Items with Descriptive Scope: 3 PCE

Number of items: 1923.

Abadi, M; Moore, D R and Sammuneh, M A (2021) A framework of indicators to measure project circularity in construction circular economy. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(2), pp. 54-66. ISSN 17514304

Abbas, G. M.; Meral Akgül, Ç and Dino, I. G. (2025) Resilient cooling of the Mediterranean office spaces under climate change. Architectural Engineering and Design Management, 21(6), pp. 1165-1186. ISSN 1745-2007

Abbasi, M H (2024) Phasing out fossil fuel heating in UK homes: A multi-dimensional framework for sustainability assessment of alternatives and their lifecycle implications. PhD thesis, Liverpool John Moores University, UK.

Abbott, C and Allen, S (2004) Exploring how regional construction activity can be supported by community benefit initiatives. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Abd Al-Salam, Mona (2021) Exploring interdisciplinary collaboration in construction: Phases and patterns of interaction in detailed design meetings. PhD thesis, University of Technology Sydney, Australia.

AbdElMottaleb, Mohamed (2025) AI in project management: Machine learning application for construction scheduling. PhD thesis, University of Salford, UK.

Abdelhady, I A I (2013) A new business process model for enhancing BIM implementation in architectural design. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Abdelmohsen, A Z (2016) Optimizing the construction planning of highway work zones. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Abdollahipour, S; Jeong, D H S; Burman, R R and Gunsaulis, F (2012) Performance assessment of on-grade horizontal directional drilling. Journal of Construction Engineering and Management, 138(3), pp. 458-468. ISSN 0733-9364

Abdul-Aziz, A R (1991) Global strategies of construction firms. PhD thesis, University of Reading, UK.

Abdul-Aziz, A R (2001) Unraveling of BOT scheme: Malaysia's indah water konsortium. Journal of Construction Engineering and Management, 127(6), pp. 457-460. ISSN 0733-9364

Abdul-Aziz, A R and How, Y M (2012) To-be-reclaimed land swap for new highway: The Jelutong expressway case. International Journal of Construction Management, 12(4), pp. 1-16. ISSN 1562-3599

Abdul-Rahman, H (1995) The cost of non-conformance during a highway project: A case study. Construction Management and Economics, 13(1), pp. 23-32. ISSN 01446193

Abeid, J and Arditi, D (2003) Photo-net: An integrated system for controlling construction progress. Engineering, Construction and Architectural Management, 10(3), pp. 162-171. ISSN 0969-9988

Abejide, O S (1997) Solid soilcrete blocks for low-cost buildings: A Nigerian case study. Building Research & Information, 25(2), pp. 115-119. ISSN 0961-3218

Abiodun, O; Abadi, M; Ejohwomu, O and Manu, P (2024) Dimensions of maturity model for institutionalising smart circular construction: A systematic literature review. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Aboagye-Nimo, E; Painting, N and Piroozfar, P (2024) Picking up where we left off: A 'temporary' safety culture. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Aboagye-Nimo, E; Raidén, A B and King, A (2014) Understanding the role of local safety groups in managing safety practices between micro construction firms and principal contractors. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Abouhamad, M and Zayed, T (2019) Risk-based asset management framework for subway systems. Journal of Construction Engineering and Management, 145(11): 04019071, ISSN 0733-9364

Abraham, D M; Wirahadikusumah, R; Short, T J and Shahbahrami, S (1998) Optimization modeling for sewer network management. Journal of Construction Engineering and Management, 124(5), pp. 402-410. ISSN 0733-9364

Abrahams, G (2017) Revealing and exploring the insider/outsider role of the building control officer in England. Architectural Engineering and Design Management, 13(4), pp. 278-290. ISSN 1745-2007

Abu Aisheh, Y (2011) Climate change and the built environment: an evaluation of sustainable refurbishment options for higher education buildings in the UK. PhD thesis, University of Birmingham, UK.

Abu Seif, Majed D (2023) Trees on buildings: Investigating opportunities and challenges for implementation. PhD thesis, Griffith University, Australia.

Abudayyeh, O Y (1991) An automated data acquisition and data storage model for improving cost and schedule control. PhD thesis, North Carolina State University, USA.

Abukhder, J and Munns, A K (2003) Attributing management problems on construction projects to project information. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Adami, V S; Verschoore, J R and Antunes, J A V (2019) Effect of relational characteristics on management of wind farm interorganizational construction projects. Journal of Construction Engineering and Management, 145(3): 05018019, ISSN 0733-9364

Addyman, S (2019) The timing of patterning or the patterning of timing?: organisational routines in temporary organisations. PhD thesis, University College London, UK.

Ade, R and Rehm, M (2021) Summertime comparative evaluation of indoor temperature and comfort in auckland New Zealand: A survey of green certified, code and older homes. Building Research & Information, 49(3), pp. 336-351. ISSN 0961-3218

Adekunle, T O (2020) Occupants' comfort and stress indices in a structural timber school building in the Northeast US in different seasons. Building Research & Information, 48(3), pp. 331-348. ISSN 0961-3218

Adel Ahmadian, A (2020) Computational design for cooperative robotic assembly of nonstandard timber frame buildings. DSc thesis, ETH Zürich, Switzerland.

Adeyeye, O (2009) Design decisions for hybrid projects using integrated building information. PhD thesis, Loughborough University, UK.

Adeyinka Shittu, T (2012) Development of a framework for sustainable repair of adobe building in an urban area in Nigeria. PhD thesis, University of Plymouth, UK.

Adinyira, E; Agyekum, K; Baiden, B K; Ebohon, O J and Ampratwum, G (2020) Regeneration of Sub-Saharan africa's open market places: A case for guileless stakeholder participation. Construction Economics and Building, 20(2), pp. 165-180. ISSN 2204-9029

Adjidjonu, D and Burgett, J (2021) Assessing the accuracy of unmanned aerial vehicles photogrammetric survey. International Journal of Construction Education and Research, 17(1), pp. 85-96. ISSN 1557-8771

Afolabi, A; Yusuf, A and Akanmu, A (2025) Effect of a passive shoulder-support exoskeleton on muscle activity, range of motion, discomfort, and exertion during painting tasks. Journal of Construction Engineering and Management, 151(5): 04025027, ISSN 0733-9364

Agapiou, A (2013) UK construction participants' experiences of adjudication. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(3), pp. 137-144. ISSN 17514312

Agapiou, A (2020) Factors influencing the selection of a procurement route for UK off-site housebuilding. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(1), pp. 3-15. ISSN 17514304

Aggiag, M A A (2005) The impact of client attributes on project success: a study of UK public construction projects. PhD thesis, Northumbria University, UK.

Aghajamali, K; Nekouvaght Tak, A; Taghaddos, H; Mousaei, A; Behzadipour, S and Hermann, U (2023) Planning of mobile crane walking operations in congested industrial construction sites. Journal of Construction Engineering and Management, 149(7): 04023047, ISSN 0733-9364

Aguilar-Carrasco, M T; Álvarez-López, A I; Bustamante, P; Álvarez Ríos, A I and Domínguez-Amarillo, S (2025) The impact of light adjustment versus tuneable white mode on ICU staff's circadian rhythms. Building Research & Information, 53(1-2), pp. 120-138. ISSN 0961-3218

Ahiaga-Dagbui, D D (2014) Rethinking construction cost overruns: an artificial neural network approach to construction cost estimation. PhD thesis, University of Edinburgh, UK.

Ahiaga-Dagbui, D D; Love, P E D; Whyte, A and Boateng, P (2017) Costing and technological challenges of offshore oil and gas decommissioning in the UK North Sea. Journal of Construction Engineering and Management, 143(7): 05017008, ISSN 0733-9364

Ahmad, A G and Rahman, H F A (2010) Treatment of salt attack and rising damp in heritage buildings in Penang, Malaysia. Journal of Construction in Developing Countries, 15(1), pp. 93-113. ISSN 1823-6499

Ahmad, T; Aibinu, A A and Stephan, A (2017) Green building projects: Process innovation leading to project innovation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Ahmed, M U (2000) ‘Champions of collaboration’ in collaborative technological innovation. PhD thesis, Simon Fraser University, Canada.

Ahn, C R; Lee, S; Sun, C; Jebelli, H; Yang, K and Choi, B (2019) Wearable sensing technology applications in construction safety and health. Journal of Construction Engineering and Management, 145(11): 03119007, ISSN 0733-9364

Ahn, Y H; Pearce, A R and Holley, P W (2009) Project delivery system for foreign manufacturers in the United States. International Journal of Construction Education and Research, 5(3), pp. 149-166. ISSN 1557-8771

Ahuja, S; Nikolova, N and Clegg, S (2020) Professional identity and anxiety in architect-client interactions. Construction Management and Economics, 38(7), pp. 589-602. ISSN 01446193

Aibinu, A and Papadonikolaki, E (2016) BIM implementation and project coordination in design-build procurement. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Aibinu, A A and Papadonikolaki, E (2020) Conceptualizing and operationalizing team task interdependences: BIM implementation assessment using effort distribution analytics. Construction Management and Economics, 38(5), pp. 420-446. ISSN 01446193

Akinci, B; Kiziltas, S; Ergen, E; Karaesmen, I Z and Keceli, F (2006) Modeling and analyzing the impact of technology on data capture and transfer processes at construction sites: A case study. Journal of Construction Engineering and Management, 132(11), pp. 1148-1157. ISSN 0733-9364

Akintoye, A; Beck, M; Hardcastle, C; Chinyio, E A and Asenova, D (2001) The financial structure of private finance initiative projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Al Surf, Mohammed Saied (2014) Challenges facing the application of sustainability to housing in Saudi Arabia. PhD thesis, Queensland University of Technology, Australia.

Al Zarooni, S; Abdou, A and Lewis, J (2011) Improving the client briefing for UAE public healthcare projects: Space programming guidelines. Architectural Engineering and Design Management, 7(4), pp. 251-265. ISSN 1745-2007

Al-Balushi, R A; Kaka, A and Fortune, C (2004) Project management processes and the achievement of organizational strategies: The case of telecomm. Operator. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Al-Dahash, H F K; Mohammed, R K; Al-Rubaye, M and Hardman, M (2024) Comprehensive evaluation of the foreign direct investment (fdi) opportunities in Iraq: The karbala cement manufacturing company as a case study. International Journal of Construction Management, 24(6), pp. 573-585. ISSN 1562-3599

Al-Haddad, S (2020) State transportation agencies: A quantitative study on the use of construction engineering and inspection consultants and their impact on project performance. PhD thesis, University of Colorado at Boulder, USA.

Al-Homoud, M S; Abdou, A A and Khan, M M (2004) Safety design practices in residential buildings in Saudi Arabia. Building Research & Information, 32(6), pp. 538-543. ISSN 0961-3218

Al-Homoud, M S and Khan, M M (2004) Assessing safety measures in residential buildings in Saudi Arabia. Building Research & Information, 32(4), pp. 300-305. ISSN 0961-3218

Al-Husseini, A-M (2006) The impact of transformational leadership and empowerment on project management. DM thesis, University of Phoenix, USA.

Al-Khalil, M I and Al-Ghafly, M A (1999) Important causes of delay in public utility projects in Saudi Arabia. Construction Management and Economics, 17(5), pp. 647-655. ISSN 01446193

Al-Meshekeh, H S S (1991) The relationship between conflict management style and construction project effectiveness. PhD thesis, University of Strathclyde, UK.

Al-Obaidi, T S A (2018) A transformational organisational framework for improving Iraqi quasi-governmental construction companies' performance. PhD thesis, University of Salford, UK.

Al-Rasheed, K A (1997) Construction schedule logic development: The impact of visualization. PhD thesis, University of Colorado at Boulder, USA.

Al-Rqaibat, Sana'A Mohammad (2019) A framework for the implementation of digital technologies in the concept stage of the architectural design process. PhD thesis, Virginia Tech, USA.

Al-Saadi, R and Abdou, A (2016) Factors critical for the success of public‒private partnerships in UAE infrastructure projects: Experts' perception. International Journal of Construction Management, 16(3), pp. 234-248. ISSN 1562-3599

Al-Sharif, F and Kaka, A (2005) Private finance intiative project's financial modelling. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

AlHamouri, K; Caldas, C H; Hwang, B G; Krishnankutty, P and de Oliveira, D P (2021) Utilization of workface planning for the execution of maintenance activities, shutdowns and turnarounds in petrochemical facilities: A case study. International Journal of Construction Management, 21(11), pp. 1115-1129. ISSN 1562-3599

Alam, M K and Hasan, M D R (2010) Protection works against wave attacks in the haor areas of Bangladesh: Analysis of sustainability. Journal of Construction in Developing Countries, 15(2), pp. 69-85. ISSN 1823-6499

Alani, A M; Petersen, A K; Chapman, K G and Khosrowshahi, F (2004) A proposed quantitative model for building repair and maintenance: Theory, model development and application. Journal of Construction Research, 5(2), pp. 193-210. ISSN 1609-9451

Alarcón, L F; Rodríguez, A and Mourgues, C (2012) Impact of machine-failure costs on equipment replacement policies: Tunneling company case study. Journal of Construction Engineering and Management, 138(6), pp. 767-774. ISSN 0733-9364

Alashwal, A M and Ann, T S (2021) Application of home-country joint venture (HJV) for international construction contractors. International Journal of Construction Management, 21(12), pp. 1278-1286. ISSN 1562-3599

Albert, A; Hallowell, M R; Kleiner, B; Chen, A and Golparvar-Fard, M (2014) Enhancing construction hazard recognition with high-fidelity augmented virtuality. Journal of Construction Engineering and Management, 140(7): 04014024, ISSN 0733-9364

Albouwarthan, M A (2020) Prolonged heat exposure and health outcomes among construction workers in Saudi Arabia. DSc thesis, University of Massachusetts Lowell, USA.

Alderman, N and Ivory, C (2010) Service-led projects: Understanding the meta-project context. Construction Management and Economics, 28(11), pp. 1131-1143. ISSN 1466433X

Aldossari, K M; Lines, B C; Smithwick, J B; Hurtado, K C and Sullivan, K T (2023) Employee reactions to adoption of alternative project delivery methods within the AEC industry. International Journal of Construction Education and Research, 19(1), pp. 4-21. ISSN 1557-8771

Aldossari, K M; Lines, B C; Smithwick, J B; Hurtado, K C and Sullivan, K T (2023) Alternative project delivery method adoption in the AEC industry: An organizational change perspective. International Journal of Construction Education and Research, 19(2), pp. 150-165. ISSN 1557-8771

Alfieri, E; Seghezzi, E; Sauchelli, M; Di Giuda, G M and Masera, G (2020) A BIM-based approach for DfMA in building construction: Framework and first results on an Italian case study. Architectural Engineering and Design Management, 16(4), pp. 247-269. ISSN 1745-2007

Alkass, S; Tribaldos, E; Mazerolle, M and Harris, F (1995) Computer aided construction delay analysis and claims preparation. Construction Management and Economics, 13(4), pp. 335-352. ISSN 01446193

Allam, S I G (1988) Multi-project scheduling: A new categorization for heuristic scheduling rules in construction scheduling problems. Construction Management and Economics, 6(2), pp. 93-115. ISSN 01446193

Allouche, E N; Ariaratnam, S T and MacLeod, C W (2003) Software for planning and cost control in directional drilling projects. Journal of Construction Engineering and Management, 129(4), pp. 446-453. ISSN 0733-9364

Allport, R J (2008) Improving decision-making for major urban rail projects. PhD thesis, Imperial College London, UK.

Allport, R J (2011) Improving decision-making for major urban rail projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(2), pp. 61-70. ISSN 17514312

Alnaseem, N (2022) Private equity infrastructure investment in emerging economies. PhD thesis, Ulster University, UK.

Alotaibi, M; El-Rayes, K and Altuwaim, A (2021) Optimizing the renovation scheduling of leased residential buildings to minimize total project cost. Journal of Construction Engineering and Management, 147(7): 2063, ISSN 0733-9364

Alothman, A and Vilventhan, A (2025) Development of building information model-enabled facility management for metro rail stations. Journal of Construction Engineering and Management, 151(3): 05024018, ISSN 0733-9364

Alqahtani, F K; Alkhaldi, M; Alsaqer, T; Abotaleb, I S; Mohamed, A G and Dirar, S (2022) A comparative assessment of advanced construction systems incorporating green concrete. Journal of Construction Engineering and Management, 148(9): 04022083, ISSN 0733-9364

Alsdorf, M; Koch, C and Sander, D (2006) Coaching at the building site: A feasibility study. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Alsharqawi, M; Abu Dabous, S; Zayed, T and Hamdan, S (2021) Budget optimization of concrete bridge decks under performance-based contract settings. Journal of Construction Engineering and Management, 147(6): 04021040, ISSN 0733-9364

Altaf, A (2022) Integrating safety, security and human factors engineering in rail infrastructure design and evaluation. PhD thesis, Bournemouth University, UK.

Altay, B and Salcı, E (2024) Exploring designers' finishing materials selection for residential interior spaces. Architectural Engineering and Design Management, 20(2), pp. 269-286. ISSN 1745-2007

Altomonte, S; Schiavon, S; Kent, M G and Brager, G (2019) Indoor environmental quality and occupant satisfaction in green-certified buildings. Building Research & Information, 47(3), pp. 255-274. ISSN 0961-3218

Altuwaijri, H A (2014) A study of the relationship between the use of GIS and project success in selected construction organizations. PhD thesis, Eastern Michigan University, USA.

Alvanchi, A; Bajalan, Z and Iravani, P (2021) Emission assessment of alternative dam structure types, a novel approach to consider in new dam projects. Construction Innovation, 21(2), pp. 203-217. ISSN 1471-4175

Aminbakhsh, A and Sonmez, R (2015) Pareto oriented optimization of discrete time-cost trade-off problem using particle swarm optimization. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Aminian, S; Hinckson, E A and Stewart, T (2015) Modifying the classroom environment to increase standing and reduce sitting. Building Research & Information, 43(5), pp. 631-645. ISSN 0961-3218

Aminorlah, A I; Rahim, N A; Mohamed, Z and Mazlan, A N (2023) Critical delay factors in typical physical projects: The case of the ministry of home affairs in Malaysia. Journal of Construction in Developing Countries, 28(2), pp. 57-79. ISSN 1823-6499

Ammar, M (2016) Aerial construction: Robotic fabrication of tensile structures with flying machines. DSc thesis, ETH Zürich, Switzerland.

Ammar, M A (2022) Optimization of line of balance scheduling considering work interruption. International Journal of Construction Management, 22(2), pp. 305-316. ISSN 1562-3599

Amorim, Adriana Eloa Bento (2020) Construction workers remote estimate of the wbgt index in outdoor activities on concrete slabs. PhD thesis, Universidade Estadual de Campinas, Brazil.

Amorim, Aldo Siervo de (2016) Critical analysis of the economic and environmental feasibility of the civil construction waste recycling process at the municipal level. PhD thesis, Universidade de São Paulo, Brazil.

An, J; Luo, Q; Wang, Z; Pan, S; Qin, H and Yan, D (2026) An integrated resilience-based failure risk assessment method of highway tunnel operation and maintenance systems for fire accidents. Journal of Construction Engineering and Management, 152(4): 04026013, ISSN 0733-9364

An, T and Watanabe, T (2011) Towards the sustainable improvement in construction labour's employment in China: Cultivating subcontractor's role. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Anderson, S; Shane, J S and Schexnayder, C (2011) Strategies for planned project acceleration. Journal of Construction Engineering and Management, 137(5), pp. 372-381. ISSN 0733-9364

Andreu, I C and Oreszczyn, T (2004) Architects need environmental feedback. Building Research & Information, 32(4), pp. 313-328. ISSN 0961-3218

Anspach, J A; Sharma, V and Madathil, K C (2024) Hospital design planning: unscheduled trauma ER visits impacting inpatient space allocation. Building Research & Information, 52(7), pp. 836-850. ISSN 0961-3218

Antillon, E I (2016) An exploration of the influence of public-private-partnerships on the life cycle design decision-making process of highway projects. PhD thesis, University of Colorado at Boulder, USA.

Aouad, G F and Barrett, P S (1998) The feasibility of using hybrid concrete structures within the context of cost and time. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Arditi, D (1985) Construction productivity improvement. Journal of Construction Engineering and Management, 111(1), pp. 1-14. ISSN 0733-9364

Arditi, D and Lee, D E (2003) Assessing the corporate service quality performance of design-build contractors using quality function deployment. Construction Management and Economics, 21(2), pp. 175-185. ISSN 01446193

Arditi, D and Yasamis, F (1998) Incentive/disincentive contracts: Perceptions of owners and contractors. Journal of Construction Engineering and Management, 124(5), pp. 361-373. ISSN 0733-9364

Ardron, T G and Allwood, J M (2025) Exploring time and cost optimization in energy retrofit programmes of traditionally constructed, owner-occupied UK dwellings. Building Research & Information, 53(3), pp. 397-415. ISSN 0961-3218

Ariaratnam, S T; Lueke, J S and Allouche, E N (1999) Utilization of trenchless construction methods by Canadian municipalities. Journal of Construction Engineering and Management, 125(2), pp. 76-86. ISSN 0733-9364

Aritua, B; Bower, D and Turner, M (2008) Managing the delivery of iconic football stadiums in England. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(2), pp. 55-60. ISSN 17514312

Aritua, B; Male, S and Bower, D (2009) Defining the intelligent public sector construction client. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(2), pp. 75-82. ISSN 17514312

Arja, M; Sauce, G and Souyri, B (2009) External uncertainty factors and LCC: A case study. Building Research & Information, 37(3), pp. 325-334. ISSN 0961-3218

Arnold, P and Javernick-Will, A (2013) Projectwide access: Key to effective implementation of construction project management software systems. Journal of Construction Engineering and Management, 139(5), pp. 510-518. ISSN 0733-9364

Arroyo, P; Tommelein, I D and Ballard, G (2016) Selecting globally sustainable materials: A case study using choosing by advantages. Journal of Construction Engineering and Management, 142(2): 05015015, ISSN 0733-9364

Arslan, M A O; Thiruchelvam, S and Hayder, G (2024) Measuring the availability of the requirements of the quality management system (ISO 9001:2015) clause leadership, performance, and planning: A case study. International Journal of Construction Management, 24(8), pp. 867-874. ISSN 1562-3599

Ascione, F; Bellia, L; Mazzei, P and Minichiello, F (2010) Solar gain and building envelope: The surface factor. Building Research & Information, 38(2), pp. 187-205. ISSN 0961-3218

Assaf, S (1987) Feasibility assessment of large-scale housing development in Saudi Arabia: A case study. Construction Management and Economics, 5(2), pp. 157-168. ISSN 01446193

Assaf, S; Al Musallami, A I and Al Sughaiyer, M (1996) Value engineering in public construction projects in Saudi Arabia. Building Research & Information, 24(3), pp. 152-159. ISSN 0961-3218

Assaf, S A and Barhamain, S Y (1996) Factors affecting construction practices in Makkah Al-Mukkaramah, Saudi Arabia. Building Research & Information, 24(1), pp. 27-30. ISSN 0961-3218

Ateloye, A; Bowles, G and Oyegoke, A (2016) Private sector participation in Nigeria higher education infrastructure development. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Atkin, B L (1988) Time-cost planning of construction. PhD thesis, University of Reading, UK.

Atkinson, A R (2002) The pathology of building defects; a human error approach. Engineering, Construction and Architectural Management, 9(1), pp. 53-61. ISSN 0969-9988

Atwal, P; Morton, P and Watts, N (2007) Mentoring in built environment higher education courses. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Awang, H and Wan Badaruzzaman, W H (2009) The bending behaviour of a 'reversed' profiled steel sheet dry board panel for application in a roofing system. Journal of Construction in Developing Countries, 14(2), pp. 21-35. ISSN 1823-6499

Awolusi, I G and Marks, E D (2017) Safety activity analysis framework to evaluate safety performance in construction. Journal of Construction Engineering and Management, 143(3): 05016022, ISSN 0733-9364

Ayoubi, M. and Arashpour, M. (2026) Early recognition of workplace hazards using data-efficient multimodal learnable prompting and parameter-efficient fine tuning. Journal of Construction Engineering and Management, 152(10): 04026165, ISSN 0733-9364

Ayoubi, M. and Arashpour, M. (2026) Early recognition of workplace hazards using data-efficient multimodal learnable prompting and parameter-efficient fine tuning. Journal of Construction Engineering and Management, 152(10): 04026165, ISSN 0733-9364

Azhar, S; Khalfan, M and Maqsood, T (2012) Building information modeling (BIM): Now and beyond. Construction Economics and Building, 12(4), pp. 15-28. ISSN 2204-9029

Azzouz, A (2018) Current perspectives and future directions of BIM assessment methods. PhD thesis, University of Bath, UK.

Azzouz, A and Abdelal, A (2019) Young Syrian architects at the time of crises. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Babar, S; Thaheem, M J and Ayub, B (2017) Estimated cost at completion: Integrating risk into earned value management. Journal of Construction Engineering and Management, 143(3): 04016104, ISSN 0733-9364

Back, W E; Grau, D and Mejia-Aguilar, G (2013) Effectiveness evaluation of contract incentives on project performance. International Journal of Construction Education and Research, 9(4), pp. 288-306. ISSN 1557-8771

Bademosi, F and Issa, R R A (2021) Factors influencing adoption and integration of construction robotics and automation technology in the US. Journal of Construction Engineering and Management, 147(8): 04021075, ISSN 0733-9364

Badenfelt, U (2007) Trust and control in the early phases of target cost contracts. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Badenfelt, U (2010) I trust you, I trust you not: A longitudinal study of control mechanisms in incentive contracts. Construction Management and Economics, 28(3), pp. 301-310. ISSN 1466433X

Badi, S (2017) Public sustainable-energy requirements and innovation in UK PFI school projects. Construction Management and Economics, 35(4), pp. 218-238. ISSN 01446193

Baharuddin, H E A; Ibrahim, C K I C; Costello, S B and Wilkinson, S (2017) Managing stakeholders through alliances: A case study of a megaproject in New Zealand. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(4), pp. 151-160. ISSN 17514304

Baharun, A; Imran, M S; Ibrahim, S H and Abidin, W A W Z (2018) Night cooled radiant cooling panel for sustainable building cooling mode in Malaysia. Journal of Construction in Developing Countries, 23(1), pp. 61-79. ISSN 1823-6499

Bahnariu, B; Kifokeris, D; Aqel, S and Koch, C (2022) Little big transitions: Electrical construction machines on small sites. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Bai, Y; Burkett, W R and Nash, P T (2006) Lessons learned from an emergency bridge replacement project. Journal of Construction Engineering and Management, 132(4), pp. 338-344. ISSN 0733-9364

Baker, H; Moncaster, A; Wilkinson, S and Remøy, H (2023) Demolition or retention of buildings: Drivers at the masterplan scale. Buildings & Cities, 4(1), pp. 488-506. ISSN 2632-6655

Baldursdottir, N and Ottosson, E (2012) Managing change through participation: Developing shared construction guidelines in 26 public organisations. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Ballard, G (2002) Managing work flow on design projects: A case study. Engineering, Construction and Architectural Management, 9(3), pp. 284-291. ISSN 0969-9988

Ballesteros-Pérez, P; Smith, S T; Lloyd-Papworth, J G and Cooke, P (2018) Incorporating the effect of weather in construction scheduling and management with sine wave curves: Application in the United Kingdom. Construction Management and Economics, 36(12), pp. 666-682. ISSN 01446193

Banerjee, S (2022) Developing an organization-wide knowledge repository with intelligent knowledge transference to enhance construction project outcomes. PhD thesis, North Carolina State University, USA.

Banks, C; Kotecha, R; Curtis, J; Dee, C; Pitt, N and Papworth, R (2018) Enhancing high-rise residential construction through design for manufacture and assembly: A UK case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 164-174. ISSN 17514304

Bansal, V K (2020) Use of GIS to consider spatial aspects in construction planning process. International Journal of Construction Management, 20(3), pp. 207-222. ISSN 1562-3599

Barati, M K and Bankaru-Swamy, S (2026) A living lab approach to co-designing climate adaptation strategies. Buildings & Cities, 7(1), pp. 39-57. ISSN 2632-6655

Barati, K; Shen, X; Li, N and Carmichael, D G (2022) Automatic mass estimation of construction vehicles by modeling operational and engine data. Journal of Construction Engineering and Management, 148(3): 4021208, ISSN 0733-9364

Barbosa, J A; Araújo, C; Mateus, R and Bragança, L (2016) Smart interior design of buildings and its relationship to land use. Architectural Engineering and Design Management, 12(2), pp. 97-106. ISSN 1745-2007

Barlow, J; Childerhouse, P; Gann, D; Hong-Minh, S; Naim, M and Ozaki, R (2003) Choice and delivery in housebuilding: Lessons from Japan for UK housebuilders. Building Research & Information, 31(2), pp. 134-145. ISSN 0961-3218

Barlow, P L and Leed, A P (2011) Development and delivery of an integrated project-based jobsite management undergraduate course. International Journal of Construction Education and Research, 7(1), pp. 3-21. ISSN 1557-8771

Barnes, Andrew Floyd (2021) Instructional video object-based learning in a flipped construction management classroom. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Baroudi, B M and Metcalfe, M (2011) A human perspective of contractor prequalification. Construction Economics and Building, 11(2), pp. 60-70. ISSN 2204-9029

Bartlett, E and Howard, N (2000) Informing the decision makers on the cost and value of green building. Building Research & Information, 28(5-6), pp. 315-324. ISSN 0961-3218

Bastem, S S and Cekmis, A (2022) Development of historic building information modelling: A systematic literature review. Building Research & Information, 50(5), pp. 527-558. ISSN 0961-3218

Basyouni, Y. A.; Shokry, H.; Murata, R. and Mahmoud, H. (2026) Novel development of affordable composite eco-cool roof tiles from waste materials: An experimental study. Architectural Engineering and Design Management, 22(3), pp. 900-925. ISSN 1745-2007

Battikha, M (2000) A computer-based system for construction quality management with application to highway pavements. PhD thesis, University of British Columbia, Canada.

Bauer, E and Menches, C L (2011) Why we need renaissance engineers: Golden Gate bridge seismic retrofit Phase II case study. Journal of Construction Engineering and Management, 137(10), pp. 901-905. ISSN 0733-9364

Baxendale, A T (1992) Construction management information systems for production control. PhD thesis, Bristol Polytechnic, UK.

Bayrak, T (2008) Semi automatic construction progress measurement using a combination of CAD modelling, photogrammetry and construction knowledge. PhD thesis, Heriot-Watt University, UK.

Bayraktar, M E; Cui, Q; Hastak, M and Minkarah, I (2006) Warranty bonds from the perspective of surety companies. Journal of Construction Engineering and Management, 132(4), pp. 333-337. ISSN 0733-9364

Bazen, E (2014) Effect of the Building Act 2011 on compliance costs in Western Australia. Construction Economics and Building, 14(2), pp. 41-56. ISSN 2204-9029

Becerik, B (2004) Suggestions for improving adoption of online collaboration and project management technology. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Beim, A and Jensen, K V (2007) Forming core elements for strategic design management: How to define and direct architectural value in an industrialized context. Architectural Engineering and Design Management, 3(1), pp. 29-38. ISSN 1745-2007

Beitelmal, J A (1999) Development of appropriate technology road condition monitoring system: Case study of the city of Benghazi in Libya. PhD thesis, University of Newcastle upon Tyne, UK.

Belhadj, T A (1989) Computer aided architectural evaluation and design: a cost modelling experiment. PhD thesis, University of Sheffield, UK.

Beliveau, Y J; Snyder, D A and Vorster, M C (1991) Dbe programs-new model. Journal of Construction Engineering and Management, 117(1), pp. 176-192. ISSN 0733-9364

Bello, M A (2012) Minimizing impediments to design for construction safety (DFCS) implementation on capital projects. PhD thesis, Carnegie Mellon University, USA.

Belpoliti, V; Said, Z; Hachicha, A A and Altan, H (2024) Simulated and monitored electrical energy balance in a solar house in Dubai, UAE. Architectural Engineering and Design Management, 20(5), pp. 1100-1117. ISSN 1745-2007

Benjaoran, V; Sooksil, N and Metham, M (2019) Effect of demand variations on steel bars cutting loss. International Journal of Construction Management, 19(2), pp. 137-148. ISSN 1562-3599

Bennett, W J (2005) Experiences of women in the nontraditional skilled construction trades. PhD thesis, Walden University, USA.

Berawi, M A; Kim, A A; Naomi, F; Basten, V; Miraj, P; Medal, L A and Sari, M (2023) Designing a smart integrated workspace to improve building energy efficiency: An Indonesian case study. International Journal of Construction Management, 23(3), pp. 410-422. ISSN 1562-3599

Berente, N; Baxter, R and Lyytinen, K (2010) Dynamics of inter-organizational knowledge creation and information technology use across object worlds: The case of an innovative construction project. Construction Management and Economics, 28(6), pp. 569-588. ISSN 1466433X

Berg, R and Hinze, J (2005) Theft and vandalism on construction sites. Journal of Construction Engineering and Management, 131(7), pp. 826-833. ISSN 0733-9364

Berker, T and Bharathi, K (2012) Energy and buildings research: Challenges from the new production of knowledge. Building Research & Information, 40(4), pp. 473-480. ISSN 0961-3218

Bernold, L E (2002) Spatial integration in construction. Journal of Construction Engineering and Management, 128(5), pp. 400-408. ISSN 0733-9364

Bernold, L E (2005) Automatic as-built generation with utility trenchers. Journal of Construction Engineering and Management, 131(6), pp. 740-747. ISSN 0733-9364

Bernold, L E (2007) Quantitative assessment of backhoe operator skill. Journal of Construction Engineering and Management, 133(11), pp. 889-899. ISSN 0733-9364

Bernold, L E (2007) Teaching evaluations for construction engineering and management: Opportunity to move us forward. Journal of Construction Engineering and Management, 133(2), pp. 146-156. ISSN 0733-9364

Besiktepe, D (2021) Multi-criteria decision-making approach for building maintenance in facility management. PhD thesis, Colorado State University, USA.

Betts, M and Liow, S R (1993) The relationship between teaching methods and educational objectives in building education. Construction Management and Economics, 11(2), pp. 131-141. ISSN 01446193

Bevan, W J (2020) How to improve the student feedback process: A case study within the built environment. International Journal of Construction Education and Research, 16(2), pp. 117-131. ISSN 1557-8771

Bevan W, L S (2013) Green marketing in housing: Reality or rhetoric? In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Bhattacharya, K.; Sarkar, D. and Solanki, A. (2026) Evaluation of road safety factors in Indian urban cities using CFPR and fuzzy DEMATEL. International Journal of Construction Management, 26(10), pp. 2058-2084. ISSN 1562-3599

Bhih, M and Hegazy, T (2023) Multiple-window modified but-for analysis of project delays and accelerations. International Journal of Construction Management, 23(4), pp. 686-696. ISSN 1562-3599

Bhorkar, S; Glew, D and Fletcher, M (2026) Improving survey-based data collection for more effective domestic retrofit evaluations: Perspectives from occupants and surveyors. Building Research & Information, 54(3), pp. 273-288. ISSN 0961-3218

Bijleveld, F R; Miller, S R and Dorée, A G (2015) Making operational strategies of asphalt teams explicit to reduce process variability. Journal of Construction Engineering and Management, 141(5): 04015002, ISSN 0733-9364

Bijleveld, Frank (2015) Professionalising the asphalt construction process: Aligning information technologies, operators' knowledge and laboratory practices. PhD thesis, University of Twente, Netherlands.

Bildsten, L and Manley, K (2015) A framework for understanding purchasing in building construction companies. Construction Management and Economics, 33(11-12), pp. 865-879. ISSN 01446193

Bingham, E (2014) Analysis of the state of practice and best practices for alternative project delivery methods in the transportation design and construction industry. PhD thesis, Arizona State University, USA.

Bingol, B N; Arditi, D and Polat, G (2024) A performance-based subcontractor selection model. Journal of Construction Engineering and Management, 150(8): 04024079, ISSN 0733-9364

Birgonul, M T and Ozdogan, I D (2000) Competitiveness of Turkish contractors in international markets. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Birgonul, Z (2021) A receptive-responsive tool for customizing occupant's thermal comfort and maximizing energy efficiency by blending BIM data with real-time information. Smart and Sustainable Built Environment, 10(3), pp. 504-535. ISSN 2046-6099

Bittner, R B and Schmitt, R L (2011) Construction engineering process and knowledge requirements for fostering creative design solutions on infrastructure projects. Journal of Construction Engineering and Management, 137(10): 0000303, ISSN 0733-9364

Blackmon, R B and Gramopadhye, A K (1995) Improving construction safety by providing positive feedback on backup alarms. Journal of Construction Engineering and Management, 121(2), pp. 166-171. ISSN 0733-9364

Blacud, N A; Bogus, S M; Diekmann, J E and Molenaar, K R (2009) Sensitivity of construction activities under design uncertainty. Journal of Construction Engineering and Management, 135(3), pp. 199-206. ISSN 0733-9364

Blakey, L H (1990) Bar codes: Prescription for precision, performance, and productivity. Journal of Construction Engineering and Management, 116(3), pp. 468-479. ISSN 0733-9364

Blismas, N; Gibb, A and Pasquire, C (2005) Assessing project suitability for off-site production. Construction Economics and Building, 5(1), pp. 9-15. ISSN 2204-9029

Blismas, N G; Sher, W and Thorpe, A (1999) The nature and characteristics of multi-site construction projects and programmes. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Boba, R and Santos, L R (2007) Single-family home construction site theft: A crime prevention case study. International Journal of Construction Education and Research, 3(3), pp. 217-236. ISSN 1557-8771

Boes, H and Holmen, E (2003) Changing supplier-customer interfaces in design-construct contracts? In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Bogus, S M; Molenaar, K R and Diekmann, J E (2006) Strategies for overlapping dependent design activities. Construction Management and Economics, 24(8), pp. 829-837. ISSN 1466433X

Bohn, J S and Teizer, J (2010) Benefits and barriers of construction project monitoring using high-resolution automated cameras. Journal of Construction Engineering and Management, 136(6), pp. 632-640. ISSN 0733-9364

Bonham, M B (2013) Leading by example: New professionalism and the government client. Building Research & Information, 41(1), pp. 77-94. ISSN 0961-3218

Bordass, B; Cohen, R; Standeven, M and Leaman, A (2001) Assessing building performance in use 3: Energy performance of the Probe buildings. Building Research & Information, 29(2), pp. 114-128. ISSN 0961-3218

Bordass, B; Cohen, R; Standeven, M and Leaman, A (2001) Assessing building performance in use 2: Technical performance of the Probe buildings. Building Research & Information, 29(2), pp. 103-113. ISSN 0961-3218

Bordass, B and Leaman, A (2005) Making feedback and post-occupancy evaluation routine 1: A portfolio of feedback techniques. Building Research & Information, 33(4), pp. 347-352. ISSN 0961-3218

Bordass, B and Leaman, A (2005) Making feedback and post-occupancy evaluation routine 3: Case studies of the use of techniques in the feedback portfolio. Building Research & Information, 33(4), pp. 361-375. ISSN 0961-3218

Bordass, B; Leaman, A and Ruyssevelt, P (2001) Assessing building performance in use 5: Conclusions and implications. Building Research & Information, 29(2), pp. 144-157. ISSN 0961-3218

Bordass, W and Leaman, A (1997) Future buildings and their services: Strategic considerations for designers and clients. Building Research & Information, 25(4), pp. 190-195. ISSN 0961-3218

Borges, D B; Soares, C A P; Najjar, M; Costa, B B F D; Tam, V W Y and Haddad, A N (2025) Project success and critical success factors of construction projects from the perspective of a multicultural team: A case study in Guyana. International Journal of Construction Management, 25(10), pp. 1115-1129. ISSN 1562-3599

Bos-de Vos, M; Lieftink, B; Volker, L and Wamelink, H (2014) International collaboration and partnering in the supply chain as business opportunities for architectural firms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Bos-de Vos, M; Volker, L and Wamelink, H (2016) Real estate development by architectural firms: Is the business model future-proof? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Bos-de Vos, M; Wamelink, J W F H and Volker, L (2016) Trade-offs in the value capture of architectural firms: The significance of professional value. Construction Management and Economics, 34(1), pp. 21-34. ISSN 01446193

Bosch-Rekveldt, M G C (2011) Managing project complexity: A study into adapting early project phases to improve project performance in large engineering projects. PhD thesis, Delft University of Technology, Netherlands.

Bosche, F N (2008) Automated recognition of three-dimensional CAD model objects in dense laser range point clouds. PhD thesis, University of Waterloo, Canada.

Bosher, L (2014) Built-in resilience through disaster risk reduction: Operational issues. Building Research & Information, 42(2), pp. 240-254. ISSN 0961-3218

Bossink, B A G (2004) Effectiveness of innovation leadership styles: A manager's influence on ecological innovation in construction projects. Construction Innovation, 4(4), pp. 211-228. ISSN 1471-4175

Bouillet, J and Grandclément, C (2024) Sufficiency, consumption patterns and limits: A survey of French households. Buildings & Cities, 5(1), pp. 675-691. ISSN 2632-6655

Boulton, R J; Boulton, L L and Boulton, M J (2025) The effects of a short information-giving intervention on householders' beliefs and actions related to window opening as purge ventilation of water vapour: Implications for surveyors. International Journal of Building Pathology and Adaptation, 43(6), pp. 1559-1576. ISSN 2398-4708

Bourikas, L; Costanza, E; Gauthier, S; James, P A B; Kittley-Davies, J; Ornaghi, C; Rogers, A; Saadatian, E and Huang, Y (2018) Camera-based window-opening estimation in a naturally ventilated office. Building Research & Information, 46(2), pp. 148-16. ISSN 0961-3218

Bowen, P A and Edwards, P J (1996) Interpersonal communication in cost planning during the building design phase. Construction Management and Economics, 14(5), pp. 395-404. ISSN 01446193

Boyd, D and Pierce, D (2001) Implicit knowledge in construction professional practice. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Božiček, D; Almezeraani, Y and Košir, M (2024) Making sense of LCA results when evaluating multiple building designs: Comparison of interpretation concepts. Building Research & Information, 52(1-2), pp. 129-147. ISSN 0961-3218

Brchner, J and Olofsson, T (2012) Construction productivity measures for innovation projects. Journal of Construction Engineering and Management, 138(5), pp. 670-677. ISSN 0733-9364

Brege, S; Stehn, L and Nord, T (2014) Business models in industrialized building of multi-storey houses. Construction Management and Economics, 32(1-2), pp. 208-226. ISSN 01446193

Brennan, M D (2011) Integrated project delivery: A normative model for value creation in complex military medical projects. PhD thesis, University of Illinois, USA.

Bresnen, M and Marshall, N (2000) Learning to co-operate and co-operating to learn: Capturing knowledge of partnering in construction. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Brett-Jones, A T (1983) Barchester low rise: A case study of a management contract for remedial work to a large housing scheme. Construction Management and Economics, 1(2), pp. 91-117. ISSN 01446193

Bridge, A J (2008) Market structures in air conditioning maintenance activity. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Broer, S (2012) Solutions to climate change in UK housing developments: a lifestyle approach. EngD thesis, University College London, UK.

Broo, D G and Schooling, J (2023) Digital twins in infrastructure: Definitions, current practices, challenges and strategies. International Journal of Construction Management, 23(7), pp. 1254-1263. ISSN 1562-3599

Brookfield, K; Fitzsimons, C; Scott, I; Mead, G; Starr, J; Thin, N; Tinker, A and Ward Thompson, C (2015) The home as enabler of more active lifestyles among older people. Building Research & Information, 43(5), pp. 616-630. ISSN 0961-3218

Brooks, T; Bruen, J and Curran, M (2020) The value of 'non-value adding' activity. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Brownlie, S M and Harris, F C (1987) A review of finance for large-scale construction. Construction Management and Economics, 5(2), pp. 115-121. ISSN 01446193

Bubshait, A A and Tahir, B M (1996) Planning and scheduling concrete repair work: a case study. Building Research & Information, 24(6), pp. 363-368. ISSN 0961-3218

Bugg, R; Collins, W and Gilbert, C (2018) Applying radio frequency identification tags to improve personnel safety in dredging construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Buijs, A and Silvester, S (1996) Demonstration projects and sustainable housing. Building Research & Information, 24(4), pp. 195-202. ISSN 0961-3218

Bullen, P A (2004) Sustainable adaptive reuse of the existing building stock in western Australia. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Burford, N K and Smith, F W (1999) Developing a new military shelter system: A case study in innovation. Building Research & Information, 27(1), pp. 35-55. ISSN 0961-3218

Burgoon, J M (2020) Exploring the equity climate of construction education in the land grant system: A mixed methods study. PhD thesis, Colorado State University, USA.

Burke, R (2014) Risk management in Republic of Ireland PPP toll roads. PhD thesis, Queen's University Belfast, UK.

Burke, R D (2018) Early design decisions in building materials for higher performing buildings. PhD thesis, Arizona State University, USA.

Burke, R D; Parrish, K and El Asmar, M (2018) Environmental product declarations: Use in the architectural and engineering design process to support sustainable construction. Journal of Construction Engineering and Management, 144(5): 04018026, ISSN 0733-9364

Burnard, M D and Kutnar, A (2020) Human stress responses in office-like environments with wood furniture. Building Research & Information, 48(3), pp. 316-330. ISSN 0961-3218

Buys, F and Nkado, R (2006) A survey of maintenance management systems in South African tertiary educational institutions. Construction Management and Economics, 24(10), pp. 997-1005. ISSN 1466433X

Buzzelli, M D (2001) The Canadian urban housebuilding industry: Firm size structure and production methods in Ontario, 1945–2000. PhD thesis, McMaster University, Canada.

Bynum, P; Issa, R R A and Olbina, S (2013) Building information modeling in support of sustainable design and construction. Journal of Construction Engineering and Management, 139(1), pp. 24-34. ISSN 0733-9364

Caballero-Güereca, C E; Vogel, J; Alaux, N; Ouellet-Plamondon, C M; Santana, J S; Foliente, G; Lützkendorf, T and Passer, A (2026) Towards net zero: Sectoral ambitions and global trends in building decarbonisation. Buildings & Cities, 7(1), pp. 396-424. ISSN 2632-6655

Cable, J K; Jaselskis, E J; Walters, R C; Li, L and Bauer, C R (2009) Stringless Portland cement concrete paving. Journal of Construction Engineering and Management, 135(11), pp. 1253-1260. ISSN 0733-9364

Caldas, C H; Torrent, D G and Haas, C T (2006) Using global positioning system to improve materials-locating processes on industrial projects. Journal of Construction Engineering and Management, 132(7), pp. 741-749. ISSN 0733-9364

Callcott, A E (1985) Microcomputers for civil engineering consultancy in developing countries. PhD thesis, Aston University, UK.

Campbell, A J (2012) The politics of canal construction: the Ashby Canal, 1781-1804. PhD thesis, University of Leicester, UK.

Camrass, K (2022) Urban regenerative thinking and practice: A systematic literature review. Building Research & Information, 50(3), pp. 339-350. ISSN 0961-3218

Canales, A R; Arbelaez, M; Vasquez, E; Aveiga, F; Strong, K; Walters, R; Jaselskis, E J and Jahren, C T (2009) Exploring training needs and development of construction language courses for American supervisors and Hispanic craft workers. Journal of Construction Engineering and Management, 135(5), pp. 387-396. ISSN 0733-9364

Canales Fernandez, A R (2004) Developing effective integration between American supervisors and hispanic craft workers in construction. PhD thesis, Iowa State University, USA.

Candel, M; Gustavsson, T K and Eriksson, P E (2019) Beyond national building regulations: Exploring public-private negotiations over sustainability requirements. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Candel, M; Karrbom Gustavsson, T and Eriksson, P E (2021) Front-end value co-creation in housing development projects. Construction Management and Economics, 39(3), pp. 245-260. ISSN 01446193

Cano-Lopez, P; Copping, A and Bullock, K (2008) Introducing an innovative approach to supporting work-based learning for specialist trade operatives. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Cao, Q; Zou, X and Zhang, L (2025) A flexible scheduling framework for repetitive construction projects based on constraint programming. Journal of Construction Engineering and Management, 151(7): 04025073, ISSN 0733-9364

Cao, S; Duan, H; Guo, S; Wu, J; Ai, T and Jiang, H (2024) BIM-based task planning method for wheeled-legged rebar binding robot. Architectural Engineering and Design Management, 20(3), pp. 656-672. ISSN 1745-2007

Capra, M (2010) Collaborative mixed reality environments: an application for civil engineering. PhD thesis, University of Nottingham, UK.

Cariaga, I and El-Diraby, T E (2013) Assessing the market potential for housing construction products in Mexico. Journal of Construction Engineering and Management, 139(6), pp. 717-725. ISSN 0733-9364

Carlsson, V and Koch, C (2014) Shall we dance? Encounters for energy renovation of single family houses. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Carpino, C; Loukou, E; Heiselberg, P and Arcuri, N (2020) Energy performance gap of a nearly zero energy building (nZEB) in Denmark: The influence of occupancy modelling. Building Research & Information, 48(8), pp. 899-921. ISSN 0961-3218

Carrillo, P (1996) Technology transfer on joint venture projects in developing countries. Construction Management and Economics, 14(1), pp. 45-54. ISSN 01446193

Carrillo, P M (1998) Mergers and acquisitions: The impact on information systems and information technology. Engineering, Construction and Architectural Management, 5(3), pp. 276-284. ISSN 0969-9988

Carrillo, P M (1998) Acquisition or divestment: UK contractors changing business portfolio. Journal of Financial Management of Property and Construction, 3(3), pp. 49-70. ISSN 1366-4387

Casanovas-Rubio, M D M; Armengou, J and Ramos, G (2014) Occupational risk index for assessment of risk in construction work by activity. Journal of Construction Engineering and Management, 140(1): 04013035, ISSN 0733-9364

Castle, C M (1999) Construction project networks: A study of internet-based interorganizational information systems in the building industry. DDes thesis, Harvard University, USA.

Castro-Lacouture, D (2003) B2b e-work intranet solution design for rebar supply interactions. PhD thesis, Purdue University, USA.

Catalano, G; Baratta, A F L; Calcagnini, L; Finucci, F; Magarò, A; Mariani, M and Trulli, L (2023) Procedures and standards for the sizing of university buildings. Architectural Engineering and Design Management, 19(3), pp. 233-249. ISSN 1745-2007

Cerimagic, S and Smith, J (2011) Project managers: The importance of cross-cultural preparation. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Cevallos, O A; Jaramillo, D; Ávila, C and Aldaz, X (2017) Production and quality levels of construction materials in Andean regions: A case study of Chimborazo, Ecuador. Journal of Construction in Developing Countries, 22(1), pp. 115-136. ISSN 1823-6499

Cha, H S (2003) Selecting value management processes for implementation on capital facility projects. PhD thesis, University of Texas at Austin, USA.

Chagadama, J (2022) Small construction business owners’ strategies to reduce voluntary employee turnover. PhD thesis, Walden University, USA.

Challender, J; Farrell, P and Sherratt, F (2016) Effects of an economic downturn on construction partnering. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 159-167. ISSN 17514304

Champion, R (2005) Acceleration in construction and engineering contracts. PhD thesis, University of London, UK.

Chan, A P; Ho, D C K and Tam, C M (2001) Design and build: Views from some major public clients in Hong Kong. Construction Economics and Building, 1(1), pp. 22-31. ISSN 2204-9029

Chan, C T W and Pasquire, C (2002) Estimation of project overheads: A contractor’s perspective. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Chan, E H W and Tse, R Y C (2003) Cultural considerations in international construction contracts. Journal of Construction Engineering and Management, 129(4), pp. 375-381. ISSN 0733-9364

Chan, K (2023) Fast track: State capacity and railway bureaucracies in China and India. PhD thesis, Princeton University, USA.

Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chan, P W (2009) The dominance of practice in constructionarium: Exploring the challenges of linking theory and practice. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Chan, P W and Moehler, R (2007) Developing a 'road-map' to facilitate employers' role in engaging with the skills development agenda. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Chan, S L and Leung, N N (2004) Prototype web-based construction project management system. Journal of Construction Engineering and Management, 130(6), pp. 935-943. ISSN 0733-9364

Chan, Zenobia Tin Yan (2024) Alms and influence the dynamics of inducements and concessions in international politics. PhD thesis, Princeton University, USA.

Chandra, V and Loosemore, M (2010) Mapping stakeholders' cultural learning in the hospital briefing process. Construction Management and Economics, 28(7), pp. 761-769. ISSN 1466433X

Chandra, V and Loosemore, M (2011) Sowing the seeds of misunderstanding in the briefing process: A case study of a new hospital project. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Chang, Y; Wilkinson, S; Potangaroa, R and Seville, E (2011) Identifying factors affecting resource availability for post-disaster reconstruction: A case study in China. Construction Management and Economics, 29(1), pp. 37-48. ISSN 1466433X

Chang, Y; Wilkinson, S; Seville, E and Potangaroa, R (2012) Changes in resource need for post-disaster reconstruction: A longitudinal study in China. Building Research & Information, 40(3), pp. 327-336. ISSN 0961-3218

Chao, L-C (1994) An adaptive approach to evaluation of implementation prospects of new construction technologies. PhD thesis, Purdue University, USA.

Charkhakan, M H and Heravi, G (2018) Risk manageability assessment to improve risk response plan: Case study of construction projects in Iran. Journal of Construction Engineering and Management, 144(11): 05018012, ISSN 0733-9364

Charlie, W A; Osman, M A and Ali, E M (1984) Construction on expansive soils in Sudan. Journal of Construction Engineering and Management, 110(3), pp. 359-374. ISSN 0733-9364

Charoenngam, C and Sriprasert, E (2001) Assessment of cost control systems: A case study of Thai construction organizations. Engineering, Construction and Architectural Management, 8(5-6), pp. 368-380. ISSN 0969-9988

Chau, A D; Hoang, H T and Nguyen, L D (2025) Web-based decision support system for automated pavement design and life-cycle cost analysis. Journal of Construction Engineering and Management, 151(8): 05025004, ISSN 0733-9364

Che Ibrahim, C K I; Costello, S B and Wilkinson, S (2017) Validation of a team integration assessment tool in road infrastructure alliance projects. International Journal of Construction Management, 17(2), pp. 151-164. ISSN 1562-3599

Cheah, C; Kang, J and Chew, D (2007) Strategic analysis of large local construction firms in China. Construction Management and Economics, 25(1), pp. 25-38. ISSN 1466433X

Cheah, C Y J; Chew, D A S and Huang, J (2006) Marketing foreign interior design services in China. Building Research & Information, 34(6), pp. 584-595. ISSN 0961-3218

Cheah, C Y J and Liu, J (2005) Real option evaluation of complex infrastructure projects: The case of dabhol power. Journal of Financial Management of Property and Construction, 10(1), pp. 55-68. ISSN 1366-4387

Chegu Badrinath, A and Hsieh, S H (2019) Empirical approach to identify operational critical success factors for BIM projects. Journal of Construction Engineering and Management, 145(3): 04018140, ISSN 0733-9364

Chellappa, V; Srivastava, V and Salve, U R (2021) A systematic review of construction workers' health and safety research in India. Journal of Engineering, Design and Technology, 19(6), pp. 1488-1504. ISSN 1726-0531

Chelson, D E (2010) The effects of building information modeling on construction site productivity. PhD thesis, University of Maryland, College Park, USA.

Chen, S.; Guan, Z.; Zhang, Z.; Guo, H. and Han, Y. (2026) Impact of construction workers' physical fatigue on unsafe behavior: An ecg-based field experiment study. Journal of Construction Engineering and Management, 152(8): 04026128, ISSN 0733-9364

Chen, C and Messner, J I (2010) A recommended practices system for a global virtual engineering team. Architectural Engineering and Design Management, 6(3), pp. 207-221. ISSN 1745-2007

Chen, C L and Zhang, H (2018) Using emotion to evaluate our community: Exploring the relationship between the affective appraisal of community residents and the community environment. Architectural Engineering and Design Management, 14(4), pp. 256-271. ISSN 1745-2007

Chen, J H; Su, M C and Huang, D Y (2010) Application of a SOM-based optimization algorithm in minimizing construction time for secant pile wall. Journal of Construction Engineering and Management, 136(11), pp. 1189-1195. ISSN 0733-9364

Chen, K; Lu, W; Wang, H; Niu, Y and Huang, G G (2017) Naming objects in BIM: A convention and a semiautomatic approach. Journal of Construction Engineering and Management, 143(7): 06017001, ISSN 0733-9364

Chen, K W; Teitelbaum, E; Meggers, F; Pantelic, J and Rysanek, A (2021) Exploring membrane-assisted radiant cooling for designing comfortable naturally ventilated spaces in the tropics. Building Research & Information, 49(5), pp. 483-495. ISSN 0961-3218

Chen, L; Gao, K; Ma, G; Ma, H and Sun, Z (2025) Experimental study on pulse elimination of concrete pumping. Journal of Construction Engineering and Management, 151(1): 04024189, ISSN 0733-9364

Chen, L; Zhang, J and Peng, W (2022) Research on the hierarchical discrete time-cost trade-off problem for program. Journal of Construction Engineering and Management, 148(7): 04022039, ISSN 0733-9364

Chen, P (2005) An interpretive comparison of Chinese and western conceptions of project management work. PhD thesis, Cranfield University, UK.

Chen, Wenxin (2022) Establishing balance in project governance: Exploring yin-yang and mindfulness. PhD thesis, University of New South Wales, Australia.

Chen, Xilin (2025) Sustainability of underground infrastructure: Digitalisation-based embodied carbon assessment and design optimisation. PhD thesis, Monash University, Australia.

Chen, Y; Fang, Q and Lan, Y (2025) Development of a modular assembling, suspended, and sliding scaffold. Journal of Construction Engineering and Management, 151(9): 04025131, ISSN 0733-9364

Cheng, M Y; Vu, Q T and Aldo, A (2026) Automated BIM parametric design for optimal external wall tile planning. International Journal of Construction Management, 26(1), pp. 131-151. ISSN 1562-3599

Cheng, Y H and Hong, W T (2025) An analytical research tool for monitoring stakeholder conflicts in public-private partnership project delivery. Construction Management and Economics, 43(12), pp. 1060-1079. ISSN 0144-6193

Cheng, E W L and Li, H (2001) Development of a conceptual model of construction partnering. Engineering, Construction and Architectural Management, 8(4), pp. 292-303. ISSN 0969-9988

Chenger, D T (2012) Executive level capital project decision making: Rational or rationale? PhD thesis, University of Calgary, Canada.

Cherkos, F D and Jha, K N (2021) Drivers of road sector public-private partnership adoption in new and inexperienced markets. Journal of Construction Engineering and Management, 147(3): 04020186, ISSN 0733-9364

Cheung, C K (2005) CH2 energy harvesting systems: Economic use and efficiency. Construction Economics and Building, 5(2), pp. 20-31. ISSN 2204-9029

Cheung, E; Loosemore, M and Chandra, D C (2014) Assessing risk dynamics in public private partnership projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Cheung, S O and Tsang, K F (1997) Professional liabilities in construction: Exposures and responses. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Chew, M Y L; Conejos, S and Azril, F H B (2019) Design for maintainability of high-rise vertical green facades. Building Research & Information, 47(4), pp. 453-467. ISSN 0961-3218

Chew, M Y L; Conejos, S and Law, J S L (2017) Green maintainability design criteria for nanostructured titanium dioxide (TiO2) façade coatings. International Journal of Building Pathology and Adaptation, 35(2), pp. 139-158.

Chew, M Y L; De Silva, N and Tan, S S (2004) A neural network approach to assessing building façade maintability in the tropics. Construction Management and Economics, 22(6), pp. 581-594. ISSN 0144-6193

Chiadighikaobi, P C and Ubani-Wokoma, B C (2025) Suitability of basalt textile-reinforced granite–periwinkle shell concrete for sustainable construction in Nigeria. Construction Economics and Building, 25(1), pp. 171-202. ISSN 2204-9029

Chiang, Y H; Li, V J; Zhou, L; Wong, F and Lam, P (2016) Evaluating sustainable building-maintenance projects: Balancing economic, social, and environmental impacts in the case of Hong Kong. Journal of Construction Engineering and Management, 142(2): 06015003, ISSN 0733-9364

Chih, Y Y; Kiazad, K; Cheng, D; Emamirad, E and Restubog, S L (2018) Interactive effects of supportive leadership and top management team's charismatic vision in predicting worker retention in the Philippines. Journal of Construction Engineering and Management, 144(10): 04018095, ISSN 0733-9364

Chin, S (1997) An integrated life-cycle information framework for construction project management. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Chinyio, E and Morton, N (2006) The effectiveness of e-learning. Architectural Engineering and Design Management, 2(1-2), pp. 73-86. ISSN 1745-2007

Chiu H.N, T D M (2002) An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows. Construction Management and Economics, 20(1), pp. 55-66. ISSN 01446193

Cho, Y (2003) The organizational boundaries of housebuilding firms in Korea. Construction Management and Economics, 21(7), pp. 671-680. ISSN 01446193

Cho, Y J (2003) A layered architecture supporting the collaborative design of virtual environments for science inquiry. PhD thesis, University of Illinois at Chicago, USA.

Chohan, A H; Che-Ani, A I; Bhai Khan, S; Awad, J; Jawaid, A and Mohd Tawil, N (2015) A model of housing quality determinants for affordable housing. Journal of Construction in Developing Countries, 20(1), pp. 117-136. ISSN 1823-6499

Choi, K; Lee, E B; Ibbs, C W and Kim, Y W (2009) Multifaceted public outreach and cost-benefit analysis for its effectiveness validation. Construction Management and Economics, 27(8), pp. 771-782. ISSN 1466433X

Choi, K C (1992) An object-oriented historical cost information base to support concurrent engineering. PhD thesis, University of California, Berkeley, USA.

Choi, Y S; Lim, I; Kim, T; Cho, H and Kang, K I (2016) Case study of the core structure succeeding method for tall building construction. Journal of Construction Engineering and Management, 142(12): 05016017, ISSN 0733-9364

Choong, Yi (2006) A mapping approach to investigating information and communication technology implementation during the building design process. PhD thesis, RMIT University, Australia.

Chow, L K and Ng, S T (2010) Delineating the performance standards of engineering consultants at design stage. Construction Management and Economics, 28(1), pp. 3-11. ISSN 1466433X

Christensen, A N (2019) Identifying private construction project owner inefficiencies that affect project goals. PhD thesis, Iowa State University, USA.

Christensen, T H; Gram-Hanssen, K; De Best-Waldhober, M and Adjei, A (2014) Energy retrofits of Danish homes: Is the energy performance certificate useful? Building Research & Information, 42(4), pp. 489-500. ISSN 0961-3218

Christini, G; Fetsko, M and Hendrickson, C (2004) Environmental management systems and ISO 14001 certification for construction firms. Journal of Construction Engineering and Management, 130(3), pp. 330-336. ISSN 0733-9364

Christodoulou, S E; Ellinas, G and Michaelidou-Kamenou, A (2010) Minimum moment method for resource leveling using entropy maximization. Journal of Construction Engineering and Management, 136(5), pp. 518-527. ISSN 0733-9364

Christodoulou, S E; Ellinas, G N and Aslani, P (2009) Disorder considerations in resource-constrained scheduling. Construction Management and Economics, 27(3), pp. 229-240. ISSN 1466433X

Chritamara, S and Ogunlana, S O (2001) Problems experienced on design and build projects in Thailand. Journal of Construction Procurement, 7(1), pp. 73-93. ISSN 1358-9180

Chro, A H R (2018) Sustainable renovation of residential buildings in subtropical climate zone. PhD thesis, University of Pécs, Hungary.

Chua, D K H; Wang, Y and Tan, W T (2003) Impacts of obstacles in East Asian cross-border construction. Journal of Construction Engineering and Management, 129(2), pp. 131-141. ISSN 0733-9364

Chua, D K H and Yeoh, K W (2011) PDM++: Planning framework from a construction requirements perspective. Journal of Construction Engineering and Management, 137(4), pp. 266-274. ISSN 0733-9364

Chunduri, S (2014) Development of planning and design phases of an integrative building lifecycle process model for advanced energy retrofit projects. PhD thesis, Pennsylvania State University, USA.

Chung, J K H; Shen, G Q P; Leung, B Y P; Hao, J J L; Hills, M J; Fox, P W and Zou, P X W (2005) Using e-learning to deliver construction technology for undergraduate students. A case study in Hong Kong. Architectural Engineering and Design Management, 1(4), pp. 295-308. ISSN 1745-2007

Chung, T H (2007) Simulation-based productivity modeling for tunnel construction operations. PhD thesis, University of Alberta, Canada.

Cidik M S, B D T N (2013) Understanding the polarized perspectives in BIM enabled projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Cleveland Jr, A B (2011) Emerging tools to enable construction engineering. Journal of Construction Engineering and Management, 137(10), pp. 836-842. ISSN 0733-9364

Clevenger, C M and Ozbek, M E (2013) Teaching sustainability through service-learning in construction education. International Journal of Construction Education and Research, 9(1), pp. 3-18. ISSN 1557-8771

Cochran, K M (2006) Construction and demolition debris recycling: Methods, markets, and policy. PhD thesis, University of Florida, USA.

Coffey, M A (2010) An optimization model for subsurface utility engineering during the design process. PhD thesis, University of Florida, USA.

Cohen, R; Standeven, M; Bordass, B and Leaman, A (2001) Assessing building performance in use 1: The Probe process. Building Research & Information, 29(2), pp. 85-102. ISSN 0961-3218

Cohenca-Zall, D; Laufer, A; Shapira, A and Howell, G A (1994) Process of planning during construction. Journal of Construction Engineering and Management, 120(3), pp. 561-578. ISSN 0733-9364

Cole, L J R (1991) Construction scheduling: Principles, practices, and six case studies. Journal of Construction Engineering and Management, 117(4), pp. 579-588. ISSN 0733-9364

Cole, R J and Larsson, N K (1999) GBC '98 and GBTool: Background. Building Research & Information, 27(4-5), pp. 221-229. ISSN 0961-3218

Cole, R J and Mitchell, L (1999) Customizing and using GBTool: Two case-study projects. Building Research & Information, 27(4-5), pp. 257-275. ISSN 0961-3218

Coleman, S and Robinson, J B (2018) Introducing the qualitative performance gap: Stories about a sustainable building. Building Research & Information, 46(5), pp. 485-500. ISSN 0961-3218

Collinge, W H (2014) Briefing as meaning making practice through signs: client requirement representations and transformations in construction project design. PhD thesis, University of Reading, UK.

Collins, A and Baccarini, D (2004) Project success: A survey. Journal of Construction Research, 5(2), pp. 211-231. ISSN 1609-9451

Connaughton J, W S (2013) Improving collaboration in construction: An opportunity for action research. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Consoli, G G S (2006) Correctional management attitudes to private prison design and construction briefs in Australia. Journal of Construction Research, 7(1), pp. 99-109. ISSN 1609-9451

Cook, M J; Shukla, Y; Rawal, R; Angelopoulos, C; Caruggi-De-faria, L; Loveday, D; Spentzou, E and Patel, J (2022) Integrating low energy cooling and ventilation strategies in Indian residences. Buildings & Cities, 3(1), pp. 279-296. ISSN 2632-6655

Coopman, J T (1998) Superintendent motivation and satisfaction related to the use of construction management for school facility projects. EdD thesis, Ball State University, USA.

Cosar-Jorda, P; Buswell, R A and Mitchell, V A (2019) Quantifying energy demand reduction considering householder willingness to apply measures. Building Research & Information, 47(7), pp. 850-864. ISSN 0961-3218

Cripps, A (2004) Cardboard as a construction material: A case study. Building Research & Information, 32(3), pp. 207-219. ISSN 0961-3218

Cristaudo, Rossana (2018) Essays on cost overruns in infrastructure provision. PhD thesis, Università degli Studi di Messina, Italy.

Crommelin, L; Loosemore, M; Easthope, H and Randolph, B (2024) How information asymmetries exacerbate building defects risks for purchasers of Australian residential multi-owned properties. Building Research & Information, 52(6), pp. 644-657. ISSN 0961-3218

Crosbie, T and Baker, K (2010) Energy-efficiency interventions in housing: Learning from the inhabitants. Building Research & Information, 38(1), pp. 70-79. ISSN 0961-3218

Cruz, C O; Marques, R C and Pereira, I (2015) Alternative contractual arrangements for urban light rail systems: Lessons from two case studies. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Cruz Rios, F (2018) Beyond recycling: Design for disassembly, reuse, and circular economy in the built environment. PhD thesis, Arizona State University, USA.

Cuervo, J C and Pheng, L S (2005) Significance of internalization factors for Singapore transnational construction corporations. Construction Management and Economics, 23(2), pp. 147-162. ISSN 01446193

Cuff, D C (1982) Negotiating architecture: a study of architects and clients in design practice. PhD thesis, University of California, Berkeley, USA.

Cummings, A J G (1980) The York Buildings Company: A case study in eighteenth century corporation mismanagement. PhD thesis, University of Strathclyde, UK.

Cunningham Emord, P (2009) Building evaluation capacity with appreciative inquiry: An exploratory case study. PhD thesis, University of New Mexico, USA.

Cândido, C; Lamberts, R; De Dear, R; Bittencourt, L and De Vecchi, R (2011) Towards a Brazilian standard for naturally ventilated buildings: Guidelines for thermal and air movement acceptability. Building Research & Information, 39(2), pp. 145-153. ISSN 0961-3218

Da Silva, W O P; Farias, B A; Monteiro, I B; Pegorini, V; Casanova, D and Bisconsini, D R (2024) Development of global quality index of unpaved roads. Journal of Construction Engineering and Management, 150(1): 04023147, ISSN 0733-9364

Dado, E (2002) ICT-enabled communication and co-operation in large-scale on -site construction projects. PhD thesis, Delft University of Technology, Netherlands.

Dainty, A R J; Cheng, M I and Moore, D R (2004) A competency-based performance model for construction project managers. Construction Management and Economics, 22(8), pp. 877-886. ISSN 01446193

Dale, A; Gonzales, C and Himangshu, P (2003) Financing of private infrastructure investments in the emerging markets of Southeast Asia. Journal of Financial Management of Property and Construction, 8(2), pp. 61-78. ISSN 1366-4387

Damoah, I S; Ayakwah, A; Aryee, K J and Twum, P (2020) The rise of PPPs in public sector affordable housing project delivery in Ghana: Challenges and policy direction. International Journal of Construction Management, 20(6), pp. 690-703. ISSN 1562-3599

Damra, T; Feng, H and Butt, T E (2022) City-wide digital twin: Architecture, engineering, construction, and operations as a 4.0 industry. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Danforth, E M; Weidman, J E and Farnsworth, C B (2017) Strategies employed and lessons learned by commercial construction companies during economic recession and recovery. Journal of Construction Engineering and Management, 143(7): 04017027, ISSN 0733-9364

Dansoh, A (2005) Strategic planning practice of construction firms in Ghana. Construction Management and Economics, 23(2), pp. 163-168. ISSN 01446193

Daoud, O E K (1997) The architect/engineer's role in rehabilitation work. Journal of Construction Engineering and Management, 123(1), pp. 1-5. ISSN 0733-9364

DarConte, F X (2017) Best value alignment process for public works construction in New York state. PhD thesis, Polytechnic Institute of New York University, USA.

Darwish, M; Elsayed, A Y and Nassar, K (2018) Design and constructability of a novel funicular arched steel truss falsework. Journal of Construction Engineering and Management, 144(3): 04018002, ISSN 0733-9364

Davey, C L; Lowe, D J and Duff, A R (2001) Generating opportunities for SMEs to develop partnerships and improve performance. Building Research & Information, 29(1), pp. 1-11. ISSN 0961-3218

Davey, C L; Powell, J A; Powell, J E and Cooper, I (2002) Action learning in a medium-sized construction company. Building Research & Information, 30(1), pp. 5-15. ISSN 0961-3218

Davies, P J; Emmitt, S and Firth, S K (2013) On-site energy management challenges and opportunities: A contractor's perspective. Building Research & Information, 41(4), pp. 450-468. ISSN 0961-3218

Davies, R and Harty, C (2013) Measurement and exploration of individual beliefs about the consequences of building information modelling use. Construction Management and Economics, 31(11), pp. 1110-1127. ISSN 1466433X

Davies, R and Harty, C (2014) Initial use of an idea capture app in a UK construction organisation. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Dawood, I (2010) Decision support system (DSS) model to facilitate strategic planning of the housing industry in the developing world. PhD thesis, University of Salford, UK.

Day, A (1996) The maquette, the model and the computer: Organizational futures for design and construction. Engineering, Construction and Architectural Management, 3(1-2), pp. 15-28. ISSN 0969-9988

De Cicco, S (2004) Design and development of an information management system for highway construction specifications. PhD thesis, University of Wisconsin - Madison, USA.

De La Garza, J M and Mitropoulos, P (1991) Technology-transfer (t2) model for expert systems. Journal of Construction Engineering and Management, 117(4), pp. 736-755. ISSN 0733-9364

De Marco, A; Briccarello, D and Rafele, C (2009) Cost and schedule monitoring of industrial building projects: Case study. Journal of Construction Engineering and Management, 135(9), pp. 853-862. ISSN 0733-9364

Deacon, C and Smallwood, J (2003) Health promotion in South African construction. Journal of Construction Research, 4(2), pp. 129-140. ISSN 1609-9451

Deakin, M (1997) The development of computer-based information systems for local authority property management 2: The application. Journal of Financial Management of Property and Construction, 2(2), pp. 59-84. ISSN 1366-4387

Debs, L and Shaurette, M (2021) An exploration of telephone and e-mail communications for design-related construction problems. International Journal of Construction Education and Research, 17(2), pp. 154-177. ISSN 1557-8771

Dehghan, R (2012) A new model, algorithm and computer tool to optimize overlapping of design activities in construction projects. PhD thesis, University of Calgary, Canada.

Delgado-Hernandez, D J; Bampton, K E and Aspinwall, E (2007) Quality function deployment in construction. Construction Management and Economics, 25(6), pp. 597-609. ISSN 1466433X

Demirel, H Ç; Leendertse, W; Volker, L and Hertogh, M (2017) Flexibility in PPP contracts: Dealing with potential change in the pre-contract phase of a construction project. Construction Management and Economics, 35(4), pp. 196-206. ISSN 0144-6193

Deng, J; Zhao, Y; Li, X; Wang, Y and Zhou, Y (2023) Network embeddedness, relationship norms, and cooperative behavior: Analysis based on evolution of construction project network. Journal of Construction Engineering and Management, 149(9): 04023070, ISSN 0733-9364

Deng, Y; Gan, V J L; Das, M; Cheng, J C P and Anumba, C (2019) Integrating 4D BIM and GIS for construction supply chain management. Journal of Construction Engineering and Management, 145(4): 04019016, ISSN 0733-9364

Deng, Y and Poon, S W (2011) Mega-challenges for mega-event flagships. Architectural Engineering and Design Management, 7(1), pp. 23-37. ISSN 1745-2007

Deng, Y and Poon, S W (2014) Positioning mega-event flagships: from performing arts center of Expo 2010 to Mercedes-Benz Arena. Architectural Engineering and Design Management, 10(3-4), pp. 233-250. ISSN 1745-2007

Desta, S; Root, D and Diederichs, C J (2006) The practice of project management office (PMO) concept within the German architect, engineer, contractor (AEC) sector. Journal of Engineering, Design and Technology, 4(1), pp. 46-59. ISSN 1726-0531

Devine, R D; Barbachyn, S M; Thrall, A P and Kurama, Y C (2018) Effect of tripping prefabricated rebar assemblies on bar spacing. Journal of Construction Engineering and Management, 144(11): 04018099, ISSN 0733-9364

Devine-Wright, P; Wrapson, W; Henshaw, V and Guy, S (2014) Low carbon heating and older adults: Comfort, cosiness and glow. Building Research & Information, 42(3), pp. 288-299. ISSN 0961-3218

Dewlaney, K S and Hallowell, M (2012) Prevention through design and construction safety management strategies for high performance sustainable building construction. Construction Management and Economics, 30(2), pp. 165-177. ISSN 1466433X

Diab, M F (2011) Analyses of highway project construction risks, performance, and contingency. PhD thesis, North Dakota State University, USA.

Dias Barkokebas, R and Li, X (2023) VR-ret: A virtual reality-based approach for real-time ergonomics training on industrialized construction tasks. Journal of Construction Engineering and Management, 149(10): 04023098, ISSN 0733-9364

Diekmann, J E and Kraiem, Z (1988) Explanation of construction engineering knowledge in expert systems. Journal of Construction Engineering and Management, 114(3), pp. 364-389. ISSN 0733-9364

Dimitrov, D S (2024) The new work of building operations in the digital age: The impact of IoT and digital twins on facility management and operational practices. PhD thesis, University of Washington, USA.

Diyagama, D; Victar, H C; Waidyasekara, A S and Rameezdeen, R (2024) Managing external stakeholders influences in mega construction projects. International Journal of Construction Management, 24(8), pp. 809-819. ISSN 1562-3599

Do, S T; Nguyen, V T and Likhitruangsilp, V (2023) Rsiam risk profile for managing risk factors of international construction joint ventures. International Journal of Construction Management, 23(7), pp. 1148-1162. ISSN 1562-3599

Dodd, J and Langford, D A (1990) Construction management on one large project in London: A case study. Construction Management and Economics, 8(4), pp. 385-398. ISSN 01446193

Dolidze, G and Spillane, J P (2020) Smart city approach to educational campuses: Case study at University of Limerick, Ireland. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(3), pp. 95-103. ISSN 17514304

Domínguez-Amarillo, S; Fernández-Agüera, J; Peacock, A and Acosta, I (2020) Energy related practices in mediterranean low-income housing. Building Research & Information, 48(1), pp. 34-52. ISSN 0961-3218

Donkoh, D and Aboagye-Nimo, E (2017) Stakeholders' role in improving Ghana's construction safety. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(2), pp. 68-76. ISSN 17514304

Donohoe, S W (2008) Can surveying and construction management undergraduate sudents' attitudes to construction law be changed by changes in teaching? DEd thesis, University of Sheffield, UK.

Dorignon, L; Oswald, D; Kempton, L; Boehme, T; Iyer-Raniga, U; Moore, T and Dalton, T (2024) Investigating residential building materials in a circular economy: An Australian perspective. Journal of Construction Engineering and Management, 150(9): 04024115, ISSN 0733-9364

Dos Santos, A; da Rocha, C G and Lepre, P (2010) Barriers and opportunities in developing 'do-it-yourself' products for low-income housing. Journal of Construction in Developing Countries, 15(1), pp. 29-43. ISSN 1823-6499

Dossick, C S and Neff, G (2010) Organizational divisions in BIM-enabled commercial construction. Journal of Construction Engineering and Management, 136(4), pp. 459-467. ISSN 0733-9364

Drury, P; Watson, S and Lomas, K J (2021) Summertime overheating in UK homes: Is there a safe haven? Buildings & Cities, 2(1), pp. 970-990. ISSN 2632-6655

Du, J; Shi, Y; Zou, Z and Zhao, D (2018) COVR: Cloud-based multiuser virtual reality headset system for project communication of remote users. Journal of Construction Engineering and Management, 144(2): 04017109, ISSN 0733-9364

Dubey, K K (2001) A framework for analysing quality in the US homebuilding industry. PhD thesis, Swansea University, UK.

Duffield, C (1998) Commercial viability of privately financed heating systems in Europe: A case study. Engineering, Construction and Architectural Management, 5(1), pp. 3-8. ISSN 0969-9988

Dulaimi, M F; Alhashemi, M; Ling, F Y Y and Kumaraswamy, M (2010) The execution of public-private partnership projects in the UAE. Construction Management and Economics, 28(4), pp. 393-402. ISSN 1466433X

Dutta, A; Breloff, S P; Dai, F; Sinsel, E W; Warren, C M and Wu, J Z (2020) Identifying potentially risky phases leading to knee musculoskeletal disorders during shingle installation operations. Journal of Construction Engineering and Management, 146(3): 04019118, ISSN 0733-9364

Dzeng, R-J (1995) Caseplan: A case-based planner and scheduler for construction using product modeling. PhD thesis, University of Michigan, USA.

Ebekozien, A; Aigbavboa, C; Samsurijan, M S; Radin Firdaus, R B and Salman, A (2024) Appraising flood resilience technologies role in developing cities: How prepared is the professional stakeholder? International Journal of Construction Management, 24(7), pp. 683-692. ISSN 1562-3599

Eberhardt, L C M; Birgisdóttir, H and Birkved, M (2019) Life cycle assessment of a Danish office building designed for disassembly. Building Research & Information, 47(6), pp. 666-680. ISSN 0961-3218

Echeverry, D (1991) Factors for generating initial construction schedules. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Edwards, D J and Holt, G D (2014) Antecedents of health and safety issues relating to plant trailer wheels. Journal of Construction Engineering and Management, 140(7): 04014027, ISSN 0733-9364

Edwards, E H (1999) The architect in the building process, pragmatic reflection, concrete experience. DrTechn thesis, Kungliga Tekniska Hogskolan, Sweden.

Edwards, P J and Bowen, P A (1998) Risk and risk management in construction: towards more appropriate research techniques. Journal of Construction Procurement, 4(2), pp. 103-115. ISSN 1358-9180

Egbelakin, T; Wilkinson, S; Potangaroa, R and Ingham, J (2011) Enhancing seismic risk mitigation decisions: A motivational approach. Construction Management and Economics, 29(10), pp. 1003-1016. ISSN 01446193

Egbelakin, T K; Wilkinson, S; Potangaroa, R and Ingham, J (2011) Challenges to successful seismic retrofit implementation: A socio-behavioural perspective. Building Research & Information, 39(3), pp. 286-300. ISSN 0961-3218

Egbu, C O; Henry, J; Kaye, G R; Quintas, P; Schumacher, T R and Young, B A (1998) Managing organizational innovations in construction. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Egbu, J; Wood, G and Egbu, C (2011) The changing face of sheltered housing for the elderly: Past, present and the future. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Eid, M S; Elbeltagi, E E and El-Adaway, I H (2021) Simultaneous multi-criteria optimization for scheduling linear infrastructure projects. International Journal of Construction Management, 21(1), pp. 41-55. ISSN 1562-3599

Eikelenboom, M; van Uden, M; Coenen, T B J and Vosman, L (2025) Strategic programmes for circular construction: Lessons from three public clients. Construction Management and Economics, 43(11), pp. 901-921. ISSN 0144-6193

Eiris Pereira, R and Gheisari, M (2019) Site visit application in construction education: A descriptive study of faculty members. International Journal of Construction Education and Research, 15(2), pp. 83-99. ISSN 1557-8771

Ekeskär, A; Havenvid, M I and Gustavsson, T K (2019) Horizontal inter-organizational collaboration: The case of third-party logistics. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Ekeskär, A; Havenvid, M I; Karrbom Gustavsson, T and Eriksson, P E (2022) Construction logistics in a multi-project context: Coopetition among main contractors and the role of third-party logistics providers. Construction Management and Economics, 40(1), pp. 25-40. ISSN 01446193

Eksteen, B and Bate, G (2002) The effects of construction on the environment: A case study. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Eksteen, B and Krause, S (2002) Constructing new automotive production facilities in a mature brownfield site. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Eksteen, B and Rosenberg, D (2002) The management of overhead costs in construction companies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

El Samaty, H S (2025) Readiness of urban design projects for integration with big data. Case study: Humanizing neighborhoods initiative—KSA. Smart and Sustainable Built Environment, 14(4), pp. 943-959. ISSN 2046-6099

El Wardani, M A; Messner, J I and Horman, M J (2006) Comparing procurement methods for design-build projects. Journal of Construction Engineering and Management, 132(3), pp. 230-238. ISSN 0733-9364

El-Dabaa, R and Abdelmohsen, S (2023) Integrating performance indicators in the production rules of shape-shifting grammars for architectural adaptive façade systems. Architectural Engineering and Design Management, 19(4), pp. 419-437. ISSN 1745-2007

El-Diraby, T E-S (1997) System for evaluating bridge construction plans. PhD thesis, University of Texas at Austin, USA.

El-Omari, S (2008) Automated data acquisition for tracking and control of construction projects. PhD thesis, Concordia University, Canada.

El-Sayegh, S M; AbdRaboh, T; Elian, D; ElJarad, N and Ahmad, Y (2022) Developing a bi-parameter bidding model integrating price and sustainable construction practices. International Journal of Construction Management, 22(11), pp. 2191-2198. ISSN 1562-3599

El-khawas, I N (1997) The optimal design of buildings: A life-cycle approach to energy efficiency. PhD thesis, Ohio State University, USA.

Elbeltagi, E; Hegazy, T and Eldosouky, A (2004) Dynamic layout of construction temporary facilities considering safety. Journal of Construction Engineering and Management, 130(4), pp. 534-541. ISSN 0733-9364

Eldin, N N (1988) Constructability improvement of project designs. Journal of Construction Engineering and Management, 114(4), pp. 631-640. ISSN 0733-9364

Elelu, K; Le, T and Le, C (2023) Collision hazard detection for construction worker safety using audio surveillance. Journal of Construction Engineering and Management, 149(1): 04022159, ISSN 0733-9364

Eley, J (2001) How do post-occupancy evaluation and the facilities manager meet? Building Research & Information, 29(2), pp. 164-167. ISSN 0961-3218

Elhakeem, A and Hegazy, T (2005) Graphical approach for manpower planning in infrastructure networks. Journal of Construction Engineering and Management, 131(2), pp. 168-175. ISSN 0733-9364

Elliott, M E and Heymsfield, E (2003) Inspection of luling bridge cable stays: Case study. Journal of Construction Engineering and Management, 129(2), pp. 226-230. ISSN 0733-9364

Ellis, R C T; Wood, G D and Keel, D A (2005) Value management practices of leading UK cost consultants. Construction Management and Economics, 23(5), pp. 483-493. ISSN 01446193

Elmahroug, M H M (2018) Facilitating effective external stakeholder involvement in the pre-design phase of civil engineering infrastructure projects. PhD thesis, University of Leeds, UK.

Elrod, M T (2017) A novel approach to determining real-time risk probabilities in critical infrastructure industrial control systems. PhD thesis, Nova Southeastern University, USA.

Elsayed, M; Romagnoni, P; Pelsmakers, S; Castaño-Rosa, R and Klammsteiner, U (2023) The actual performance of retrofitted residential apartments: Post-occupancy evaluation study in Italy. Building Research & Information, 51(4), pp. 411-429. ISSN 0961-3218

Embi, M R (1997) An intelligent assistant for designing to fire regulations in Malaysia. PhD thesis, University of Sheffield, UK.

Emmitt, S (2016) The construction design manager – a rapidly evolving innovation. Architectural Engineering and Design Management, 12(2), pp. 138-148. ISSN 1745-2007

Emsley, M (2005) A benefits analysis of partnering: A case study of a community primary school. Journal of Financial Management of Property and Construction, 10(1), pp. 69-79. ISSN 1366-4387

Emuze, F (2022) Examining exploitation and its influence on construction sites in South Africa. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Emuze F, S J (2013) How can supply chain management proliferate in South African construction? In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Engström, S (2014) Overcoming barriers to innovation: Demonstrating an argument in favour of communication arenas. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Enshassi, A (1997) Construction safety issues in Gaza Strip. Building Research & Information, 25(6), pp. 370-373. ISSN 0961-3218

Ergen, E and Akinci, B (2008) Formalization of the flow of component-related information in precast concrete supply chains. Journal of Construction Engineering and Management, 134(2), pp. 112-121. ISSN 0733-9364

Eriksson, P E; Volker, L; Kadefors, A; Lingegård, S; Larsson, J and Rosander, L (2019) Collaborative procurement strategies for infrastructure projects: A multiple-case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(5), pp. 197-205. ISSN 17514304

Eriksson, T and Kadefors, A (2012) Trust, control and knowledge integration in a rock tunnel project. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Erk, E Y; Budayan, C; Koc, K and Tokdemir, O B (2023) Value creation in PPP projects undertaken in the Turkish healthcare industry. Journal of Construction Engineering and Management, 149(11): 04023108, ISSN 0733-9364

Ernzen, J J and Schexnayder, C (2000) One company's experience with design/build: Labor cost risk and profit potential. Journal of Construction Engineering and Management, 126(1), pp. 10-14. ISSN 0733-9364

Esmaeili, I; Poças Martins, J and Castro, J M (2026) Computer vision-based CAD to BIM design change management: Case of building's lightings. International Journal of Construction Management, 26(2), pp. 234-255. ISSN 1562-3599

Evans, R C and Kaka, A P (1998) Analysis of the accuracy of standard/average value curves using food retail building projects as case studies. Engineering, Construction and Architectural Management, 5(1), pp. 58-67. ISSN 0969-9988

Everett, J G; Halkali, H and Schlaff, T G (1998) Time-lapse video applications for construction project management. Journal of Construction Engineering and Management, 124(3), pp. 204-209. ISSN 0733-9364

Eyiah, A K and Cook, P (2003) Financing small and medium-scale contractors in developing countries: A Ghana case study. Construction Management and Economics, 21(4), pp. 357-367. ISSN 01446193

Ezeldin, A S and Sharara, L M (2006) Neural networks for estimating the productivity of voncreting activities. Journal of Construction Engineering and Management, 132(6), pp. 650-656. ISSN 0733-9364

Ezulike, E I; Perry, J G and Hawwash, K (1997) The barriers to entry into the PFI market. Engineering, Construction and Architectural Management, 4(3), pp. 179-193. ISSN 0969-9988

Ezulike, Ekene Ifeanyi (1998) Construction compainies and their strategies in the emerging PFI industry. PhD thesis, University of Birmingham, UK.

Fahdah, I (2008) Distributed IT for integration and communication of engineering information for collaborative building design. PhD thesis, University of Nottingham, UK.

Fahrich, R; Schumann, L; Kremser, L; Schmitt, L and Kriegel, M (2025) Building energy efficiency assessment considering IEQ and sustainability certification data for German office buildings. Building Research & Information, 53(7), pp. 912-928. ISSN 0961-3218

Fang, Y.; Minati, L.; Cosentino, S.; Voltolini, S.; Sadler, G. and Yoshimura, Y. (2025) Redefining walking: A bio-inspired kinetic architecture. Architectural Engineering and Design Management, 21(6), pp. 1562-1581. ISSN 1745-2007

Fang, D P; Huang, X Y and Hinze, J (2004) Benchmarking studies on construction safety management in China. Journal of Construction Engineering and Management, 130(3), pp. 424-432. ISSN 0733-9364

Fang, T; Sun, L; Xu, X; Li, H and Shao, Z (2024) Exploring the impacts of spatial morphology of underground shopping mall atriums on natural lighting performance. Architectural Engineering and Design Management, 20(4), pp. 808-831. ISSN 1745-2007

Fang, X; Li, H; Ma, J; Xing, X; Ren, Q; Umer, W and Wang, L (2024) Online assessment of spontaneous mental fatigue in construction workers considering data quality: Improved online sequential extreme learning machine. Journal of Construction Engineering and Management, 150(11): 04024148, ISSN 0733-9364

Fang, Y; Cho, Y K; Zhang, S and Perez, E (2016) Case study of BIM and cloud-enabled real-time RFID indoor localization for construction management applications. Journal of Construction Engineering and Management, 142(7): 5016003, ISSN 0733-9364

Fang, Z (2022) Machine learning integrated portfolio-based strategic building asset management. PhD thesis, University College London, UK.

Faniran, O O and Caban, G (1998) Minimizing waste on construction project sites. Engineering, Construction and Architectural Management, 5(2), pp. 182-188. ISSN 0969-9988

Farnham, C; Emura, K and Mizuno, T (2015) Evaluation of cooling effects: Outdoor water mist fan. Building Research & Information, 43(3), pp. 334-345. ISSN 0961-3218

Farrell, A and Sunindijo, R Y (2022) Overcoming challenges of early contractor involvement in local government projects. International Journal of Construction Management, 22(10), pp. 1902-1909. ISSN 1562-3599

Farrow, C B and Reyes, M D (2022) Land-grant university strategic plans: Are university-level service-learning goals aligned with construction programs’ goals? International Journal of Construction Education and Research, 18(4), pp. 333-351. ISSN 1557-8771

Faruqi, S and Smith, N J (1997) Karachi light rail transit: A private finance proposal. Engineering, Construction and Architectural Management, 4(3), pp. 233-246. ISSN 0969-9988

Fash, M F (2024) Development of a femalized kinesthetic learning model to increase architecture, engineering, and construction (AEC) career interests in African American middle school girls. PhD thesis, North Carolina Agricultural and Technical State University, USA.

Fathi, M (2020) Public-private partnership contract framework development and project performance analysis compared to design-build in the US highway projects. PhD thesis, University of Nevada, Las Vegas, USA.

Faulkner, A C; Sargent, J H and Wearne, S H (1989) Civil engineers' managerial roles and needs: Report of survey. Construction Management and Economics, 7(2), pp. 155-174. ISSN 01446193

Fawcett, W and Song, J Y (2009) Modelling the use of space and time in the knowledge economy. Building Research & Information, 37(3), pp. 312-324. ISSN 0961-3218

Fazio, P; Théberge, P; revay, S and Moselhi, O (1988) Design impact of construction fast-track. Construction Management and Economics, 6(3), pp. 195-208. ISSN 01446193

Feghaly, J (2020) Innovative delivery of water infrastructure projects. PhD thesis, Arizona State University, USA.

Fernandes, C. N.; Ramalho, P. C. and Lima-Silva, F. (2026) Climate-related risks: Implications for municipal governments in Brazil. Buildings & Cities, 7(1), pp. 559-575. ISSN 2632-6655

Fernando, S; Hansen, E; Kozak, R and Sinha, A (2018) Organizational cultural compatibility of engineered wood products manufacturers and building specifiers in the Pacific Northwest. Architectural Engineering and Design Management, 14(5), pp. 398-410. ISSN 1745-2007

Ferreira, Thiago Lopes (2014) Vernacular architecture and contemporary production processes: Formation, experimentation and construction in a Brazilian rural settlement. PhD thesis, Universidade de São Paulo, Brazil.

Fewings, P and Hodgson, P (2005) Collaboration and learning: A business integration model. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Fifield, L-J (2017) Monitoring UK hospital building type performance. PhD thesis, Loughborough University, UK.

Figliola, A; Canducci, A; Calcagni, L and Battisti, A (2024) Passive strategies for climate change mitigation in architectural heritage: the case study of Santa Maria in Trastevere Basilica, Rome. Building Research & Information, 52(7), pp. 725-747. ISSN 0961-3218

Finnie, D; Ameer Ali, N and Park, K (2021) Early contractor involvement: a review of pre-construction service agreements. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(4), pp. 143-150. ISSN 17514304

Fiona, T S C (2009) A critical study on performance-based fire safety design in Hong Kong with timber perforated ceilings as an example. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Fischer, J (2010) Translating zero carbon into building design regulation, theories and practices. PhD thesis, University of Manchester, UK.

Fitch, T; Keki, I and Smyth, H (2010) Power and perceptions in business development: The case of a major contractor and design consultancies in civil engineering influencer and referral markets. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Fitzpatrick-Ramirez, Cameron (2014) Strategies and contradictions: Knowledge workers and the built environment. PhD thesis, University of New South Wales, Australia.

Florez, L; Irizarry, J; Castro-Lacouture, D; Abdollahipour, S and Jeong, H (2012) Feasibility of implementing a computer-assisted pavement rehabilitation decision support system. International Journal of Construction Education and Research, 8(4), pp. 281-300. ISSN 1557-8771

Formoso, C; Leite, F and Miron, L (2011) Client requirements management in social housing: A case study on the residential leasing program in Brazil. Journal of Construction in Developing Countries, 16(2), pp. 47-67. ISSN 1823-6499

Formoso, C T; Tzortzopoulos, P and Liedtke, R (2002) A model for managing the product development process in house building. Engineering, Construction and Architectural Management, 9(5-6), pp. 419-432. ISSN 0969-9988

Forooraghi, M; Cobaleda-Cordero, A and Babapour Chafi, M (2022) A healthy office and healthy employees: A longitudinal case study with a salutogenic perspective in the context of the physical office environment. Building Research & Information, 50(1-2), pp. 134-151. ISSN 0961-3218

Foroughi Sabzevar, M; Gheisari, M and Lo, L J (2021) Improving access to design information of paper-based floor plans using augmented reality. International Journal of Construction Education and Research, 17(2), pp. 178-198. ISSN 1557-8771

Forsythe, A E (2008) The lack of a clearly defined retention strategy and the impact of the retention of civil engineers. PhD thesis, Capella University, USA.

Forsythe, P (2011) Drivers of housing demolition decision making and the impact on timber waste management. Construction Economics and Building, 11(1), pp. 1-14. ISSN 2204-9029

Forsythe, P (2018) Extending and operationalizing construction productivity measurement on building projects. Construction Management and Economics, 36(12), pp. 683-699. ISSN 01446193

Fortunato Iii, B R; Hallowell, M R; Behm, M and Dewlaney, K (2012) Identification of safety risks for high-performance sustainable construction projects. Journal of Construction Engineering and Management, 138(4), pp. 499-508. ISSN 0733-9364

Foulds, C; Royston, S; Aggeli, A; Crowther, A and Robison, R (2026) Sharing energy renovations know-how through citizen–professional knowledge networks. Buildings & Cities, 7(1), pp. 341-359. ISSN 2632-6655

Fox, S; Marsh, L and Cockerham, G (2003) Assessing the capability of construction processes to realize building designs. Construction Management and Economics, 21(1), pp. 7-10. ISSN 01446193

Fox, S J (2010) Information and communication design for multi-disciplinary multi-national education and research. International Journal of Construction Education and Research, 6(1), pp. 30-45. ISSN 1557-8771

Frances, Z and Stevenson, F (2018) Domestic photovoltaic systems: The governance of occupant use. Building Research & Information, 46(1), pp. 23-41. ISSN 0961-3218

Francis, A (2013) The chronographical approach for construction project modelling. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(4), pp. 188-204. ISSN 17514312

Francis, T J; Geens, A J and Littlewood, J (2011) Assessing the effectiveness of maintenance practice, in caring for historic buildings. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Franz, B W; Leicht, R M and Riley, D R (2013) Project impacts of specialty mechanical contractor design involvement in the health care industry: Comparative case study. Journal of Construction Engineering and Management, 139(9), pp. 1091-1097. ISSN 0733-9364

Freer, D R (2000) Vital considerations for the design and construction of new student housing communities. EdD thesis, University of California, Los Angeles, USA.

Frei, M (2021) Data-driven building retrofit using a wireless sensor network. DSc thesis, ETH Zürich, Switzerland.

Gabai, D S; Haronian, E; Sacks, R; Kennard, N S; Wong, N; Miera, M K and Cloyd, T D (2026) Doubling throughput and halving project durations: Lessons from intel's ocf strategy for project portfolio management. Journal of Construction Engineering and Management, 152(2): 04025256, ISSN 0733-9364

Gaber, B; Zhan, C; Han, X; Omar, M and Li, G (2024) Employing ANN for daylight and energy prediction of hot climate office buildings: A case study of new cairo, Egypt. Architectural Engineering and Design Management, 20(6), pp. 1752-1776. ISSN 1745-2007

Gajjar, D; Lucas, J and Davis, D (2023) Understanding employee perception to promote management level workforce development for roofing contractors. International Journal of Construction Education and Research, 19(2), pp. 221-238. ISSN 1557-8771

Galha Bartolo, H M (2002) The application of repertory grid techniques to the assessment of users' perceptions of design quality construction. PhD thesis, University of Reading, UK.

Galiano-Garrigós, A; Marcos, C L; Kouider, T and Juan Gutiérrez, P J (2022) Reassessing thermal comfort in modern architecture: E.1027 as a case study. Building Research & Information, 50(1-2), pp. 230-254. ISSN 0961-3218

Gallardo, Amarilis Lucia Casteli Figueiredo (2004) Evaluation of the environmental management practices in the construction of the descending roadway of imigrantes highway. PhD thesis, Universidade de São Paulo, Brazil.

Gan, C E (1998) Organizational interactions in the management of development projects. PhD thesis, National University of Singapore, Singapore.

Gana, V F G; Giridharan, R and Watkins, R (2018) Application of soft landings in the design management process of a non-residential building. Architectural Engineering and Design Management, 14(3), pp. 178-193. ISSN 1745-2007

Ganah, A A M (2003) The use of computer visualisation in communicating constructability information in UK. Journal of Engineering, Design and Technology, 1(2), pp. 151-167. ISSN 1726-0531

Gangolells, M; Casals, M; Forcada, N; Fuertes, A and Roca, X (2013) Model for enhancing integrated identification, assessment, and operational control of on-site environmental impacts and health and safety risks in construction firms. Journal of Construction Engineering and Management, 139(2), pp. 138-147. ISSN 0733-9364

Gansmo, H J (2012) Municipal planning of a sustainable neighbourhood: Action research and stakeholder dialogue. Building Research & Information, 40(4), pp. 493-503. ISSN 0961-3218

Gao, J (2011) A characterization framework to document and compare BIM implementations on construction projects. PhD thesis, Stanford University, USA.

Gao, T; Ergan, S; Akinci, B and Garrett, J H (2014) Proactive productivity management at job sites: Understanding characteristics of assumptions made for construction processes during planning based on case studies and interviews. Journal of Construction Engineering and Management, 140(3): 4013054, ISSN 0733-9364

Garba, A and Kishk, M (2014) Renewable energy technology means of providing sustainable electricity in Nigerian rural areas: A review. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Garcia, G; Golparvar-Fard, M; De La Garza, J M and Fischer, M (2021) Measuring progress and productivity in model-driven engineering for capital project delivery. Journal of Construction Engineering and Management, 147(4): 04021009, ISSN 0733-9364

Garnett, J (2002) Work based learning partnerships and structural capital: The case of Middlesex University. DProf thesis, Middlesex University, UK.

Garretón, J Y; Rodriguez, R and Pattini, A (2016) Effects of perceived indoor temperature on daylight glare perception. Building Research & Information, 44(8), pp. 907-919. ISSN 0961-3218

Garrido Martins, C (2019) Assessment of project risks in fast-track construction projects. PhD thesis, University of New Mexico, USA.

Garvin, M J and Cheah, C Y J (2004) Valuation techniques for infrastructive investment decisions. Construction Management and Economics, 22(4), pp. 373-383. ISSN 01446193

Gavieta, R C (1997) Socio-economic and spatial indicators for household energy for a tropical urban community in urban Manila. Building Research & Information, 25(2), pp. 124-128. ISSN 0961-3218

Gbadegesin, A O; Sun, Y and Nwulu, N I (2021) Stacked value streams of hybrid energy storage systems in prosumer microgrids. Journal of Engineering, Design and Technology, 19(5), pp. 1063-1079. ISSN 1726-0531

Georg, S and Tryggestad, K (2009) On the emergence of roles in construction: The qualculative role of project management. Construction Management and Economics, 27(10), pp. 969-981. ISSN 1466433X

George, M G (2003) The implementation of project management in the building construction field in the United Arab Emirates. PhD thesis, University of South Wales, UK.

Georgiou, J (2013) Workmanship and defects in housing in the state of Victoria, Australia. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Georgy, M and Basily, S Y (2008) Using genetic algorithms in optimizing construction material delivery schedules. Construction Innovation, 8(1), pp. 23-45. ISSN 1471-4175

Georgy, M E; Chang, L M and Zhang, L (2005) Utility-function model for engineering performance assessment. Journal of Construction Engineering and Management, 131(5), pp. 558-568. ISSN 0733-9364

Gerth, R; Boqvist, A; Bjelkemyr, M and Lindberg, B (2013) Design for construction: Utilizing production experiences in development. Construction Management and Economics, 31(2), pp. 135-150. ISSN 1466433X

Ghadiri, S T; Pazhouhanfar, M and Saberi, M (2026) Impact of architectural design characteristics of railway stations on travellers' preferences: A digital design method. Building Research & Information, 54(2), pp. 179-197. ISSN 0961-3218

Ghansah, F A (2025) Digital twins for smart building at the facility management stage: A systematic review of enablers, applications and challenges. Smart and Sustainable Built Environment, 14(4), pp. 1194-1229. ISSN 2046-6099

Gharaibeh, H M (2013) Managing the cost of power transmission projects: Lessons learned. Journal of Construction Engineering and Management, 139(8), pp. 1063-1067. ISSN 0733-9364

Gharaie, E; Wakefield, R and Blismas, N (2010) Explaining the increase in the Australian average house completion time: Activity-based versus workflow-based approach. Construction Economics and Building, 10(4), pp. 34-49. ISSN 2204-9029

Ghodoosi, F; Abu-Samra, S; Zeynalian, M and Zayed, T (2018) Maintenance cost optimization for bridge structures using system reliability analysis and genetic algorithms. Journal of Construction Engineering and Management, 144(2): 04017116, ISSN 0733-9364

Ghosh, S and Robson, K F (2015) Analyzing the empire state building project from the perspective of lean delivery system: A descriptive case study. International Journal of Construction Education and Research, 11(4), pp. 257-267. ISSN 1557-8771

Gibb, A; Hide, S; Haslam, R; Gyi, D; Pavitt, T; Atkinson, S and Duff, R (2005) Construction tools and equipment: their influence on accident causality. Journal of Engineering, Design and Technology, 3(1), pp. 12-23. ISSN 1726-0531

Gibb, A; Lingard, H; Behm, M and Cooke, T (2014) Construction accident causality: Learning from different countries and differing consequences. Construction Management and Economics, 32(5), pp. 446-459. ISSN 01446193

Gibb, A G F and Isack, F (2001) Client drivers for construction projects: Implications for standardization. Engineering, Construction and Architectural Management, 8(1), pp. 46-58. ISSN 0969-9988

Gibb, A G F and Isack, F (2003) Re-engineering through pre-assembly: Client expectations and drivers. Building Research & Information, 31(2), pp. 146-160. ISSN 0961-3218

Gibson Jr, G E; McGinnis, C I; Flanigan, W S and Wood, J E (1996) Constructability in public sector. Journal of Construction Engineering and Management, 122(3), pp. 274-280. ISSN 0733-9364

Gil, N; Beckman, S and Tommelein, I (2008) Problem-solving base building under uncertainty and ambiguity: Multiple-case study on an airport expansion program. Journal of Construction Engineering and Management, 134(12), pp. 991-1001. ISSN 0733-9364

Gillich, A (2025) Market transformations: Gas conversion as a blueprint for net zero retrofit. Buildings & Cities, 6(1), pp. 359-377. ISSN 2632-6655

Gillich, A; Sunikka-Blank, M and Ford, A (2018) Designing an 'optimal' domestic retrofit programme. Building Research & Information, 46(7), pp. 767-778. ISSN 0961-3218

Gillott, C (2022) Potential for the vertical extension of existing buildings. PhD thesis, University of Sheffield, UK.

Giupponi, N and Thomson, C (2020) The implication of advances in community mapping through spatial information technologies for urban regeneration projects. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Glass, J and Pepper, C (2005) Perceptions of precast concrete cladding in the UK market. Architectural Engineering and Design Management, 1(4), pp. 233-246. ISSN 1745-2007

Gledson, B J and Greenwood, D (2014) The implementation and use of 4D BIM and virtual construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Glick, S; Leed, A P; Guggemos, A A and Price, J (2011) Increasing resource efficiency through residential greywater use. International Journal of Construction Education and Research, 7(1), pp. 41-57. ISSN 1557-8771

Glick, S; Porter, D and Smith, C (2012) Student visualization: Using 3-d models in undergraduate construction management education. International Journal of Construction Education and Research, 8(1), pp. 26-46. ISSN 1557-8771

Glick, S; Shuler, S and Guggemos, A A (2013) Life cycle analysis for sustainable development: A case study of parking lot pavements. International Journal of Construction Education and Research, 9(3), pp. 226-236. ISSN 1557-8771

Gocmen, F C (2014) Infrastructure scaling and pricing. PhD thesis, Columbia University, USA.

Goh, C S; Abdul-Rahman, H and Abdul Samad, Z (2013) Applying risk management workshop for a public construction project: Case study. Journal of Construction Engineering and Management, 139(5), pp. 572-580. ISSN 0733-9364

Goins, J and Moezzi, M (2013) Linking occupant complaints to building performance. Building Research & Information, 41(3), pp. 361-372. ISSN 0961-3218

Gomes, Helton Cristiano (2013) Multi-objective optimization algorithms for the activity sequencing problem in steel construction projects. PhD thesis, Universidade Federal de Ouro Preto, Brazil.

Goncalves Sartori, Thais (2023) Improving whole building life cycle assessment software tools for decision-making. PhD thesis, Queensland University of Technology, Australia.

Gong, J; Borcherding, J D and Caldas, C H (2011) Effectiveness of craft time utilization in construction. Construction Management and Economics, 29(7), pp. 737-751. ISSN 1466433X

Goodchild, B and Beatty, C (2000) Assessing the procurement practices of housing associations: A case study of new build in Scotland. Journal of Construction Procurement, 6(1), pp. 20-32. ISSN 1358-9180

Goodhew, S; Fitzgerald, D and Southcombe, C (1999) Water efficient dwellings: Do UK house builders recognise a need? Journal of Financial Management of Property and Construction, 4(2), pp. 49-62. ISSN 1366-4387

Goonetillake, J F (2019) A framework for the integration of information requirements within infrastructure digital construction. PhD thesis, Cardiff University, UK.

Gorgolewski, M (2008) Designing with reused building components: Some challenges. Building Research & Information, 36(2), pp. 175-188. ISSN 0961-3218

Gosling, J and Naim, M M (2009) Coping with project uncertainty in construction supply chains. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Gotthelf, H; Ozbek, M E and Guggemos, A (2013) Potential efficiency gains from early involvement of steel fabricators and erectors: Lessons learned from the nrel research support facility project. International Journal of Construction Education and Research, 9(2), pp. 147-160. ISSN 1557-8771

Govender, N.; Laryea, S. and Watermeyer, R. (2025) To what extent does professional service fees influence the quality of project documents? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 16-28. ISSN 1751-4304

Govertsen, K and Kane, M (2024) Measuring health inequities due to housing characteristics. Buildings & Cities, 5(1), pp. 451-469. ISSN 2632-6655

Graham, L T; Parkinson, T and Schiavon, S (2021) Lessons learned from 20 years of CBE's occupant surveys. Buildings & Cities, 2(1), pp. 166-184. ISSN 2632-6655

Graham, P; McFarlane, K and Taheri, M (2025) Developing criteria for effective building-sector commitments in nationally determined contributions. Buildings & Cities, 6(1), pp. 695-712. ISSN 2632-6655

Graham, P and Rawal, R (2019) Achieving the 2°C goal: The potential of India's building sector. Building Research & Information, 47(1), pp. 108-122. ISSN 0961-3218

Granheimer, K; Gustavsson, T K and Eriksson, P E (2021) Public procurement of engineering services: Governance and control mechanisms. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Grant, E J (2020) Mainstreaming environmental education for architects: The need for basic literacies. Buildings & Cities, 1(1), pp. 538-549. ISSN 2632-6655

Grassie, D; Schwartz, Y; Symonds, P; Korolija, I; Mavrogianni, A and Mumovic, D (2022) Energy retrofit and passive cooling: Overheating and air quality in primary schools. Buildings & Cities, 3(1), pp. 204-225. ISSN 2632-6655

Greenwood, D and Gledson, B J (2012) The efficient scheduling of resources in engineering construction projects: Reflections on a case study from Iran. Construction Management and Economics, 30(8), pp. 687-695. ISSN 1466433X

Greenwood, D; Horne, M; Thompson, E M; Allwood, C M; Wernemyr, C and Westerdahl, B (2008) Strategic perspectives on the use of virtual reality within the building industries of four countries. Architectural Engineering and Design Management, 4(2), pp. 85-98. ISSN 1745-2007

Greenwood, D; Walker, P and Walker, A (2008) The world turned upside-down: Architects as subcontractors in design-and-build contracts. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Greenwood, J P (2007) An examination of the performance based building code on the design of a commercial building. Construction Economics and Building, 7(1), pp. 37-44. ISSN 2204-9029

Grenzfurtner, W; Rudberg, M; Mayrhofer, R; Loike, K and Gronalt, M (2022) Performance measurement and management practices of on-site activities in industrialized housebuilding. Construction Management and Economics, 40(4), pp. 239-253. ISSN 01446193

Griffith, A (2011) Delivering best value in the small works portfolio of public sector organizations when using preferred contractors. Construction Management and Economics, 29(9), pp. 891-900. ISSN 1466433X

Griffiths, G (1999) Construction procurement arrangements of housing associations in liverpool. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Grilo, A C B (1998) The development of electronic trading between construction firms. PhD thesis, University of Salford, UK.

Grimes, H J (2012) Integrating human rights into water governance. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(3), pp. 141-157. ISSN 17514312

Grobler, F (1988) Object-oriented data representation for unified construction project information. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Gruneberg, S and Hughes, W P (2004) Analysing the types of procurement used in the UK: A comparison of two data sets. Journal of Financial Management of Property and Construction, 9(2), pp. 63-74. ISSN 1366-4387

Gu, Y (2011) The impacts of real-time knowledge based personal lighting control on energy consumption, user satisfaction and task performance in offices. PhD thesis, Carnegie Mellon University, USA.

Guerin, T F (2025) Perceptions of volume home builders and the transition to net zero emissions housing in Australia. Building Research & Information, 53(3), pp. 323-344. ISSN 0961-3218

Gunderson, D E and Gloeckner, G W (2006) Needs assessment: Construction management doctoral programs in the United States. International Journal of Construction Education and Research, 2(3), pp. 169-180. ISSN 1557-8771

Gunhan, S and Arditi, D (2005) International expansion decision for construction companies. Journal of Construction Engineering and Management, 131(8), pp. 928-937. ISSN 0733-9364

Gunhan, S M (2003) Foreign market entry decision model for construction companies. PhD thesis, Illinois Institute of Technology, USA.

Gunning, J G and McCallion, E M (2007) TQM in large Northern Ireland contracting organisations. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Guo, W.; Fang, D.; Lu, W. and Tan, Y. (2026) The ups and downs of collaboration: Investigating the u-curve between interorganizational routines and conflict resolution behaviors. Journal of Construction Engineering and Management, 152(10): 04026169, ISSN 0733-9364

Guo, S J (2002) Identification and resolution of work space conflicts in building construction. Journal of Construction Engineering and Management, 128(4), pp. 287-295. ISSN 0733-9364

Guo, Youheng (2025) Defect information modeling in intelligent civil infrastructure asset management. PhD thesis, University of New South Wales, Australia.

Guo, Z; Xu, X; Gao, X; Xu, Y; Liu, J; Zhang, M and Li, F (2025) Enhanced risk-based quality control for hydraulic engineering construction projects considering the risk-influencing mechanism. Journal of Construction Engineering and Management, 151(2): 04024204, ISSN 0733-9364

Gupta, R and Gregg, M (2013) Preventing the overheating of English suburban homes in a warming climate. Building Research & Information, 41(3), pp. 281-300. ISSN 0961-3218

Gyasi-Addo, A J and Bennadji, A (2020) Investigating the major causes of morphological transformations in the cbd of Accra and the impact on urban heat island intensity. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Gómez-Chaparro, M; García-Sanz-Calcedo, J and Aunión-Villa, J (2020) Maintenance in hospitals with less than 200 beds: Efficiency indicators. Building Research & Information, 48(5), pp. 526-537. ISSN 0961-3218

Görsch, C; Seppänen, O; Peltokorpi, A and Lavikka, R (2024) Task planning and control in construction: Revealing workers as early and late planners. Construction Management and Economics, 42(5), pp. 431-450. ISSN 01446193

Haddad, S; Osmond, P and King, S (2019) Application of adaptive thermal comfort methods for Iranian schoolchildren. Building Research & Information, 47(2), pp. 173-189. ISSN 0961-3218

Hadidi, L A (2016) Using quality function deployment to conduct assessment for engineering designs' contractors. Architectural Engineering and Design Management, 12(3), pp. 205-230. ISSN 1745-2007

Hadikusumo, B H W and Tobgay, S (2015) Construction claim types and causes for a large-scale hydropower project in Bhutan. Journal of Construction in Developing Countries, 20(1), pp. 49-63. ISSN 1823-6499

Hafez, H; El-Mahdy, D and Marsh, A T M (2023) Barriers and enablers for scaled-up adoption of compressed earth blocks in Egypt. Building Research & Information, 51(7), pp. 783-797. ISSN 0961-3218

Haghighi, Z (2022) Architectural photovoltaic application. PhD thesis, Delft University of Technology, Netherlands.

Haglund, P; Rudberg, M and Sezer, A A (2022) Organizing logistics to achieve strategic fit in building contractors: A configurations approach. Construction Management and Economics, 40(9), pp. 711-726. ISSN 01446193

Halabya, A and El-Rayes, K (2020) Optimizing the planning of pedestrian facilities upgrade projects to maximize accessibility for people with disabilities. Journal of Construction Engineering and Management, 146(1): 04019088, ISSN 0733-9364

Hall, M A (2001) 'Root' cause analysis: A tool for closer supply chain integration in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Hall, M A and Jaggar, D M (1998) The importance of cultural differences to British construction professionals working internationally. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Haller, M and Stehn, L (2011) Evaluation of efficiency in housing construction design. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Halliday, S; Beggs, C and Muneer, T (1999) Is solar air conditioning feasible? Building Research & Information, 27(3), pp. 149-164. ISSN 0961-3218

Halligan, D W; Demsetz, L A; Brown, J D and Pace, C B (1994) Action-response model and loss of productivity in construction. Journal of Construction Engineering and Management, 120(1), pp. 47-64. ISSN 0733-9364

Hallowell, M (2010) Safety risk perception in construction companies in the Pacific Northwest of the USA. Construction Management and Economics, 28(4), pp. 403-413. ISSN 1466433X

Hallowell, M; Esmaeili, B and Chinowsky, P (2011) Safety risk interactions among highway construction work tasks. Construction Management and Economics, 29(4), pp. 417-429. ISSN 1466433X

Hallowell, M R and Gambatese, J A (2009) Construction safety risk mitigation. Journal of Construction Engineering and Management, 135(12), pp. 1316-1323. ISSN 0733-9364

Hallsted, B K (2010) Examining motivational factors in selecting spray polyurethane foam insulation for residential construction. PhD thesis, Northcentral University, USA.

Hamledari, H; Sajedi, S; McCabe, B and Fischer, M (2021) Automation of inspection mission planning using 4D bims and in support of unmanned aerial vehicle-based data collection. Journal of Construction Engineering and Management, 147(3): 4020179, ISSN 0733-9364

Hammad, A W A; Akbarnezhad, A; Rey, D and Waller, S T (2016) A computational method for estimating travel frequencies in site layout planning. Journal of Construction Engineering and Management, 142(5): 04015102, ISSN 0733-9364

Hammond, D; Dempsey, J J; Szigeti, F and Davis, G (2005) Integrating a performance-based approach into practice: A case study. Building Research & Information, 33(2), pp. 128-141. ISSN 0961-3218

Hamta, N; Ehsanifar, M and Sarikhani, J (2021) Presenting a goal programming model in the time-cost-quality trade-off. International Journal of Construction Management, 21(1), pp. 1-11. ISSN 1562-3599

Hamzeh, F R (2009) Improving construction workflow: The role of production planning and control. PhD thesis, University of California, Berkeley, USA.

Han, W N; Tao, Y H; Zhu, J S; Wang, D W and Yang, R P (2026) Terrestrial laser scan planning for bridge structures at complex sites. Journal of Construction Engineering and Management, 152(2): 04025241, ISSN 0733-9364

Han, S (2013) Automated monitoring and systemic analysis of workers' safety behavior in construction operations. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Han, S (2024) Understanding of AI-aided reality capture data for the development of BIM modeling for building façade inspections. PhD thesis, Marquette University, USA.

Han, S; Bouferguene, A; Al-Hussein, M and Hermann, U R (2017) 3D-based crane evaluation system for mobile crane operation selection on modular-based heavy construction sites. Journal of Construction Engineering and Management, 143(9): 04017060, ISSN 0733-9364

Han, S H; Diekmann, J E; Lee, Y and Ock, J H (2004) Multicriteria financial portfolio risk management for international projects. Journal of Construction Engineering and Management, 130(3), pp. 346-356. ISSN 0733-9364

Han, S H; Park, S H; Kim, D Y; Kim, H and Kang, Y W (2007) Causes of bad profit in overseas construction projects. Journal of Construction Engineering and Management, 133(12), pp. 932-943. ISSN 0733-9364

Han, Y and Wade, F (2022) Mapping supply chain actors for innovative building retrofit. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Hanlon, E J and Sanvido, V E (1995) Constructability information classification scheme. Journal of Construction Engineering and Management, 121(4), pp. 337-345. ISSN 0733-9364

Hansen, D E (2021) Including commissioning during design phase benefits new construction: A qualitative case study. PhD thesis, Northcentral University, USA.

Hao, J L; Tam, V W Y; Yuan, H P and Wang, J Y (2011) Construction waste challenges in Hong Kong and Pearl River Delta region. International Journal of Construction Management, 11(1), pp. 37-47. ISSN 1562-3599

Hardie, M and Saha, S (2009) Builders' perceptions of lowest cost procurement and its impact on quality. Construction Economics and Building, 9(1), pp. 1-8. ISSN 2204-9029

Hardwicke, J and King, A (2014) The use of evidence based design in NHS construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Harfield, T; Panko, M; Davies, K and Kenley, R (2007) Toward a learning-styles profile of construction students: Results from New Zealand. International Journal of Construction Education and Research, 3(3), pp. 143-158. ISSN 1557-8771

Haroglu, H; Glass, J and Thorpe, T (2009) A study of professional perspectives on structural frame selection. Construction Management and Economics, 27(12), pp. 1209-1217. ISSN 1466433X

Harrington, S and Mulville, M (2021) A risk framework for the delivery of long-term performance through the large-scale energy focused retrofit of housing. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Hartmann, A. and van den Berg, M. (2026) Circularity on demand and at the side: Working rule patterns in construction design practices. Construction Management and Economics, 44(8), pp. 639-652. ISSN 0144-6193

Hartmann, T; Gao, J and Fischer, M (2008) Areas of application for 3D and 4D models on construction projects. Journal of Construction Engineering and Management, 134(10), pp. 776-785. ISSN 0733-9364

Hartmann, T and Levitt, R E (2010) Understanding and managing three-dimensional/four-dimensional model implementations at the project team level. Journal of Construction Engineering and Management, 136(7), pp. 757-767. ISSN 0733-9364

Hartmann A, D e A (2013) Messages in bottles: The fallacy of transferring knowledge between construction projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Hasan, S and Sacks, R (2023) Integrating BIM and multiple construction monitoring technologies for acquisition of project status information. Journal of Construction Engineering and Management, 149(7): 04023051, ISSN 0733-9364

Hasannejad, A; Sardrud, J M and Shirzadi Javid, A A (2023) BIM-based clash detection improvement automatically. International Journal of Construction Management, 23(14), pp. 2431-2437. ISSN 1562-3599

Hassan, Fahad Ul (2022) Digitalization of construction project requirements using natural language processing (NLP) techniques. PhD thesis, Clemson University, USA.

Hassanain, M A (2007) Post-occupancy indoor environmental quality evaluation of student housing facilities. Architectural Engineering and Design Management, 3(4), pp. 249-256. ISSN 1745-2007

Hassanein, A A G and Afify, H M F (2006) Contractors' risk identification behaviour: A case study. Journal of Construction Procurement, 12(1),

Hassanein, A A G and Afify, H M F (2007) Risk management practices of contractors: A case study of power station projects in Egypt. Journal of Financial Management of Property and Construction, 12(3), pp. 164-179. ISSN 1366-4387

Hastie, J; Sutrisna, M and Egbu, C (2017) Modelling knowledge integration process in early contractor involvement procurement at tender stage: A Western Australian case study. Construction Innovation, 17(4), pp. 429-456. ISSN 1471-4175

Hatem, W A H (2012) Comparing the effectiveness of face to face and computer mediated collaboration in design. PhD thesis, Cardiff University, UK.

Hauck, A J (1990) Development and evaluation of computerized construction estimating, pricing, and bidding programs using integrated applications software. PhD thesis, University of Maryland, College Park, USA.

Hauck, A J; Walker, D H T; Hampson, K D and Peters, R J (2004) Project alliancing at national museum of Australia: collaborative process. Journal of Construction Engineering and Management, 130(1), pp. 143-152. ISSN 0733-9364

Hayes, J; McDermott, V and Lingard, H (2015) What is risk? Construction activity near hazardous infrastructure. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

He, T; Jazizadeh, F and Arpan, L (2022) Ai-powered virtual assistants nudging occupants for energy saving: Proactive smart speakers for HVAC control. Building Research & Information, 50(4), pp. 394-409. ISSN 0961-3218

Hedborg, S and Gustavsson, T K (2019) Developing a neighbourhood: Horizontal interdependencies in an innovative multi-project context. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Hedgren, E and Stehn, L (2014) The impact of clients' decision-making on their adoption of industrialized building. Construction Management and Economics, 32(1-2), pp. 126-145. ISSN 01446193

Heffernan, E; Pan, W and Liang, X (2012) Delivering zero carbon homes in the UK. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Hegazy, T (1999) Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management, 125(3), pp. 167-175. ISSN 0733-9364

Hegazy, T and Ersahin, T (2001) Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management, 127(6), pp. 469-475. ISSN 0733-9364

Hegazy, T and Kamarah, E (2008) Efficient repetitive scheduling for high-rise construction. Journal of Construction Engineering and Management, 134(4), pp. 253-264. ISSN 0733-9364

Hegazy, T and Menesi, W (2008) Delay analysis under multiple baseline updates. Journal of Construction Engineering and Management, 134(8), pp. 575-582. ISSN 0733-9364

Hegazy, T and Menesi, W (2012) Heuristic method for satisfying both deadlines and resource constraints. Journal of Construction Engineering and Management, 138(6), pp. 688-696. ISSN 0733-9364

Helaly, H.; El-Rayes, K. and Ignacio, E. J. (2026) Multiobjective optimization for the planning of prefabricated bridge construction projects. Journal of Construction Engineering and Management, 152(8): 04026103, ISSN 0733-9364

Hellström, M; Wikström, R; Gustafsson, M and Luotola, H (2016) The value of project execution services: A problem and uncertainty perspective. Construction Management and Economics, 34(4-5), pp. 272-285. ISSN 01446193

Hellwig, R T (2015) Perceived control in indoor environments: A conceptual approach. Building Research & Information, 43(3), pp. 302-315. ISSN 0961-3218

Hemphill, L M (2009) Building bridges: A study of coordination in projects. PhD thesis, University of Michigan, USA.

Henderson, K (2007) Achieving legitimacy: Visual discourses in engineering design and green building code development. Building Research & Information, 35(1), pp. 6-17. ISSN 0961-3218

Hendrickson, D J and Wittman, H K (2010) Post-occupancy assessment: Building design, governance and household consumption. Building Research & Information, 38(5), pp. 481-490. ISSN 0961-3218

Henjewele, C; Sun, M and Fewings, P (2008) Uncertainties and the challenge of long-term value for money in the delivery of PFI projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Herbsman, Z J (1995) A+B bidding method: hidden success story for highway construction. Journal of Construction Engineering and Management, 121(4), pp. 430-437. ISSN 0733-9364

Hertin, J; Berkhout, F; Gann, D M and Barlow, J (2003) Climate change and the UK house building sector: Perceptions, impacts and adaptive capacity. Building Research & Information, 31(3-4), pp. 278-290. ISSN 0961-3218

Hes, D; Morrison, A W and Bates, M (2005) Assessment and selection of materials for Melbourne city Council House 2. Construction Economics and Building, 5(2), pp. 8-19. ISSN 2204-9029

Heshmati, K; Shahabpoor, E; Walker, I; Ghanbari, S and Darby, A (2025) The effect of wind-induced vibrations in tall buildings on occupants' work performance. Building Research & Information, 53(8), pp. 949-964. ISSN 0961-3218

Hesselink, L; Vahdatikhaki, F; Harmsen, Y and Voordijk, H (2024) Usability analysis of virtual-reality-enabled digital twin for the inspection of sewage pumping stations. International Journal of Construction Management, 24(13), pp. 1419-1430. ISSN 1562-3599

Heurkens, E W T M (2012) Private sector-led urban development projects: Management, partnerships and effects in the Netherlands and the UK. PhD thesis, Delft University of Technology, Netherlands.

Hickey, P J (2023) A study of gender diversity in u.S. Architecture, engineering, and construction (AEC) industry leadership. PhD thesis, University of Maryland, College Park, USA.

Hietajärvi, A-M; Aaltonen, K and Haapasalo, H (2017) Opportunity management in large projects: A case study of an infrastructure alliance project. Construction Innovation, 17(3), pp. 340-362. ISSN 1471-4175

Hiete, M; Stengel, J; Ludwig, J and Schultmann, F (2011) Matching construction and demolition waste supply to recycling demand: A regional management chain model. Building Research & Information, 39(4), pp. 333-351. ISSN 0961-3218

Higuera-Trujillo, J L; Llinares Millán, C; Montañana i Aviñó, A and Rojas, J C (2020) Multisensory stress reduction: A neuro-architecture study of paediatric waiting rooms. Building Research & Information, 48(3), pp. 269-285. ISSN 0961-3218

Hijazi, A A; Perera, S; Calheiros, R N and Alashwal, A (2021) Rationale for the integration of BIM and blockchain for the construction supply chain data delivery: A systematic literature review and validation through focus group. Journal of Construction Engineering and Management, 147(10): 03121005, ISSN 0733-9364

Hill, C and Ainsworth, A (2001) Health and safety: Academic research and practical application. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Hill, C and Rodgers, J (2000) Project partnering arrangement for delivery of a tight scheduled project. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Hill, Natoya (2025) A systematic literature review: Exploring the integration of artificial intelligence in construction management. DSc thesis, Middle Georgia State University, USA.

Hill, S (1997) The complex effects of obstructions on horizontal illuminance in interior lighting design. PhD thesis, University of Reading, UK.

Hintson, J (2025) State expansion and hollowness in contemporary Africa. PhD thesis, Stanford University, California, USA.

Hinze, J and Brown, J (1994) Properties of soundless chemical demolition agents. Journal of Construction Engineering and Management, 120(4), pp. 816-827. ISSN 0733-9364

Hinze, J and Godfrey, R (2003) An evaluation of safety performance measures for construction projects. Journal of Construction Research, 4(1), pp. 5-15. ISSN 1609-9451

Hinze, J and Wiegand, F (1992) Role of designers in construction worker safety. Journal of Construction Engineering and Management, 118(4), pp. 677-684. ISSN 0733-9364

Hipwood, T (2022) Adapting owner-occupied dwellings in the UK: Lessons for the future. Buildings & Cities, 3(1), pp. 297-315. ISSN 2632-6655

Ho, S P; Lin, Y H; Chu, W and Wu, H L (2009) Model for organizational governance structure choices in construction joint ventures. Journal of Construction Engineering and Management, 135(6), pp. 518-530. ISSN 0733-9364

Hoezen, M; Voordijk, H and Dewulf, G (2012) Contracting dynamics in the competitive dialogue procedure. Built Environment Project and Asset Management, 2(1), pp. 6-24. ISSN 2044-124X

Hoezen, M; van Rutten, J; Voordijk, H and Dewulf, G (2010) Towards better customized service-led contracts through the competitive dialogue procedure. Construction Management and Economics, 28(11), pp. 1177-1186. ISSN 1466433X

Hofman, E; Voordijk, H and Halman, J (2009) Matching supply networks to a modular product architecture in the house-building industry. Building Research & Information, 37(1), pp. 31-42. ISSN 0961-3218

Hofman, P; Wade, F; Webb, J and Groenleer, M (2021) Retrofitting at scale: Comparing transition experiments in Scotland and the Netherlands. Buildings & Cities, 2(1), pp. 637-654. ISSN 2632-6655

Holley, P W (2006) Effectiveness of it-based course material: A case study in publishing and using a digital textbook for construction surveying. International Journal of Construction Education and Research, 2(1), pp. 29-41. ISSN 1557-8771

Holt, E A; Perrenoud, A; Perkins, E and Bigelow, B F (2023) Recommendations for recruiting and developing early career membership in construction associations. International Journal of Construction Education and Research, 19(3), pp. 242-258. ISSN 1557-8771

Holt, L (1983) A case study of the construction of a terephthalic acid plant for Imperial Chemicals Limited at the Davies Works, Wilton, Cleveland, UK. Construction Management and Economics, 1(1), pp. 57-74. ISSN 01446193

Holt, L (1989) Project management excellence: The Shell Stanney case. Construction Management and Economics, 7(3), pp. 217-234. ISSN 01446193

Honda, Wilson Saburo (2016) Sustainability certificate of corporate offices buildings in Brazil. PhD thesis, Universidade de São Paulo, Brazil.

Hong, Z; Tam, C M and Shi, J J (2001) Resource allocation heuristic in construction simulation. Construction Management and Economics, 19(6), pp. 643-651. ISSN 01446193

Hong, Z; Hong, Y; Cai, H; Abraham, D M; Zhang, J and Dunston, P S (2025) BIM-based framework for in-plant quality control of precast concrete manufacturing. Journal of Construction Engineering and Management, 151(12): 05025017, ISSN 0733-9364

Hopkin, T; Lu, S-L; Rogers, P and Sexton, M (2016) Detecting defects in the UK new-build housing sector: A learning perspective. Construction Management and Economics, 34(1), pp. 35-45. ISSN 0144-6193

Hossain, Y (2017) Energy-efficient homes in Alaska: Historical and contemporary perspectives on adaptation and innovation. PhD thesis, University of Alaska Fairbanks, USA.

Hou, X; Zeng, Y and Xue, J (2020) Detecting structural components of building engineering based on deep-learning method. Journal of Construction Engineering and Management, 146(2): 04019097, ISSN 0733-9364

Houng, S C; Pal, A and Lin, J J (2024) 4D BIM and reality model-driven camera placement optimization for construction monitoring. Journal of Construction Engineering and Management, 150(6): 04024045, ISSN 0733-9364

Howard, W E (1996) Innovative strategies for compensation of engineering and construction contractors. PhD thesis, Clemson University, USA.

Hsu, P. Y. (2026) Reinforcement learning framework for just-in-time material ordering in urban construction: Development, evaluation, and real-time deployment. Journal of Construction Engineering and Management, 152(9): 04026157, ISSN 0733-9364

Hsu, P. Y. (2026) Reinforcement learning framework for just-in-time material ordering in urban construction: Development, evaluation, and real-time deployment. Journal of Construction Engineering and Management, 152(9): 04026157, ISSN 0733-9364

Hsu, C L; Wang, J T and Huang, Y H (2023) A functional element-naming approach for BIM elements in building envelope systems. Journal of Construction Engineering and Management, 149(6): 04023035, ISSN 0733-9364

Hsu, S-C (2013) A complexity-based approach to intra-organizational team selection. PhD thesis, University of Maryland, College Park, USA.

Hu, J; Ren, Z and Shen, L Y (2008) Impacts of overseas management structures on project buyout management: Case studies of Chinese international contractors. Journal of Construction Engineering and Management, 134(11), pp. 864-875. ISSN 0733-9364

Hu, M (2020) Life-cycle environmental assessment of energy-retrofit strategies on a campus scale. Building Research & Information, 48(6), pp. 659-680. ISSN 0961-3218

Hu, Q; Bai, Y; He, L; Cai, Q; Tang, S; Ma, G; Tan, J and Liang, B (2020) Intelligent framework for worker-machine safety assessment. Journal of Construction Engineering and Management, 146(5): 04020045, ISSN 0733-9364

Hu, X; Xia, B; Buys, L; Skitmore, M; Kennedy, R and Drogemuller, R (2015) Stakeholder analysis of a retirement village development in Australia: Insights from an interdisciplinary workshop. International Journal of Construction Management, 15(4), pp. 299-309. ISSN 1562-3599

Hu, Z; Chan, W T; Hu, H and Xu, F (2023) Cognitive factors underlying unsafe behaviors of construction workers as a tool in safety management: A review. Journal of Construction Engineering and Management, 149(3): 03123001, ISSN 0733-9364

Huang, J; Han, D; Zhang, H and Cui, W (2024) Framework and case study for the assembly accuracy prediction of prefabricated buildings using BIM and tls. Architectural Engineering and Design Management, 20(6), pp. 1427-1453. ISSN 1745-2007

Huang, L and Cao, Y (2025) A study on factors influencing the spatial oppressiveness in small courtyard spaces within university residential areas. Architectural Engineering and Design Management, 21(4), pp. 589-602. ISSN 1745-2007

Huang, R Y and Sun, K S (2006) Non-unit-based planning and scheduling of repetitive construction projects. Journal of Construction Engineering and Management, 132(6), pp. 585-597. ISSN 0733-9364

Huang, X; Bernd, D and Bernold, L E (1996) Innovative technology development for safe excavation. Journal of Construction Engineering and Management, 122(1), pp. 91-96. ISSN 0733-9364

Huang, Y (2010) Sustainable infrastructure system modeling under uncertainties and dynamics. PhD thesis, University of California, Davis, USA.

Huang, Y L and Pi, C C (2014) Real-option valuation of build-operate-transfer infrastructure projects under performance bonding. Journal of Construction Engineering and Management, 140(5): 04013068, ISSN 0733-9364

Hubbard, B; Huang, Q; Caskey, P and Wang, Y (2013) Safety awareness educational topics for the construction of power transmission systems with smart grid technologies. Construction Economics and Building, 13(3), pp. 114-127. ISSN 2204-9029

Hubbard, B and Hubbard, S (2023) Utilization of uas data by transportation agencies: Building on the experience of construction contractors. International Journal of Construction Management, 23(4), pp. 679-685. ISSN 1562-3599

Hudak, D and Maxwell, M (2007) A macro approach to estimating correlated random variables in engineering production projects. Construction Management and Economics, 25(8), pp. 883-892. ISSN 1466433X

Huebner, G M; Watson, N E; Direk, K; McKenna, E; Webborn, E; Hollick, F; Elam, S and Oreszczyn, T (2021) Survey study on energy use in UK homes during COVID-19. Buildings & Cities, 2(1), pp. 952-969. ISSN 2632-6655

Huijbregts, H J J (2002) Information and communications technology for real estate investment management. DDes thesis, Harvard University, USA.

Humphreys, M A (2005) Quantifying occupant comfort: Are combined indices of the indoor environment practicable? Building Research & Information, 33(4), pp. 317-325. ISSN 0961-3218

Hurtado, K (2018) An andragogically-centered schema for a heuristic approach to post-collegiate development in the built environment. PhD thesis, Arizona State University, USA.

Hussain, M B (1993) Constraint-based construction project scheduling. PhD thesis, Carnegie Mellon University, USA.

Hussein, M K; Yusof, M J M and Jaafar, N S (2020) An observational study on forest landscape conservation in Malaysia via the establishment of forestry educational centres. Journal of Construction in Developing Countries, 25(2), pp. 153-173. ISSN 1823-6499

Hutchings, D M and Christofferson, J P (2004) Management practices of residential construction companies producing 25 or fewer units annually. International Journal of Construction Education and Research, 1(1), pp. 34-44. ISSN 1557-8771

Huuhka, S; Moisio, M; Salmio, E; Köliö, A and Lahdensivu, J (2023) Renovate or replace? Consequential replacement LCA framework for buildings. Buildings & Cities, 4(1), pp. 212-228. ISSN 2632-6655

Hwang, Y; Kim, T; Ryu, J and Yang, K (2025) Collaborative bricklaying with a robotic arm using a head-mounted camera in construction. Journal of Construction Engineering and Management, 151(12): 04025204, ISSN 0733-9364

Hyari, K and El-Rayes, K (2006) Field experiments to evaluate lighting performance in nighttime highway construction. Construction Management and Economics, 24(6), pp. 591-601. ISSN 1466433X

Hyari, K H and Alamayreh, T (2023) Unbalanced bidding in construction projects: A contractors' perspective. International Journal of Construction Management, 23(12), pp. 2058-2066. ISSN 1562-3599

Hyde, R A (1999) Educating engineers for environmentally sensitive practice. PhD thesis, University of Toronto, Canada.

Hymes, S J (2011) Front-end specifications and construction claims. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(3), pp. 139-146. ISSN 17514312

Höök, M; Stehn, L and Brege, S (2015) The development of a portfolio of business models: A longitudinal case study of a building material company. Construction Management and Economics, 33(5-6), pp. 334-348. ISSN 01446193

Ibbs, C W (1986) Future directions for computerized construction research. Journal of Construction Engineering and Management, 112(3), pp. 326-345. ISSN 0733-9364

Ibbs, W and Nguyen, L D (2007) Alternative for quantifying field-overhead damages. Journal of Construction Engineering and Management, 133(10), pp. 736-742. ISSN 0733-9364

Ibbs, W; Nguyen, L D and Simonian, L (2011) Concurrent delays and apportionment of damages. Journal of Construction Engineering and Management, 137(2), pp. 119-126. ISSN 0733-9364

Ibrahim, A; Ali, H; Abuhendi, F and Jaradat, S (2020) Thermal seasonal variation and occupants' spatial behaviour in domestic spaces. Building Research & Information, 48(4), pp. 364-378. ISSN 0961-3218

Ikerd II, W F (2021) Level of acceptance (LOA) for scan-to-BIM creation. PhD thesis, University of Denver, USA.

Isaksson, T (2002) Model for estimation of time and cost based on risk evaluation applied on tunnel projects. PhD thesis, Kungliga Tekniska Hogskolan, Sweden.

Ishtiaque, T A; Wondimu, P A and Klakegg, O J (2025) Likelihood of early contractor involvement (ECI) benefits in infrastructure versus building projects: The client's perception. International Journal of Construction Management, 25(10), pp. 1227-1238. ISSN 1562-3599

Ismaeel, W S E; Alamoudy, F O and Sameh, R (2023) How renovation activities may jeopardise indoor air quality: Accounting for short and long-term symptoms of sick building syndrome in educational buildings. Architectural Engineering and Design Management, 19(4), pp. 360-377. ISSN 1745-2007

Ismail, S; Che Ibrahim, C K I; Belayutham, S; Cheung, C M and Isa, C M M (2022) Mainstreaming prevention through design in engineering education. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Ittmann, J T (2020) Liability of the structural engineer: Establishing, quantifying, and managing risks. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Iyer, K C and Sagheer, M (2011) A real options based traffic risk mitigation model for build-operate-transfer highway projects in India. Construction Management and Economics, 29(8), pp. 771-779. ISSN 1466433X

Iyer-Raniga, U and Wingrove, D (2012) Curriculum innovation in transnational teaching: A pilot study. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Jackson, G (2003) Contingency for cost control in project management: A case study. Construction Economics and Building, 3(1), pp. 1-12. ISSN 2204-9029

Jacob, J C; Pandit, D and Sen, J (2023) An explorative study on transient cooling pattern and energy efficiency while using micro-zonal occupant-centric control. Architectural Engineering and Design Management, 19(4), pp. 340-359. ISSN 1745-2007

Jacobsen, P H; Harty, C and Tryggestad, K (2016) (re)constructing the wicked problem through the visual and the verbal: The case of a dialogue based architectural competition. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Jacobsson, M and Linderoth, H C J (2010) The influence of contextual elements, actors' frames of reference, and technology on the adoption and use of ICT in construction projects: A Swedish case study. Construction Management and Economics, 28(1), pp. 13-23. ISSN 1466433X

Jacobsson, M and Roth, P (2014) Towards a shift in mindset: Partnering projects as engagement platforms. Construction Management and Economics, 32(5), pp. 419-432. ISSN 01446193

Jain, M and Rawal, R (2022) Emissions from a net-zero building in India: Life cycle assessment. Buildings & Cities, 3(1), pp. 398-416. ISSN 2632-6655

Jaiswal, A; Laishram, B and Johari, S (2025) A measuring tool to quantify the level of gender inclusion in a construction organization. Journal of Construction Engineering and Management, 151(10): 04025143, ISSN 0733-9364

Janda, K B and Parag, Y (2013) A middle-out approach for improving energy performance in buildings. Building Research & Information, 41(1), pp. 39-50. ISSN 0961-3218

Jansson, G; Johnsson, H and Engström, D (2014) Platform use in systems building. Construction Management and Economics, 32(1-2), pp. 70-82. ISSN 01446193

Jansson, G; Söderholm, E and Johnsson, H (2008) Design process organisation at industrial house builders: A case study of two timber housing companies in Sweden. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Jaradat, S and Sexton, M (2016) BIM articulation in different-sized architectural firms. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Jaselskis, E J; Gao, Z and Walters, R C (2005) Improving transportation projects using laser scanning. Journal of Construction Engineering and Management, 131(3), pp. 377-384. ISSN 0733-9364

Jaselskis, E J; Han, H C; Grigas, J; Tan, L and Fahrion, D (2001) Status of roller mountable microwave asphalt pavement density sensor. Journal of Construction Engineering and Management, 127(1), pp. 46-52. ISSN 0733-9364

Jasiński, A (2021) Impact of BIM implementation on architectural practice. Architectural Engineering and Design Management, 17(5-6), pp. 447-457. ISSN 1745-2007

Javanmardi, A; Abbasian-Hosseini, S A; Liu, M and Hsiang, S M (2020) Improving effectiveness of constraints removal in construction planning meetings: Information-theoretic approach. Journal of Construction Engineering and Management, 146(4): 04020015, ISSN 0733-9364

Javed, S; Ørnes, I R; Myrup, M and Dokka, T H (2019) Design optimization of the borehole system for a plus-energy kindergarten in Oslo, Norway. Architectural Engineering and Design Management, 15(3), pp. 181-195. ISSN 1745-2007

Jayawardane, A K; Price, A D and Harris, F C (1995) Measurement of brickwork and blockwork productivity: Part A: Productivity of operations can be improved by accurate estimating, good planning, optimum use of resources and having a sound knowledge of the productivity variables. Building Research & Information, 23(2), pp. 81-86. ISSN 0961-3218

Jebelli, H (2019) Wearable biosensors to understand construction workers' mental and physical stress. PhD thesis, University of Michigan, USA.

Jefferies M, G T B G (2013) Public private partnerships: The provision of healthcare infrastructure in Australia. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Jegard, L.; Castaño-Rosa, R. and Pelsmakers, S. (2026) Impact of glazed balcony design on daylight in Finnish apartments. Buildings & Cities, 7(1), pp. 576-596. ISSN 2632-6655

Jensen, P A (2009) Design integration of facilities management: A challenge of knowledge transfer. Architectural Engineering and Design Management, 5(3), pp. 124-135. ISSN 1745-2007

Jensen, P A (2011) Inclusive briefing and user involvement: Case study of a media centre in Denmark. Architectural Engineering and Design Management, 7(1), pp. 38-49. ISSN 1745-2007

Jergeas, G and Der Put, J V (2001) Benefits of constructability on construction projects. Journal of Construction Engineering and Management, 127(4), pp. 281-290. ISSN 0733-9364

Jeschke, K N; Waldorff, S B; Dyreborg, J; Kines, P and Ajslev, J Z N (2021) Complaining about occupational safety and health: A barrier for collaboration between managers and workers on construction sites. Construction Management and Economics, 39(6), pp. 459-474. ISSN 01446193

Jewell, C; Flanagan, R and Lu, W (2014) The dilemma of scope and scale for construction professional service firms. Construction Management and Economics, 32(5), pp. 473-486. ISSN 01446193

Ji, Y and Leite, F (2020) Optimized planning approach for multiple tower cranes and material supply points using mixed-integer programming. Journal of Construction Engineering and Management, 146(3): 04020007, ISSN 0733-9364

Jia, Y A; Rowlinson, S; Kvan, T; Lingard, H C and Yip, B (2009) Burnout among Hong Kong Chinese architecture students: The paradoxical effect of Confucian conformity values. Construction Management and Economics, 27(3), pp. 287-298. ISSN 1466433X

Jiang, B; Nordin, J and Mohd Salleh, M N (2025) Design preferences for learning spaces among rural primary school students in China: A case study. Building Research & Information, 53(4), pp. 458-478. ISSN 0961-3218

Jiang, Y (2020) Determination of elevations for excavation operations using drone technologies. PhD thesis, Marquette University, USA.

Jiang, Y and Bai, Y (2020) Estimation of construction site elevations using drone-based orthoimagery and deep learning. Journal of Construction Engineering and Management, 146(8): 04020086, ISSN 0733-9364

Jimoh, R and van Wyk, J (2013) Ideological leaning and praxis of housing co-operatives in South Africa: Matters arising. Construction Economics and Building, 13(2), pp. 54-66. ISSN 2204-9029

Jin, S. (2026) Dynamics and influences analysis of public concerns in mega construction projects: An integrated topic and sentiment modeling approach. Journal of Construction Engineering and Management, 152(8): 04026104, ISSN 0733-9364

Jin, X H and Ling, F Y Y (2005) Constructing a framework for building relationships and trust in project organizations: Two case studies of building projects in China. Construction Management and Economics, 23(7), pp. 685-696. ISSN 01446193

Jin, X H and Zuo, J (2011) Critical uncertainty factors for efficient risk allocation in privately financed public infrastructure projects in Australia. International Journal of Construction Management, 11(3), pp. 19-34. ISSN 1562-3599

Jnior, A C L and Melhado, S B (2011) Design for producing vertical non-loadbearing masonry: Scope analysis. Architectural Engineering and Design Management, 7(4), pp. 275-284. ISSN 1745-2007

Johannes, Koos (2023) Crafting intrapreneurial stewardship: An institutional perspective on client-led innovation in smart building maintenance. PhD thesis, University of Twente, Netherlands.

John, S T; Sarkar, P and Davis, R (2023) A long-range wide-area network system for monitoring early-age concrete compressive strength. Journal of Construction Engineering and Management, 149(1): 04022148, ISSN 0733-9364

Johnson, P (2002) A quantitative assessment of knowledge and perceptions of civil engineering. PhD thesis, Purdue University, USA.

Johnson, R; Clayton, M; Xia, G E; Woo, J H and Song, Y (2002) The strategic implications of e-commerce for the design and construction industry. Engineering, Construction and Architectural Management, 9(3), pp. 241-248. ISSN 0969-9988

Johnsson, H; Janols, H and Stehn, L (2006) 3D computer visualization in timber construction: some important parameters. Architectural Engineering and Design Management, 2(3), pp. 161-175. ISSN 1745-2007

Johnston, D; Farmer, D; Brooke-Peat, M and Miles-Shenton, D (2016) Bridging the domestic building fabric performance gap. Building Research & Information, 44(2), pp. 147-159. ISSN 0961-3218

Johnston, D and Miles-Shenton, D (2009) Airtightness of UK dwellings. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Jonasson, S; Dunston, P S; Ahmed, K and Hamilton, J (2002) Factors in productivity and unit cost for advanced machine guidance. Journal of Construction Engineering and Management, 128(5), pp. 367-374. ISSN 0733-9364

Jones, I and Graham, M (2009) The integration of sprinkler systems into school fire safety packages within South and West Wales. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Jones, S H and Armanios, D E (2020) Methodological framework and feasibility study to assess social equity impacts of the built environment. Journal of Construction Engineering and Management, 146(11): 05020016, ISSN 0733-9364

Jonsson, H (2018) Production strategy in project based production within a house-building context. PhD thesis, Linköping University, Sweden.

Jonsson, H and Rudberg, M (2015) Production system classification matrix: Matching product standardization and production-system design. Journal of Construction Engineering and Management, 141(6): 05015004, ISSN 0733-9364

Joshi, P; Kumar, A; Singh, P V and Jahangeer, J (2020) Sediment outflow under simulated rainfall conditions with varying geotechnical properties. Journal of Construction Engineering and Management, 146(7): 04020074, ISSN 0733-9364

Joubert, F; Steyn, E and Pretorius, L (2021) Using the HAZOP method to conduct a risk assessment on the dismantling of large industrial machines and associated structures: Case study. Journal of Construction Engineering and Management, 147(1): 05020021, ISSN 0733-9364

Joutsiniemi, A; Vaattovaara, M and Airaksinen, J (2021) Empowered by planning law: Unintended outcomes in the Helsinki region. Buildings & Cities, 2(1), pp. 837-855. ISSN 2632-6655

Junnila, S (2004) The environmental impact of an office building throughout its life cycle. PhD thesis, Helsinki University of Technology, Finland.

Jägbeck, A (1998) It support for construction planning: A system design based on integrated information. PhD thesis, KTH Royal Institute of Technology, Sweden.

Kaboli, A S and Carmichael, D G (2014) Optimum scraper load time and fleet size for minimum emissions. International Journal of Construction Management, 14(4), pp. 209-226. ISSN 1562-3599

Kadefors, A (2005) Fairness in interorganizational project relations: Norms and strategies. Construction Management and Economics, 23(8), pp. 871-878. ISSN 01446193

Kalantari, S; Shepley, M M; Rybkowski, Z K and Bryant, J (2017) Designing for operational efficiency: Facility managers' perspectives on how their knowledge can be better incorporated during design. Architectural Engineering and Design Management, 13(6), pp. 457-478. ISSN 1745-2007

Kamara, J M (2012) Integration in the project development process of a private finance initiative (PFI) project. Architectural Engineering and Design Management, 8(4), pp. 228-245. ISSN 1745-2007

Kamardeen, I (2014) Adaptive e-tutorial for enhancing student learning in construction education. International Journal of Construction Education and Research, 10(2), pp. 79-95. ISSN 1557-8771

Kamardeen, I (2015) Critically reflective pedagogical model: A pragmatic blueprint for enhancing learning and teaching in construction disciplines. Construction Economics and Building, 15(4), pp. 63-75. ISSN 2204-9029

Kaming, P F; Olomolaiye, P O; Holt, G D; Kometa, S T and Harris, F C (1996) Project managers' perception of production problems: an Indonesian case study. Building Research & Information, 24(5), pp. 302-310. ISSN 0961-3218

Kandil, A and El-Rayes, K (2006) Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects. Journal of Construction Engineering and Management, 132(5), pp. 491-498. ISSN 0733-9364

Kandil, A; El-Rayes, K and El-Anwar, O (2010) Optimization research: Enhancing the robustness of large-scale multiobjective optimization in construction. Journal of Construction Engineering and Management, 136(1), pp. 17-25. ISSN 0733-9364

Kao, C C; Green, S D and Larsen, G D (2009) Emergent discourses of construction competitiveness: Localized learning and embeddedness. Construction Management and Economics, 27(10), pp. 1005-1017. ISSN 1466433X

Kappia, J G; Dainty, A R J and Price, A D F (2004) New perspectives in the analysis of trade and craft careers. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Karam, K S; Karam, J S and Einstein, H H (2007) Decision analysis applied to tunnel exploration planning. I: Principles and case study. Journal of Construction Engineering and Management, 133(5), pp. 344-353. ISSN 0733-9364

Karan, E P; Sivakumar, R; Irizarry, J and Guhathakurta, S (2014) Digital modeling of construction site terrain using remotely sensed data and geographic information systems analyses. Journal of Construction Engineering and Management, 140(3): 4013067, ISSN 0733-9364

Karim, M A (1998) Development of a systems approach to planning, design and operations of intermodal passenger transfer facilities to increase the mobility and safety of older travelers. PhD thesis, West Virginia University, USA.

Karlsson, M; Lakka, A; Sulankivi, K; Hanna, A S and Thompson, B P (2008) Best practices for integrating the concurrent engineering environment into multipartner project management. Journal of Construction Engineering and Management, 134(4), pp. 289-299. ISSN 0733-9364

Karrbom Gustavsson, T (2016) Liminality roles in construction project practice: Opportunities and challenges. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Kartam, N A (1999) Design/construction integration: Issues and illustrative prototype. Engineering, Construction and Architectural Management, 6(3), pp. 299-314. ISSN 0969-9988

Kassem, M; Dawood, N and Mitchell, D (2012) A decision support system for the selection of curtain wall systems at the design development stage. Construction Management and Economics, 30(12), pp. 1039-1053. ISSN 1466433X

Kassim, S M (2006) Sustainability of private sector in solid waste collection: a case of Dar es Salaam Tanzania. PhD thesis, Loughborough University, UK.

Katsanis, C J (1998) An empirical examination of the relationships between strategy, structure and performance in building industry organizations. PhD thesis, Universite de Montreal, Canada.

Kaya, S; Hinks, J and Alexander, K (2005) Innovation in facilities supply chain. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Keast, R and Hampson, K (2007) Building constructive innovation networks: Role of relationship management. Journal of Construction Engineering and Management, 133(5), pp. 364-373. ISSN 0733-9364

Kelly, G (2015) Understanding how improved feedback to architects can support the design of more adaptable buildings. PhD thesis, Loughborough University, UK.

Kelly, G; Schmidt, R; Dainty, A and Story, V (2011) Improving the design process for adaptability: Linking feedback and architectural values. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Kelly, G D (2024) Experiences and impact of women in construction management. EdD thesis, Northern Kentucky University, USA.

Kelly, J and Hunter, K (2002) Using value management techniques to set up partnering agreements. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kempton, J (2009) Modern methods of construction: Maintenance issues in the registered social landlord sector. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Kempton, J; Chapman, K and Alani, A M (2002) Surveyor element lifetime predictions and the anchoring and adjustment heuristic. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kenley, R and Heywood, C (2000) Corporate real estate management practice: Contrasts between financial and service provision priorities in corporate and government organizations. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Kennedy, N F (2005) The ethos of architects towards an analysis of architectural practice in Turkey. PhD thesis, Middle East Technical University, Turkey.

Kerali, A G and Thomas, T H (2002) Effect of mix retention and curing on low-cement walling blocks. Building Research & Information, 30(5), pp. 362-366. ISSN 0961-3218

Kern, A P and Zuliani da Silva, L G (2025) System of rehabilitation assessment and cost comparative (SARC): Case study in abandoned buildings rehabilitation in Brazil. Architectural Engineering and Design Management, 21(1), pp. 78-97. ISSN 1745-2007

Keung, C and Shen, L (2017) Network strategy for contractors' business competitiveness. Construction Management and Economics, 35(8-9), pp. 482-497. ISSN 01446193

Keung, C C W; Yiu, T W and Feng, Z (2023) Building information modeling education for quantity surveyors in Hong Kong: Current states, education gaps, and challenges. International Journal of Construction Education and Research, 19(3), pp. 259-275. ISSN 1557-8771

Khamaksorn, A; Nimmolrat, A; Mahat, N and Thinnukool, O (2023) An IDEF0 functional planning model for the development of an asset management framework: A case study of chiang mai university. Journal of Construction in Developing Countries, 28(1), pp. 133-150. ISSN 1823-6499

Khan, S (2017) Using the last planner system and lean principles to improve workflow in BIM-based building design projects. PhD thesis, University of Huddersfield, UK.

Khoshbakht, M; Zhang, F; Zomorodian, Z S and Gou, Z (2024) Thermal sensitivity and adaptive comfort in mixed-mode office buildings in humid subtropical climate. Building Research & Information, 52(6), pp. 693-707. ISSN 0961-3218

Khosravi, M; Mirsaeedie, L and Emami, A (2019) The application of open building principles in popular residential buildings in Iran. Journal of Construction in Developing Countries, 24(1), pp. 125-140. ISSN 1823-6499

Khosrowshahi, F (1997) Construction activity in the UK recent trends and projections. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Kifokeris, D and Tezel, A (2025) Blockchain and lean construction: An exploration of bidirectional synergies and interactions. Architectural Engineering and Design Management, 21(1), pp. 171-189. ISSN 1745-2007

Kilby, A and McCabe, S (2008) Human resource management (HRM) in construction: An exploration of issues and practice. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Kim, B; Lim, H; Kim, H and Hong, T (2012) Determining the value of governmental subsidies for the installation of clean energy systems using real options. Journal of Construction Engineering and Management, 138(3), pp. 422-430. ISSN 0733-9364

Kim, C; Kim, H; Ryu, J and Kim, C (2011) Ubiquitous sensor network for construction material monitoring. Journal of Construction Engineering and Management, 137(2), pp. 158-165. ISSN 0733-9364

Kim, C S and Liu, L Y (2007) Cost information model for managing multiple projects. Journal of Construction Engineering and Management, 133(12), pp. 966-974. ISSN 0733-9364

Kim, H; Ahn, C R and Yang, K (2017) Identifying safety hazards using collective bodily responses of workers. Journal of Construction Engineering and Management, 143(2): 04016090, ISSN 0733-9364

Kim, J; Kamari, M; Lee, S and Ham, Y (2021) Large-scale visual data-driven probabilistic risk assessment of utility poles regarding the vulnerability of power distribution infrastructure systems. Journal of Construction Engineering and Management, 147(10): 04021121, ISSN 0733-9364

Kim, J and Philips, P (2014) Remuneration and absenteeism on a large construction site. Construction Management and Economics, 32(10), pp. 983-999. ISSN 01446193

Kim, J L and Ellis Jr, R D (2008) Permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling. Journal of Construction Engineering and Management, 134(11), pp. 904-913. ISSN 0733-9364

Kim, J-J (1993) A work package-based process model for petrochemical construction planning. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kim, J-L (2006) A multiheuristic approach to resource constrained project scheduling: An adaptive hybrid genetic algorithm. PhD thesis, University of Florida, USA.

Kim, K; Cho, Y and Kim, K (2018) BIM-driven automated decision support system for safety planning of temporary structures. Journal of Construction Engineering and Management, 144(8): 04018072, ISSN 0733-9364

Kim, K and Cho, Y K (2021) Automatic recognition of workers' motions in highway construction by using motion sensors and long short-term memory networks. Journal of Construction Engineering and Management, 147(3): 04020184, ISSN 0733-9364

Kim, N; Yan, N; Grégoire, L; Anderson, B A and Ahn, C R (2023) Road construction workers' boredom susceptibility, habituation to warning alarms, and accident proneness: Virtual reality experiment. Journal of Construction Engineering and Management, 149(2): 04022175, ISSN 0733-9364

Kim, T; Lim, H; Cho, H and Kang, K I (2014) Automated lifting system integrated with construction hoists for table formwork in tall buildings. Journal of Construction Engineering and Management, 140(10): 04014049, ISSN 0733-9364

Kim, W S; Minh Tam, N and Jung, D H (2005) Experimental study on strength of cement stabilized clay. Journal of Engineering, Design and Technology, 3(2), pp. 116-126. ISSN 1726-0531

Kim, Y W; Han, S; Shin, S and Choi, K (2011) A case study of activity-based costing in allocating rebar fabrication costs to projects. Construction Management and Economics, 29(5), pp. 449-461. ISSN 1466433X

Kim Wan Siu, G; Bridge, A and Skitmore, M (2001) Assessing the service quality of building maintenance providers: Mechanical and engineering services. Construction Management and Economics, 19(7), pp. 719-726. ISSN 01446193

King, N; Price, A D F and Dainty, A R J (2004) Strategic approaches to managing human relations within construction SMEs. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

King, T H and Jemtrud, M (2025) A strategic niche management framework to scale deep energy retrofits. Buildings & Cities, 6(1), pp. 310-326. ISSN 2632-6655

Kishk, M a U C (2008) The impact of effective risk management on project success. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Kitamura, A and Takeuchi, Y (1983) Seikan tunnel. Journal of Construction Engineering and Management, 109(1), pp. 25-38. ISSN 0733-9364

Kivrak, S; Ross, A; Arslan, G and Tuncan, M (2010) Construction professionals' perspectives on cross-cultural training for international construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Kleemann, F; Lederer, J; Aschenbrenner, P; Rechberger, H and Fellner, J (2016) A method for determining buildings' material composition prior to demolition. Building Research & Information, 44(1), pp. 51-62. ISSN 0961-3218

Klitgaard, K A (1987) The organization of work in residential construction. PhD thesis, University of New Hampshire, USA.

Knos, C T (2001) Investigating the effects of insurance industry standards on public building inspection departments in Florida, Georgia, and South Carolina. DPA thesis, University of Georgia, USA.

Koch, C and Buser, M (2003) Innovating mature public private partnerships: Danish municipalities and construction firms in networked public services. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Koch, C and Buser, M (2015) Sitting between two chairs: Introducing social sustainability in three large Swedish contractor companies. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Koch, C and Haubjerg, E (2011) Performing the transition: Integrated design processes in climate change mitigation. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Koch, C and Larsen, A (2018) Performance of retrofit with ICT of social housing: Proving technology optimists wrong? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Koch, C and Larsen, C S (2006) Quality in construction: A supply chain perspective. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Koch, C H G H J K (2018) Information standards: A hinder or an enabler for innovation? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Koch-Ørvad, N and Thuesen, C (2016) Sustainable building in scandinavia: Directions of innovations for supporting the transition. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Kodikara, G W (1990) Data flow in building contractor organisations. PhD thesis, Loughborough University, UK.

Kodikara, G W and McCaffer, R (1993) Flow of estimating data in Sri Lankan building contractor organizations. Construction Management and Economics, 11(5), pp. 341-346. ISSN 01446193

Kohler, N (2018) From the design of green buildings to resilience management of building stocks. Building Research & Information, 46(5), pp. 578-593. ISSN 0961-3218

Kokkonen, A (2017) Integrated project emerging within the daily project life through active participation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Kokkonen, A and Vaagaasar, A L (2018) Managing collaborative space in multi-partner projects. Construction Management and Economics, 36(2), pp. 83-95. ISSN 01446193

Konanahalli, A; Oyedele, L O; Spillane, J and Marinelli, M (2014) The outcomes of cross-cultural adjustment: A case of British expatriates working on international architectural, engineering and construction assignments. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Kong, A T and Gray, J (2006) Traditional procurement is too slow. Construction Economics and Building, 6(1), pp. 51-62. ISSN 2204-9029

Kong, D; Tiong, R L K; Cheah, C Y J; Permana, A and Ehrlich, M (2008) Assessment of credit risk in project finance. Journal of Construction Engineering and Management, 134(11), pp. 876-884. ISSN 0733-9364

Kong, F and Dou, D (2021) Resource-constrained project scheduling problem under multiple time constraints. Journal of Construction Engineering and Management, 147(2): 04020170, ISSN 0733-9364

Koo, B and Fischer, M (2000) Feasibility study of 4D CAD in commercial construction. Journal of Construction Engineering and Management, 126(4), pp. 251-260. ISSN 0733-9364

Koo, D H (2007) Development of sustainability assessment model for underground infrastructure. PhD thesis, Arizona State University, USA.

Koo, H J; Kelly, D and Deman, D (2024) Risk assessment of the challenges in the adaptive reuse of historic buildings. Journal of Construction Engineering and Management, 150(9): 04024119, ISSN 0733-9364

Koo, K J and Park, S C (2012) GA-based fuel-efficient transfer path selection model for delivering construction materials. Journal of Construction Engineering and Management, 138(6), pp. 725-732. ISSN 0733-9364

Kordi, N E; Belayutham, S and Che Ibrahim, C K I (2021) Mapping of social sustainability attributes to stakeholders' involvement in construction project life cycle. Construction Management and Economics, 39(6), pp. 513-532. ISSN 01446193

Koulinas, G K and Anagnostopoulos, K P (2012) Construction resource allocation and leveling using a threshold accepting-based hyperheuristic algorithm. Journal of Construction Engineering and Management, 138(7), pp. 854-863. ISSN 0733-9364

Koushki, P A; Al-Rashid, K and Kartam, N (2005) Delays and cost increases in the construction of private residential projects in Kuwait. Construction Management and Economics, 23(3), pp. 285-294. ISSN 01446193

Kpamma, Z E; Adjei-Kumi, T; Ayarkwa, J and Adinyira, E (2016) An exploration of the choosing by advantages decision system as a user engagement tool in participatory design. Architectural Engineering and Design Management, 12(1), pp. 51-66. ISSN 1745-2007

Kramer, R; Schellen, L and Schellen, H (2018) Adaptive temperature limits for air-conditioned museums in temperate climates. Building Research & Information, 46(6), pp. 686-697. ISSN 0961-3218

Kranz, C N (2021) Optimizing compost incorporation for stormwater infiltration, runoff quality, and vegetation establishment in post-construction soils. PhD thesis, North Carolina State University, USA.

Kremers, J; Rietjens, B; Voordijk, H and de Boer, S J (2010) Construction contracting and civil-military interaction. Construction Management and Economics, 28(8), pp. 871-883. ISSN 1466433X

Krima, N; Aouad, G; Hatush, Z and Baldry, D (2005) An assessment model: The efficiency of consultants when dealing with delays in construction projects in Libya. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kristensen, E K (2011) Systemic barriers to a future transformation of the building industry from a buyer controlled to a seller driven industry: an analysis of key systemic variables in the building industry, such as 'procurement model', 'buyer perception', 'production mode' and 'leadership and management', principally in a Danish development context and seen from the perspective of the architect. PhD thesis, Robert Gordon University, UK.

Kuitert, L; Willems, J J and Volker, L (2021) Value integration through social innovation in blue-green infrastructure projects. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Kululanga, G K; Edum-Fotwe, F T; McCaffer, R and Price, A D F (1998) Learning mechanisms for addressing improvement in construction companies. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Kumar, S (2013) Experience-based design review of healthcare facilities using interactive virtual prototypes. PhD thesis, Pennsylvania State University, USA.

Kumari, T; Kulathunga, U; Hewavitharana, T and Madusanka, N (2022) Embodied carbon reduction strategies for high-rise buildings in Sri Lanka. International Journal of Construction Management, 22(13), pp. 2605-2613. ISSN 1562-3599

Kurwi, S; Demian, P; Hassan, T M and Blay, K B (2022) A process model for collaboration at the design stage of rail project delivery. Journal of Construction Engineering and Management, 148(10): 04022105, ISSN 0733-9364

Kus, R H and Nygren, K (2002) Microenvironmental characterization of rendered autoclaved aerated concrete. Building Research & Information, 30(1), pp. 25-34. ISSN 0961-3218

Kwawu, W E K and Hughes, W P (2008) Strategies for aligning organizational incentive systems through contracts. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Kwon, A H C; Then, D and Skitmore, R M (2000) Risk management in Singapore construction joint ventures. Journal of Construction Research, 1(2), pp. 139-149. ISSN 1609-9451

Lacey, W E (1964) Change order procedures and practices in California school construction. EdD thesis, University of Southern California, USA.

Lahdenperä, P (2012) How to proportion capability and fee percentage for team comparison in competitive early involvement. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Lahdenperä, P (2017) Towards a coherent theory of project alliancing: Discovering the system's complex mechanisms yielding value for money. Construction Economics and Building, 17(2), pp. 41-61. ISSN 2204-9029

Lai, C M and Chiang, C M (2006) How phase change materials affect thermal performance: Hollow bricks. Building Research & Information, 34(2), pp. 118-130. ISSN 0961-3218

Lai, J H K (2010) Operation and maintenance budgeting for commercial buildings in Hong Kong. Construction Management and Economics, 28(4), pp. 415-427. ISSN 1466433X

Lallimo, J (2014) From pedagogical ideas to a school building: Analysis of user involvement in building design. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Lam, E W; Chan, A P C and Chan, D W (2003) Why is design-build commonly used in the public sector? An illustration from Hong Kong. Construction Economics and Building, 3(1), pp. 53-62. ISSN 2204-9029

Lam, K C; Runeson, G; Tam, C M and Lo, S M (1998) Modelling loan acquisition decisions. Engineering, Construction and Architectural Management, 5(4), pp. 359-375. ISSN 0969-9988

Lam, K C; Thomas Ng, S; Hu, T; Skitmore, M and Cheung, S O (2000) Decision support system for contractor pre-qualification: Artificial neural network model. Engineering, Construction and Architectural Management, 7(3), pp. 251-266. ISSN 0969-9988

Lam, K-C (2003) Co-ordination of building services and procurement methods for highly serviced buildings. PhD thesis, Loughborough University, UK.

Lam, Y T (1995) A knowledge-based system for planning and scheduling ready-mixed concrete. PhD thesis, Loughborough University, UK.

Lama, Supreet (2023) Improving design briefing with BIM-based concept generation aiming to enhance building project performance. PhD thesis, University of West London, UK.

Lambers, Rebeca (2019) Development of a model to risk manage construction defects in the residential sector. PhD thesis, Queensland University of Technology, Australia.

Lamirande, M (2023) Exploring practices and understandings of designing inclusively. PhD thesis, Open University, UK.

Landgren, M and Jensen, L B (2018) How does sustainability certification affect the design process? Mapping final design projects at an architectural office. Architectural Engineering and Design Management, 14(4), pp. 292-305. ISSN 1745-2007

Langston, Y L and Langston, C (2007) Building energy and cost performance: An analysis of thirty Melbourne case studies. Construction Economics and Building, 7(1), pp. 1-18. ISSN 2204-9029

Langston, Y L and Langston, C A (2008) Reliability of building embodied energy modelling: An analysis of 30 Melbourne case studies. Construction Management and Economics, 26(2), pp. 147-160. ISSN 1466433X

Laovisutthichai, V; Lu, W and Bao, Z (2022) Design for construction waste minimization: Guidelines and practice. Architectural Engineering and Design Management, 18(3), pp. 279-298. ISSN 1745-2007

Larsen, G D and Whyte, J (2013) Safe construction through design: Perspectives from the site team. Construction Management and Economics, 31(6), pp. 675-690. ISSN 1466433X

Larsson, N K and Cole, R J (2001) Green building challenge: The development of an idea. Building Research & Information, 29(5), pp. 336-345. ISSN 0961-3218

Laryea, S (2016) Compensation events in NEC3 contracts: Case studies from South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(2), pp. 49-64. ISSN 17514304

Lateef, O A; Khamidi, M F and Idrus, A (2010) Building maintenance management in a Malaysian university campus: A case study. Construction Economics and Building, 10(1-2), pp. 76-89. ISSN 2204-9029

Lau, E and Rowlinson, S (2009) Interpersonal trust and inter-firm trust in construction projects. Construction Management and Economics, 27(6), pp. 539-554. ISSN 1466433X

Laufer, A (1987) Construction safety: Economics, information and management involvement. Construction Management and Economics, 5(1), pp. 73-90. ISSN 01446193

Laufer, A; Shapira, A; Cohenca-Zall, D and Howell, G A (1993) Prebid and preconstruction planning process. Journal of Construction Engineering and Management, 119(3), pp. 426-444. ISSN 0733-9364

Lavy, S and Shohet, I M (2004) Integrated maintenance management of hospital buildings: A case study. Construction Management and Economics, 22(1), pp. 25-34. ISSN 01446193

Lawrence, R; Elsayed, M and Keime, C (2019) Evaluation of environmental design strategies for university buildings. Building Research & Information, 47(8), pp. 883-900. ISSN 0961-3218

Le Gallais, Tricia Anne (2006) Building identities in FE: A case study of construction lecturers. PhD thesis, Birmingham City University, UK.

Leaman, A and Bordass, B (2001) Assessing building performance in use 4: The probe occupant surveys and their implications. Building Research & Information, 29(2), pp. 129-143. ISSN 0961-3218

Leathem, T; Wetzel, E M and Farrow, C B (2025) Reflections of transformative active learning experiences (TALEs) in higher education from early career construction management professionals. International Journal of Construction Management, 25(2), pp. 204-214. ISSN 1562-3599

Leblanc, H; Thomson, C and Cameron, I (2015) Developing a sustainability KM strategy for HA planned works. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(2), pp. 49-65. ISSN 17514304

Lee, H S and Yi, K J (1999) Application of mathematical matrix to integrate project schedule and cost. Journal of Construction Engineering and Management, 125(5), pp. 339-346. ISSN 0733-9364

Lee, J and Ham, Y (2021) Physiological sensing-driven personal thermal comfort modelling in consideration of human activity variations. Building Research & Information, 49(5), pp. 512-524. ISSN 0961-3218

Lee, J S (2018) Value engineering for defect prevention on building façade. Journal of Construction Engineering and Management, 144(8): 04018069, ISSN 0733-9364

Lee, K and Hasanzadeh, S (2024) Understanding cognitive anticipatory process in dynamic hazard anticipation using multimodal psychophysiological responses. Journal of Construction Engineering and Management, 150(4): 04024008, ISSN 0733-9364

Lee, N H (2009) A framework for developing new visualization schemes for construction project performance monitoring. PhD thesis, University of Washington, USA.

Lee, S and Halpin, D W (2003) Predictive tool for estimating accident risk. Journal of Construction Engineering and Management, 129(4), pp. 431-436. ISSN 0733-9364

Lee, W and Migliaccio, G C (2018) Temporal effect of construction workforce physical strain on diminishing marginal productivity at the task level. Journal of Construction Engineering and Management, 144(9): 04018083, ISSN 0733-9364

Lee, W V and Steemers, K (2017) Exposure duration in overheating assessments: A retrofit modelling study. Building Research & Information, 45(1-2), pp. 60-82. ISSN 0961-3218

Lee Kay Hwa, Albert (2026) Beyond technical mastery: Investigating how engineers adapt business management skills to the workplace in the built environment industry in Singapore. DBA thesis, Golden Gate University, USA.

Leite, Francisco Claudio Morato (2021) Proposal for a performance indicator system for the maintenance management of public buildings. PhD thesis, Universidade Estadual de Londrina, Brazil.

Lerche, J; Neve, H H; Ballard, G; Teizer, J; Wandahl, S and Gross, A (2020) Application of last planner system to modular offshore wind construction. Journal of Construction Engineering and Management, 146(11): 05020015, ISSN 0733-9364

Leslie-Carter, R; Zou, P X W and Tan, E X (2009) Managing international projects: A case study of the water cube aquatic centre for Beijing 2008 olympic games. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Lessing, J and Brege, S (2018) Industrialized building companies' business models: Multiple case study of Swedish and North American companies. Journal of Construction Engineering and Management, 144(2): 05017019, ISSN 0733-9364

Leung, M Y; Yu, J and Chan, Y S (2014) Focus group study to explore critical factors of public engagement process for mega development projects. Journal of Construction Engineering and Management, 140(3): 4013061, ISSN 0733-9364

Leung, M Y; Yu, J and Liang, Q (2013) Improving public engagement in construction development projects from a stakeholder's perspective. Journal of Construction Engineering and Management, 139(11): 4013019, ISSN 0733-9364

Leung, W Y (2006) A study of the competitiveness of local contractors in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lewis, P; Karimi, B; Shan, Y and Rasdorf, W (2019) Comparing the economic, energy, and environmental impacts of biodiesel versus petroleum diesel fuel use in construction equipment. International Journal of Construction Education and Research, 15(4), pp. 276-290. ISSN 1557-8771

Li, F.; Chi, H. L.; Li, R.; Zou, Z. and Wang, R. D. (2026) Two-stage optimization design framework for tower crane layout planning in modular integrated construction considering transportation efficiency, operator visibility, and lifting safety. Journal of Construction Engineering and Management, 152(6): 04026080, ISSN 0733-9364

Li, Y and Zhong, R Y (2026) Spatial-temporal traceability and coordination in modular integrated construction: A future framework with hybrid digital twin and reinforcement learning. International Journal of Construction Management, 26(5), pp. 875-904. ISSN 1562-3599

Li, H; Li, V; Skitmore, M; Wong, J K W and Cheng, E W L (2009) Competitiveness factors: A study of the real estate market in China. Construction Management and Economics, 27(6), pp. 567-579. ISSN 1466433X

Li, H; Wang, M and Dong, X (2019) Resource leveling in projects with stochastic minimum time lags. Journal of Construction Engineering and Management, 145(4): 04019015, ISSN 0733-9364

Li, H; Xu, Z and Demeulemeester, E (2015) Scheduling policies for the stochastic resource leveling problem. Journal of Construction Engineering and Management, 141(2): 04014072, ISSN 0733-9364

Li, M G; Chen, J J; Xu, A J; Xia, X H and Wang, J H (2014) Case study of innovative top-down construction method with channel-type excavation. Journal of Construction Engineering and Management, 140(5): 05014003, ISSN 0733-9364

Li, R and Roberti, R (2017) Optimal scheduling of railway track possessions in large-scale projects with multiple construction works. Journal of Construction Engineering and Management, 143(6): 04017007, ISSN 0733-9364

Li, S; Cai, H and Kamat, V R (2016) Integrating natural language processing and spatial reasoning for utility compliance checking. Journal of Construction Engineering and Management, 142(12): 04016074, ISSN 0733-9364

Li, Y; Cao, L; Han, Y and Wei, J (2020) Development of a conceptual benchmarking framework for healthcare facilities management: Case study of Shanghai municipal hospitals. Journal of Construction Engineering and Management, 146(1): 05019016, ISSN 0733-9364

Li, Y; Li, G; Wang, T; Zhu, Y and Li, X (2019) Semicustomized design framework of container accommodation for migrant construction workers. Journal of Construction Engineering and Management, 145(4): 04019014, ISSN 0733-9364

Li, Y; Nie, X and Chen, S (2007) Fuzzy approach to prequalifying construction contractors. Journal of Construction Engineering and Management, 133(1), pp. 40-49. ISSN 0733-9364

Liao, L; Gan, C; Yang, J and Liang, Y (2025) Impacts of safety capacity and personalized safety training on construction workers' hazard recognition using eye-tracking technology. Journal of Construction Engineering and Management, 151(6): 04025050, ISSN 0733-9364

Liao, L; Teo, E A L and Low, S P (2017) A project management framework for enhanced productivity performance using building information modelling. Construction Economics and Building, 17(3), pp. 1-26. ISSN 2204-9029

Licher, Monica Katherine (2016) Estimating post-construction costs of a changing urban stormwater program. PhD thesis, Virginia Tech, USA.

Liddiard, R (2014) Room-scale profiles of space use and electricity consumption in non-domestic buildings. Building Research & Information, 42(1), pp. 72-94. ISSN 0961-3218

Lidelow, S and Engstrom, S (2015) Furthering sustainable building or not? Discussing contractors' reflections on a sustainable building pilot project. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Lihakanga, R (2022) Generic wireless sensor network for dynamic monitoring of a new generation of building material. PhD thesis, Heriot-Watt University, UK.

Lim, S H and Chan, T K (2020) Enhancing student motivation and learning with monetary prizes in a construction management undergraduate subject. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Lin, K L and Haas, C T (1996) Multiple heavy lifts optimization. Journal of Construction Engineering and Management, 122(4), pp. 354-362. ISSN 0733-9364

Lin, L-k (1994) Improving the productivity of roadway construction job sites with a portable expert system. PhD thesis, University of Utah, USA.

Lin, M-C (2000) Contract design of private infrastructure concessions. PhD thesis, University of California, Berkeley, USA.

Lin, S L (2021) Environmental risk and delay analysis: Lessons learned from the california high speed rail project. DEnv thesis, University of California, Los Angeles, USA.

Linares-Garcia, D A and Roofigari-Esfahan, N (2024) Practical deployment of BIM-interoperable voice-based intelligent virtual agent support construction worker productivity. Journal of Construction Engineering and Management, 150(11): 04024153, ISSN 0733-9364

Lindhard, S M (2024) Applying work measurements to identify productivity potentials: The case of prefabricated concrete elements. International Journal of Construction Management, 24(15), pp. 1668-1678. ISSN 1562-3599

Lindkvist, C and Elmualim, A (2010) An examination of actors that impact technology introduction to FM. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Lines, B C; Perrenoud, A; Sullivan, K T and Smithwick, J (2015) Implementing new project delivery strategies: Development of a web-based multimedia tool to support owner project team training. International Journal of Construction Education and Research, 11(2), pp. 140-160. ISSN 1557-8771

Lines, B C; Sullivan, K T and Wiezel, A (2016) Support for organizational change: Change-readiness outcomes among AEC project teams. Journal of Construction Engineering and Management, 142(2): 04015062, ISSN 0733-9364

Ling, F Y Y and Gui, Y (2009) Strengths, weaknesses, opportunities, and threats: Case study of consulting firms in Shenzhen, China. Journal of Construction Engineering and Management, 135(7), pp. 628-636. ISSN 0733-9364

Ling, F Y Y; Kumaraswamy, M M; Dulaimi, M F and Khalfan, M (2011) Public private partnerships: Overcoming pre-contract problems faced by public clients and private providers in infrastructure projects in Singapore. International Journal of Construction Management, 11(1), pp. 63-77. ISSN 1562-3599

Ling, F Y Y; Pham, V M C and Hoang, T P (2009) Strengths, weaknesses, opportunities, and threats for architectural, engineering, and construction firms: Case study of Vietnam. Journal of Construction Engineering and Management, 135(10), pp. 1105-1113. ISSN 0733-9364

Lingard, H; Francis, V and Turner, M (2010) It’s about time: The impact of fluctating work hours on the work-life balance of project-based construction workers. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Lingard, H; Raj, I S; Lythgo, N; Troynikov, O and Fitzgerald, C (2019) The impact of tool selection on back and wrist injury risk in tying steel reinforcement bars: A single case experiment. Construction Economics and Building, 19(1), pp. 1-19. ISSN 2204-9029

Lingard, H and Turner, M (2015) Improving the health of male, blue collar construction workers: A social ecological perspective. Construction Management and Economics, 33(1), pp. 18-34. ISSN 01446193

Lingard, H; Wakefield, R and Walker, D (2020) The client's role in promoting work health and safety in construction projects: Balancing contracts and relationships to effect change. Construction Management and Economics, 38(11), pp. 993-1008. ISSN 01446193

Lingard, H C; Yip, B; Rowlinson, S and Kvan, T (2007) The experience of burnout among future construction professionals: A cross-national study. Construction Management and Economics, 25(4), pp. 345-357. ISSN 1466433X

Litchfield, K I (2014) Characterizing and understanding the growing population of socially engaged engineers through engineers without borders-USA. PhD thesis, University of Colorado at Boulder, USA.

Liu, W; Chan, A P C; Debrah, C and Darko, A (2026) Evaluating project success for emergency healthcare infrastructure based on the cloud matter-element model. Journal of Construction Engineering and Management, 152(5): 04026038, ISSN 0733-9364

Liu, W; Feng, Z and Luo, X (2026) Study of a risk-sharing mechanism in a prefabricated building project supply chain. Journal of Construction Engineering and Management, 152(6): 04026063, ISSN 0733-9364

Liu, A M M; Lau, W S W and Fellows, R (2012) The contributions of environmental management systems towards project outcome: Case studies in Hong Kong. Architectural Engineering and Design Management, 8(3), pp. 160-169. ISSN 1745-2007

Liu, J; Li, W; Li, F and Zhao, X (2025) Chinese named entity recognition for bridge damage and defects based on text mining and natural language pretraining models. Journal of Construction Engineering and Management, 151(6): 04025060, ISSN 0733-9364

Liu, J; Olsen, D A and Hein, M F (2011) Enhancing construction education using an online multimedia collection. International Journal of Construction Education and Research, 7(2), pp. 85-108. ISSN 1557-8771

Liu, J; Yan, X and Gao, W (2024) A dualistic perspective of opportunity and risk: The impact of head-mounted augmented reality on construction onsite hazard identification of workers. Journal of Construction Engineering and Management, 150(11): 04024160, ISSN 0733-9364

Liu, J Y; Zou, P X W and Gong, W (2013) Managing project risk at the enterprise level: Exploratory case studies in China. Journal of Construction Engineering and Management, 139(9), pp. 1268-1274. ISSN 0733-9364

Liu, Jing (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction. PhD thesis, University of Alberta, Canada.

Liu, K and Golparvar-Fard, M (2015) Crowdsourcing construction activity analysis from jobsite video streams. Journal of Construction Engineering and Management, 141(11): 04015035, ISSN 0733-9364

Liu, L (2009) Risk management during technology transfer: A case study of sanitation project in Shangdong Province, China. PhD thesis, University College London, UK.

Liu, Qinjun (2022) Managing mental health in the multicultural construction workforce. PhD thesis, Western Sydney University, Australia.

Liu, R; Du, J; Issa, R R A and Giel, B (2017) BIM cloud score: Building information model and modeling performance benchmarking. Journal of Construction Engineering and Management, 143(4): 04016109, ISSN 0733-9364

Liu, W; Zhang, J; Qu, C and Zhang, H (2024) Performance of priority rules for finance-based and resource-constrained project scheduling heuristics. Journal of Construction Engineering and Management, 150(6): 04024047, ISSN 0733-9364

Liu, Y (2017) Human-tool-interaction-based action recognition framework for automatic construction operation monitoring. PhD thesis, Texas A&M University, USA.

Liyanage, C; Egbu, C and Tookey, J (2005) Investigating the current state of infection control practices in domestics services in the national health service in Scotland: A case study approach. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Lloyd-walker, B M; Mills, A J and Walker, D H T (2014) Enabling construction innovation: The role of a no-blame culture as a collaboration behavioural driver in project alliances. Construction Management and Economics, 32(3), pp. 229-245. ISSN 01446193

Loforte Robeiro, F and Love, P E D (2003) Value creation through an e-business strategy: Implication for SMEs in construction. Construction Innovation, 3(1), pp. 3-14. ISSN 1471-4175

Logcher, R D; Wang, M T and Chen, F H S (1989) Knowledge processing for construction management data base. Journal of Construction Engineering and Management, 115(2), pp. 196-211. ISSN 0733-9364

Lomas, K J (2021) Summertime overheating in dwellings in temperate climates. Buildings & Cities, 2(1), pp. 487-494. ISSN 2632-6655

Lomas, K J; Cook, M J and Short, C A (2009) Commissioning hybrid advanced naturally ventilated buildings: A US case study. Building Research & Information, 37(4), pp. 397-412. ISSN 0961-3218

London, K A and Cadman, K (2009) Impact of a fragmented regulatory environment on sustainable urban development design management. Architectural Engineering and Design Management, 5(1-2), pp. 5-23. ISSN 1745-2007

Long, W; Wang, X; Liang, Y and Ye, K (2023) Characteristics of collusive practices in bidding: Mixed methods study in China. Journal of Construction Engineering and Management, 149(6): 04023030, ISSN 0733-9364

Lonsdale, J and Lucas, C (2019) The influence of key performance indicators on relationship and performance of joint venture construction projects in the UK. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Loosemore, M (2014) Rebalancing the construction productivity debate. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Lopez, R; Mascione, D and Liu, H J (2017) Management of issues in the delivery of airport infrastructure within Western Australia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(5), pp. 207-217. ISSN 17514304

Lord, S-F; Noye, S; Ure, J; Tennant, M G and Fisk, D J (2016) Comparative review of building commissioning regulation: A quality perspective. Building Research & Information, 44(5-6), pp. 630-643. ISSN 0961-3218

Lotfabadi, P and Iranmanesh, A (2024) Evaluation of learning methods in architecture design studio via analytic hierarchy process: A case study. Architectural Engineering and Design Management, 20(1), pp. 47-64. ISSN 1745-2007

Lou, J; Lu, W; Xu, J; Li, X and Wang, J (2022) Nomenclature for offsite construction. Building Research & Information, 50(8), pp. 894-908. ISSN 0961-3218

Love, P E D; Davis, P R; Chevis, R and Edwards, D J (2011) Risk/reward compensation model for civil engineering infrastructure alliance projects. Journal of Construction Engineering and Management, 137(2), pp. 127-136. ISSN 0733-9364

Love, P E D; Davis, P R; Lopez, R and Jasper, T (2008) It’s not just about bricks and mortar: Procedural failures in construction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Love, P E D; Edwards, D J and Irani, Z (2010) Work stress, support, and mental health in construction. Journal of Construction Engineering and Management, 136(6), pp. 650-658. ISSN 0733-9364

Love, P E D; Edwards, D J; Irani, Z and Goh, Y M (2011) Dynamics of rework in complex offshore hydrocarbon projects. Journal of Construction Engineering and Management, 137(12), pp. 1060-1070. ISSN 0733-9364

Love, P E D; Mistry, D and Davis, P R (2010) Price competitive alliance projects: Identification of success factors for public clients. Journal of Construction Engineering and Management, 136(9), pp. 947-956. ISSN 0733-9364

Love, P E D; Niedzweicki, M; Bullen, P A and Edwards, D J (2012) Achieving the green building council of Australia's world leadership rating in an office building in perth. Journal of Construction Engineering and Management, 138(5), pp. 652-660. ISSN 0733-9364

Love, P E D; Smith, J; Treloar, G J and Li, H (2000) Some empirical observations of service quality in construction. Engineering, Construction and Architectural Management, 7(2), pp. 191-201. ISSN 0969-9988

Love, P E D; Veli, S; Davis, P; Teo, P and Morrison, J (2017) See the difference in a precast facility: Changing mindsets with an experiential safety program. Journal of Construction Engineering and Management, 143(2): 05016021, ISSN 0733-9364

Lowe, D and Skitmore, M (2011) The learning climate of chartered quantity surveying practices. Construction Economics and Building, 11(4), pp. 1-20. ISSN 2204-9029

Lowry, M B (2008) An online analytic-deliberative approach to public participation for transportation investment decisions. PhD thesis, University of Washington, USA.

Lu, M and Anson, M (2004) Establish concrete placing rates using quality control records from Hong Kong building construction projects. Journal of Construction Engineering and Management, 130(2), pp. 216-224. ISSN 0733-9364

Lu, M; Shen, X and Chen, W (2009) Automated collection of mixer truck operations data in highly dense urban areas. Journal of Construction Engineering and Management, 135(1), pp. 17-23. ISSN 0733-9364

Lu, W; Ghansah, F A and Xu, J (2023) A category and index hybrid (cih) approach to measuring the level of prefabrication. International Journal of Construction Management, 23(15), pp. 2658-2669. ISSN 1562-3599

Lu, Y and Zhu, Y (2021) Integrating hoisting efficiency into construction site layout plan model for prefabricated construction. Journal of Construction Engineering and Management, 147(10): 04021130, ISSN 0733-9364

Lucke, T and Arthur, S (2011) Plastic pipe pressures in siphonic roof drainage systems. Building Research & Information, 39(1), pp. 79-92. ISSN 0961-3218

Ludvig, K; Stenberg, A C and Gluch, P (2013) The value of communicative skills for developing an energy strategy. Building Research & Information, 41(6), pp. 611-621. ISSN 0961-3218

Lueke, J S and Ariaratnam, S T (2005) Surface heave mechanisms in horizontal directional drilling. Journal of Construction Engineering and Management, 131(5), pp. 540-547. ISSN 0733-9364

Luiten, G T (1994) Computer-aided design for construction in the building industry. Dr thesis, Delft University of Technology, Netherlands.

Lundgren, R (2023) Social life cycle assessment of adaptive reuse. Buildings & Cities, 4(1), pp. 334-351. ISSN 2632-6655

Lundgren, R; Kyrö, R and Olander, S (2024) The lifecycle impact and value capture of circular business models in the built environment. Construction Management and Economics, 42(6), pp. 527-544. ISSN 01446193

Lundkvist, R (2015) Experience feedback in industrialised house-building: The impact of production strategies. PhD thesis, Luleå University of Technology, Sweden.

Lundkvist, R; Meiling, J H and Sandberg, M (2014) A proactive plan-do-check-act approach to defect management based on a Swedish construction project. Construction Management and Economics, 32(11), pp. 1051-1065. ISSN 01446193

Luo, L; Niu, X; Jiang, K; Bo, Q and Zhou, D (2026) Fuzzy cognitive map-based approach for measuring megaproject complexity considering dynamic interactions. Journal of Construction Engineering and Management, 152(2): 04025255, ISSN 0733-9364

Luo, Huyuan (2013) Towards green universities: A decision support framework for green roof and living wall implementation. PhD thesis, Queensland University of Technology, Australia.

Luo, Xiaowei (2013) Requirements, specifications and deployment models for autonomous jobsite safety proximity monitoring. PhD thesis, University of Texas at Austin, USA.

Luo, Y; Hu, D; Yao, Q; Wang, J; Chen, X; Li, H and Shi, M (2025) Blasting and sliding parameter optimization for efficient autonomous construction rock debris sliding transportation in an inclined shaft. Journal of Construction Engineering and Management, 151(11): 04025162, ISSN 0733-9364

Lynch, Ellen (2024) Humility as a professional engineering asset: An analysis of humble behaviour in the Australian engineering workforce. PhD thesis, Australian National University, Australia.

Löfgren, A (2008) Making mobile meaning: Expectations and experiences of mobile computing usefulness in construction site management practice. PhD thesis, KTH Royal Institute of Technology, Sweden.

Löwstedt, M; Räisänen, C and Stenberg, A C (2011) How does change happen in a large construction company: Comparing objectified and lived versions of change. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Lützkendorf, T; Foliente, G; Balouktsi, M and Wiberg, A H (2015) Net-zero buildings: Incorporating embodied impacts. Building Research & Information, 43(1), pp. 62-81. ISSN 0961-3218

Ma, G; Gu, L and Li, N (2015) Scenario-based proactive robust optimization for critical-chain project scheduling. Journal of Construction Engineering and Management, 141(10): 04015030, ISSN 0733-9364

Ma, G; Wang, A; Li, N; Gu, L and Ai, Q (2014) Improved critical chain project management framework for scheduling construction projects. Journal of Construction Engineering and Management, 140(12): 04014055, ISSN 0733-9364

Ma, J; Jiang, X; Zheng, D; Liao, X; Lu, J and Zhao, Y (2024) Transwallnet: High-performance semantic segmentation of large-scale and multifeatured point clouds of building gables. Journal of Construction Engineering and Management, 150(8): 04024092, ISSN 0733-9364

Ma, K; Wu, R; Xiao, Y and Wang, H (2024) Spherical dome: Design, digital twin manufacturing, and testing of a glubam structure. Architectural Engineering and Design Management, 20(6), pp. 1471-1488. ISSN 1745-2007

Ma, S; Li, Z; Li, L; Zhang, S and Zheng, R (2024) Deciphering the key characteristics of on-site industrialized construction: Inspiration from China. Journal of Construction Engineering and Management, 150(4): 05024003, ISSN 0733-9364

Ma, Z; Liu, W; Li, C; Sang, Y; Zhang, Y; Li, G and Xu, Y (2024) Research on energy-saving control strategy of loader based on intelligent identification of working stages. Journal of Construction Engineering and Management, 150(7): 04024075, ISSN 0733-9364

Mabuza, P V (2016) The potential role of public-private partnerships in the South African economy: An innovative conceptual public-private partnerships model for small and medium enterprise development. DLittPhil thesis, University of South Africa, South Africa.

MacArulla, M; Forcada, N; Casals, M; Gangolells, M; Fuertes, A and Roca, X (2013) Standardizing housing defects: Classification, validation, and benefits. Journal of Construction Engineering and Management, 139(8), pp. 968-976. ISSN 0733-9364

Mackley, C J and Milonas, S (2001) Knowledge transfer and green building challenge. Building Research & Information, 29(5), pp. 346-354. ISSN 0961-3218

Maddocks, A and Sher, W (1999) Introducing professional development at undergraduate level. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Maftei, L and Harty, C (2014) Designers' perspectives on the use of immersive virtual reality technology in practice. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Maghiar, M (2011) Crew coordination modeling in wood-framing construction. PhD thesis, Arizona State University, USA.

Mahalingam, A (2010) PPP experiences in Indian cities: Barriers, enablers, and the way forward. Journal of Construction Engineering and Management, 136(4), pp. 419-429. ISSN 0733-9364

Mahalingam, A and Levitt, R E (2007) Safety issues on global projects. Journal of Construction Engineering and Management, 133(7), pp. 506-516. ISSN 0733-9364

Mahdavi, A; Mino-Rodriguez, I; Berger, C; Martínez-Muñoz, I and Wagner, A (2025) An exploration of experts' views on the relative importance of indoor-environmental quality parameters. Building Research & Information, 53(1-2), pp. 3-18. ISSN 0961-3218

Mahdavi, A; Naderpajouh, N; Choi, J; Ketabi, A B; Hastak, M and Cui, Q (2021) Dynamics of project selection and growth in project-based organizations. International Journal of Construction Management, 21(12), pp. 1200-1217. ISSN 1562-3599

Mahdi, H S and Afshar, E (2024) Performance of electronic devices for bridging existing information gaps at construction sites: The case of a developing country. International Journal of Construction Management, 24(14), pp. 1510-1520. ISSN 1562-3599

Mahoney, J J and Tatum, C B (1994) Construction site applications of CAD. Journal of Construction Engineering and Management, 120(3), pp. 617-631. ISSN 0733-9364

Mai, T P A; Doan, D T and Ghaffarianhoseini, A (2025) Utilizing multiskilled resources in addressing labor shortage issues in off-site construction: Benefits, challenges, and best practices. Journal of Construction Engineering and Management, 151(4): 04025014, ISSN 0733-9364

Maisarah, F; Abduh, M; Wirahadikusumah, R and Cakravastia, A (2025) Development of the conceptual business model of a third-party logistics provider for Indonesian small contractors. International Journal of Construction Management, 25(2), pp. 194-203. ISSN 1562-3599

Maiwada, Y B (2003) Private financing of infrastructure projects in Sub-Sahara Africa: a case study of Nigerian water infrastructure project. PhD thesis, University of Manchester, UK.

Maiwada, Yusuf Bashir (2003) Private financing of infrastructure projects in sub Sahara Africa: A case study of Nigerian water infrastructure project. PhD thesis, University of Manchester, UK.

Malik, N; Ahmad, R; Chen, Y; Altaf, M S and Al-Hussein, M (2021) Minimizing joist cutting waste through dynamic waste allocation in panelized floor manufacturing. International Journal of Construction Management, 21(10), pp. 1011-1023. ISSN 1562-3599

Malmberg, F (2007) Introduction of a new form of quote evaluation: A case study in southern Sweden. Construction Management and Economics, 25(6), pp. 661-669. ISSN 1466433X

Maloney, W F; Cameron, I and Hare, B (2007) Tradesmen involvement in health and safety. Journal of Construction Engineering and Management, 133(4), pp. 297-305. ISSN 0733-9364

Maloney, W F and McFillen, J M (1986) Motivation in unionized construction. Journal of Construction Engineering and Management, 112(1), pp. 122-136. ISSN 0733-9364

Manavazhi, M R (2000) Hybrid modelling framework for synthesizing virtual structures. Construction Management and Economics, 18(4), pp. 415-426. ISSN 01446193

Mane, K M; Kulkarni, D K and Prakash, K B (2021) Prediction of shear strength of concrete produced by using pozzolanic materials and partly replacing nfa by MS using ann. Journal of Engineering, Design and Technology, 19(2), pp. 578-587. ISSN 1726-0531

Mansuri, L; Udeaja, C; Trillo, C; Kwasi, G; Patel, D; Jha, K; Makore, C B and Gupta, S (2019) Scientometric analysis and mapping of digital technologies used in cultural heritage field. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Mantle, E J (2007) An evaluation of 3d building modelling and visualisation packages for enhancing public participation within the planning process. PhD thesis, University of Glamorgan, UK.

Mao, Sheng (2016) Design and optimization of tunnel guidance systems for tunneling subject to constrained space and limited visibility. PhD thesis, University of Alberta, Canada.

Mao, X; Zhang, X and Abourizk, S M (2009) Enhancing value engineering process by incorporating inventive problem-solving techniques. Journal of Construction Engineering and Management, 135(5), pp. 416-424. ISSN 0733-9364

Maradza, E; Whyte, J and Larsen, G D (2014) Interactive learning in UK construction practice: Examining the role of BIM process standards. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Marchant, T (2013) Keep going: Career perspectives on ageing and masculinity of self-employed tradesmen in Australia. Construction Management and Economics, 31(8), pp. 845-860. ISSN 1466433X

Martin, Clinton D (2015) Multicultural attitudes of construction management students in a rural southern university. EdD thesis, Georgia Southern University, USA.

Martinez-Avila, C and Olander, S (2024) Stakeholder participation in the implementation of urban property development projects. Construction Management and Economics, 42(10), pp. 926-941. ISSN 01446193

Martínez, A; Alonso, C; Martín-Consuegra, F; Pérez, G; Frutos, B and Gutiérrez, Á (2021) Experimental analysis of a prototype for a thermochromic trombe wall. Building Research & Information, 49(7), pp. 777-794. ISSN 0961-3218

Martínez-Carricondo, P; Carvajal-Ramírez, F; Yero-Paneque, L and Agüera-Vega, F (2020) Combination of nadiral and oblique UAV photogrammetry and HBIM for the virtual reconstruction of cultural heritage. Case study of Cortijo del Fraile in Níjar, Almería (Spain). Building Research & Information, 48(2), pp. 140-159. ISSN 0961-3218

Martínez-Rocamora, A; García-Alvarado, R; Casanova-Medina, E; González-Böhme, L F and Auat-Cheein, F (2020) Parametric programming of 3D printed curved walls for cost-efficient building design. Journal of Construction Engineering and Management, 146(5): 04020039, ISSN 0733-9364

Marzouk, M and Ashmawy, M M (2021) Assessment of highways concrete and asphalt pavements using superiority inferiority ranking technique. Construction Innovation, 21(2), pp. 259-278. ISSN 1471-4175

Marzouk, M and Zaher, M (2025) Integrated approach for facility management of existing buildings using point cloud segmentation. International Journal of Building Pathology and Adaptation, 43(6), pp. 1439-1465. ISSN 2398-4708

Marzuki, P; Oktavianus, A; Regina, A and Hasiholan, B (2019) Interface problems in change order-challenged projects. Journal of Construction in Developing Countries, 24(2), pp. 1-22. ISSN 1823-6499

Masurier, J L; Blockley, D and Wood, D M (2000) Management of value and uncertainty in construction projects. Journal of Construction Research, 1(2), pp. 123-129. ISSN 1609-9451

Masurier, J L; Rotimi, J O B and Wilkinson, S (2006) A comparison between routine construction and post-disaster reconstruction with case studies from New Zealand. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Matete, R; Emuze, F and Smallwood, J (2024) Controlling the risk of site dust exposures in South African construction. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Mavrogianni, A; Taylor, J; Davies, M; Thoua, C and Kolm-Murray, J (2015) Urban social housing resilience to excess summer heat. Building Research & Information, 43(3), pp. 316-333. ISSN 0961-3218

McCahan, R D (1993) School superintendents' perceptions of the planning and construction of a school facility. DEd thesis, Pennsylvania State University, USA.

McCall, V (2022) Inclusive living: Ageing, adaptations and future-proofing homes. Buildings & Cities, 3(1), pp. 250-264. ISSN 2632-6655

McCandless, D W; Bruce, R D and Gebken, R J (2010) Retention of construction teachers in secondary education. International Journal of Construction Education and Research, 6(2), pp. 104-121. ISSN 1557-8771

McCord, P J and Gunderson, D E (2014) Factors that most affect relationships with general contractors on commercial construction projects: Pacific Northwest subcontractor perspectives. International Journal of Construction Education and Research, 10(2), pp. 126-139. ISSN 1557-8771

McCowan, A K and Mohamed, S (2007) Decision support system to evaluate and compare concession options. Journal of Construction Engineering and Management, 133(2), pp. 114-123. ISSN 0733-9364

McCulloueh, B G and Gunn, P (1993) Construction field data acquisition with pen-based computers. Journal of Construction Engineering and Management, 119(2), pp. 374-384. ISSN 0733-9364

McDermott, P; Khalfan, M and Swan, W (2005) Trust in construction projects. Journal of Financial Management of Property and Construction, 10(1), pp. 19-32. ISSN 1366-4387

McDonnell, A and Sinnott, D (2010) Barriers and enablers to energy efficient retrofitting of dwellings in Ireland. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

McFillen, J M and Maloney, W F (1988) New answers and new questions in construction worker motivation. Construction Management and Economics, 6(1), pp. 35-48. ISSN 01446193

McGuffin, A A and Obonyo, E (2010) Enhancing performance: A case study of the effects of employee coaching in construction practice. Construction Management and Economics, 28(2), pp. 141-149. ISSN 1466433X

McGuire, M. (2026) Impact of competition-based learning on student engagement and performance. International Journal of Construction Education and Research, 22(2), pp. 360-389. ISSN 1557-8771

McKay, L J (2010) The effect of offsite construction on occupational health and safety. PhD thesis, Loughborough University, UK.

McLeod, J S (2000) Planning for startup: An evaluation of factors affecting the startup of process industry facilities. PhD thesis, University of Texas at Austin, USA.

McLoud, M (1988) Craftsmen and entrepreneurs: Builders in late nineteenth-century Washington, D.C. PhD thesis, George Washington University, USA.

McMahon, P; Dawood, N N and Hobbs, B (1998) The utilization of it for managing ground information and optimizing earthworks. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

McMahon, P; Dawood, N N and Hobbs, B (1999) Development of an integrated ground modelling system. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

McMichael, P S; Iglesias, M C; Johnston, J; Holley, P and Peresin, M S (2025) Case study of bio-based coagulation and flocculation systems to treat contaminants in concrete washout water. International Journal of Construction Education and Research, 21(3), pp. 371-381. ISSN 1557-8771

McNerney, M T (1994) The use of geographical information systems for airport engineering and management. PhD thesis, University of Texas at Austin, USA.

Meacham, B J (2016) Sustainability and resiliency objectives in performance building regulations. Building Research & Information, 44(5-6), pp. 474-489. ISSN 0961-3218

Mei, X; Zhou, X; Xu, F and Zhang, Z (2023) Human intrusion detection in static hazardous areas at construction sites: Deep learning-based method. Journal of Construction Engineering and Management, 149(1): 04022142, ISSN 0733-9364

Meiling, J H; Sandberg, M and Johnsson, H (2014) A study of a plan-do-check-act method used in less industrialized activities: Two cases from industrialized housebuilding. Construction Management and Economics, 32(1-2), pp. 109-125. ISSN 01446193

Meir, I A; Schwartz, M; Davara, Y and Garb, Y (2019) A window of one's own: A public office post-occupancy evaluation. Building Research & Information, 47(4), pp. 437-452. ISSN 0961-3218

Mejlænder-Larsen, Ø (2017) Using a change control system and building information modelling to manage change in design. Architectural Engineering and Design Management, 13(1), pp. 39-51. ISSN 1745-2007

Melanta, S; Miller-Hooks, E and Avetisyan, H G (2013) Carbon footprint estimation tool for transportation construction projects. Journal of Construction Engineering and Management, 139(5), pp. 547-555. ISSN 0733-9364

Mello, Simone Gueresi de (2023) Urban transformation in pieces: Financing, regulation, and implementation tricks of social interest housing in the consortium urban operations of the city of São Paulo. PhD thesis, Universidade de São Paulo, Brazil.

Memarian, B and Mitropoulos, P (2014) Production system design for speed and reliability: A case study in concrete construction. International Journal of Construction Education and Research, 10(3), pp. 181-200. ISSN 1557-8771

Menches, C L and Hanna, A S (2006) Quantitative measurement of successful performance from the project manager's perspective. Journal of Construction Engineering and Management, 132(12), pp. 1284-1293. ISSN 0733-9364

Menesi, W; Golzarpoor, B and Hegazy, T (2013) Fast and near-optimum schedule optimization for large-scale projects. Journal of Construction Engineering and Management, 139(9), pp. 1117-1124. ISSN 0733-9364

Menzies, B; Emmanuel, R; Thomson, C and Walton, J (2010) Creating the conditions that facilitate the development of equitable, low carbon communities in Scotland. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Mergel, C; Decker, T and Menrad, K (2023) Affinity towards flexible housing–a study among homeowners in Germany. Building Research & Information, 51(8), pp. 871-880. ISSN 0961-3218

Meriläinen, S and Tervo, A (2025) The changing typology of urban apartment buildings in Aurinkolahti. Buildings & Cities, 6(1), pp. 50-69. ISSN 2632-6655

Merna, A and Smith, N J (1994) Concession contracts for power generation. Engineering, Construction and Architectural Management, 1(1), pp. 17-27. ISSN 0969-9988

Mesquita, Maria Julia de Moraes (2007) Subsidy for quality plans of buildings in the hospitality sector. PhD thesis, Universidade de São Paulo, Brazil.

Mezher, T; Abdul-Malak, M A; Arnaout, S and Bassil, Z (2004) Public project programming system (3PS): A decision support system for public sector investment. Construction Innovation, 4(2), pp. 99-111. ISSN 1471-4175

Mihara, H; Kurokawa, M; Hughes, W P and Hojo, T (2014) The comparison of construction management curricula in universities between the UK and Japan. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Milián Bernal, D; Pelsmakers, S; Nisonen, E and Vanhatalo, J (2026) Working at home: Tactics to reappropriate the home. Buildings & Cities, 7(1), pp. 143-160. ISSN 2632-6655

Miller, S and Dorée, A (2008) Improving logistics in the asphalt paving process: What can we learn from the planner's logic? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Miller, S; Haupt, T C and Chileshe, N (2005) Student perceptions of the first year civil engineering course content. Journal of Engineering, Design and Technology, 3(2), pp. 180-189. ISSN 1726-0531

Mills, A; Maqsood, T; Khalfan, M and Walker, D (2011) Infrastructure development using alliances: Lessons and observations. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Min, V; Panuwatwanich, K and Matsumoto, K (2025) Evaluating key attributes for enhancing contractors' performance in construction waste management: A multi-criteria decision analysis using the best worst method. International Journal of Construction Management, 25(16), pp. 1968-1981. ISSN 1562-3599

Min, W and Pheng, L S (2005) EOQ with a price discount versus JIT purchasing: an alternative analysis in the ready-mixed concrete industry. Journal of Construction Research, 6(1), pp. 47-69. ISSN 1609-9451

Min, W and Pheng, L S (2005) Economic order quantity (EOQ) versus just-in-time (JIT) purchasing: An alternative analysis in the ready-mixed concrete industry. Construction Management and Economics, 23(4), pp. 409-422. ISSN 01446193

Minami, K (2004) Whole life appraisal of the repair and improvement work costs of post office buildings in Japan. Construction Management and Economics, 22(3), pp. 311-318. ISSN 01446193

Minato, T (2003) Representing causal mechanism of defective designs: A system approach considering human errors. Construction Management and Economics, 21(3), pp. 297-305. ISSN 01446193

Minchin Jr, R E; Lewis, D W and McLeod, L (2011) Improving productivity on a troubled bridge project. Journal of Construction Engineering and Management, 137(5), pp. 364-371. ISSN 0733-9364

Miraj, P; Wang, T; Koutamanis, A and Chan, P (2025) Organising digital twin in the built environment: A systematic review and research directions on the missing links of use and user perspectives of digital twin in architecture, engineering and construction (AEC) sector. Construction Management and Economics, 43(6), pp. 465-481. ISSN 0144-6193

Mirzaie, S (2022) Influence of BREEAM, BIM, and Soft Landings on lifecycle performance of two non-domestic buildings. PhD thesis, Heriot-Watt University, UK.

Mitkees, L; Heidarinejad, M; Sabatino, M and Stephens, B (2024) Occupant thermal comfort and indoor environmental conditions in Mies van der Rohe's S.R. Crown hall. Building Research & Information, 52(3), pp. 249-272. ISSN 0961-3218

Mitropoulos, P and Guillama, V (2010) Analysis of residential framing accidents, activities, and task demands. Journal of Construction Engineering and Management, 136(2), pp. 260-269. ISSN 0733-9364

Mitropoulos, P and Memarian, B (2013) Task demands in masonry work: Sources, performance implications, and management strategies. Journal of Construction Engineering and Management, 139(5), pp. 581-590. ISSN 0733-9364

Mitropoulos, P and Sanchez, R (2016) Criteria and considerations for project work structuring. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(3), pp. 124-130. ISSN 17514304

Mitropoulos, P and Tajima, V (2022) Constructability opportunities in the engineering design of marine pier structures: A case study. International Journal of Construction Management, 22(3), pp. 366-378. ISSN 1562-3599

Mkandawire, K; Kabiri, S; Mbugua, L and Connaughton, J (2022) Managing interfaces between offsite and onsite construction. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Modin, J (1995) KBS-class: A neural network tool for automatic content recognition of building texts. Construction Management and Economics, 13(5), pp. 411-416. ISSN 01446193

Mohamad, Saifulnizam Suhaimi (2014) Value management in design planning: A systems-based framework for multi-disciplinary team involvement. PhD thesis, Queensland University of Technology, Australia.

Mohamed, M; Abdelaty, A; Khresat, G and Abu El Rub, M (2026) Mapping the patterns of cost and time overruns in the U.S. Highway construction projects: A regional risk analysis. International Journal of Construction Management, 26(3), pp. 470-481. ISSN 1562-3599

Mohamed, M and Tran, D Q (2023) Examining critical factors and their combination effects on quality of roadway construction operations. International Journal of Construction Management, 23(15), pp. 2637-2648. ISSN 1562-3599

Mohamed, T and Karima, A (2018) Architectural quality through the integration of users' viewpoints in architectural design: Case study Pouillon's Diar es Saada. Journal of Construction in Developing Countries, 23(1), pp. 149-175. ISSN 1823-6499

Mohammadi, A; Amador-Jimenez, L and Nasiri, F (2020) Reliable, effective, and sustainable urban railways: A model for optimal planning and asset management. Journal of Construction Engineering and Management, 146(6): 04020057, ISSN 0733-9364

Mohlasedi, K M and Nkado, R N (1997) The role of stakeholders in the delivery of affordable housing schemes in South Africa. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Moir, S (2004) Worker participation in OHS change in the construction workplace. ScD thesis, University of Massachusetts Lowell, USA.

Mok, C K; Rao Tummala, V M and Leung, H M (1997) Practices, barriers and benefits of risk management process in building services cost estimation. Construction Management and Economics, 15(2), pp. 161-175. ISSN 01446193

Mokhtar Azizi, N S; Wilkinson, S and Fassman, E (2014) Management practice to achieve energy-efficient performance of green buildings in New Zealand. Architectural Engineering and Design Management, 10(1-2), pp. 25-39. ISSN 1745-2007

Moloney, J; Globa, A; Wang, R; Khoo, C K and Tokede, O (2019) Hybrid environmental-media facades: Rationale and feasibility. Architectural Engineering and Design Management, 15(5), pp. 313-333. ISSN 1745-2007

Moncaster, A (2012) Constructing sustainability: connecting the social and the technical in a case study of school building projects. PhD thesis, University of East Anglia, UK.

Mondorf, P E; Kuprenas, J A and Kordahi, E N (1997) Segmental cantilever bridge construction case study. Journal of Construction Engineering and Management, 123(1), pp. 79-84. ISSN 0733-9364

Moon, H J and Augenbroe, G (2008) Empowerment of decision-makers in mould remediation. Building Research & Information, 36(5), pp. 486-498. ISSN 0961-3218

Moon, S and Bernold, L E (1998) Graphic-based human-machine interface for construction manipulator control. Journal of Construction Engineering and Management, 124(4), pp. 305-314. ISSN 0733-9364

Moon, S; Ha, C and Yang, J (2012) Structured idea creation for improving the value of construction design. Journal of Construction Engineering and Management, 138(7), pp. 841-853. ISSN 0733-9364

Moon, S; Xu, S; Hou, L; Wu, C; Wang, X and Tam, V W Y (2018) RFID-aided tracking system to improve work efficiency of scaffold supplier: Stock management in Australasian supply chain. Journal of Construction Engineering and Management, 144(2): 04017115, ISSN 0733-9364

Moore, D R (1997) An examination of the experimental design process with regard to tolerance requirement general theory. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Moore, T; Ridley, I; Strengers, Y; Maller, C and Horne, R (2017) Dwelling performance and adaptive summer comfort in low-income Australian households. Building Research & Information, 45(4), pp. 443-456. ISSN 0961-3218

Morrey N, D A and Thomson D, P C (2013) Problematisation of the shift from products to services. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Morton, C N (1979) Collective bargaining in building and civil engineering: a case study of three major re-development protects in the City of London. PhD thesis, London School of Economics and Political Science, UK.

Morton, N; Vincent, W; Schiessel Harvey, N and Curzon, R (2017) 'Thank you for taking the time to understand': A critical reflection on peer-led interventions in early experiences of higher education. International Journal of Construction Education and Research, 13(3), pp. 163-79. ISSN 1557-8771

Mosaner, Fabio Ferreira Lins (2021) Design and process in architectural production: João filgueiras lima (lelé) and the centro de tecnologia da rede sarah (ctrs). PhD thesis, Universidade de São Paulo, Brazil.

Moselhi, O; Fazio, P and Hason, S (1992) Automation of concrete slab-on-grade construction. Journal of Construction Engineering and Management, 118(4), pp. 731-748. ISSN 0733-9364

Moselhi, O and Lorterapong, P (1993) Near optimal solution for resource-constrained scheduling problems. Construction Management and Economics, 11(4), pp. 293-303. ISSN 01446193

Moses, S (2008) Improving interoperability of AEC collaborative software through the creation of data exchange standards. PhD thesis, Loughborough University, UK.

Moss, Q Z (2012) Performance measurement in facilities management-the case of outsourced service contracts. PhD thesis, University of Salford, UK.

Motawa, I A; Khosrowshahi, F and Kaka, A P (2005) Development and evaluation of a company-level budgeting technique incorporating future construction contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Motawa, I A; Price, A D F and Sher, W (1999) Implementing construction innovations. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Mottaki, Z; Hosseini Sabzevari, S A and Aslani, F (2024) Designing post-earthquake temporary shelter in hot and arid climate (case study: Isfahan city, Iran). Architectural Engineering and Design Management, 20(6), pp. 1777-1794. ISSN 1745-2007

Mouri, M M; Han, W; Xu, L; Ghasemi, A; Loh, W Y; Zhu, Z and Dai, F (2026) Assessing impacts of drone-induced distraction on postural stability of roofers during shingle installation on inclined surfaces. Journal of Construction Engineering and Management, 152(6): 04026061, ISSN 0733-9364

Moynihan, G; Zhou, H and Cui, Q (2009) Stochastic modeling for pavement warranty cost estimation. Journal of Construction Engineering and Management, 135(5), pp. 352-359. ISSN 0733-9364

Munhos, M M and da Silva, A M (2024) Eco-roofs: Influence of shape and material variations on surface temperature, rainwater volume and quality. Architectural Engineering and Design Management, 20(6), pp. 1709-1724. ISSN 1745-2007

Murray, B and Smyth, H (2009) Barriers to franchise initiation for general contractors in US remodeling industry: A non-franchisor perspective. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Murray, B and Smyth, H (2011) Franchising in the US remodelling market: Growth opportunities and barriers faced by general contractors. Construction Management and Economics, 29(6), pp. 623-634. ISSN 1466433X

Murtagh, N; Roberts, A and Hind, R (2016) The role of environmental sustainability in marketing of small architectural design practices. Construction Management and Economics, 34(4-5), pp. 258-271. ISSN 01446193

Musenero, Leah (2023) Development of an integrated framework for constructive dispute resolution in infrastructure public-private partnership projects. PhD thesis, University of Adelaide, Australia.

Myint, K. Z. and Hadikusumo, B. H. W. (2026) Key factors influencing governance in transport infrastructure public-private partnership projects in Myanmar: Case study approach. International Journal of Construction Management, 26(10), pp. 2258-2278. ISSN 1562-3599

Mzyece, D; Ndekugri, I E; Ankrah, N and Hammond, F (2012) The principal contractor’s role under construction (design and management) regulations 2007: Areas for further research based on a qualitative inquiry. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Nageeb, M (2012) The effectiveness of the hybrid graphical representation method in visually combining and communicating logical and spatial relationships between scheduled activities. PhD thesis, Texas A&M University, USA.

Nahapiet, H and Nahapiet, J (1985) A comparison of contractual arrangements for building projects. Construction Management and Economics, 3(3), pp. 217-231. ISSN 01446193

Nahmens, I and Bindroo, V (2011) Is customization fruitful in industrialized homebuilding industry? Journal of Construction Engineering and Management, 137(12), pp. 1027-1035. ISSN 0733-9364

Naoum, S and Haidar, A L I (2000) A hybrid knowledge base system and genetic algorithms for equipment selection. Engineering, Construction and Architectural Management, 7(1), pp. 3-14. ISSN 0969-9988

Nasr, E B (2005) An integrated project planning and control system approach for measuring project performance. PhD thesis, University of Colorado at Boulder, USA.

Nasri, E; Pegels, G; Mostofinejad, D and Chini, A (2010) International transfer of CAD/CAM construction technologies: Case study of a German-Iranian partnership. International Journal of Construction Management, 10(2), pp. 71-92. ISSN 1562-3599

Nassar, Y.; Albeaino, G.; Jeelani, I.; Gheisari, M. and Issa, R. R. A. (2026) Human-robot collaboration levels in construction with mobile ground robots: Cognitive workload, safety perception, and attitudes. Journal of Construction Engineering and Management, 152(9): 04026155, ISSN 0733-9364

Naumets, S; Lu, M and Ali, M (2022) Project schedule development under environment-induced time-window constraints: Case of constructing river-crossing bridge in remote Northern region. Journal of Construction Engineering and Management, 148(12): 04022129, ISSN 0733-9364

Navon, R and Berkovich, O (2006) An automated model for materials management and control. Construction Management and Economics, 24(6), pp. 635-646. ISSN 1466433X

Navon, R and Goldschmidt, E (2003) Can labor inputs be measured and controlled automatically? Journal of Construction Engineering and Management, 129(4), pp. 437-445. ISSN 0733-9364

Navon, R and Haskaya, I (2006) Is detailed progress monitoring possible without designated manual data collection? Construction Management and Economics, 24(12), pp. 1225-1229. ISSN 1466433X

Navon, R and Shpatnitsky, Y (2005) Field experiments in automated monitoring of road construction. Journal of Construction Engineering and Management, 131(4), pp. 487-493. ISSN 0733-9364

Nawaz, A; Jiang, W and Akhtar, S (2025) Exploring the role of servant leadership, teamwork, and organizational learning in the success of construction projects: A focus on project nature as a moderator. Journal of Construction Engineering and Management, 151(10): 04025154, ISSN 0733-9364

Ndekugri, I and Turner, A (1994) Building procurement by design and build approach. Journal of Construction Engineering and Management, 120(2), pp. 243-256. ISSN 0733-9364

Nemati, M A and Rastaghi, Z (2024) Quality assessment of on-campus student housing facilities through a holistic post-occupancy evaluation (A case study of Iran). Architectural Engineering and Design Management, 20(4), pp. 719-740. ISSN 1745-2007

Nesensohn, C; Bryde, D; Ochieng, E and Fearon, D (2014) Maturity and maturity models in lean construction. Construction Economics and Building, 14(1), pp. 45-59. ISSN 2204-9029

Neves, J C and Bugalho, A (2008) Coordination and control in emerging international construction firms. Construction Management and Economics, 26(1), pp. 3-13. ISSN 1466433X

Newaz, M T; Davis, P; Sher, W and Simon, L (2022) Factors affecting construction waste management streams in Australia. International Journal of Construction Management, 22(13), pp. 2625-2633. ISSN 1562-3599

Newsham, G R; Veitch, J A and Hu, Y V (2018) Effect of green building certification on organizational productivity metrics. Building Research & Information, 46(7), pp. 755-766. ISSN 0961-3218

Ng, A and Loosemore, M (2006) Risk allocation in public private partnership (PPP) projects: The new southern railway project. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ng, A K W and Price, A D F (2002) Optimizing the performance of sub-contractors in building construction projects in Hong Kong. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Ng, M F; Tummala, V M R and Yam, R C M (2003) A risk-based maintenance management model for toll road/tunnel operations. Construction Management and Economics, 21(5), pp. 495-510. ISSN 01446193

Ng, S T and Hon, W C W (2011) Concerns of the society on new mega infrastructure and construction projects in Hong Kong. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Ng, S T and Wong, Y M W (2007) Payment and audit mechanisms for non private-funded PPP-based infrastructure maintenance projects. Construction Management and Economics, 25(9), pp. 915-923. ISSN 1466433X

Ng, T; Luu, D and Chen, S (2002) Decision criteria and their subjectivity in construction procurement selection. Construction Economics and Building, 2(1), pp. 70-80. ISSN 2204-9029

Ng, T; Palaneeswaran, E and Kumaraswamy, M (2008) Costs and benefits of ISO 9000-based quality management systems to construction contractors. Construction Economics and Building, 8(2), pp. 23-29. ISSN 2204-9029

Ngowi, A B (1997) A hybrid approach to house construction: a case study in Botswana. Building Research & Information, 25(3), pp. 142-147. ISSN 0961-3218

Ngowi, A B (1998) Is construction procurement a key to sustainable development? Building Research & Information, 26(6), pp. 340-350. ISSN 0961-3218

Ngowi, A B and Pienaar, E (2005) Trust factor in construction alliances. Building Research & Information, 33(3), pp. 267-278. ISSN 0961-3218

Nguyen, D T; Doan, D T V; Tran, N N C and Tran, D H (2023) A novel multiple objective whale optimization for time-cost-quality tradeoff in non-unit repetitive projects. International Journal of Construction Management, 23(5), pp. 843-854. ISSN 1562-3599

Nguyen, Hong Trang (2018) Formulating supportive instruments for green building development in Vietnam. PhD thesis, Queensland University of Technology, Australia.

Nguyen, L D and Ibbs, W (2008) Flora: New forensic schedule analysis technique. Journal of Construction Engineering and Management, 134(7), pp. 483-491. ISSN 0733-9364

Nguyen, L D and Ibbs, W (2010) Case law and variations in cumulative impact productivity claims. Journal of Construction Engineering and Management, 136(8), pp. 826-833. ISSN 0733-9364

Nguyen, T A; Do, S T; Le-Hoai, L; Nguyen, V T and Pham, T A (2023) Practical workflow for cultural heritage digitalization and management: A case study in Vietnam. International Journal of Construction Management, 23(13), pp. 2305-2319. ISSN 1562-3599

Nguyen, T H; Berstein, S; McIntyre, C and Smith, G R (2008) Customer service management practices in the homebuilding industry. International Journal of Construction Education and Research, 4(1), pp. 3-17. ISSN 1557-8771

Nguyen, T T (2017) Modeling of CLT creep behavior and real-time hybrid simulation of a CLT-LiFS building. PhD thesis, University of Alabama, USA.

Nicholas, J; Holt, G D and Harris, P T (2000) Suppliers' debt collection and contractor creditworthiness evaluation. Building Research & Information, 28(4), pp. 268-279. ISSN 0961-3218

Nicholson, M P and Naamani, Z (1992) Managing architectural design: a recent survey. Construction Management and Economics, 10(6), pp. 479-487. ISSN 01446193

Nicol, F and Roaf, S (2005) Post-occupancy evaluation and field studies of thermal comfort. Building Research & Information, 33(4), pp. 338-346. ISSN 0961-3218

Nicolini, D (2002) In search of 'project chemistry'. Construction Management and Economics, 20(2), pp. 167-177. ISSN 01446193

Nielsen, Y and Sayar, T (2001) Web-based information flow modelling in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Nielson, Y and Erdogan, B (2003) Expanding the envelope of visualization for communication in construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Nikellis, A (2019) Risk-informed decision making for civil infrastructure subjected to single and multiple hazards. PhD thesis, State University of New York at Buffalo, USA.

Nikkhah Manesh, S (2020) Temporal and spatial analysis of the wage gap for women and underrepresented minorities in the architecture, engineering, and construction (AEC) workforce. PhD thesis, University of Nevada, Las Vegas, USA.

Nikoopayan Tak, M S; Bhattacharya, A; Metcalf, A R and Mousavi, E (2023) Cleanroom air quality: Combined effects of ventilation rate and filtration schemes in a laboratory cleanroom. Building Research & Information, 51(6), pp. 717-729. ISSN 0961-3218

Nima, M A; Abdul-Kadir, M R; Jaafar, M S and Alghulami, R G (2004) Constructability concepts in Kuala Selangor cable-stayed bridge in Malaysia. Journal of Construction Engineering and Management, 130(3), pp. 315-321. ISSN 0733-9364

Nimesha Sahani, J; Chan, D W M and Kumaraswamy, M (2021) A systematic literature review and analysis towards developing PPP models for delivering smart infrastructure. Built Environment Project and Asset Management, 11(1), pp. 121-137. ISSN 2044-124X

Ninan, J; Zaharia, A and Bosch-Rekveldt, M (2026) How digital platforms enable sustainability transitions in the built environment. Construction Management and Economics, 44(4), pp. 300-317. ISSN 0144-6193

Ninan, J; Mahalingam, A; Clegg, S and Sankaran, S (2020) ICT for external stakeholder management: Sociomateriality from a power perspective. Construction Management and Economics, 38(9), pp. 840-855. ISSN 01446193

Nnaji, C; Lee, H W; Karakhan, A and Gambatese, J (2018) Developing a decision-making framework to select safety technologies for highway construction. Journal of Construction Engineering and Management, 144(4): 04018016, ISSN 0733-9364

Nobe, M C (2007) Values and construction waste recycling: An application of the cognitive hierarchy to construction management education. PhD thesis, Colorado State University, USA.

Noghabaei, M; Han, K and Albert, A (2021) Feasibility study to identify brain activity and eye-tracking features for assessing hazard recognition using consumer-grade wearables in an immersive virtual environment. Journal of Construction Engineering and Management, 147(9): 04021104, ISSN 0733-9364

Noller, Hanna and Tarik, Ayat (2025) The importance of multi-roles and code-switching in living labs. Buildings & Cities, 6(1), pp. 952-968. ISSN 2632-6655

Noor, R N H R M; Ibrahim, C K I C and Belayutham, S (2021) Making sense of multi-actor social collaboration in building information modelling Level 2 projects: A case in Malaysia. Construction Economics and Building, 21(4), pp. 89-114. ISSN 2204-9029

Noshadravan, A; Miller, T R and Gregory, J G (2017) A lifecycle cost analysis of residential buildings including natural hazard risk. Journal of Construction Engineering and Management, 143(7): 04017017, ISSN 0733-9364

Novak, V M (2014) Design management of sustainability values: A learning organization perspective. Architectural Engineering and Design Management, 10(3-4), pp. 218-232. ISSN 1745-2007

Nuorivaara, E and Ahvenharju, S (2025) Acceptability of sufficiency consumption policies by Finnish households. Buildings & Cities, 6(1), pp. 121-138. ISSN 2632-6655

Nwazota, A (2023) Special purpose vehicle for infrastructure project financing through public private partnerships: the answer to infrastructure problems in developing countries? PhD thesis, University of Manchester, UK.

Nyström, J (2008) A quasi-experimental evaluation of partnering. Construction Management and Economics, 26(5), pp. 531-541. ISSN 1466433X

O'Connor, J T and Koo, H J (2021) Proactive design quality assessment tool for building projects. Journal of Construction Engineering and Management, 147(2): 04020174, ISSN 0733-9364

O'Connor, J T; O'Brien, W J and Choi, J O (2015) Standardization strategy for modular industrial plants. Journal of Construction Engineering and Management, 141(9): 4015026, ISSN 0733-9364

O'Connor, J T; Torres, N and Woo, J (2016) Sustainability actions during the construction phase. Journal of Construction Engineering and Management, 142(7): 4016016, ISSN 0733-9364

Obike, O; Soetanto, R and Sohail, M (2025) A risk management model for integrating resilience into renewable energy projects. Construction Management and Economics, 43(7), pp. 537-555. ISSN 0144-6193

Obiri, K A; Bjeirmi, B; Moore, D and Boateng, P (2020) Infrastructure development in the West African extractive industry: A system thinking approach. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Ochoa Franco, L A (2004) Life cycle assessment of residential buildings. PhD thesis, Carnegie Mellon University, USA.

Odeh, I; El-Rayes, K and Liu, L (2009) Field experiments to evaluate and control light tower glare in nighttime work zones. Journal of Construction Engineering and Management, 135(9), pp. 911-919. ISSN 0733-9364

Ofek, S (2021) Stimulating key stakeholders to promote residential green building in Israel. PhD thesis, University of Haifa, Israel.

Ogunlana, S O and Pien Chang, W E I (1998) Worker motivation on selected construction sites in Bangkok, Thailand. Engineering, Construction and Architectural Management, 5(1), pp. 61-81. ISSN 0969-9988

Ogwang, A (2016) Threshold-based resurfacing policies in pavement management to minimize costs and greenhouse gas emissions. PhD thesis, UniversityofCalifornia, Berkeley, USA.

Ojghaz, A S and Heravi, G (2026) An integrated BIM-GIS framework for building quality assessment based on price estimation: Evaluating design and location factors. Journal of Construction Engineering and Management, 152(4): 04026020, ISSN 0733-9364

Ojiako, U; Papadopoulos, T; Stamati, T; Anagnostopoulos, D and Marshall, A (2015) Collaborative governance in Greek infrastructure projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(3), pp. 135-145. ISSN 17514304

Okonkwo, P N and Wium, J (2020) Health and safety management systems within construction contractor organizations: Case study of South Africa. Journal of Construction Engineering and Management, 146(5): 05020003, ISSN 0733-9364

Oladiran, O; Hallam, P and Westlake, H (2025) Are the COVID-19 footprints fading? Analysing dynamics in work, corporate real estate strategies and building use. Building Research & Information, 53(7), pp. 929-947. ISSN 0961-3218

Olawale, Y A and Sun, M (2010) Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5), pp. 509-526. ISSN 1466433X

Olbina, S and Beliveau, Y (2009) Developing a transparent shading device as a daylighting system. Building Research & Information, 37(2), pp. 148-163. ISSN 0961-3218

Oliveira, L A and Melhado, S B (2011) Conceptual model for the integrated design of building façades. Architectural Engineering and Design Management, 7(3), pp. 190-204. ISSN 1745-2007

Oliver, A and Pearl, D S (2018) Rethinking sustainability frameworks in neighbourhood projects: A process-based approach. Building Research & Information, 46(5), pp. 513-527. ISSN 0961-3218

Oliver, A and Smith, S D (2018) Perceptions of sustainability in domestic housing: How do those who must deliver it understand it? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Olivieri, H; Seppänen, O; Alves, T D C L; Scala, N M; Schiavone, V; Liu, M and Granja, A D (2019) Survey comparing critical path method, last planner system, and location-based techniques. Journal of Construction Engineering and Management, 145(12): 04019077, ISSN 0733-9364

Olotuah, A O and Aiyetan, A O (2006) Sustainable low-cost housing provision in Nigeria: A bottom-up participatory approach. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Omar, I and Makhlomo, S (2003) Energy alternatives for water pumping in rural areas: Using a case study approach. Journal of Engineering, Design and Technology, 1(1), pp. 1-14. ISSN 1726-0531

Omar, I and Mncwango, S (2005) Sanitary landfill energy harnessing and applications. Journal of Engineering, Design and Technology, 3(2), pp. 127-139. ISSN 1726-0531

Omoregie, A and Radford, D (2006) Polycentric cultural framework for infrastructure procurement in Nigeria. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Oo, B L; Abdul-Aziz, A R and Lim, Y M (2011) Information feedback and learning in construction bidding. Construction Economics and Building, 11(3), pp. 33-44. ISSN 2204-9029

Oo, B L; Drew, D S and Lo, H P (2008) Heterogeneous approach to modeling contractors' decision-to-bid strategies. Journal of Construction Engineering and Management, 134(10), pp. 766-775. ISSN 0733-9364

Oo, B L; Drew, D S and Lo, H P (2010) Modeling the heterogeneity in contractors' mark-up behavior. Journal of Construction Engineering and Management, 136(7), pp. 720-729. ISSN 0733-9364

Oo, B-L; Drew, D and Lo, H-P (2008) Comparing contractors' decision to bid in different market environments. Construction Economics and Building, 8(1), pp. 1-10. ISSN 2204-9029

Opoku, A and Tallon, A (2019) The role of project sponsors in defining and realising project benefits. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Opoku, A; Tallon, A; Lok, K L; Chen, C X L and Umar, T (2020) Realising project benefits in the public sector: Project sponsor's perspective. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(1), pp. 7-13. ISSN 17514304

Orero, E (2019) Exploring options in infrastructure financing in Africa: steering of public private partnerships (PPPs) in Kenya. PhD thesis, Royal Holloway, University of London, UK.

Orhan, E; Kahraman, Z E and Güngördü, N (2020) Building a framework for analysing the quality of life at neighbourhood level: An empirical case from Ankara. Journal of Construction in Developing Countries, 25(1), pp. 63-82. ISSN 1823-6499

Osaily, Y; Copping, A; McCann, S and Uddin, T (2019) Exploring the value of demolition contractor involvement at the design stage of construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Osipova, E and Eriksson, P E (2011) How procurement options influence risk management in construction projects. Construction Management and Economics, 29(11), pp. 1149-1158. ISSN 1466433X

Ostakh, O; Uzyakova, E; Grechishcheva, N and Kusheeva, V (2021) Ecotoxicological assessment of soil-like mixtures made of drill cuttings. Journal of Engineering, Design and Technology, 19(6), pp. 1433-1450. ISSN 1726-0531

Oteifa, S and Baldwin, A (1991) Estimators' tasks and computer-aided estimating systems: A survey of fcec member companies. Construction Management and Economics, 9(6), pp. 543-552. ISSN 01446193

Ou, C-S (2007) Sustainable infrastructure materials: A life cycle assessment approach. PhD thesis, University of Colorado at Boulder, USA.

Oussadou, A (1988) Residential satisfaction in the new urban housing projects in Algeria: a case study of Ain-Allah, Algiers. PhD thesis, University of Nottingham, UK.

Ovbiagbonhia, A R (2021) Learning to innovate: How to foster innovation competence in students of built environment at universities of applied sciences. PhD thesis, Wageningen University and Research, Netherlands.

Oviedo-Haito, R J; Jiménez, J; Cardoso, F F and Pellicer, E (2014) Survival factors for subcontractors in economic downturns. Journal of Construction Engineering and Management, 140(3): 4013056, ISSN 0733-9364

Owolabi, O V (2021) The use of active learning pedagogy in two undergraduate remote civil engineering classrooms: A mixed methods study. PhD thesis, Morgan State University, USA.

Oztas, A (1995) The mitigation of the effects of delays in construction projects: A knowledge based system approach. PhD thesis, University of Manchester, UK.

Ozturk, A (2010) Management of trans-boundary mega-projects in the post-cold war Eurasia: The case studies of GAP water and Baku-Ceyhan pipeline projects. PhD thesis, Keele University, UK.

O’Brien, J J; Kreitzberg, F C and Mikes, W F (1985) Network scheduling variations for repetitive work. Journal of Construction Engineering and Management, 111(2), pp. 105-116. ISSN 0733-9364

O’Connor, J T and Davis, V S (1988) Constructability improvement during field operations. Journal of Construction Engineering and Management, 114(4), pp. 548-564. ISSN 0733-9364

O’Neill, T; Hartigan, K and Spillane, J P (2024) Factors inhibiting higher education institutions from addressing industry driven change in Irish construction management programs. International Journal of Construction Education and Research, 20(1), pp. 65-82. ISSN 15578771

Painting, N; Ashton, P and Gidado, K (2004) PFI in south aast England secondary schools: A school manager's perspective. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Pala, M (2018) Implementing inter-organisational information systems for the integration of construction supply chains. PhD thesis, Loughborough University, UK.

Palacios, J L; Gonzalez, V and Alarcón, L F (2014) Selection of third-party relationships in construction. Journal of Construction Engineering and Management, 140(4): B4013005, ISSN 0733-9364

Palencia, M; Mora, M and Lerma, T A (2021) Environment-friendly stimulus-sensitive polyurethanes based on cationic aminoglycosides for the controlled release of phytohormones. Smart and Sustainable Built Environment, 10(1), pp. 1-17. ISSN 2046-6099

Pali, P (2020) Potential for climate change mitigation through low carbon investment in Indian roads and railways: an assessment of obstacles and opportunities for the Asian Development Bank. PhD thesis, University of Manchester, UK.

Pan, W; Dainty, A R J and Gibb, A G F (2004) Managing innovation: A focus on off-site production (OSP) in the UK housebuilding industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Pan, W; Gibb, A G F and Dainty, A R J (2012) Strategies for integrating the use of off-site production technologies in house building. Journal of Construction Engineering and Management, 138(11), pp. 1331-1340. ISSN 0733-9364

Pantouvakis, J P and Manoliadis, O G (2008) A compromise programming model for site selection of borrow pits. Construction Management and Economics, 26(5), pp. 433-446. ISSN 1466433X

Panwar, A and Jha, K N (2017) Trade-off between life cycle cost and greenhouse gas emission in construction projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Papadonikolaki, E; Vrijhoef, R and Wamelink, H (2016) The interdependences of BIM and supply chain partnering: Empirical explorations. Architectural Engineering and Design Management, 12(6), pp. 476-494. ISSN 1745-2007

Papadonikolaki, E and van Oel, C (2016) The actors' perceptions and expectations of their roles in BIM-based collaboration. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Papajohn, D (2019) Contract administration functions and tools for design-build and construction manager/general contractor project delivery in U.S. Highway construction. PhD thesis, Arizona State University, USA.

Parami Dewi, Anak Agung Diah (2013) Framework for implementing design build project delivery system in road infrastructure in Indonesia. PhD thesis, Queensland University of Technology, Australia.

Park, J (2011) Best-value in Korean public building construction. PhD thesis, University of Southampton, UK.

Park, J; Brown, J; Al-Hasani, L E; Gentry, T R; Kurtis, K E and Cho, Y K (2024) Cost-effective thermal control planning for mass concrete construction using nomograms. Journal of Construction Engineering and Management, 150(10): 06024001, ISSN 0733-9364

Park, J; Kim, K and Cho, Y K (2017) Framework of automated construction-safety monitoring using cloud-enabled BIM and BLE mobile tracking sensors. Journal of Construction Engineering and Management, 143(2): 05016019, ISSN 0733-9364

Park, M and Peña-Mora, F (2004) Reliability buffering for construction projects. Journal of Construction Engineering and Management, 130(5), pp. 626-637. ISSN 0733-9364

Park, T; Kim, M K; Kim, C and Kim, H (2009) Interactive 3D CAD for effective derrick crane operation in a cable-stayed bridge construction. Journal of Construction Engineering and Management, 135(11), pp. 1261-1270. ISSN 0733-9364

Pasquire, C L (1991) Builders quantities for contractors' management. PhD thesis, Loughborough University, UK.

Passe, U (2020) A design workflow for integrating performance into architectural education. Buildings & Cities, 1(1), pp. 565-578. ISSN 2632-6655

Pastore, L and Andersen, M (2019) Detecting trends and further development potential of contemporary façade design for workspaces. Architectural Engineering and Design Management, 15(4), pp. 267-281. ISSN 1745-2007

Patcharachavalit, N; Limsawasd, C and Athigakunagorn, N (2023) Multiobjective optimization for improving sustainable equipment options in road construction projects. Journal of Construction Engineering and Management, 149(1): 04022160, ISSN 0733-9364

Patel, T.; Guo, B. H. W.; van der Walt, J. D. and Bapat, H. (2026) Vision-based automated road construction progress monitoring: Improved u-net segmentation approach. International Journal of Construction Management, 26(10), pp. 2154-2175. ISSN 1562-3599

Patil, S S (2000) Optimal owner contractor relationships based on capital project competencies. PhD thesis, Texas A&M University, USA.

Patterson, D A; Farnsworth, C B; Hutchings, D M; Eggett, D L and Weidman, J E (2023) Comparing cost, schedule, and quality of CM/GC and DBB project delivery for repetitive commercial construction. International Journal of Construction Education and Research, 19(2), pp. 166-186. ISSN 1557-8771

Patterson, M R (2017) Skin fit and retrofit: Challenging the sustainability of curtainwall practice in tall buildings. PhD thesis, University of Southern California, USA.

Paullin, R J (1977) Construction management: Implications for intermediate school district boards of education and administrators in Michigan. PhD thesis, Michigan State University, USA.

Pavitt, T C and Gibb, A G F (1999) Managing organizational interfaces in the cladding supply chain: Initial results from expert interviews. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Peansupap, V and Walker, D H T (2004) Strategic adoption of information and communication technology (ICT): Case studies of construction contractors. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Peer, S (1986) An improved systematic activity sampling technique for work study. Construction Management and Economics, 4(2), pp. 151-159. ISSN 01446193

Pekkonen, M; Turunen, M and Haverinen-Shaughnessy, U (2018) Housing quality perceptions in Finland: The elderly population. Building Research & Information, 46(4), pp. 417-429. ISSN 0961-3218

Pellicer, E; Yepes, V; Correa, C L and Alarcón, L F (2014) Model for systematic innovation in construction companies. Journal of Construction Engineering and Management, 140(4): B4014001, ISSN 0733-9364

Pemsel, S and Widén, K (2011) Bridging boundaries between organizations in construction. Construction Management and Economics, 29(5), pp. 495-506. ISSN 1466433X

Perera, C S R; Francis, V and Shang, G (2023) Acceptance and adoption of construction 4.0 related technology: A review. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Perera, S; Senaratne, S; Rodrigo, M N N and Brady, L (2021) Analysis of embodied carbon and cost profiles of school buildings in Australia. Built Environment Project and Asset Management, 11(4), pp. 660-672. ISSN 2044-124X

Perez-Bella, J M; Dominguez-Hernandez, J; Cano-Suñen, E; Del Coz-Diaz, J J and Alvarez Rabanal, F P (2015) Improvement alternatives for determining the watertightness performance of building facades. Building Research & Information, 43(6), pp. 723-736. ISSN 0961-3218

Perez-Bezos, S; Grijalba, O and Hernandez-Minguillon, R J (2023) Multifactorial approach to indoor environmental quality perception of social housing residents in Northern Spain. Building Research & Information, 51(4), pp. 392-410. ISSN 0961-3218

Perkinson, C L (2008) The use of computing technology in highway construction contractor companies as a total jobsite management tool (TJMT). PhD thesis, Florida International University, USA.

Perreira, A and Rankin, J H (2015) Adoption of knowledge management by Canadian housing charities. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(2), pp. 76-88. ISSN 17514304

Perrucci, D V (2021) Methods for scenario modeling of post-disaster temporary housing. PhD thesis, Vanderbilt University, USA.

Peter, E; Love, D and Heng, L I (2000) Quantifying the causes and costs of rework in construction. Construction Management and Economics, 18(4), pp. 479-490. ISSN 01446193

Pham, V H S and Pham, D H (2025) A cutting-edge approach to prefabricated construction site layouts using multi-objective artificial hummingbird algorithm solution. International Journal of Construction Management, 25(16), pp. 2063-2081. ISSN 1562-3599

Pheng, L S and Hou, C W (2008) Middle management's influence on the effectiveness of ISO 9000 quality management systems in architectural firms. Architectural Engineering and Design Management, 4(3-4), pp. 189-205. ISSN 1745-2007

Pheng, L S and Pong, C Y (2003) Integrating ISO 9001 and ohsas 18001 for construction. Journal of Construction Engineering and Management, 129(3), pp. 338-347. ISSN 0733-9364

Pheng, L S and Tan, J H K (2005) Integrating ISO 9001 quality management system and ISO 14001 environmental management system for contractors. Journal of Construction Engineering and Management, 131(11), pp. 1241-1244. ISSN 0733-9364

Pheng, L S and Tan, S K L (1997) The measurement of just in time wastage for a public housing project in Singapore. Building Research & Information, 25(2), pp. 67-81. ISSN 0961-3218

Phillips, H C (2009) A proposed method to determine confidence in a construction schedule. PhD thesis, University of New Mexico, USA.

Phillips-Alonge, O K (2019) The influence of partnering on the occurrence of construction requirement conflicts and disputes. International Journal of Construction Management, 19(4), pp. 291-306. ISSN 1562-3599

Pickrell, S W (1999) A surveyor's world-view: decision-making in building surveying. PhD thesis, University of Reading, UK.

Pienaar, Josua (2015) Understanding progression in the built environment through an interactive student-centred model of progression. PhD thesis, Central Queensland University, Australia.

Pilgrim, M J (2003) The application of visualisation techniques to the process of building performance analysis. PhD thesis, Loughborough University, UK.

Pinfold, L (2018) Coupling innovative technology, space management and BIM processes with smart city management: Congested construction sites in urban centres in Cape Town South Africa. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Pishdad-Bozorgi, P (2017) Case studies on the role of integrated project delivery approach on the establishment and promotion of trust. International Journal of Construction Education and Research, 13(2), pp. 102-23. ISSN 1557-8771

Pitt, M and Smith, A (2003) An assessment of waste management efficiency at baa airports. Construction Management and Economics, 21(4), pp. 421-431. ISSN 01446193

Platt, R T (1998) Development of a ready-to-assemble construction system. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Plumblee II, J M (2013) Incorporating natural hazard resistance into the life cycle assessment framework. PhD thesis, Clemson University, USA.

Pocock, J B; Kuennen, S T; Gambatese, J and Rauschkolb, J (2006) Constructability state of practice report. Journal of Construction Engineering and Management, 132(4), pp. 373-383. ISSN 0733-9364

Polat, G; Arditi, D and Mungen, U (2007) Simulation-based decision support system for economical supply chain management of rebar. Journal of Construction Engineering and Management, 133(1), pp. 29-39. ISSN 0733-9364

Polat, G and Bayhan, H G (2022) Selection of HVAC-ahu system supplier with environmental considerations using fuzzy edas method. International Journal of Construction Management, 22(10), pp. 1863-1871. ISSN 1562-3599

Poleacovschi, C (2017) The role of social and governance mechanisms on the process of knowledge seeking in engineering organizations. PhD thesis, University of Colorado at Boulder, USA.

Poleacovschi, C and Javernick-Will, A (2017) Who are the experts? Assessing expertise in construction and engineering organizations. Journal of Construction Engineering and Management, 143(8): 04017033, ISSN 0733-9364

Pomares, J C; Irles, R; Segovia, E and Ferrer, B (2014) Acceleration and deflection analysis for class C edge protection systems in construction work. Journal of Construction Engineering and Management, 140(8): 04014031, ISSN 0733-9364

Pons, O; Casanovas-Rubio, M M; Armengou, J and De La Fuente, A (2021) Sustainability-driven decision-making model: Case study of fiber-reinforced concrete foundation piles. Journal of Construction Engineering and Management, 147(10): 04021116, ISSN 0733-9364

Poon, C S; Yu, A T W; See, S C and Cheung, E (2004) Minimizing demolition wastes in Hong Kong public housing projects. Construction Management and Economics, 22(8), pp. 799-805. ISSN 01446193

Poon, C S; Yu, A T W; Wong, A and Yip, R (2013) Quantifying the impact of construction waste charging scheme on construction waste management in Hong Kong. Journal of Construction Engineering and Management, 139(5), pp. 466-479. ISSN 0733-9364

Porter, D and Glick, S (2022) Spatial visualization in construction management education: A review and validation of the literature using professionals and related practitioners. International Journal of Construction Education and Research, 18(1), pp. 17-31. ISSN 1557-8771

Porter, D S (2018) Spatial abilities of construction and related professionals. PhD thesis, Colorado State University, USA.

Porwal, A; Parsamehr, M; Szostopal, D; Ruparathna, R and Hewage, K (2023) The integration of building information modeling (BIM) and system dynamic modeling to minimize construction waste generation from change orders. International Journal of Construction Management, 23(1), pp. 156-166. ISSN 1562-3599

Powell, C (1989) Workload fluctuations and aspects of building quality. Construction Management and Economics, 7(2), pp. 125-136. ISSN 01446193

Powell, R and Copping, A (2010) Construction worker sleep deprivation and its effects on personal safety. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Preece, C and Male, S (1997) Promotional literature for competitive advantage in UK construction firms. Construction Management and Economics, 15(1), pp. 59-69. ISSN 01446193

Preece, C N (1993) A study of the management of promotion for competitive advantage in UK construction firms. PhD thesis, Heriot-Watt University, UK.

Preece, C N; Mat Isa, C M; Saman, H M and Che Ibrahim, C K (2016) Development of entry location, entry timing and entry mode decision model for construction firms in international markets. Construction Management and Economics, 34(4-5), pp. 236-257. ISSN 01446193

Pregenzer, L J; Seppanen, P J; Kunz, J C and Paulson, B C (1999) Value-added assessment of construction plans. Journal of Construction Engineering and Management, 125(4), pp. 242-248. ISSN 0733-9364

Price, T (2010) Site waste management plans, the designer and the CDM principal contractor. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Prihatmanti, R and Bahauddin, A (2014) Indoor air quality in adaptively reused heritage buildings at a UNESCO world heritage site, Penang, Malaysia. Journal of Construction in Developing Countries, 19(1), pp. 69-91. ISSN 1823-6499

Proverbs, D G; Olomolaiye, P O and Harris, F C (1996) Planned construction times and labour utilization: a comparison of UK and French contractors. Engineering, Construction and Architectural Management, 3(3), pp. 219-232. ISSN 0969-9988

Psilander, K (2012) Managing production costs of small and large developers in Sweden: A case study on multi-family construction. International Journal of Construction Education and Research, 8(1), pp. 47-62. ISSN 1557-8771

Puddicombe, M S (1997) Designers and contractors: Impediments to integration. Journal of Construction Engineering and Management, 123(3), pp. 245-252. ISSN 0733-9364

Pulaski, M H and Horman, M J (2005) Organizing constructability knowledge for design. Journal of Construction Engineering and Management, 131(8), pp. 911-919. ISSN 0733-9364

Puri, V and Martinez, J C (2013) Modeling of simultaneously continuous and stochastic construction activities for simulation. Journal of Construction Engineering and Management, 139(8), pp. 1037-1045. ISSN 0733-9364

Pérez-Bou, S; Kishnani, N and Dutta, A (2024) Human factors for a successful integrated design process in zero energy buildings: Leadership, trust, and goal orientation: A case study in Singapore. Architectural Engineering and Design Management, 20(4), pp. 928-945. ISSN 1745-2007

Qi, T.; Liu, D.; Guo, Y.; Zhou, X.; Zhao, X.; Huang, X.; Wang, Y.; Jiang, Y.; Lu, L. and Wang, Z. (2025) Toward efficient and agent-scalable indoor pathfinding: Intelligent navigation-ability-driven indoor map generation using building information model. Architectural Engineering and Design Management, 21(5), pp. 1000-1021. ISSN 1745-2007

Raheem, A A; Falola, O O and Adeyeye, K J (2012) Production and testing of lateritic interlocking blocks. Journal of Construction in Developing Countries, 17(1), pp. 35-50. ISSN 1823-6499

Rahmani, F (2021) Challenges and opportunities in adopting early contractor involvement (ECI): Client's perception. Architectural Engineering and Design Management, 17(1-2), pp. 67-76. ISSN 1745-2007

Rahmat, A; Che Ibrahim, C K I and Belayutham, S (2020) Exploring the quantitative measures for multi-organization integration in Malaysian construction projects. International Journal of Construction Education and Research, 16(4), pp. 233-250. ISSN 1557-8771

Raidén, A B; Dainty, A R J and Neale, R H (2001) Human resource information systems in construction: Are their capabilities fully exploited? In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Raidén, A B; Dainty, A R J and Neale, R H (2008) Understanding employee resourcing in construction organizations. Construction Management and Economics, 26(11), pp. 1133-1143. ISSN 1466433X

Raidén, A B; Räisänen, C and Caven, V (2012) Juggling work, family ... and life in academia: The case of the "new" man. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Raisbeck, P (2008) Perceptions of architectural design and project risk: Understanding the architects' role in a PPP project. Construction Management and Economics, 26(11), pp. 1145-1157. ISSN 1466433X

Raisbeck, P and Aibinu, A A (2010) Early stage cost estimation and the relationship of architects to quantity surveyors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Raisbeck, P and Tang, L C M (2009) Humanistic and scientific knowledge management: A comparison of design practice between architects and engineers. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Raisbeck, P and Tang, L C M (2013) Identifying design development factors in Australian PPP projects using an AHP framework. Construction Management and Economics, 31(1), pp. 20-39. ISSN 1466433X

Ramalingam, S and Mahalingam, A (2018) Knowledge coordination in transnational engineering projects: A practice-based study. Construction Management and Economics, 36(12), pp. 700-715. ISSN 01446193

Ramani, P V; Selvaraj, P; T., S and Gupta, A (2022) Application of linear scheduling in water canal construction with a comparison of critical path method. Journal of Construction in Developing Countries, 27(1), pp. 189-212. ISSN 1823-6499

Rameezdeen, R and Rajapakse, C (2007) Contract interpretation: The impact of readability. Construction Management and Economics, 25(7), pp. 729-737. ISSN 1466433X

Ramos, N M M and De Freitas, V P (2009) Experimental determination of the hygroscopic inertia of building materials. Building Research & Information, 37(3), pp. 293-299. ISSN 0961-3218

Rana, V.; Singh, V.; Singh, A. R.; Rao, M. S. and Kashyap, K. (2026) Promoting real estate sensitivity among AEC students: A board game-based approach to applied learning. Architectural Engineering and Design Management, 22(1), pp. 149-167. ISSN 1745-2007

Raouf, A M and Al-Ghamdi, S G (2019) Effectiveness of project delivery systems in executing green buildings. Journal of Construction Engineering and Management, 145(10): 03119005, ISSN 0733-9364

Raouf, A M and Al-Ghamdi, S G (2023) Framework to evaluate quality performance of green building delivery: Construction and operational stage. International Journal of Construction Management, 23(2), pp. 253-267. ISSN 1562-3599

Rasmussen C K S, T C L (2013) Organizing construction practices in different cultural contexts. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Rasouli, S; Zhong, W; Singh, A K; Mohandes, S R; Antwi-Afari, M F; Cheung, C M and Manu, P (2024) The adoption of uav for construction safety management: A systematic literature review. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Razak, D S A; Mills, G and Roberts, A (2018) How do infrastructure owners build capabilities to reduce operational failure? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Razavialavi, S and Abourizk, S (2017) Genetic algorithm-simulation framework for decision making in construction site layout planning. Journal of Construction Engineering and Management, 143(1): 04016084, ISSN 0733-9364

Razmdoost, K and Mills, G (2016) Towards a service-led relationship in project-based firms. Construction Management and Economics, 34(4-5), pp. 317-334. ISSN 01446193

Rekapalli, P V and Martinez, J C (2011) Discrete-event simulation-based virtual reality environments for construction operations: Technology introduction. Journal of Construction Engineering and Management, 137(3), pp. 214-224. ISSN 0733-9364

Rekola, M; Kojima, J and Mäkeläinen, T (2010) Towards integrated design and delivery solutions: Pinpointed challenges of process change. Architectural Engineering and Design Management, 6(4), pp. 264-278. ISSN 1745-2007

Ren, X; Li, Y and Guo, M (2023) Dynamically identifying and evaluating key barriers to promoting prefabricated buildings: Text mining approach. Journal of Construction Engineering and Management, 149(9): 04023075, ISSN 0733-9364

Reszka, M and Edwards, P J (1997) Joint ventures: A construction project case study. Journal of Financial Management of Property and Construction, 2(2), pp. 5-20. ISSN 1366-4387

Ribeiro, F L (1998) Delivering large scale building projects: a case study. Journal of Construction Procurement, 4(2), pp. 77-88. ISSN 1358-9180

Ribeiro, F L (1998) Project delivery methods for large scale building projects: A case study. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Ribeiro, F L (2001) BOT model: The Portuguese case. Journal of Construction Procurement, 7(2), pp. 72-86. ISSN 1358-9180

Ribón, J G T M (2020) Advanced monitoring of construction safety using UAS and positioning technologies. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.

Richardson, S (2017) Embodied carbon assessment and decision making under uncertainty: case studies of UK supermarket construction. EngD thesis, University of Reading, UK.

Riel, Paul E (2015) Campus planners' preferences for residence hall project delivery methods. EdD thesis, University of North Florida, USA.

Rijal, H B; Humphreys, M A and Nicol, J F (2009) Understanding occupant behaviour: The use of controls in mixed-mode office buildings. Building Research & Information, 37(4), pp. 381-396. ISSN 0961-3218

Riley, D R (1994) Modeling the space behavior of construction activities. PhD thesis, Pennsylvania State University, USA.

Riley, D R and Sanvido, V E (1997) Space planning method for multistory building construction. Journal of Construction Engineering and Management, 123(2), pp. 171-180. ISSN 0733-9364

Riley, D R; Varadan, P; James, J S and Thomas, H R (2005) Benefit-cost metrics for design coordination of mechanical, electrical, and plumbing systems in multistory buildings. Journal of Construction Engineering and Management, 131(8), pp. 877-889. ISSN 0733-9364

Rintala, Kai M (2004) The economic efficiency of accommodation service PFI projects. PhD thesis, University College London, UK.

Ritter, V (2012) Optimizing the combination of active and passive building components in refurbishment projects to allow for net-zero emission architecture. DSc thesis, ETH Zürich, Switzerland.

Rob Danie Raijmakers, S V and Remko Cremers, A D (2023) Two paths colliding at one road: Integrating split municipal climate action agendas. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Robinson, A; Austin, S and Gibb, A (2011) Efficiencies in design and manufacturing for construction using shipping containers. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Robinson, H S; Carrillo, P M; Anumba, C J and Al-Ghassani, A M (2004) Developing a business case for knowledge management: The IMPaKT approach. Construction Management and Economics, 22(7), pp. 733-743. ISSN 01446193

Robinson, P and McIlwaine, S (2020) Losing ground: Adapting construction management approaches to permafrost retreat. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Robinson A, A S G A (2013) Reinventing the wheel? Case study of research into linear/non-linear and framing processes. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Rodger, D; Callaghan, N and Thomson, C (2018) Are retrofitted social houses sufficiently reflecting the holistic health and wellbeing requirements of older people? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Rodriguez-Labajos, L; Thomson, C and O'Brien, G (2016) Exploring the attributes and KPIs adopted by international healthcare providers to measure the performance of their estates at the strategic level. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Rodriguez-Labajos, L; Thomson, C and O'Brien, G (2017) A critical analysis of strategic performance measurement in supporting estate decisions in NHS Scotland. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Rogers, M (2000) Using ELECTRE to aid the choice of housing construction process within structural engineering. Construction Management and Economics, 18(3), pp. 333-342. ISSN 01446193

Rogers, T R (1996) A conceptual communication-system model applied to construction. PhD thesis, University of Maryland, College Park, USA.

Rohde, L; Jensen, R L; Larsen, O K; Jønsson, K T and Larsen, T S (2021) Holistic indoor environmental quality assessment as a driver in early building design. Building Research & Information, 49(4), pp. 460-481. ISSN 0961-3218

Rokooei, S; Shojaei, A and Ly, R (2025) Faculty development program to enhance teaching quality in construction. International Journal of Construction Management, 25(1), pp. 89-98. ISSN 1562-3599

Rosa, Fabiana Pires (2021) Proposal for a management model for the building maintenance phase, using the BIM concept, focusing on preventive maintenance. PhD thesis, Universidade do Vale do Rio dos Sinos, Brazil.

Rosander, L and Kadefors, A (2019) From project to policy: Implementing a collaborative procurement strategy in a public client organisation. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Roumboutsos, A and Anagnostopoulos, K P (2008) Public private partnership projects in Greece: Risk ranking and preferred risk allocation. Construction Management and Economics, 26(7), pp. 751-763. ISSN 1466433X

Rounds, J L and Warning, G (1987) Impact of computerizing midsized construction companies. Journal of Construction Engineering and Management, 113(2), pp. 183-190. ISSN 0733-9364

Rowings Jr, J E; Federle, M O and Rusk, J (2000) Design/build methods for electrical contracting industry. Journal of Construction Engineering and Management, 126(1), pp. 15-21. ISSN 0733-9364

Rubio, F J (2018) Maintaining and widening the M25 motorway, UK: A private finance case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(5), pp. 197-206. ISSN 17514304

Ruff, C M; Dzombak, D A and Hendrickson, C T (1996) Owner-contractor relationships on contaminated site remediation projects. Journal of Construction Engineering and Management, 122(4), pp. 348-353. ISSN 0733-9364

Ruge, J; Dimitrova, V; Grubbauer, M and Bögle, A (2022) Models, mock-ups and materials: Artefacts of collaboration in the planning of large-scale construction projects. Building Research & Information, 50(8), pp. 881-893. ISSN 0961-3218

Rujirayanyong, T (2004) Data warehousing for construction. PhD thesis, Illinois Institute of Technology, USA.

Ruokamo, E; Tikkanen, T; Lukkarinen, J and Karhinen, S (2026) Energy retrofits in shared ownership: Exploring motivations in Finnish housing companies. Building Research & Information, 54(3), pp. 289-305. ISSN 0961-3218

Ruokolainen, A and Plat, H T (1998) A system for allocating of private home owners' annual budget to housing. Journal of Financial Management of Property and Construction, 3(3), pp. 37-48. ISSN 1366-4387

Russell, J S and Jaselskis, E J (1992) Quantitative study of contractor evaluation programs and their impact. Journal of Construction Engineering and Management, 118(3), pp. 612-624. ISSN 0733-9364

Russell, M M; Howell, G; Hsiang, S M and Liu, M (2013) Application of time buffers to construction project task durations. Journal of Construction Engineering and Management, 139(10): 04013008, ISSN 0733-9364

Russell, M M; Liu, M; Howell, G and Hsiang, S M (2015) Case studies of the allocation and reduction of time buffer through use of the last planner system. Journal of Construction Engineering and Management, 141(2): 04014068, ISSN 0733-9364

Rwelamila, P D (2012) Research contribution to innovation in infrastructure development in Africa: Assessing the status. Journal of Construction in Developing Countries, 17(S1), pp. 43-56. ISSN 1823-6499

Rwelamila, P D and Phungula, M G (2009) Managing the complexity of public private partnerships initiatives: How mature are South African public institutions? In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Ryan, R C (2008) Use of an e-text as a primary course resource. International Journal of Construction Education and Research, 4(2), pp. 97-114. ISSN 1557-8771

Rybkowski, Z K; Arroyo, P and Parrish, K (2022) Assessment of current target value design practices: Consistencies and inconsistencies of application. Construction Management and Economics, 40(7-8), pp. 598-617. ISSN 01446193

Räisänen, C; Rapp-Ricciardi, M; Grill, M and Larsman, P (2023) Is it possible to foster long-term construction-site safety leadership through behavioural training? In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Sadek, A H; Willis, J; Joubert, L; Shah, B; Fawzy, M and Speakman, D (2024) Outpatient oncology settings: the distinctive contribution of supportive design to patient experience and wellbeing. Building Research & Information, 52(7), pp. 817-835. ISSN 0961-3218

Sadullah, M; Ghazali, M and Rashid, A (2018) Critical success factors in a public–private partnership highway project in Malaysia: Ampang–Kuala Lumpur elevated highway. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(6), pp. 234-242. ISSN 17514304

Saghatforoush, Ehsan (2014) Extension of constructability to include operation and maintenance for infrastructure projects. PhD thesis, Queensland University of Technology, Australia.

Said, H M and Reginato, J (2018) Impact of design changes on virtual design and construction performance for electrical contractors. Journal of Construction Engineering and Management, 144(1): 04017097, ISSN 0733-9364

Sainati, T (2018) Governance of infrastructure megaprojects : The role of the special purpose entities. PhD thesis, University of Leeds, UK.

Salah Eldeen Ismaeel Elsayed Ahmed, Walaa (2014) Developing a systemic framework for applying LEED system: Managing energy and materials credits. PhD thesis, Politecnico di Milano, Italy.

Salam, M; Killen, C and Forsythe, P (2025) Assessing interdisciplinary collaboration in the detailed design phase of construction projects: applying practice-based inter-organisational theories. International Journal of Construction Management, 25(2), pp. 238-247. ISSN 1562-3599

Salehudin, Muhamad Syafiq Bin (2012) Developing sustainable resorts in developing countries: A proposed new generation rating framework for Malaysia. PhD thesis, University of New South Wales, Australia.

Saleki, S and Bahramani, S K (2019) Designing a low-carbon building via lcb method 3.0, case study: An educational building in Tehran. Journal of Construction in Developing Countries, 23(2), pp. 129-150. ISSN 1823-6499

Salim, M (1993) Process-oriented planning for the placement of reinforcing bars. PhD thesis, North Carolina State University, USA.

Salman, A; Moselhi, O and Zayed, T (2013) Scheduling model for rehabilitation of distribution networks using MINLP. Journal of Construction Engineering and Management, 139(5), pp. 498-509. ISSN 0733-9364

Salmio, E and Huuhka, S (2026) Environmental impacts of reclaimed bricks: Comparing different deconstruction methods. Buildings & Cities, 7(1), pp. 323-340. ISSN 2632-6655

Salonen, A (2006) Relational risk and relationship management in facilities management partnerships. PhD thesis, Helsinki University of Technology, Finland.

Sam, Mahya (2023) Exploring the relationship between human-robot collaboration (HRC) and the resilience of construction work processes. PhD thesis, University of Florida, USA.

Samarakkody, A L; Perera, B A K S and Palliyaguru, R (2022) Appropriateness of soft landings concept for avoiding malpractices in Sri Lankan building projects. International Journal of Construction Management, 22(14), pp. 2817-2829. ISSN 1562-3599

Sami Ur Rehman, M; Thaheem, M J; Nasir, A R and Khan, K I A (2022) Project schedule risk management through building information modelling. International Journal of Construction Management, 22(8), pp. 1489-1499. ISSN 1562-3599

Sampson Mamphweli, N and Leroy Meyer, E (2013) Performance monitoring system for a biomass gasifier. Journal of Engineering, Design and Technology, 11(1), pp. 7-18. ISSN 1726-0531

Samuels, A F and Bruder, M J (1996) Construction representative: Scheduling and cost management. Journal of Construction Engineering and Management, 122(3), pp. 281-290. ISSN 0733-9364

Sandy, T (2018) High-accuracy mobile manipulation for on-site robotic building construction. DSc thesis, ETH Zürich, Switzerland.

Sanei, H (2016) Discipline breakdown structure: Bridging project management and systems engineering to form an integrated management system in multidisciplinary rail projects. PhD thesis, University College London, UK.

Santoso, D S (2009) The construction site as a multicultural workplace: A perspective of minority migrant workers in Brunei. Construction Management and Economics, 27(6), pp. 529-537. ISSN 1466433X

Santoso, D S; Joewono, T B; Wibowo, A; Sinaga, H P A and Santosa, W (2012) Public-private partnerships for tollway construction and operation: Risk assessment and allocation from the perspective of investors. Journal of Construction in Developing Countries, 17(2), pp. 45-66. ISSN 1823-6499

Santoso, J and Loosemore, M (2013) Expatriate management in Australian multinational enterprises. Construction Management and Economics, 31(11), pp. 1098-1109. ISSN 1466433X

Sanvido, V E and Paulson, B C (1992) Site-level construction information system. Journal of Construction Engineering and Management, 118(4), pp. 701-715. ISSN 0733-9364

Sargent, K; Hyland, P and Sawang, S (2012) Factors influencing the adoption of information technology in a construction business. Construction Economics and Building, 12(2), pp. 72-86. ISSN 2204-9029

Sarhan, M (2008) Risk-based approach in highway geometric design. PhD thesis, Carleton University, Canada.

Sarisley, E F (1990) Construction methods and costs of stress-laminated timber bridges. Journal of Construction Engineering and Management, 116(3), pp. 432-447. ISSN 0733-9364

Sarraj, Z M A (1990) Formal development of line-of-balance technique. Journal of Construction Engineering and Management, 116(4), pp. 689-704. ISSN 0733-9364

Sarshar, M; Murat Tanyer, A; Aouad, G and Underwood, J (2002) A vision for construction IT 2005 2010: Two case studies. Engineering, Construction and Architectural Management, 9(2), pp. 152-160. ISSN 0969-9988

Sasidharan, M P (2020) A risk-informed approach to setting economically-justifiable maintenance strategies for railway tracks. PhD thesis, University of Birmingham, UK.

Sateei, S and Sundquist, V (2022) Knowledge integration through resource combining: The case of a national standard framework for hospital design. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Savage, D (2010) Business networks and conflict management. PhD thesis, Queen's University Belfast, UK.

Savoie, É; Sapinski, J P and Laroche, A M (2025) Key factors for revitalising heritage buildings through adaptive reuse. Buildings & Cities, 6(1), pp. 103-120. ISSN 2632-6655

Savva, C (2023) Lessons that can be learnt using action research strategies within TfL. PhD thesis, University of Liverpool, UK.

Sayed, N; Badawy, A; Attia, T and Ahmed, A (2025) Cost-benefit analysis of recycled materials in road asphalt layer: A case study in Egypt. Built Environment Project and Asset Management, 15(4), pp. 791-807. ISSN 2044-124X

Sazalli, S A H; Greenwood, D; Morton, D and Agnew, B (2012) Industrialized building system in Malaysian housing: An emerging innovation system explanation. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Scala, N M; Alves, T d C L; Hawkins, D; Schiavone, V and Liu, M (2025) Application of the maturity model for collaborative scheduling for construction projects. Engineering, Construction and Architectural Management, 32(11), pp. 7399-7425. ISSN 0969-9988

Scharpff, J; Schraven, D; Volker, L; Spaan, M T J and de Weerdt, M M (2021) Can multiple contractors self-regulate their joint service delivery? A serious gaming experiment on road maintenance planning. Construction Management and Economics, 39(2), pp. 99-116. ISSN 01446193

Schexnayder, C; Alarcón, L F; Antillo, E D; Morales, B C and Lopez, M (2014) Observations on bridge performance during the Chilean earthquake of 2010. Journal of Construction Engineering and Management, 140(4): B4013001, ISSN 0733-9364

Schied Jr., E P (2012) Geometric information scheduling to identify and resolve spatial conflicts and increase efficiency of space use on construction projects. PhD thesis, Catholic University of America, USA.

Schoenwitz, M; Naim, M and Potter, A (2012) The nature of choice in mass customized house building. Construction Management and Economics, 30(3), pp. 203-219. ISSN 1466433X

Scholtenhuis, L L O; Hartmann, T and Dorée, A G (2016) Testing the value of 4D visualizations for enhancing mindfulness in utility reconstruction works. Journal of Construction Engineering and Management, 142(7): 4016015, ISSN 0733-9364

Schrapers, M (2018) Applying standards, guidelines and methods in construction project management. PhD thesis, Edinburgh Napier University, UK.

Schuler, M. L.; Albertson, L.; Katz, L. E.; Armanios, D. E. and Faust, K. M. (2026) Drawn from experience: Coproducing a graphic guide with arctic water sector workers. Journal of Construction Engineering and Management, 152(9): 04026146, ISSN 0733-9364

Schweber, L (2013) The effect of BREEAM on clients and construction professionals. Building Research & Information, 41(2), pp. 129-145. ISSN 0961-3218

Schweber, L and Haroglu, H (2014) Comparing the fit between BREEAM assessment and design processes. Building Research & Information, 42(3), pp. 300-317. ISSN 0961-3218

Scott, L and Fortune, C J (2012) Framework for formative assessment learning strategies in built environment higher education programmes. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Sebastian, R (2007) Managing collaborative design. Dr thesis, Delft University of Technology, Netherlands.

Senaratne, S and Malewana, C (2011) Linking individual, team and organizational learning in construction project team settings. Architectural Engineering and Design Management, 7(1), pp. 50-63. ISSN 1745-2007

Senaratne, S and Pasqual, Y S (2011) Learning, teaching and research for construction undergraduate programmes: An exploratory case study in Sri Lanka. International Journal of Construction Management, 11(3), pp. 35-48. ISSN 1562-3599

Senaratne, S and Rasagopalasingam, V (2017) The causes and effects of work stress in construction project managers: The case in Sri Lanka. International Journal of Construction Management, 17(1), pp. 65-75. ISSN 1562-3599

Senghore, O; Hastak, M; Abdelhamid, T S; AbuHammad, A and Syal, M G (2004) Production process for manufactured housing. Journal of Construction Engineering and Management, 130(5), pp. 708-718. ISSN 0733-9364

Serugga, J; Kagioglou, M and Tzortzopoulos, P (2021) Benefits realization: Novel conceptual model for front end-design decision-making using dempster-shafer theory and quality function deployment. Journal of Construction Engineering and Management, 147(7): 04021062, ISSN 0733-9364

Seydel, A; Wilson, O D and Skitmore, R M (2002) Financial evaluation of waste management methods: a case study. Journal of Construction Research, 3(1), pp. 167-179. ISSN 1609-9451

Sezer, A A and Bosch-Sijtsema, P (2022) Actor-to-actor tensions influencing waste management in building refurbishment projects: A service ecosystem perspective. International Journal of Construction Management, 22(9), pp. 1690-1699. ISSN 1562-3599

Shah, R K and Dawood, N (2011) An innovative approach for generation of a time location plan in road construction projects. Construction Management and Economics, 29(5), pp. 435-448. ISSN 1466433X

Shah, R K; Dawood, N; Dean, J and Castro, S (2009) A virtual construction model of 4d planning in road project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Shahhosseini, V; Afshar, M R and Amiri, O (2018) Value engineering practices in infrastructure projects: A case study of Ilam gas refinery's water transmission system at Reno Mountain, Iran. International Journal of Construction Management, 18(5), pp. 351-363. ISSN 1562-3599

Shakantu, W; Muya, M; Tookey, J and Bown, P (2008) Evaluating truck empty running in construction: A case study from Cape Town, South Africa. Construction Economics and Building, 8(2), pp. 41-49. ISSN 2204-9029

Shalaby, A M H (2021) Model for the automated generation of optimized work packages in results-based-finance mega sanitation projects. PhD thesis, The American University in Cairo, Egypt.

Shankar, R and Tan, W (2024) Bid variability in public-private partnerships: Lessons from asset monetization through the toll-operate-transfer model in India. Journal of Construction Engineering and Management, 150(12): 05024015, ISSN 0733-9364

Shao, Y; Yang, Y; Ng, S T; Xing, J and Kwok, C Y (2025) Revelation and enhancement for pedestrian evacuation at metro station: Metamodeling-based simulation optimization approach. Journal of Construction Engineering and Management, 151(2): 04024198, ISSN 0733-9364

Shapira, A (1999) Contemporary trends in formwork standards: a case study. Journal of Construction Engineering and Management, 125(2), pp. 69-75. ISSN 0733-9364

Shapira, A and Elbaz, A (2014) Tower crane cycle times: Case study of remote-control versus cab-control operation. Journal of Construction Engineering and Management, 140(12): 05014010, ISSN 0733-9364

Shapira, A and Schexnayder, C J (1999) Selection of mobile cranes for building construction projects. Construction Management and Economics, 17(4), pp. 519-527. ISSN 01446193

Sharifi, S; Saman, W; Alemu, A and Boland, J (2021) A proposed long-term thermal comfort scale. Building Research & Information, 49(6), pp. 661-678. ISSN 0961-3218

Sharma, A and Sharma, R K (2021) Uplift behaviour of axial granular pile anchor encased with geogrid in cohesionless soil. Journal of Engineering, Design and Technology, 19(2), pp. 588-602. ISSN 1726-0531

Shaurette, M (2007) Assessment of webcam technology on teaching and learning in construction management education. PhD thesis, Purdue University, USA.

Shehab, T; Moselhi, O and Nasr, E (2009) Barcode-assisted system for document management of construction projects. International Journal of Construction Education and Research, 5(1), pp. 45-60. ISSN 1557-8771

Sheibani, G and Havard, T (2005) The government role in housing in libya during the period 1970: 2000. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Shelbourn, M (2002) Using computer-aided-learning to train inexperienced surveyors in diagnosing defects in buildings. PhD thesis, University of Salford, UK.

Shen, L Y; Li, Q M; Drew, D and Shen, Q P (2004) Awarding construction contracts on multicriteria basis in China. Journal of Construction Engineering and Management, 130(3), pp. 385-393. ISSN 0733-9364

Shepherd, S (2006) Evaluation of an engineering intervention to prevent silica exposures in construction. ScD thesis, University of Massachusetts Lowell, USA.

Sherafat, Behnam (2022) Acoustical modeling of construction jobsites with multiple operational machines for activity recognition and productivity analysis. PhD thesis, University of Utah, USA.

Sherif, E h and Kaka, A (2004) A multi criteria mode for the selection of the payments systems in construction projects. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Sherratt, F; Ivory, C; Sherratt, S and Crawley, S (2022) Organizing construction work: A digital and cooperative way forwards for micro-projects. Building Research & Information, 50(5), pp. 559-573. ISSN 0961-3218

Sherratt, F and Sherratt, S (2018) PPP problems: Challenging academic compliance with economic opportunism and exploitation. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Shi, X.; Gong, X.; Ke, Y. and Wu, X. (2026) Bundling strategies for routine expressway maintenance projects with similarity thresholds. Journal of Construction Engineering and Management, 152(8): 04026125, ISSN 0733-9364

Shi, J; Liu, B; Tan, J; Dai, J; Chen, J and Ji, R (2020) Experimental studies and microstructure analysis for rapid-hardening cement emulsified asphalt mortar. Journal of Construction Engineering and Management, 146(12): 04020130, ISSN 0733-9364

Shi, M; Wang, J; Li, Q; Cui, B; Guan, S and Zeng, T (2022) Accelerated earth-rockfill dam compaction by collaborative operation of unmanned roller fleet. Journal of Construction Engineering and Management, 148(7): 04022046, ISSN 0733-9364

Shields, R and West, K (2003) Innovation in clean-room construction: A case study of co-operation between firms. Construction Management and Economics, 21(4), pp. 337-344. ISSN 01446193

Shin, D H (2007) Strategic development of AR systems for industrial construction. PhD thesis, Purdue University, USA.

Shirani, F; O’sullivan, K; Henwood, K; Hale, R and Pidgeon, N (2022) Living in an active home: Household dynamics and unintended consequences. Buildings & Cities, 3(1), pp. 589-604. ISSN 2632-6655

Shirazi, A and Hampson, K (1998) Project manager competencies in a knowledge-based society. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Shokri, S; Ahn, S; Lee, S; Haas, C T and Haas, R C G (2016) Current status of interface management in construction: Drivers and effects of systematic interface management. Journal of Construction Engineering and Management, 142(2): 04015070, ISSN 0733-9364

Short, C A; Whittle, G E and Owarish, M (2006) Fire and smoke control in naturally ventilated buildings. Building Research & Information, 34(1), pp. 23-54. ISSN 0961-3218

Shrivastava, S (2012) Development of an energy information system for the construction phase of buildings: A contractor’s perspective. PhD thesis, University of Florida, USA.

Shuster, W D; Burkman, C E; Grosshans, J; Dadio, S and Losco, R (2015) Green residential demolitions: Case study of vacant land reuse in storm water management in cleveland. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Sidwell, A C (1983) An evaluation of management contracting. Construction Management and Economics, 1(1), pp. 47-55. ISSN 01446193

Sidwell, A C (1990) Project management: Dynamics and performance. Construction Management and Economics, 8(2), pp. 159-178. ISSN 01446193

Sigonda, G G G (2000) The impact of infrastructural projects on the environment in Tanzania: The case of mindu dam. PhD thesis, University of Manchester, UK.

Simmons, D R; Iorio, J; Taylor, J E and Li, D (2018) Work values across generations among construction professionals in the United States. Journal of Construction Engineering and Management, 144(10): 04018096, ISSN 0733-9364

Simpson, E; Gilmour, D; Blackwood, D; Falconer, R and Isaacs, J (2015) Major project team learning: Examining building information modelling. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Simpson, S; Banfill, P; Haines, V; Mallaband, B and Mitchell, V (2016) Energy-led domestic retrofit: Impact of the intervention sequence. Building Research & Information, 44(1), pp. 97-115. ISSN 0961-3218

Simu, K and Lidelöw, H (2019) Middle managers' perceptions of operations strategies at construction contractors. Construction Management and Economics, 37(6), pp. 351-366. ISSN 01446193

Sing, T F (2002) Time to build options in construction processes. Construction Management and Economics, 20(2), pp. 119-130. ISSN 01446193

Singh, M M; Sawhney, A and Borrmann, A (2019) Integrating rules of modular coordination to improve model authoring in BIM. International Journal of Construction Management, 19(1), pp. 15-31. ISSN 1562-3599

Singh, R (2018) Defining models for project management processes. PhD thesis, King's College London, UK.

Singh Rajput, T and Thomas, A (2023) Optimizing passive design strategies for energy efficient buildings using hybrid artificial neural network (ann) and multi-objective evolutionary algorithm through a case study approach. International Journal of Construction Management, 23(13), pp. 2320-2332. ISSN 1562-3599

Sinha, S (2006) Skill based framework for measuring complexity of construction projects. PhD thesis, University of Strathclyde, UK.

Sinha, S; Kumar, B and Thomson, A (2006) Measuring project complexity: A project manager's tool. Architectural Engineering and Design Management, 2(3), pp. 187-202. ISSN 1745-2007

Slaughter, E S (1991) "Rapid" innovation and integration of components: Comparison of user and manufacturer innovations through a study of residential construction. PhD thesis, Massachusetts Institute of Technology, USA.

Slaughter, E S (2000) Implementation of construction innovations. Building Research & Information, 28(1), pp. 2-17. ISSN 0961-3218

Smallwood, J and Deacon, C (2001) The role of health and safety culture in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Smallwood, J J (2004) The influence of clients on contractor health and safety (H&S). In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Smith, D R (2020) Adaptive leadership strategies and project success of construction project managers in Jamaica. PhD thesis, Walden University, USA.

Smith, J M; Kenley, R and Wyatt, R (1998) Evaluating the client briefing problem: An exploratory study. Engineering, Construction and Architectural Management, 5(4), pp. 387-398. ISSN 0969-9988

Smithers, G L (2000) The effect of the site environment on motivation and demotivation of construction professionals. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Smits, W; van Buiten, M and Hartmann, T (2017) Yield-to-BIM: Impacts of BIM maturity on project performance. Building Research & Information, 45(3), pp. 336-346. ISSN 0961-3218

Smyth, H (2005) Trust in the design team. Architectural Engineering and Design Management, 1(3), pp. 211-223. ISSN 1745-2007

Sodagar, B; Rai, D; Jones, B; Wihan, J and Fieldson, R (2011) The carbon-reduction potential of straw-bale housing. Building Research & Information, 39(1), pp. 51-65. ISSN 0961-3218

Soe, Y (2017) Construction supply chain risk management framework for construction projects: case studies in Myanmar. PhD thesis, University of Birmingham, UK.

Soetanto, R; Childs, M; Poh, P; Austin, S and Hao, J (2014) Virtual collaborative learning for building design. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(1), pp. 25-34. ISSN 17514304

Soetanto, R; Glass, J; Dainty, A R J and Price, A D F (2007) Structural frame selection: Case studies of hybrid concrete frames. Building Research & Information, 35(2), pp. 206-219. ISSN 0961-3218

Soliman-Junior, J; Tzortzopoulos, P and Kagioglou, M (2022) Designers' perspective on the use of automation to support regulatory compliance in healthcare building projects. Construction Management and Economics, 40(2), pp. 123-141. ISSN 01446193

Somani, N; Singh, N and Gupta, N K (2021) Joining and characterization of ss-430 using microwave hybrid heating technique. Journal of Engineering, Design and Technology, 19(6), pp. 1344-1357. ISSN 1726-0531

Son, J; O'Brien, W J and Thomas, S R (2022) Recommended practices for effective management of academia-industry collaborative research teams in construction management. Journal of Construction Engineering and Management, 148(8): 04022075, ISSN 0733-9364

Song, J (2005) Tracking the location of materials on construction projects. PhD thesis, University of Texas at Austin, USA.

Song, S H; Choi, J O and Cho, H (2024) Transportation-induced impact on a prefinished volumetric modular house using trailer bogie: Case study. Journal of Construction Engineering and Management, 150(7): 05024007, ISSN 0733-9364

Song, Y (2022) Resilience bonds and the financing of resilient infrastructure. PhD thesis, University College London, UK.

Songer, A D; Molenaar, K R and Robinson, G D (1996) Selection factors and success criteria for design-build in the USA and UK. Journal of Construction Procurement, 2(2), pp. 69-82. ISSN 1358-9180

Sonmez, R; Aminbakhsh, S and Atan, T (2020) Activity uncrashing heuristic with noncritical activity rescheduling method for the discrete time-cost trade-off problem. Journal of Construction Engineering and Management, 146(8): 1870, ISSN 0733-9364

Sonmez, R; Iranagh, M A and Uysal, F (2016) Critical sequence crashing heuristic for resource-constrained discrete time-cost trade-off problem. Journal of Construction Engineering and Management, 142(3): 04015090, ISSN 0733-9364

Soo, A and Oo, B L (2010) The effect of information feedback in construction bidding. Construction Economics and Building, 10(1-2), pp. 65-75. ISSN 2204-9029

Sooksil, N and Benjaoran, V (2014) Validation of construction safety equilibrium model on high-rise building construction project in Thailand. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Spaeth, A B and Khali, R (2018) The place of VR technologies in UK architectural practice. Architectural Engineering and Design Management, 14(6), pp. 470-487. ISSN 1745-2007

Sparer, E H (2015) Improving health and safety in construction: The intersection of programs and policies, work organization, and safety climate. DSc thesis, Harvard University, USA.

Spennemann, D H R (2025) Removal or preservation in place? A review of the conservation management options for asbestos cement sheeting in heritage properties. International Journal of Building Pathology and Adaptation, 43(6), pp. 1406-1422. ISSN 2398-4708

Sporrong, J and Kadefors, A (2014) Municipal consultancy procurement: New roles and practices. Building Research & Information, 42(5), pp. 616-628. ISSN 0961-3218

Ssimbwa, Edward (2023) Streamlining the management of building construction regulatory framework in Sub-Sahara africa's public service - a case for Uganda. DM thesis, Colorado Technical University, USA.

Staal, A A G (2019) Managing innovative suppliers: Exploring company, procurement, and performance variables in New Zealand construction supply chains. PhD thesis, Auckland University of Technology, New Zealand.

Stehn, L. and Erikshammar, J. (2026) Configuring innovation ecosystem capabilities for scaling digital innovation in construction. International Journal of Construction Management, 26(9), pp. 1944-1959. ISSN 1562-3599

Stehn, L (2002) Environmental labelling of timber-framed dwellings and their building components. Building Research & Information, 30(4), pp. 248-254. ISSN 0961-3218

Stephan, A and Crawford, R H (2014) A comprehensive life cycle water analysis framework for residential buildings. Building Research & Information, 42(6), pp. 685-695. ISSN 0961-3218

Sterner, E (2002) 'Green procurement' of buildings: A study of Swedish clients' considerations. Construction Management and Economics, 20(1), pp. 21-30. ISSN 01446193

Stevens, J D and Murray, A L (1994) Modified roof erection system. Journal of Construction Engineering and Management, 120(4), pp. 828-837. ISSN 0733-9364

Stevenson, F and Baborska-Narozny, M (2018) Housing performance evaluation: Challenges for international knowledge exchange. Building Research & Information, 46(5), pp. 501-512. ISSN 0961-3218

Stewart, D R (2000) Environmental decision-making: Combining engineering and business aspects. PhD thesis, Colorado State University, USA.

Stewart, M G (1993) Modeling human performance in reinforced concrete beam construction. Journal of Construction Engineering and Management, 119(1), pp. 6-22. ISSN 0733-9364

Stjern, M (1998) Uncertainty in construction contracting: A new approach for contractors. DrIng thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.

Stockings, W H (2002) The process of construction planning. PhD thesis, Eindhoven University of Technology, Netherlands.

Strahorn, S; Gajendran, T and Brewer, G (2014) Experiences of trust in construction project management: The influence of procurement mechanisms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Straub, M (2014) A new framework for designing and developing cost-effective logistic chains for long items. PhD thesis, University of Gloucestershire, UK.

Strengers, Y (2008) Comfort expectations: The impact of demand-management strategies in Australia. Building Research & Information, 36(4), pp. 381-391. ISSN 0961-3218

Su, Y; Isaac, S and Lucko, G (2018) Integrated temporal-spatial model for construction plans with boolean logic operators. Journal of Construction Engineering and Management, 144(4): 04018009, ISSN 0733-9364

Subprasom, K and Chen, A (2007) Effects of regulation on highway pricing and capacity choice of a build-operate-transfer scheme. Journal of Construction Engineering and Management, 133(1), pp. 64-71. ISSN 0733-9364

Subsomboon, K (2004) A procurement and material management (PMM) system based on the fully integrated and automated project process (FIAPP). PhD thesis, Columbia University, USA.

Suchocki, C; Błaszczak-Bąk, W; Janicka, J and Dumalski, A (2021) Detection of defects in building walls using modified optd method for down-sampling of point clouds. Building Research & Information, 49(2), pp. 197-215. ISSN 0961-3218

Sugiyama, G T; Rodrigues, M F and Rodrigues, H (2025) Environmental impacts and BIM: A Portuguese heritage case study. International Journal of Building Pathology and Adaptation, 43(7), pp. 1863-1877. ISSN 2398-4708

Sullivan, K T and Oates, H D (2012) Analysis of Arizona's LEED for new construction population's credits. Journal of Construction Engineering and Management, 138(12), pp. 1386-1393. ISSN 0733-9364

Sun, A C S; Zou, P X W; Long, B and Marix-Evans, P (2010) Case studies of return on investment in contruction safety management. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Sun, Q; He, L; Ding, F; Chen, X; Ding, L and Tu, Y (2021) Modeling and analysis of structure parameters on the lifting force for power catwalk. Journal of Engineering, Design and Technology, 19(1), pp. 187-202. ISSN 1726-0531

Sun, Y and Goh, B H (2015) Contribution index based on green building certification systems. Construction Economics and Building, 15(2), pp. 31-48. ISSN 2204-9029

Sundling, R (2019) Factors influencing the outcome of renovation projects. PhD thesis, Lund University, Sweden.

Sunikka, M (2006) Energy efficiency and low-carbon technologies in urban renewal. Building Research & Information, 34(6), pp. 521-533. ISSN 0961-3218

Sunikka, M and Boon, C (2003) Environmental policies and efforts in social housing: The Netherlands. Building Research & Information, 31(1), pp. 1-12. ISSN 0961-3218

Surahyo, M and El-Diraby, T E (2009) Schema for interoperable representation of environmental and social costs in highway construction. Journal of Construction Engineering and Management, 135(4), pp. 254-266. ISSN 0733-9364

Suriyanon, N and Chovichien, V (2009) Applying conjoint analysis to study attitudes of Thai government organisations. Construction Economics and Building, 9(1), pp. 45-54. ISSN 2204-9029

Suriyanon, N; Sutheerawatthana, P; Kaewmoracharoen, M and Klansai, V (2023) The utility and value of contract terms: A case study on interior contractors. Construction Economics and Building, 23(1-2), pp. 77-94. ISSN 2204-9029

Susanti, B; Kadarsa, E; Foralisa, M and Juliantina, I (2023) Non-toll revenue potential to increase funding sources for toll road maintenance. Construction Economics and Building, 23(3-4), pp. 170-185. ISSN 2204-9029

Sutt, J and Lill, I (1999) Multi-skilling as a possibility of compensating the unrhythmic working load. Journal of Financial Management of Property and Construction, 4(1), pp. 47-58. ISSN 1366-4387

Svensson, I (2020) Change in public facilities management organisations: The connection between emotions, humans and objects. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Svensson, I (2022) Exploring the connection between emotions, artefacts and institutional work: The case of institutional change for public facilities management. Construction Management and Economics, 40(5), pp. 343-358. ISSN 01446193

Sweetnam, T; Fell, M; Oikonomou, E and Oreszczyn, T (2019) Domestic demand-side response with heat pumps: Controls and tariffs. Building Research & Information, 47(4), pp. 344-361. ISSN 0961-3218

Swiggum, K E; Anderson, S D and Russell, J S (1994) Case study of burlington cable-stayed bridge. Journal of Construction Engineering and Management, 120(3), pp. 649-666. ISSN 0733-9364

Symons, Anne Wood (2021) Integrated design, design management and the delivery of major hospitals. PhD thesis, University College London, UK.

Szamocki, N; Kim, M K; Ahn, C R and Brilakis, I (2019) Reducing greenhouse gas emission of construction equipment at construction sites: Field study approach. Journal of Construction Engineering and Management, 145(9): 05019012, ISSN 0733-9364

Szydlik, C C (2014) Identifying and overcoming the barriers to sustainable construction. PhD thesis, Missouri University of Science and Technology, USA.

Sánchez-Romero, M and Alavedra-Ribot, P (1996) Experimental study of the thermal behaviour of radiant floors. Building Research & Information, 24(6), pp. 369-373. ISSN 0961-3218

Söderholm, E and Johnsson, H (2009) Housing design performance: How is it measured? In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Ta'i, Behnam (1994) Critical evaluation of stormwater management practices on urban construction sites in the Sydney region. PhD thesis, University of New South Wales, Australia.

Taggart, M; Koskela, L and Rooke, J (2014) The role of the supply chain in the elimination and reduction of construction rework and defects: An action research approach. Construction Management and Economics, 32(7-8), pp. 829-842. ISSN 01446193

Taggart, M; Koskela, L K and Rooke, J A (2014) An improvement strategy for the defects and rework management process within an SME: An action research approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Taghaddos, H; Abourizk, S; Mohamed, Y and Hermann, U (2012) Simulation-based auction protocol for resource scheduling problems. Journal of Construction Engineering and Management, 138(1), pp. 31-42. ISSN 0733-9364

Taghaddos, M; Pereira, E; Osorio-Sandoval, C; Hermann, U and Abourizk, S (2023) A data-driven approach for deploying safety policies for schedule planning in industrial construction projects: A case study. Journal of Construction Engineering and Management, 149(12): 05023013, ISSN 0733-9364

Taleb, H; Elsebaei, M and El-Attar, M (2019) Enhancing the sustainability of shipping container homes in a hot arid region: A case study of Aswan in Egypt. Architectural Engineering and Design Management, 15(6), pp. 459-474. ISSN 1745-2007

Tam, C M; Tong, T K L and Lau, C T (2003) ELECTRE III in evaluating performance of construction plants: Case study on concrete vibrators. Construction Innovation, 3(1), pp. 45-61. ISSN 1471-4175

Tam, C M; Tong, T K L and Wong, Y W (2004) Selection of concrete pump using the superiority and inferiority ranking method. Journal of Construction Engineering and Management, 130(6), pp. 827-834. ISSN 0733-9364

Tam, V W Y and Hao, J J L (2014) Prefabrication as a mean of minimizing construction waste on site. International Journal of Construction Management, 14(2), pp. 113-121. ISSN 1562-3599

Tam, V W Y and Tam, C M (2008) Waste reduction through incentives: A case study. Building Research & Information, 36(1), pp. 37-43. ISSN 0961-3218

Tamburro, N and Wood, P (2014) Alliancing in Australia: Competing for thought leadership. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(2), pp. 75-82. ISSN 17514304

Tan, T; Mills, G; Papadonikolaki, E; Li, B and Huang, J (2023) Digital-enabled design for manufacture and assembly (dfma) in offsite construction: A modularity perspective for the product and process integration. Architectural Engineering and Design Management, 19(3), pp. 267-282. ISSN 1745-2007

Tan, W (2011) Managing lean projects: Understanding the structures of lean production. International Journal of Construction Management, 11(3), pp. 67-78. ISSN 1562-3599

Tan, W and Dong, X (2010) Institutional innovation and financing infrastructure in Xi'an. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(4), pp. 143-149. ISSN 17514312

Tang, C M; Leung, A Y T and Lam, K C (2006) Entropy application to improve construction finance decisions. Journal of Construction Engineering and Management, 132(10), pp. 1099-1113. ISSN 0733-9364

Tang, L; Chen, C; Li, H and Mak, D Y Y (2022) Developing a BIM GIS-integrated method for urban underground piping management in China: A case study. Journal of Construction Engineering and Management, 148(9): 05022004, ISSN 0733-9364

Tang, S L; Lee, H K and Wong, K (1997) Safety cost optimization of building projects in Hong Kong. Construction Management and Economics, 15(2), pp. 177-186. ISSN 01446193

Tang, Y; Liu, C; Feng, K; Yang, X; Li, X and Leng, X (2025) Identifying struck-by hazards in unknown lifting loads: A hybrid computer vision approach. Journal of Construction Engineering and Management, 151(10): 04025146, ISSN 0733-9364

Tangrungruengyoo, K (2018) The impact of environmental impact assessment on new housing development: a case study of Bangkok, Thailand. PhD thesis, King's College London, UK.

Tanikawa, H and Hashimoto, S (2009) Urban stock over time: Spatial material stock analysis using 4d-GIS. Building Research & Information, 37(5-6), pp. 483-502. ISSN 0961-3218

Tao, X (2023) Distributed common data environment for secure BIM-based collaborative design using blockchain technology. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Tarpio, J and Huuhka, S (2022) Residents' views on adaptable housing: A virtual reality-based study. Buildings & Cities, 3(1), pp. 93-110. ISSN 2632-6655

Tarpio, J; de la Rosa, R C and Pelsmakers, S (2025) Promoting resilience in Finland: Built environment professionals' perspectives. Building Research & Information, 53(3), pp. 305-322. ISSN 0961-3218

Tarr, K R (2024) Incorporating sustainability in infrastructure design: A case study of phoenix, Arizona. PhD thesis, Arizona State University, USA.

Tavafzadeh Haghi, N; Ahmadian Nezhad Monfared, M; Hashemian, L and Bayat, A (2019) Capital cost comparison of pavements comprised of insulation layers: Case study in Edmonton, Canada. Journal of Construction Engineering and Management, 145(7): 04019038, ISSN 0733-9364

Tavakolan, M and Nikoukar, S (2022) Developing an optimization financing cost-scheduling trade-off model in construction project. International Journal of Construction Management, 22(2), pp. 262-277. ISSN 1562-3599

Tay, L and Morgan, N A (2002) Antecedents and consequences of market orientation in chartered surveying firms. Construction Management and Economics, 20(4), pp. 331-341. ISSN 01446193

Tayeh, Ralph (2021) Augmented reality applications for BIM and GIS in online construction education. PhD thesis, University of Florida, USA.

Taylor, M D; Fisher, A and Wamuziri, S C (2009) A comparison of modern methods of bathroom construction: A project case study. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Taylor, T (2014) Assessing the thermal performance of buildings at the construction stage using thermography: development and evaluation of a testing approach in the context of new housing in Wales. PhD thesis, Cardiff Metropolitan University, UK.

Tazilan, A (2012) Identifying microarchitecture for sustainable design in Malaysia. Smart and Sustainable Built Environment, 1(2), pp. 172-185. ISSN 2046-6099

Teale, Allan F (2022) The relationship between transparency, public private partnerships and delivery outcomes in major transport infrastructure. PhD thesis, University of Technology Sydney, Australia.

Teixeira, J M (1993) Contractors management functions: an integrated approach for planning, estimating and control. PhD thesis, Loughborough University, UK.

Tejero-González, A; DeFreitas-Barros-Galvão, V M; Zarzuelo-Sánchez, A M and SanJosé-Alonso, J F (2021) Energy use optimization in ventilation of operating rooms during inactivity periods. Building Research & Information, 49(3), pp. 308-324. ISSN 0961-3218

Telem, D; Shapira, A; Goren, Y D and Schexnayder, C J (2006) Moving a reinforced-concrete building: Case study. Journal of Construction Engineering and Management, 132(2), pp. 115-124. ISSN 0733-9364

Teli, D; James, P A B and Jentsch, M F (2015) Investigating the principal adaptive comfort relationships for young children. Building Research & Information, 43(3), pp. 371-382. ISSN 0961-3218

Teo, E A L and Harikrishna, N (2006) A quantitative model for efficient maintenance of plastered and painted façades. Construction Management and Economics, 24(12), pp. 1283-1293. ISSN 1466433X

Teo, E A L and Lin, G (2012) Factors affecting adaptation potential for public housing in Singapore: Decision makers' perspective. International Journal of Construction Management, 12(3), pp. 63-84. ISSN 1562-3599

Teo, M and Loosemore, M (2006) Community protest groups' perceptions of environmental risks using social contagion theory. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Teriö, O and Kähkönen, K (2011) Developing and implementing environmental management systems for small and medium-sized construction enterprises. Construction Management and Economics, 29(12), pp. 1183-1195. ISSN 1466433X

Terry, N and Palmer, J (2016) Trends in home computing and energy demand. Building Research & Information, 44(2), pp. 175-187. ISSN 0961-3218

Teshnehdel, S; Soflaei, F and Shokouhian, M (2020) Assessment of solar shading performance of courtyard houses in desert climate of Kashan, Iran. Architectural Engineering and Design Management, 16(6), pp. 473-492. ISSN 1745-2007

Thajudeen, S; Elgh, F and Lennartsson, M (2022) A framework supporting mixed production strategies in platform development: A case study in post and beam building system. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Thajudeen, S; Lennartsson, M and Elgh, F (2020) Identification of challenges and success factors in industrialised house building design. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(1), pp. 27-37. ISSN 17514304

Thawanapong, C and Tachakitkachorn, T (2026) The sequence of activities for digital twin implementation for building operations by industrial practitioners: A multiple case study analysis in Thailand. International Journal of Construction Management, 26(5), pp. 825-839. ISSN 1562-3599

Theaker, I G and Cole, R J (2001) The role of local governments in fostering 'green' buildings: A case study. Building Research & Information, 29(5), pp. 394-408. ISSN 0961-3218

Thekinen, J D; Pandey, N; Mollaoglu, S; Duva, M; Frank, K and Zhao, D (2023) Detecting information bottlenecks in architecture engineering construction projects for integrative project management. Journal of Construction Engineering and Management, 149(12): 04023135, ISSN 0733-9364

Thevenin, M K; Elliott, J W and Bigelow, B F (2016) Mentors, role models, and observed differences in students' construction education self-efficacy and motivation. International Journal of Construction Education and Research, 12(3), pp. 162-178. ISSN 1557-8771

Thomas, A; Davis, B; Dadi, G B and Goodrum, P M (2013) Case study on the effect of 690 mpa (100 ksi) steel reinforcement on concrete productivity in buildings. Journal of Construction Engineering and Management, 139(11): 4013025, ISSN 0733-9364

Thomas, A V; Kalidindi, S N and Ganesh, L S (2006) Modelling and assessment of critical risks in BOT road projects. Construction Management and Economics, 24(4), pp. 407-424. ISSN 01446193

Thomas, H R and Bluedorn, A C (1986) Case study of organizational changes. Journal of Construction Engineering and Management, 112(3), pp. 358-369. ISSN 0733-9364

Thomas, H R; Guevara, J M and Gustenhoven, C T (1984) Improving productivity estimates by work sampling. Journal of Construction Engineering and Management, 110(2), pp. 178-188. ISSN 0733-9364

Thomas, H R; Horman, M J and De Souza, U E L (2004) Symbiotic crew relationships and labor flow. Journal of Construction Engineering and Management, 130(6), pp. 908-917. ISSN 0733-9364

Thomas, H R; Sanvido, V E and Sanders, S R (1989) Impact of material management on productivity: a case study. Journal of Construction Engineering and Management, 115(3), pp. 370-384. ISSN 0733-9364

Thomas, J; Giddings, B and Little, L (2006) An holistic evaluation of the workplace environment. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Thomas, K (2002) The exploitation of information technology (IT) in the Irish architecture/engineering/construction (AEC) industry. PhD thesis, University College Cork, Ireland.

Thomas, T (1998) Domestic water supply using rainwater harvesting. Building Research & Information, 26(2), pp. 94-101. ISSN 0961-3218

Thompson, M J (2023) Environmental sustainability of small wastewater treatment systems and pathways for improvement. PhD thesis, University of Nebraska - Lincoln, USA.

Thompson, P and Surgeoner, D (2014) Bridging the gap: University to professional qualifications. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(4), pp. 189-200. ISSN 17514304

Thomson, C S; El-Haram, M A and Emmanuel, R (2009) Mapping knowledge during sustainability assessment within a PPP school project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Thomson, C S; El-Haram, M A; Hardcastle, C and Horner, R M W (2008) Developing an urban sustainability assessment protocol reflecting the project lifecycle. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Thuvander, L (2002) Towards environmental informatics for building stocks. A conceptual model for an environmental building stock information system for sustainable development – EBSIS. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Thuvander, L (2003) Towards environmental informatics for building stocks: A conceptual model for an environmental building stock information system for sustainable development - EBSIS(SD). PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Tidakbi, Emmanuel Tinakpa (2002) Risk management in the public sector: The case of the National Health Service, United Kingdom. PhD thesis, University College London, UK.

Tiellemans, N; Kemperman, A; Maussen, S and Arentze, T (2022) The influence of group decision-making on residents' preferences for sustainable energy measures of dwellings. Building Research & Information, 50(4), pp. 410-423. ISSN 0961-3218

Tillson, A A; Oreszczyn, T and Palmer, J (2013) Assessing impacts of summertime overheating: Some adaptation strategies. Building Research & Information, 41(6), pp. 652-661. ISSN 0961-3218

Tingey, M; Webb, J and Van Der Horst, D (2021) Housing retrofit: Six typeof local authority energy service models. Buildings & Cities, 2(1), pp. 518-532. ISSN 2632-6655

Tjell, J and Bosch-Sijtsema, P (2015) Client’s presence during design: A study on roles, practice and visual management. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Tomar, A and Bansal, V K (2022) Generation, visualization, and evaluation schedule of repetitive construction projects using GIS. International Journal of Construction Management, 22(6), pp. 1104-1119. ISSN 1562-3599

Tommelein, I D (1989) SightPlan: an expert system that models and augments human decision making for designing construction site layouts. PhD thesis, Stanford University, USA.

Tookey, J E; Murray, M; Hardcastle, C and Langford, D (2001) Construction procurement routes: Re-defining the contours of construction procurement. Engineering, Construction and Architectural Management, 8(1), pp. 20-30. ISSN 0969-9988

Toole, T M (2002) Construction site safety roles. Journal of Construction Engineering and Management, 128(3), pp. 203-210. ISSN 0733-9364

Torcellini, P; Pless, S and Leach, M (2014) A pathway for net-zero energy buildings: Creating a case for zero cost increase. Building Research & Information, 43(1), pp. 25-33. ISSN 0961-3218

Torku, A; Chan, A P C and Yung, E H K (2021) Implementation of age-friendly initiatives in smart cities: Probing the barriers through a systematic review. Built Environment Project and Asset Management, 11(3), pp. 412-426. ISSN 2044-124X

Touran, A; Atgun, M and Bhurisith, I (2004) Analysis of the United States department of transportation prompt pay provisions. Journal of Construction Engineering and Management, 130(5), pp. 719-725. ISSN 0733-9364

Towner, M and Baccarini, D (2008) Risk pricing in construction tenders: how, who, what. Construction Economics and Building, 8(1), pp. 49-60. ISSN 2204-9029

Townsend, R S (2019) Successful infrastructure construction project execution. DBA thesis, Temple University, USA.

Tozer, L; Macrae, H and Smit, E (2023) Achieving deep-energy retrofits for households in energy poverty. Buildings & Cities, 4(1), pp. 258-273. ISSN 2632-6655

Trahan Jr., G N (2009) A comparison of the effectiveness of two alternative instructional strategies for teaching basic construction surveying concepts. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Tran, D Q; Jeon, Y; Aboah, A; Bak, J; Park, M and Park, S (2025) Leveraging semisupervised learning for domain adaptation: Enhancing safety at construction sites through long-tailed object detection. Journal of Construction Engineering and Management, 151(1): 04024190, ISSN 0733-9364

Tregloan, K; Thompson, J; Holland, S and Song, H (2024) Unreal … a typology for learning from virtual site visits. International Journal of Construction Education and Research, 20(3), pp. 301-321. ISSN 15578771

Trinder, L (2018) Design for manufacture and assembly: Its benefits and risks in the UK water industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 152-163. ISSN 17514304

Troje, D (2024) Charting the course: Navigating sustainability priorities in Swedish housing companies. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Tsai, J S and Chi, C S F (2015) Learning for win-win collaboration. Journal of Construction Engineering and Management, 141(7): 4015013, ISSN 0733-9364

Tsai, W-S (1995) Evaluation of geotextiles as separators in roadways. PhD thesis, University of Washington, USA.

Tsao, C C Y; Tommelein, I D; Swanlund, E S and Howell, G A (2004) Work structuring to achieve integrated product-process design. Journal of Construction Engineering and Management, 130(6), pp. 780-789. ISSN 0733-9364

Tucker, M; Mulliner, E and Wilson, H (2017) Research preparedness in the undergraduate property and construction curriculum: The student experience. International Journal of Construction Education and Research, 13(3), pp. 203-24. ISSN 1557-8771

Turner, M and Holdsworth, S (2023) Developing resilience: Examining the protective factors of early career construction professionals. Construction Management and Economics, 41(10), pp. 805-819. ISSN 01446193

Turner, M; Holdsworth, S; Scott-Young, C and Johnson, A (2017) Profiling resilience among construction management students: An international study. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Turner, M and Lingard, H (2020) Examining the interaction between bodily pain and mental health of construction workers. Construction Management and Economics, 38(11), pp. 1009-1023. ISSN 01446193

Tutesigensi, A and Oak, D P (2007) Feasibility of collaborative working at the second tier subcontractor level in a prime contract. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Tzortzopoulos, P and Cooper, R (2007) Design management from a contractor's perspective: The need for clarity. Architectural Engineering and Design Management, 3(1), pp. 17-28. ISSN 1745-2007

Tzoumis, K A (1992) The role of public involvement in managing political conflict: A comparative case study of public involvement activities in siting low-level radioactive waste disposal facilities. PhD thesis, Texas A&M University, USA.

Udawatta, N; Zuo, J; Chiveralls, K and Zillante, G (2015) Attitudinal and behavioural approaches to improving waste management on construction projects in Australia: Benefits and limitations. International Journal of Construction Management, 15(2), pp. 137-147. ISSN 1562-3599

Uddin, W (2008) Airborne laser terrain mapping for expediting highway projects: Evaluation of accuracy and cost. Journal of Construction Engineering and Management, 134(6), pp. 411-420. ISSN 0733-9364

Uggla, G (2021) Model and reality: Connecting BIM and the built environment. PhD thesis, KTH Royal Institute of Technology, Sweden.

Ugwu, O O; Arop, J B; Nwoji, C U and Osadebe, N N (2013) Nanotechnology as a preventive engineering solution to highway infrastructure failures. Journal of Construction Engineering and Management, 139(8), pp. 987-993. ISSN 0733-9364

Uher, T E and Runeson, G (1984) Pre-tender and post-tender negotiations in Australia. Construction Management and Economics, 2(3), pp. 185-192. ISSN 01446193

Umeokafor, N; Evangelinos, K and Windapo, A (2022) Strategies for improving complex construction health and safety regulatory environments. International Journal of Construction Management, 22(7), pp. 1333-1344. ISSN 1562-3599

Underwood, J (1995) Integrating design and construction to improve constructability through an effective usage of IT. PhD thesis, University of Salford, UK.

Unger, C (2006) Industrialised house building: Fundamental change or business as usual? PhD thesis, KTH Royal Institute of Technology, Sweden.

Urquhart, S and Whyte, A (2018) Impact of contractor internal tendering procedure governance on tender win-rates: How procedures can be improved. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Valks, B; Arkesteijn, M H; Koutamanis, A and den Heijer, A C (2021) Towards a smart campus: Supporting campus decisions with internet of things applications. Building Research & Information, 49(1), pp. 1-20. ISSN 0961-3218

Van Amstel, F M C; Zerjav, V; Hartmann, T; Van Der Voort, M C and Dewulf, G P M R (2015) Expanding the representation of user activities. Building Research & Information, 43(2), pp. 144-159. ISSN 0961-3218

Van Bohemen, H D (2004) Ecological engineering and civil engineering works. PhD thesis, Delft University of Technology, Netherlands.

Van Bueren, E and De Jong, J (2007) Establishing sustainability: Policy successes and failures. Building Research & Information, 35(5), pp. 543-556. ISSN 0961-3218

Van Reedt Dortland, M; Voordijk, H and Dewulf, G (2013) Real options in project coalitions in Dutch health care: Two case studies of construction projects. Construction Management and Economics, 31(3), pp. 266-286. ISSN 1466433X

Vaughan, J L; Leming, M L; Liu, M and Jaselskis, E (2013) Cost-benefit analysis of construction information management system implementation: Case study. Journal of Construction Engineering and Management, 139(4), pp. 445-455. ISSN 0733-9364

Vazquez, F and Allen, S (2004) Private sector participation in the delivery of highway infrastructure in central America and Mexico. Construction Management and Economics, 22(7), pp. 745-754. ISSN 01446193

Vellei, M; Ramallo-González, A P; Coley, D; Lee, J; Gabe-Thomas, E; Lovett, T and Natarajan, S (2017) Overheating in vulnerable and non-vulnerable households. Building Research & Information, 45(1-2), pp. 102-118. ISSN 0961-3218

Vernikos V K, N R and Goodier Ci, R P C (2013) Implementing an offsite construction strategy: A UK contracting organisation case study. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Vogelius, P; Forman, M; Haugbølle, K and Storgaard, K (2009) Innovation in the kitchen line of business: Users, configuration and context. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Vohmann, B (2023) Undergraduate built environment courses and the post-COVID legacy for learning. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Voordijk, H; Van Leuven, A and Laan, A (2003) Enterprise resource planning in a large construction firm: Implementation analysis. Construction Management and Economics, 21(5), pp. 511-521. ISSN 01446193

Voyatzaki, M G (1996) An insight into the design process of unconventional structures. PhD thesis, University of Bath, UK.

Vu, Thu Hang (2017) Equity issues in land acquisition: A source of delays in large construction projects in Vietnam. PhD thesis, Queensland University of Technology, Australia.

Waara, F (2008) Mitigating contractual hazards in public procurement: A study of Swedish local authorities. Construction Management and Economics, 26(2), pp. 137-145. ISSN 1466433X

Walker, A and Newcombe, R (2000) The positive use of power on a major construction project. Construction Management and Economics, 18(1), pp. 37-44. ISSN 01446193

Walker, D H T and Vines, M W (2000) Australian multi-unit residential project construction time performance factors. Engineering, Construction and Architectural Management, 7(3), pp. 278-284. ISSN 0969-9988

Walker D.H.T, S Y J (2002) Project understanding, planning, flexibility of management action and construction time performance: Two Australian case studies. Construction Management and Economics, 20(1), pp. 31-44. ISSN 01446193

Wallhagen, M and Glaumann, M (2011) Design consequences of differences in building assessment tools: A case study. Building Research & Information, 39(1), pp. 16-33. ISSN 0961-3218

Walsh, K D; Hershauer, J C; Tommelein, I D and Walsh, T A (2004) Strategic positioning of inventory to match demand in a capital projects supply chain. Journal of Construction Engineering and Management, 130(6), pp. 818-826. ISSN 0733-9364

Wamuziri, S (2010) Alternative models for procurement of major infrastructure projects in Scotland. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Wamuziri, S (2011) Evaluation of workplace drug testing in UK civil engineering construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(3), pp. 147-157. ISSN 17514312

Wanberg, J; Harper, C; Hallowell, M R and Rajendran, S (2013) Relationship between construction safety and quality performance. Journal of Construction Engineering and Management, 139(10): 04013004, ISSN 0733-9364

Wandahl, S; Pérez, C T; Salling, S; Neve, H H; Lerche, J and Petersen, S (2021) The impact of construction labour productivity on the renovation wave. Construction Economics and Building, 21(3), pp. 11-32. ISSN 2204-9029

Wang, L; Wang, J; Li, H; Han, S; Zhang, M; Yang, X and Guo, N (2026) Noncontact physiological evaluation of cognitive load among prolonged sitting workers using millimeter wave sensing. Journal of Construction Engineering and Management, 152(3): 04025280, ISSN 0733-9364

Wang, H; Meng, X and McGetrick, P J (2018) Incorporating knowledge of construction and facility management into the design in the BIM environment. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Wang, H; Yi, W; Zhen, L; Song, Y and Wu, P (2025) Designing optimal government-contractor subsidy policy for promoting modular construction: Bilevel stochastic program. Journal of Construction Engineering and Management, 151(10): 04025136, ISSN 0733-9364

Wang, J; Chen, J J and Isaac, D (1996) Financing real estate in China: The development of a real estate investment bond market in Tianjin. Journal of Financial Management of Property and Construction, 1(3), pp. 5-22. ISSN 1366-4387

Wang, J; Liang, M and Liao, P C (2024) Toward an intuitive device for construction hazard recognition management: Eye fixation-related potentials in reinvestigation of hazard recognition performance prediction. Journal of Construction Engineering and Management, 150(5): 04024028, ISSN 0733-9364

Wang, J; Luo, H; Pena-Mora, F; Zhou, W and Fang, W (2024) An integrated BIM-IoT framework for real-time quality monitoring in construction site. Journal of Construction Engineering and Management, 150(11): 05024013, ISSN 0733-9364

Wang, J; Shou, W and Wang, X (2015) A framework of total constraint management for improving work flow in liquefied natural gas construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Wang, M; Altaf, M S; Al-Hussein, M and Ma, Y (2020) Framework for an IoT-based shop floor material management system for panelized homebuilding. International Journal of Construction Management, 20(2), pp. 130-145. ISSN 1562-3599

Wang, N and Horner, R M W (2007) Fuzzy rule based system approach to assess cleaning costs of carpet flooring. Journal of Financial Management of Property and Construction, 12(1), pp. 25-36. ISSN 1366-4387

Wang, S; Zhu, S and Yuen, P L (2021) Assessment of ground-borne vibration impact on nearby underground facilities induced by ground surface excavation. Journal of Construction Engineering and Management, 147(7): 04021071, ISSN 0733-9364

Wang, S Q; Dulaimi, M F and Aguria, M Y (2004) Risk management framework for construction projects in developing countries. Construction Management and Economics, 22(3), pp. 237-252. ISSN 01446193

Wang, S Q; Tiong, R L K; Ting, S K and Ashley, D (1999) Political risks: Analysis of key contract clauses in China's BOT project. Journal of Construction Engineering and Management, 125(3), pp. 190-197. ISSN 0733-9364

Wang, S Q; Tiong, R L K; Ting, S K and Ashley, D (2000) Evaluation and management of political risks in China's BOT projects. Journal of Construction Engineering and Management, 126(3), pp. 242-250. ISSN 0733-9364

Wang, W C and Demsetz, L A (2000) Model for evaluating networks under correlated uncertainty: netcor. Journal of Construction Engineering and Management, 126(6), pp. 458-466. ISSN 0733-9364

Wang, X (2022) Enabling human-robot partnerships in digitally-driven construction work through integration of building information models, interactive virtual reality, and process-level digital twins. PhD thesis, University of Michigan, USA.

Wang, Y; Thangasamy, V K; Tiong, R L K and Zhang, L (2022) Improved workflow for precast element design based on BIM and lean construction. Journal of Construction Engineering and Management, 148(8): 04022065, ISSN 0733-9364

Ward, S C; Curtis, B and Chapman, C B (1991) Advantages of management contracting: critical analysis. Journal of Construction Engineering and Management, 117(2), pp. 195-211. ISSN 0733-9364

Wasif, I; Josephson, P-E and Styhre, A (2008) Individual learning in construction projects: Professions and their approaches. Construction Economics and Building, 8(2), pp. 50-60. ISSN 2204-9029

Waskett, P R (1999) Management of the building design process with the analytical design planning technique. PhD thesis, Loughborough University, UK.

Waters, B L; Dixit, M K and Pariafsai, F (2023) Architects' ranking of professional design services. Architectural Engineering and Design Management, 19(6), pp. 620-641. ISSN 1745-2007

Watson, P and Davis, R (2002) The application of the European foundation for quality management excellence model. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Watts, G; Dainty, A and Fernie, S (2015) Making sense of CSR in construction: Do contractor and client perceptions align? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Wearne, S H (1969) Organization of large engineering design departments. PhD thesis, University of Manchester, UK.

Wei, L; Krizek, R J and Hadavi, A (1999) Effects of high prequalification requirements. Construction Management and Economics, 17(5), pp. 603-612. ISSN 01446193

Wells, J (1993) Appropriate building technologies: An appraisal based on case studies of building projects in Senegal and Kenya. Construction Management and Economics, 11(3), pp. 203-216. ISSN 01446193

Wennstroem, A; Havenvid, M I; Eriksson, P E and Larsson, J (2023) Incentivising supplier innovation in mega infrastructure projects: Exploring the result of innovation bonuses. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Weshah, N A (2015) Developing an interface management (im) model for construction projects. PhD thesis, University of Calgary, Canada.

Whelton, M G and Keane, M M (1998) The systematic development of a software environment for building appraisal in the building renovation industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Whyte, A and Cammarano, C (2012) Value management in infrastructure projects in western Australia: Techniques and staging. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Whyte, J (2000) Virtual reality applications in the house-building industry. PhD thesis, Loughborough University, UK.

Whyte, J and Bouchlaghem, D (2002) Implementation of VR systems: A comparison between the early adoption of CAD and current uptake of VR. Construction Innovation, 2(1), pp. 3-13. ISSN 1471-4175

Whyte, J; Lindkvist, C and Ibrahim, N H (2013) From projects into operations: Lessons for data handover. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(2), pp. 86-93. ISSN 17514312

Wiik, M K (2025) Developing whole-life carbon benchmark values for Norwegian buildings. Building Research & Information, 53(3), pp. 345-358. ISSN 0961-3218

Wiley, K J L L (2003) The relationship between HR safety practices and organizational safety outcomes. PhD thesis, University of Iowa, USA.

Wilkinson, R; Sherratt, F and Farrell, P (2015) Knowledge management on site: A case study project. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(2), pp. 99-109. ISSN 17514304

Wilkinson, S; Piri, I S and Chang-Rihcards, Y (2017) Developing resilience in subcontracting organisations during disaster recovery. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Wilkinson, S J and Reed, R (2011) Examining and quantifying the drivers behind alterations and extensions to commercial buildings in a central business district. Construction Management and Economics, 29(7), pp. 725-735. ISSN 1466433X

Wilson, H K and Cotgrave, A J (2020) Learning space design: The presentation of a framework for the built environment discipline. International Journal of Construction Education and Research, 16(2), pp. 132-148. ISSN 1557-8771

Winch, G (1998) Zephyrs of creative destruction: Understanding the management of innovation in construction. Building Research & Information, 26(5), pp. 268-279. ISSN 0961-3218

Wingrove, K; Heffernan, E and Daly, D (2024) Increased home energy use: unintended outcomes of energy efficiency focused policy. Building Research & Information, 52(5), pp. 577-595. ISSN 0961-3218

Wirahadikusumah, R D and Ario, D (2015) A readiness assessment model for Indonesian contractors in implementing sustainability principles. International Journal of Construction Management, 15(2), pp. 126-136. ISSN 1562-3599

Wolters, R S and Burleson, R C (1996) Merit shop recruitment and selection practices in Alabama. Journal of Construction Engineering and Management, 122(2), pp. 152-157. ISSN 0733-9364

Wong, J T Y; Hui, E C M; Seabrooke, W and Raftery, J (2005) A study of the Hong Kong property market: Housing price expectations. Construction Management and Economics, 23(7), pp. 757-765. ISSN 01446193

Wong, P S P; Holdsworth, S; Crameri, L and Lindsay, A (2019) Does carbon accounting have an impact on decision-making in building design? International Journal of Construction Management, 19(2), pp. 149-161. ISSN 1562-3599

Wong, P S P; Zwar, C and Gharaie, E (2017) Examining the drivers and states of organizational change for greater use of prefabrication in construction projects. Journal of Construction Engineering and Management, 143(7): 04017020, ISSN 0733-9364

Wong, T K and Logcher, R D (1986) Contractors in cyclical economic environments. Journal of Construction Engineering and Management, 112(3), pp. 310-325. ISSN 0733-9364

Woo, Jeyoung (2024) Engineering design quality defects: Causal factors, interactions between causal factors, and mitigation strategies. PhD thesis, University of Texas at Austin, USA.

Woodroffe, N J A and Ariaratnam, S T (2009) Contractor perspective on factors for evaluating installation options for small-diameter utilities. Journal of Construction Engineering and Management, 135(2), pp. 75-87. ISSN 0733-9364

Woodson, T; Coulibaly, Y and Traoré, E S (2012) Earth-air heat exchangers for passive air conditioning: Case study Burkina Faso. Journal of Construction in Developing Countries, 17(1), pp. 21-33. ISSN 1823-6499

Wright, C E (1980) The energy requirements of residential developments. PhD thesis, University of Surrey, UK.

Wu, C; Hu, X; Guo, X and Han, Y (2026) Discretionary control over safety resources: Examining workers' safety territorial behaviors in construction projects. Journal of Construction Engineering and Management, 152(3): 04025275, ISSN 0733-9364

Wu, J; Sadraddin, H L; Ren, R; Zhang, J and Shao, X (2021) Invariant signatures of architecture, engineering, and construction objects to support BIM interoperability between architectural design and structural analysis. Journal of Construction Engineering and Management, 147(1): 04020148, ISSN 0733-9364

Wu, M (2005) Modelling just-in-time purchasing in the ready mixed concrete industry. PhD thesis, National University of Singapore, Singapore.

Wu, W; Mayo, G; McCuen, T L; Issa, R R A and Smith, D K (2018) Building information modeling body of knowledge. II: Consensus building and use cases. Journal of Construction Engineering and Management, 144(8): 04018066, ISSN 0733-9364

Xia, N; Zhong, R; Wu, C; Wang, X and Wang, S (2017) Assessment of stakeholder-related risks in construction projects: Integrated analyses of risk attributes and stakeholder influences. Journal of Construction Engineering and Management, 143(8): 04017030, ISSN 0733-9364

Xiao, Y; Liu, J and Pang, Y (2019) Development of a competency model for real-estate project managers: Case study of China. International Journal of Construction Management, 19(4), pp. 317-328. ISSN 1562-3599

Xiong, B; Skitmore, M; Xia, P; Ballesteros-Pérez, P; Ye, K and Zhang, X (2019) Impact of corporate credit scoring on construction contractors in China. Journal of Construction Engineering and Management, 145(4): 05019002, ISSN 0733-9364

Xiong, W and Zhang, X (2016) The real option value of renegotiation in public-private partnerships. Journal of Construction Engineering and Management, 142(8): 4016021, ISSN 0733-9364

Xu, C.; Zhou, H.; Li, H.; Zhang, Z. and Li, P. (2026) A low-cost automatic indoor measurement device with multisensor fusion. Journal of Construction Engineering and Management, 152(6): 04026068, ISSN 0733-9364

Xu, Jing (2019) The value of trust in construction supply chains. PhD thesis, University College London, UK.

Yakub, H (1992) Buildings at risk registers: Their influence in reducing risk of dilapidation. PhD thesis, Oxford Brookes University, UK.

Yan, S (1992) Intermodal pricing and operations using network flow techniques. PhD thesis, Massachusetts Institute of Technology, USA.

Yang, C Y; Xu, M X and Chen, W F (2007) Reliability analysis of shotcrete lining during tunnel construction. Journal of Construction Engineering and Management, 133(12), pp. 975-981. ISSN 0733-9364

Yang, J B and Tsai, M K (2011) Computerizing ICBF method for schedule delay analysis. Journal of Construction Engineering and Management, 137(8), pp. 583-591. ISSN 0733-9364

Yang, L and Shi, J J (2010) Experimental study on the impact of rainfall on RCC construction. Journal of Construction Engineering and Management, 136(5), pp. 477-483. ISSN 0733-9364

Yang, M L; Chen, S J and Chen, S T (2006) Innovative central opening strut system for foundation excavation. Journal of Construction Engineering and Management, 132(1), pp. 58-66. ISSN 0733-9364

Yang, S; Guan, T; Wang, J; Wang, X and Ren, B (2025) Label scarcity- and class imbalance-aware current-based pipeline for concrete vibration activity recognition. Journal of Construction Engineering and Management, 151(10): 04025135, ISSN 0733-9364

Yang, W and Lam, P T I (2021) Evaluating non-market costs of ICT involving data transmission in smart cities. Building Research & Information, 49(7), pp. 715-728. ISSN 0961-3218

Yang, Y; Pan, M and Pan, W (2022) Integrated offsite logistics scheduling approach for high-rise modular building projects. Journal of Construction Engineering and Management, 148(6): 04022032, ISSN 0733-9364

Yang, Y C; Park, C J; Kim, J H and Kim, J J (2007) Management of daily progress in a construction project of multiple apartment buildings. Journal of Construction Engineering and Management, 133(3), pp. 242-253. ISSN 0733-9364

Yanita, R and Mochtar, K (2021) Legal aspect of value engineering implementation in Jakarta (Indonesia) construction projects. International Journal of Construction Management, 21(2), pp. 131-139. ISSN 1562-3599

Yao, Y P; Ruan, Y Z; Chen, J; Geng, Y; Zhang, X; Liu, B Y; Zong, X P and Yu, G Z (2018) Research on a real-time monitoring platform for compaction of high embankment in airport engineering. Journal of Construction Engineering and Management, 144(1): 04017096, ISSN 0733-9364

Yasamis-Speroni, F; Lee, D E and Arditi, D (2012) Evaluating the quality performance of pavement contractors. Journal of Construction Engineering and Management, 138(10), pp. 1114-1124. ISSN 0733-9364

Yates, J K (1993) Construction decision support system for delay analysis. Journal of Construction Engineering and Management, 119(2), pp. 226-244. ISSN 0733-9364

Ye, K; Jiang, W and Shen, L (2008) Project competition intensity (PCI) in the construction market: A case study in China. Construction Management and Economics, 26(5), pp. 463-470. ISSN 01446193

Ye, S and Tiong, R K L (2000) Government support and risk-return trade-off in China's BOT power projects. Engineering, Construction and Architectural Management, 7(4), pp. 412-422. ISSN 0969-9988

Ye, S and Tiong, R L K (2004) Public-private partnership for power projects: A case study of Hub power project. Journal of Financial Management of Property and Construction, 9(3), pp. 129-140. ISSN 1366-4387

Yeganeh, A A; Azizi, M and Falsafi, R (2019) Root causes of design-construction interface problems in Iranian design-build projects. Journal of Construction Engineering and Management, 145(12): 05019014, ISSN 0733-9364

Yeoh, J K W and Chua, D K H (2017) Optimizing crane selection and location for multistage construction using a four-dimensional set cover approach. Journal of Construction Engineering and Management, 143(8): 04017029, ISSN 0733-9364

Yevu, S K; Owusu, E K; Chan, A P C; Oti-Sarpong, K; Wuni, I Y and Tetteh, M O (2023) Systematic review on the integration of building information modelling and prefabrication construction for low-carbon building delivery. Building Research & Information, 51(3), pp. 279-300. ISSN 0961-3218

Yin, Z and Caldas, C (2022) Scaffolding in industrial construction projects: Current practices, issues, and potential solutions. International Journal of Construction Management, 22(13), pp. 2554-2563. ISSN 1562-3599

Yin, Z; Caldas, C and de Oliveira, D (2024) Identification of business-project management processes that improve capital efficiency of downstream and chemical projects. International Journal of Construction Management, 24(1), pp. 1-9. ISSN 1562-3599

Ying, W; Dai, X and Shen, W (2025) Rapid project delivery through bricolage and planning: A case study of the huoshenshan hospital project. Journal of Construction Engineering and Management, 151(8): 05025003, ISSN 0733-9364

Yllmaz, M and Dede, T (2025) Optimizing multiobjective time-cost-quality problems in construction projects: Efficacy of strength Pareto-based rao algorithms. Journal of Construction Engineering and Management, 151(5): 04025036, ISSN 0733-9364

Yogeswaran, K; Kumaraswamy, M M and Miller, D R A (1997) Perceived sources and causes of construction claims. Journal of Construction Procurement, 3(3), pp. 3-26. ISSN 1358-9180

Yu, T; Shen, G Q and Shi, Q (2017) Comparing the performance quality of design-bid-build and design-build delivery methods. Journal of Construction Engineering and Management, 143(4): 04016111, ISSN 0733-9364

Yu, W D (2006) PIREM: A new model for conceptual cost estimation. Construction Management and Economics, 24(3), pp. 259-270. ISSN 01446193

Yu, W D; Chang, P L; Yao, S H and Liu, S J (2009) KVAM: Model for measuring knowledge management performance of engineering community of practice. Construction Management and Economics, 27(8), pp. 733-747. ISSN 1466433X

Yuan, H and Shen, X (2024) Optimizing floor plans of accessible restrooms in elderly long-term care facilities: a path planning approach. Architectural Engineering and Design Management, 20(4), pp. 891-910. ISSN 1745-2007

Yuan, Y; Zhou, X and Zhang, X (2019) Numerical and experimental study on the characteristics of radiant ceiling systems. Building Research & Information, 47(8), pp. 912-927. ISSN 0961-3218

Zaalouk, A and Han, S (2021) Parameterized design optimization framework for worker-friendly workplaces in modular construction. Journal of Construction Engineering and Management, 147(5): 04021030, ISSN 0733-9364

Zamalik, M N and Nawi, M N M (2024) Managing soil and geotechnical aspects in housing developments: Analysis of case studies. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Zaman, A A U and Abdelaty, A (2025) Effects of uav imagery overlap on photogrammetric data quality for construction applications. International Journal of Construction Management, 25(16), pp. 1901-1916. ISSN 1562-3599

Zanni, M A; Soetanto, R and Ruikar, K (2017) Towards a BIM-enabled sustainable building design process: Roles, responsibilities, and requirements. Architectural Engineering and Design Management, 13(2), pp. 101-129. ISSN 1745-2007

Zaryoun, M and Hosseini, M (2019) Lightweight fiber-reinforced clay as a sustainable material for disaster resilient architecture of future buildings. Architectural Engineering and Design Management, 15(6), pp. 430-444. ISSN 1745-2007

Zayed, T; Sharifi, M R; Baciu, S and Amer, M (2008) Slip-form application to concrete structures. Journal of Construction Engineering and Management, 134(3), pp. 157-168. ISSN 0733-9364

Zeiler, W; Vissers, D; Maaijen, R and Boxem, G (2014) Occupants' behavioural impact on energy consumption: 'Human-in-the-loop' comfort process control. Architectural Engineering and Design Management, 10(1-2), pp. 108-130. ISSN 1745-2007

Zeng, N; Liu, Y and König, M (2023) 4D BIM-enabled look-ahead scheduling for early warning of off-site supply chain disruptions. Journal of Construction Engineering and Management, 149(1): 04022154, ISSN 0733-9364

Zeng, R; Chini, A; Srinivasan, R S and Jiang, P (2017) Energy efficiency of smart windows made of photonic crystal. International Journal of Construction Management, 17(2), pp. 100-112. ISSN 1562-3599

Zeynalian, M; Trigunarsyah, B and Ronagh, H R (2013) Modification of advanced programmatic risk analysis and management model for the whole project life cycle's risks. Journal of Construction Engineering and Management, 139(1), pp. 51-59. ISSN 0733-9364

Zhairy, A. E.; Daoud, A. O. and Mohamed, A. G. (2026) Transforming facility management with BIM, IoT, and digital twin: A data-driven approach to air quality monitoring. Architectural Engineering and Design Management, 22(2), pp. 426-445. ISSN 1745-2007

Zhan, H; Hwang, B G and Jabbar, S B B A (2025) Erratum for: An integrated approach to assessing digitalization of integrated digital delivery projects (journal of construction engineering and management DOI: 10.1061/jcemd4.Coeng-16149). Journal of Construction Engineering and Management, 151(10): 08225001, ISSN 0733-9364

Zhang, C (2013) Automated progress control using laser scanning technology. PhD thesis, Illinois Institute of Technology, USA.

Zhang, H; Li, L; Demeulemeester, E; Bai, S and Zhang, J (2025) Heuristic methods for dynamic multiproject scheduling problems with stochastic transfer times. Journal of Construction Engineering and Management, 151(2): 04024207, ISSN 0733-9364

Zhang, H and Tam, C M (2003) Fuzzy decision-making for dynamic resource allocation. Construction Management and Economics, 21(1), pp. 31-41. ISSN 01446193

Zhang, J and El-Diraby, T E (2006) Constructability analysis of the bridge superstructure rotation construction method in China. Journal of Construction Engineering and Management, 132(4), pp. 353-362. ISSN 0733-9364

Zhang, J; Zhou, Q and Zhang, S (2022) Case study of field application of prefabricated anchoring frame beam structure in slope supporting projects. Journal of Construction Engineering and Management, 148(9): 05022008, ISSN 0733-9364

Zhang, L (2002) Engineering performance improvement based on the integration of genetic algorithms and artificial neural networks. PhD thesis, Purdue University, USA.

Zhang, L; Wu, X and Liu, H (2016) Strategies to reduce ground settlement from shallow tunnel excavation: A case study in China. Journal of Construction Engineering and Management, 142(5): 04016001, ISSN 0733-9364

Zhang, M; Cao, T and Zhao, X (2019) Using smartphones to detect and identify construction workers' near-miss falls based on ann. Journal of Construction Engineering and Management, 145(1): 04018120, ISSN 0733-9364

Zhang, N; Wang, J; Al-Hussein, M and Yin, X (2023) BIM-based automated design of drainage systems for panelized residential buildings. International Journal of Construction Management, 23(15), pp. 2683-2698. ISSN 1562-3599

Zhang, S; Duan, H; Zhao, X; Xia, B; Feng, Y and Galvin, S (2021) Learning on rework management of construction projects: A case study. International Journal of Construction Management, 21(3), pp. 246-260. ISSN 1562-3599

Zhang, S; Leiringer, R and Winch, G (2024) Procuring infrastructure public-private partnerships: Capability development and learning from an owner perspective. Construction Management and Economics, 42(1), pp. 35-53. ISSN 01446193

Zhang, Y; Luo, H; Skitmore, M; Li, Q and Zhong, B (2018) Optimal camera placement for monitoring safety in metro station construction work. Journal of Construction Engineering and Management, 145(1): 04018118, ISSN 0733-9364

Zhao, B; Yu, Y; Xu, Y and Guo, H (2024) Bamboo as a sustainable construction material for residential buildings in the cold and severe cold regions of China. Architectural Engineering and Design Management, 20(6), pp. 1511-1528. ISSN 1745-2007

Zhao, L and Freiheit, T (2017) Estimating good design attributes from generalized drivers to provide early assistance to design requirements analysis. Journal of Engineering, Design and Technology, 15(3), pp. 317-340.

Zhao, N (2021) Developing a framework for roading infrastructure projects procurement system selection. PhD thesis, Auckland University of Technology, New Zealand.

Zhao, S and De Angelis, E (2020) Reducing mould risk during the building design stage: Case studies in South-East China. Journal of Construction in Developing Countries, 25(1), pp. 1-20. ISSN 1823-6499

Zhao, Z Y; Shen, L Y and Zuo, J (2009) Performance and strategy of Chinese contractors in the international market. Journal of Construction Engineering and Management, 135(2), pp. 108-118. ISSN 0733-9364

Zheng, R; Li, Z; Li, L; Dou, Y; Yuan, M and Yin, X (2024) Proposing a lean-optimized scheduling model of mixed-flow prefabricated component production in off-site construction. Journal of Construction Engineering and Management, 150(8): 04024088, ISSN 0733-9364

Zheng, S and Tiong, R L K (2010) First public-private-partnership application in taiwan's wastewater treatment sector: Case study of the nanzih BOT wastewater treatment project. Journal of Construction Engineering and Management, 136(8), pp. 913-922. ISSN 0733-9364

Zhong, B; Hu, X; Pan, X; Chen, X and Liu, Z (2025) Construction quality hazard management with deep learning-based multimodal storage strategy-enabled blockchain. Journal of Construction Engineering and Management, 151(1): 04024184, ISSN 0733-9364

Zhong, S and Elzarka, H (2022) A hybrid grey system theory-based subcontractor selection model for high-stakes construction projects. Journal of Construction Engineering and Management, 148(6): 04022037, ISSN 0733-9364

Zhou, R.; Li, H.; Hu, W.; Meng, T.; Lu, H.; Wu, Y.; Chen, Y.; Cao, D. and Wang, F. Y. (2026) Integrated dual-crane positioning and lifting planning in extreme conditions: A critical states and spatial constraint optimization approach. Journal of Construction Engineering and Management, 152(6): 04026072, ISSN 0733-9364

Zhou, S; Mosca, L and Whyte, J (2023) How the reliability of external competences shapes the modularization strategies of industrialized construction firms. Construction Management and Economics, 41(7), pp. 608-619. ISSN 01446193

Zhou, T; Zhu, Q; Ye, Y and Du, J (2023) Humanlike inverse kinematics for improved spatial awareness in construction robot teleoperation: Design and experiment. Journal of Construction Engineering and Management, 149(7): 04023044, ISSN 0733-9364

Zhu, X.; Ma, J.; Chen, W. and Tan, Y. (2026) Llm-querybc: An llm-based regulation query system for textual and tabular information in building codes. Journal of Construction Engineering and Management, 152(6): 04026075, ISSN 0733-9364

Zhu, Z; Jeelani, I and Gheisari, M (2026) Bidirectional human–drone safety communication in construction. Journal of Construction Engineering and Management, 152(2): 04025250, ISSN 0733-9364

Zhu, J; Zhang, C; Yuan, J; Pan, W; Xue, J and Lou, F (2025) An improved model for precast component transportation scheduling under dynamic traffic and weather conditions. Journal of Construction Engineering and Management, 151(11): 04025181, ISSN 0733-9364

Zhu, K; Xiang, Y; Bu, J and Zhang, H (2021) The design and construction of public service building in developing rural regions during the post COVID-19 period: Cased on a Chinese village centre. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Zhu, Y and Ibrahim, M (2017) Application of structure–behavior–function (SBF) theory to construction education. International Journal of Construction Management, 17(4), pp. 264-279. ISSN 1562-3599

Zhu, Z and Brilakis, I (2010) Machine vision-based concrete surface quality assessment. Journal of Construction Engineering and Management, 136(2), pp. 210-218. ISSN 0733-9364

Zohrehvandi, S. (2026) A sustainable project scheduling algorithm in construction; an approach to using project buffer management techniques. International Journal of Construction Education and Research, 22(2), pp. 331-359. ISSN 1557-8771

Zou, P X W (2004) Knowledge management practice in two Australian architecture-engineering-construction (AEC) companies. Construction Economics and Building, 4(2), pp. 19-32. ISSN 2204-9029

Zou, Y; Wu, Y; Guo, B H W; Papadonikolaki, E; Dimyadi, J and Hung, S N (2022) Investigating the New Zealand off-site manufacturing industry's readiness for automated compliance checking. Journal of Construction Engineering and Management, 148(12): 05022013, ISSN 0733-9364

Zulu, S and Brown, A (2004) Quality of the project management process: An integrated approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Zuo, F; Zio, E and Yuan, Y (2022) Risk-response strategy optimization considering limited risk-related resource allocation and scheduling. Journal of Construction Engineering and Management, 148(11): 04022123, ISSN 0733-9364

Zuofa, T; Ochieng, E G and Ode-Ichakpa, I (2023) An evaluation of determinants influencing the adoption of circular economy principles in Nigerian construction SMEs. Building Research & Information, 51(1), pp. 69-84. ISSN 0961-3218

de Moraes Goulart, F.; Joseph, A.; Jiang, Y.; Shokrollahi Ardekani, M. and Chandrika Bhanu, A. (2026) Healthcare staff evaluation of an emergency department mental health room: A virtual reality study. Building Research & Information, 54(5), pp. 632-651. ISSN 0961-3218

de Valence, Gerard and Runeson, Goran (2011) On the state of the building industry after the GFC and the Euro crisis. Construction Economics and Building, 11(4), pp. 102-113. ISSN 2204-9029

de Villiers, A J (1988) Procurement of rural primary schools in southern Africa: An approach to resource optimization. PhD thesis, University of Pretoria, South Africa.

den Heijer, F (2025) Comprehensive risk-perspective for flood defence system management. PhD thesis, Delft University of Technology, Netherlands.

den Otter, A and Emmitt, S (2008) Design team communication and design task complexity: The preference for dialogues. Architectural Engineering and Design Management, 4(2), pp. 121-129. ISSN 1745-2007

van Stijn, A (2023) Developing circular building components: Between ideal and feasible. PhD thesis, Delft University of Technology, Netherlands.

van den Boomen, M; Spaan, M T J; Schoenmaker, R and Wolfert, A R M (2019) Untangling decision tree and real options analyses: A public infrastructure case study dealing with political decisions, structural integrity and price uncertainty. Construction Management and Economics, 37(1), pp. 24-43. ISSN 01446193

van den Boomen, M; Spaan, M T J; Shang, Y and Wolfert, A R M (2020) Infrastructure maintenance and replacement optimization under multiple uncertainties and managerial flexibility. Construction Management and Economics, 38(1), pp. 91-107. ISSN 01446193

van der Meer, J; Hartmann, A; van der Horst, A and Dewulf, G (2020) Multi-criteria decision analysis and quality of design decisions in infrastructure tenders: A contractor's perspective. Construction Management and Economics, 38(2), pp. 172-188. ISSN 01446193

Çankaya Topak, S (2024) Conforming to future changes in buildings: A component-oriented detailing strategy. PhD thesis, Middle East Technical University, Turkey.

Ó Riain, M (2016) The nZEB retrofit of regional technical college buildings. PhD thesis, University College Cork, Ireland.

Şevik, S; Koçer, A; İnce, H and Tombuş, F E (2022) Determination of optimum tilt angle of the solar collector and evaluation of the position of the existing buildings in terms of solar potential. Architectural Engineering and Design Management, 18(6), pp. 812-828. ISSN 1745-2007

Šelih, J (2005) Improvement of construction and demolition (C&D) waste management on construction sites. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

This list was generated on Sat Aug 22 02:55:43 2026 UTC.