Items with Descriptive Scope: 3 PTA
Abdul-Hadi, N H; Al-Sudairi, A and Alqahtani, S (2005) Prioritizing barriers to successful business process re-engineering (BPR) efforts in Saudi Arabian construction industry. Construction Management and Economics, 23(3), pp. 305-315. ISSN 01446193
Aghililotf, M; Ramezanianpour, A M; Arbabi, H and Maghrebi, M (2024) Identifying construction managers' challenges: A novel approach based on social network analysis. Journal of Construction Engineering and Management, 150(1): 04023141, ISSN 0733-9364
Aouad, R and Amara, I (2018) Influence of the cutting condition on the wear and the surface roughness in the steel aisi 4140 with mixed ceramic and diamond tool. Journal of Engineering, Design and Technology, 16(6), pp. 828-836. ISSN 1726-0531
Assaf, S; Hassanain, M A; Abdallah, A; Sayed, A M Z and Alshahrani, A (2019) Significant causes of claims and disputes in construction projects in Saudi Arabia. Built Environment Project and Asset Management, 9(5), pp. 597-615. ISSN 2044-124X
Atapattu, C N; Domingo, N and Sutrisna, M (2025) A bibliometric review of the statistical modelling techniques for cost estimation of infrastructure projects. Smart and Sustainable Built Environment, 14(5), pp. 1369-1388. ISSN 2046-6099
Bin Bandi, S (2014) Review on the fundamental usage of bills of quantities (BQ) by contracting organisations. Construction Economics and Building, 14(1), pp. 118-131. ISSN 2204-9029
Bröchner, J (2009) Construction metaphors in Aristotle: Knowledge, purpose, process. Construction Management and Economics, 27(5), pp. 515-523. ISSN 1466433X
Chachere, B P (1978) An investigation of some aspects of affirmative action programs in the construction industry. PhD thesis, University of California, Berkeley, USA.
Cheung, S O and Li, K (2019) Biases in construction project dispute resolution. Engineering, Construction and Architectural Management, 26(2), pp. 321-348. ISSN 0969-9988
Davidson, C (2013) Innovation in construction: before the curtain goes up. Construction Innovation, 13(4), pp. 344-351. ISSN 1471-4175
Davidson, C H (2009) The challenge of organizational design for manufactured construction. Construction Innovation, 9(1), pp. 42-57. ISSN 1471-4175
Emuze, F and Shakantu, W M (2012) Resolving the methodological conundrum: Bolstering the research Achilles' heel in South Africa. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Everett, J G and Farghal, S (1994) Learning curve predictors for construction field operations. Journal of Construction Engineering and Management, 120(3), pp. 603-616. ISSN 0733-9364
Fang, Y; Daniel, E I and Li, S (2021) Conceptual framework for lean construction ambidexterity in project-based organizations. Construction Management and Economics, 39(10), pp. 824-838. ISSN 01446193
Fernie, S and Tennant, S (2013) The non-adoption of supply chain management. Construction Management and Economics, 31(10), pp. 1038-1058. ISSN 1466433X
Grosse, H (2017) What’s the benefit: A personal story of a researching manager? In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Grosse, H (2019) Lévinas' ethics in practice: A construction contractor’s account. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Holder, L and Coffey, M (1997) Customer feedback and contractor appraisal in construction. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Holt, G D and Goulding, J S (2017) The "ological-triad": Considerations for construction management research. Journal of Engineering, Design and Technology, 15(3), pp. 286-304.
Hui, K J (2008) Court decisions on building contract disputes: a Coasian empirical analysis. PhD thesis, University of Hong Kong, Hong Kong.
Kan, F K and Khalid, A G (2022) The decision-making behaviour of public procurement officers: An interplay between procedural rationality and groupthink bias. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Le, A T H; Domingo, N; Macgregor, C and Potangaroa, R (2022) Conceptualising a framework for construction sector capacity. Construction Economics and Building, 22(4), pp. 17-35. ISSN 2204-9029
Lemna, G J; Borcherding, J D and Tucker, R L (1986) Productive foremen in industrial construction. Journal of Construction Engineering and Management, 112(2), pp. 192-210. ISSN 0733-9364
Livesey, P V and Bold, J (2013) Overcoming inadvertent barriers to entry in large infrastructure projects. Construction Economics and Building, 13(1), pp. 85-91. ISSN 2204-9029
Loganathan, M K and Gandhi, O P (2015) Reliability evaluation and analysis of CNC cam shaft grinding machine. Journal of Engineering, Design and Technology, 13(1), pp. 37-73.
Manu, E; Ankrah, N A; Chinyio, E and Proverbs, D G (2011) Control influence on trust and relational governance in the client-contractor dyad. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Munifi, A (2005) An analysis of construction demand in Saudi Arabia. PhD thesis, University College London, UK.
Ofori, G (1985) Managing construction industry development. Construction Management and Economics, 3(1), pp. 33-42. ISSN 01446193
Orczyk, J J (1989) Parametric construction scheduling. PhD thesis, Purdue University, USA.
Raoufi, M and Fayek, A R (2020) Fuzzy Monte Carlo agent-based simulation of construction crew performance. Journal of Construction Engineering and Management, 146(5): 04020041, ISSN 0733-9364
Root, D; Fellows, R F and Hancock, M (1997) Quantitative versus qualitative or positivism and interactionism: a reflection of ideology in the current methodological debate? Journal of Construction Procurement, 3(2), pp. 34-44. ISSN 1358-9180
Seymour, D E and Rooke, J D (1998) Construction management research and the attempt to build a social science. Journal of Construction Procurement, 4(1), pp. 59-73. ISSN 1358-9180
Snyder, J H (1975) Feasibility of a practitioner-generated word association test as a method of job analysis of professional-technical-managerial positions in the construction industry. PhD thesis, Purdue University, USA.
Sturk, R (1998) Engineering geological information: Its value and impact on tunnelling. DrTech thesis, Kungliga Tekniska Hogskolan, Sweden.
Sutrisna, M and Potts, K (2002) Analysing typical factors for the early prediction of variations. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Thompson, R M (2006) An investigation of change to key provisions in the AIA A201 and its impact on perceptions of the value-added benefit of the design professional during construction. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Tse, R Y C and Ganesan, S (1997) Causal relationship between construction flows and GDP: Evidence from Hong Kong. Construction Management and Economics, 15(4), pp. 371-376. ISSN 01446193
Yu, M K W and Ive, G (2011) Orders and output in UK construction statistics: New methodology and old problems. Construction Management and Economics, 29(7), pp. 653-658. ISSN 1466433X
Up a level