comparing the performance of contractors internationally. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Xiao, Y (2017) Three-dimensional reconstruction and modeling using low-precision vision sensors for automation and robotics applications in construction. PhD thesis, University of Michigan, USA.
Xie, Q and Yuan, X (2022) Functioning and environment: Exploring outdoor activity-friendly environments for older adults with disabilities in a Chinese long-term care facility. Building Research & Information, 50(1-2), pp. 43-59. ISSN 0961-3218
Xie, X (2002) Communications in construction design. PhD thesis, Loughborough University, UK.
Xie, X; Thorpe, A and Baldwin, A N (2000) A survey of communication issues in construction design. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Xiong, Yunjie (2020) A BIM-based interoperability platform in support of building operation and energy management. PhD thesis, Virginia Tech, USA.
Xu, J (2019) In the shadow of a negative past: Repairing and developing trust in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(1), pp. 5-13. ISSN 17514304
Xu, J; Jin, R; Piroozfar, P; Wang, Y; Kang, B G; Ma, L; Wanatowski, D and Yang, T (2018) Constructing a BIM climate-based framework: Regional case study in China. Journal of Construction Engineering and Management, 144(11): 04018105, ISSN 0733-9364
Xu, J; Teng, Y and Pan, W (2021) A BIM-LCA integrated method for enhancing efficiency of embodied carbon estimation of prefabricated high-rise buildings. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Xu, J and Zeng, Z (2011) Applying optimal control model to dynamic equipment allocation problem: Case study of concrete-faced rockfill dam construction project. Journal of Construction Engineering and Management, 137(7), pp. 536-550. ISSN 0733-9364
Xu, Lichao (2019) Geometric, semantic, and system-level scene understanding for improved construction and operation of the built environment. PhD thesis, University of Michigan, USA.
Xu, W and Wang, T K (2023) Construction worker safety prediction and active warning based on computer vision and the gray absolute decision analysis method. Journal of Construction Engineering and Management, 149(4): 04023014, ISSN 0733-9364
Xu, Y; Chan, A P C and Yeung, J F Y (2010) Developing a fuzzy risk allocation model for PPP projects in China. Journal of Construction Engineering and Management, 136(8), pp. 894-903. ISSN 0733-9364
Xu, Yongzhi (2021) Automated and real-time scan-to-BIM through deep learning-based object detection. PhD thesis, University of New South Wales, Australia.
Xuan, X; Huang, Y and Zhang, Z (2025) Effects of IEQ on inpatients' psychological restoration in hospital wards: The role of environmental perceptions. Building Research & Information, 53(8), pp. 1014-1038. ISSN 0961-3218
Xue, H; Li Teh, K K and Ling, F Y Y (2025) Effects of crisis management leadership, perceived self-efficacy, and job performance on facility management professionals' job satisfaction in a crisis. Journal of Construction Engineering and Management, 151(7): 04025084, ISSN 0733-9364
Xue, J; Shen, G Q; Yang, R J; Zafar, I and Ekanayake, E M A C (2020) Dynamic network analysis of stakeholder conflicts in megaprojects: Sixteen-year case of Hong Kong-Zhuhai-Macao Bridge. Journal of Construction Engineering and Management, 146(9): 04020103, ISSN 0733-9364
Yadollahi, M; Ebrahimi Saryazdi, S M; Shafaat, A and Hafezi, M (2023) Life cycle cost analysis of near zero energy buildings benefited from earth-sheltering. International Journal of Construction Management, 23(15), pp. 2670-2682. ISSN 1562-3599
Yakubu, O A and Sun, M (2009) A survey of construction project cost and time control practices in the UK. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Yalçınkaya Çalışkan, F and Acar, E (2016) An exploratory analysis of continuing professional development perspectives of Turkish architects according to career stages. Architectural Engineering and Design Management, 12(5), pp. 381-406. ISSN 1745-2007
Yang, F; Li, X; Song, Z; Li, Y and Zhu, Y (2018) Job burnout of construction project managers: Considering the role of organizational justice. Journal of Construction Engineering and Management, 144(11): 04018103, ISSN 0733-9364
Yang, G (2017) Problematic encounters between Chinese nationals and black South Africans in the building industry in Johannesburg South Africa: An intercultural communication analysis. PhD thesis, University of Pretoria, South Africa.
Yang, J; Shen, G Q; Drew, D S and Ho, M (2010) Critical success factors for stakeholder management: Construction practitioners' perspectives. Journal of Construction Engineering and Management, 136(7), pp. 778-786. ISSN 0733-9364
Yang, J; Shen, P Q; Bourne, L; Ho, C M F and Xue, X (2011) A typology of operational approaches for stakeholder analysis and engagement. Construction Management and Economics, 29(2), pp. 145-162. ISSN 1466433X
Yang, K; Sunindijo, R Y; Wang, C C and Zhang, S (2024) Key leadership competencies in different management levels for digital transformation in construction organisations. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Yang, S; Zhang, J; Xu, S; Deng, T; He, Q and Wang, P (2025) Work section planning for accompanying construction of extra-long tunnel and ballastless track of mountainous high-speed railways. Journal of Construction Engineering and Management, 151(9): 04025126, ISSN 0733-9364
Yang, T and Fellows, R (1998) Organizational effectiveness on building projects in the UK and China: An investigation of the impacts of project managers, project organizational structures and managerial activities. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Yao, F.; Tong, W.; Ji, Y.; Zhang, Y. and Li, H. X. (2026) Monitoring hoisting workers' negative emotions in prefabricated construction using galvanic skin response measurements. Journal of Construction Engineering and Management, 152(9): 04026150, ISSN 0733-9364
Yap, J B H; Hew, Q L T and Skitmore, M (2022) Student learning experiences in higher education: Investigating a quantity surveying programme in Malaysia. Construction Economics and Building, 22(1), pp. 1-20. ISSN 2204-9029
Yap, J B H; Rou Chong, J; Skitmore, M and Lee, W P (2020) Rework causation that undermines safety performance during production in construction. Journal of Construction Engineering and Management, 146(9): 04020106, ISSN 0733-9364
Yap, J B H; Skitmore, M; Lam, C G Y; Lee, W P and Lew, Y L (2024) Advanced technologies for enhanced construction safety management: Investigating Malaysian perspectives. International Journal of Construction Management, 24(6), pp. 633-642. ISSN 1562-3599
Yashiro, T (2014) Conceptual framework of the evolution and transformation of the idea of the industrialization of building in Japan. Construction Management and Economics, 32(1-2), pp. 16-39. ISSN 01446193
Yasin, F and Egbu, C (2011) Critical steps to knowledge mapping in facilities management organisation. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Yates, J K (1990) Data-base systems for evaluating construction programs. Journal of Construction Engineering and Management, 116(4), pp. 624-642. ISSN 0733-9364
Yates, J K (2014) Design and construction for sustainable industrial construction. Journal of Construction Engineering and Management, 140(4): B4014005, ISSN 0733-9364
Yates, M E B (2017) An extended PMBOK project management model for companies delivering large multidiscipline mining projects. PhD thesis, University of Johannesburg, South Africa.
Yates-Suver, J K (1986) A cross-cultural evaluation of the behavior and training of American engineering and construction professionals who operate in the international marketplace. PhD thesis, Texas A&M University, USA.
Yau, Y (2012) Eco-labels and willingness-to-pay: A Hong Kong study. Smart and Sustainable Built Environment, 1(3), pp. 277-290. ISSN 2046-6099
Yaworsky, R A (1994) Risk planning for large and BOT projects: A holistic framework. PhD thesis, University of British Columbia, Canada.
Ye, M (2018) The impacts of institutional distance on corporate social responsibility "glocalisation" : evidence from international construction. PhD thesis, University of Hong Kong, Hong Kong.
Ye, S and Liu, Y (2008) Study on development patterns of infrastructure projects. Journal of Construction Engineering and Management, 134(2), pp. 94-102. ISSN 0733-9364
Ye, X; Shi, S; Chong, H Y; Fu, X; Liu, L and He, Q (2018) Empirical analysis of firms' willingness to participate in infrastructure PPP projects. Journal of Construction Engineering and Management, 144(1): 04017092, ISSN 0733-9364
Ye, Y; Xia, P; Zhou, T and Du, J (2023) Spatial memory of BIM and virtual reality: Mental mapping study. Journal of Construction Engineering and Management, 149(7): 04023042, ISSN 0733-9364
Yean-Yng Ling, F and Sui Pheng Low, G (2000) Importance of design consultants' soft skills in design-build projects. Engineering, Construction and Architectural Management, 7(4), pp. 389-398. ISSN 0969-9988
Yeoh, K-W (2012) Construction requirements driven planning and scheduling. PhD thesis, National University of Singapore, Singapore.
Yeung, D and Skitmore, M (2012) A method for systematically pooling data in very early stage construction price forecasting. Construction Management and Economics, 30(11), pp. 929-939. ISSN 1466433X
Yeung, H C; Ridwan, T; Tariq, S and Zayed, T (2022) Beam plus implementation in Hong Kong: Assessment of challenges and policies. International Journal of Construction Management, 22(14), pp. 2830-2844. ISSN 1562-3599
Yeung, J F Y; Chan, A P C and Chan, D W M (2008) Establishing quantitative indicators for measuring the partnering performance of construction projects in Hong Kong. Construction Management and Economics, 26(3), pp. 277-301. ISSN 1466433X
Yeung, J F Y; Chan, A P C; Chan, D W M; Chiang, Y H and Yang, H (2013) Developing a benchmarking model for construction projects in Hong Kong. Journal of Construction Engineering and Management, 139(6), pp. 705-716. ISSN 0733-9364
Yeung, J F Y; Chan, A P C; Chan, D W M and Li, L K (2007) Development of a partnering performance index (PPI) for construction projects in Hong Kong: A Delphi study. Construction Management and Economics, 25(12), pp. 1219-1237. ISSN 1466433X
Yeung, J F Y; Chan, D W M; Chan, J H L and Lok, K L (2023) Development of a composite project performance index for the New Engineering Contract (necppi) of construction projects in Hong Kong: A Delphi study. International Journal of Construction Management, 23(16), pp. 2804-2817. ISSN 1562-3599
Yevu, S K; Yu, A T W; Nani, G; Darko, A and Tetteh, M O (2022) Electronic procurement systems adoption in construction procurement: A global survey on the barriers and strategies from the developed and developing economies. Journal of Construction Engineering and Management, 148(1): 04021186, ISSN 0733-9364
Yimprayoon, C (2012) Energy efficiency design strategies for buildings with grid-connected photovoltaic systems. PhD thesis, University of Michigan, USA.
Ying, F J; O'Sullivan, M and Adan, I (2021) Simulation of vehicle movements for planning construction logistics centres. Construction Innovation, 21(4), pp. 608-624. ISSN 1471-4175
Yiu, T W; Cheung, S O and Siu, L Y (2012) Application of bandura's self-efficacy theory to examining the choice of tactics in construction dispute negotiation. Journal of Construction Engineering and Management, 138(3), pp. 331-340. ISSN 0733-9364
Yiu, T W and Lai, W Y (2009) Efficacy of trust-building tactics in construction mediation. Journal of Construction Engineering and Management, 135(8), pp. 683-689. ISSN 0733-9364
Yiu, T W and Lee, H K (2011) How do personality traits affect construction dispute negotiation? Study of big five personality model. Journal of Construction Engineering and Management, 137(3), pp. 169-178. ISSN 0733-9364
Yiu, T W; Liu, T and Kwok, L C (2018) Explicating the role of relationship in construction claim negotiations. Journal of Construction Engineering and Management, 144(2): 04017114, ISSN 0733-9364
Yoo, W; Ozer, H and Ham, Y (2019) System-level approach for identifying main uncertainty sources in pavement construction life-cycle assessment for quantifying environmental impacts. Journal of Construction Engineering and Management, 145(2): 04018137, ISSN 0733-9364
Yoon, S; Hastak, M and Lee, J (2018) Suitability of intelligent compaction for asphalt pavement quality control and quality assurance. Journal of Construction Engineering and Management, 144(4): 04018006, ISSN 0733-9364
Yoon, S; Kang, K; Yoon, Y; Hastak, M and Ji, R (2018) Systematic decision-making process for composite pavement maintenance. Journal of Construction Engineering and Management, 144(6): 04018044, ISSN 0733-9364
Yoon, Y and Gangarao, H (2021) Prioritization framework for rockfall countermeasures for rock-cut slopes for rural roads. Journal of Construction Engineering and Management, 147(10), ISSN 0733-9364
Yoon, Y; Patel, S; Ji, R and Hastak, M (2017) Current state of reflective cracking in the United States. Journal of Construction Engineering and Management, 143(3): 04016099, ISSN 0733-9364
Yu, A; Shen, Q P; Kelly, J and Hunter, K (2004) Development of a value management framework for the formation of project briefs. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Yu, A T W; Shen, Q; Kelly, J and Hunter, K (2006) Investigation of critical success factors in construction project briefing by way of content analysis. Journal of Construction Engineering and Management, 132(11), pp. 1178-1186. ISSN 0733-9364
Yu, H (2009) A knowledge based system for construction health and safety competence assessment. PhD thesis, University of Wolverhampton, UK.
Yu, J and Leung, M Y (2018) Structural stakeholder model in public engagement for construction development projects. Journal of Construction Engineering and Management, 144(6): 04018046, ISSN 0733-9364
Yu, J H; Lee, H S and Kim, W (2006) Evaluation model for information systems benefits in construction management processes. Journal of Construction Engineering and Management, 132(10), pp. 1114-1121. ISSN 0733-9364
Yu, M; Ruan, W; Zhou, Y and Zhao, Y (2025) Flow shop scheduling for prefabricated components production considering parallel machines and buffer constraints. Journal of Construction Engineering and Management, 151(4): 04025010, ISSN 0733-9364
Yu, R K T and Leung, M Y (2001) Investigation of construction conflict resolution in Hong Kong. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Yu, W D; Lin, T C; Liu, S J and Chang, P L (2013) Is the knowledge management system truly cost effective? Case study of km-enabled engineering problem solving. Journal of Construction Engineering and Management, 139(2), pp. 216-224. ISSN 0733-9364
Yu, W D; Wang, K C and Wu, H T (2022) Empirical comparison of learning effectiveness of immersive virtual reality-based safety training for novice and experienced construction workers. Journal of Construction Engineering and Management, 148(9): 04022078, ISSN 0733-9364
Yu, Y (2022) Use inspired research in using virtual reality for safe operation of exemplar critical infrastructure systems. PhD thesis, Rutgers The State University of New Jersey, School of Graduate Studies, USA.
Yuan, J; Zeng, A Y; Skibniewski, M J and Li, Q (2009) Selection of performance objectives and key performance indicators in public-private partnership projects to achieve value for money. Construction Management and Economics, 27(3), pp. 253-270. ISSN 1466433X
Yuan, X; Pan, H and Fu, B (2023) Models and analysis of stadium and commercial space integration: A case study from China. Building Research & Information, 51(8), pp. 915-936. ISSN 0961-3218
Yuan, X X (2012) Bayesian method for the correlated competitive bidding model. Construction Management and Economics, 30(6), pp. 477-491. ISSN 1466433X
Yun, G Y; Steemers, K and Baker, N (2008) Natural ventilation in practice: Linking facade design, thermal performance, occupant perception and control. Building Research & Information, 36(6), pp. 608-624. ISSN 0961-3218
Yunus, R and Yang, J (2014) Improving ecological performance of industrialized building systems in Malaysia. Construction Management and Economics, 32(1-2), pp. 183-195. ISSN 01446193
Zadawa, A N; Hussin, A A and Osmadi, A (2018) Mediating effects of enforcement on public procurement guidelines' compliance barriers and cost performance of construction projects in Nigerian federal universities: A process macro approach. Journal of Construction in Developing Countries, 23(1), pp. 81-102. ISSN 1823-6499
Zafar, I; Wuni, I Y; Shen, G Q P; Ahmed, S and Yousaf, T (2022) A fuzzy synthetic evaluation analysis of time overrun risk factors in highway projects of terrorism-affected countries: The case of Pakistan. International Journal of Construction Management, 22(4), pp. 732-750. ISSN 1562-3599
Zafar, J and Chileshe, N (2018) Analysis of health and well-being practices among older construction site-based workers in South Australia. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Zailani, M B; Abubakar, M and Muhammad, A (2019) Assessment of barriers to risk management implementation in small construction projects in Nigeria. African Journal of Built Environment Research, 3(1), pp. 15-28. ISSN 2414-0236
Zainab S, P W and Goodhew S, F A (2013) Stakeholders perspective on sustainable technology selection to achieve zero carbon retail buildings. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Zaman, A A U; Abdelaty, A; Yamany, M S; Jacobs, F and Marzouk, M (2025) Integrating 3D photogrammetry and game engine for construction safety training. Built Environment Project and Asset Management, 15(4), pp. 844-862. ISSN 2044-124X
Zami, M S (2022) Barriers hindering acceptance of earth construction in the urban context of the United Kingdom. Architectural Engineering and Design Management, 18(6), pp. 941-958. ISSN 1745-2007
Zaneldin, E (2000) An information model for improving design coordination in building projects. PhD thesis, University of Waterloo, Canada.
Zaneldin, E K (2020) Investigating the types, causes and severity of claims in construction projects in the UAE. International Journal of Construction Management, 20(5), pp. 385-401. ISSN 1562-3599
Zarei, F; Arashpour, M; Mirnezami, S A; Shahabi-Shahamiri, R and Ghasemi, M (2024) Multi-skill resource-constrained project scheduling problem considering overlapping: Fuzzy multi-objective programming approach to a case study. International Journal of Construction Management, 24(8), pp. 820-833. ISSN 1562-3599
Zatta, E and Condotta, M (2023) Assessing the sustainability of architectural reclamation processes: An evaluation procedure for the early design phase. Building Research & Information, 51(1), pp. 21-38. ISSN 0961-3218
Zayed, T M (2001) Assessment of productivity for concrete bored pile construction. PhD thesis, Purdue University, USA.
Zayed, T M and Halpin, D W (2004) Process versus data oriented techniques in pile construction productivity assessment. Journal of Construction Engineering and Management, 130(4), pp. 490-499. ISSN 0733-9364
Zayed, T M and Halpin, D W (2004) Simulation as a tool for pile productivity assessment. Journal of Construction Engineering and Management, 130(3), pp. 394-404. ISSN 0733-9364
Zayed, T M and Halpin, D W (2005) Deterministic models for assessing productivity and cost of bored piles. Construction Management and Economics, 23(5), pp. 531-543. ISSN 01446193
Zayed, T M and Minkarah, I (2004) Resource allocation for concrete batch plant operation: Case study. Journal of Construction Engineering and Management, 130(4), pp. 560-569. ISSN 0733-9364
Zeng, N; Liu, Y; Wang, C; Chen, Q; Liu, Y and Li, Q (2026) On- and off-site coordination in a modular construction supply chain: Domain-spanning production flow framing and evaluation. Journal of Construction Engineering and Management, 152(2): 04025245, ISSN 0733-9364
Zeng, Q and Pishdad-Bozorgi, P (2025) The evolution of sustainable building rating tools: A systematic literature review. Smart and Sustainable Built Environment, 14(4), pp. 1230-1263. ISSN 2046-6099
Zerihun, A; Beza, D and Idrisi, M J (2025) Factors affecting contractor and subcontractor relationship and their effects on building project performance: Case of Addis Ababa. International Journal of Construction Management, 25(14), pp. 1716-1724. ISSN 1562-3599
Zerjav, V; Hartmann, T and Achammer, C (2013) Managing the process of interdisciplinary design: Identifying, enforcing, and anticipating decision-making frames. Architectural Engineering and Design Management, 9(2), pp. 121-133. ISSN 1745-2007
Zhai, Y (2022) Evaluation for optimisation: Design for assembly in panel construction. PhD thesis, The Chinese University of Hong Kong, Hong Kong.
Zhan, H; Hwang, B G and Jabbar, S B B A (2025) An integrated approach to assessing digitalization of integrated digital delivery projects. Journal of Construction Engineering and Management, 151(6): 04025044, ISSN 0733-9364
Zhang, S; Bao, Z; Yu, X; Shi, X; Wang, B and Zhang, Y (2026) How safety knowledge impacts construction workers' risk perception: ERP study. Journal of Construction Engineering and Management, 152(1): 04025234, ISSN 0733-9364
Zhang, C (2017) Human-centered automation for resilience in acquiring construction field information. PhD thesis, Arizona State University, USA.
Zhang, C; Zayed, T and Hammad, A (2008) Resource management of bridge deck rehabilitation: Jacques cartier bridge case study. Journal of Construction Engineering and Management, 134(5), pp. 311-319. ISSN 0733-9364
Zhang, G and Yang, J (2006) Factors influencing the implementation of the raised floor system in Australian office buildings. Construction Management and Economics, 24(5), pp. 529-543. ISSN 1466433X
Zhang, L (2019) To insist or to concede? Chinese contractors' behavioural strategies when handling disputed construction claims. PhD thesis, University of Manchester, UK.
Zhang, L and Agapiou, A (2020) Influence diagrams for off-site construction manufacturing risk assessment in China. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(4), pp. 145-162. ISSN 17514304
Zhang, L and El-Gohary, N (2023) Human-centred and BIM-integrated automated value analysis of buildings. International Journal of Construction Management, 23(11), pp. 1911-1923. ISSN 1562-3599
Zhang, L and El-Gohary, N M (2016) Discovering stakeholder values for axiology-based value analysis of building projects. Journal of Construction Engineering and Management, 142(4): 04015095, ISSN 0733-9364
Zhang, L and Sunindijo, R Y (2021) Emotional intelligence of local and overseas graduates in real estate industry in China. Journal of Construction in Developing Countries, 26(1), pp. 185-204. ISSN 1823-6499
Zhang, L; Wong, W F and Chen, P H (2010) Critical factors influencing learning effectiveness in international construction joint ventures. International Journal of Construction Management, 10(1), pp. 87-100. ISSN 1562-3599
Zhang, L; Yao, Y and Yiu, T W (2020) Job burnout of construction project managers: Exploring the consequences of regulating emotions in workplace. Journal of Construction Engineering and Management, 146(10): 04020117, ISSN 0733-9364
Zhang, R P and Lingard, H (2016) A longitudinal analysis of safety climate in the dynamic construction project environment. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Zhang, R P; Lingard, H and Oswald, D (2020) Impact of supervisory safety communication on safety climate and behavior in construction workgroups. Journal of Construction Engineering and Management, 146(8): 0001881, ISSN 0733-9364
Zhang, S; Loosemore, M; Sunindijo, R Y and Gu, D (2023) An investigation of safety climate in Chinese major construction projects. International Journal of Construction Management, 23(8), pp. 1365-1375. ISSN 1562-3599
Zhang, T (2019) Investigating the effectiveness of BIM-bms integration on managing existing building facilities: A New Zealand educational building case. PhD thesis, Auckland University of Technology, New Zealand.
Zhang, W; Xue, N; Zhang, J and Zhang, X (2021) Identification of critical causal factors and paths of tower-crane accidents in China through system thinking and complex networks. Journal of Construction Engineering and Management, 147(12): 04021174, ISSN 0733-9364
Zhang, W; Yuan, G; Xue, R; Han, Y and Taylor, J E (2022) Mitigating common method bias in construction engineering and management research. Journal of Construction Engineering and Management, 148(9): 04022089, ISSN 0733-9364
Zhang, X (2005) Concessionaire's financial capability in developing build-operate-transfer type infrastructure projects. Journal of Construction Engineering and Management, 131(10), pp. 1054-1064. ISSN 0733-9364
Zhang, X (2005) Critical success factors for public-private partnerships in infrastructure development. Journal of Construction Engineering and Management, 131(1), pp. 3-14. ISSN 0733-9364
Zhang, X (2005) Paving the way for public-private partnerships in infrastructure development. Journal of Construction Engineering and Management, 131(1), pp. 71-80. ISSN 0733-9364
Zhang, X; Liu, T; Rahman, A and Zhou, L (2023) Blockchain applications for construction contract management: A systematic literature review. Journal of Construction Engineering and Management, 149(1): 03122011, ISSN 0733-9364
Zhang, X and Tariq, S (2020) Failure mechanisms in international water PPP projects: A public sector perspective. Journal of Construction Engineering and Management, 146(6): 04020055, ISSN 0733-9364
Zhang, X; Zhang, W; Jiang, L and Zhao, T (2020) Identification of critical causes of tower-crane accidents through system thinking and case analysis. Journal of Construction Engineering and Management, 146(7): 04020071, ISSN 0733-9364
Zhang, Xutong (2025) Physics-guided machine learning for condition assessment of building structures in operational environments. PhD thesis, University of Technology Sydney, Australia.
Zhang, Y (2018) An investigation of trust between parties in construction claims using reciprocity theory of social exchange. PhD thesis, University of Hong Kong, Hong Kong.
Zhang, Y; Chang, R; Mao, W; Zuo, J; Liu, L and Han, Y (2024) Challenges of automating interior construction progress monitoring. Journal of Construction Engineering and Management, 150(9): 03124004, ISSN 0733-9364
Zhang, Y; Wang, Z; Lin, W; Minchin, R E and Xue, X (2022) Understanding the slow diffusion of alternative delivery systems using interpretive structural modelling. Construction Management and Economics, 40(6), pp. 459-476. ISSN 01446193
Zhang, Y; Wang, W; Mi, L; Sun, G; Qiao, L; Tao, M and Wang, L (2025) Uncovering the organizational vulnerability toward construction project accidents: Bertopic-based text mining analysis. Journal of Construction Engineering and Management, 151(11): 04025179, ISSN 0733-9364
Zhang, Z; Fang, K; Zhang, S; Zhang, W; Wang, X and Furuya, N (2023) Physical environmental factors that affect users' willingness to visit neighbourhood centres in China. Building Research & Information, 51(5), pp. 568-587. ISSN 0961-3218
Zhao, J. and Xu, Z. (2026) A generalizable deep reinforcement learning-based algorithm for priority rule scheduling in stochastic resource-constrained project scheduling. Journal of Construction Engineering and Management, 152(9): 04026156, ISSN 0733-9364
Zhao, C E (2007) Financial risk management of PPP projects in the UK and China: A comparative study. PhD thesis, University of London, University College London, UK.
Zhao, J (2022) Rethinking value for money in Public Private Partnerships: a critique, analysis and model for transport infrastructure projects. PhD thesis, Northumbria University, UK.
Zhao, X; Chen, L; Pan, W and Lu, Q (2017) AHP-ANP-fuzzy integral integrated network for evaluating performance of innovative business models for sustainable building. Journal of Construction Engineering and Management, 143(8): 04017054, ISSN 0733-9364
Zhao, X; Hwang, B G and See, Y L (2015) Green retrofit projects: Risk assessment and mitigation. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Zhao, Y; Mantha, B R K; Knijnenburg, B P and Li, D (2025) Exploring the feasibility of mobile robots for post-occupancy evaluations. Building Research & Information, 53(1-2), pp. 165-182. ISSN 0961-3218
Zhao, Z; Wang, X; Ji, Y; Liu, H; Liu, X and Yao, F (2025) Analysis of quality-influencing factors of adopting prefabricated steel structure housings: Based on the ISM-MICMAC model. Journal of Construction Engineering and Management, 151(8): 04025098, ISSN 0733-9364
Zheng, J; Zhang, Z; Wu, G; Yang, Y; Xia, N and Liu, B (2021) Daily self-efficacy, work engagement, and deviance behavior among construction professionals and workers: Cross-level moderating role of job control. Journal of Construction Engineering and Management, 147(4): 04021018, ISSN 0733-9364
Zhou, H W; Zhou, Y H and Zhao, C J (2016) Fault-response mechanism of production system in concrete-dam-construction simulation. Journal of Construction Engineering and Management, 142(11): 04016065, ISSN 0733-9364
Zhou, H; Chan, A P C; Yang, Y and Yi, W (2025) A systematic review of mental states and safety performance of construction workers. Journal of Construction Engineering and Management, 151(10): 03125007, ISSN 0733-9364
Zhou, L; Keivani, R and Kurul, E (2013) Sustainability performance measurement framework for PFI projects in the UK. Journal of Financial Management of Property and Construction, 18(3), pp. 232-250. ISSN 1366-4387
Zhou, Q; Fang, D and Mohamed, S (2011) Safety climate improvement: Case study in a Chinese construction company. Journal of Construction Engineering and Management, 137(1), pp. 86-95. ISSN 0733-9364
Zhou, S (2024) Platforming for industrialized building: a comparative case study of digitally-enabled product platforms. Building Research & Information, 52(1-2), pp. 4-18. ISSN 0961-3218
Zhou, X and Liao, P C (2023) Weighing votes in human-machine collaboration for hazard recognition: Inferring a hazard-based perceptual threshold and decision confidence from electroencephalogram wavelets. Journal of Construction Engineering and Management, 149(9): 04023084, ISSN 0733-9364
Zhou, Yifan (2010) Asset life prediction and maintenance decision-making using a non-linear non-Gaussian state space model. PhD thesis, Queensland University of Technology, Australia.
Zhu, L; Cheung, S O; Gao, X; Li, Q and Liu, G (2020) Success DNA of a record-breaking megaproject. Journal of Construction Engineering and Management, 146(8): 05020009, ISSN 0733-9364
Zhu, L; Zhu, Q and Zhao, X (2024) Identifying determinants of student learning effects in intensive online environments: An empirical investigation in civil engineering education. International Journal of Construction Management, 24(11), pp. 1249-1258. ISSN 1562-3599
Zhu, Y; Ahmad, I and Wang, L (2009) Estimating work zone road user cost for alternative contracting methods in highway construction projects. Journal of Construction Engineering and Management, 135(7), pp. 601-608. ISSN 0733-9364
Zhu, Y; Brigham, J C and Fascetti, A (2025) Lidar-rgb data fusion for four-dimensional uav-based monitoring of reinforced concrete bridge construction: Case study of the fern hollow bridge reconstruction. Journal of Construction Engineering and Management, 151(1): 05024016, ISSN 0733-9364
Zhuravchak, R; Nord, N and Brattebø, H (2022) The effect of building attributes on the energy performance at a scale: An inferential analysis. Building Research & Information, 50(6), pp. 662-680. ISSN 0961-3218
Zoiopoulos, I I (2011) Exploring the relationship between the configurations of international construction majors and the effectiveness with which they develop their core competencies. PhD thesis, University College London, UK.
Zolfagharian, S and Irizarry, J (2017) Constructability assessment model for commercial building designs in the United States. Journal of Construction Engineering and Management, 143(8): 04017031, ISSN 0733-9364
Zolfagharian, S; Irizarry, J; Ressang, A; Nourbakhsh, M and Gheisari, M (2014) Automated safety planning approach for residential construction sites in Malaysia. International Journal of Construction Management, 14(3), pp. 134-147. ISSN 1562-3599
Zou, P X W and Couani, P (2012) Managing risks in green building supply chain. Architectural Engineering and Design Management, 8(2), pp. 143-158. ISSN 1745-2007
Zou, P X W and Darvish, H (2006) Group assignments and teamwork skills development in postgraduate construction management studies. Architectural Engineering and Design Management, 2(3), pp. 203-215. ISSN 1745-2007
Zou R R, F R and Jewell C, T L C M (2013) An exploratory study of information maturity in construction and developing a decision-making model. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Zouein, P P (1995) MoveSchedule: a planning tool for scheduling space use on construction sites. PhD thesis, University of Michigan, USA.
Zubair, M U; Zhang, X and Hassan, M U (2024) Aligning expectations and perceptions of elevator maintenance stakeholders: An application of expectation confirmation theory. Building Research & Information, 52(4), pp. 418-430. ISSN 0961-3218
Zubairu, S N (1998) Maintenance of government office buildings in Nigeria: A post-occupancy evaluation approach. PhD thesis, University of Lagos, Nigeria.
Zulu, S (2007) Impact of project management on project performance: A structural equation modelling approach. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Zuluaga Santa, C M (2018) Protecting bridge maintenance workers: Evaluating fall protection supplementary devices using virtual prototyping and wearable technology. PhD thesis, North Carolina State University, USA.
af Hällström, A and Bosch-Sijtsema, P (2020) Collaboration and relationships in Nordic infrastructure project networks. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
al Abo Omar, E and Mangin, J (2002) A new cost control model and indicators to measure productivity on building sites. Construction Innovation, 2(2), pp. 83-101. ISSN 1471-4175
da Silva, M B C; Moschen, S D A; Cecatto, B and Larentis, F (2022) Perceived attributes and dimensions of accessibility in adapted bathrooms. Building Research & Information, 50(1-2), pp. 60-73. ISSN 0961-3218
de Castro e Silva Neto, D (2019) Contributions to the governance and renegotiation processes of public-private partnerships in Brazil. PhD thesis, Universidade de Aveiro, Portugal.
de Melo, R S S; Do, D; Tillmann, P; Ballard, G and Granja, A D (2016) Target value design in the public sector: Evidence from a hospital project in San Francisco, CA. Architectural Engineering and Design Management, 12(2), pp. 125-137. ISSN 1745-2007
ke, Y; Ling, F Y Y and Ning, Y (2013) Public construction project delivery process in Singapore, Beijing, Hong Kong and Sydney. Journal of Financial Management of Property and Construction, 18(1), pp. 6-25. ISSN 1366-4387
ng, S T and Chow, L K (2004) Evaluating engineering consultants' general capabilities during the pre-selection process: A Hong Kong study. Engineering, Construction and Architectural Management, 11(3), pp. 150-158. ISSN 0969-9988
van Nguyen, M V and Khanh, K D (2025) Exploring the relationship between corporate social responsibility and innovation performance in architectural design firms. International Journal of Construction Management, 25(12), pp. 1454-1462. ISSN 1562-3599
van den Berg, J; Appel-Meulenbroek, R; Kemperman, A and Sotthewes, M (2020) Knowledge workers' stated preferences for important characteristics of activity-based workspaces. Building Research & Information, 48(7), pp. 703-718. ISSN 0961-3218
van den Brom, P; Meijer, A and Visscher, H (2018) Performance gaps in energy consumption: Household groups and building characteristics. Building Research & Information, 46(1), pp. 54-70. ISSN 0961-3218
zu Ermgassen, S O S E (2022) Hard questions, concrete solutions: Mitigating the ecological impacts of the global infrastructure boom. PhD thesis, University of Kent, UK.
Çevikbaş, M; Okudan, O and Işlk, Z (2022) New delay-analysis method using modified schedule and modified updated schedule for construction projects. Journal of Construction Engineering and Management, 148(11): 04022119, ISSN 0733-9364
Özdemir, M (2015) A fuzzy structural equation model to analyze relationships between determinants of safety performance in construction sites: Development of a safety performance index assessment tool. PhD thesis, Middle East Technical University, Turkey.
Špačková, O (2012) Risk management of tunnel construction projects. PhD thesis, Czech Technical University, Czech Republic.
Up a level