Items with Descriptive Scope: 3 PCA

Number of items: 2588.

Abd El Halim, A E H O and Haas, R (2004) Process and case illustration of construction innovation. Journal of Construction Engineering and Management, 130(4), pp. 570-575. ISSN 0733-9364

Abdel Aziz, A M (2023) Statistical analysis and representation models of working-days liquidated damages. Journal of Construction Engineering and Management, 149(7): 04023054, ISSN 0733-9364

Abdelkader, E M; Moselhi, O; Marzouk, M and Zayed, T (2021) Integrative evolutionary-based method for modeling and optimizing budget assignment of bridge maintenance priorities. Journal of Construction Engineering and Management, 147(9): 04021100, ISSN 0733-9364

Abdenour, J I (2021) A cost estimation model for improving the budget estimates of industrial plant construction projects. DEng thesis, George Washington University, USA.

Abdul Karim, Mahmoud (2022) Postwar infrastructure reconstruction in Syria: How public-private partnership impacts economic growth. ArtD thesis, University of Florence, Italy.

Abdul Mujeebu, M and Ashraf, N (2020) Impact of location and deadband on energy performance of nano aerogel glazing for office building in Saudi Arabia. Building Research & Information, 48(6), pp. 645-658. ISSN 0961-3218

Abdul-Aziz, A-R (1998) Adapting procurement practices to suit a host country as a probable localization tactic. Journal of Construction Procurement, 4(1), pp. 45-58. ISSN 1358-9180

Abdul-Rahman, H and Alidrisyi, M N (1994) A perspective of material management practices in fast developing economy: The case of Malaysia. Construction Management and Economics, 12(5), pp. 413-422. ISSN 01446193

Abdulghafour, A B (1998) Modeling highway construction tasks to determine project duration. PhD thesis, University of Tennessee, USA.

Abdulkareem, M (2016) Investigation of the daylighting and the thermal environment of Nigeria's low-income housing: the case of Abuja. PhD thesis, University of Portsmouth, UK.

Abdullatif, M I (1992) A system for quality-related costs for construction projects. PhD thesis, University of Kansas, USA.

Abdulmajid, S A D (1967) Resource forecasting models for private housing projects. PhD thesis, University of Manchester, UK.

Abdul‐Aziz, A R (2003) Construction entrepreneurship in Terengganu, Malaysia: An exploration of the influential forces. Journal of Engineering, Design and Technology, 1(1), pp. 15-41. ISSN 1726-0531

Abediniangerabi, B; Shahandashti, M and Makhmalbaf, A (2021) Coupled transient heat and moisture transfer investigation of facade panel connections. Journal of Engineering, Design and Technology, 19(3), pp. 758-777. ISSN 1726-0531

Abeid, J N (2000) Photo-net: An integrated system for controlling the progress of construction activities. PhD thesis, Illinois Institute of Technology, USA.

Abeydeera, W P P (2003) The role of social capital in collaborative governmental and non-governmental programmes on poverty reduction in Sri Lanka. PhD thesis, University of Guelph, Canada.

Abid, M S (1995) Reconstruction for low-income communities in earthquake zones: an investigation for the implementation of community-managed housing reconstruction programmes in low-income countries located in earthquakes zones. PhD thesis, Loughborough University, UK.

Abo Kanon, H (2017) The motivations, possibilities and constrains of flexible housing practices in the UK and Turkey. PhD thesis, Heriot-Watt University, UK.

Aboagye-Nimo, E; Piroozfar, P; Wood, H and Madgwick, D (2017) The impact of thermal imaging on users' perception of energy consumption: The round hill project. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Aboagye-Nimo, E; Raidén, A B; Tietze, S and King, A (2012) The use of experience and situated knowledge in ensuring safety among workers of small construction firms. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Abohilal, S A (2017) Investigating the roles of leaders, managers and their mutual roles in aligning strategy and project management in public sector organisations: the case of the Kingdom of Saudi Arabia. PhD thesis, Brunel University, UK.

Abolkhair, K (2022) Cost certainty and timing of cost certainty in the construction projects of public universities. PhD thesis, University of Florida, USA.

AbouRizk, S M and Wales, R J (1997) Combined discrete-event/continuous simulation for project planning. Journal of Construction Engineering and Management, 123(1), pp. 11-20. ISSN 0733-9364

Abourizk, S M and Dozzi, S P (1993) Application of computer simulation in resolving construction disputes. Journal of Construction Engineering and Management, 119(2), pp. 355-373. ISSN 0733-9364

Abourizk, S M and Halpin, D W (1990) Probabilistic simulation studies for repetitive construction processes. Journal of Construction Engineering and Management, 116(4), pp. 575-594. ISSN 0733-9364

Abourizk, S M; Halpin, D W and Wilson, J R (1991) Visual interactive fitting of beta distributions. Journal of Construction Engineering and Management, 117(4), pp. 589-605. ISSN 0733-9364

Abourizk, S M; Halpin, D W and Wilson, J R (1994) Fitting beta distributions based on sample data. Journal of Construction Engineering and Management, 120(2), pp. 288-305. ISSN 0733-9364

Abraham, D M (1990) A state-based framework using indicators for construction monitoring and evaluation. PhD thesis, University of Maryland, College Park, USA.

Abu El-Maaty, A E; El-Kholy, A M and Akal, A Y (2017) Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach. Engineering, Construction and Architectural Management, 24(5), pp. 809-827. ISSN 0969-9988

Abu-Hijleh, S F and Ibbs, C W (1993) Systematic automated management exception reporting. Journal of Construction Engineering and Management, 119(1), pp. 87-104. ISSN 0733-9364

Abu-Mahfouz, E; Al-Dahidi, S; Gharaibeh, E and Alahmer, A (2025) A novel feature engineering-based hybrid approach for precise construction cost estimation using fuzzy-AHP and artificial neural networks. International Journal of Construction Management, 25(15), pp. 1800-1810. ISSN 1562-3599

Abubaker, A E; Greenwood, D and Osborne, A (2008) A study of project planning on Libyan construction projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Abuhishmeh, K S K (2023) Risk assessment of reinforced concrete sewer pipes under external loading and adverse environmental conditions using an adaptive neuro-fuzzy system. PhD thesis, University of Texas at Arlington, USA.

Acar, E and Yalçın, N (2019) Task-related pro-environmental behaviours of architectural designers: LEED-based evidence from Turkey. Architectural Engineering and Design Management, 15(2), pp. 121-140. ISSN 1745-2007

Acar, E and Yasemin, G (2011) Prediction of risk perception by owners' psychological traits in small building contractors. Construction Management and Economics, 29(8), pp. 841-852. ISSN 1466433X

Adabre, M A; Chan, A P C and Edwards, D J (2023) Modeling relationship between success factors (policies) and critical success criteria (goals) for sustainable housing in developing countries. International Journal of Construction Management, 23(10), pp. 1642-1652. ISSN 1562-3599

Adams, F K (2006) Expert elicitation and Bayesian analysis of construction contract risks: An investigation. Construction Management and Economics, 24(1), pp. 81-96. ISSN 01446193

Adams, J D and Brown, A W (2002) Project management in public sector construction projects: Assessing value for money. Journal of Construction Procurement, 8(2), pp. 84-100. ISSN 1358-9180

Adams, K A (2023) A multi-hazard cascading risk model for coastal rail infrastructure: numerical modelling & engineering failure analysis. PhD thesis, Brunel University, UK.

Adamtey, S A (2022) An empirical study to assist owners in selecting the right procurement method for design-build projects. International Journal of Construction Education and Research, 18(1), pp. 67-84. ISSN 1557-8771

Adamy, A and Abu Bakar, A H (2021) Developing a building-performance evaluation framework for post-disaster reconstruction: The case of hospital buildings in Aceh, Indonesia. International Journal of Construction Management, 21(1), pp. 56-77. ISSN 1562-3599

Adebisi, J and McArthur, J J (2025) HVAC characterisation of existing Canadian buildings for decarbonisation retrofit identification. Buildings & Cities, 6(1), pp. 729-746. ISSN 2632-6655

Adesanya, A; Misra, S; Maskeliunas, R and Damasevicius, R (2021) Prospects of ocean-based renewable energy for West africa's sustainable energy future. Smart and Sustainable Built Environment, 10(1), pp. 37-50. ISSN 2046-6099

Adeyemi, O and Oke, A (2022) Factors affecting mentoring of professionals in construction firms: Nigerian quantity surveyors' perspective. International Journal of Construction Management, 22(12), pp. 2300-2307. ISSN 1562-3599

Adi Maimun, N H (2016) Price and rent effects of energy efficiency in residential properties: evidence from the Belfast Metropolitan area. PhD thesis, Ulster University, UK.

Adinyira, E; Agyekum, K; Danku, J C; Addison, P and Kukah, A S (2020) Influence of subcontractor risk management on quality performance of building construction projects in Ghana. Journal of Construction in Developing Countries, 25(2), pp. 175-197. ISSN 1823-6499

Adoko, M T (2016) Developing a cost overrun predictive model for complex systems development projects. PhD thesis, George Washington University, USA.

Adriaanse, A M and Voordijk, H (2002) Information richness in construction projects: A critical social theory. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Adriaanse, Adriaan Maria (2007) The use of interorganisational ICT in construction projects: A critical perspective. PhD thesis, University of Twente, Netherlands.

Afkhamiaghda, M and Elwakil, E (2023) Challenges review of decision making in post-disaster construction. International Journal of Construction Management, 23(14), pp. 2409-2418. ISSN 1562-3599

Afshar, M R; Shahhosseini, V and Sebt, M H (2022) A genetic algorithm with a new local search method for solving the multimode resource-constrained project scheduling problem. International Journal of Construction Management, 22(3), pp. 357-365. ISSN 1562-3599

Afzal, Muneeb (2024) Improving request for information (RFI) processing in construction projects using natural language processing (NLP) techniques. PhD thesis, University of Technology Sydney, Australia.

Agbesi, K; Kissi, E and Adjei-Kumi, T (2020) Implementation of sustainable procurement practices in public sector construction organisation in Ghana. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Aggeli, A; Christensen, T H and Larsen, S P A K (2022) The gendering of energy household labour. Buildings & Cities, 3(1), pp. 709-724. ISSN 2632-6655

Aghajamali, K; Rahimi, A; Metvaei, S; Lei, Z; Chen, Q; Suliman, A and Pirzad, A (2026) Production planning with an enriched BIM-based heuristic construction order model to improve the efficiency of complex prefabricated projects. Journal of Construction Engineering and Management, 152(6): 04026057, ISSN 0733-9364

Agyefi-Mensah, S; Post, J; van Egmond, E E L C; Badu, E and Mohammadi, M (2015) A typological analysis of public apartment buildings in Ghana. Architectural Engineering and Design Management, 11(5), pp. 376-389. ISSN 1745-2007

Ahadzi, M and Bowles, G (2004) Public-private partnerships and contract negotiations: An empirical study. Construction Management and Economics, 22(9), pp. 967-978. ISSN 01446193

Ahadzie, D K; Proverbs, D G and Olomolaiye, P O (2008) Model for predicting the performance of project managers at the construction phase of mass house building projects. Journal of Construction Engineering and Management, 134(8), pp. 618-629. ISSN 0733-9364

Ahadzie, D K; Proverbs, D G; Olomolaiye, P O and Ankrah, N (2009) Towards developing competency-based measures for project managers in mass house building projects in developing countries. Construction Management and Economics, 27(1), pp. 89-102. ISSN 1466433X

Ahiaga-Dagbui, D and Smith, S D (2012) Neural networks for modelling the final target cost of water projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Ahiaga-Dagbui, D D and Smith, S D (2014) Dealing with construction cost overruns using data mining. Construction Management and Economics, 32(7-8), pp. 682-694. ISSN 01446193

Ahmadian Fard Fini, A; Rashidi, T H; Akbarnezhad, A and Travis Waller, S (2016) Incorporating multiskilling and learning in the optimization of crew composition. Journal of Construction Engineering and Management, 142(5): 04015106, ISSN 0733-9364

Ahmadian Fard Fini, Alireza (2017) Optimizing crew performance through integration of human resource strategies into planning of construction activities. PhD thesis, University of New South Wales, Australia.

Ahmed, V S (2000) The effectiveness of computer assisted learning in construction. PhD thesis, Loughborough University, UK.

Ahn, Sang Jun (2019) Transportation framework in panelized construction for residential building. PhD thesis, University of Alberta, Canada.

Ahuja, V and Thiruvengadam, V (2004) Project scheduling and monitoring: Current research status. Construction Innovation, 4(1), pp. 19-31. ISSN 1471-4175

Aibinu, A A (2006) The relationship between distribution of control, fairness and potential for dispute in the claims handling process. Construction Management and Economics, 24(1), pp. 45-54. ISSN 01446193

Aigbavboa, C and Thwala, W (2013) The role of beneficiaries' participation in South Africa low-income housing occupants' satisfaction. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Ait Hammou, K (2013) The effect of national culture, perception of control the environment, and generation gap on strategic behavior and financial performance: The case of cement manufacturers in Morocco and the United States of America. DBA thesis, Alliant International University, USA.

Akan, G T; Imre, M and Arditi, D (1984) Priority ranking of highway improvement projects. Construction Management and Economics, 2(1), pp. 49-55. ISSN 01446193

Akbas, R (2003) Geometry-based modeling and simulation of construction processes. PhD thesis, Stanford University, USA.

Akhimien, N (2022) A framework for incorporating circular economy in the design of energy efficient residential buildings in Nigeria. PhD thesis, Cardiff University, UK.

Akinbo, T F; Fagbenle, O I and Amusan, L M (2024) Assessment of knowledge management barriers and improvement strategies on public-private partnership projects in Nigeria. International Journal of Construction Management, 24(9), pp. 1018-1028. ISSN 1562-3599

Akindele, M A (2024) Development and evaluation of portable reduced-complexity air quality models for policy assessment in Africa. PhD thesis, Carnegie Mellon University, USA.

Akintoye, A (2000) Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18(1), pp. 77-89. ISSN 01446193

Akintoye, A and Skitmore, M (1994) Models of UK private sector quarterly construction demand. Construction Management and Economics, 12(1), pp. 3-13. ISSN 01446193

Akinwunmi, A; Gameson, R; Hammond, F and Olomolaiye, P (2007) Mortgage insurance and housing finance in emerging economies. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Akomea-Frimpong, Isaac (2023) Developing a holistic financial risk management framework to optimize financial performance of public-private partnership projects in Ghana. PhD thesis, Western Sydney University, Australia.

Akplotsyi, R and Mahdjoubi, L (2011) Effects of learning styles on engaging children in school projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Aksözen, M; Hassler, U and Kohler, N (2017) Reconstitution of the dynamics of an urban building stock. Building Research & Information, 45(3), pp. 239-258. ISSN 0961-3218

Aksözen, M; Hassler, U; Rivallain, M and Kohler, N (2017) Mortality analysis of an urban building stock. Building Research & Information, 45(3), pp. 259-277. ISSN 0961-3218

Akuete, E; Nduka, D O and Ogundipe, K E (2022) Maintenance feedback mechanisms and limiting factors of post-occupancy evaluation in student residents of higher education institutions in Nigeria. Journal of Construction in Developing Countries, 27(2), pp. 17-41. ISSN 1823-6499

Al Shawa, B (2021) Achieving the climate change targets for the global buildings sector: a techno-socioeconomic pathway. PhD thesis, University of Bath, UK.

Al-Aomar, R; AlTal, M and Abel, J (2024) A data-driven predictive maintenance model for hospital HVAC system with machine learning. Building Research & Information, 52(1-2), pp. 207-224. ISSN 0961-3218

Al-Aubaidy, N A; Caldas, C H and Mulva, S P (2022) Assessment of underreporting factors on construction safety incidents in US construction projects. International Journal of Construction Management, 22(1), pp. 103-120. ISSN 1562-3599

Al-Bahar, J F (1988) Risk management in construction projects: A systematic analytical approach for contractors. PhD thesis, University of California, Berkeley, USA.

Al-Bahar, J F and Crandall, K C (1990) Systematic risk management approach for construction projects. Journal of Construction Engineering and Management, 116(3), pp. 533-546. ISSN 0733-9364

Al-Bayati, A J and Panzer, L (2020) Reducing damages to underground utilities: Importance of stakeholders' behaviors. Journal of Construction Engineering and Management, 146(9): 04020107, ISSN 0733-9364

Al-Dahash, H; Thayaparan, M and Kulatunga, U (2016) Understanding the terminologies: Disaster, crisis and emergency. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Al-Dughaither, K A (1996) International construction financing strategies: Influential factors and decision-making. PhD thesis, Carnegie Mellon University, USA.

Al-Ghamdi, S G (2015) Advancing green building rating systems using life-cycle assessment. PhD thesis, University of Pittsburgh, USA.

Al-Ghassani, A M; Carrillo, P M; Anumba, C J and Robinson, H S (2001) Software requirements for knowledge management in construction organizations. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Al-Hammad, A M; Assaf, S and Al-Hazmi, T (1996) Assessment of the types of public building maintenance contracts in Saudi Arabia. Building Research & Information, 24(6), pp. 358-362. ISSN 0961-3218

Al-Harasis, D H; Jabi, W and Sharmin, T (2025) Developing a taxonomy for sensory-informed architectural design qualities in autism. Building Research & Information, 53(4), pp. 532-551. ISSN 0961-3218

Al-Humaidi, H M (2007) A fuzzy logic approach to model delays in construction projects. PhD thesis, Ohio State University, USA.

Al-Hussein, M; Alkass, S and Moselhi, O (2005) Optimization algorithm for selection and on site location of mobile cranes. Journal of Construction Engineering and Management, 131(5), pp. 579-590. ISSN 0733-9364

Al-Ibrahim, A (2006) Optimizing roof maintenance and replacement decisions. PhD thesis, North Carolina State University, USA.

Al-Jibouri, S and Mawdesley, M J (2001) Development and application of a stochastic based cost prediction model for construction. Journal of Financial Management of Property and Construction, 6(1), pp. 61-69. ISSN 1366-4387

Al-Jibouri, S and Ogink, G (2009) Proposed model for integrating rams method in the design process in construction. Architectural Engineering and Design Management, 5(4), pp. 179-192. ISSN 1745-2007

Al-Khatri, H; Etri, T and Gadi, M B (2022) User response to indoor thermal environment in female high school buildings in Oman. Building Research & Information, 50(1-2), pp. 192-212. ISSN 0961-3218

Al-Muyeed, A and Afrin, R (2005) Effect of masonry infill for reducing the sway of RC frame using finite element modeling. Journal of Construction Research, 6(2), pp. 293-306. ISSN 1609-9451

Al-Nijaidi, H R (1985) Flexibility in the design of buildings. PhD thesis, Oxford Brookes University, UK.

Al-Qawasmi, J (2016) Vernacular as a renewable resource: Toward region-specific architecture in Saudi Arabia, a case from KFUPM. Architectural Engineering and Design Management, 12(2), pp. 81-96. ISSN 1745-2007

Al-Sabah, R; Menassa, C C and Hanna, A (2014) Evaluating impact of construction risks in the Arabian gulf region from perspective of multinational architecture, engineering and construction firms. Construction Management and Economics, 32(4), pp. 382-402. ISSN 01446193

Al-Saeed, Y W M (2018) Towards developing a sustainability assessment framework for residential buildings in Iraq. PhD thesis, Coventry University, UK.

Al-Sharif, F and Kaka, A (2003) Potential of PFI/PPP as a financing source for public services projects in Saudi Arabia. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Al-Sinaidi, A A (2002) Computation of construction contractor capability. PhD thesis, Florida Institute of Technology, USA.

Al-Tabtabai, H (1992) Judgemental forecasting in construction projects. Construction Management and Economics, 10(1), pp. 19-30. ISSN 01446193

Al-Tabtabai, H and Alex, A P (1999) Using genetic algorithms to solve optimization problems in construction. Engineering, Construction and Architectural Management, 6(2), pp. 121-132. ISSN 0969-9988

Al-Tabtabai, H; Kartam, N; Flood, I A N and Alex, A P (1997) Expert judgment in forecasting construction project completion. Engineering, Construction and Architectural Management, 4(4), pp. 271-293. ISSN 0969-9988

Alao, O O and Jagboro, G O (2017) Assessment of causative factors for project abandonment in Nigerian public tertiary educational institutions. International Journal of Building Pathology and Adaptation, 35(1), pp. 41-62.

Alashwal, A M and Alduais, H S (2019) Performance strategies of Malaysian international contractors during boom and recession periods. International Journal of Construction Management, 19(5), pp. 453-461. ISSN 1562-3599

Albert, A; Jeelani, I and Han, K (2020) Developing hazard recognition skill among the next-generation of construction professionals. Construction Management and Economics, 38(11), pp. 1024-1039. ISSN 01446193

Alcaraz Carrillo de Albornoz, V; Ke, Y and Molina Millán, J (2024) Public-private partnerships: Pro-cyclical or counter-cyclical? An empirical study. International Journal of Construction Management, 24(1), pp. 97-107. ISSN 1562-3599

Aldaiyat, R M R E (2017) Perception eccentricities in risk time dimension of construction professionals in the state of Kuwait. PhD thesis, Loughborough University, UK.

Aleithawe, I (2010) Acquisition of right of way for highway construction. PhD thesis, Mississippi State University, USA.

Aleithawe, I; Sinno, R R and McAnally, W H (2012) Right-of-way acquisition duration prediction model for highway construction projects. Journal of Construction Engineering and Management, 138(4), pp. 540-544. ISSN 0733-9364

Alencar, C T (2000) Highway concessions in Brazil: An analysis towards the feasibility of the securitization. Journal of Financial Management of Property and Construction, 5(3), pp. 159-169. ISSN 1366-4387

Alexandrou, K; Thravalou, S and Artopoulos, G (2024) Heritage-BIM for energy simulation: A data exchange method for improved interoperability. Building Research & Information, 52(3), pp. 373-386. ISSN 0961-3218

Alfeld, L E (1990) Construction delays: A simulation analysis. DSc thesis, Washington University in St. Louis, USA.

Alfian, N N; Kanu, R and Mohammed, M A (2025) Speech intelligibility evaluation of small-scale mosque with multiple domes design. International Journal of Building Pathology and Adaptation, 43(7), pp. 1741-1761. ISSN 2398-4708

Alharbi, E A and Alsehaimi, A (2025) Machine learning model to predict the cooling load of mosque buildings during the design stage. International Journal of Construction Management, 25(8), pp. 965-979. ISSN 1562-3599

Alhashedi, E; Zhang, H and Lin, Y (2026) Adaptive estimation and management of cost contingencies in EPC projects. Journal of Construction Engineering and Management, 152(5): 04026056, ISSN 0733-9364

Alhudaithy, I M (2006) Rights of tenderers and contractors under Saudi public procurement contract regulations: a comparative study with England and Wales. PhD thesis, Durham University, UK.

Ali, B; Aibinu, A and Paton-Cole, V (2023) Facilitating agreement in disruption claims through disruption analysis methods. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Ali, H H; Sharif, A A and Shdaifat, N M (2025) Developing a sustainable self-sufficient temporary shelter unit for desert climate. Architectural Engineering and Design Management, 21(1), pp. 98-119. ISSN 1745-2007

Ali, H M and Ruddock, L (2000) The impact of portfolio strategy onthe 'style' performance of UK property companies. Journal of Financial Management of Property and Construction, 5(3), pp. 123-133. ISSN 1366-4387

Aliasgari, R; Fan, C; Li, X; Golabchi, A and Hamzeh, F (2024) MOCAP and ai-based automated physical demand analysis for workplace safety. Journal of Construction Engineering and Management, 150(7): 04024060, ISSN 0733-9364

Aligamhe, V I; Mustapa, M; Ogbu, C P and Misnan, M S (2024) Modelling cost-risk impact on Nigerian highway projects using multiple linear regression and artificial neural networks. Journal of Construction in Developing Countries, 29(2), pp. 107-128. ISSN 1823-6499

Alinaitwe, H; Nyamutale, W and Tindiwensi, D (2014) Design phase constructability improvement strategies for highway projects in Uganda. Journal of Construction in Developing Countries, 19(1), pp. 127-140. ISSN 1823-6499

Aliu, J; Aghimien, D; Aigbavboa, C; Oke, A; Ebekozien, A and Temidayo, O (2023) Empirical investigation of discipline-specific skills required for the employability of built environment graduates. International Journal of Construction Education and Research, 19(4), pp. 460-479. ISSN 1557-8771

Aliu, J; Agbaje, D H; Oke, A E and Ebekozien, A (2025) Driving forces behind the adoption of IEQ principles in building design: Evidence from Nigerian quantity surveying firms. International Journal of Building Pathology and Adaptation, 43(6), pp. 1541-1558. ISSN 2398-4708

Alkaissy, Maryam (2022) Worksite accidents quantification in construction: Safety relations with project performance metrics. PhD thesis, Monash University, Australia.

Alkass, S T (1988) An expert system applied to earthmoving operations and equipment selection. PhD thesis, Loughborough University, UK.

Alkhard, A (2024) Enhancing asset management through integrated facilities data, digital asset management, and metadata strategies. Construction Economics and Building, 24(3), pp. 76-94. ISSN 2204-9029

Alkoc, E and Erbatur, F (1998) Simulation in concreting operations: A comparison of models and resource combinations. Engineering, Construction and Architectural Management, 5(2), pp. 159-173. ISSN 0969-9988

Alkoud, S. and Qatamin, L. (2025) Global trends and future directions of virtual teams in the workplace: A bibliometric analysis. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 108-115. ISSN 1751-4304

Allport, R J (2015) Pre-implementation planning: The weak link in rail projects 1. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(5), pp. 205-212. ISSN 17514304

Almeraikhi, A M (2010) An integrated framework for multi-project planning and control. PhD thesis, Sheffield Hallam University, UK.

Almhafdy, A and Alsehail, A M (2025) The effect of window design factors on the cooling load in hospitals wards. Smart and Sustainable Built Environment, 14(5), pp. 1389-1406. ISSN 2046-6099

Almomani, A Q M; Almeida, R M S F; Vicente, R and Barreira, E (2025) Long-term monitoring of thermal comfort in three apartments in Jordan. Building Research & Information, 53(8), pp. 965-982. ISSN 0961-3218

Almås, A J; Lisø, K R; Hygen, H O; Øyen, C F and Thue, J V (2011) An approach to impact assessments of buildings in a changing climate. Building Research & Information, 39(3), pp. 227-238. ISSN 0961-3218

Alnahari, Mohammed Saeed (2023) Exploring the potential of blockchain technology for improved management and safety of underground utilities. PhD thesis, Arizona State University, USA.

Alnaqbi, A; Al-Khateeb, G G and Zeiada, W (2025) Machine learning applications for predicting longitudinal cracking in continuously reinforced concrete pavement. Construction Economics and Building, 25(1), pp. 143-170. ISSN 2204-9029

Alnsour, M A M (2020) Integrating sustainability assessment into public works development in Jordan. PhD thesis, University of Leeds, UK.

Alongi, A; Angelotti, A; Rizzo, A and Zanelli, A (2021) Measuring the thermal resistance of double and triple layer pneumatic cushions for textile architectures. Architectural Engineering and Design Management, 17(3-4), pp. 334-346. ISSN 1745-2007

Alrefaie, A M; Abdul-Samad, Z; Salleh, H; Alashwal, A M and Amos, D (2023) Modelling labour productivity of reinforcement bar using polynomial regression: A study on a tropical country's weather. International Journal of Construction Management, 23(10), pp. 1633-1641. ISSN 1562-3599

Alruqi, W M and Hallowell, M R (2019) Critical success factors for construction safety: Review and meta-analysis of safety leading indicators. Journal of Construction Engineering and Management, 145(3): 04019005, ISSN 0733-9364

Alsedairy, F and Smith, S D (2016) Understanding the drivers and needs for mega infrastructure project development in Saudi Arabia. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Alshboul, O; Shehadeh, A and Saleh, E (2025) Advancing construction quality management: An integrated evidential reasoning and belief functions framework. Journal of Construction Engineering and Management, 151(8): 04025093, ISSN 0733-9364

Alshboul, O; Shehadeh, A and Tamimi, M (2025) Sustainability-focused pavement management under climate variability. Journal of Construction Engineering and Management, 151(7): 04025076, ISSN 0733-9364

Altalhoni, A; Liu, H; Abudayyeh, O; Kwigizile, V; Huang, W C and Kirkpatrick, K (2025) Robust forecasting models for highway construction cost indices during pandemic-era inflation. Journal of Construction Engineering and Management, 151(8): 04025101, ISSN 0733-9364

Aluko, R O; Adenuga, O A; Kukoyi, P O; Soyingbe, A A and Oyedeji, J O (2016) Predicting the academic success of architecture students by pre-enrolment requirement: Using machine-learning techniques. Construction Economics and Building, 16(4), pp. 86-98. ISSN 2204-9029

Alzubaidi, H J (1993) Maintenance modelling of a major hospital complex. PhD thesis, University of Salford, UK.

Alzubi, Y; Aljaafreh, A and Khatatbeh, A (2024) Application of machine learning techniques in estimating the construction cost of residential buildings in the middle East region. International Journal of Construction Management, 24(9), pp. 946-958. ISSN 1562-3599

Amankwaa, E F; Roberts, B M; Mensah, P and Gough, K V (2025) Impact of roofing materials on school temperatures in tropical Africa. Buildings & Cities, 6(1), pp. 139-157. ISSN 2632-6655

Amer, F; Koh, H Y and Golparvar-Fard, M (2021) Automated methods and systems for construction planning and scheduling: Critical review of three decades of research. Journal of Construction Engineering and Management, 147(7): 0002093, ISSN 0733-9364

Amewornu, E M and Nwulu, N I (2021) A framework for the techno-economic and reliability analysis of grid connected microgrids. Journal of Engineering, Design and Technology, 19(3), pp. 659-685. ISSN 1726-0531

Amies, P; Jin, X and Senaratne, S (2025) Blueprints for success: Applying structural equation modeling in dam construction planning. Engineering, Construction and Architectural Management, 32(11), pp. 7539-7560. ISSN 0969-9988

Amies, P; Jin, X and Senaratne, S (2025) Achieving design-phase success in dam construction: An exploration of project success elements through factor analysis and structural equation modeling. International Journal of Construction Education and Research, 21(4), pp. 554-584. ISSN 1557-8771

Amirudin, R B (1998) The application of a knowledge-based engineering approach to the structural design of steel framed office buildings. PhD thesis, University of Reading, UK.

Ammar, A; Hanna, A S; Nordheim, E V and Russell, J S (2003) Indicator variables model of firm's size-profitability relationship of electrical contractors using financial and economic data. Journal of Construction Engineering and Management, 129(2), pp. 192-197. ISSN 0733-9364

Ammar, M A (2020) Resource optimisation in line of balance scheduling. Construction Management and Economics, 38(8), pp. 715-725. ISSN 01446193

Ammar, M A and Abd-ElKhalek, S I (2022) Criticality measurement in fuzzy project scheduling. International Journal of Construction Management, 22(2), pp. 252-261. ISSN 1562-3599

Ammar, M A and Abdel-Maged, A F (2018) Modeling of LOB scheduling with learning development effect. International Journal of Construction Management, 18(6), pp. 517-526. ISSN 1562-3599

Amponsah, C T and Forbes, J L (2012) Public-private partnerships: Critical factors for procurement of capital projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(4), pp. 211-221. ISSN 17514312

Anagnostopoulos, I (2018) Generating as-is BIMs of existing buildings: from planar segments to spaces. PhD thesis, University of Cambridge, UK.

Anagnostopoulos, K P and Koulinas, G K (2010) A simulated annealing hyperheuristic for construction resource levelling. Construction Management and Economics, 28(2), pp. 163-175. ISSN 1466433X

Anastasopoulos, P C; Labi, S; Bhargava, A; Bordat, C and Mannering, F L (2010) Frequency of change orders in highway construction using alternate count-data modeling methods. Journal of Construction Engineering and Management, 136(8), pp. 886-893. ISSN 0733-9364

Anastassakou, M (2008) Organisational benefits using explicit project management tools, techniques and knowledge. PhD thesis, University College London, UK.

Andersen, M (2002) Light distribution through advanced fenestration systems. Building Research & Information, 30(4), pp. 264-281. ISSN 0961-3218

Anderson, B and James, P (2021) Covid-19 lockdown: Impacts on gb electricity demand and CO2 emissions. Buildings & Cities, 2(1), pp. 134-149. ISSN 2632-6655

Anderson, J and Moncaster, A (2020) Embodied carbon of concrete in buildings, Part 1: Analysis of published EPD. Buildings & Cities, 1(1), pp. 198-217. ISSN 2632-6655

Andrić, J M; Wang, J; Zou, P X W; Zhang, J and Zhong, R (2019) Fuzzy logic-based method for risk assessment of belt and road infrastructure projects. Journal of Construction Engineering and Management, 145(12): 4019082, ISSN 0733-9364

Angel, S (2023) Urban expansion: Theory, evidence and practice. Buildings & Cities, 4(1), pp. 124-138. ISSN 2632-6655

Anondho, B; Soeleiman, L; Latief, Y and Mochtar, K (2023) The influence of external factors on construction project performance based on estimated duration in Jakarta. International Journal of Construction Management, 23(13), pp. 2270-2278. ISSN 1562-3599

Antwi, A and Deakin, M (1996) Discounting, obsolescence, depreciation and their effects on the environment of cities. Journal of Financial Management of Property and Construction, 1(2), pp. 39-56. ISSN 1366-4387

Anumba, C J (1996) Issues in the investigation and reporting of housing subsidence: The problem of inaccurate diagnosis, which can often be traced to inadequacies in the procedures adopted, is examined in detail. Building Research & Information, 24(3), pp. 170-175. ISSN 0961-3218

Anvuur, A M and Kumaraswamy, M M (2007) Conceptual model of partnering and alliancing. Journal of Construction Engineering and Management, 133(3), pp. 225-234. ISSN 0733-9364

Anvuur, A M and Kumaraswamy, M M (2016) Effects of teamwork climate on cooperation in crossfunctional temporary multi-organization workgroups. Journal of Construction Engineering and Management, 142(1): 04015054, ISSN 0733-9364

Anwer, S; Li, H; Umer, W; Antwi-Afari, M F; Mehmood, I; Yu, Y; Haas, C and Wong, A Y L (2023) Identification and classification of physical fatigue in construction workers using linear and nonlinear heart rate variability measurements. Journal of Construction Engineering and Management, 149(7): 04023057, ISSN 0733-9364

Aouad, G F; Bakis, N; Amaratunga, D; Osbaldiston, S; Sun, M; Kishk, M; Al-Hajj, A and Pollock, R (2001) An integrated life cycle costing database: A conceptual framework. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Arditi, D and Alavipour, S M R (2019) Trends in expectations about duties and responsibilities of construction managers. Journal of Construction Engineering and Management, 145(7): 04019037, ISSN 0733-9364

Arditi, D and Chotibhongs, R (2009) Detection and prevention of unbalanced bids. Construction Management and Economics, 27(8), pp. 721-732. ISSN 1466433X

Arditi, D and Patel, B K (1989) Impact analysis of owner-directed acceleration. Journal of Construction Engineering and Management, 115(1), pp. 144-157. ISSN 0733-9364

Arditi, D and Suh, K (1991) Estimating system selection expert. Construction Management and Economics, 9(4), pp. 369-381. ISSN 01446193

Arif, M; Syal, M and Hightower, R (2013) Investigating the green leadership in energy and environmental design (LEED) servicescape scale in Brazil. Construction Innovation, 13(3), pp. 242-265. ISSN 1471-4175

Arkani, S (1999) Contractual interfaces: the implications of building production process management and interorganisational relations for productivity in building project coalitions. PhD thesis, University of Greenwich, UK.

Armstrong, A (2022) Revenue patterns of piped water services in rural Africa. PhD thesis, University of Oxford, UK.

Aroke, O; Hasanzadeh, S; Esmaeili, B; Dodd, M D and Brock, R (2022) Using worker characteristics, personality, and attentional distribution to predict hazard identification performance: A moderated mediation analysis. Journal of Construction Engineering and Management, 148(6): 04022033, ISSN 0733-9364

Arroyo, P; Tommelein, I D and Ballard, G (2015) Comparing AHP and CBA as decision methods to resolve the choosing problem in detailed design. Journal of Construction Engineering and Management, 141(1): 04014063, ISSN 0733-9364

Arshad, M F; Thaheem, M J; Nasir, A R and Malik, M S A (2019) Contractual risks of building information modeling: Toward a standardized legal framework for design-bid-build projects. Journal of Construction Engineering and Management, 145(4): 04019010, ISSN 0733-9364

Artmann, N; Gyalistras, D; Manz, H and Heiselberg, P (2008) Impact of climate warming on passive night cooling potential. Building Research & Information, 36(2), pp. 111-128. ISSN 0961-3218

Arun, C (2004) Development of a decision support tool for scheduling highway construction projects based on simulation studies. PhD thesis, Anna University, Chennai, India.

Asadi, R; Rotimi, J O B and Wilkinson, S (2023) Analyzing underlying factors of rework in generating contractual claims in construction projects. Journal of Construction Engineering and Management, 149(6): 04023036, ISSN 0733-9364

Asadi, R; Wilkinson, S and Rotimi, J O B (2023) Mixed-method approach to the evaluation of rework provisions within general contract conditions. Construction Economics and Building, 23(3-4), pp. 45-70. ISSN 2204-9029

Asadujjaman, Md (2023) Planning and scheduling supply chain integrated projects. PhD thesis, University of New South Wales, Australia.

Asefi, Maziar (2007) Transformable architectural structures: Background, development, evaluation and design. PhD thesis, University of Liverpool, UK.

Asfour, O S and Gadi, M B (2006) Effect of integrating wind catchers with curved roofs on natural ventilation performance in buildings. Architectural Engineering and Design Management, 2(4), pp. 289-304. ISSN 1745-2007

Ashtab, M and Ryoo, B Y (2022) Predicting construction workforce demand using a combination of feature selection and multivariate deep-learning seq2seq models. Journal of Construction Engineering and Management, 148(12): 04022136, ISSN 0733-9364

Ashuri, B; Shahandashti, S M and Lu, J (2012) Empirical tests for identifying leading indicators of ENR construction cost index. Construction Management and Economics, 30(11), pp. 917-927. ISSN 1466433X

Asianoah, R K (2023) A risk management model for commercial property development and investment in Ghana. PhD thesis, Nelson Mandela University, South Africa.

Asigri, E O; Afram, S O and Ameyaw, C (2021) Fire safety design attributes of students' housing facilities in KNUST Ghana. African Journal of Built Environment Research, 5(1), pp. 41-58. ISSN 2414-0236

Aslan, V Z (2012) Financial implications of engineering decisions. PhD thesis, Texas A&M University, USA.

Assaad, R H; Omran, A; Soliman, N and Assaf, G (2024) Prediction of the lateral pressure of self-consolidating concrete on construction formwork systems using machine-learning algorithms. Journal of Construction Engineering and Management, 150(9): 04024110, ISSN 0733-9364

Assad, M; Hosny, O; Elhakeem, A and El Haggar, S (2015) Green building design in Egypt from cost and energy perspectives. Architectural Engineering and Design Management, 11(1), pp. 21-40. ISSN 1745-2007

Assaf, S A-E (1982) A systematic approach to the selection of a risk retention level for construction insurance. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Atalah, A (2008) Effect of rock trenching vibrations on nearby structures. Journal of Construction Engineering and Management, 134(4), pp. 234-241. ISSN 0733-9364

Atkinson, A (1997) The management of construction failures and defects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Atmaca, N (2017) Life-cycle assessment of post-disaster temporary housing. Building Research & Information, 45(5), pp. 524-538. ISSN 0961-3218

Attakora-Amaniampong, E; Anugwo, I C and Appau, M W (2025) Relationship between indoor environmental quality and residential mobility: Implications for student housing design and management in Northern Ghana. International Journal of Building Pathology and Adaptation, 43(6), pp. 1482-1500. ISSN 2398-4708

Attarzadeh, M; Nath, T and Tiong, R L K (2015) Identifying key factors for building information modelling adoption in Singapore. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(5), pp. 220-231. ISSN 17514304

Attoh-Okine, N O (2003) Rule induction in productivity analysis: A rough set approach. Engineering, Construction and Architectural Management, 10(6), pp. 413-417. ISSN 0969-9988

Au, T and Hendrickson, C (1986) Profit measures for construction projects. Journal of Construction Engineering and Management, 112(2), pp. 273-286. ISSN 0733-9364

Augenbroe, G and Park, C S (2005) Quantification methods of technical building performance. Building Research & Information, 33(2), pp. 159-172. ISSN 0961-3218

Aurangzeb, Q (2014) Impact of reclaimed asphalt pavements on pavement sustainability. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Austin, S; Baldwin, A and Newton, A (1994) Manipulating the flow of design information to improve the programming of building design. Construction Management and Economics, 12(5), pp. 445-455. ISSN 01446193

Awale, R and Rowlinson, S (2014) A conceptual framework for achieving firm competitiveness in construction: A 'creating shared value' (CSV) concept. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Ayat, M; Kim, B and Kang, C W (2023) A new data mining-based framework to predict the success of private participation in infrastructure projects. International Journal of Construction Management, 23(13), pp. 2151-2159. ISSN 1562-3599

Aydın, M (2025) Evaluation of master's degree programmes in project and construction management: an agglomerative hierarchical clustering study. International Journal of Construction Management, 25(1), pp. 18-31. ISSN 1562-3599

Aye, L and Fuller, R J (2005) The proposed heating and cooling system in the CH2 building and its impact on occupant productivity. Construction Economics and Building, 5(2), pp. 32-39. ISSN 2204-9029

Ayodeji, A A (2008) Managing building and civil engineering project claims to reduce conflict intensity and contractors' potential to dispute. PhD thesis, National University of Singapore, Singapore.

Ayodele, T O and Olaleye, A (2022) Fundamental sources of uncertainty in real estate development: Perspectives from an emerging market. International Journal of Construction Management, 22(14), pp. 2775-2787. ISSN 1562-3599

Ayus, A M B N (1992) Building contract claims: a comparative study (Scotland, England and Malaysia). PhD thesis, University of Aberdeen, UK.

Ayyub, B M and Haidar, A (1984) Project scheduling using fuzzy set concepts. Journal of Construction Engineering and Management, 110(2), pp. 189-204. ISSN 0733-9364

Azimi, R (2011) An integrated real-time control system for structural steel fabrication projects. PhD thesis, University of Alberta, Canada.

Aziz, Z; Qasim, R M and Wajdi, S (2017) Improving productivity of road surfacing operations using value stream mapping and discrete event simulation. Construction Innovation, 17(3), pp. 294-323. ISSN 1471-4175

Azman, M A; Lee, B L; Rahman, R A and Ballesteros-Pérez, P (2026) Ownership and contracting specialization: Unlocking the productivity of construction firms in hybrid market economies. Construction Management and Economics, 44(1), pp. 61-78. ISSN 0144-6193

Azman, M A; Hon, C K H; Skitmore, M; Lee, B L and Xia, B (2019) A meta-frontier method of decomposing long-term construction productivity components and technological gaps at the firm level: Evidence from Malaysia. Construction Management and Economics, 37(2), pp. 72-88. ISSN 01446193

Azman, Mohd Azrai (2020) Diversification, institutions, and productivity performance of large construction firms in Malaysia. PhD thesis, Queensland University of Technology, Australia.

Ağar, M (2024) A rule based expert system for delay analysis in construction projects. PhD thesis, Middle East Technical University, Turkey.

Babangida, I (2014) Hierarchical structuring and evaluation of risks, uncertainties and technical challenges faced by building refurbishment contractors. PhD thesis, University of Bolton, UK.

Babangida, I; Olubodun, F and Kangwa, J (2012) Building refurbishment: Holistic evaluation of barriers and opportunities. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Babatunde, O K (2013) Cross cultural management of quality performance of Chinese construction firms in Nigeria. PhD thesis, National University of Singapore, Singapore.

Babatunde, S O; Adeniyi, O and Awodele, O A (2017) Investigation into the causes of delay in land acquisition for PPP projects in developing countries. Journal of Engineering, Design and Technology, 15(4), pp. 552-570.

Babon-Ayeng, P; Kissi, E; Tannor, R A; Aigbavboa, C and Badu, E (2024) Critical success factors (CSFs) for the adoption of green construction concepts in road construction in Ghana. International Journal of Construction Management, 24(13), pp. 1465-1474. ISSN 1562-3599

Babrauskas, V; Lucas, D; Eisenberg, D; Singla, V; Dedeo, M and Blum, A (2012) Flame retardants in building insulation: A case for re-evaluating building codes. Building Research & Information, 40(6), pp. 738-755. ISSN 0961-3218

Baccarini, D (2004) Estimating project cost contingency: A model and exploration of research questions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Baccarini, D and Love, P E D (2014) Statistical characteristics of cost contingency in water infrastructure projects. Journal of Construction Engineering and Management, 140(3): 4013063, ISSN 0733-9364

Bacon, M (2014) Occupancy analytics: A new basis for low-energy-low-carbon hospital design and operation in the UK. Architectural Engineering and Design Management, 10(1-2), pp. 146-163. ISSN 1745-2007

Badathuruge, Chamari Pamoshika Jayarathna (2023) Transforming logistics systems towards sustainability and circular economy. PhD thesis, Queensland University of Technology, Australia.

Badi, S.; Suliman, A.; Torku, A. and Yasin, K. (2026) How does AI adoption in construction organisations influence employee well-being? The mediating role of job crafting. Construction Management and Economics, 44(8), pp. 613-638. ISSN 0144-6193

Badran, Y (2020) Analysis of construction and stakeholder risks for Public Private Partnership projects in developing countries: a comparative analysis using Artificial Neural Networks to determine the effect of poor stakeholder management and construction risks on the project's schedule (PPP vs. traditional projects). PhD thesis, University of Salford, UK.

Bae, S; Martin, C S and Asojo, A O (2021) Higher education students' indoor environmental quality satisfaction benchmark. Building Research & Information, 49(6), pp. 679-694. ISSN 0961-3218

Bagheri, M; Roth, L; Siebke, L; Rohde, C and Linke, H J (2024) Implementing housing policies for a sufficient lifestyle. Buildings & Cities, 5(1), pp. 300-315. ISSN 2632-6655

Bai, L (2013) RFID sensor-driven structural condition monitoring in integrated building information modeling environment. PhD thesis, University of Maryland, College Park, USA.

Bai, S; Li, M; Lu, Q; Tian, H and Qin, L (2022) Global time optimization method for dredging construction cycles of trailing suction hopper dredger based on grey system model. Journal of Construction Engineering and Management, 148(2): 04021198, ISSN 0733-9364

Bai, Y and Bernold, L E (2001) Quality control parameters for robotic bridge painting. Journal of Construction Engineering and Management, 127(2), pp. 142-148. ISSN 0733-9364

Bailey, O C (2008) Least-cost energy system design for commercial buildings: The relationship between end-use energy efficiency, distributed generation, and utility energy supply. PhD thesis, Cornell University, USA.

Bajere, P A (1996) Maintenance conditions and occupant behavior in government-provided housing in Lagos, Nigeria. DIT thesis, University of Northern Iowa, USA.

Baker, M; Ali, M and French, E (2023) Investigating how women leaders and managers support other women's entrance and advancement in construction and engineering. Journal of Construction Engineering and Management, 149(2): 4022166, ISSN 0733-9364

Baker, T O (2021) An investigation into pricing anomalies and the influence of information processing constraints on forecasts derived from sports betting markets. PhD thesis, University of Southampton, UK.

Ballesteros-Pérez, P; González-Cruz, M C; Fuentes-Bargues, J L and Skitmore, M (2015) Analysis of the distribution of the number of bidders in construction contract auctions. Construction Management and Economics, 33(9), pp. 752-770. ISSN 01446193

Ballesteros-Pérez, P; Sanz-Ablanedo, E; Soetanto, R; González-Cruz, M C; Larsen, G D and Cerezo-Narváez, A (2020) Duration and cost variability of construction activities: An empirical study. Journal of Construction Engineering and Management, 146(1): 04019093, ISSN 0733-9364

Ballesteros-Pérez, P and Skitmore, M (2016) Estimating the number of new and repeated bidders in construction auctions. Construction Management and Economics, 34(12), pp. 919-934. ISSN 01446193

Ballesteros-Pérez, P and Skitmore, M (2017) On the distribution of bids for construction contract auctions. Construction Management and Economics, 35(3), pp. 106-121. ISSN 01446193

Ballesteros-Pérez, P; Skitmore, M; Cerezo-Narváez, A; González-Cruz, M C; Pastor-Fernández, A and Otero-Mateo, M (2021) Standard deviation of bids for construction contract auctions. Journal of Construction Engineering and Management, 147(8): 04021096, ISSN 0733-9364

Ballesteros-Pérez, P; Skitmore, M; Pellicer, E and González-Cruz, M C (2015) Scoring rules and abnormally low bids criteria in construction tenders: A taxonomic review. Construction Management and Economics, 33(4), pp. 259-278. ISSN 01446193

Ballesteros-Pérez, P; Skitmore, M; Sanz-Ablanedo, E and Verhoeven, P (2019) Forecasting the number and distribution of new bidders for an upcoming construction auction. Journal of Construction Engineering and Management, 145(10): 040190561, ISSN 0733-9364

Baltazar dos Santos, A P (2009) Cyberarchitecture: the virtualisation of architecture beyond representation towards interactivity. PhD thesis, University College London, UK.

Banfill, P F G and Peacock, A D (2007) Energy-efficient new housing - The UK reaches for sustainability. Building Research & Information, 35(4), pp. 426-436. ISSN 1466-4321

Banfill, P F G and Peacock, A D (2007) Energy-efficient new housing: the UK reaches for sustainability. Building Research & Information, 35(4), pp. 426-436. ISSN 0961-3218

Barbachyn, S M; Devine, R D; Thrall, A P and Kurama, Y C (2017) Economic evaluation of high-strength materials in stocky reinforced concrete shear walls. Journal of Construction Engineering and Management, 143(10): 04017074, ISSN 0733-9364

Barkokebas, B; Al-Hussein, M and Hamzeh, F (2023) Assessment of digital twins to reassign multiskilled workers in offsite construction based on lean thinking. Journal of Construction Engineering and Management, 149(1): 04022143, ISSN 0733-9364

Barot, B (2002) Growth and business cycles for the Swedish economy. Journal of Construction Research, 3(2), pp. 217-253. ISSN 1609-9451

Barqawi, M; Chong, H Y and Lopez, R (2023) Effects of critical success factors, BIM implementation strategies, and barriers on employer-initiated delays. International Journal of Construction Management, 23(16), pp. 2788-2803. ISSN 1562-3599

Barr, B (2008) UK civil engineering education in the twenty-first century. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(1), pp. 17-23. ISSN 17514312

Barraza, G A and Bueno, R A (2007) Probabilistic control of project performance using control limit curves. Journal of Construction Engineering and Management, 133(12), pp. 957-965. ISSN 0733-9364

Barrett, P (1992) Measuring the ability gap for construction professionals. Construction Management and Economics, 10(4), pp. 321-342. ISSN 01446193

Barrett, P; Sharma, M and Zeisel, J (2019) Optimal spaces for those living with dementia: Principles and evidence. Building Research & Information, 47(6), pp. 734-746. ISSN 0961-3218

Basha, I M and Gab-Allah, A A (1991) Value engineering in Egyptian bridge construction. Journal of Construction Engineering and Management, 117(3), pp. 393-401. ISSN 0733-9364

Bashir, A M; Suresh, S; Proverbs, D and Gameson, R (2011) A critical, theoretical, review of the impacts of lean construction tools in reducing accidents on construction sites. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Bashirzadeh Tabrizi, Toktam (2019) Towards a simplified LCA tool: Minimising the life cycle environmental impact at the early stages of building design. PhD thesis, University of Sydney, Australia.

Basurto, C; Kämpf, J H and Scartezzini, J-L (2017) Multi-criteria analysis for the integrated performance assessment of complex fenestration systems. Building Research & Information, 45(8), pp. 926-942. ISSN 0961-3218

Batra, S. (2026) A model of cognitive vulnerability in construction education: Exploring the indirect effects of institutional support on brooding rumination. Journal of Construction Engineering and Management, 152(9): 04026135, ISSN 0733-9364

Batra, S (2020) Framework of socialisation, authentic leadership and affective commitment for construction professionals. Construction Economics and Building, 20(1), pp. 77-95. ISSN 2204-9029

Beardmore, D C and Molenaar, K R (2023) Roadway design and construction in infrastructure limited contexts: A risk breakdown structure. International Journal of Construction Management, 23(10), pp. 1675-1683. ISSN 1562-3599

Bee-Hua, G (1999) An evaluation of the accuracy of the multiple regression approach in forecasting sectoral construction demand in Singapore. Construction Management and Economics, 17(2), pp. 231-241. ISSN 01446193

Bee-Hua, G (2000) Evaluating the performance of combining neural networks and genetic algorithms to forecast construction demand: The case of the Singapore residential sector. Construction Management and Economics, 18(2), pp. 209-217. ISSN 01446193

Beeston, D (1986) Combining risks in estimating. Construction Management and Economics, 4(1), pp. 75-79. ISSN 01446193

Beg, Z A (2015) Complexity, contract design and incentive design in the construction management industry. DBA thesis, Harvard University, USA.

Behm, M (2012) Safe design suggestions for vegetated roofs. Journal of Construction Engineering and Management, 138(8), pp. 999-1003. ISSN 0733-9364

Behnia, B; Kheirollahi, M; Sahragard, M and Soltanifar, A (2022) A conceptual model for children's participation in the architectural design process: Exploring deep participation. Architectural Engineering and Design Management, 18(3), pp. 344-367. ISSN 1745-2007

Behzadi, N and Fadeyi, M O (2012) A preliminary study of indoor air quality conditions in Dubai public elementary schools. Architectural Engineering and Design Management, 8(3), pp. 192-213. ISSN 1745-2007

Belay, A M and Torp, O (2023) Construction cost performance under quality-gated framework: The cases of Norwegian road constructions. International Journal of Construction Management, 23(6), pp. 1030-1043. ISSN 1562-3599

Bell, L C and Stukhart, G (1987) Costs and benefits of materials management systems. Journal of Construction Engineering and Management, 113(2), pp. 222-234. ISSN 0733-9364

Bello, A O and Ayegba, C (2025) Adoption of building information modelling for post-construction in Nigeria: Examination of barriers and strategies development. International Journal of Building Pathology and Adaptation, 43(6), pp. 1501-1521. ISSN 2398-4708

Bello W A, O K T (2013) Weak management of the predictability of contingency allowance in construction projects in Nigeria. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Beltramin, Renata Maria Geraldini (2020) A graphical-systematic approach to architectural programming for office buildings and spaces. PhD thesis, Universidade Estadual de Campinas, Brazil.

Bengtsson, W J (2019) Unconscious bias in infrastructure project finance decisions. PhD thesis, Technische Universitaet Darmstadt, Germany.

Bennett, F L (1966) Some approaches to the critical path scheduling resource allocation problem. PhD thesis, Cornell University, USA.

Bennett, J (1983) Project management in construction. Construction Management and Economics, 1(3), pp. 183-197. ISSN 01446193

Berglund-Brown, J; Dobie, I; Hewitt, J; De Wolf, C and Ochsendorf, J (2025) Lifetimes of demolished buildings in US and European cities. Buildings & Cities, 6(1), pp. 1099-1116. ISSN 2632-6655

Bernal, D M; Laitinen, J; Shevchenko, H; Ivanova, O; Pelsmakers, S and Nisonen, E (2026) Spatial (in)justice shaping the home as a space of work. Buildings & Cities, 7(1), pp. 161-175. ISSN 2632-6655

Bernie, J and Howes, R (1983) Project management control using real-time budgeting and forecasting models. Construction Papers, 2(1), pp. 19-40. ISSN 0144-8587

Bernold, L E (2003) Economic model to optimize underground utility protection. Journal of Construction Engineering and Management, 129(6), pp. 645-652. ISSN 0733-9364

Berrill, P and Hertwich, E G (2021) Correction: Material flows and GHG emissions from housing stock evolution in US counties, 2020–60. Buildings & Cities, 2(1), pp. 797-799. ISSN 2632-6655

Berrill, P and Hertwich, E G (2021) Material flows and GHG emissions from housing stock evolution in US counties, 2020–60. Buildings & Cities, 2(1), pp. 599-617. ISSN 2632-6655

Best, R (2011) Developing a basket of resources as a tool for collecting construction cost data internationally. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Bhagat, G and Jha, K N (2023) Stage-wise evaluation of integrity risks in public works procurement in India. International Journal of Construction Management, 23(16), pp. 2818-2829. ISSN 1562-3599

Bhatia, A; Moselhi, O and Han, S (2025) Hybrid optimization approach for scheduling in panelized construction manufacturing. Journal of Construction Engineering and Management, 151(8): 04025107, ISSN 0733-9364

Bhatt, N and Sarkar, D (2020) Evaluation of success and risk factors for highway project performance through integrated analytical hierarchy process and fuzzy interpretive structural modelling. International Journal of Construction Management, 20(6), pp. 653-665. ISSN 1562-3599

Bhaumik, P K (2016) Developing and using a new family of project S-curves using early and late shape parameters. Journal of Construction Engineering and Management, 142(12): 04016076, ISSN 0733-9364

Biagi, Silvia (2025) BIM for public administration: Critical investigation of the European situation and implementation perspectives for the Italian case. PhD thesis, Università degli Studi di Pisa, Italy.

Bigelow, B F; Saseendran, A and Elliott, J W (2018) Attracting students to construction education programs: An exploration of perceptions by gender. International Journal of Construction Education and Research, 14(3), pp. 179-197. ISSN 1557-8771

Biltoria, A K and Roy, U K (2024) Affordable housing using industrialized construction: a market-based standardization of housing units in India. Architectural Engineering and Design Management, 20(5), pp. 1203-1221. ISSN 1745-2007

Bingley, B; Knight, A and Xing, Y (2025) Church pipe organs: Historical tuning records as indoor environmental evidence. Buildings & Cities, 6(1), pp. 1010-1026. ISSN 2632-6655

Birchmore, R; Davies, K; Etherington, P; Tait, R and Pivac, A (2017) Overheating in Auckland homes: Testing and interventions in full-scale and simulated houses. Building Research & Information, 45(1-2), pp. 157-175. ISSN 0961-3218

Bird, B (1987) Costs-in-use: Principles in the context of building procurement. Construction Management and Economics, 5(4), ISSN 01446193

Birgonul, M T; Dikmen, I and Demirel, T (2005) Decision support tool for the quantification of fault rates in construction fall accidents. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Birkes, A Y (1999) Multimedia data definition and requirements for construction applications. PhD thesis, Georgia Institute of Technology, USA.

Birnie, J (2000) Assessing the extent of construction management research in the UK by means of the RAE, and the ARCOM and COBRA conferences. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Birnie, J W (1993) A behavioural study using decision analysis of building cost prediction by chartered quantity surveyors. PhD thesis, Ulster University, UK.

Bishop, E A (1997) Talking shop: Egyptian engineers and Soviet specialists at the Aswan High Dam. PhD thesis, University of Chicago, USA.

Bitarafan, M; Hosseini, S B; Abazarlou, S and Mahmoudzadeh, A (2015) Selecting the optimal composition of architectural forms from the perspective of civil defense using AHP and IHWP methods. Architectural Engineering and Design Management, 11(2), pp. 137-148. ISSN 1745-2007

Bofang, Z and Jianbo, C (1989) Finite element analysis of effect of pipe cooling in concrete dams. Journal of Construction Engineering and Management, 115(4), pp. 487-498. ISSN 0733-9364

Bogie, J R (1986) Funding approaches to capital outlay building projects in California public school districts: Post-proposition 13. EdD thesis, University of Southern California, USA.

Bogus, S M; Diekmann, J E; Molenaar, K R; Harper, C; Patil, S and Lee, J S (2011) Simulation of overlapping design activities in concurrent engineering. Journal of Construction Engineering and Management, 137(11), pp. 950-957. ISSN 0733-9364

Bojic, M; Yik, F and Lee, M (2003) Influence of air-conditioning exhaust on exterior recessed space. Building Research & Information, 31(1), pp. 24-33. ISSN 0961-3218

Bokor, O; Szenik, G and Kocsis, T (2011) Application of evaluation lines in the analysis of time-type data of project plans. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Bollen, R (2000) Applying quantitative techniques to evaluate residential development profitability. Journal of Financial Management of Property and Construction, 5(1-2), pp. 51-64. ISSN 1366-4387

Bollo, C S and Cole, R J (2019) Decoupling climate-policy objectives and mechanisms to reduce fragmentation. Building Research & Information, 47(2), pp. 219-233. ISSN 0961-3218

Bon, R (1988) Replacement simulation model: A framework for building portfolio decisions. Construction Management and Economics, 6(2), pp. 149-159. ISSN 01446193

Bon, R and Pietroforte, R (1993) New construction versus maintenance and repair construction technology in the US since World War II. Construction Management and Economics, 11(2), pp. 151-162. ISSN 01446193

Bonham, D R; Goodrum, P M; Littlejohn, R and Albattah, M A (2017) Application of data mining techniques to quantify the relative influence of design and installation characteristics on labor productivity. Journal of Construction Engineering and Management, 143(8): 04017052, ISSN 0733-9364

Bonyani, A and Alimohammadlou, M (2020) A new approach for evaluating international EPC contractors in Iran's energy sector. International Journal of Construction Management, 20(7), pp. 775-782. ISSN 1562-3599

Boodai, F J (2014) Achieving construction project success through integration in the project delivery system from an owner's perspective. PhD thesis, University of Wisconsin - Madison, USA.

Booth, C A; Horry, R; Isaac, C; Mahamadu, A M; Manu, P; Awuah, K G B; Aboagye-Nimo, E; Georgakis, P and Prabhakaran, A (2022) Earthship buildings: opinions on their contribution towards sustainable alternative housing in the UK. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(4), pp. 192-198. ISSN 17514304

Bordalo Faustino, P (2017) Public procurement award criteria in the EU member states: a comparative study of the discretionary powers of contracting authorities. PhD thesis, University of Nottingham, UK.

Bordass, W and Leaman, A (1997) Design for manageability. Building Research & Information, 25(3), pp. 148-157. ISSN 0961-3218

Borg, L and Song, H S (2015) Quality change and implications for productivity development: Housing construction in Sweden 1990-2010. Journal of Construction Engineering and Management, 141(1): 05014014, ISSN 0733-9364

Borgeson, S and Brager, G (2011) Comfort standards and variations in exceedance for mixed-mode buildings. Building Research & Information, 39(2), pp. 118-133. ISSN 0961-3218

Bortolini, R and Forcada, N (2020) A probabilistic performance evaluation for buildings and constructed assets. Building Research & Information, 48(8), pp. 838-855. ISSN 0961-3218

Bostancioglu, E and Onder, N P (2019) Applying analytic hierarchy process to the evaluation of double skin façades. Architectural Engineering and Design Management, 15(1), pp. 66-82. ISSN 1745-2007

Botejara-Antúnez, M; González-Domínguez, J; Sánchez-Barroso, G and García-Sanz-Calcedo, J (2024) Optimal selection of false ceiling systems in healthcare buildings: A multidimensional hierarchical analysis for sustainability. Architectural Engineering and Design Management, 20(6), pp. 1815-1831. ISSN 1745-2007

Bouachera, T; Kishk, M and Power, L (2007) Towards a generic framework for whole life costing in the oil industry. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Bouchlaghem, D; Shang, H; Anumba, C J; Cen, M; Miles, J and Taylor, M (2005) ICT-enabled collaborative working environment for concurrent conceptual design. Architectural Engineering and Design Management, 1(4), pp. 261-280. ISSN 1745-2007

Bouchlaghem, K A D and Pasquire, C (2009) An information-led process framework for hybrid projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Bouhamou, N E; Belas, N; Attar, A; Achour, B and Mebrouki, A (2011) Properties of self-consolidating concrete produced using local algerian materials. Journal of Construction in Developing Countries, 16(2), pp. 1-25. ISSN 1823-6499

Boukendour, S and Bah, R (2001) The guaranteed maximum price contract as call option. Construction Management and Economics, 19(6), pp. 563-567. ISSN 01446193

Boussaa, Y; Dodoo, A; Nguyen, T and Rupar-Gadd, K (2024) Comprehensive renovation of a multi-apartment building in Sweden: Techno-economic analysis with respect to different economic scenarios. Building Research & Information, 52(4), pp. 463-478. ISSN 0961-3218

Boussabaine, A H (2001) Neurofuzzy modelling of construction projects' duration I: Principles. Engineering, Construction and Architectural Management, 8(2), pp. 104-113. ISSN 0969-9988

Boussabaine, A H and Duff, A R (1996) An expert-simulation system for construction productivity forecasting. Building Research & Information, 24(5), pp. 279-286. ISSN 0961-3218

Boussabaine, A H and Kaka, A P (1998) A neural networks approach for cost flow forecasting. Construction Management and Economics, 16(4), pp. 471-479. ISSN 01446193

Boussabaine, A H and Kirkham, R J (2004) Simulation of maintenance costs in UK local authority sport centres. Construction Management and Economics, 22(10), pp. 1011-1020. ISSN 01446193

Boussabaine, A H; Kirkham, R J and Grew, R G (1999) Estimating the cost of energy usage in sport centres: A comparative modelling approach. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Boussabaine, A H; Thomas, R and Elhag, T M S (1999) Modelling cost-flow forecasting for water pipeline projects using neural networks. Engineering, Construction and Architectural Management, 6(3), pp. 213-224. ISSN 0969-9988

Bowen, P; Peihua Zhang, R and Edwards, P (2021) An investigation of work-related strain effects and coping mechanisms among South African construction professionals. Construction Management and Economics, 39(4), pp. 298-322. ISSN 01446193

Bowen, P; Yakubu, K and Govender, R (2022) Predictors of moderate to high risk of alcohol harm among site-based South African construction workers. Construction Management and Economics, 40(6), pp. 442-458. ISSN 01446193

Bowlby, R L and Schriver, W R (1986) Observations on productivity and composition of building construction output in the United States, 1972-82. Construction Management and Economics, 4(1), pp. 1-18. ISSN 01446193

Boyacioglu, S E; Greenwood, D; Rogage, K; Gledson, B; Parry, A and Hinds, M (2022) Developing an improved process model for forensic analysis of construction project delays. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Boyd, D (2021) A critical inquiry into the hyperreality of digitalization in construction. Construction Management and Economics, 39(7), pp. 549-564. ISSN 01446193

Boyd, D and Taft, A (2016) Identifying the complex information requirements of sustainable drainage systems. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Br chner, J (1994) Precontractual investigation and risk aversion. Engineering, Construction and Architectural Management, 1(2), pp. 91-101. ISSN 0969-9988

Bracke, W; Delghust, M; Laverge, J and Janssens, A (2019) Building energy performance: Sphere area as a fair normalization concept. Building Research & Information, 47(5), pp. 549-566. ISSN 0961-3218

Bradley, P (2019) The development of a conceptual framework to help achieve low carbon commercial office buildings in London by 2050. PhD thesis, Ulster University, UK.

Bradley, P E (2010) An ultrametric interpretation of building related event data. Construction Management and Economics, 28(3), pp. 311-326. ISSN 1466433X

Brady, M (1991) Growing a housebuilder: Investigating a context for learning and modeling principles of transpersonal psychology. PhD thesis, Institute of Transpersonal Psychology, USA.

Brahme, R and Mahdavi, A (2003) Complex early design inquiries via generative design agents. Construction Innovation, 3(2), pp. 81-95. ISSN 1471-4175

Braimah, N; Ndekugri, I and Gameson, R (2006) A review of industry standards and publications/charts for adjusting productivity losses in construction contracts. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Brandli, L L; Jüngles, A E and Heineck, L F (1999) Sub-contracting policies: The case of the construction firms in brazil. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Branki, C N E (1995) Agents, applications, and interactions in collaborative building design. PhD thesis, University of Strathclyde, UK.

Brattebø, H; Bergsdal, H; Sandberg, N H; Hammervold, J and Müller, D B (2009) Exploring built environment stock metabolism and sustainability by systems analysis approaches. Building Research & Information, 37(5-6), pp. 569-582. ISSN 0961-3218

Bray Jr., H G (1994) Domestic construction contractors and ISO 9000 registration. DE thesis, Louisiana Tech University, USA.

Bresnen, M; Lennie, S J and Marshall, N (2025) Partnering in construction re-visited: Gauging progress in industry practice and prospects for advances in academic research. Construction Management and Economics, 43(1), pp. 59-77. ISSN 0144-6193

Briant, Sarah (2024) Bridging theory and practice: Exploring work-integrated learning in architecture from the profession's perspective. PhD thesis, Queensland University of Technology, Australia.

Brilakis, I and Soibelman, L (2006) Multimodal image retrieval from construction databases and model-based systems. Journal of Construction Engineering and Management, 132(7), pp. 777-785. ISSN 0733-9364

Briscoe, G (2005) Women and minority groups in UK construction: Recent trends. Construction Management and Economics, 23(10), pp. 1001-1005. ISSN 01446193

Brizendine, A L (1997) Risk based analysis of levees. PhD thesis, West Virginia University, USA.

Brodetskaia, I; Sacks, R and Shapira, A (2013) Stabilizing production flow of interior and finishing works with reentrant flow in building construction. Journal of Construction Engineering and Management, 139(6), pp. 665-674. ISSN 0733-9364

Brosque, C; Skeie, G and Fischer, M (2021) Comparative analysis of manual and robotic concrete drilling for installation hangers. Journal of Construction Engineering and Management, 147(3): 05021001, ISSN 0733-9364

Brown, B H J (1974) An econometric forecasting model for a segment of the construction market. PhD thesis, Oklahoma State University, USA.

Bruhns, H and Wyatt, P (2011) A data framework for measuring the energy consumption of the non-domestic building stock. Building Research & Information, 39(3), pp. 211-226. ISSN 0961-3218

Bröchner, J and Björk, B C (2008) Where to submit? Journal choice by construction management authors. Construction Management and Economics, 26(7), pp. 739-749. ISSN 1466433X

Bubbers, G and Christian, J (1992) Hypertext and claim analysis. Journal of Construction Engineering and Management, 118(4), pp. 716-730. ISSN 0733-9364

Bugg, R A and Redden, L W (2020) Assessment and improvement of a required construction management service-learning course. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Bui, T T P; Wilkinson, S; Domingo, N and MacGregor, C (2021) Towards zero carbon building refurbishment: A new conceptual framework for decision support tools. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Bukhari, Fakhri A (2011) A hierarchical evolutionary algorithmic design (head) system for generating and evolving building design models. PhD thesis, Queensland University of Technology, Australia.

Burns, T M (2007) The effect of selected request for information variables on steel fabrication outcomes. PhD thesis, Indiana State University, USA.

Burt, R; Redden, L and Yantis, A (2022) Identifying communication knowledge and skills for construction management graduates using content analysis of entry level job descriptions from the southeast United States. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Byrd, R H (1981) The mathematical modelling of the environmental performance of buildings as an aid in the design process. PhD thesis, Aston University, UK.

Cabahug, R R; Edwards, D J and Nicholas, J (2004) Classifying plant operator maintenance proficiency: Examining personal variables. Building Research & Information, 32(2), pp. 119-127. ISSN 0961-3218

Caetano, L F; de Souza, H A and Gomes, A P (2022) Effect of the exposed steel structure on the thermal performance of buildings. Architectural Engineering and Design Management, 18(1), pp. 38-55. ISSN 1745-2007

Cai, J; Li, S and Cai, H (2019) Empirical analysis of capital structure determinants in infrastructure projects under public-private partnerships. Journal of Construction Engineering and Management, 145(5): 04019032, ISSN 0733-9364

Caiden, D (2017) Engineering expert witness work: What the lawyers require. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(4), pp. 181-185. ISSN 17514304

Cakan, H (2012) Analysis and modeling of roofer and steel worker fall accidents. PhD thesis, Wayne State University, USA.

Caldas, C H; Kim, J Y; Haas, C T; Goodrum, P M and Zhang, D (2015) Method to assess the level of implementation of productivity practices on industrial projects. Journal of Construction Engineering and Management, 141(1): 04014061, ISSN 0733-9364

Callaghan, N and Marcano-Salcedo, M (2020) A study of the housing needs of residents in informal settlements in the Dominican Republic. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Calvert, G S (2021) A multiple defect approach to bridge life cycle modelling. PhD thesis, University of Nottingham, UK.

Camargo Júnior, Alceu Salles (2003) Simultaneous engineering: A comparison between "point-based" and "set-based" approaches. PhD thesis, Universidade de São Paulo, Brazil.

Cao, D (2025) Coupling risk assessment method of accident causative factors in building construction. Journal of Construction Engineering and Management, 151(11): 04025184, ISSN 0733-9364

Cao, M T; Cheng, M Y and Wu, Y W (2015) Hybrid computational model for forecasting Taiwan construction cost index. Journal of Construction Engineering and Management, 141(4): 04014089, ISSN 0733-9364

Cao, N and Cheung, S O (2024) Voluntary mediation as a tenable resolution mechanism for construction disputes. Journal of Construction Engineering and Management, 150(6): 04024046, ISSN 0733-9364

Capace, Brunella (2019) NDT application in transport asset management: Qa/qc performance specifications in pavement construction and maintenance. PhD thesis, Università degli Studi di Catania, Italy.

Capano, C D (2007) Construction operations analysis for development of historical cost databases. PhD thesis, Marquette University, USA.

Carbonara, N; Costantino, N and Pellegrino, R (2014) Revenue guarantee in public-private partnerships: A fair risk allocation model. Construction Management and Economics, 32(4), pp. 403-415. ISSN 01446193

Carbonara, N and Pellegrino, R (2020) The role of public private partnerships in fostering innovation. Construction Management and Economics, 38(2), pp. 140-156. ISSN 01446193

Carlin, M C (2014) A comparative analysis of horizontal directional drilling construction methods in mainland China. PhD thesis, Arizona State University, USA.

Carmichael, S and Murray, M (2006) Record keeping for contemporaneous delay analysis: A model for effective event management. Construction Management and Economics, 24(10), pp. 1007-1018. ISSN 1466433X

Carr, R I (1983) Impact of number of bidders on competition. Journal of Construction Engineering and Management, 109(1), pp. 61-73. ISSN 0733-9364

Carr, R I (1987) Competitive bidding and opportunity costs. Journal of Construction Engineering and Management, 113(1), pp. 151-165. ISSN 0733-9364

Carr, R I (1989) Cost-estimating principles. Journal of Construction Engineering and Management, 115(4), pp. 545-551. ISSN 0733-9364

Carr, R I (1993) Cost, schedule, and time variances and integration. Journal of Construction Engineering and Management, 119(2), pp. 245-265. ISSN 0733-9364

Carroll, B W (1985) Bias and organizational outcomes. PhD thesis, American University, USA.

Carter, K and Fortune, C (2003) Procuring sustainable projects: A grounded approach. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Carthey, J; Chandra, V and Loosemore, M (2008) Assessing the adaptive capacity of hospital facilities to cope with climate-related extreme weather events: A risk management approach. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Carvajal-Figueroa, A (2006) The identification and measurement of the benefits of visualization technologies during the briefing process. PhD thesis, University of Reading, UK.

Cattell, D W; Bowen, P A and Kaka, A P (2007) Review of unbalanced bidding models in construction. Journal of Construction Engineering and Management, 133(8), pp. 562-573. ISSN 0733-9364

Cavalcante, Gustavo Henrique Ferreira (2022) Seismic risk analysis of typical bridges located in the northeastern Brazil. PhD thesis, Universidade Estadual de Campinas, Brazil.

Ceric, A (2013) Application of the principal-agent theory to construction management: Literature review. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Cerrada Morato, L (2024) Suburban climate adaptation governance: Assumptions and imaginaries affecting peripheral municipalities. Buildings & Cities, 5(1), pp. 64-82. ISSN 2632-6655

Chakraborty, B and Das, S (2014) MGNEGRA and water management: Sustainability issues of built forms in rural India. Journal of Construction in Developing Countries, 19(2), pp. 33-50. ISSN 1823-6499

Chan, A P C (1999) Modelling building durations in Hong Kong. Construction Management and Economics, 17(2), pp. 189-196. ISSN 01446193

Chan, A P C; Scott, D and Chan, A P L (2004) Factors affecting the success of a construction project. Journal of Construction Engineering and Management, 130(1), pp. 153-155. ISSN 0733-9364

Chan, E H W; Suen, H C H and Chan, C K L (2006) Maut-based dispute resolution selection model prototype for international construction projects. Journal of Construction Engineering and Management, 132(5), pp. 444-451. ISSN 0733-9364

Chan, P; Cooper, R and Tzortzopoulos, P (2005) Organizational learning: Conceptual challenges from a project perspective. Construction Management and Economics, 23(7), pp. 747-756. ISSN 01446193

Chan, P W (2013) A 'zombie' existence: Exploring Ulrich Beck's zombie categories and construction management research. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Chan, W T; Chen, C; Messner, J I and Chua, D K H (2005) Interface management for China's build-operate-transfer projects. Journal of Construction Engineering and Management, 131(6), pp. 645-655. ISSN 0733-9364

Chan I Y S, L A M M and Cao S, F R (2013) Competency and empowerment of project managers in China. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Chand, A M and Loosemore, M (2012) Hospital facility resilience: An adaptation framework for extreme weather events. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Chand A M, L M (2013) Reconceptualising hospital facility resilience to extreme weather events using a panarchy model. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Chang, C J and Yu, S W (2018) Three-variance approach for updating earned value management. Journal of Construction Engineering and Management, 144(6): 04018045, ISSN 0733-9364

Chang, C Y (2005) Recent development of uk construction products sector: Evidence from microdata. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Chang, C Y (2014) Principal-agent model of risk allocation in construction contracts and its critique. Journal of Construction Engineering and Management, 140(1): 04013032, ISSN 0733-9364

Chang, C Y and Ko, J W (2017) New approach to estimating the standard deviations of lognormal cost variables in the Monte Carlo analysis of construction risks. Journal of Construction Engineering and Management, 143(1): 06016006, ISSN 0733-9364

Chang, L M and Chen, P H (2001) BOT financial model: Taiwan high speed rail case. Journal of Construction Engineering and Management, 127(3), pp. 214-222. ISSN 0733-9364

Chang, R; He, T; Han, Y; Xue, R and Zhang, W E (2023) Geographical imbalance and influential characteristics of the green building market. Journal of Construction Engineering and Management, 149(10): 04023093, ISSN 0733-9364

Chang, R D; Zuo, J; Soebarto, V; Zhao, Z Y; Zillante, G and Gan, X L (2017) Discovering the transition pathways toward sustainability for construction enterprises: Importance-performance analysis. Journal of Construction Engineering and Management, 143(6): 04017013, ISSN 0733-9364

Chang, S; Castro-Lacouture, D and Yamagata, Y (2020) Estimating building electricity performance gaps with internet of things data using Bayesian multilevel additive modeling. Journal of Construction Engineering and Management, 146(12): 05020017, ISSN 0733-9364

Chang, Y; Wilkinson, S; Potangaroa, R and Seville, E (2010) Resourcing challenges for post-disaster housing reconstruction: A comparative analysis. Building Research & Information, 38(3), pp. 247-264. ISSN 0961-3218

Chantawit, D; Hadikusumo, B H W; Charoenngam, C and Rowlinson, S (2005) 4DCAD-Safety: Visualizing project scheduling and safety planning. Construction Innovation, 5(2), pp. 99-114. ISSN 1471-4175

Chao, L C (2010) Estimating project overheads rate in bidding: DSS approach using neural networks. Construction Management and Economics, 28(3), pp. 287-299. ISSN 1466433X

Chao, L C and Liaw, S J (2019) Fuzzy logic model for determining minimum overheads-cum-markup rate. Journal of Construction Engineering and Management, 145(4): 04019008, ISSN 0733-9364

Chao, L C and Skibniewski, M J (1995) Neural network method of estimating construction technology acceptability. Journal of Construction Engineering and Management, 121(1), pp. 130-142. ISSN 0733-9364

Chapman, R and Howden-Chapman, P (2021) Does reframing urban policy around wellbeing support carbon mitigation? Buildings & Cities, 2(1), pp. 688-699. ISSN 2632-6655

Chapman, R J (1999) The likelihood and impact of changes of key project personnel on the design process. Construction Management and Economics, 17(1), pp. 99-106. ISSN 01446193

Charlson, J (2014) Law for engineering undergraduates on accredited courses 1. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(4), pp. 201-206. ISSN 17514304

Charuvil Elizabeth, R M; Sattari, F; Lefsrud, L and Gue, B (2025) Reducing serious injuries and fatalities in industrial construction-application of machine learning to analyze emotional intelligence and psychosocial factors. International Journal of Construction Management, 25(12), pp. 1404-1414. ISSN 1562-3599

Chasey, A D and Merchant, S (2000) Issues for construction of 300-mm fab. Journal of Construction Engineering and Management, 126(6), pp. 451-457. ISSN 0733-9364

Chatzipoulka, C and Nikolopoulou, M (2018) Urban geometry, SVF and insolation of open spaces: London and Paris. Building Research & Information, 46(8), pp. 881-898. ISSN 0961-3218

Chau, A D (2018) Conceptual cost estimation decision support system in university construction projects. PhD thesis, University of Alabama, USA.

Chau, K W (1995) Monte Carlo simulation of construction costs using subjective data. Construction Management and Economics, 13(5), pp. 369-383. ISSN 01446193

Chau, K W; Poon, S W; Wang, Y S and Lu, L L (2005) Technological progress and the productive efficiency of construction firms in Hong Kong, 1981-2001. Journal of Construction Research, 6(2), pp. 195-207. ISSN 1609-9451

Cheetham, D W; Kaka, A P and Humphreys, G (1997) Development and implementation of a system of financial planning and control for a medium sized building contractor. Journal of Financial Management of Property and Construction, 2(1), pp. 5-34. ISSN 1366-4387

Chehayeb, N N (1996) Simulation-based project control. PhD thesis, University of Alberta, Canada.

Chen, Y.; Liu, Q.; Nie, B. and Luo, X. (2026) Construction safety knowledge reasoning-capable large language model for hydropower and water conservancy engineering. Journal of Construction Engineering and Management, 152(9): 04026132, ISSN 0733-9364

Chen, B and Jia, Z (2025) Stress and deformation characteristics of 'dual-purpose diaphragm wall' in metro stations. Architectural Engineering and Design Management, 21(3), pp. 571-587. ISSN 1745-2007

Chen, C (2007) Institutional barriers to private participation in infrastructure: The case of electronic toll collection in Taiwan. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Chen, C; Wang, Q; Martek, I and Li, H (2016) International market selection model for large Chinese contractors. Journal of Construction Engineering and Management, 142(10): 04016044, ISSN 0733-9364

Chen, H; Feng, Z; Liu, Y; Chen, B; Deng, T; Qin, Y and Xu, W (2023) Multiobjective optimization of a 3D laser scanning scheme for engineering structures based on rf-NSGA-II. Journal of Construction Engineering and Management, 149(2): 4022169, ISSN 0733-9364

Chen, H L; O'Brien, W J and Herbsman, Z J (2005) Assessing the accuracy of cash flow models: The significance of payment conditions. Journal of Construction Engineering and Management, 131(6), pp. 669-676. ISSN 0733-9364

Chen, H-L (2002) Development of a systematic integration approach for multi-level cost flow prediction and management. PhD thesis, University of Florida, USA.

Chen, J H; Hayati, D W; Su, Y M; Wijatmiko, I and Purnamasari, R (2019) Improving preliminary cost estimation in Indonesia using support vector regression. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(1), pp. 25-33. ISSN 17514304

Chen, J J and Wills, D (1996) Urban housing reform in China: policies and performance. Building Research & Information, 24(5), pp. 311-317. ISSN 0961-3218

Chen, J-H (2003) Litigation prediction model for construction disputes caused by change orders. PhD thesis, University of Wisconsin - Madison, USA.

Chen, Q; Jin, Z; Xia, B; Wu, P and Skitmore, M (2016) Time and cost performance of design-build projects. Journal of Construction Engineering and Management, 142(2): 04015074, ISSN 0733-9364

Chen, R (2025) Investigation of mechanical and thermal performances and masonry quality for new raw soil-based insulating hollow bricks. Architectural Engineering and Design Management, 21(3), pp. 533-552. ISSN 1745-2007

Chen, T; Hu, H and Zhu, F (2020) Developing a hierarchical road layout method for large-scale construction site. Journal of Construction Engineering and Management, 146(9): 04020115, ISSN 0733-9364

Chen, W T and Huang, Y H (2006) Approximately predicting the cost and duration of school reconstruction projects in Taiwan. Construction Management and Economics, 24(12), pp. 1231-1239. ISSN 1466433X

Chen, X; Zhang, Y; Zhao, B and Yang, S (2021) Investment probabilistic interval estimation for construction project using the hybrid model of SVR and GWO. Journal of Construction Engineering and Management, 147(5): 04021031, ISSN 0733-9364

Chen, Y (2008) A highway work zone design and traffic management decision system. PhD thesis, University of Wisconsin - Madison, USA.

Chen, Y; Dib, H; Cox, R F; Shaurette, M and Vorvoreanu, M (2016) Structural equation model of building information modeling maturity. Journal of Construction Engineering and Management, 142(9): 04016032, ISSN 0733-9364

Chen, Y; Wang, W; Zhang, S and You, J (2018) Understanding the multiple functions of construction contracts: The anatomy of FIDIC model contracts. Construction Management and Economics, 36(8), pp. 472-485. ISSN 01446193

Chen, Y-K (1991) An analysis of decision strategy as applied to construction portfolios. PhD thesis, Stevens Institute of Technology, USA.

Chen, Yuxuan (2024) Investigation of faults in air-conditioning systems in commercial buildings: Occurrence, diagnostic validation, and energy impacts. PhD thesis, University of Nebraska - Lincoln, USA.

Chen, Z; Li, H and Wong, C T C (2000) Environmental management of urban construction projects in China. Journal of Construction Engineering and Management, 126(4), pp. 320-324. ISSN 0733-9364

Chen, Z; Li, H and Wong, C T C (2005) Environalplanning: Analytic network process model for environmentally conscious construction planning. Journal of Construction Engineering and Management, 131(1), pp. 92-101. ISSN 0733-9364

Cheng, E W L and Li, H (2005) Analytic network process applied to project selection. Journal of Construction Engineering and Management, 131(4), pp. 459-466. ISSN 0733-9364

Cheng, E W L; Li, H and Fox, P (2007) Job performance dimensions for improving final project outcomes. Journal of Construction Engineering and Management, 133(8), pp. 592-599. ISSN 0733-9364

Cheng, E W L and li, H (2003) Utility of consistency measure in the analytic hierarchy process. Construction Innovation, 3(4), pp. 231-247. ISSN 1471-4175

Cheng, J; Proverbs, D; Oduoza, C and Potts, K (2008) Investigating the interrelationship of strategic decisions and client satisfaction: A conceptual framework. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Cheng, J; Proverbs, D G; Oduoza, C and Fleming, C (2005) A conceptual model towards the measurement of construction client satisfaction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Cheng, L and Tiong, R L K (2005) Minimum feasible tariff model for BOT water supply projects in Malaysia. Construction Management and Economics, 23(3), pp. 255-263. ISSN 01446193

Cheng, M Y and Ko, C H (2003) Object-oriented evolutionary fuzzy neural inference system for construction management. Journal of Construction Engineering and Management, 129(4), pp. 461-469. ISSN 0733-9364

Cheng, M Y; Su, C W and You, H Y (2003) Optimal project organizational structure for construction management. Journal of Construction Engineering and Management, 129(1), pp. 70-79. ISSN 0733-9364

Cheng, Y M; Yu, C H and Wang, H T (2011) Short-interval dynamic forecasting for actual S-curve in the construction phase. Journal of Construction Engineering and Management, 137(11), pp. 933-941. ISSN 0733-9364

Cheung, S O and Ma, Q (2026) Economic incentives and psychological empowerment in construction contracting: Complementing or undermining. Journal of Construction Engineering and Management, 152(4): 04026022, ISSN 0733-9364

Cheung, F K T (2005) Development and testing of a method for forecasting prices of multi-storey buildings during the early design stage: The storey enclosure method revisited. PhD thesis, Queensland University of Technology, Australia.

Cheung, F K T and Skitmore, M (2006) A modified storey enclosure model. Construction Management and Economics, 24(4), pp. 391-405. ISSN 01446193

Cheung, S O; Chow, P T and Yiu, T W (2009) Contingent use of negotiators' tactics in construction dispute negotiation. Journal of Construction Engineering and Management, 135(6), pp. 466-476. ISSN 0733-9364

Cheung, S O; Zhu, L and Yu, K I (2022) The value of apology in construction dispute negotiation. International Journal of Construction Management, 22(10), pp. 1910-1923. ISSN 1562-3599

Chi, S and Caldas, C H (2012) Image-based safety assessment: Automated spatial safety risk identification of earthmoving and surface mining activities. Journal of Construction Engineering and Management, 138(3), pp. 341-351. ISSN 0733-9364

Chiang, Y H and Cheng, E W L (2009) Perception of financial institutions toward financing PFI projects in Hong Kong. Journal of Construction Engineering and Management, 135(9), pp. 833-840. ISSN 0733-9364

Chileshe, N and Haupt, T C (2005) Modelling critical success factors of construction project management (CPM). Journal of Engineering, Design and Technology, 3(2), pp. 140-154. ISSN 1726-0531

Chileshe, N and Haupt, T C (2007) Age influences on the job satisfaction of construction workers: Evidence from South Africa. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Chileshe, N and Kavishe, N (2020) Capacity building for Tanzanian public-private partnerships (PPPs) projects: Challenges and advocated solutions. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Chileshe, N; Kavishe, N and Edwards, D J (2023) Identification of critical capacity building challenges in public-private partnerships (PPPs) projects: The case of Tanzania. International Journal of Construction Management, 23(3), pp. 495-504. ISSN 1562-3599

Chin, C S (2009) Process capability and performance improvement. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Chin, C S and Russell, J S (2008) Predicting the expected service level and the realistic lead time of rfi process using binary logistic regression. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Chiponde, D B; Gledson, B and Greenwood, D (2024) Challenges and opportunities of learning from failure: Looking backwards to move forward using vignettes. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Cho, C-S (2000) Development of the project definition rating index (PDRI) for building projects. PhD thesis, University of Texas at Austin, USA.

Cho, S (2000) Sequential estimation and decision-making in project management: A Bayesian way and heuristic approaches. PhD thesis, George Washington University, USA.

Cho, Y; Wang, C and Zhuang, Z (2013) Framework for empirical process to improve nonnuclear gauge performance in hot-mix asphalt pavement construction. Journal of Construction Engineering and Management, 139(6), pp. 601-610. ISSN 0733-9364

Choi, B (2003) Topics in risk-based design and performance evaluation of structures. PhD thesis, North Carolina State University, USA.

Choi, B; Lee, H S; Park, M; Cho, Y K and Kim, H (2014) Framework for work-space planning using four-dimensional BIM in construction projects. Journal of Construction Engineering and Management, 140(9): 04014041, ISSN 0733-9364

Choi, J and Song, H (2014) Evaluation of the modular method for industrial plant construction projects. International Journal of Construction Management, 14(3), pp. 171-180. ISSN 1562-3599

Chokwitthaya, C (2020) A framework for augmenting building performance models using machine learning and immersive virtual environment. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Choudhary, R and Tian, W (2014) Influence of district features on energy consumption in non-domestic buildings. Building Research & Information, 42(1), pp. 32-46. ISSN 0961-3218

Choudhury, I (2009) The effect of political unrest on construction time for food grain warehouses in Bangladesh. Construction Management and Economics, 27(7), pp. 619-624. ISSN 1466433X

Choudhury, N-U-S (1989) An evaluation of factors to improve performance of American engineering and construction managers overseas. PhD thesis, Texas A&M University, USA.

Chow, D H C (2005) Effects of future climate change and near-extreme weather on office building in the UK. PhD thesis, University of Manchester, UK.

Chow, L K and Ng, S T (2003) Performance-based evaluation for engineering consultants: A study of assessment criteria. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Chow, L K and Ng, S T (2005) Establishing a quantitaive performance evaluation framework through fuzzy membership functions. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Chow, P T; Kong, F and Cheung, S O (2012) Mediating and moderating effect of tension on withdrawal-commitment relationship in construction dispute negotiation. Journal of Construction Engineering and Management, 138(10), pp. 1230-1238. ISSN 0733-9364

Chowdhury, A A (1994) An object-oriented finite element formulation for construction simulation. PhD thesis, Lehigh University, USA.

Choy, L H T; Ho, W K O and Mak, S W K (2012) Housing attributes and Hong Kong real estate prices: A quantile regression analysis. Construction Management and Economics, 30(5), pp. 359-366. ISSN 01446193

Christie, L; Donn, M and Walton, D (2011) The'apparent disconnect' towards the adoption of energy-e/cient technologies. Building Research & Information, 39(5), pp. 450-458. ISSN 0961-3218

Christina, D; Loosemore, M and Newton, S (2016) The dimensionality of public trust in public private partnership projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Chu, L (2017) Incorporation of functional considerations in highway pavement design and operations. PhD thesis, National University of Singapore, Singapore.

Chua, D K H and Goh, Y M (2005) Poisson model of construction incident occurrence. Journal of Construction Engineering and Management, 131(6), pp. 715-722. ISSN 0733-9364

Chun, M I; Harty, C and Schweber, L (2015) Comparative study of user-centred design approaches. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Chunekar, A and Sreenivas, A (2019) Towards an understanding of residential electricity consumption in India. Building Research & Information, 47(1), pp. 75-90. ISSN 0961-3218

Chung, W W S; Tariq, S; Mohandes, S R and Zayed, T (2023) IoT-based application for construction site safety monitoring. International Journal of Construction Management, 23(1), pp. 58-74. ISSN 1562-3599

Clarke, L and Janssen, J (2008) A historical context for theories underpinning the production of the built environment. Building Research & Information, 36(6), pp. 659-662. ISSN 0961-3218

Clarke, L and Wall, C (2000) Craft versus industry: The division of labour in European housing construction. Construction Management and Economics, 18(6), pp. 689-698. ISSN 01446193

Clegg, S and Kreiner, K (2014) Fixing concrete: Inquiries, responsibility, power and innovation. Construction Management and Economics, 32(3), pp. 262-278. ISSN 01446193

Cocerhan, I and Bradley, J (2019) Investigation into how technology can overcome language barriers experienced by construction workers from eastern Europe on sites in London. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Codinhoto, R (2013) Evidence and design: an investigation of the use of evidence in the design of healthcare environments. PhD thesis, University of Salford, UK.

Colberg, M R (1950) Federal control of construction following World War II. PhD thesis, University of Michigan, USA.

Cole, B K (2012) Building social infrastructure through public-private partnerships: The case of student housing in public higher education. PhD thesis, Clemson University, USA.

Cole, R (2006) Shared markets: Coexisting building environmental assessment methods. Building Research & Information, 34(4), pp. 357-371. ISSN 0961-3218

Cole, R; Simpson, C H; Ferguson, L; Symonds, P; Taylor, J; Heaviside, C; Murage, P; Macintyre, H L; Hajat, S; Mavrogianni, A and Davies, M (2024) A population-level framework to estimate unequal exposure to indoor heat and air pollution. Buildings & Cities, 5(1), pp. 562-580. ISSN 2632-6655

Cole, R J and Fedoruk, L (2015) Shifting from net-zero to net-positive energy buildings. Building Research & Information, 43(1), pp. 111-120. ISSN 0961-3218

Cole, R J; Oliver, A and Robinson, J (2013) Regenerative design, socio-ecological systems and co-evolution. Building Research & Information, 41(2), pp. 237-247. ISSN 0961-3218

Cole-Colander, C (2003) Designing the customer experience. Building Research & Information, 31(5), pp. 357-366. ISSN 0961-3218

Collinge W H, H C F (2013) Evolving designs and stakeholder contributions to the briefing process. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Commuri, S; Mai, A T and Zaman, M (2011) Neural network-based intelligent compaction analyzer for estimating compaction quality of hot asphalt mixes. Journal of Construction Engineering and Management, 137(9), pp. 634-644. ISSN 0733-9364

Cong, W; Goh, Y M; Zhang, S; Liang, H; Zhou, Z and Guo, N (2023) Linking leader-member exchange and informal safety communication of construction workers in China: A cognitive psychology perspective. Journal of Construction Engineering and Management, 149(10): 04023092, ISSN 0733-9364

Conley, M A and Gregory, R A (1999) Partnering on small construction projects. Journal of Construction Engineering and Management, 125(5), pp. 320-324. ISSN 0733-9364

Conzatti, A; Fosas De Pando, D; Chater, B and Coley, D (2025) Are simple models for natural ventilation suitable for shelter design? Buildings & Cities, 6(1), pp. 158-181. ISSN 2632-6655

Cooper, E; Wang, Y; Stamp, S; Nijsen, T; de Graaf, P; Hofman, J; Inki, T; Driessen, R; Liebmann, J; Geven, I T M; Vervoort, K; La Manna, V P; Valster, S; de Wolf, P; Peltonen, S; Burman, E; Salminen, A; van Galen, R and Mumovic, D (2022) Why do people use portable air purifiers? Evidence from occupant surveys and air quality monitoring in homes in three European cities. Building Research & Information, 50(1-2), pp. 213-229. ISSN 0961-3218

Cooper, I (2012) Winning hearts and minds or evidence-driven: Which trajectory for regenerative design? Building Research & Information, 40(3), pp. 357-360. ISSN 0961-3218

Cooper, T E (1994) A knowledge-based construction claims advisor for the A.I.A. A201 general conditions document. PhD thesis, Auburn University, USA.

Copray, D and Smith, J (2011) Capstone projects: Industry partnering. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Costa, L; Barbosa, M B A; Baldam, R D L and Coelho, T D P (2019) Challenges of process modeling in architecture and engineering to execute projects and public works. Journal of Construction Engineering and Management, 145(1): 05018015, ISSN 0733-9364

Cottrell, D S (2006) Contractor process improvement for enhancing construction productivity. Journal of Construction Engineering and Management, 132(2), pp. 189-196. ISSN 0733-9364

Coulter III, C (1968) A systems analysis of the corps of engineers approach to design and construction. PhD thesis, Texas A&M University, USA.

Crandell, D (2018) Enhancing traditional earned value management with three-point estimates to produce probability based performance forecasts and contingency funding projections for engineering-construction projects. DEngr thesis, George Washington University, USA.

Crawford, R H and Pullen, S (2011) Life cycle water analysis of a residential building and its occupants. Building Research & Information, 39(6), pp. 589-602. ISSN 0961-3218

Crawley, J; McKenna, E; Gori, V and Oreszczyn, T (2020) Creating domestic building thermal performance ratings using smart meter data. Buildings & Cities, 1(1), pp. 1-13. ISSN 2632-6655

Crawley, S E (2017) The difference in how UAE and EW law controls Gharar (risk) and so Riba in a construction contract in the Emirate of Dubai, UAE. PhD thesis, Robert Gordon University, UK.

Creedy, G D (2006) Risk factors leading to cost overrun in the delivery of highway construction projects. PhD thesis, Queensland University of Technology, Australia.

Creedy, G D; Skitmore, M and Wong, J K W (2010) Evaluation of risk factors leading to cost overrun in delivery of highway construction projects. Journal of Construction Engineering and Management, 136(5), pp. 528-537. ISSN 0733-9364

Cross, B J (2003) Self-perceived leadership: A comparative study of domestic and international project managers in a large United States-based engineering and construction firm. DIBA thesis, Nova Southeastern University, USA.

Crowe, P (2014) Motivation agenda for social empowerment and respect for people during the drafting of construction contracts. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Crowley, L G (1997) Robust statistical estimators for use within competitive bid data. Journal of Construction Engineering and Management, 123(1), pp. 53-63. ISSN 0733-9364

Cruz, C O and Marques, R C (2013) Exogenous determinants for renegotiating public infrastructure concessions: Evidence from Portugal. Journal of Construction Engineering and Management, 139(9), pp. 1082-1090. ISSN 0733-9364

Cruz Rios, F; Grau, D and Bilec, M (2021) Barriers and enablers to circular building design in the US: An empirical study. Journal of Construction Engineering and Management, 147(10): 04021117, ISSN 0733-9364

Cusack, M M (1984) The use and limitations of mathematical models in the planning and control of construction projects. Construction Management and Economics, 2(3), pp. 219-224. ISSN 01446193

Cusack, M M (1985) The use of integer linear programming for modelling project control information. Construction Management and Economics, 3(2), pp. 91-104. ISSN 01446193

Dabke, S; Salem, O; Genaidy, A and Daraiseh, N (2008) Job satisfaction of women in construction trades. Journal of Construction Engineering and Management, 134(3), pp. 205-216. ISSN 0733-9364

Dadi, G B; Goodrum, P M; Taylor, T R B and Carswell, C M (2014) Cognitive workload demands using 2D and 3D spatial engineering information formats. Journal of Construction Engineering and Management, 140(5): 04014001, ISSN 0733-9364

Dafeamekpor, C A; Adjei-Kumi, T; Nani, G; Kissi, E and Tengan, C (2023) Determinants for assessing self-help housing affordability in Ghana's housing sector: A Delphi approach. International Journal of Construction Management, 23(11), pp. 1815-1827. ISSN 1562-3599

Dai, F (2010) Applied photogrammetry for 3D modeling, quantity surveying, and augmented reality in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Dai, F and Lu, M (2013) Three-dimensional modeling of site elements by analytically processing image data contained in site photos. Journal of Construction Engineering and Management, 139(7), pp. 881-894. ISSN 0733-9364

Dai, F; Rashidi, A; Brilakis, I and Vela, P (2013) Comparison of image-based and time-of-flight-based technologies for three-dimensional reconstruction of infrastructure. Journal of Construction Engineering and Management, 139(1), pp. 69-79. ISSN 0733-9364

Damirchilo, F (2021) Use of machine learning and data science on infrastructure transportation and construction projects. PhD thesis, Arizona State University, USA.

Damnjanovic, I; Duthie, J and Waller, S T (2008) Valuation of strategic network flexibility in development of toll road projects. Construction Management and Economics, 26(9), pp. 979-990. ISSN 1466433X

Damnjanovic, I and Zhou, X (2009) Impact of crude oil market behaviour on unit bid prices: The evidence from the highway construction sector. Construction Management and Economics, 27(9), pp. 881-890. ISSN 1466433X

Damodaran, L; Rubek Hansen, J; Hassan, T M and Olphert, C W (1999) Impact of large scale engineering products and processes on society: The eLSEwise view. Engineering, Construction and Architectural Management, 6(1), pp. 63-70. ISSN 0969-9988

Dan-Asabe, D and Radosavljevic, M (2009) Do construction companies need to match employees' expectations? In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Daniel, C and Neufville, E K (2025) An autogluon-enabled robust machine learning model for concrete tensile and compressive strength forecast. International Journal of Construction Management, 25(13), pp. 1636-1647. ISSN 1562-3599

Dao, B; Kermanshachi, S; Shane, J; Anderson, S and Damnjanovic, I (2022) Developing a logistic regression model to measure project complexity. Architectural Engineering and Design Management, 18(3), pp. 226-240. ISSN 1745-2007

Darko, A; Chan, A P C; Ameyaw, E E; Owusu, E K; Pärn, E and Edwards, D J (2019) Review of application of analytic hierarchy process (AHP) in construction. International Journal of Construction Management, 19(5), pp. 436-452. ISSN 1562-3599

Darlow, M J (1968) Investigations into line of balance scheduling house building. PhD thesis, Loughborough University, UK.

Darragh, A J R (2001) Patterns of injury among residential construction workers before and after a safety intervention program, 1994-1998. PhD thesis, Colorado State University, USA.

David, D D (2007) Numerical platform to validate resistivity testing for NDE of civil engineering structures. PhD thesis, Wayne State University, USA.

Davies, R J (2003) Formulating competitive strategy in the UK housebuilding industry: Executive summary. EngD thesis, University of Warwick, UK.

Dawood, N N (1994) Developing a production management modelling approach for precast concrete building products. Construction Management and Economics, 12(5), pp. 393-412. ISSN 01446193

Dawson, R; Ojiako, U and Hughes, L (2008) Assessing the impact of amended building regulations on the operations of UK construction companies. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Dayan, V; Chileshe, N and Hassanli, R (2022) A scoping review of information-modeling development in bridge management systems. Journal of Construction Engineering and Management, 148(9): 03122006, ISSN 0733-9364

De Castro E Silva Neto, D; Cruz, C O; Rodrigues, F and Silva, P (2016) Bibliometric analysis of PPP and PFI literature: Overview of 25 years of research. Journal of Construction Engineering and Management, 142(10): 06016002, ISSN 0733-9364

De Lima, R X; Júnior, E F N; Prata, B D A and Weissmann, J (2013) Distribution of materials in road earthmoving and paving: Mathematical programming approach. Journal of Construction Engineering and Management, 139(8), pp. 1046-1054. ISSN 0733-9364

De Marco, A; Mangano, G and Narbaev, T (2017) The influence of risk on the equity share of build-operate-transfer projects. Built Environment Project and Asset Management, 7(1), pp. 45-58. ISSN 2044-124X

De Paris, S; Lacerda Lopes, C N; Neuenfeldt Junior, A L and Dorneles, V G (2024) Understanding housing design in urban areas through adaptability and flexibility assessment. Architectural Engineering and Design Management, 20(5), pp. 1185-1202. ISSN 1745-2007

De Silva, D G (2002) Asymmetries in procurement auctions. PhD thesis, University of Oklahoma, USA.

De Venny, A S (1999) Recycling of demolished masonry rubble. PhD thesis, Edinburgh Napier University, UK.

Deakin, M (1998) Local Authority property management: A management exercise. Journal of Financial Management of Property and Construction, 3(1), pp. 43-72. ISSN 1366-4387

Debrah, C; Chan, A P C; Darko, A; Akowuah, E; Amudjie, J; Asare, K A B and Ghansah, F A (2025) A bibliometrix-based scientometric-systematic analysis and visualization of the global outlook on post-occupancy evaluation of green building. Building Research & Information, 53(8), pp. 1058-1074. ISSN 0961-3218

Deddis, W G; McCluskey, W J; Mamis, A and McBumey, R D (1997) The potential for market research, property market analysis, & property valuation using (GIS) geographic information system technology. Journal of Financial Management of Property and Construction, 2(3), pp. 45-62. ISSN 1366-4387

Deepak, B B V L; Bahubalendruni, R M V A; Rao, C A and Nalini, J (2017) Computer aided weld seam tracking approach. Journal of Engineering, Design and Technology, 15(1), pp. 31-43.

Delaney, J W (2018) The effect of competition on bid quality and final results on state dot projects. PhD thesis, State University of New York at Buffalo, USA.

Delgado, L; Shealy, T; Garvin, M and Pearce, A (2018) Framing energy efficiency with payback period: Empirical study to increase energy consideration during facility procurement processes. Journal of Construction Engineering and Management, 144(5): 04018027, ISSN 0733-9364

Delgoshaei, P (2017) Semantic models and reasoning for building system operations: Focus on knowledge-based control and fault detection for HVAC. PhD thesis, University of Maryland, College Park, USA.

Den Hartog, J P (2004) Designing indoor climate. PhD thesis, Delft University of Technology, Netherlands.

Deng, F (2004) Expert and decision-support system approaches for construction project financing and cash flow management for large infrastructure projects. PhD thesis, State University of New York at Buffalo, USA.

Deng, F and Smyth, H (2014) Nature of firm performance in construction. Journal of Construction Engineering and Management, 140(2): 04013040, ISSN 0733-9364

Deng, S; Ni, P; Zhu, H; Cai, Y and Pan, Y (2024) Artificial cognition to predict and explain the potential unsafe behaviors of construction workers. Journal of Construction Engineering and Management, 150(7): 04024074, ISSN 0733-9364

Deng, X; Ding, S and Tian, Q (2004) Reasons underlying a mandatory high penalty construction contract bonding system. Journal of Construction Engineering and Management, 130(1), pp. 67-74. ISSN 0733-9364

Deng, X; Low, S P; Li, Q and Zhao, X (2014) Developing competitive advantages in political risk management for international construction enterprises. Journal of Construction Engineering and Management, 140(9): 04014040, ISSN 0733-9364

Dericks, G H and Phua, F T T (2020) The occupational attractiveness of the built environment and the roles of individualism and collectivism: A hidden source of conflict and gender imbalance? Construction Management and Economics, 38(9), pp. 773-788. ISSN 01446193

Derrington, P A (1981) Controlling the quality of professional performance in architectural practice. PhD thesis, University of California, Berkeley, USA.

Devapriya, K A K and Ganesan, S (2002) Technology transfer through subcontracting in developing countries. Building Research & Information, 30(3), pp. 171-182. ISSN 0961-3218

Devapriya, K A K and Pretorius, F (2002) The economic implication of project finance arrangements for BOO/BOT power projects in Asia. Journal of Construction Research, 3(2), pp. 285-309. ISSN 1609-9451

Dewulf, G and Garvin, M J (2020) Responsive governance in PPP projects to manage uncertainty. Construction Management and Economics, 38(4), pp. 383-397. ISSN 01446193

Dharmapuri Tirumala, R; Dangol, N; Tiwari, P and Vaz-Serra, P (2021) Comparative analysis of outcomes under PPP and traditional modes of delivery: A study of schools in Melbourne. Construction Management and Economics, 39(11), pp. 894-911. ISSN 01446193

Dias, J L; Silva, A; Chai, C; Gaspar, P L and De Brito, J (2014) Neural networks applied to service life prediction of exterior painted surfaces. Building Research & Information, 42(3), pp. 371-380. ISSN 0961-3218

Dias Jr., A (1994) A managerial and financial study on the involvement of private sector companies in the development, construction, operation, and ownership of infrastructure projects. PhD thesis, University of Michigan, USA.

Diaz, C F and Hadipriono, F C (1993) Nondeterministic networking methods. Journal of Construction Engineering and Management, 119(1), pp. 40-57. ISSN 0733-9364

Dickens, G (2002) Teamworking, perceptions and communication within construction projects. PhD thesis, University of Nottingham, UK.

Diekmann, J E and Featherman, W D (1998) Assessing cost uncertainty: Lessons from environmental restoration projects. Journal of Construction Engineering and Management, 124(6), pp. 445-451. ISSN 0733-9364

Diekmann, J E and Girard, M J (1995) Are contract disputes predictable? Journal of Construction Engineering and Management, 121(4), pp. 355-363. ISSN 0733-9364

Diekmann, J E and Kim, M P (1992) Superchange: Expert system for analysis of changes claims. Journal of Construction Engineering and Management, 118(2), pp. 399-411. ISSN 0733-9364

Dietzenbacher, E and Hoen, A (2006) Coefficient stability and predictability in input-output models: A comparative analysis for the Netherlands. Construction Management and Economics, 24(7), pp. 671-680. ISSN 1466433X

Diker, F and Erkan, İ (2022) Fuzzy logic method in the design of elementary school classrooms. Architectural Engineering and Design Management, 18(5), pp. 739-758. ISSN 1745-2007

Dikmen, I and Birgonul, M T (2004) Neural network model to support international market entry decisions. Journal of Construction Engineering and Management, 130(1), pp. 59-66. ISSN 0733-9364

Dikmen, I; Birgonul, M T; Tah, J H M and Ozer, A H (2012) Web-based risk assessment tool using integrated duration-cost influence network model. Journal of Construction Engineering and Management, 138(9), pp. 1023-1034. ISSN 0733-9364

Din, Z U (2017) Teaching prevention through design (PTD) principles using a non-traditional pedagogical strategy. PhD thesis, Arizona State University, USA.

Dissanayaka, S M and Kumaraswamy, M M (1999) Evaluation of factors affecting time and cost performance in Hong Kong building projects. Engineering, Construction and Architectural Management, 6(3), pp. 287-298. ISSN 0969-9988

Dissanayake, G M (2006) An integrated computational intelligence framework for construction performance diagnosis. PhD thesis, University of Alberta, Canada.

Dixit, M K (2017) Embodied energy and cost of building materials: Correlation analysis. Building Research & Information, 45(5), pp. 508-523. ISSN 0961-3218

Dixon, T J (1994) An analysis of IT skills training and education in the surveying profession. PhD thesis, University of Reading, UK.

Dolla, T and Laishram, B (2019) Prequalification in municipal solid waste management public-private partnerships of India. Construction Economics and Building, 19(1), pp. 40-56. ISSN 2204-9029

Domingo, N; Osmani, M and Price, A D F (2008) Reducing construction waste in healthcare facilities: A project lifecycle approach. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Donadon, Bruno Fazendeiro (2024) Analysis of the mechanical behavior of glued laminated timber beams reinforced with synthetic and natural fibers. PhD thesis, Universidade Estadual de Campinas, Brazil.

Dong, H (2024) Impact of sensing and occupancy parameters to achieve comfort and demand side management in buildings. PhD thesis, Michigan State University, USA.

Donn, M; Selkowitz, S and Bordass, B (2012) The building performance sketch. Building Research & Information, 40(2), pp. 186-208. ISSN 0961-3218

Dorr, E E (1979) Economies of scale in high school construction and operation. PhD thesis, North Carolina State University, USA.

Douglas, J C (1994) Aesthetic-based conflict in highway planning: Federal highway administration putting planners at risk. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Dowdle, D L (2006) Engaging learners: The development of effective e-learning applications for students of the built environment. Architectural Engineering and Design Management, 2(1-2), pp. 31-48. ISSN 1745-2007

Drew, D and Skitmore, M (1997) The effect of contract type and size on competitiveness in bidding. Construction Management and Economics, 15(5), pp. 469-489. ISSN 01446193

Drew, D S (1994) The effect of contract type and size on competitiveness in construction contract bidding. PhD thesis, University of Salford, UK.

Drew, D S; Shen, L Y and Zou, P X W (2002) Developing an optimal bidding strategy in two-envelope fee bidding. Construction Management and Economics, 20(7), pp. 611-620. ISSN 01446193

Du, J and El-Gafy, M (2011) Feasibility analytical mapping (FAM) for the bidding decision: A graphic bidding decision making model based on multidimensional scaling and discriminant analysis. International Journal of Construction Education and Research, 7(3), pp. 198-209. ISSN 1557-8771

Du Toit, G J (1997) The potential of labour-intensive construction methods in the provision of urban infrastructure. PhD thesis, University of Pretoria, South Africa.

Duan, Y; Ye, M; Zhang, Q and Lu, S (2025) Informal institutional pressures and ESG implementation by international contractors: The moderating effects of joint ventures. Journal of Construction Engineering and Management, 151(10): 04025139, ISSN 0733-9364

Duarte, J P and Correia, R (2006) Implementing a description grammar: Generating housing programs online. Construction Innovation, 6(4), pp. 203-216. ISSN 1471-4175

Duffield, C F and Regan, M (2004) Public private partnership arrangement for the Spencer Street station upgrade in Victoria, Australia. Journal of Financial Management of Property and Construction, 9(3), pp. 163-178. ISSN 1366-4387

Duffy, G A (2009) Linear scheduling of pipeline construction projects with varying production rates. PhD thesis, Oklahoma State University, USA.

Duffy, G A; Oberlender, G D and Seok Jeong, D H (2011) Linear scheduling model with varying production rates. Journal of Construction Engineering and Management, 137(8), pp. 574-582. ISSN 0733-9364

Duncan, K; Case, A and Manzo IV, F (2024) Prevailing wages, school construction costs, and bids by out-of-state contractors: evidence from the Minneapolis–Saint Paul metropolitan area. Construction Management and Economics, 42(8), pp. 695-713. ISSN 01446193

Duncan, K; Philips, P and Prus, M (2006) Prevailing wage legislation and public school construction efficiency: A stochastic frontier approach. Construction Management and Economics, 24(6), pp. 625-634. ISSN 1466433X

Dunlop, P G (2005) Investigation, modelling and planning of stochastic concrete placing operations. PhD thesis, University of Edinburgh, UK.

Dunn, B (2004) The regionalization of international contracting and its implications for models of construction spending. Construction Management and Economics, 22(1), pp. 93-100. ISSN 01446193

Dunston, P S; Savage, B M and Mannering, F L (2000) Weekend closure for construction of asphalt overlay on urban highway. Journal of Construction Engineering and Management, 126(4), pp. 313-315. ISSN 0733-9364

Dunston, P S; Sinfield, J V and Lee, T Y (2007) Technology development decision economics for real-time rolling resistance monitoring of haul roads. Journal of Construction Engineering and Management, 133(5), pp. 393-402. ISSN 0733-9364

Dursun, O and Stoy, C (2016) Conceptual estimation of construction costs using the multistep ahead approach. Journal of Construction Engineering and Management, 142(9): 04016038, ISSN 0733-9364

Dutra, Clezio Thadeu de Souza (2016) Sustainable public bidding for engineering works and services. PhD thesis, Universidade Federal Fluminense, Brazil.

Dutta, A (2020) An in-depth investigation of the effects of work-related factors on the development of knee musculoskeletal disorders among construction roofers. PhD thesis, West Virginia University, USA.

Dutta, A; Breloff, S P; Dai, F; Sinsel, E W; Warren, C M; Carey, R E and Wu, J Z (2021) Application of data fusion via canonical polyadic decomposition in risk assessment of musculoskeletal disorders in construction: Procedure and stability evaluation. Journal of Construction Engineering and Management, 147(8): 04021083, ISSN 0733-9364

Duzkale, A K (2013) Reducing uncertainty in bid preparation phase of cost estimating for structural steel. PhD thesis, Catholic University of America, USA.

Duzkale, A K and Lucko, G (2016) Exposing uncertainty in bid preparation of steel construction cost estimating: I. Conceptual framework and qualitative C-I-V-I-L classification. Journal of Construction Engineering and Management, 142(10): 04016049, ISSN 0733-9364

Duzkale, A K and Lucko, G (2016) Exposing uncertainty in bid preparation of steel construction cost estimating: II. Comparative analysis and quantitative C-I-V-I-L classification. Journal of Construction Engineering and Management, 142(10): 04016050, ISSN 0733-9364

Dykes, C and Baird, G (2014) Performance benchmarks for non-domestic buildings: Towards user perception benchmarks. Building Research & Information, 42(1), pp. 62-71. ISSN 0961-3218

Eadie, R and Potts, S (2016) Innovation partnership procurement: EU directive impact. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(6), pp. 238-247. ISSN 17514304

Easa, S M (1987) Earthwork allocations with nonconstant unit costs. Journal of Construction Engineering and Management, 113(1), pp. 34-50. ISSN 0733-9364

Easa, S M (1988) Earthwork allocations with linear unit costs. Journal of Construction Engineering and Management, 114(4), pp. 641-655. ISSN 0733-9364

Easa, S M (1989) Resource leveling in construction by optimization. Journal of Construction Engineering and Management, 115(2), pp. 302-316. ISSN 0733-9364

Easson, Michael Bernard (2016) The application of a theory of real options (tro) to the decision-making of mega urban transport projects (mutps). PhD thesis, University of Melbourne, Australia.

Ebekozien, A; Abdul-Aziz, A R and Jaafar, M (2022) Moderating effect of government support policy on the relationship between Malaysian LCH leakages, high construction cost and LCH demand-supply: A proposed framework. International Journal of Construction Management, 22(4), pp. 600-611. ISSN 1562-3599

Eccles, S; O'Reilly, M and Stovin, V (1997) Numerical modelling of contract strategy evaluation. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Edike, U E; Ameh, O J; Adenuga, O A and Akintunde, O P (2024) Life cycle energy analysis of houses incorporating conventional and alternative masonry units. Architectural Engineering and Design Management, 20(5), pp. 1079-1099. ISSN 1745-2007

Edkins, A J and Smyth, H J (2006) The imperative of trust in PPPs: Evaluations from the provision of 'full service' contracts. Journal of Construction Procurement, 12(1),

Edum-Fotwe, F T; Gregory, M J; Thorpe, A; Cooper, R and Deasley, P J (2002) Managing distributed design teams and processes: A cross-sector study of construction and aerospace. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Edwards, D J and Holt, G D (2006) Hand-arm vibration exposure from construction tools: Results of a field study. Construction Management and Economics, 24(2), pp. 209-217. ISSN 01446193

Edwards, D J and Holt, G D (2007) Construction hand tools: Vibration emissions from alternative inserts. Building Research & Information, 35(3), pp. 329-342. ISSN 0961-3218

Edwards, D J; Holt, G D and Harris, F C (1998) Financial management of construction plant: Conceptualising cost prediction. Journal of Financial Management of Property and Construction, 3(2), pp. 59-74. ISSN 1366-4387

Edwards, D J; Holt, G D and Harris, F C (2002) Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry. Construction Management and Economics, 20(7), pp. 581-591. ISSN 01446193

Edwards, D J; Owusu-Manu, D-G; Baiden, B; Badu, E and Love, P E (2017) Financial distress and highway infrastructure delays. Journal of Engineering, Design and Technology, 15(1), pp. 118-132.

Edwards, D J; Thorpe, T and Love, P (2004) Financial implications of poorly utilised construction plant and equipment. Journal of Financial Management of Property and Construction, 9(1), pp. 3-12. ISSN 1366-4387

Edwards, P J and Bowen, P A (1998) Risk and risk management in construction: A review and future directions for research. Engineering, Construction and Architectural Management, 5(4), pp. 339-349. ISSN 0969-9988

Eftekhari, M M (1996) Ventilator air flow measurement in new houses. Building Research & Information, 24(3), pp. 176-182. ISSN 0961-3218

Egbu, C O (1999) Skills, knowledge and competencies for managing construction refurbishment works. Construction Management and Economics, 17(1), pp. 29-43. ISSN 01446193

Egger, H S (1986) Business techniques and skills utilized by small residential contractors with one to four employees in six high growth areas of Texas. EdD thesis, Texas A&M University, USA.

Ehrhardt, D; Behnisch, M; Jehling, M and Michaeli, M (2023) Mapping soft densification: A geospatial approach for identifying residential infill potentials. Buildings & Cities, 4(1), pp. 193-211. ISSN 2632-6655

Eissa, R and El-Adaway, I H (2024) Accelerating the circular economy transition: A construction value chain-structured portfolio of strategies and implementation insights. Journal of Construction Engineering and Management, 150(8): 04024077, ISSN 0733-9364

Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2008) The impact of multiskilling on UK's construction manpower. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(1), pp. 25-30. ISSN 17514312

Eke, G (2017) Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects. PhD thesis, Aston University, UK.

Ekemode, B G (2024) Factors influencing building information modelling adoption for residential property development. International Journal of Construction Management, 24(9), pp. 986-996. ISSN 1562-3599

Eken, T Y; Sarioglu, C and Kucuk, I (2021) Corrosion behaviour of twin-roll cast 8006 aluminium alloy foil with different thicknesses for the food packaging industry. Journal of Engineering, Design and Technology, 19(6), pp. 1421-1432. ISSN 1726-0531

Ekenel, M (2004) Durability performance of advanced construction materials. PhD thesis, University of Missouri - Rolla, USA.

Ekström, D; Rempling, R and Plos, M (2019) Integrated project team performance in early design stages: performance indicators influencing effectiveness in bridge design. Architectural Engineering and Design Management, 15(4), pp. 249-266. ISSN 1745-2007

El-Abbasy, M S; Zayed, T; Ahmed, M; Alzraiee, H and Abouhamad, M (2013) Contractor selection model for highway projects using integrated simulation and analytic network process. Journal of Construction Engineering and Management, 139(7), pp. 755-767. ISSN 0733-9364

El-Adaway, I H; Abotaleb, I S; Eid, M S; May, S; Netherton, L and Vest, J (2018) Contract administration guidelines for public infrastructure projects in the United States and Saudi Arabia: Comparative analysis approach. Journal of Construction Engineering and Management, 144(6): 04018031, ISSN 0733-9364

El-Adaway, I H and Kandil, A A (2010) Multiagent system for construction dispute resolution (MAS-COR). Journal of Construction Engineering and Management, 136(3), pp. 303-315. ISSN 0733-9364

El-Gohary, K M; Aziz, R F and Abdel-Khalek, H A (2017) Engineering approach using ANN to improve and predict construction labor productivity under different influences. Journal of Construction Engineering and Management, 143(8): 04017045, ISSN 0733-9364

El-Haram, M A and Horner, R M W (2003) Application of the principles of ILS to the development of cost effective maintenance strategies for existing building stock. Construction Management and Economics, 21(3), pp. 283-296. ISSN 01446193

El-Mashaleh, M S; Hyari, K H; Bdour, A N and Rababeh, S M (2016) A multi-attribute decision-making model for construction enterprise resource planning system selection. International Journal of Construction Education and Research, 12(1), pp. 66-79. ISSN 1557-8771

El-Rayes, K and Khalafallah, A (2005) Trade-off between safety and cost in planning construction site layouts. Journal of Construction Engineering and Management, 131(11), pp. 1186-1195. ISSN 0733-9364

El-Samadony, A A E-Y (1986) Development of an improved construction bidding model incorporating multiple objective functions. PhD thesis, University of Leeds, UK.

Elazouni, A and Salem, O A (2011) Progress monitoring of construction projects using pattern recognition techniques. Construction Management and Economics, 29(4), pp. 355-370. ISSN 1466433X

Elazouni, A M (2006) Classifying construction contractors using unsupervised-learning neural networks. Journal of Construction Engineering and Management, 132(12), pp. 1242-1253. ISSN 0733-9364

Elazouni, A M; Ali, A E and Abdel-Razek, R H (2005) Estimating the acceptability of new formwork systems using neural networks. Journal of Construction Engineering and Management, 131(1), pp. 33-41. ISSN 0733-9364

Eldin, N N (1997) Concurrent engineering: A schedule reduction tool. Journal of Construction Engineering and Management, 123(3), pp. 354-362. ISSN 0733-9364

Eldin, N N and Senouci, A B (1992) Use of scrap tires in road construction. Journal of Construction Engineering and Management, 118(3), pp. 561-576. ISSN 0733-9364

Elgamal, S; Ayer, S and Parrish, K (2025) A review of VR in undergraduate construction education and training: Unveiling the opportunities to address content areas from ACCE's student learning outcomes (SLOs). International Journal of Construction Education and Research, 21(3), pp. 408-432. ISSN 1557-8771

Elkhayat, Y O; Ibrahim, M G; Tokimatsu, K and Ali, A A M M (2020) Life cycle cost analysis on three high-performance glazing systems for an office building in New Cairo, Egypt. Architectural Engineering and Design Management, 17(1-2), pp. 131-145. ISSN 1745-2007

Ellabbar, K and Havard, T (2005) The accounting disclosure in developing countries: A comparative study of Libyan & Egyptian construction companies. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Elliman, T and Orange, G (2003) Developing distributed design capabilities in the construction supply chain. Construction Innovation, 3(1), pp. 15-26. ISSN 1471-4175

Ellis L, P A L T (2013) Assessing learning and teaching strategies of a post-graduate capstone course: Students' perspective. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Elmahroug, M H; Tutesigensi, A and Brookes, N J (2014) Integrating external stakeholder identification and project initiation in civil engineering infrastructure projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Elmahroug, M H; Tutesigensi, A and Smith, N J (2016) A problem solving approach to identifying civil engineering infrastructure projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Elmousalami, H H; Elyamany, A H and Ibrahim, A H (2018) Predicting conceptual cost for field canal improvement projects. Journal of Construction Engineering and Management, 144(11): 04018102, ISSN 0733-9364

Elsheikh, A; Motawa, I and Diab, E (2023) Multi-objective genetic algorithm optimization model for energy efficiency of residential building envelope under different climatic conditions in Egypt. International Journal of Construction Management, 23(7), pp. 1244-1253. ISSN 1562-3599

Elwakil, E (2017) Integrating analytical hierarchy process and regression for assessing construction organizations' performance. International Journal of Construction Management, 17(1), pp. 76-88. ISSN 1562-3599

Elzibak, A (2025) Coastal storms and building code adoption: Motivators and impacts 1979-2022. PhD thesis, New York University Tandon School of Engineering, USA.

Embry, E (2023) Building change: A multi-level analysis of resilience through sustainability, health, and entrepreneurship in the built environment. PhD thesis, University of Colorado at Boulder, USA.

Emmitt, S (2006) Selection and specification of building products: Implications for design managers. Architectural Engineering and Design Management, 2(3), pp. 176-186. ISSN 1745-2007

Emmitt, S; Gorse, C A and Jones, S R (1999) The housing site manager: Changing roles and training needs. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Emsley, M W (2001) A model to optimize single tower crane location within a construction site. PhD thesis, Loughborough University, UK.

Emsley, M W; Lowe, D J; Duff, A R; Harding, A and Hickson, A (2002) Data modelling and the application of a neural network approach to the prediction of total construction costs. Construction Management and Economics, 20(6), pp. 465-472. ISSN 01446193

Emuze, F and Smallwood, J J (2012) Perspectives on health and safety in construction and design. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 27-34. ISSN 17514312

Emuze F, S J (2013) Construction motor vehicle accidents in South Africa: Causes and impact. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Enshassi, A; Mohamed, S and Ekarriri, A (2009) Essential skills and training provisions for building project stakeholders in Palestine. Journal of Construction in Developing Countries, 14(1), pp. 31-50. ISSN 1823-6499

Enshassi, A; Shakalaih, S and AlKilani, S (2019) Strategies for community participation in pre-disaster phase in the Gaza Strip, Palestine. Journal of Construction in Developing Countries, 23(2), pp. 107-127. ISSN 1823-6499

Erbas, I (2013) Construction management project delivery system as a form of project implementation in Turkish public procurement. PhD thesis, Istanbul Technical University, Turkey.

Erdogan, B; Anumba, C; Bouchlaghem, D and Nielsen, Y (2005) Change management in construction: The current context. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Erfani, A; Ma, Z; Cui, Q and Baecher, G B (2023) Ex post project risk assessment: Method and empirical study. Journal of Construction Engineering and Management, 149(2): 04022174, ISSN 0733-9364

Erlita, A; Amin, M and Bintoro, B P K (2023) Multiphase project risk management on food factory building construction: Consultant perspective. Journal of Construction in Developing Countries, 28(1), pp. 1-17. ISSN 1823-6499

Erman, E (2002) Timber joint design: The geometric breakdown method. Building Research & Information, 30(6), pp. 446-469. ISSN 0961-3218

Esangbedo, O; Bilge, E and Yasemin, N (2024) Factors analysis on stakeholder management to achieve sustainable buildings. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Escamilla, E (2011) Investigation of project management planning practices for renovation of historical buildings in urban contexts located in Texas. PhD thesis, Texas A&M University, USA.

Eshtehardian, E; Afshar, A and Abbasnia, R (2008) Time-cost optimization: Using GA and fuzzy sets theory for uncertainties in cost. Construction Management and Economics, 26(7), pp. 679-691. ISSN 1466433X

Esmaeili, B; Hallowell, M R and Rajagopalan, B (2015) Attribute-based safety risk assessment. I: Analysis at the fundamental level. Journal of Construction Engineering and Management, 141(8): 04015021, ISSN 0733-9364

Esmaeili, B; Hallowell, M R and Rajagopalan, B (2015) Attribute-based safety risk assessment. II: Predicting safety outcomes using generalized linear models. Journal of Construction Engineering and Management, 141(8): 04015022, ISSN 0733-9364

Espinoza, R D (2011) Contingency estimating using option pricing theory: Closing the gap between theory and practice. Construction Management and Economics, 29(9), pp. 913-927. ISSN 1466433X

Essa, R A (2008) A framework for the pre-construction evaluation of sustainable housing projects in the UK. PhD thesis, Heriot-Watt University, UK.

Evans, S.; Steadman, P.; Neto-Bradley, A.; Humphrey, D.; Liddiard, R.; Shamsi, H.; Palmer, J. and Simons, G. (2026) Nine 'myths' about the building stock of Great Britain. Buildings & Cities, 7(1), pp. 704-721. ISSN 2632-6655

Evans, S; Liddiard, R and Steadman, P (2019) Modelling a whole building stock: Domestic, non-domestic and mixed use. Building Research & Information, 47(2), pp. 156-172. ISSN 0961-3218

Everett, J G and Farghal, S H (1997) Data representation for predicting performance with learning curves. Journal of Construction Engineering and Management, 123(1), pp. 46-52. ISSN 0733-9364

Everett, J G and Slocum, A H (1994) Automation and robotics opportunities: Construction versus manufacturing. Journal of Construction Engineering and Management, 120(2), pp. 443-452. ISSN 0733-9364

Ewuga, D; Opiyo, N and Oyegoke, A S (2025) An evaluation of the delivery of quantity surveying degree apprenticeship in UK universities. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(3), pp. 180-187. ISSN 17514304

Eybpoosh, M; Dikmen, I and Birgonul, M T (2011) Identification of risk paths in international construction projects using structural equation modeling. Journal of Construction Engineering and Management, 137(12), pp. 1164-1175. ISSN 0733-9364

Fagan-Watson, B and Burchell, K (2016) Heatwave planning: Community involvement in co-producing resilience. Building Research & Information, 44(7), pp. 754-763. ISSN 0961-3218

Fageha, M K and Aibinu, A A (2014) Prioritising project scope definition elements in public building projects. Construction Economics and Building, 14(3), pp. 18-33. ISSN 2204-9029

Faghih, S A M and Kashani, H (2018) Forecasting construction material prices using vector error correction model. Journal of Construction Engineering and Management, 144(8): 04018075, ISSN 0733-9364

Famakin, I O and Abisuga, A O (2016) Effect of path-goal leadership styles on the commitment of employees on construction projects. International Journal of Construction Management, 16(1), pp. 67-76. ISSN 1562-3599

Fan, C L (2026) Crack identification and severity analysis via computer vision: Comparative study of rgb and grayscale imagery. Journal of Construction Engineering and Management, 152(3): 04026004, ISSN 0733-9364

Fan, S. L.; Lu, S. M.; Recha, F.; Ong, W. S. and Tseng, T. S. (2026) Automatic BIM-based formwork quantification system. Journal of Construction Engineering and Management, 152(7): 04026082, ISSN 0733-9364

Fan, S L (2012) Modified time impact analysis method. Journal of Construction Engineering and Management, 138(2), pp. 227-233. ISSN 0733-9364

Faniran, O O; Oluwoye, J O and Lenard, D J (1998) Interactions between construction planning and influence factors. Journal of Construction Engineering and Management, 124(4), pp. 245-256. ISSN 0733-9364

Farahani, A (2019) A systematic approach to strategic maintenance and renovation planning in multifamily buildings. PhD thesis, Chalmers University of Technology, Sweden.

Farahani, A V; kravchenko, I; Jokisalo, J; Korhonen, N; Jylhä, K and Kosonen, R (2024) Overheating assessment for apartments during average and hot summers in the Nordic climate. Building Research & Information, 52(3), pp. 273-291. ISSN 0961-3218

Faraj, I (2001) Verification and spatial clearance of features in a product modelling environment. Construction Innovation, 1(1), pp. 55-74. ISSN 1471-4175

Faraji, A (2021) Neuro-fuzzy system based model for prediction of project performance in downstream sector of petroleum industry in Iran. Journal of Engineering, Design and Technology, 19(6), pp. 1268-1290. ISSN 1726-0531

Farghal, S H and Everett, J G (1997) Learning curves: Accuracy in predicting future performance. Journal of Construction Engineering and Management, 123(1), pp. 41-45. ISSN 0733-9364

Farran, H H (1993) A study of the implementation and impact of turn-key management contracts in hospitals in the kingdom of Saudi Arabia. PhD thesis, Swansea University, UK.

Farrell, M L (1996) Real property valuation in a context of Knight-Keynes uncertainty. Journal of Financial Management of Property and Construction, 1(1), pp. 5-20. ISSN 1366-4387

Farrow, B and Burt, R (2020) Service learning: Aligning university mission with design and construction. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Farshchian, M M and Heravi, G (2018) Probabilistic assessment of cost, time, and revenue in a portfolio of projects using stochastic agent-based simulation. Journal of Construction Engineering and Management, 144(5): 4018028, ISSN 0733-9364

Fasakin, J O and Ogunsemi, D R (2003) Modelling the selling prices of residential buildings in Nigeria. Journal of Financial Management of Property and Construction, 8(2), pp. 111-114. ISSN 1366-4387

Fateh, M A M and Mohammad, M F (2017) Industrialized building system provision in local and international standard form of contracts. Journal of Construction in Developing Countries, 22(2), pp. 67-80. ISSN 1823-6499

Fateh, M A M; Supian, A N and Goh, C S (2024) Managing emotional intelligence of construction players during COVID-19 in Malaysia. Journal of Construction in Developing Countries, 29(1), pp. 191-210. ISSN 1823-6499

Fatokun, A; Akintoye, A and Liyanage, C (2015) Renegotiation of public private partnership road contracts: Issues and outcomes. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Fayek, A R and Oduba, A (2005) Predicting industrial construction labor productivity using fuzzy expert systems. Journal of Construction Engineering and Management, 131(8), pp. 938-941. ISSN 0733-9364

Fazil, M W; Muhamad Tamyez, P F and Lee, C K (2024) Enhancing cost estimation performance through effective organizational control: The moderating role of project complexity in construction projects. International Journal of Construction Management, 24(15), pp. 1630-1642. ISSN 1562-3599

Fehan, H and Aigbogun, O (2021) Influence of internal organizational factors and institutional pressures on construction firms' performance. Construction Economics and Building, 21(2), pp. 81-99. ISSN 2204-9029

Feige, A; McAllister, P and Wallbaum, H (2013) Rental price and sustainability ratings: Which sustainability criteria are really paying back? Construction Management and Economics, 31(4), pp. 322-334. ISSN 1466433X

Fellows, R; Liu, A and Fong, C M (2003) Leadership style and power relations in quantity surveying in Hong Kong. Construction Management and Economics, 21(8), pp. 809-818. ISSN 01446193

Feng, K (2020) Environmentally friendly construction processes under uncertainty assessment, optimisation and robust decision-making. PhD thesis, Luleå University of Technology, Sweden.

Feng, K (2022) Infrastructure resilience and management under changing tropical cyclone risk. PhD thesis, Princeton University, USA.

Feng, K; Xiong, W; Wang, S; Wu, C and Xue, Y (2017) Optimizing an equity capital structure model for public-private partnership projects involved with public funds. Journal of Construction Engineering and Management, 143(9): 04017067, ISSN 0733-9364

Feng, Y (2015) Mathematical models for determining the minimum level of voluntary safety investments for building projects. Journal of Construction Engineering and Management, 141(7): 4015015, ISSN 0733-9364

Feng, Y and Trinh, M T (2019) Developing resilient safety culture for construction projects. Journal of Construction Engineering and Management, 145(11), ISSN 0733-9364

Fenn, F P (1999) An aetiology of construction disputes. PhD thesis, University of Manchester, UK.

Fente, J; Schexnayder, C and Knutson, K (2000) Defining a probability distribution function for construction simulation. Journal of Construction Engineering and Management, 126(3), pp. 234-241. ISSN 0733-9364

Fereidouni, H G (2011) Factors contributing to the fluctuation in residential construction in Iran. Construction Economics and Building, 11(4), pp. 77-86. ISSN 2204-9029

Ferguson, M (2020) Improving mobile robot navigation with dynamic building information models and stochastic neural control. PhD thesis, Stanford University, USA.

Fergusson, K J (1993) Impact of integration on industrial facility quality. PhD thesis, Stanford University, USA.

Fernández-Sols, J L; Pathak, R; Lavy, S; Beltrán, L O; Son, K and Kim, K (2011) Framework for selecting performance assessment tools for achieving LEED 3.0 credits. Architectural Engineering and Design Management, 7(4), pp. 236-250. ISSN 1745-2007

Ferreira, Sérgio Leal (2005) Proposal of IFC model extension with ies LM-63 contribution: Luminaire in building lifecycle. PhD thesis, Universidade de São Paulo, Brazil.

Fewkes, A and Ferris, S A (1983) The collection and storage of rainwater for W.C. flushing. Construction Papers, 2(1), pp. 79-86. ISSN 0144-8587

Filippova, O; Xiao, Y; Rehm, M and Ingham, J (2018) Economic effects of regulating the seismic strengthening of older buildings. Building Research & Information, 46(7), pp. 711-724. ISSN 0961-3218

Fini, A A F; Akbarnezhad, A; Rashidi, T H and Travis Waller, S (2017) Job assignment based on brain demands and human resource strategies. Journal of Construction Engineering and Management, 143(5): 04016123, ISSN 0733-9364

Finnie, D (2013) Comparison of time adjustment clauses between DZ3910, AS4000 and STCC. Construction Economics and Building, 13(1), pp. 66-84. ISSN 2204-9029

Fiorani, Viviane Miranda Araujo (2016) Building sites environmental compensations in urban areas: Focusing the anthropic environment. PhD thesis, Universidade de São Paulo, Brazil.

Firouzi, A; Yang, W and Li, C Q (2016) Prediction of total cost of construction project with dependent cost items. Journal of Construction Engineering and Management, 142(12): 04016072, ISSN 0733-9364

Fisher, D J and O’Connor, J T (1991) Constructability for piping automation: Field operations. Journal of Construction Engineering and Management, 117(3), pp. 468-485. ISSN 0733-9364

Fisher, N (1990) The use of structured data analysis as a construction management research tool: 1. The technique. Construction Management and Economics, 8(4), pp. 341-362. ISSN 01446193

Fitchett, A S (2009) Skills development and employment creation through small public buildings in South Africa. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Flanagan, R and Norman, G (1983) The accuracy and monitoring of quantity surveyors' price forecasting for building work. Construction Management and Economics, 1(2), pp. 157-180. ISSN 01446193

Flanagan, R and Norman, G (1985) Sealed bid auctions: An application to the building industry. Construction Management and Economics, 3(2), pp. 145-161. ISSN 01446193

Florencio, Lutemberg de Araújo (2018) Structuring of a rating system for the classification of risk of linking commercial real estate properties as guarantee for long-term credit operations. PhD thesis, Universidade de São Paulo, Brazil.

Fonte, G C A (2011) Energy management reduces Great Pyramid build effort by more than 98%. Journal of Construction Engineering and Management, 137(12), pp. 1195-1204. ISSN 0733-9364

Forcada, N; Gangolells, M; Casals, M and Macarulla, M (2017) Factors affecting rework costs in construction. Journal of Construction Engineering and Management, 143(8): 04017032, ISSN 0733-9364

Forsythe, P (2014) Proactive construction safety systems and the human factor. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(5), pp. 242-252. ISSN 17514304

Forsythe, P J (2007) A conceptual framework for studying customer satisfaction in residential construction. Construction Management and Economics, 25(2), pp. 171-182. ISSN 1466433X

Fortune, C (2001) Exploring the model selection process in the formulation of building project advice. Journal of Financial Management of Property and Construction, 6(3), pp. 167-177. ISSN 1366-4387

Fortune, C and Hinks, J (1999) Quality issues in building project price forecasting: factors affecting model selection. Journal of Construction Procurement, 5(2), pp. 129-140. ISSN 1358-9180

Fortune, C and Lees, M (1997) Cognitive errors of judgement, learning style characteristics and clients' early cost advisors. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Fortune, C and Lees, M (1998) Quality in strategic cost advice: The effect of anchoring and adjustment. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Fortune, C and Lees, M (2000) Strategic cost advice and the effect of cognitive error. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Fox, S (2003) A matrix to indicate the utility of technologies. Construction Management and Economics, 21(2), pp. 187-196. ISSN 01446193

Francis, A (2017) Simulating uncertainties in construction projects with chronographical scheduling logic. Journal of Construction Engineering and Management, 143(1): 04016085, ISSN 0733-9364

Francis, A and Thomas, A (2022) A machine learning-based life cycle assessment prediction model for the environmental impacts of buildings. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Francis, V and Prosser, A (2014) Exploring vocational guidance and gender in construction. International Journal of Construction Education and Research, 10(1), pp. 39-57. ISSN 1557-8771

Franco-Duran, D M and De La Garza, J M (2020) Performance of resource-constrained scheduling heuristics. Journal of Construction Engineering and Management, 146(4): 04020026, ISSN 0733-9364

Francom, T C and El Asmar, M (2015) Project quality and change performance differences associated with the use of building information modeling in design and construction projects: Univariate and multivariate analyses. Journal of Construction Engineering and Management, 141(9): 4015028, ISSN 0733-9364

Franke, M and Nadler, C (2021) Towards a holistic approach for assessing the impact of IEQ on satisfaction, health, and productivity. Building Research & Information, 49(4), pp. 417-444. ISSN 0961-3218

Franz, B; Leicht, R; Molenaar, K and Messner, J (2017) Impact of team integration and group cohesion on project delivery performance. Journal of Construction Engineering and Management, 143(1): 04016088, ISSN 0733-9364

Franz, B; Molenaar, K R and Roberts, B A M (2020) Revisiting project delivery system performance from 1998 to 2018. Journal of Construction Engineering and Management, 146(9): 04020100, ISSN 0733-9364

Franz, B W (2014) Modeling the role of team integration and group cohesion in construction project performance. PhD thesis, Pennsylvania State University, USA.

Fraser, C (2000) Stakeholder evaluation of management performance: A study of construction site managers. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Fraser, C and Zhu, C (2008) Stakeholder perception of construction site managers' effectiveness. Construction Management and Economics, 26(6), pp. 579-590. ISSN 1466433X

Friedrich, D R; Daly, J P and Dick, W G (1987) Revisions, repairs, and rework on large projects. Journal of Construction Engineering and Management, 113(3), pp. 488-500. ISSN 0733-9364

Frimpong, S; Riza Yosia, S; Cynthia Changxin, W; Elijah Frimpong, B; Dansoh, A; Hon, C K H and Yiu, T W (2024) Promoting positive mental health among young construction workers: The role of theory. Construction Management and Economics, 42(4), pp. 366-385. ISSN 01446193

Fu, W K; Drew, D S and Lo, H P (2004) Start-up and steady-state learning in recurrent bidding. Building Research & Information, 32(6), pp. 484-496. ISSN 0961-3218

Fuentes, M and Smyth, H (2016) Value co-creation in a project setting: A service-dominant logic perspective. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Fuller, P A; Dainty, A R J; Thorpe, T and Slater, I (2007) Learning organisations: Can they be shown to exist through the realisation of quantifiable benefits? In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Funches Allen, Dawn (2025) Analyzing factors that contribute to cost overruns on department of defense (dod) contractor programs. DEngr thesis, George Washington University, USA.

Gabriela Alves Tenório de, M; Claudia, R S d M S N; dos Santos, E B; Kleyton, M N d S; Fernandes, B S and Rachel Perez, P (2024) Integration potential between Revit and LEED: A review. Architectural Engineering and Design Management, 20(3), pp. 510-525. ISSN 1745-2007

Gage, S A and Graham, J M R (2000) Static split duct roof ventilators. Building Research & Information, 28(4), pp. 234-244. ISSN 0961-3218

Galbraith, G H; Guo, J S and McLean, R C (2000) The effect of temperature on the moisture permeability of building materials. Building Research & Information, 28(4), pp. 245-259. ISSN 0961-3218

Galbraith, G H; McLean, R C and Guo, J S (1998) Moisture permeability data presented as a mathematical relationship. Building Research & Information, 26(3), pp. 157-168. ISSN 0961-3218

Gamal, A; Nashaat, B; Shahda, M M and Nosier, S R (2024) Ten questions concerning the integration of digital fabrication techniques into the architectural design process. Architectural Engineering and Design Management, 20(1), pp. 120-149. ISSN 1745-2007

Gambo, N; Musonda, I and Zadawa, A N (2023) Effects of social media learning environments on AEC learning process among university students in Nigeria. International Journal of Construction Education and Research, 19(1), pp. 99-127. ISSN 1557-8771

Gameson, R; Suresh, S and Chinyio, E (2008) Project debriefing: A multi-domain review of practices and procedures. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Ganesan, S; Lau, S S Y; Wong, K C and Chau, K W (2004) Growth of finance, insurance and real estate (FIRE) and office space absorption in Hong Kong. Journal of Financial Management of Property and Construction, 9(2), pp. 103-117. ISSN 1366-4387

Gangolells, M and Casals, M (2012) Resilience to increasing temperatures: Residential building stock adaptation through codes and standards. Building Research & Information, 40(6), pp. 645-664. ISSN 0961-3218

Gann, D M; Salter, A J and Whyte, J K (2003) Design quality indicator as a tool for thinking. Building Research & Information, 31(5), pp. 318-333. ISSN 0961-3218

Gao, L; Luo, X; Wang, Y; Zhang, N and Deng, X (2024) Retention in challenging international construction assignments: Role of expatriate resilience. Journal of Construction Engineering and Management, 150(2): 04023158, ISSN 0733-9364

Gao, N and Touran, A (2020) Cost overruns and formal risk assessment program in US rail transit projects. Journal of Construction Engineering and Management, 146(5): 05020004, ISSN 0733-9364

Garthwaite, P M and Eckert, C M (2012) Glitches, snags and crises: A study of change in two hospital adaptation projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Gary, D H (2013) Note: Issues of importance, timing and method relating to peer review of journal manuscripts. Journal of Financial Management of Property and Construction, 18(3), pp. 282-290. ISSN 1366-4387

Gatti, U C; Migliaccio, G C; Bogus, S M and Schneider, S (2014) An exploratory study of the relationship between construction workforce physical strain and task level productivity. Construction Management and Economics, 32(6), pp. 548-564. ISSN 01446193

Ge, X J and Lam, K-C (2002) Building a house prices forecasting model in Hong Kong. Construction Economics and Building, 2(2), pp. 57-70. ISSN 2204-9029

Geekiyanage, D; Ramachandra, T and Thurairajah, N (2018) A model for early stage estimation of operational expenses (opex) in commercial buildings. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Geem, Z W (2010) Multiobjective optimization of time-cost trade-off using harmony search. Journal of Construction Engineering and Management, 136(6), pp. 711-716. ISSN 0733-9364

Gerges, M; Mayouf, M; Rumley, P and Moore, D (2017) Human behaviour under fire situations in high-rise residential building. International Journal of Building Pathology and Adaptation, 35(1), pp. 90-106.

Gerstenberger, A J (2021) Modeling the likelihood of construction incidents using public data. EdD thesis, Teachers College, Columbia University, USA.

Gessford, G N (1966) An investigation of the utility of critical path time and cost analysis as an aid to budgeting and administrative control by construction firms. PhD thesis, University of California, Los Angeles, USA.

Gething, B and Bordass, B (2006) Rapid assessment checklist for sustainable buildings. Building Research & Information, 34(4), pp. 416-426. ISSN 0961-3218

Ghahramanpouri, A; Lamit, H and Sedaghatnia, S (2012) Behavioural observation of human stationary and sustained activities in pedestrian priority streets of Johor Bahru. Journal of Construction in Developing Countries, 17(2), pp. 105-116. ISSN 1823-6499

Ghanbari, A (2006) Model-based integrated total project management systems, with an emphasis on materials management. PhD thesis, University of British Columbia, Canada.

Ghanbariazarneir, S.; Maskell, D.; Darby, A.; Heshmati, K. and Walker, I. (2026) The relationship between temperature, relative humidity, and productivity in workplace settings. Building Research & Information, 54(5), pp. 611-631. ISSN 0961-3218

Ghanbaripour, A N; Golmoradi, M; Langston, C; Skulmoski, G and Arqoub, M A (2022) The effect of project manager's management style on project delivery success in construction projects. International Journal of Construction Management, 22(15), pp. 2941-2950. ISSN 1562-3599

Gharouni Jafari, K. and Noorzai, E. (2026) Challenging the status quo: Critical barriers to integrated project delivery implementation in Iran. Architectural Engineering and Design Management, 22(1), pp. 83-98. ISSN 1745-2007

Gharouni Jafari, K and Noorzai, E (2021) Selecting the most appropriate project manager to improve the performance of the occupational groups in road construction projects in warm regions. Journal of Construction Engineering and Management, 147(10): 04021131, ISSN 0733-9364

Ghasemi, M; Chakrabortty, R K; Shahabi-Shahmiri, R and Mirnezami, S A (2024) A chance-constrained programming method with credibility measure for solving the multi-skill multi-mode resource-constrained project scheduling problem. International Journal of Construction Management, 24(10), pp. 1090-1106. ISSN 1562-3599

Ghavam, H R (1990) Characteristics of external activators in third world village development. PhD thesis, Colorado State University, USA.

Ghazi Wakili, K; Bundi, R and Binder, B (2004) Effective thermal conductivity of vacuum insulation panels. Building Research & Information, 32(4), pp. 293-299. ISSN 0961-3218

Gholami Rostam, Mehdi (2024) Energy efficiency assessment in building designs integrating climate resilience and long-term environmental sustainability. PhD thesis, University of New South Wales, Australia.

Gholipour, H F; Farzanegan, M R and Abu Al-Foul, M N (2024) House prices and labour productivity growth: Evidence from oecd countries. Construction Management and Economics, 42(6), pp. 582-589. ISSN 01446193

Ghorbani Naeini, H; Norouziasas, A; Piraei, F; Kazemi, M; Kazemi, M and Hamdy, M (2024) Impact of building envelope parameters on occupants’ thermal comfort and energy use in courtyard houses. Architectural Engineering and Design Management, 20(6), pp. 1725-1751. ISSN 1745-2007

Ghosh, S; Krishna, S R; Billton, J V; Srikanth, S A; Mohandas, S; Ashwin Ganesh, M and Shiv Kulin, C (2021) Countering tropical cyclonic storm impacts on low-rise houses. Smart and Sustainable Built Environment, 10(4), pp. 631-652. ISSN 2046-6099

Ghulman, B A (2000) Predicting construction cost growth in ODOT's paving projects using information available at the bidding time. PhD thesis, Oklahoma State University, USA.

Gil, N and Tommelein, I D (2003) Using product and process flexibility to cope with project delivery uncertainty. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Gil, N; Tommelein, I D and Ballard, G (2004) Theoretical comparison of alternative delivery systems for projects in unpredictable environments. Construction Management and Economics, 22(5), pp. 495-508. ISSN 01446193

Gil, N; Tommelein, I D; Kirkendall, R L and Ballard, G (2001) Leveraging specialty-contractor knowledge in design-build organizations. Engineering, Construction and Architectural Management, 8(5-6), pp. 355-367. ISSN 0969-9988

Gil, N A P d A P (2001) Product-process development simulation to support specialty contractor involvement in early design. PhD thesis, University of California, Berkeley, USA.

Gilbert, M; Barati, K and Shen, X (2025) Parametric analysis and optimisation of design elements impacting thermal loads in residential settings. Built Environment Project and Asset Management, 15(5), pp. 974-987. ISSN 2044-124X

Gilkey, D P (2002) Occupational low back pain in residential carpenters: Ergonomic elements of posture and strain. PhD thesis, Colorado State University, USA.

Gilkey, D P; Del Puerto, C L; Keefe, T; Bigelow, P; Herron, R; Rosecrance, J and Chen, P (2012) Comparative analysis of safety culture perceptions among homesafe managers and workers in residential construction. Journal of Construction Engineering and Management, 138(9), pp. 1044-1052. ISSN 0733-9364

Girmscheid, G (2009) NPV model for evaluating the economic efficiency of municipal street maintenance by private providers. Journal of Construction Engineering and Management, 135(8), pp. 701-709. ISSN 0733-9364

Gluch, P and Stenberg, A C (2006) How do trade media influence green building practice? Building Research & Information, 34(2), pp. 104-117. ISSN 0961-3218

Godoy-Shimizu, D; Steadman, P and Evans, S (2021) Density and morphology: From the building scale to the city scale. Buildings & Cities, 2(1), pp. 92-113. ISSN 2632-6655

Godoy-Shimizu, D; Steadman, P; Hamilton, I; Donn, M; Evans, S; Moreno, G and Shayesteh, H (2018) Energy use and height in office buildings. Building Research & Information, 46(8), pp. 845-863. ISSN 0961-3218

Goedert, J D and Meadati, P (2008) Integrating construction process documentation into building information modeling. Journal of Construction Engineering and Management, 134(7), pp. 509-516. ISSN 0733-9364

Goel, A; Ganesh, L S and Kaur, A (2021) Sustainability assessment of construction practices in India using inductive content analysis of research literature. International Journal of Construction Management, 21(8), pp. 802-817. ISSN 1562-3599

Goh, Y M (2015) Empirical investigation of the average deployment force of personal fall-arrest energy absorbers. Journal of Construction Engineering and Management, 141(1): 04014059, ISSN 0733-9364

Goldswain C, S J (2013) Key inputs into a designing for construction health, safety, and ergonomics model in South Africa. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Golizadeh, H and Namini, S B (2015) Predicting the significant characteristics of concrete containing palm oil fuel ash. Journal of Construction in Developing Countries, 20(1), pp. 85-98. ISSN 1823-6499

Gomar, J E; Haas, C T and Morton, D P (2002) Assignment and allocation optimization of partially multiskilled workforce. Journal of Construction Engineering and Management, 128(2), pp. 103-109. ISSN 0733-9364

Gomez, C; Castiblanco, D; Lozano, J M and Daza, C (2020) An exact optimization approach to the principal-agent problem in infrastructure projects via PPPs. International Journal of Construction Management, 20(6), pp. 679-689. ISSN 1562-3599

Goncalves, Andriani Tavares Tenorio (2019) Integrated solid waste management index for decision support in municipalities. PhD thesis, Universidade Federal de Itajubá, Brazil.

González-Cruz, M C; Ballesteros-Pérez, P; Lucko, G and Zhang, J X (2022) Critical duration index: Anticipating project delays from deterministic schedule information. Journal of Construction Engineering and Management, 148(11): 04022121, ISSN 0733-9364

Goodess, C; Berk, S; Ratna, S B; Brousse, O; Davies, M; Heaviside, C; Moore, G and Pineo, H (2021) Climate change projections for sustainable and healthy cities. Buildings & Cities, 2(1), pp. 812-836. ISSN 2632-6655

Goodrum, P M; Zhai, D and Yasin, M F (2009) Relationship between changes in material technology and construction productivity. Journal of Construction Engineering and Management, 135(4), pp. 278-287. ISSN 0733-9364

Gori, E (1996) Portfolio selection of capital investment projects in the Durban Metropolitan Region. Construction Management and Economics, 14(5), pp. 451-456. ISSN 01446193

Gormley, M and Campbell, D P (2006) Modelling water reduction effects: Method and implications for horizontal drainage. Building Research & Information, 34(2), pp. 131-144. ISSN 0961-3218

Gorse, C; Glew, D; Miles-Shenton, D and Farmer, D (2015) Addressing the thermal performance gap: Possible performance control tools for the construction manager. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Gorse, C; Stafford, A; Shenton, D M; Johnston, D; Sutton, R and Farmer, D (2012) Thermal performance of buildings and the management process. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Gorse, C A (2004) Monitoring, planning and tracking: Delay, disruption and legal risk management. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Gorse, C A and Emmitt, S (2007) Communication behaviour during management and design team meetings: A comparison of group interaction. Construction Management and Economics, 25(11), pp. 1197-1213. ISSN 01446193

Goulding, J S and Alshawi, M (2002) Generic and specific IT training: A process protocol model for construction. Construction Management and Economics, 20(6), pp. 493-505. ISSN 01446193

Gowda, R K; Singh, A and Connolly, M (1998) Holistic enhancement of the production analysis of bituminous paving operations. Construction Management and Economics, 16(4), pp. 417-432. ISSN 01446193

Grafström, J and Rydén, S (2026) A transition probability analysis of material flows in the European aggregates industry. Construction Management and Economics, 44(3), pp. 200-213. ISSN 0144-6193

Graham, D; Tommelein, I D and Smith, S D (2005) Cost reduction through vertical integration of the in-situ concrete supply chain. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Graham, L D; Smith, S D and Dunlop, P (2005) Lognormal distribution provides an optimum representation of the concrete delivery and placement process. Journal of Construction Engineering and Management, 131(2), pp. 230-238. ISSN 0733-9364

Graham, P; Nourian, P; Warwick, E and Gath-Morad, M (2024) 'Rightsize': a housing design game for spatial and energy sufficiency. Buildings & Cities, 5(1), pp. 316-330. ISSN 2632-6655

Grau, D and Back, W E (2015) Predictability index: Novel metric to assess cost and schedule performance. Journal of Construction Engineering and Management, 141(12): 04015043, ISSN 0733-9364

Greeff, T N (2018) Justification for the recognition of a new nominate contract based on project defect management. LLD thesis, University of Pretoria, South Africa.

Green, M F (1975) The application of probabilistic methods to building design. PhD thesis, University of Surrey, UK.

Green, S D (1998) The technocratic totalitarianism of construction process improvement: A critical perspective. Engineering, Construction and Architectural Management, 5(4), pp. 376-386. ISSN 0969-9988

Green, S D and Schweber, L (2008) Theorizing in the context of professional practice: The case for middle-range theories. Building Research & Information, 36(6), pp. 649-654. ISSN 0961-3218

Greene, A; Thorpe, A and Austin, S A (2001) Utilizing the risky shift phenomenon in construction project management. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Greenwood, D J and Shaglouf, A A (1997) Comparison between planned and actual durations in medium sized building projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Greenwood, M (1997) Discovering an individual's "risk behaviour profile". In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Griffith, A F (1997) Team alignment during pre-project planning of capital facilities. PhD thesis, University of Texas at Austin, USA.

Griffiths, P W; Norton, B; Eames, P C and Lo, S N G (1996) Detailed simulation of heat transfer across planar evacuated glazing. Building Research & Information, 24(3), pp. 141-147. ISSN 0961-3218

Grosse, H (2023) Thrown into a construction dispute: The personal toll of aggressive claims management. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Guan, L (2009) Implication of global warming on air-conditioned office buildings in Australia. Building Research & Information, 37(1), pp. 43-54. ISSN 0961-3218

Guan, Z; Millard, S and Yang, Z (2008) CDIO and the Liverpool Constructionarium. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(2), pp. 77-83. ISSN 17514312

Guerra-Santin, O and Silvester, S (2017) Development of Dutch occupancy and heating profiles for building simulation. Building Research & Information, 45(4), pp. 396-413. ISSN 0961-3218

Guikema, S D (2003) Optimal resource allocation in an engineering design team with asymmetric information. PhD thesis, Stanford University, USA.

Gulbinas, R (2014) Motivating and quantifying energy efficient behavior among commercial building occupants. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Gunathilaka S, T M M D A R J (2013) Critical analysis of research on project success in construction management journals. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Gunatilake, S and Liyanage, C (2010) Harmonizing sustainable construction policy with practice at project level: A research proposition. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Gunay, H B; O'Brien, W; Beausoleil-Morrison, I and Huchuk, B (2014) On adaptive occupant-learning window blind and lighting controls. Building Research & Information, 42(6), pp. 739-756. ISSN 0961-3218

Gunay, H B; Shen, W and Yang, C (2019) Text-mining building maintenance work orders for component fault frequency. Building Research & Information, 47(5), pp. 518-533. ISSN 0961-3218

Gunduz, M (2002) Change orders impact assessment for labor intensive construction. PhD thesis, University of Wisconsin - Madison, USA.

Gunner, J and Skitmore, M (1999) Pre-bid building price forecasting accuracy: Price intensity theory. Engineering, Construction and Architectural Management, 6(3), pp. 267-275. ISSN 0969-9988

Gunner, J and Skitmore, M (1999) Comparative analysis of pre-bid forecasting of building prices based on Singapore data. Construction Management and Economics, 17(5), pp. 635-646. ISSN 01446193

Gunning, J G and Fellows, R F (1997) Perspectives on the review of research publications in construction management. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Guo, J and Kato, H (2024) Role of government equity investment in capital structure of project finance: Global evidence from PPP projects in developing countries. Journal of Construction Engineering and Management, 150(3): 04024003, ISSN 0733-9364

Guo, K; Zhang, L and Wang, T (2021) Concession period optimisation in complex projects under uncertainty: A public-private partnership perspective. Construction Management and Economics, 39(2), pp. 156-172. ISSN 01446193

Guo, X (2008) Pricing and financing roads in transportation networks. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Gupta, M; Hasan, A; Jain, A K and Jha, K N (2018) Site amenities and workers' welfare factors affecting workforce productivity in Indian construction projects. Journal of Construction Engineering and Management, 144(11): 04018101, ISSN 0733-9364

Gupta, R and Chandiwala, S (2010) Understanding occupants: Feedback techniques for large-scale low-carbon domestic refurbishments. Building Research & Information, 38(5), pp. 530-548. ISSN 0961-3218

Gupta, S; Jha, K N and Vyas, G (2022) Proposing building information modeling-based theoretical framework for construction and demolition waste management: Strategies and tools. International Journal of Construction Management, 22(12), pp. 2345-2355. ISSN 1562-3599

Gurmu, A.; Galluzzo, A. and Kite, J. (2021) Modelling customers' perception of the quality of services provided by builders: A case of Victoria, Australia. Construction Economics and Building, 21(1), pp. 100-124. ISSN 2204-9029

Gurmu, A; Kamardeen, I and Mahmood, M N (2023) Blended pedagogical model for effective teaching of building measurement and estimating. International Journal of Construction Management, 23(7), pp. 1138-1147. ISSN 1562-3599

Gurmu, A T (2021) Hybrid model for assessing the influence of safety management practices on labor productivity in multistory building projects. Journal of Construction Engineering and Management, 147(11): 04021139, ISSN 0733-9364

Gurmu, A T and Ongkowijoyo, C S (2020) Predicting construction labor productivity based on implementation levels of human resource management practices. Journal of Construction Engineering and Management, 146(3): 04019115, ISSN 0733-9364

Gurmu, A T and Ongkowijoyo, C S (2020) Stochastic-based model for setting formwork-productivity baseline. Journal of Construction Engineering and Management, 146(9): 04020099, ISSN 0733-9364

Gurung, N and Mahendran, M (2002) Comparative life cycle costs for new steel portal frame building systems. Building Research & Information, 30(1), pp. 35-46. ISSN 0961-3218

Gutierrez-Bucheli, L; Goh, J T; Rashidi, A; Maxwell, D; Digby, R; Fang, Y; Pook, H and Arashpour, M (2025) Adopting immersive technologies in construction training: Determining educational decision-making criteria through a Delphi technique. Smart and Sustainable Built Environment, 14(5), pp. 1434-1458. ISSN 2046-6099

Guy, G B and Kibert, C J (1998) Developing indicators of sustainability: US experience. Building Research & Information, 26(1), pp. 39-45. ISSN 0961-3218

Gwak, H S; Son, S H; Park, Y J and Lee, D E (2016) Exact time-cost tradeoff analysis in concurrency-based scheduling. Journal of Construction Engineering and Management, 142(10): 04016054, ISSN 0733-9364

Gyadu-Asiedu, Nana Akua Asabea; Aigbavboa, Clinton and Stephen, Seyi (2026) Nature-based solutions and materials promoting net-zero construction in South Africa: Trends and insights from a bibliometric review. Journal of Construction Business and Management, 8(2), pp. 28-42. ISSN 2521-0165

Götze, V; Gerber, J D and Jehling, M (2024) Mapping municipal land policies: Applications of flexible zoning for densification. Buildings & Cities, 5(1), pp. 506-520. ISSN 2632-6655

Haar, B W (1983) Collusion in the highway construction industry: Economic evidence as an investigative tool. PhD thesis, University of Nebraska - Lincoln, USA.

Habyalimana, J-B (1989) Change orders and construction projects characteristics: A relational quantitative study. PhD thesis, University of Missouri - Columbia, USA.

Hadidi, L; Assaf, S; Aluwfi, K and Akrawi, H (2017) The effect of ISO 9001 implementation on the customer satisfaction of the engineering design services. International Journal of Building Pathology and Adaptation, 35(2), pp. 176-190.

Hadikusumo, B H W and Rowlinson, S (2004) Capturing safety knowledge using design-for-safety-process tool. Journal of Construction Engineering and Management, 130(2), pp. 281-289. ISSN 0733-9364

Hadipriono, F C (1982) Institutional and procedural methods for preventing failures of long span structures. DEngr thesis, University of California, Berkeley, USA.

Haik, R; Peled, A and Meir, I A (2021) Thermal performance of alternative binders lime hemp concrete (lhc) building: Comparison with conventional building materials. Building Research & Information, 49(7), pp. 763-776. ISSN 0961-3218

Haj Kazem Kashani, H (2012) A real options model for the financial valuation of infrastructure systems under uncertainty. PhD thesis, Georgia Institute of Technology, USA.

Hajifathalian, K; Howell, G; Wambeke, B W; Hsiang, S M and Liu, M (2016) Oops simulation: Cost-benefits trade-off analysis of reliable planning for construction activities. Journal of Construction Engineering and Management, 142(8): 4016030, ISSN 0733-9364

Hajifathalian, K; Wambeke, B W; Liu, M and Hsiang, S M (2012) Effects of production control strategy and duration variance on productivity and work in process: Simulation-based investigation. Journal of Construction Engineering and Management, 138(9), pp. 1035-1043. ISSN 0733-9364

Hajjar, D and Abourizk, S M (1998) Modeling and analysis of aggregate production operations. Journal of Construction Engineering and Management, 124(5), pp. 390-401. ISSN 0733-9364

Haller, M; Lu, W; Stehn, L and Jansson, G (2015) An indicator for superfluous iteration in offsite building design processes. Architectural Engineering and Design Management, 11(5), pp. 360-375. ISSN 1745-2007

Halman, J I M and Voordijk, J T (2012) Balanced framework for measuring performance of supply chains in house building. Journal of Construction Engineering and Management, 138(12), pp. 1444-1450. ISSN 0733-9364

Halpin, D W (1973) An investigation of the use of simulation networks for modeling construction operations. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Halpin, J E (1999) The impact of out-of-town stores on local wildlife habitats. PhD thesis, University of Southampton, UK.

Hamayat, F.; Ahmad, R. F.; Ghaban, W.; Saeed, F.; Ahmad, J.; Anwar, S. M. and Zubair, S. (2026) Data-driven stnet and stprophet models for secure edge-based indoor air temperature prediction in smart buildings. Building Research & Information, 54(4), pp. 492-509. ISSN 0961-3218

Hamide, M (2017) Schedule and cost performance analysis and prediction in Louisiana DOTD. PhD thesis, University of New Orleans, USA.

Hammad, A W A (2020) A multi-objective construction site layout planning problem solved through integration of location and traffic assignment models. Construction Management and Economics, 38(8), pp. 756-772. ISSN 01446193

Hamoda, M F (2008) Modeling of construction noise for environmental impact assessment. Journal of Construction in Developing Countries, 13(1), pp. 79-89. ISSN 1823-6499

Han, J; Chen, C; Tiong, R L K; Wu, K and Chew, D K H (2024) Strategic workforce planning for production of prefabricated bathroom units: An advanced markovian approach. Journal of Construction Engineering and Management, 150(8): 04024097, ISSN 0733-9364

Han, J and Ye, N (2025) Changing identities of architects in China and the UK from the 1950s to the 1990s. Building Research & Information, 53(5), pp. 553-564. ISSN 0961-3218

Hanc, M; McAndrew, C and Ucci, M (2019) Conceptual approaches to wellbeing in buildings: A scoping review. Building Research & Information, 47(6), pp. 767-783. ISSN 0961-3218

Hanna, A S; Camlic, R; Peterson, P A and Lee, M J (2004) Cumulative effect of project changes for electrical and mechanical construction. Journal of Construction Engineering and Management, 130(6), pp. 762-771. ISSN 0733-9364

Hanna, A S; Chang, C K; Sullivan, K T and Lackney, J A (2008) Impact of shift work on labor productivity for labor intensive contractor. Journal of Construction Engineering and Management, 134(3), pp. 197-204. ISSN 0733-9364

Hanna, A S and Gunduz, M (2004) Impact of change orders on small labor-intensive projects. Journal of Construction Engineering and Management, 130(5), pp. 726-733. ISSN 0733-9364

Hanna, A S; Russell, J S; Gotzion, T W and Nordheim, E V (1999) Impact of change orders on labor efficiency for mechanical construction. Journal of Construction Engineering and Management, 125(3), pp. 176-184. ISSN 0733-9364

Hanna, A S; Russell, J S and Vandenberg, P J (1999) The impact of change orders on mechanical construction labour efficiency. Construction Management and Economics, 17(6), pp. 721-730. ISSN 01446193

Hanna Jr., H M (1988) The use of construction management in school building construction. EdD thesis, University of Missouri - Columbia, USA.

Harajli, H A (2009) Cost-benefit analysis of microgenerators: An integrated appraisal perspective. PhD thesis, University of Bath, UK.

Harding, A; Lowe, D; Hickson, A; Emsley, M and Duff, A R (1999) Implementation of a neural network model for the comparison of the cost of different procurement approaches. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Hariyadi, A; Fukuda, H and Ma, Q (2017) The effectiveness of the parametric design 'sudare' blind as external shading for energy efficiency and visibility quality in Jakarta. Architectural Engineering and Design Management, 13(5), pp. 384-403. ISSN 1745-2007

Harris, J R (1980) Organization of building standards: Systematic techniques for scope and arrangement. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Harvey, J (1979) Competitive bidding on Canadian public construction contracts: Stochastic analysis for optimization. PhD thesis, University of Western Ontario, Canada.

Hashemi, H; Mousavi, S M and Mojtahedi, S M H (2011) Bootstrap technique for risk analysis with interval numbers in bridge construction projects. Journal of Construction Engineering and Management, 137(8), pp. 600-608. ISSN 0733-9364

Hasheminasab, S and Kashi, E (2021) Finite element analysis of ports pavement under container loading. Journal of Engineering, Design and Technology, 19(2), pp. 497-508. ISSN 1726-0531

Hassan, O A B and Anderstedt, R (2017) Estimation of drying time of fresh concrete slabs: A comparative study. Journal of Engineering, Design and Technology, 15(2), pp. 134-148.

Hassanein, A A G and el Nemr, W (2007) Management of change order claims in the Egyptian industrial construction sector. Journal of Financial Management of Property and Construction, 12(1), pp. 45-60. ISSN 1366-4387

Hassim, S; Kadir, M R A; Lew, Y L and Sim, Y C (2003) Estimation of minimum working capital for construction projects in Malaysia. Journal of Construction Engineering and Management, 129(4), pp. 369-374. ISSN 0733-9364

Hatamleh, M T (2020) Enhancing the management proficiencies in developing countries: The impact of project risk management within a project management maturity model on project performance. PhD thesis, University of Alabama, USA.

Hayne, G; Kumar, B and Hare, B (2017) Design hazard identification and the link to site experience. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(2), pp. 85-94. ISSN 17514304

Haynes, N S and Love, P E D (2004) Psychological adjustment and coping among construction project managers. Construction Management and Economics, 22(2), pp. 129-140. ISSN 01446193

He, Q and Ng, S T (2017) Energy-efficient window retrofit for existing high-rise residential buildings with the consideration of mutual shading. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

He, Q; Wu, Z; Li, S; Li, H and Wang, Y (2023) Two decades of the evolution of China's green building policy: Insights from text mining. Building Research & Information, 51(2), pp. 158-178. ISSN 0961-3218

He, X; Liu, R and Anumba, C J (2021) Data-driven insights on the knowledge gaps of conceptual cost estimation modeling. Journal of Construction Engineering and Management, 147(2): 04020165, ISSN 0733-9364

Hegazy, T and Moselhi, O (1994) Estimator: A prototype of an integrated bid preparation system. Engineering, Construction and Architectural Management, 1(1), pp. 51-67. ISSN 0969-9988

Hegazy, T and Petzold, K (2003) Genetic optimization for dynamic project control. Journal of Construction Engineering and Management, 129(4), pp. 396-404. ISSN 0733-9364

Helaly, H; El-Rayes, K; Ignacio, E J and Joan, H J (2025) Comparison of machine-learning algorithms for estimating cost of conventional and accelerated bridge construction methods during early design phase. Journal of Construction Engineering and Management, 151(3): 04025004, ISSN 0733-9364

Hellowell, M S (2012) Fair return for risk? An examination of structure, competition and profitability in the market for private finance in the National Health Service. PhD thesis, University of Edinburgh, UK.

Henderson, J R; Ruikar, K and Dainty, A R J (2010) The need for embedding 'learning' in healthcare projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Henn, R L (2013) Moving targets: Managing interinstitutional relationships in green building design and construction. PhD thesis, University of Michigan, USA.

Henriksen, T; Lo, S and Knaack, U (2016) The impact of a new mould system as part of a novel manufacturing process for complex geometry thin-walled gfrc. Architectural Engineering and Design Management, 12(3), pp. 231-249. ISSN 1745-2007

Henriksen, T; Lo, S; Knaack, U and Kirkegaard, P H (2023) Developing and testing a novel manufacturing method for complex geometry thin-walled gfrc panels by fabricating a 10 m high, self-supporting gfrc hyperbolic shell. Architectural Engineering and Design Management, 19(5), pp. 480-510. ISSN 1745-2007

Henson, L L (1980) Use of the Delphi technique: University community involvement in the creation of a library building program at Florida Institute of Technology. PhD thesis, Florida State University, USA.

Heravi, G; Taherkhani, A H; Sobhkhiz, S; Mashhadi, A H and Zahiri-Hashemi, R (2022) Integrating risk management's best practices to estimate deep excavation projects' time and cost. Built Environment Project and Asset Management, 12(2), pp. 180-204. ISSN 2044-124X

Heravi, M Y; Jang, Y and Chauhan, H (2025) Comparative analysis of deep-learning approaches for automatic recognition of awkward postures in construction environments through wrist-worn biosensors. Journal of Construction Engineering and Management, 151(8): 04025108, ISSN 0733-9364

Hidayat, B and Egbu, C (2011) Critical success factors associated with post-disaster reconstruction projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Higham, A and Fortune, C (2010) The early stage benefit planning of housing rengeneration projects: The gap between theory and practice. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Hildreth, J C (2003) The use of short-interval GPS data in construction operations analysis. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Hildreth, J C and Vorster, M C (2010) Learning construction performance improvement through planning. International Journal of Construction Education and Research, 6(2), pp. 139-151. ISSN 1557-8771

Hill, C (2010) The concerns of health, safety and welfare within the tri-partite relationship surrounding work placement for construction. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Hindle, R D and Muller, M H (1997) The role of education as an agent of change: a two-fold effect. Journal of Construction Procurement, 3(1), pp. 56-69. ISSN 1358-9180

Hinze, J and Bren, D (1996) Analysis of fatalities and injuries due to powerline contacts. Journal of Construction Engineering and Management, 122(2), pp. 177-182. ISSN 0733-9364

Hinze, J and Parker, R (1988) Productivity study on extruded concrete curbing operations. Journal of Construction Engineering and Management, 114(2), pp. 256-262. ISSN 0733-9364

Hiyassat, M A; Alkasagi, F; El-Mashaleh, M and Sweis, G J (2022) Risk allocation in public construction projects: The case of Jordan. International Journal of Construction Management, 22(8), pp. 1478-1488. ISSN 1562-3599

Ho, D C W; Chau, K W and Yau, Y (2008) Evaluating unauthorized appendages in private apartment buildings. Building Research & Information, 36(6), pp. 568-579. ISSN 0961-3218

Hoang, V N; Raharjo, J P and Susilawati, C (2022) Meta-frontier efficiency analysis of real estate and construction firms in Indonesia. Construction Management and Economics, 40(10), pp. 770-780. ISSN 01446193

Hobart, C (2019) Building sustainability assessment schemes: The role of criteria in translating aims into effect. PhD thesis, Anglia Ruskin University, UK.

Hoff, R M (2023) A proposal for infrastructure adaptation and cascading failures for black swans. PhD thesis, Arizona State University, USA.

Hollar, D A; Rasdorf, W; Liu, M; Hummer, J E; Arocho, I and Hsiang, S M (2013) Preliminary engineering cost estimation model for bridge projects. Journal of Construction Engineering and Management, 139(9), pp. 1259-1267. ISSN 0733-9364

Holley, P W (2016) Learning styles and preferences of field managers in U.S. non-residential construction. PhD thesis, Auburn University, USA.

Hong, S M; Paterson, G; Mumovic, D and Steadman, P (2014) Improved benchmarking comparability for energy consumption in schools. Building Research & Information, 42(1), pp. 47-61. ISSN 0961-3218

Honorée, A L; Morgan, Y C T and Krenn, M (2020) Heights of privilege: Economic and cultural determinants of skyscraper height across the world. International Journal of Construction Management, 20(7), pp. 761-774. ISSN 1562-3599

Hopkin, C; Spearpoint, M; Hopkin, D and Wang, Y (2020) Fire safety design of open plan apartments in England. Architectural Engineering and Design Management, 16(5), pp. 391-410. ISSN 1745-2007

Horman, M J; Orosz, M P and Riley, D R (2006) Sequence planning for electrical construction. Journal of Construction Engineering and Management, 132(4), pp. 363-372. ISSN 0733-9364

Horman, Michael J (2000) Process dynamics: Buffer management in building project operations. PhD thesis, University of Melbourne, Australia.

Hosny, O A (1991) An intelligent decision support system for construction planning and scheduling. PhD thesis, University of Missouri - Rolla, USA.

Hossain, L (2010) An optimization model for the dynamic multi-project environment in construction. PhD thesis, University of Calgary, Canada.

Hossain, M K (2015) Investigating the relationship between the culture of construction project-based organisations and the implementation of building information modelling. PhD thesis, University of Dundee, UK.

Hosseini, M R; Maghrebi, M; Akbarnezhad, A; Martek, I and Arashpour, M (2018) Analysis of citation networks in building information modeling research. Journal of Construction Engineering and Management, 144(8): 04018064, ISSN 0733-9364

Hosseini, M R; Martek, I; Chileshe, N; Zavadskas, E K and Arashpour, M (2018) Assessing the influence of virtuality on the effectiveness of engineering project networks: "Big five theory" perspective. Journal of Construction Engineering and Management, 144(7): 04018059, ISSN 0733-9364

Hosseinian, S M and Jaberi, A (2024) Optimal sharing of construction project outcomes with downstream contracting parties: Principal-agent analysis. Journal of Construction Engineering and Management, 150(2): 04023156, ISSN 0733-9364

Hou, H (2023) Understanding building and urban environment interactions: an integrated framework for building occupancy modelling. PhD thesis, Imperial College London, UK.

Householder, J L and Rutland, H E (1990) Who owns float? Journal of Construction Engineering and Management, 116(1), pp. 130-133. ISSN 0733-9364

Hovde, G O (1995) Fatigue and overload reliability of offshore structural systems, considering the effect of inspection and repair. DrIng thesis, Universitetet i Trondheim Norges Tekniske Hogskole, Norway.

Hoxley, M (2000) Are competitive fee tendering and construction professional service quality mutually exclusive? Construction Management and Economics, 18(5), pp. 599-605. ISSN 01446193

Hoxley, M and Rowsell, R (2006) Using video in the construction technology classroom: Encouraging active learning. Architectural Engineering and Design Management, 2(1-2), pp. 115-122. ISSN 1745-2007

Hsiao, W T; Yu, W D and Shih, C C (2026) Proactive construction hazard prevention model using machine learning. Journal of Construction Engineering and Management, 152(2): 04025261, ISSN 0733-9364

Hsieh, H H Y (2005) The 1990s Taiwan residential construction boom: A supply side interpretation. Construction Management and Economics, 23(3), pp. 265-284. ISSN 01446193

Hu, E C M; Ng, I and Lau, O M F (2011) Speculative bubbles in mass and luxury properties: An investigation of the Hong Kong residential market. Construction Management and Economics, 29(8), pp. 781-793. ISSN 1466433X

Hu, M and Milner, D (2021) Factors influencing existing medium-sized commercial building energy retrofits to achieve the net zero energy goal in the United States. Building Research & Information, 49(5), pp. 525-542. ISSN 0961-3218

Hu, M; Nippala, E; Kallioharju, K and Pelsmakers, S (2022) Monte Carlo simulation approach to understand the cost variance for energy retrofit projects: Comparative study of Finland and the United States. Construction Management and Economics, 40(3), pp. 207-222. ISSN 01446193

Hu, M and Skibniewski, M (2022) The impact of the design team characteristics on the sustainable building construction cost: Structural equation model analysis. Architectural Engineering and Design Management, 18(5), pp. 614-630. ISSN 1745-2007

Hu, X; Xia, B; Skitmore, M and Buys, L (2015) Conceptualizing sustainable retirement villages in Australia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Hu, Y; Castro-Lacouture, D; Eastman, C M and Navathe, S B (2021) Component change list prediction for BIM-based clash resolution from a graph perspective. Journal of Construction Engineering and Management, 147(8), ISSN 0733-9364

Hu, Z; Chan, W T and Hu, H (2023) Personalized construction safety interventions considering cognitive-related factors. Journal of Construction Engineering and Management, 149(12): 04023137, ISSN 0733-9364

Hua, G B (1996) Residential construction demand forecasting using economic indicators: A comparative study of artificial neural networks and multiple regression. Construction Management and Economics, 14(1), pp. 25-34. ISSN 01446193

Huang, C and Wong, C K (2017) Discretized cell modeling for optimal facility layout plans of unequal and irregular facilities. Journal of Construction Engineering and Management, 143(1): 04016082, ISSN 0733-9364

Huang, X and Hinze, J (2006) Owner's role in construction safety: Guidance model. Journal of Construction Engineering and Management, 132(2), pp. 174-181. ISSN 0733-9364

Huang, Y; Trinh, M T and Le, T (2021) Critical factors affecting intention of use of augmented hearing protection technology in construction. Journal of Construction Engineering and Management, 147(8): 0002116, ISSN 0733-9364

Huang, Y L (2009) Prediction of contractor default probability using structural models of credit risk: An empirical investigation. Construction Management and Economics, 27(6), pp. 581-596. ISSN 1466433X

Huang, Y L and Lin, T C (2023) Compound deferrable options for the valuation of multi-stage infrastructure investment projects. Construction Management and Economics, 41(8), pp. 670-686. ISSN 01446193

Huang, Y L and Lin, W (2010) Does debt structure matter? Estimating contractor default barrier by the down-and-out call option approach. Construction Management and Economics, 28(9), pp. 947-958. ISSN 1466433X

Huchuk, B; Gunay, H B; O'Brien, W and Cruickshank, C A (2016) Model-based predictive control of office window shades. Building Research & Information, 44(4), pp. 445-455. ISSN 0961-3218

Huebner, G M; Fell, M J and Watson, N E (2021) Improving energy research practices: Guidance for transparency, reproducibility and quality. Buildings & Cities, 2(1), pp. 1-20. ISSN 2632-6655

Hughes, C and Crosby, N (2012) The challenge of self-regulation in commercial property leasing: A study of lease codes in the UK. International Journal of Law in the Built Environment, 4(1), pp. 23-44. ISSN 1756-1450

Hughes, S W (2004) The relationship between a project's success and the level of engagement of its labor and management. PhD thesis, University of Alabama in Huntsville, USA.

Huh, Y (2004) Highway bridge construction production rates for time estimation. PhD thesis, University of Texas at Austin, USA.

Hui, E C M (1999) Hong Kong's public housing policy: A new perspective on government intervention and rationale. Journal of Financial Management of Property and Construction, 4(3), pp. 5-28. ISSN 1366-4387

Hui, E C M (2002) Land use regulations and property market. Journal of Financial Management of Property and Construction, 7(1), pp. 65-71. ISSN 1366-4387

Hui, E C M; Ho, M F and Tam, S H (1998) Review of public housing rent policy in Hong Kong. Journal of Financial Management of Property and Construction, 3(3), pp. 75-88. ISSN 1366-4387

Hui, E C M; Liang, C; Wang, Z; Song, B T and Gu, Q (2012) Real estate bubbles in China: A tale of two cities. Construction Management and Economics, 30(11), pp. 951-961. ISSN 1466433X

Hui, E C M; Lo, T K K; Chen, J and Wang, Z (2012) Housing and consumer markets in urban China. Construction Management and Economics, 30(2), pp. 117-131. ISSN 1466433X

Hui, E C M and Ng, I (2009) Price discovery of property markets in Shenzhen and Hong Kong. Construction Management and Economics, 27(12), pp. 1175-1196. ISSN 1466433X

Hulio, Z H; Yousufzai, G and Jiang, W (2021) Statistical analysis of wind resource and energy potential assessment of quaidabad site, sindh Pakistan. Journal of Engineering, Design and Technology, 19(6), pp. 1291-1316. ISSN 1726-0531

Hunt, B J P (1980) Development of a research program for scaffolding standards. DEng thesis, University of Kansas, USA.

Hunter, I A N; Mitrovic, D; Hassan, T M; Gayoso, A and Garas, F (1999) The elsewise vision, development routes and recommendations. Engineering, Construction and Architectural Management, 6(1), pp. 51-62. ISSN 0969-9988

Huovinen, P (2020) Advancement of the design of AEC-related business management concepts along the common good dimension. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Hwang, B G; Krishnankutty, P; Zhu, L; Caldas, C H; Shounak, A and Mulva, S (2020) Improving labour productivity in process construction maintenance and shutdown/turnaround projects. International Journal of Construction Management, 20(7), pp. 822-836. ISSN 1562-3599

Hwang, B G; Shan, M; Zhu, L and Lim, W C (2020) Cost control in megaprojects: Efficacy, tools and techniques, key knowledge areas and project comparisons. International Journal of Construction Management, 20(5), pp. 437-449. ISSN 1562-3599

Hwang, S; Park, M; Lee, H S and Lee, S (2016) Hybrid simulation framework for immediate facility restoration planning after a catastrophic disaster. Journal of Construction Engineering and Management, 142(8): 4016026, ISSN 0733-9364

Ianakiev, A and Greenwood, J (2013) Design and analysis of rotomoulded panels for a self-erecting low-cost flood barrier. Architectural Engineering and Design Management, 9(2), pp. 110-120. ISSN 1745-2007

Ibbs, C W and Ashley, D B (1987) Impact of various construction contract clauses. Journal of Construction Engineering and Management, 113(3), pp. 501-521. ISSN 0733-9364

Ibbs, W (2005) Impact of change's timing on labor productivity. Journal of Construction Engineering and Management, 131(11), pp. 1219-1223. ISSN 0733-9364

Ibem, E O; Anosike, M N; Azuh, D E and Mosaku, T O (2011) Work stress among professionals in the building construction industry in Nigeria. Construction Economics and Building, 11(3), pp. 46-57. ISSN 2204-9029

Ibrahim, Y M; Kaka, A P; Aouad, G and Kagioglou, M (2008) As-built documentation of construction sequence by integrating virtual reality with time-lapse movies. Architectural Engineering and Design Management, 4(2), pp. 73-84. ISSN 1745-2007

Ibrahim Mahmoud, M M (2005) An xml initiative of transferring architectural information to the construction site based on the BIM object concept. PhD thesis, Illinois Institute of Technology, USA.

Idowu, O S and Lam, K C (2020) Conceptual quantities estimation using bootstrapped support vector regression models. Journal of Construction Engineering and Management, 146(4): 04020018, ISSN 0733-9364

Igwe, C; Hammad, A and Nasiri, F (2022) Influence of lean construction wastes on the transformation-flow-value process of construction. International Journal of Construction Management, 22(13), pp. 2598-2604. ISSN 1562-3599

Ikuabe, M; Clinton, C; Anumba, C and Oke, A E (2025) Structural determinants of the uptake of cyber-physical systems for facilities management: A confirmatory factor analysis approach. Smart and Sustainable Built Environment, 14(5), pp. 1591-1607. ISSN 2046-6099

Ilozor, B D and Ilozor, D B (2005) Openplan attributes and effective facilities management. Journal of Engineering, Design and Technology, 3(1), pp. 1-11. ISSN 1726-0531

Ilozor, B D and Ilozor, D B (2005) Open-plan attributes and effective facilities management. Journal of Engineering, Design and Technology, 3(1), pp. 1-11. ISSN 1726-0531

Innella, Filomena (2020) Performance of building modules production and transportation. PhD thesis, Monash University, Australia.

Innocent Jr., M J F (2018) Predicting military construction project time outcomes using data analytics. PhD thesis, George Washington University, USA.

Ioannou, P G (1987) Geologic prediction model for tunneling. Journal of Construction Engineering and Management, 113(4), pp. 569-590. ISSN 0733-9364

Ioannou, P G and Awwad, R E (2010) Below-average bidding method. Journal of Construction Engineering and Management, 136(9), pp. 936-946. ISSN 0733-9364

Ip, K; Miller, A and Ellis, J (2003) Criteria and measurement of indoor air quality in sustainable buildings. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Ip, K; Miller, A and Shum, F (2003) Evaluation of indoor air quality and energy use in air conditioned office buildings. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Irurah, D K and Holm, D (1999) Energy impact analysis of building construction as applied to South Africa. Construction Management and Economics, 17(3), pp. 363-374. ISSN 01446193

Ishaak, F F (2025) Improving commercial property price statistics. PhD thesis, Delft University of Technology, Netherlands.

Isikdag, U; Underwood, J; Aouad, G and Trodd, N (2007) Investigating the role of building information models as a part of an integrated data layer: A fire response management case. Architectural Engineering and Design Management, 3(2), pp. 124-142. ISSN 1745-2007

Islam, M D M and Faniran, O O (2005) Structural equation model of project planning effectiveness. Construction Management and Economics, 23(2), pp. 215-223. ISSN 01446193

Islam, M S; Mohandes, S R; Mahdiyar, A; Fallahpour, A and Olanipekun, A O (2022) A coupled genetic programming Monte Carlo simulation-based model for cost overrun prediction of thermal power plant projects. Journal of Construction Engineering and Management, 148(8): 04022073, ISSN 0733-9364

Islam, M S; Salem, M; Tantawy, M and Salah, M (2024) Cost overrun risk assessment for healthcare projects: A modified fuzzy group decision-making approach. Journal of Construction Engineering and Management, 150(12): 04024168, ISSN 0733-9364

Ismaeel, W S E (2020) An integrated model for energy-efficient building opening design. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Ismaeel, W S E; Mohamed, F and Elakkad, N (2021) Scenarios of occupational capacity for high educational buildings in the time of COVID. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Israel, B (2023) The impact of clients' procurement challenges on the substance goals of roads construction projects in songwe, Tanzania. International Journal of Construction Management, 23(12), pp. 2144-2150. ISSN 1562-3599

Issa, D; Emsley, M and Krikham, R (2012) Reviewing risk allocation for infrastructure pfi: Between theory and practice. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Issa, M H; Attalla, M; Rankin, J H and Christian, A J (2011) Energy consumption in conventional, energyretrofitted and green LEED Toronto schools. Construction Management and Economics, 29(4), pp. 383-395. ISSN 1466433X

Ive, G (1994) A theory of ownership types applied to the construction majors. Construction Management and Economics, 12(4), pp. 349-364. ISSN 01446193

Ive, G; Murray, A and Marsh, R (2015) Cost and value ratios of operating renewed English secondary schools. Building Research & Information, 43(4), pp. 465-485. ISSN 0961-3218

Iweka A, A A K (2015) Ethnicity of households and crowding levels in public housing multifamily apartments in Lagos, Nigeria. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Izzat, R M (1977) A computerised approach to bidding strategy in civil engineering. PhD thesis, Aston University, UK.

Işıklar Bengi, S and Toprakli, A Y (2025) Assessing experiential performance in basketball halls: a comparative measure through post-occupancy evaluation. Architectural Engineering and Design Management, 21(4), pp. 621-641. ISSN 1745-2007

Jaafari, A; Manivong, K K and Chaaya, M (2001) Vircon: Interactive system for teaching construction management. Journal of Construction Engineering and Management, 127(1), pp. 66-75. ISSN 0733-9364

Jaafari, A and Mateffy, V K (1990) Realistic model for equipment replacement. Journal of Construction Engineering and Management, 116(3), pp. 514-532. ISSN 0733-9364

Jack, R; Loveday, D; Allinson, D and Lomas, K (2018) First evidence for the reliability of building co-heating tests. Building Research & Information, 46(4), pp. 383-401. ISSN 0961-3218

Jacob, J C; Pandit, D and Sen, J (2025) Developing a validated simulation model of micro-zonal air-conditioning to evaluate thermal comfort parameters. Architectural Engineering and Design Management, 21(2), pp. 289-314. ISSN 1745-2007

Jadevicius, A; Sloan, B and Brown, A (2010) Is 100 years of research on property cycles enough to predict the future of UK property market performance with accuracy? In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Jafari, K G; Nozhat Sadat Ghazi, S and Noorzai, E (2021) BIM-based integrated solution for analysis and management of mismatches during construction. Journal of Engineering, Design and Technology, 19(1), pp. 81-102. ISSN 1726-0531

Jafarzadeh, R; Ingham, J M; Walsh, K Q; Hassani, N and Ghodrati Amiri, G R (2015) Using statistical regression analysis to establish construction cost models for seismic retrofit of confined masonry buildings. Journal of Construction Engineering and Management, 141(5): 04014098, ISSN 0733-9364

Jagafa, K (2016) A framework for construction business recovery in small and medium sized privately owned companies. PhD thesis, University of Salford, UK.

Jahanger, Q K (2025) Digitalization of construction-phase information management by project owners: Qualitative analysis of potential benefits and probable factors. Engineering, Construction and Architectural Management, 32(11), pp. 7561-7586. ISSN 0969-9988

Jahren, C T and Hancher, D E (1989) Evaluation of new concepts for cellular structure construction. Journal of Construction Engineering and Management, 115(1), pp. 15-34. ISSN 0733-9364

Jalilzadehazhari, E; Johansson, J and Mahapatra, K (2019) Applying a decision-making framework for resolving conflicts when selecting windows and blinds. Architectural Engineering and Design Management, 15(5), pp. 382-401. ISSN 1745-2007

Jalilzadehazhari, E; Johansson, P; Johansson, J and Mahapatra, K (2017) Application of analytical hierarchy process for selecting an interior window blind. Architectural Engineering and Design Management, 13(4), pp. 308-324. ISSN 1745-2007

Jalilzadehazhari, E; Johansson, P; Johansson, J and Mahapatra, K (2019) Developing a decision-making framework for resolving conflicts when selecting windows and blinds. Architectural Engineering and Design Management, 15(5), pp. 357-381. ISSN 1745-2007

Jalloul, H; Choi, J; Manheim, D; Yesiller, N and Derrible, S (2024) Incorporating disaster debris into sustainable construction research and practice. Journal of Construction Engineering and Management, 150(1): 02523001, ISSN 0733-9364

Jamalizadeh, A.; Kargar, V.; Haghighi, A.; Jahangiri, M.; Alimohammadlou, M. and Kamalinia, M. (2026) Identification and prioritization of preventive measures for crane overturning to enhance safety in asymmetric tandem lifting: Fuzzy logic approach. Journal of Construction Engineering and Management, 152(8): 04026126, ISSN 0733-9364

Jang, Y; Jeong, I B; Cho, Y K and Ahn, Y (2019) Predicting business failure of construction contractors using long short-term memory recurrent neural network. Journal of Construction Engineering and Management, 145(11): 04019067, ISSN 0733-9364

Jannadi, M O (1997) An effective safety programme for a concrete product manufacturing plant. Building Research & Information, 25(2), pp. 92-100. ISSN 0961-3218

Jarkas, A M (2010) Buildability factors influencing micro-level formwork labour productivity of slab panels in building floors. Architectural Engineering and Design Management, 6(3), pp. 161-174. ISSN 1745-2007

Jarkas, A M (2010) The influence of buildability factors on rebar fixing labour productivity of beams. Construction Management and Economics, 28(5), pp. 527-543. ISSN 1466433X

Jarkas, A M (2010) Buildability factors influencing formwork labour productivity of walls. International Journal of Construction Management, 10(4), pp. 101-117. ISSN 1562-3599

Jarkas, A M (2010) The effects of buildability factors on rebar fixing labour productivity of isolated foundations. International Journal of Construction Management, 10(2), pp. 33-51. ISSN 1562-3599

Jarkas, A M (2011) Buildability factors that influence micro-level formwork labour productivity of beams in building floors. Journal of Construction in Developing Countries, 16(1), pp. 1-18. ISSN 1823-6499

Jarkas, A M (2012) Buildability factors influencing concreting labor productivity. Journal of Construction Engineering and Management, 138(1), pp. 89-97. ISSN 0733-9364

Jarkas, A M (2012) Influence of buildability factors on rebar installation labor productivity of columns. Journal of Construction Engineering and Management, 138(2), pp. 258-267. ISSN 0733-9364

Jarkas, A M (2017) Beamless or beam-supported building floors: Is buildability knowledge the missing link to improving productivity? Engineering, Construction and Architectural Management, 24(3), pp. 537-552. ISSN 0969-9988

Jarkas, A M and Horner, R M W (2015) Creating a baseline for labour productivity of reinforced concrete building construction in Kuwait. Construction Management and Economics, 33(8), pp. 625-639. ISSN 01446193

Jarrah, R T (2007) Planning for, facilitating, and evaluating design effectiveness. PhD thesis, University of Texas at Austin, USA.

Jaselskis, E J (1988) Achieving construction project success through predictive discrete choice models. PhD thesis, University of Texas at Austin, USA.

Jaselskis, E J; Anderson, S D and Russell, J S (1996) Strategies for achieving excellence in construction safety performance. Journal of Construction Engineering and Management, 122(1), pp. 61-70. ISSN 0733-9364

Jaskot, P B (1993) The architectural policy of the SS, 1936-1945. PhD thesis, Northwestern University, USA.

Javid, M and Seneviratne, P N (2000) Investment risk analysis in airport parking facility development. Journal of Construction Engineering and Management, 126(4), pp. 298-305. ISSN 0733-9364

Jayantha Wadu, M and Maqsood, T (2022) Transport infrastructure, accessibility and residential property values: Evidence from Hong Kong. Built Environment Project and Asset Management, 12(2), pp. 163-179. ISSN 2044-124X

Jayasuriya, S; Zhang, G and Yang, R J (2020) Exploring the impact of stakeholder management strategies on managing issues in PPP projects. International Journal of Construction Management, 20(6), pp. 666-678. ISSN 1562-3599

Jayawardane, A K W (1989) Optimising earthmoving by linear programming and computer simulation. PhD thesis, Loughborough University, UK.

Jayawardane, A K W and Harris, F C (1990) Further development of integer programming in earthwork optimization. Journal of Construction Engineering and Management, 116(1), pp. 18-34. ISSN 0733-9364

Jeelani, I; Albert, A and Gambatese, J A (2017) Why do construction hazards remain unrecognized at the work interface? Journal of Construction Engineering and Management, 143(5): 04016128, ISSN 0733-9364

Jennings, W (2012) Why costs overrun: Risk, optimism and uncertainty in budgeting for the London 2012 Olympic Games. Construction Management and Economics, 30(6), pp. 455-462. ISSN 1466433X

Jensen, D A (2010) A longitudinal study of a Type I differing conditions claim: Investigating the contractor's failure to meet the reasonable prudent standard. Construction Management and Economics, 28(1), pp. 63-74. ISSN 1466433X

Jensen, D A and Patterson, J E (2011) Janus head of liquidated damages: Does public policy influence United States courts regarding enforceability of a liquidating damages clause? International Journal of Construction Education and Research, 7(2), pp. 143-156. ISSN 1557-8771

Jensen, E and Koch, C (2003) Making large infrastructure projects safe: The case of the Copenhagen Metro. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Jensen, P A (2012) Knowledge transfer from facilities management to building projects: A typology of transfer mechanisms. Architectural Engineering and Design Management, 8(3), pp. 170-179. ISSN 1745-2007

Jensen Jr., D A (1993) Liquidated damages clauses in construction contracts: A study of the application preference of the three-prong test by the appellate court system. PhD thesis, Texas A&M University, USA.

Jensen Jr, D A and Craig Jr, J W (1998) Testing the validity of liquidated damages clauses: Measuring the application preference and consistency of the intent test as applied by the United States court system. Construction Management and Economics, 16(3), pp. 269-281. ISSN 01446193

Jeong, E; Jang, J; Kim, T W and Lee, S (2025) Divide-and-conquer-based stratified models for predicting precast concrete installation times. Journal of Construction Engineering and Management, 151(9): 05025011, ISSN 0733-9364

Jeong, J and Jeong, J (2024) Sustainability in prefabricated construction: Enhancing multicriteria analysis and prediction using machine learning. Journal of Construction Engineering and Management, 150(8): 04024081, ISSN 0733-9364

Jezzini, Y; Assaad, R H and El-Adaway, I H (2025) Modeling framework to quantify and gauge project cost risks due to construction material price volatilities using predictive probabilistic deep-learning algorithms and stochastic risk modeling. Journal of Construction Engineering and Management, 151(7): 04025071, ISSN 0733-9364

Ji, X L; Lou, W Z; Dai, Z Z; Wang, B G and Liu, S Y (2006) Predicting thermal comfort in Shanghai's non-air-conditioned buildings. Building Research & Information, 34(5), pp. 507-514. ISSN 0961-3218

Jia, B; Yang, Y; Xie, B and Yu, X (2021) Novel geometric control technology for precast segmental bridges. Journal of Construction Engineering and Management, 147(4): 04021006, ISSN 0733-9364

Jia, J (2017) Multi-criteria evaluation in support of the decision-making process in highway construction projects. PhD thesis, Florida International University, USA.

Jiang, A and Zhu, Y (2011) Life cycle cost analysis of residential grid-connected solar photovoltaic systems in Florida. International Journal of Construction Education and Research, 7(1), pp. 71-81. ISSN 1557-8771

Jiang, A and Zhu, Y (2012) Impact of incentives and system efficiency on the life cycle cost of photovoltaic systems. International Journal of Construction Education and Research, 8(3), pp. 204-222. ISSN 1557-8771

Jiang, A; Zhu, Y; Elsafty, A and Tumeo, M (2018) Effects of global climate change on building energy consumption and its implications in Florida. International Journal of Construction Education and Research, 14(1), pp. 22-45. ISSN 1557-8771

Jiang, W; Zhao, X and Zuo, J (2021) Confucian principles and performance: A contractors' leadership model. International Journal of Construction Management, 21(8), pp. 834-844. ISSN 1562-3599

Jiang, Y (1990) The development of performance prediction and optimization models for bridge management systems. PhD thesis, Purdue University, USA.

Jiménez-Moreno, P (2020) Mass customisation for zero energy housing: the potential of Japanese manufacturing practices in the context of sustainable housebuilding in the United Kingdom. PhD thesis, University of Edinburgh, UK.

Jin, H; Chan, M and Bai, Y (2025) Joint optimization of critical concession parameters for sustainable PPP contracts. Journal of Construction Engineering and Management, 151(6): 04025051, ISSN 0733-9364

Jin, H; Liu, S; Li, J and Liu, C (2020) A game-theoretic approach to developing a concession renegotiation framework for user-pays PPPs. International Journal of Construction Management, 20(6), pp. 642-652. ISSN 1562-3599

Jobling, P E and Smith, N J (2018) Experience of the role of contracts in megaproject execution. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(1), pp. 18-24. ISSN 17514304

Johansson, C (2001) A modularization approach to housing. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

John, V (2012) Derivation of reliable simplification strategies for the comparative LCA of individual and "typical" newly built Swiss apartment buildings. DSc thesis, ETH Zürich, Switzerland.

Johnston, D; Wingfield, J and Miles-Shenton, D (2010) Measuring the fabric performance of UK dwellings. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Johnston, D W; Kahn, K P and Phillips, J B (1989) Formwork pressures in tall and thick concrete walls. Journal of Construction Engineering and Management, 115(3), pp. 444-461. ISSN 0733-9364

Jones, P; Lannon, S and Patterson, J (2013) Retrofitting existing housing: How far, how much? Building Research & Information, 41(5), pp. 532-550. ISSN 0961-3218

Jones III, R C (1991) An economic analysis of national society of professional engineers versus United States. PhD thesis, University of California, Los Angeles, USA.

Joo, M.; Im, J. B.; Lee, K. T. and Kim, J. H. (2026) Comparative analysis of work performance and physiological response based on office types and indoor space design. Architectural Engineering and Design Management, 22(2), pp. 365-381. ISSN 1745-2007

Joustra, C M and Yeh, D H (2014) Framework for net-zero and net-positive building water cycle management. Building Research & Information, 43(1), pp. 121-132. ISSN 0961-3218

Juliana, A; Oladimeji, O; Abiodun, A O; Haddad, A N and Tam, V W Y (2024) Influence of rework on construction project performance in Nigeria. International Journal of Construction Management, 24(8), pp. 888-893. ISSN 1562-3599

Jun, D H and El-Rayes, K (2011) Multiobjective optimization of resource leveling and allocation during construction scheduling. Journal of Construction Engineering and Management, 137(12), pp. 1080-1088. ISSN 0733-9364

Jung, S (2010) Facility siting and layout optimization based on process safety. PhD thesis, Texas A&M University, USA.

Jung, Y J (2007) Subsurface utility engineering for highway projects: A study of utility impact rating and benefit-cost analysis. PhD thesis, Pennsylvania State University, USA.

Kabasakal, H E and Sözen, Z (1989) Organizational context, structural attributes and management systems in construction firms. Construction Management and Economics, 7(4), pp. 347-356. ISSN 01446193

Kaboli, Alireza (2014) Cost and emissions analysis of earthmoving operations. PhD thesis, University of New South Wales, Australia.

Kadir Pakir, A H (2003) Integration: A study in the context of low cost housing projects in Malaysia with special reference to the state of penang. PhD thesis, University College London, UK.

Kahaduwa, A and Rajapakse, L (2022) Review of climate change impacts on reservoir hydrology and long-term basin-wide water resources management. Building Research & Information, 50(5), pp. 515-526. ISSN 0961-3218

Kaiser, M J and Lledare, W O (2006) The gulf of Mexico decommissioning market. Journal of Construction Engineering and Management, 132(8), pp. 815-826. ISSN 0733-9364

Kaiser, M J; Pulsipher, A G and Byrd, R C (2005) Cost of abrasive cutting in decommissioning operations in the gulf of Mexico. Journal of Construction Engineering and Management, 131(1), pp. 137-148. ISSN 0733-9364

Kaiser, M J; Pulsipher, A G and Martin, J (2005) Cost of site clearance and verification operations in the gulf of Mexico. Journal of Construction Engineering and Management, 131(1), pp. 117-126. ISSN 0733-9364

Kaka, A P (2001) Turnover forecasting for contracting companies based on published information. Journal of Financial Management of Property and Construction, 6(3), pp. 217-229. ISSN 1366-4387

Kaka, A P and Fortune, C (2002) Net cash flow models: Towards the black box approach. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kalasapudi, V S (2017) Automatic change-based diagnosis of structures using spatiotemporal data and as-designed model. PhD thesis, Arizona State University, USA.

Kale, S and Arditi, D (2005) Diffusion of computer aided design technology in architectural design practice. Journal of Construction Engineering and Management, 131(10), pp. 1135-1141. ISSN 0733-9364

Kale, S and Arditi, D (2006) Diffusion of ISO 9000 certification in the precast concrete industry. Construction Management and Economics, 24(5), pp. 485-495. ISSN 1466433X

Kalhor, E and Valentin, V (2018) Cost estimation framework for optimal retrofit planning to mitigate residential building vulnerability to wildfires. Journal of Construction Engineering and Management, 144(4): 05018003, ISSN 0733-9364

Kalu, I E and Ogbonna, N J (2021) Investigation of environmental effect of stone quarrying activities on soil and water in Akpoha and Ishiagu communities of Ebonyi State, Nigeria. International Journal of Construction Management, 21(12), pp. 1185-1199. ISSN 1562-3599

Kam, C-k C (2002) The exploration of a multi-dimensional safe behaviour model for construction workers in Hong Kong: A structural equation modelling approach. PhD thesis, University of Hull, UK.

Kamel Hedayat Abad, M E (2017) Integration and interoperability of building envelope information and energy modeling. PhD thesis, Pennsylvania State University, USA.

Kaminsky, J (2019) The global influence of national cultural values on construction permitting. Construction Management and Economics, 37(2), pp. 89-100. ISSN 01446193

Kaminsky, J A (2018) National culture shapes private investment in transportation infrastructure projects around the globe. Journal of Construction Engineering and Management, 144(2): 04017098, ISSN 0733-9364

Kammouh, O; Nogal, M; Binnekamp, R and Wolfert, A R M (2021) Mitigation controller: Adaptive simulation approach for planning control measures in large construction projects. Journal of Construction Engineering and Management, 147(8): 04021093, ISSN 0733-9364

Kanai, Júlia (2025) Systematic management model based on lean construction through a mobile app for industrialized buildings in the frame system. PhD thesis, Universidade Estadual de Campinas, Brazil.

Kang, K; Xiao, J and Moon, S (2025) Evaluating safety risks in pedestrian facilities for different ride modes: Application of a deep learning-based 3D scanning system. Journal of Construction Engineering and Management, 151(11): 04025183, ISSN 0733-9364

Kang, L S and Paulson, B C (1997) Adaptability of information classification systems for civil works. Journal of Construction Engineering and Management, 123(4), pp. 419-426. ISSN 0733-9364

Kang, S-C (2006) Computer planning and simulation of construction erection processes using single or multiple cranes. PhD thesis, Stanford University, USA.

Kang, Y; O'Brien, W J; Dai, J; Mulva, S P; Thomas, S P; Chapman, R E and Butry, D (2013) Interaction effects of information technologies and best practices on construction project performance. Journal of Construction Engineering and Management, 139(4), pp. 361-371. ISSN 0733-9364

Kangari, R and Miyatake, Y (1997) Developing and managing innovative construction technologies in Japan. Journal of Construction Engineering and Management, 123(1), pp. 72-84. ISSN 0733-9364

Kannan, G and Vorster, M (2000) Development of an experience database for truck loading operations. Journal of Construction Engineering and Management, 126(3), pp. 201-209. ISSN 0733-9364

Kanoglu, A and Arditi, D (2001) A computer-based information system for architectural design offices. Construction Innovation, 1(1), pp. 15-29. ISSN 1471-4175

Kaplinski, O (1993) Diminishing non-uniformity of construction processes. Construction Management and Economics, 11(1), pp. 53-61. ISSN 01446193

Kapliński, O and Thiel, T (1995) Evaluation of multi-family housing systems in Poland. Construction Management and Economics, 13(4), pp. 291-298. ISSN 01446193

Kar, S and Jha, K N (2021) Investigation into lead time of construction materials and influencing factors. Journal of Construction Engineering and Management, 147(3): 01998, ISSN 0733-9364

Karadimitriou, N (2007) Re-use of previously developed land: housebuilder adaptation to a changing context. PhD thesis, University College London, UK.

Karafiath, L L (1988) Rolling resistance of off-road vehicles. Journal of Construction Engineering and Management, 114(3), pp. 458-471. ISSN 0733-9364

Karam, A H (2003) Marketing and architects in South Africa. Engineering, Construction and Architectural Management, 10(6), pp. 402-412. ISSN 0969-9988

Karim, A and Adeli, H (1999) OO information model for construction project management. Journal of Construction Engineering and Management, 125(5), pp. 361-367. ISSN 0733-9364

Karunaratne, Banneka Mudiyanselage (1994) A new method of analysis for cyclic construction operations using systems engineering approach. PhD thesis, University of New South Wales, Australia.

Kasapolu, E (2011) Leadership behaviors in project design offices. Journal of Construction Engineering and Management, 137(5), pp. 356-363. ISSN 0733-9364

Kasapoǧlu, E (2014) Leadership styles in architectural design offices in Turkey. Journal of Construction Engineering and Management, 140(2): 04013047, ISSN 0733-9364

Kashiwagi, D T; Slater, C and Kashiwagi, M (2002) 'Just in time' information for performance based systems. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kataoka, M (2008) Automated generation of construction plans from primitive geometries. Journal of Construction Engineering and Management, 134(8), pp. 592-600. ISSN 0733-9364

Kavanagh, D P (1985) SIREN: A repetitive construction simulation model. Journal of Construction Engineering and Management, 111(3), pp. 308-323. ISSN 0733-9364

Kawal, D E (1970) A systems model of a construction firm. PhD thesis, Iowa State University, USA.

Kayan, B A (2017) Green maintenance for heritage buildings: Paint repair appraisal. International Journal of Building Pathology and Adaptation, 35(1), pp. 63-89.

Kayatekin, C S (2021) Architectural form: Flexibility, subdivision and diversity in Manhattan loft buildings. Buildings & Cities, 2(1), pp. 888-906. ISSN 2632-6655

Kazan, E E (2013) Analysis of fatal and nonfatal accidents involving earthmoving equipment operators and on-foot workers. PhD thesis, Wayne State University, USA.

Kazaz, A; Ulubeyli, S and Arslan, A (2020) Quantification of fresh ready-mix concrete waste: Order and truck-mixer based planning coefficients. International Journal of Construction Management, 20(1), pp. 53-64. ISSN 1562-3599

Kaçel, S and Lau, B (2018) Louis I. Kahn and Richard Kelly: Collaborative design in creation of the luminous environment. Architectural Engineering and Design Management, 14(4), pp. 306-316. ISSN 1745-2007

Keane, P J (1994) A computer-aided systematic approach to time delay analysis for extension of time claims on construction projects. PhD thesis, Loughborough University, UK.

Kedir, F; Chen, Q; Hall, D M; Adey, B T and Boyd, R (2022) Formative scenario analysis of the factors influencing the adoption of industrialised construction in countries with high housing demand–the cases of Ethiopia, Kenya, and South Africa. Construction Management and Economics, 40(9), pp. 690-710. ISSN 01446193

Keller, E C (1999) Prevailing wage rates: The effects on school construction, levels of taxation, and state reimbursements. DEd thesis, Pennsylvania State University, USA.

Kenley, R (1999) Cash farming in building and construction: A stochastic analysis. Construction Management and Economics, 17(3), pp. 393-401. ISSN 01446193

Kere, K J (2023) Probabilistic model development and risk management strategies for pipelines with anomalies. PhD thesis, Marquette University, USA.

Kermanshachi, S (2016) Decision making and uncertainty analysis in success of construction projects. PhD thesis, Texas A&M University, USA.

Khalili, A and Chua, D K (2014) Integrated prefabrication configuration and component grouping for resource optimization of precast production. Journal of Construction Engineering and Management, 140(2): 04013052, ISSN 0733-9364

Khamooshi, H and Cioffi, D F (2013) Uncertainty in task duration and cost estimates: Fusion of probabilistic forecasts and deterministic scheduling. Journal of Construction Engineering and Management, 139(5), pp. 488-497. ISSN 0733-9364

Khan, A; Khan, M W A; Sorooshian, S; Ullah, M and Rana, F (2022) The mediating role of benefit management for sustaining the performance of infrastructure projects. Construction Economics and Building, 22(3), pp. 124-143. ISSN 2204-9029

Khan, L R (2014) Reliability estimation and risk-cost optimisation of underground pipelines. PhD thesis, University of Greenwich, UK.

Khanapure, V and Shastri, S (2024) A sustainability assessment framework for high-rise residential projects: A case of India. International Journal of Construction Management, 24(5), pp. 495-502. ISSN 1562-3599

Khanh, K D; Minh, N V and Dinh Thuc, L (2025) Enhancing the accuracy of construction project completion estimates by incorporating updated timing-based error margins (utems). International Journal of Construction Management, 25(15), pp. 1859-1868. ISSN 1562-3599

Khodakarami, V (2009) Applying Bayesian networks to model uncertainty in project scheduling. PhD thesis, Queen Mary University of London, UK.

Khosrowshahi, F (1989) A new mathematically based model for forecasting construction project expenditure pattern. PhD thesis, South Bank Polytechnic, UK.

Khosrowshahi, F (1996) Value profile analysis of contruction projects. Journal of Financial Management of Property and Construction, 1(1), pp. 55-76. ISSN 1366-4387

Khosrowshahi, F (2000) A radical approach to risk in project financial management. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Khurana, M; Garvin, M J and Mahalingam, A (2022) Synthesis of relational practices for PPP contracts and their linkage with governance mechanisms. Journal of Construction Engineering and Management, 148(12): 04022131, ISSN 0733-9364

Kiang, Q L (1992) Comparative variability in tender bids for refurbishment and new build work. Construction Management and Economics, 10(3), pp. 263-269. ISSN 01446193

Kifokeris, D and Löwstedt, M (2021) Lost and found in translation: Top-down decoupling and bottom-up recoupling of strategies and practices in construction production. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Kikwasi, G J; Sospeter, N G and Rwelamila, P D (2023) Critical success factors for adopting supply chain management in Tanzanian construction projects. Journal of Construction in Developing Countries, 28(1), pp. 43-61. ISSN 1823-6499

Kim, D. H. and Jeong, J. H. (2026) Development of a decision-making framework to prioritize expressway pavement sections for large-scale repairs. Journal of Construction Engineering and Management, 152(8): 04026106, ISSN 0733-9364

Kim, S. and Liang, Y. (2026) Dissecting highway construction cost inflation: A two-decade analysis of inflation types using the national highway construction cost index. Journal of Construction Engineering and Management, 152(7): 04026087, ISSN 0733-9364

Kim, B C (2007) Forecasting project progress and early warning of project overruns with probabilistic methods. PhD thesis, Texas A&M University, USA.

Kim, B C and Kim, H J (2014) Sensitivity of earned value schedule forecasting to S-curve patterns. Journal of Construction Engineering and Management, 140(7): 04014023, ISSN 0733-9364

Kim, B C and Kim, S J (2015) Credibility evaluation of project duration forecast using forecast sensitivity and forecast-risk compatibility. Journal of Construction Engineering and Management, 141(8): 04015023, ISSN 0733-9364

Kim, B C and Reinschmidt, K F (2009) Probabilistic forecasting of project duration using bayesian inference and the beta distribution. Journal of Construction Engineering and Management, 135(3), pp. 178-186. ISSN 0733-9364

Kim, B C and Reinschmidt, K F (2010) Probabilistic forecasting of project duration using Kalman filter and the earned value method. Journal of Construction Engineering and Management, 136(8), pp. 834-843. ISSN 0733-9364

Kim, D Y (2011) Construction planning and execution strategies for enhancing project success on electrical construction subcontracts. PhD thesis, University of Texas at Austin, USA.

Kim, D Y; Han, S H and Kim, H (2008) Discriminant analysis for predicting ranges of cost variance in international construction projects. Journal of Construction Engineering and Management, 134(6), pp. 398-410. ISSN 0733-9364

Kim, H and Ham, Y (2021) Increasing reliability of participatory sensing for utility pole condition assessment using fuzzy inference. Journal of Construction Engineering and Management, 147(1): 0001968, ISSN 0733-9364

Kim, H J and Reinschmidt, K F (2006) A dynamic competition model for construction contractors. Construction Management and Economics, 24(9), pp. 955-965. ISSN 1466433X

Kim, J (2007) An investigation of activity duration input modeling by duration variance ratio for simulation-based construction scheduling. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.

Kim, J (2022) A multimodal approach to improve fire safety on construction sites. PhD thesis, Oklahoma State University, USA.

Kim, J; Shan, Y; Kim, S; Song, D; Park, H and Bang, C (2021) Factors influencing fire safety on building construction sites: A fire officer's perspective. Journal of Construction Engineering and Management, 147(10): 04021118, ISSN 0733-9364

Kim, J C; Kim, D H; Kim, J J; Ye, J S and Lee, H S (2000) Segmenting the Korean housing market using multiple discriminant analysis. Construction Management and Economics, 18(1), pp. 45-54. ISSN 01446193

Kim, J J; Miller, J A and Kim, S (2020) Cost impacts of change orders due to unforeseen existing conditions in building renovation projects. Journal of Construction Engineering and Management, 146(8): 04020094, ISSN 0733-9364

Kim, J L (2013) Genetic algorithm stopping criteria for optimization of construction resource scheduling problems. Construction Management and Economics, 31(1), pp. 3-19. ISSN 1466433X

Kim, J L; Greene, M and Kim, S (2014) Cost comparative analysis of a new green building code for residential project development. Journal of Construction Engineering and Management, 140(5): 05014002, ISSN 0733-9364

Kim, Jong Jin (2005) A study of the externalities of reconstruction projects in neighbourhood residential markets. PhD thesis, University of New South Wales, Australia.

Kim, Jungsoo (2014) Impact of indoor environmental quality (IEQ) factors on occupant evaluation of workspaces. PhD thesis, University of Sydney, Australia.

Kim, S (1990) Development of risk assessment decision support system for hazardous materials movement. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Kim, S J (2009) Identification of construction project problems and their impacts on project success. PhD thesis, University of Florida, USA.

Kim, T W; Yu, J H and Lee, H S (2003) On-site productivity evaluation through productivity achievement ratio. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Kim, Y A; Ryoo, B Y; Kim, Y S and Huh, W C (2013) Major accident factors for effective safety management of highway construction projects. Journal of Construction Engineering and Management, 139(6), pp. 628-640. ISSN 0733-9364

Kim, Y W and Kim, S C (2011) Cost analysis of information technology-assisted quality inspection using activity-based costing. Construction Management and Economics, 29(2), pp. 163-172. ISSN 1466433X

Kirkham, R J and Boussabaine, A H (2000) Developing a framework for whole of life costing in the national health service estate. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Kirkham, R J and Boussabaine, A H (2005) Forecasting the residual service life of nhs hospital buildings: A stochastic approach. Construction Management and Economics, 23(5), pp. 521-529. ISSN 01446193

Kishk, M (2005) On the mathematical modelling of whole-life costs. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kishk, M and Oladunjoye, B (2009) Risk assessment and allocation in Nigerian oil and gas projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Kisilewicz, T (2007) Computer simulation in solar architecture design. Architectural Engineering and Design Management, 3(2), pp. 106-123. ISSN 1745-2007

Kleindienst, S and Andersen, M (2012) Comprehensive annual daylight design through a goal-based approach. Building Research & Information, 40(2), pp. 154-173. ISSN 0961-3218

Kliewer, J E (1994) Development of performance based test procedures for asphalt mixtures. PhD thesis, Oregon State University, USA.

Klitgaard, A; Beck, F and Buhl, H (2018) Facilitation of interorganizational teams: An exploratory literature review. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Knauseder, I; Josephson, P E and Styhre, A (2007) Learning approaches for housing, service and infrastructure project organizations. Construction Management and Economics, 25(8), pp. 857-867. ISSN 1466433X

Knight, K and Fayek, A R (2002) Use of fuzzy logic for predicting design cost overruns on building projects. Journal of Construction Engineering and Management, 128(6), pp. 503-512. ISSN 0733-9364

Ko, C H and Cheng, M Y (2007) Dynamic prediction of project success using artificial intelligence. Journal of Construction Engineering and Management, 133(4), pp. 316-324. ISSN 0733-9364

Ko, J H; Park, S H and Kim, D C (2015) Efficiency analysis of project management offices for large-scale information system projects: Insights for construction megaprojects. Construction Economics and Building, 15(3), pp. 34-47. ISSN 2204-9029

Koc, K and Pelin Gurgun, A (2021) Assessment of readability risks in contracts causing conflicts in construction projects. Journal of Construction Engineering and Management, 147(6): 20202277, ISSN 0733-9364

Koch, C (2004) Operations management on the construction site: Developing a human resource and knowledge oriented alternative to lean construction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Koehn, E and Brown, G (1985) Climatic effects on construction. Journal of Construction Engineering and Management, 111(2), pp. 129-137. ISSN 0733-9364

Koehn, E and Musser, K (1983) OSHA regulations effects on construction. Journal of Construction Engineering and Management, 109(2), pp. 233-244. ISSN 0733-9364

Kohn, M J (1970) The stock of unfinished construction in the USSR, 1950-1965: An efficiency problem in a centrally planned economy. PhD thesis, Yale University, USA.

Kokkaew, N and Chiara, N (2010) Modelling completion risk using stochastic critical path-envelope method: A BOT highway project application. Construction Management and Economics, 28(12), pp. 1239-1254. ISSN 1466433X

Kolokotroni, M; Robinson-Gayle, S; Tanno, S and Cripps, A (2004) Environmental impact analysis for typical office facades. Building Research & Information, 32(1), pp. 2-16. ISSN 0961-3218

Komarek, R L D (2020) Exploration and assessment of leadership development in engineering students. PhD thesis, University of Colorado at Boulder, USA.

Konchar, M and Sanvido, V (1998) Comparison of U.S. Project delivery systems. Journal of Construction Engineering and Management, 124(6), pp. 435-444. ISSN 0733-9364

Konchar, M D (1997) A comparison of United States project delivery systems. PhD thesis, Pennsylvania State University, USA.

Kong, M.; Son, Y. J.; Snyder, E.; Byun, K.; C. Pope, Z. and Hogan, C. J. (2026) Indoor environmental quality in the era of hybrid work: Comparing home and healthy office environments. Building Research & Information, 54(6), pp. 693-713. ISSN 0961-3218

Kong, J S (2001) Lifetime maintenance strategies for deteriorating structures. PhD thesis, University of Colorado at Boulder, USA.

Koo, Hyun Jeong (2021) Building design quality: Design complexity and BIM applications. Doctor thesis, University of Texas at Austin, USA.

Korb, S and Sacks, R (2021) Agent-based simulation of general contractor-subcontractor interactions in a multiproject environment. Journal of Construction Engineering and Management, 147(1): 1944, ISSN 0733-9364

Kosaner, Y (1979) A study of industrialised building systems with special reference to Turkey. PhD thesis, University of Manchester, UK.

Koskisto, O (1997) Reliability-based optimization of plant precast concrete building systems. PhD thesis, Johns Hopkins University, USA.

Kosonen, H K and Kim, A A (2018) Mental model approach to wastewater treatment plant project delivery during emergency response. Journal of Construction Engineering and Management, 144(6): 05018005, ISSN 0733-9364

Kosovac, B (2007) A framework for managing information from heterogeneous, distributed, and autonomous sources in the architecture, engineering, construction, and facilities management domain. PhD thesis, University of British Columbia, Canada.

Kostourou, F (2021) Housing growth: Impacts on density, space consumption and urban morphology. Buildings & Cities, 2(1), pp. 55-78. ISSN 2632-6655

Kowaltowski, D C C K; Muianga, E A D; Granja, A D; Moreira, D D C; Bernardini, S P and Castro, M R (2019) A critical analysis of research of a mass-housing programme. Building Research & Information, 47(6), pp. 716-733. ISSN 0961-3218

Kramer, S W (2008) Does prior project management work experience have an effect on the academic achievement of university students in the classroom? International Journal of Construction Education and Research, 4(1), pp. 18-33. ISSN 1557-8771

Krasnokutskaya, E (2003) Identification and estimation in highway procurement auctions under unobserved heterogeneity. PhD thesis, Yale University, USA.

Kreitl, G; Urschitz, G and Oberndorfer, W J (2002) Corporate growth of engineering consulting firms: A European review. Construction Management and Economics, 20(5), pp. 437-448. ISSN 01446193

Kriklenko, E (2020) Complex bending-active structures from continuous flexible planar sheets or a hybrid structure introducing the use of spacer fabrics. Architectural Engineering and Design Management, 17(3-4), pp. 1-22. ISSN 1745-2007

Krishnan, R (1987) Knowledge-based aids for model construction. PhD thesis, University of Texas at Austin, USA.

Kristjansdottir, T F; Heeren, N; Andresen, I and Brattebø, H (2018) Comparative emission analysis of low-energy and zero-emission buildings. Building Research & Information, 46(4), pp. 367-382. ISSN 0961-3218

Krych, K; Heeren, N and Hertwich, E G (2021) Factors influencing the life-cycle GHG emissions of Brazilian office buildings. Buildings & Cities, 2(1), pp. 856-873. ISSN 2632-6655

Kuipers, E J (1976) A method of forecasting the efficiency of construction labor in any climatological conditions. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kumamoto, T; Kameda, H; Hoshiya, M and Ishii, K (1990) Construction of difficult dry dock in yokohama, Japan. Journal of Construction Engineering and Management, 116(2), pp. 201-220. ISSN 0733-9364

Kumar, S; Singh, L K; Roy, L B; Kumar, R and Lal, D (2025) Enhancing the sustainability of slope stability in embankment construction by leveraging smart sensors and monitoring systems for data-driven insights. International Journal of Construction Management, 25(16), pp. 2102-2120. ISSN 1562-3599

Kumar, A; Meena, R K; Sharma, D and Raj, R (2024) Structural parameters of wrench–c shape building using CFD. International Journal of Construction Management, 24(6), pp. 664-672. ISSN 1562-3599

Kumaraswamy, M M (1991) Evaluating the management of construction projects. PhD thesis, Loughborough University, UK.

Kumaraswamy, M M (1997) Conflicts, claims and disputes in construction. Engineering, Construction and Architectural Management, 4(2), pp. 95-111. ISSN 0969-9988

Kumaraswamy, M M and Chan, D W M (1998) Contributors to construction delays. Construction Management and Economics, 16(1), pp. 17-29. ISSN 01446193

Kumari, P; Reddy, S R N and Yadav, R (2024) Indoor occupancy detection and counting system based on boosting algorithm using different sensor data. Building Research & Information, 52(1-2), pp. 87-106. ISSN 0961-3218

Kumi, L; Jeong, J; Jeong, J and Mun, H (2025) Development of multimodal recommender system for advancing design for safety with expert validation. Journal of Construction Engineering and Management, 151(9): 04025114, ISSN 0733-9364

Kuo, S-F (1995) Decision support for irrigated project planning using a genetic algorithm. PhD thesis, Utah State University, USA.

Kuru, K and Artan, D (2020) A canvas model for risk assessment and performance estimation in public-private partnerships. International Journal of Construction Management, 20(6), pp. 704-719. ISSN 1562-3599

Kurvinen, A; Huovari, J; Lahtinen, M; Sen, T and Saari, A (2024) A dynamic model for estimating the long-term need for repairs and renovations in residential buildings. Building Research & Information, 52(5), pp. 533-550. ISSN 0961-3218

Kuwaiti, E A; Ajmal, M M and Hussain, M (2018) Determining success factors in Abu Dhabi health care construction projects: Customer and contractor perspectives. International Journal of Construction Management, 18(5), pp. 430-445. ISSN 1562-3599

Kuzmanovska, I (2020) Building design for manufacture and assembly (BDFMA): Reframing the design-production relationship in industrialised construction. PhD thesis, Monash University, Australia.

Kwok, E C S; Ng, S H S and Tam, J C L (2009) Risk assessment as an explicit dimension for tender evaluation. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(3), pp. 117-120. ISSN 17514312

Kwok-Chun, W and Walker, A (2000) Property rights implications of public-private joint ventures. Construction Management and Economics, 18(2), pp. 131-138. ISSN 01446193

Labib, Y N; Lotfallah, W B; Hanna, A S and Boulos, N W (2021) Development and application of performance index for comparative assessment of public capital projects. Journal of Construction Engineering and Management, 147(2): 04020175, ISSN 0733-9364

Ladzani, M W (2009) Evaluation of small and medium-sized enterprises' performance in the built environment. DPhil thesis, University of Johannesburg, South Africa.

Lagerkvist, Johan (2025) A design approach for cost effective, climate smart and buildable bridges. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Lahdenperä, P (2001) An analysis of the statistics on project procurement methods in Finland, 1989-1998. Journal of Construction Procurement, 7(1), pp. 27-41. ISSN 1358-9180

Lai, X; Huang, J; Lin, S; Hu, C; Mao, N; Liu, J and Chen, Q (2023) Efficiency scoring for subway tunnel construction based on shield-focused big data and Gaussian broad learning system. Journal of Construction Engineering and Management, 149(12): 04023132, ISSN 0733-9364

Lal, H (1999) The use of characteristic productivity modelling in the improvement of site performance and the evaluation of delay and disruption claims. PhD thesis, University of Dundee, UK.

Lam, E W M; Chan, A P C and Chan, D W M (2008) Determinants of successful design-build projects. Journal of Construction Engineering and Management, 134(5), pp. 333-341. ISSN 0733-9364

Lam, K C; Hu, T S and Ng, S T (2005) Using the principal component analysis method as a tool in contractor pre-qualification. Construction Management and Economics, 23(7), pp. 673-684. ISSN 01446193

Lam, K C; Ning, X and Ng, T (2007) The application of the ant colony optimization algorithm to the construction site layout planning problem. Construction Management and Economics, 25(4), pp. 359-374. ISSN 1466433X

Lam, K C; Tang, C M and Lee, W C (2005) Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects. Construction Management and Economics, 23(2), pp. 127-145. ISSN 01446193

Lam, T I and Leung, M Y (2001) An analytical hierarchy process based procurement selection method. Construction Management and Economics, 19(4), pp. 427-437. ISSN 01446193

Lam, W M (2005) A conceptual model of success for design and build projects in the public sector of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Langford, D A; Kennedy, P; Conlin, J and McKenzie, N (2003) Comparison of construction costs on motorway projects using measure and value and alternative tendering initiative contractual arrangements. Construction Management and Economics, 21(8), pp. 831-840. ISSN 01446193

Langston, C (2013) The application of data envelopment analysis to the benchmarking of construction performance in Australian and American high-rise buildings. International Journal of Construction Management, 13(3), pp. 55-75. ISSN 1562-3599

Larsson, R and Rudberg, M (2019) Impact of weather conditions on in situ concrete wall operations using a simulation-based approach. Journal of Construction Engineering and Management, 145(7): 05019009, ISSN 0733-9364

Laryea, S (2016) Risk apportionment in target cost contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(6), pp. 248-257. ISSN 17514304

Laryea, S and Watermeyer, R B (2018) Comparison of two infrastructure project implementation models in a developing country. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(1), pp. 3-17. ISSN 17514304

Laryea, S A and Hughes, W P (2006) The price of risk in construction projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Laryea S, A A N T (2013) The increasing development of publication on sustainable procurement and issues in practice. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Lashford, C (2016) Modelling the role of SuDS management trains to minimise the flood risk of new-build housing developments in the UK. PhD thesis, Coventry University, UK.

Lasshof, B and Stoy, C (2016) Estimation models for heating energy and electricity costs. Construction Management and Economics, 34(9), pp. 622-640. ISSN 01446193

Laufer, A and Cohenca, D (1990) Factors affecting construction-planning outcomes. Journal of Construction Engineering and Management, 116(1), pp. 135-156. ISSN 0733-9364

Laufer, A and Ledbetter, W B (1986) Assessment of safety performance measures at construction sites. Journal of Construction Engineering and Management, 112(4), pp. 530-542. ISSN 0733-9364

Laufer, A and Tucker, R L (1988) Competence and timing dilemma in construction planning. Construction Management and Economics, 6(4), pp. 339-355. ISSN 01446193

Lavy, S; Kiss, C W and Fernandez-Solis, J L (2015) Linking design and energy performance in U.S. Military hospitals. Architectural Engineering and Design Management, 11(1), pp. 41-64. ISSN 1745-2007

Law, M D (2005) An investigation into the utilization of cost variance along with information technology by Pennsylvania home building firms. PhD thesis, Pennsylvania State University, USA.

Law, Matthew E (2023) Occupational risk perceptions among foreign-born construction workers in central Florida. DPh thesis, Walden University, USA.

Layzell, J and Ledbetter, S (1998) FMEA applied to cladding systems: reducing the risk of failure. Building Research & Information, 26(6), pp. 351-357. ISSN 0961-3218

Le, P L; Nguyen, T Q L and Nguyen, T T (2025) Exploring the roles of lean design and operations in improving construction logistics collaboration and supply chain performance. Architectural Engineering and Design Management, 21(3), pp. 553-570. ISSN 1745-2007

Le, T (2009) Improving right-of-way acquisition in highway projects through scope definition and management of inherent factors. PhD thesis, University of Texas at Austin, USA.

Leaman, A and Bordass, B (1999) Productivity in buildings: The 'killer' variables. Building Research & Information, 27(1), pp. 4-19. ISSN 0961-3218

Lee, B; Lee, H S; Park, M and Kim, H (2015) Influence factors of learning-curve effect in high-rise building constructions. Journal of Construction Engineering and Management, 141(8): 04015019, ISSN 0733-9364

Lee, B-H (2011) Forecasting wheat yield and quality conditional on weather information and estimating construction costs of agricultural facilities. PhD thesis, Oklahoma State University, USA.

Lee, C; Won, J and Lee, E B (2018) Method for predicting raw material prices for product production over long periods. Journal of Construction Engineering and Management, 145(1): 05018017, ISSN 0733-9364

Lee, C Y; Chong, H Y; Li, Q and Wang, X (2020) Joint contract-function effects on BIM-enabled EPC project performance. Journal of Construction Engineering and Management, 146(3): 04020008, ISSN 0733-9364

Lee, C Y; Chong, H Y; Tanko, B L and Klufallah, M (2022) Effect between trust in communication technology and interorganizational trust in BIM-enabled projects. Journal of Construction Engineering and Management, 148(8): 04022059, ISSN 0733-9364

Lee, D E (2005) Probability of project completion using stochastic project scheduling simulation. Journal of Construction Engineering and Management, 131(3), pp. 310-318. ISSN 0733-9364

Lee, D E and Arditi, D (2006) Automated statistical analysis in stochastic project scheduling simulation. Journal of Construction Engineering and Management, 132(3), pp. 268-277. ISSN 0733-9364

Lee, D E; Lim, T K and Arditi, D (2012) Stochastic project financing analysis system for construction. Journal of Construction Engineering and Management, 138(3), pp. 376-389. ISSN 0733-9364

Lee, E B; Lee, H and Ibbs, C W (2007) Productivity aspects of urban freeway rehabilitation with accelerated construction. Journal of Construction Engineering and Management, 133(10), pp. 798-806. ISSN 0733-9364

Lee, F-P B (2009) Factors affecting the profitability of construction companies in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Lee, G; Lee, G; Chi, S and Oh, S (2023) Automatic classification of construction work codes in bill of quantities of national roadway based on text analysis. Journal of Construction Engineering and Management, 149(2): 04022163, ISSN 0733-9364

Lee, J; Park, M; Lee, H S and Hyun, H (2019) Classification of modular building construction projects based on schedule-driven approach. Journal of Construction Engineering and Management, 145(5): 04019031, ISSN 0733-9364

Lee, J K (2011) Building environment rule and analysis (BERA) language and its application for evaluating building circulation and spatial program. PhD thesis, Georgia Institute of Technology, USA.

Lee, J M (2010) Automated checking of building requirements on circulation over a range of design phases. PhD thesis, Georgia Institute of Technology, USA.

Lee, J S (2016) Estimating cumulative damages due to disruptions in repetitive construction. Journal of Construction Engineering and Management, 142(11): 04016064, ISSN 0733-9364

Lee, K R and Fenn, P (2007) Investigation of critical factors affecting successful mediation: Korean mediation users perspectives. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Lee, N and Rojas, E M (2013) Visual representations for monitoring project performance: Developing novel prototypes for improved communication. Journal of Construction Engineering and Management, 139(8), pp. 994-1005. ISSN 0733-9364

Lee, S (2007) Understanding and quantifying the impact of changes on construction labor productivity: Integration of productivity factors and quantification methods. PhD thesis, University of California, Berkeley, USA.

Lee, S (2018) Investigating the relationship between energy consumption, CO2 emissions, and the factors affecting them in the United States building sector: A macro and micro view. PhD thesis, Arizona State University, USA.

Lee, S; Peña-Mora, F and Park, M (2006) Reliability and stability buffering approach: Focusing on the issues of errors and changes in concurrent design and construction projects. Journal of Construction Engineering and Management, 132(5), pp. 452-464. ISSN 0733-9364

Lee, S; Tae, S; Jee, N and Shin, S (2015) LDA-based model for measuring impact of change orders in apartment projects and its application for prerisk assessment and postevaluation. Journal of Construction Engineering and Management, 141(7): 4015011, ISSN 0733-9364

Lee, S H; Thomas, S R and Tucker, R L (2004) Effective practice utilization using performance prediction software. Journal of Construction Engineering and Management, 130(4), pp. 576-585. ISSN 0733-9364

Lee, S H; Thomas, S R and Tucker, R L (2005) The relative impacts of selected practices on project cost and schedule. Construction Management and Economics, 23(5), pp. 545-553. ISSN 01446193

Lee, S M and Olson, D L (1983) Chance constrained aggregate blending. Journal of Construction Engineering and Management, 109(1), pp. 39-47. ISSN 0733-9364

Lee, S-H (2001) Discriminant function analysis for categorization of best practices. PhD thesis, University of Texas at Austin, USA.

Lee, S-H (2012) Management of building energy consumption and energy supply network on campus scale. PhD thesis, Georgia Institute of Technology, USA.

Lee, Y L and Lee, Y (2021) Developing an autonomous psychological behaviour of virtual user to atypical architectural geometry. Building Research & Information, 49(1), pp. 69-83. ISSN 0961-3218

Legard, D A (1983) Probabilistic analysis of an idealized model of construction projects. Construction Management and Economics, 1(1), pp. 31-45. ISSN 01446193

Lehtiranta, L; Kärnä, S; Junnonen, J M and Julin, P (2012) The role of multi-firm satisfaction in construction project success. Construction Management and Economics, 30(6), pp. 463-475. ISSN 1466433X

Lehtonen, J L and Kiiras, J M (2010) Cost modelling in underpinning projects. Construction Management and Economics, 28(9), pp. 985-995. ISSN 1466433X

Leino, J L (2008) Community and private sector approaches to development in Kenya. PhD thesis, University of California, Berkeley, USA.

Leiringer, R (2006) Technological innovation in PPPs: Incentives, opportunities and actions. Construction Management and Economics, 24(3), pp. 301-308. ISSN 01446193

Lema, N M and Price, A D F (1996) Construction process performance variability: Focus on labour productivity. Building Research & Information, 24(6), pp. 339-350. ISSN 0961-3218

Lensgraf, S E (2024) Towards scalable autonomous underwater construction with free-floating robots. PhD thesis, Dartmouth College, USA.

Leontaris, G (2021) Decision making under uncertainty for construction management of offshore wind assets. PhD thesis, Delft University of Technology, Netherlands.

Lertpaitoonpan, W (2000) Bridge damage detection using a system identification method. PhD thesis, University of Florida, USA.

Leslie, S E (1997) Forecasting the funding needs of infrastructure renewal: A construction estimating technique. PhD thesis, University of Cincinnati, USA.

Leu, S S and Hung, T H (2002) A genetic algorithm-based optimal resource-constrained scheduling simulation model. Construction Management and Economics, 20(2), pp. 131-141. ISSN 01446193

Leu, S S and Lin, Y C (2008) Project performance evaluation based on statistical process control techniques. Journal of Construction Engineering and Management, 134(10), pp. 813-819. ISSN 0733-9364

Leung, A W T and Tam, C M (1999) Models for assessing hoisting times of tower cranes. Journal of Construction Engineering and Management, 125(6), pp. 385-391. ISSN 0733-9364

Leung, A W T and Tam, C M (1999) Prediction of hoisting time for tower cranes for public housing construction in Hong Kong. Construction Management and Economics, 17(3), pp. 305-314. ISSN 01446193

Leung, M Y; Chan, Y S and Yuen, K W (2010) Impacts of stressors and stress on the injury incidents of construction workers in Hong Kong. Journal of Construction Engineering and Management, 136(10), pp. 1093-1103. ISSN 0733-9364

Leung, M Y; Olomolaiye, P; Chong, A and Lam, C C Y (2005) Impacts of stress on estimation performance in Hong Kong. Construction Management and Economics, 23(9), pp. 891-903. ISSN 01446193

Levander, E; Engström, S; Sardén, Y and Stehn, L (2011) Construction clients' ability to manage uncertainty and equivocality. Construction Management and Economics, 29(7), pp. 753-764. ISSN 1466433X

Levenson, M; Pearlmutter, D and Aleksandrowicz, O (2025) An observational analysis of shade-related pedestrian activity. Buildings & Cities, 6(1), pp. 398-414. ISSN 2632-6655

Lewis, P; Rasdorf, W; Frey, H C; Pang, S H and Kim, K (2009) Requirements and incentives for reducing construction vehicle emissions and comparison of nonroad diesel engine emissions data sources. Journal of Construction Engineering and Management, 135(5), pp. 341-351. ISSN 0733-9364

Li, H; Xie, T; Liu, Y; Cui, C; Xia, B; Li, Y and Hou, X (2026) Influence of stressful events on work engagement of construction workers during emergency infrastructure projects: Analysis using affective events theory and self-efficacy theory. Journal of Construction Engineering and Management, 152(4): 04026012, ISSN 0733-9364

Li, J.; Ouyang, Y.; Dai, Q. and Luo, X. (2026) Impact of age on cognitive states influencing falling from heights in high-altitude construction: Evidence from a virtual reality and electroencephalogram study. Journal of Construction Engineering and Management, 152(7): 04026101, ISSN 0733-9364

Li, B; Akintoye, A and Hardcastle, C (2000) Conceptual framework for construction public private partnerships. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Li, F G N; Smith, A Z P; Biddulph, P; Hamilton, I G; Lowe, R; Mavrogianni, A; Oikonomou, E; Raslan, R; Stamp, S; Stone, A; Summerfield, A J; Veitch, D; Gori, V and Oreszczyn, T (2015) Solid-wall U-values: Heat flux measurements compared with standard assumptions. Building Research & Information, 43(2), pp. 238-252. ISSN 0961-3218

Li, H (1996) Neural network models for intelligent support of mark-up estimation. Engineering, Construction and Architectural Management, 3(1-2), pp. 69-81. ISSN 0969-9988

Li, H; Shen, L Y and Love, P E D (1999) Ann-based mark-up estimation system with self-explanatory capacities. Journal of Construction Engineering and Management, 125(3), pp. 185-189. ISSN 0733-9364

Li, J; Moselhi, O and Alkass, S (2006) Forecasting project status by using fuzzy logic. Journal of Construction Engineering and Management, 132(11), pp. 1193-1202. ISSN 0733-9364

Li, J; Mao, L and Cao, J (2025) Process model for claim and payment management in a construction supply chain based on smart contracts. Journal of Construction Engineering and Management, 151(11): 04025172, ISSN 0733-9364

Li, M (2024) Dfma-oriented rebar design optimization for reinforced concrete structures using graph neural network. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Li, M and Ashuri, B (2021) Proportional cox hazards model to quantify the likelihood of underestimation in transportation projects. Journal of Construction Engineering and Management, 147(10): 04021134, ISSN 0733-9364

Li, R Y M (2012) Econometric modelling of risk adverse behaviours of entrepreneurs in the provision of house fittings in China. Construction Economics and Building, 12(1), pp. 72-82. ISSN 2204-9029

Li, S; Fan, M and Wu, X (2018) Effect of social capital between construction supervisors and workers on workers' safety behavior. Journal of Construction Engineering and Management, 144(4): 04018014, ISSN 0733-9364

Li, S and Liu, M (2023) Reasonable kitchen space for urban residences: Based on an investigation in Beijing. Building Research & Information, 51(8), pp. 881-896. ISSN 0961-3218

Li, W; Zhang, Y; Lu, D and Augenbroe, G (2020) Quantification methods of natural ventilated building performance in preliminary design. Building Research & Information, 48(4), pp. 401-414. ISSN 0961-3218

Li, Y; Lu, Y; Li, D and Ma, L (2015) Metanetwork analysis for project task assignment. Journal of Construction Engineering and Management, 141(12): 04015044, ISSN 0733-9364

Li, Z and Tong, X (2017) Applications of the discrete element method and Fibonacci sequence on a banana screen. Journal of Engineering, Design and Technology, 15(1), pp. 2-12.

Liang, H.; Yang, D. and Cong, W. (2026) The impact of mindful organizing on construction safety violations: A moderated mediation model. Journal of Construction Engineering and Management, 152(6): 04026066, ISSN 0733-9364

Liang, C J; Wang, X; Kamat, V R and Menassa, C C (2021) Human-robot collaboration in construction: Classification and research trends. Journal of Construction Engineering and Management, 147(10): 03121006, ISSN 0733-9364

Liang, C-J (2021) Affecting fundamental transformation in future construction work through replication of the master-apprentice learning model in human-robot worker teams. PhD thesis, University of Michigan, USA.

Liang, D (2001) Improved reliability and economic modeling for new and retrofitted low-rise structures subjected to extreme wind hazards. PhD thesis, State University of New York at Buffalo, USA.

Liang, D; Song, L and Branham, T (2011) A task-based safety model for construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 29-40. ISSN 17514312

Liang, R; Li, R and Chong, H Y (2023) Decision-making model for evaluating joint venture contractors in construction of complex infrastructure megaprojects. Journal of Construction Engineering and Management, 149(9): 04023071, ISSN 0733-9364

Liang, Y; Ashuri, B and Sun, W (2020) Analysis of the variability of project cost and schedule performance in the design-build environment. Journal of Construction Engineering and Management, 146(6): 04020060, ISSN 0733-9364

Liang, Y; Sun, H; Chen, M and Liu, J (2021) Research on fraudulent, corrupt and collusive practices in infrastructure projects. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Liang Wong, I; Eames, P and Perera, S (2012) Energy simulations of a transparent-insulated office façade retrofit in London, UK. Smart and Sustainable Built Environment, 1(3), pp. 253-276. ISSN 2046-6099

Liao, P C; Shi, H; Su, Y and Luo, X (2018) Development of data-driven influence model to relate the workplace environment to human error. Journal of Construction Engineering and Management, 144(3): 04018003, ISSN 0733-9364

Liddiard, R; Godoy-Shimizu, D; Ruyssevelt, P; Steadman, P; Evans, S; Humphrey, D and Azhari, R (2021) Energy use intensities in London houses. Buildings & Cities, 2(1), pp. 336-353. ISSN 2632-6655

Lim, T K; Park, S M; Lee, H C and Lee, D E (2016) Artificial neural network-based slip-trip classifier using smart sensor for construction workplace. Journal of Construction Engineering and Management, 142(2): 04015065, ISSN 0733-9364

Lima, Rosimeire Midori Suzuki Rosa (2012) Evaluation system of integrated construction and demolition waste management at the municipal level. PhD thesis, Universidade de São Paulo, Brazil.

Lin, J; Xing, R and Cai, Y (2026) Advancing safer construction hris: A multisourced approach for diagnosing unsafe behavior tendencies. Journal of Construction Engineering and Management, 152(2): 04025247, ISSN 0733-9364

Lin, C L; Chiang, W H; Weng, Y S and Wu, H P (2023) Assessing the anthropogenic carbon emission of wooden construction: An LCA study. Building Research & Information, 51(2), pp. 138-157. ISSN 0961-3218

Lin, C L and Huang, H M (2010) Improved baseline productivity analysis technique. Journal of Construction Engineering and Management, 136(3), pp. 367-376. ISSN 0733-9364

Lin, R F Y (2016) The comparative econometric analysis of property and construction markets in commercial and residential sectors for GB and its regions. PhD thesis, University of London, University College London, UK.

Lin, S and Cheung, S O (2022) Exploring the concept of psychological distance and its impact on intention to settle in construction dispute negotiation. Journal of Construction Engineering and Management, 148(12): 04022133, ISSN 0733-9364

Lin, S and Cheung, S O (2022) Intention to settle as an indispensable element of negotiated construction dispute settlement. Journal of Construction Engineering and Management, 148(10): 04022113, ISSN 0733-9364

Lin, S and Cheung, S O (2025) What organizational justice brings to project dispute negotiation. Journal of Construction Engineering and Management, 151(4): 04025015, ISSN 0733-9364

Lin, Solomon Tung Kit (2021) Brim-based structural life cycle assessment of bridges: Incorporating finite element analysis and real-time sensor measurements. PhD thesis, Monash University, Australia.

Lin, Y-S (1996) Optimal design and probabilistic evaluation of fire egress systems. PhD thesis, Duke University, USA.

Lind, H and Brunes, F (2014) Policies to avoid cost overruns in infrastructure projects: Critical evaluation and recommendations. Construction Economics and Building, 14(3), pp. 74-85. ISSN 2204-9029

Lind, H and Brunes, F (2015) Explaining cost overruns in infrastructure projects: A new framework with applications to Sweden. Construction Management and Economics, 33(7), pp. 554-568. ISSN 01446193

Lindgren, J and Widén, K (2018) Diffusing building information management-knowledge integration, mechanisms and knowledge development. Architectural Engineering and Design Management, 14(5), pp. 347-362. ISSN 1745-2007

Lindhard, S and Wandahl, S (2014) Exploration of the reasons for delays in construction. International Journal of Construction Management, 14(1), pp. 36-44. ISSN 1562-3599

Lines, B C and Ravi Kumar, G G (2018) Developing more competitive proposals: Relationship between contractor qualifications-based proposal content and owner evaluation scores. Journal of Construction Engineering and Management, 144(5): 04018030, ISSN 0733-9364

Ling, C S; Ahmad, M H and Ossen, D R (2007) The effect of geometric shape and building orientation on minimising solar insolation on high-rise buildings in hot humid climate. Journal of Construction in Developing Countries, 12(1), pp. 27-38. ISSN 1823-6499

Ling, F Y Y (2005) Global factors affecting margin-size of construction projects. Journal of Construction Research, 6(1), pp. 91-106. ISSN 1609-9451

Ling, F Y Y; Chan, S L; Chong, E and Ee, L P (2004) Predicting performance of design-build and design-bid-build projects. Journal of Construction Engineering and Management, 130(1), pp. 75-83. ISSN 0733-9364

Ling, Y Y (2002) Model for predicting performance of architects and engineers. Journal of Construction Engineering and Management, 128(5), pp. 446-455. ISSN 0733-9364

Liou, F M and Huang, C P (2008) Automated approach to negotiations of BOT contracts with the consideration of project risk. Journal of Construction Engineering and Management, 134(1), pp. 18-24. ISSN 0733-9364

Liou, F M; Yang, C H; Chen, B and Chen, W (2011) Identifying the Pareto-front approximation for negotiations of BOT contracts with a multi-objective genetic algorithm. Construction Management and Economics, 29(5), pp. 535-548. ISSN 1466433X

Liow, K H (1998) An empirical investigation of corporate growth of property companies. Journal of Financial Management of Property and Construction, 3(3), pp. 5-16. ISSN 1366-4387

Liow, K H (1999) Corporate real estate in financial statements: Evidence from Singapore hotel corporations. Journal of Financial Management of Property and Construction, 4(2), pp. 63-80. ISSN 1366-4387

Liow, K H (2000) Corporate financial reporting of Singapore property companies: Issues and evidence. Journal of Financial Management of Property and Construction, 5(3), pp. 149-158. ISSN 1366-4387

Liow, K H (2002) Corporate real estate in financial statements: The accounting perspective. Journal of Financial Management of Property and Construction, 7(2), pp. 91-96. ISSN 1366-4387

Liow, K H; Leong, J O T; Ebrahim, M S and Brown, G R (2001) Performance measurement in corporate real estate: Issues, evidence and research agenda. Journal of Financial Management of Property and Construction, 6(2), pp. 71-79. ISSN 1366-4387

Lisø, K R; Kvande, T and Thue, J V (2005) High-performance weather-protective flashings. Building Research & Information, 33(1), pp. 41-54. ISSN 0961-3218

Liu, J.; Chen, J.; Li, Y. and Zhao, K. (2026) Optimizing constrained construction crew-task assignment with grey wolf optimizer. Journal of Construction Engineering and Management, 152(8): 04026118, ISSN 0733-9364

Liu, D; Hu, C; Guo, S and Yu, J (2022) Z -number-based quantitative expression of activity information in uncertain project scheduling. Journal of Construction Engineering and Management, 148(9): 04022098, ISSN 0733-9364

Liu, F; Chang-Richards, A; Wang, K I K and Dirks, K N (2023) Critical indoor environmental factors affecting productivity: Perspectives from university staff and postgraduate students. Building Research & Information, 51(6), pp. 730-745. ISSN 0961-3218

Liu, G; Huang, R; Li, K; Shrestha, A and Fu, X (2022) Greenhouse gas emissions management in prefabrication and modular construction based on earned value management. Journal of Construction Engineering and Management, 148(6): 04022034, ISSN 0733-9364

Liu, H (2024) Enhancing accuracy and security in BIM-based construction cost management leveraging AI and blockchain technologies. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Liu, H; Zhang, F; Ma, R; Wang, L; Chen, Z; Zhang, Q and Guo, L (2024) Intelligent noncontact structural displacement detection method based on computer vision and deep learning. Journal of Construction Engineering and Management, 150(10): 04024127, ISSN 0733-9364

Liu, J and Cheah, C Y J (2009) Real option application in PPP/PFI project negotiation. Construction Management and Economics, 27(4), pp. 331-342. ISSN 1466433X

Liu, J; Liu, J and Bu, Z (2022) Effects of different face-saving concerns on the escalation of commitment between state-owned and private investors in PPP projects. Journal of Construction Engineering and Management, 148(9): 04022092, ISSN 0733-9364

Liu, J and London, K (2011) Analysing the relationship between new housing supply and residential construction costs with the regional heterogeneities. Construction Economics and Building, 11(3), pp. 58-67. ISSN 2204-9029

Liu, J; Chen, J; Tian, J and Li, Y (2025) An efficient random key-based genetic algorithm for solving multimode resource-constrained project scheduling problem. Journal of Construction Engineering and Management, 151(12): 04025193, ISSN 0733-9364

Liu, L-Y (1991) Coops: Construction object-oriented process simulation system. PhD thesis, University of Michigan, USA.

Liu, P (2024) Trustworthy civil infrastructure inspection through human-machine intelligence integration. PhD thesis, Carnegie Mellon University, USA.

Liu, S L; Wang, S Y and Lai, K K (2005) A general multivariate analysis approach for determining bid mark-up strategy. Construction Management and Economics, 23(4), pp. 347-353. ISSN 01446193

Liu, S S and Wang, C J (2009) Two-stage profit optimization model for linear scheduling problems considering cash flow. Construction Management and Economics, 27(11), pp. 1023-1037. ISSN 1466433X

Liu, S S and Wang, C J (2010) Profit optimization for multiproject scheduling problems considering cash flow. Journal of Construction Engineering and Management, 136(12), pp. 1268-1278. ISSN 0733-9364

Liu, T; Mostafa, S; Sherif, M and Tuan Son, N (2021) Emerging themes of public-private partnership application in developing smart city projects: A conceptual framework. Built Environment Project and Asset Management, 11(1), pp. 138-156. ISSN 2044-124X

Liu, X; Song, Y; Yi, W; Wang, X and Zhu, J (2018) Comparing the random forest with the generalized additive model to evaluate the impacts of outdoor ambient environmental factors on scaffolding construction productivity. Journal of Construction Engineering and Management, 144(6): 04018037, ISSN 0733-9364

Liu, X L; Chen, W F and Bowman, M D (1986) Shore-slab interaction in concrete buildings. Journal of Construction Engineering and Management, 112(2), pp. 227-244. ISSN 0733-9364

Liu, Xiaoyan (2023) The effects of public-private partnership on innovation and project performance. PhD thesis, University of Sydney, Australia.

Liu, Y; Habibnezhad, M; Shayesteh, S; Jebelli, H and Lee, S (2021) Paving the way for future EEG studies in construction: Dependent component analysis for automatic ocular artifact removal from brainwave signals. Journal of Construction Engineering and Management, 147(8), ISSN 0733-9364

Liu, Y; Yao, F; Ji, Y; Tong, W; Liu, G; Li, H X and Hu, X (2022) Quality control for offsite construction: Review and future directions. Journal of Construction Engineering and Management, 148(8): 03122003, ISSN 0733-9364

Liu, Z; Li, X; Gao, Z; Zhang, Y; Teng, Y and Wu, C (2025) A hybrid and intuitive work packaging approach with multiple task relations, general work package precedence, and BIM in modular construction. Journal of Construction Engineering and Management, 151(4): 04025019, ISSN 0733-9364

Liu, Z; Wang, H and Li, H (2018) Model of equipment sharing between contractors on construction projects. Journal of Construction Engineering and Management, 144(6): 04018039, ISSN 0733-9364

Lloyd, C A (2020) Modular manufacture and construction of small nuclear power generation systems. PhD thesis, University of Cambridge, UK.

Lo, H P and Lam, M-L (2001) A bidding strategy using multivariate distribution. Journal of Financial Management of Property and Construction, 6(3), pp. 155-165. ISSN 1366-4387

Long, G (2010) A detailed investigation of the applicability and utility of simulation and gaming in the teaching of civil engineering students. PhD thesis, University of Nottingham, UK.

Long, J (2004) Computer-integrated information modelling for design of building structures. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Loosemore, M (1994) Dealing with unexpected problems-do contracts help? A comparison of the NEC and JCT 80 forms. Engineering, Construction and Architectural Management, 1(2), pp. 115-137. ISSN 0969-9988

Lopes, J; Ruddock, L and Ribeiro, F L (2002) Investment in construction and economic growth in developing countries. Building Research & Information, 30(3), pp. 152-159. ISSN 0961-3218

Lopez de Ortigosa, D A (1993) Forecasting construction costs in hyper-inflated economies. PhD thesis, University of Texas at Austin, USA.

Lou, E C W; Lee, A and Mathison, G (2011) Recapitulation of corporate social responsibility (CSR) for construction SMEs in the UK. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Lou, Y (2022) Interconnections among energy consumption, carbon emissions, and economic impacts for sustainable buildings. PhD thesis, University of Colorado at Boulder, USA.

Love, P E D and Teo, P (2017) Statistical analysis of injury and nonconformance frequencies in construction: Negative binomial regression model. Journal of Construction Engineering and Management, 143(8): 05017011, ISSN 0733-9364

Love, P E D; Teo, P; Morrison, J and Grove, M (2016) Quality and safety in construction: Creating a no-harm environment. Journal of Construction Engineering and Management, 142(8): 5016006, ISSN 0733-9364

Love, P E D; Tse, R Y C and Edwards, D J (2005) Time-cost relationships in Australian building construction projects. Journal of Construction Engineering and Management, 131(2), pp. 187-194. ISSN 0733-9364

Love, P E D; Wang, X; Sing, C P and Tiong, R L K (2013) Determining the probability of project cost overruns. Journal of Construction Engineering and Management, 139(3), pp. 321-330. ISSN 0733-9364

Lovencin, W (2006) Assessment of design and properties for flowable fill usage in highway pavement construction for conditions in Florida. PhD thesis, University of Florida, USA.

Low, S P (2012) Strategic development of the built environment through international construction, quality and productivity management. DSc thesis, University of Birmingham, UK.

Lowe, D J; Emsley, M W and Harding, A (2006) Predicting construction cost using multiple regression techniques. Journal of Construction Engineering and Management, 132(7), pp. 750-758. ISSN 0733-9364

Lowe, D J; Emsley, M W and Harding, A (2006) Relationships between total construction cost and project strategic, site related and building definition variable. Journal of Financial Management of Property and Construction, 11(3), pp. 165-180. ISSN 1366-4387

Lowe, D J; Emsley, M W and Harding, A (2007) Relationships between total construction cost and design related variables. Journal of Financial Management of Property and Construction, 12(1), pp. 11-24. ISSN 1366-4387

Lowe, D J and Leiringer, R (2005) Commercial management in project-based organisations. Journal of Financial Management of Property and Construction, 10(1), pp. 3-18. ISSN 1366-4387

Lowe, D J and Parvar, J (2004) A logistic regression approach to modelling the contractor's decision to bid. Construction Management and Economics, 22(6), pp. 643-653. ISSN 01446193

Lowe, D J; Parvar, J and Emsley, M W (2004) Development of a decision support system (DSS) for the contractor's decision to bid: Regression analysis and neural networks solutions. Journal of Financial Management of Property and Construction, 9(1), pp. 27-42. ISSN 1366-4387

Lowe, D J and Skitmore, M (2007) The learning climate of an organisation and practitioner competence. Journal of Financial Management of Property and Construction, 12(3), pp. 151-164. ISSN 1366-4387

Lu, L-T (2003) The impact of cultural distance on the management style and performance of Japanese and Taiwanese joint ventures with local partners in China. PhD thesis, University of Leeds, UK.

Lu, M and Lam, H C (2009) Transform schemes applied on non-finish-to-start logical relationships in project network diagrams. Journal of Construction Engineering and Management, 135(9), pp. 863-873. ISSN 0733-9364

Lu, W; Olofsson, T and Stehn, L (2011) A lean-agile model of homebuilders' production systems. Construction Management and Economics, 29(1), pp. 25-35. ISSN 1466433X

Lu, W; Peng, Y; Shen, Q and Li, H (2013) Generic model for measuring benefits of BIM as a learning tool in construction tasks. Journal of Construction Engineering and Management, 139(2), pp. 195-203. ISSN 0733-9364

Lu, Z; Liu, J and Bu, Z (2025) Influencing factors of the government's willingness to compensate in the early termination of PPP projects: Based on multiple cases in China. Construction Management and Economics, 43(10), pp. 823-848. ISSN 0144-6193

Lucas, A N and Löschke, S K (2025) Towards circular renovation: A comparative review of circular economy integration in sustainable building rating systems. Building Research & Information, 53(3), pp. 375-396. ISSN 0961-3218

Lucke, T and Beecham, S (2010) Aeration and gutter water levels in siphonic roof drainage systems. Building Research & Information, 38(6), pp. 670-685. ISSN 0961-3218

Lucke, T and Beecham, S (2011) Field investigation of clogging in a permeable pavement system. Building Research & Information, 39(6), pp. 603-615. ISSN 0961-3218

Lucko, G (2003) A statistical analysis and model of the residual value of different types of heavy construction equipment. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Lucko, G (2009) Productivity scheduling method: Linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 135(4), pp. 246-253. ISSN 0733-9364

Lucko, G (2011) Modeling the residual market value of construction equipment under changed economic conditions. Journal of Construction Engineering and Management, 137, pp. 806-816. ISSN 0733-9364

Lucko, G (2011) Optimizing cash flows for linear schedules modeled with singularity functions by simulated annealing. Journal of Construction Engineering and Management, 137(7), pp. 523-535. ISSN 0733-9364

Lucko, G and Pea Orozco, A A (2009) Float types in linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 135(5), pp. 368-377. ISSN 0733-9364

Lucko, G; Vorster, M C and Anderson-Cook, C M (2007) Unknown element of owning costs-impact of residual value. Journal of Construction Engineering and Management, 133(1), pp. 3-9. ISSN 0733-9364

Luu, T V; Kim, S Y; Cao, H L and Park, Y M (2008) Performance measurement of construction firms in developing countries. Construction Management and Economics, 26(4), pp. 373-386. ISSN 1466433X

Läufer, A; Howell, G A and Rosenfeld, Y (1992) Three modes of short-term construction planning. Construction Management and Economics, 10(3), pp. 249-262. ISSN 01446193

Lützkendorf, T (2020) The role of carbon metrics in supporting built-environment professionals. Buildings & Cities, 1(1), pp. 662-672. ISSN 2632-6655

Lützkendorf, T and Frischknecht, R (2020) (Net-) zero-emission buildings: A typology of terms and definitions. Buildings & Cities, 1(1), pp. 662-675. ISSN 2632-6655

Ma, G.; Chen, Y. and Du, C. (2026) Intelligent optimization framework for tunnel construction organization driven by multi-source data and process-level simulation. International Journal of Construction Management, 26(7), pp. 1299-1319. ISSN 1562-3599

Ma, G; Jia, J; Ding, J; Wu, M and Wang, D (2021) Examining the impact of social media use on project management performance: Evidence from construction projects in China. Journal of Construction Engineering and Management, 147(3): 04021004, ISSN 0733-9364

Ma, H; Cao, S; Wang, Y and Zhang, H (2023) The moderating effect of optimism bias on ambivalence of workers' unsafe behaviors. Journal of Construction Engineering and Management, 149(9): 04023087, ISSN 0733-9364

Ma, L; Lovreglio, R; Yi, W; Yiu, T W and Shan, M (2023) Barriers and strategies for building information modelling implementation: A comparative study between New Zealand and China. International Journal of Construction Management, 23(12), pp. 2067-2076. ISSN 1562-3599

Ma, Yunlong (2020) Holistic assessment of the impacts of building energy code improvements on Australian commercial buildings. PhD thesis, Queensland University of Technology, Australia.

Maali, O M (2022) Management practices to improve adoption and employee well-being during organizational changes in the AEC industry. PhD thesis, University of Kansas, USA.

Magdub, R H (2006) Application of the lump sum turnkey contracts in Libyan civil law with reference to English law and international practice. PhD thesis, Glasgow Caledonian University, UK.

Maghiar, M; Sturges, D; Maurer, T and Jackson, M (2015) Exploration of student perceptions, behaviors and academic performance in construction management classes. International Journal of Construction Education and Research, 11(4), pp. 241-256. ISSN 1557-8771

Mahamid, I (2011) Early cost estimating for road construction projects using multiple regression techniques. Construction Economics and Building, 11(4), pp. 87-101. ISSN 2204-9029

Mahamid, I and Bruland, A (2012) Cost deviation in road construction projects: The case of Palestine. Construction Economics and Building, 12(1), pp. 58-71. ISSN 2204-9029

Mahboubi Niazmandi, M; Moussavi, P; Ahmadi Bonakdar, Z; Shakiba, A; Sedaeesoula, R; Mohammadzade Esfahani Nezhad, S and Oke, A E (2025) Synergistic effects of building information modelling and lean construction: A conceptual model for enhancing productivity in construction projects. International Journal of Construction Management, 25(13), pp. 1552-1569. ISSN 1562-3599

Mahdavian, A; Shojaei, A; Salem, M; Yuan, J S and Oloufa, A A (2021) Data-driven predictive modeling of highway construction cost items. Journal of Construction Engineering and Management, 147(3): 04020180, ISSN 0733-9364

Mahdi Hosseinian, S; Arjomand, A; Li, C Q and Zhang, G (2022) Developing a model for assessing project completion time reliability during construction using time-dependent reliability theory. Journal of Construction Engineering and Management, 148(4): 04022006, ISSN 0733-9364

Mahdjoubi, L and A-Rahman, M A (2012) Effects of multimedia characteristics on novice CAD learners practice performance. Architectural Engineering and Design Management, 8(3), pp. 214-225. ISSN 1745-2007

Mahdy, M M M (2014) Applying architecture simulation tools to assess building sustainable design: adapting the Egyptian residential energy code for climate change. PhD thesis, University of Kent, UK.

Mahinkanda, M; Ochoa, J J; Chileshe, N; Rameezdeen, R and Gu, N (2025) Optimizing design decisions for construction waste minimization through an interpretive structural modelling approach. Built Environment Project and Asset Management, 15(5), pp. 1036-1054. ISSN 2044-124X

Mahmood, N A (2021) Real-time site safety risk assessment and intervention for on-foot building construction workers using RFID-based multi-sensor intelligent system. PhD thesis, Ohio State University, USA.

Mahmud, Bello Zailani (2025) Equity-driven workforce development initiatives through long-term strategic partnerships for the construction and maintenance of green stormwater infrastructure. DEng thesis, Morgan State University (Maryland), USA.

Maio, C; Schexnayder, C; Knutson, K and Weber, S (2000) Probability distribution functions for construction simulation. Journal of Construction Engineering and Management, 126(4), pp. 285-292. ISSN 0733-9364

Mak, S and Raftery, J (1992) Risk attitude and systematic bias in estimating and forecasting. Construction Management and Economics, 10(4), pp. 303-320. ISSN 01446193

Malakhatka, E; Shafqat, O; Sandoff, A and Thuvander, L (2025) Positive energy districts and energy communities: How living labs create value. Buildings & Cities, 6(1), pp. 783-799. ISSN 2632-6655

Maleki, B; Casanovas-Rubio, M D M and Fuente Antequera, A D L (2022) Sustainability assessment in residential high-rise building design: State of the art. Architectural Engineering and Design Management, 18(6), pp. 927-940. ISSN 1745-2007

Maloney, W F (1990) Framework for analysis of performance. Journal of Construction Engineering and Management, 116(3), pp. 399-415. ISSN 0733-9364

Maloney, W F and McFillen, J M (1985) Valence of and satisfaction with job outcomes. Journal of Construction Engineering and Management, 111(1), pp. 53-73. ISSN 0733-9364

Maloney, W F and McFillen, J M (1987) Influence of foremen on performance. Journal of Construction Engineering and Management, 113(3), pp. 399-415. ISSN 0733-9364

Maloney, W F and McFillen, J M (1987) Motivational impact of work crews. Journal of Construction Engineering and Management, 113(2), pp. 208-221. ISSN 0733-9364

Manavazhi, M R and Xunshi, Z (2001) Productivity oriented analysis of design revisions. Construction Management and Economics, 19(4), pp. 379-391. ISSN 01446193

Manege, S L and Kennedy, C J (2022) Investigating whole life costing awareness in Tanzania building construction industry. International Journal of Construction Management, 22(15), pp. 2914-2921. ISSN 1562-3599

Mangkuto, R A and Paramita, B (2022) Computation of the greenery-sky-view factor in daylit buildings. Architectural Engineering and Design Management, 18(6), pp. 850-869. ISSN 1745-2007

Mangvwat, J S and Spillane, J P (2021) Social sustainability in procurement of construction projects: A literature review from a Nigerian perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Mani, N (2015) A framework for estimating labor productivity frontiers. PhD thesis, University of Nebraska - Lincoln, USA.

Mann, P and Denoncourt, J (2009) Copyright issues on the protection of architectural works and designs. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Mann, P and Wong, D T W (2014) Is expert witness immunity from suit a thing of the past in construction law? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Manrique Delgado, B; Cao, S; Hasan, A and Sirén, K (2018) Energy and exergy analysis of prosumers in hybrid energy grids. Building Research & Information, 46(6), pp. 668-685. ISSN 0961-3218

Mante, J; Ndekugri, I; Ankrah, N and Hammond, F (2012) The influence of procurement methods on dispute resolution mechanism choice in construction. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Manthe, M F and Smallwood, J J (2008) An overview of the appropriateness of tertiary built environment education in South Africa. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Manu, P; Ankrah, N; Proverbs, D and Suresh, S (2010) The contribution of construction project features to accident causation and health and safety risk: A conceptual model. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Mao, X (2008) The framework of TRIZ-enhanced-value engineering analysis and its knowledge management. PhD thesis, University of Alberta, Canada.

Maqsoom, A; Choudhry, R M; Umer, M and Mehmood, T (2021) Influencing factors indicating time delay in construction projects: Impact of firm size and experience. International Journal of Construction Management, 21(12), pp. 1251-1262. ISSN 1562-3599

Marenjak, S (2004) A generic approach to minimising whole life costs in the building industry. PhD thesis, University of Dundee, UK.

Marenjak, S; El-Haram, M A and Horner, M R W (2003) Generic approach to minimize whole life costs in the building industry. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Marion, G L C; Saurin, T A and Viana, D D (2025) The cost-benefit of slack in production planning and control in construction projects. Construction Management and Economics, 43(11), pp. 883-900. ISSN 0144-6193

Markiz, N and Jrade, A (2022) Integrating an expert system with brims, cost estimation, and linear scheduling at conceptual design stage of bridge projects. International Journal of Construction Management, 22(5), pp. 913-928. ISSN 1562-3599

Marsh, K and Fayek, A R (2010) SuretyAssist: Fuzzy expert system to assist surety underwriters in evaluating construction contractors for bonding. Journal of Construction Engineering and Management, 136(11), pp. 1219-1226. ISSN 0733-9364

Marsh, R (2017) Building lifespan: Effect on the environmental impact of building components in a Danish perspective. Architectural Engineering and Design Management, 13(2), pp. 80-100. ISSN 1745-2007

Marston, V K (1985) Interdependence of the functional element costs of buildings. PhD thesis, University of Portsmouth, UK.

Martin, H; Lewis, T M and Fifi, J (2014) Centralized versus decentralized construction project structure: easing communication difficulties. International Journal of Construction Management, 14(3), pp. 156-170. ISSN 1562-3599

Martin, H; Sorhaindo, C and Welch, F (2014) Motivation of undergraduate civil engineering students for higher levels of academic success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Martin, L and Root, D (2009) Knowledge creation in construction: The seci model. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Martin, S D (1981) Building contracts in classical Roman law. PhD thesis, University of Michigan, USA.

Martinez, L H (2001) A neuro-fuzzy decision support system for risk analysis of revenue-dependent infrastructure projects. PhD thesis, Purdue University, USA.

Martins, R S; Siqueira de Aquino, G; Coelho Pagel, É and Gouveia, G L O D (2025) Realistic designs of windows and doors as solutions to improve natural ventilation in hot-humid climates: A factorial design approach. Architectural Engineering and Design Management, 21(2), pp. 268-288. ISSN 1745-2007

Marzouk, M; Abdallah, M and El-Said, M (2010) Modeling microtunneling projects using computer simulation. Journal of Construction Engineering and Management, 136(6), pp. 670-682. ISSN 0733-9364

Marzouk, M and Moselhi, O (2003) Object-oriented simulation model for earthmoving operations. Journal of Construction Engineering and Management, 129(2), pp. 173-181. ISSN 0733-9364

Marzouk, M and Moselhi, O (2004) Fuzzy clustering model for estimating haulers' travel time. Journal of Construction Engineering and Management, 130(6), pp. 878-886. ISSN 0733-9364

Marzouk, M; Said, H and El-Said, M (2009) Framework for multiobjective optimization of launching girder bridges. Journal of Construction Engineering and Management, 135(8), pp. 791-800. ISSN 0733-9364

Masih-Tehrani, M and Ebrahimi-Nejad, S (2018) Hybrid genetic algorithm and linear programming for bulldozer emissions and fuel-consumption management using continuously variable transmission. Journal of Construction Engineering and Management, 144(7): 04018053, ISSN 0733-9364

Mason, J R (2007) The views and experiences of specialist contractors on partnering in the UK. Construction Management and Economics, 25(5), pp. 519-527. ISSN 1466433X

Mastrandrea, F (1991) The quantification of construction contractors' claims. PhD thesis, University of Reading, UK.

Mathew, S A; Tran, D Q and Nguyen, P H D (2021) Evaluation of cost growth factors in design-build highway projects using structural equation modeling. Journal of Construction Engineering and Management, 147(7): 04021070, ISSN 0733-9364

Matsumoto, I; Stapleton, J; Glass, J and Thorpe, T (2005) Developing a framework to measure organizational and employee skills development in a professional engineering design consultancy. Construction Innovation, 5(1), pp. 53-66. ISSN 1471-4175

Matthews, J C and Stowe, R (2015) Critical data needs associated with asbestos cement pipe renewal methods. Journal of Construction Engineering and Management, 141(1): 06014009, ISSN 0733-9364

Mattila, K G (1997) Resources leveling of linear schedules: A mathematical approach using integer linear programming. PhD thesis, Purdue University, USA.

Mattila, K G and Abraham, D M (1998) Resource leveling of linear schedules using integer linear programming. Journal of Construction Engineering and Management, 124(3), pp. 232-243. ISSN 0733-9364

Mawdesley, M J; Askew, W H and Al-Jibouri, S H (2004) Site layout for earthworks in road projects. Engineering, Construction and Architectural Management, 11(2), pp. 83-89. ISSN 0969-9988

Mayer, R H J (1982) Cost estimates from stochastic geometric programs. PhD thesis, University of Delaware, USA.

McCabe, B Y (1997) An automated modeling approach for construction performance improvement using simulation and belief networks. PhD thesis, University of Alberta, Canada.

McCaffer, R (1976) Contractors' bidding behaviour and tender price prediction. PhD thesis, Loughborough University, UK.

McCarthy, S C (1991) BOT and OMT contracts for infrastructure in developing countries. PhD thesis, University of Birmingham, UK.

McCowan, A and Mohamed, S (2002) A classification of decision support systems (DSSs) for the Analysis and evaluation of concession project investments (CPIs). Journal of Financial Management of Property and Construction, 7(2), pp. 127-137. ISSN 1366-4387

McErlane, A; Heaney, G; Haran, M and McClements, S (2016) The application of stakeholder theory to UK PPP stakeholders. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

McGill, G; Sharpe, T; Robertson, L; Gupta, R and Mawditt, I (2017) Meta-analysis of indoor temperatures in new-build housing. Building Research & Information, 45(1-2), pp. 19-39. ISSN 0961-3218

McGuire, J P (1995) Assessment of the perceptions and attitudes of construction aggregate mine operators and county regulatory officials regarding aggregate mining. PhD thesis, Iowa State University, USA.

McIntosh, J F (1984) The application of the relational data model to computer-aided building design. ArchD thesis, University of Michigan, USA.

McKay, L J; Gibb, A G F; Haslam, R and Pendlebury, M (2002) Implications for the effect of standardization and pre-assembly on health, safety and accident causality: Preliminary results. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

McLean, J S (2017) Navigational complexity within building codes. PhD thesis, University of Vermont and State Agricultural College, USA.

McMahon, E; Spillane, J P and Bradley, J G (2023) When enough is not enough! Evaluating the minimum entry requirements for apprenticeships in Ireland. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

McNamara, E T; Howarth, T A P; Hill, C J and Stoneman, G R W (1997) Mentoring construction graduates: Bridging the gap between academia and industry. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Meduri, S S and Annamalai, T R (2013) Unit costs of public and PPP road projects: Evidence from India. Journal of Construction Engineering and Management, 139(1), pp. 35-43. ISSN 0733-9364

Meeampol, S and Ogunlan, S O (2006) Factors affecting cost and time performance on highway construction projects: Evidence from Thailand. Journal of Financial Management of Property and Construction, 11(1), pp. 3-20. ISSN 1366-4387

Mei, X; Ma, W; Xu, F and Zhang, Z (2024) Vision-based detection of unsafe worker guardrail climbing based on posture and instance segmentation data fusion. Journal of Construction Engineering and Management, 150(11): 04024156, ISSN 0733-9364

Meifrinaldi, S R C P (2024) Stakeholder readiness for integrated project delivery in public sector construction: The role of maturity models. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Meinel, G; Hecht, R and Herold, H (2009) Analyzing building stock using topographic maps and GIS. Building Research & Information, 37(5-6), pp. 468-482. ISSN 0961-3218

Melo, Reymard Savio Sampaio de (2015) Guidelines for target costing introduction in the real estate products development proces. PhD thesis, Universidade Estadual de Campinas, Brazil.

Menches, C L (2006) Effect of pre-construction planning on electrical project performance. PhD thesis, University of Wisconsin - Madison, USA.

Menendez Acurio, J R (2014) Incorporating risk and uncertainty into pavement network maintenance and rehabilitation budget allocation decisions. PhD thesis, Texas A&M University, USA.

Meng, Q; Zhu, J; Li, Z and Chong, H Y (2024) Clarifying unsafe behaviors of construction workers through a complex network of unsafe behavior chains. Journal of Construction Engineering and Management, 150(11): 04024164, ISSN 0733-9364

Meng, S (2023) Development of a regional wind risk assessment framework for wood-frame single-family residential building stock. PhD thesis, University of California, Los Angeles, USA.

Meniru, K C U (2005) Computer-aided conceptual building design. PhD thesis, Concordia University, Canada.

Menzies, J L and Orr, S C (2014) Internationalization to China: A model for Australian architectural, engineering and construction firms. International Journal of Construction Education and Research, 10(3), pp. 201-221. ISSN 1557-8771

Merna, T (2004) Assessing methods to analyse portfolios of projects and their risks procured by project finance. PhD thesis, University of Manchester, UK.

Mertens, A.; Yönder, Ç; Hamarat, Y. and Elsen, C. (2026) Argumentation in co-design for architect-client interaction tools. Architectural Engineering and Design Management, 22(1), pp. 19-38. ISSN 1745-2007

Messi, Leonardo (2022) Development of a BIM-based simulator for workspace management in construction. PhD thesis, Università Politecnica delle Marche, Italy.

Mestizo Reyes, Rubén D (2018) Political risk and success factors in public-private partnerships at the subnational level: The case of road infrastructure concessions. DBA thesis, Pontificia Universidad Catolica del Peru, Peru.

Migliaccio, G C; Guindani, M; D'Incognito, M and Zhang, L (2013) Empirical assessment of spatial prediction methods for location cost-adjustment factors. Journal of Construction Engineering and Management, 139(7), pp. 858-869. ISSN 0733-9364

Mikhailitchenko, Serguei (2008) The Australian housing market: Price dynamics and capital stock growth. PhD thesis, Griffith University, Australia.

Miller, D P (2009) Essays on subcontracting, competitive bidding, and dynamic housing demand. PhD thesis, University of Minnesota, USA.

Miller, M L and Bernold, L E (1991) Sensor-integrated nailing for building construction. Journal of Construction Engineering and Management, 117(2), pp. 213-225. ISSN 0733-9364

Mills, A; Lingard, H; McLaughlin, P and Iyer-Raniga, U (2012) Pathways to industry: Work practices of undergraduate students in construction programs in Australia. International Journal of Construction Education and Research, 8(3), pp. 159-170. ISSN 1557-8771

Mircheva, B K (2009) Infrastructure: The building block for exports in sub-Saharan Africa? PhD thesis, American University, USA.

Mirzaei, A; Nasirzadeh, F; Parchami Jalal, M and Zamani, Y (2018) 4D-BIM dynamic time-space conflict detection and quantification system for building construction projects. Journal of Construction Engineering and Management, 144(7): 04018056, ISSN 0733-9364

Mirzaei, J; Amiri Hanzaei, H; Khaleghi, H and Kashani, H (2024) Cost estimation models for seismic retrofit of masonry school buildings. International Journal of Construction Management, 24(8), pp. 843-853. ISSN 1562-3599

Mishra, S K; Upadhyay, B and Das, B B (2026) Exploring the role of metakaolin in binary and ternary blended 3D printable mortars: Deep insights into printability. International Journal of Construction Management, 26(2), pp. 185-203. ISSN 1562-3599

Miskawi, Z (1993) A numerical analysis method for computing schedule and resource forecasting for industrial projects. Construction Management and Economics, 11(6), pp. 411-420. ISSN 01446193

Mitchell Jr., Z W (1998) A statistical analysis of construction equipment repair costs using field data and the cumulative cost model. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Mitchell Jr., Zane Windsor (1998) A statistical analysis of construction equipment repair costs using field data & the cumulative cost model. PhD thesis, Virginia Tech, USA.

Mitikie, B B and Lee, T S (2019) Experimental investigation of enzyme stabilization and its effect on clay brick. Journal of Construction Engineering and Management, 145(4): 04019012, ISSN 0733-9364

Mitropoulos, P and Cupido, G (2009) Safety as an emergent property: Investigation into the work practices of high-reliability framing crews. Journal of Construction Engineering and Management, 135(5), pp. 407-415. ISSN 0733-9364

Mitropoulos, P and Howell, G (2001) Model for understanding, preventing, and resolving project disputes. Journal of Construction Engineering and Management, 127(3), pp. 223-231. ISSN 0733-9364

Mitropoulos, P and Tatum, C B (2000) Forces driving adoption of new information technologies. Journal of Construction Engineering and Management, 126(5), pp. 340-348. ISSN 0733-9364

Mnea, A and Zairul, M (2023) Housing design studies in Saudi Arabia: A thematic review. Journal of Construction in Developing Countries, 28(1), pp. 317-339. ISSN 1823-6499

Moezzi, M (2009) Are comfort expectations of building occupants too high? Building Research & Information, 37(1), pp. 79-83. ISSN 0961-3218

Mofokeng, M; Alhassan, A L and Zeka, B (2024) Public-private partnerships and economic growth: A sectoral analysis from developing countries. International Journal of Construction Management, 24(10), pp. 1029-1037. ISSN 1562-3599

Mohamad Karimi, S; Jamshid Mousavi, S; Kaveh, A and Afshar, A (2007) Fuzzy optimization model for earthwork allocations with imprecise parameters. Journal of Construction Engineering and Management, 133(2), pp. 181-190. ISSN 0733-9364

Mohamed, M A; Hamzah, M J A; Pauzi, N N; Shahrudin, N S N and Sheffie, S I M (2023) The effect of COVID-19 on construction site personnel: Psychological and physiological perspectives. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Mohamed, S (2003) Scorecard approach to benchmarking organizational safety culture in construction. Journal of Construction Engineering and Management, 129(1), pp. 80-88. ISSN 0733-9364

Mohamed, S (2003) Adaptation of the balanced scorecard to measure organizational safety culture. Journal of Construction Research, 4(1), pp. 45-57. ISSN 1609-9451

Mohamed Sultan, A A B (2019) Decision tools for recycling with a focus on fibre reinforced composites. PhD thesis, University of Manchester, UK.

Mohammed Abdelkader, E; Zayed, T; Elshaboury, N and Taiwo, R (2025) A hybrid Bayesian optimization-based deep learning model for modeling the condition of saltwater pipes in Hong Kong. International Journal of Construction Management, 25(1), pp. 46-62. ISSN 1562-3599

Mohanta, A and Das, S (2023) Decision support system for the early stage of green building envelope design considering energy and maintainability. Architectural Engineering and Design Management, 19(2), pp. 163-182. ISSN 1745-2007

Mohanta, A; Das, S and Mohanty, R N (2021) Building envelope trade-off method integrated with BIM-based framework for energy-efficient building envelope. Architectural Engineering and Design Management, 17(5-6), pp. 516-536. ISSN 1745-2007

Mohareb, E; Gillich, A and Bristow, D (2022) Participation in domestic energy retrofit programmes: Key spatio-temporal drivers. Buildings & Cities, 3(1), pp. 356-375. ISSN 2632-6655

Mohieldin, Y A (1989) Analysis of construction processes with nonstationary work task durations. PhD thesis, University of Maryland, College Park, USA.

Mohsini, R A and Davidson, C H (1992) Determinants of performance in the traditional building process. Construction Management and Economics, 10(4), pp. 343-359. ISSN 01446193

Mojela, T. W.; Laryea, S.; Zungu, Z. and Kwasafo, O. K. (2026) Client and contractor experiences in framework construction agreements in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 154-168. ISSN 1751-4304

Mokhlesian, S and Holmén, M (2012) Business model changes and green construction processes. Construction Management and Economics, 30(9), pp. 761-775. ISSN 1466433X

Mokhtari, M and Hosseinian, S M (2025) Optimal outcome sharing among clients, builders, and designers in collaborative construction contracts: Comparing design–bid–build and design–build methods using principal–agent theory. Journal of Construction Engineering and Management, 151(3): 04024212, ISSN 0733-9364

Molenaar, K R; Park, J I and Washington, S (2009) Framework for measuring corporate safety culture and its impact on construction safety performance. Journal of Construction Engineering and Management, 135(6), pp. 488-496. ISSN 0733-9364

Molwus, J J; Erdogan, B and Ogunlana, S (2017) Using structural equation modelling to understand the relationships among critical success factors for stakeholder management in construction. Engineering, Construction and Architectural Management, 24(3), pp. 426-450. ISSN 0969-9988

Monteiro do Nascimento, F A; Neto, G D M P; Hazin Alencar, L and Valdes-Vasquez, R (2026) Multicriteria subcontractor selection model for construction activities in wind farm projects. International Journal of Construction Management, 26(5), pp. 772-788. ISSN 1562-3599

Moon, H; Kim, K; Lee, H S; Park, M; Williams, T P; Son, B and Chun, J Y (2020) Cost performance comparison of design-build and design-bid-build for building and civil projects using mediation analysis. Journal of Construction Engineering and Management, 146(9): 04020113, ISSN 0733-9364

Moon, S and Munira Chowdhury, A (2021) Utilization of prior information in neural network training for improving 28-day concrete strength prediction. Journal of Construction Engineering and Management, 147(5): 2047, ISSN 0733-9364

Mooney, C and Mooney, E (2014) Risk allocation in construction contracts: Irish public works. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(2), pp. 68-74. ISSN 17514304

Moore, W B (1989) Modeling the impact of large construction projects on surrounding communities. PhD thesis, University of Maryland, College Park, USA.

Morgan, C; Foster, J A; Poston, A and Sharpe, T R (2017) Overheating in Scotland: Contributing factors in occupied homes. Building Research & Information, 45(1-2), pp. 143-156. ISSN 0961-3218

Morgan, R E and Morgan, N A (1991) An appraisal of the marketing development in engineering consultancy firms. Construction Management and Economics, 9(4), pp. 355-368. ISSN 01446193

Morledge, R and Owen, K (1998) Critical success factors in PFI projects. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Morley, D; Lu, M and Abourizk, S (2014) Identification of invariant average weighted haul distance to simplify earthmoving simulation modeling in planning site grading operations. Journal of Construction Engineering and Management, 140(12): 04014057, ISSN 0733-9364

Morris, Austin J (2022) Project management maturity and project success in NSW local government. PhD thesis, University of Technology Sydney, Australia.

Morua Padilla, E (1986) Resource strategies for dynamic construction project management. PhD thesis, University of Michigan, USA.

Moschandreas, D J; Yoon, S H and Demirev, D (2006) Validation of the indoor environmental quality conceptual model. Building Research & Information, 34(5), pp. 483-495. ISSN 0961-3218

Moselhi, O and Alshibani, A (2009) Optimization of earthmoving operations in heavy civil engineering projects. Journal of Construction Engineering and Management, 135(10), pp. 948-954. ISSN 0733-9364

Moselhi, O; Assem, I and El-Rayes, K (2005) Change orders impact on labor productivity. Journal of Construction Engineering and Management, 131(3), pp. 354-359. ISSN 0733-9364

Moselhi, O and Ei-Rayes, K (1993) Scheduling of repetitive projects with cost optimization. Journal of Construction Engineering and Management, 119(4), pp. 681-697. ISSN 0733-9364

Moselhi, O; Hegazy, T and Fazio, P (1993) DBID: Analogy-based dss for bidding in construction. Journal of Construction Engineering and Management, 119(3), pp. 466-479. ISSN 0733-9364

Moselhi, O and Nicholas, M J (1990) Hybrid expert system for construction planning and scheduling. Journal of Construction Engineering and Management, 116(2), pp. 221-238. ISSN 0733-9364

Mostafa, K and Hegazy, T (2025) Smart rehabilitation-planning framework for sustainable infrastructure: Roofing application. Journal of Construction Engineering and Management, 151(2): 04024203, ISSN 0733-9364

Mostafavi, A; Abraham, D; Noureldin, S; Pankow, G; Novak, J; Walker, R; Hall, K and George, B (2013) Risk-based protocol for inspection of transportation construction projects undertaken by state departments of transportation. Journal of Construction Engineering and Management, 139(8), pp. 977-986. ISSN 0733-9364

Mostofi, F; Tokdemir, O B and Toǧan, V (2023) Comprehensive root cause analysis of construction defects using semisupervised graph representation learning. Journal of Construction Engineering and Management, 149(9): 04023079, ISSN 0733-9364

Mostofi, F; Tokdemir, O B; Toǧan, V and Arditi, D (2024) Predicting the cost of rework in high-rise buildings using graph convolutional networks. Journal of Construction Engineering and Management, 150(8): 04024085, ISSN 0733-9364

Motlagh, K C (1992) Algorithms for computerised surface modelling and highway alignment design. PhD thesis, University of Strathclyde, UK.

Moua, B and Russell, J S (2001) Comparison of two maintainability programs. Journal of Construction Engineering and Management, 127(3), pp. 239-244. ISSN 0733-9364

Mousaei, A; Taghaddos, H; Marzieh Bagheri, S and Hermann, U (2021) Optimizing heavy lift plans for industrial construction sites using dijkstra's algorithm. Journal of Construction Engineering and Management, 147(11): 04021160, ISSN 0733-9364

Mousakhani, E; Yavarkhani, M and Sohrabi, S (2017) Selecting an appropriate alternative for a major infrastructure project with regard to value engineering approach. Journal of Engineering, Design and Technology, 15(3), pp. 395-416.

Moussa, A; Ezzeldin, M and El-Dakhakhni, W (2025) Data-driven assessment of complexity-induced risks in infrastructure projects. Journal of Construction Engineering and Management, 151(7): 04025074, ISSN 0733-9364

Moussa, M; Ruwanpura, J and Jergeas, G (2006) Decision tree modeling using integrated multilevel stochastic networks. Journal of Construction Engineering and Management, 132(12), pp. 1254-1266. ISSN 0733-9364

Moussourakis, J and Haksever, C (2004) Flexible model for time/cost tradeoff problem. Journal of Construction Engineering and Management, 130(3), pp. 307-314. ISSN 0733-9364

Moussourakis, J and Haksever, C (2010) Project compression with nonlinear cost functions. Journal of Construction Engineering and Management, 136(2), pp. 251-259. ISSN 0733-9364

Mselle, J and Sanga, S A (2018) Constraints facing incremental housing construction in Dar es Salaam, Tanzania. Journal of Construction in Developing Countries, 23(1), pp. 1-20. ISSN 1823-6499

Mucheti, Alexsander Silva (2025) Experimental and numerical analysis of nailed soil structures in urban areas. PhD thesis, Universidade Estadual de Campinas, Brazil.

Muga, H E (2009) An integrated framework for assessing the sustainability of components that make up the built environment. PhD thesis, Michigan Technological University, USA.

Muianga, E A D; Kowaltowski, D C C K and Koolwijk, J S J (2026) Social housing improvement factors for upgrading processes. Building Research & Information, 54(3), pp. 306-329. ISSN 0961-3218

Mujumdar, P (2017) Modeling design interdependency and iteration for multiple two-way information exchanges in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Mukherjee, A (2005) A multi-agent framework for general purpose situational simulations in construction management. PhD thesis, University of Washington, USA.

Mulholland, B and Christian, J (1999) Risk assessment in construction schedules. Journal of Construction Engineering and Management, 125(1), pp. 8-15. ISSN 0733-9364

Mumtaz, M; Khan, K I A; Hassan, M U; Ahmad, T and Ahmed, K (2026) Impact of youtube on dissemination of construction engineering and management knowledge: Opinion-mining inquiry. Journal of Construction Engineering and Management, 152(1): 04025216, ISSN 0733-9364

Murguia, D; Demian, P and Soetanto, R (2021) Systemic BIM adoption: A multilevel perspective. Journal of Construction Engineering and Management, 147(4): 04021014, ISSN 0733-9364

Murphy, M; Dainty, A and Ren, Z (2011) Understanding women's experiences of construction education: A need for longitudinal research? In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Murtagh, N; Roberts, A and Hind, R (2016) The relationship between motivations of architectural designers and environmentally sustainable construction design. Construction Management and Economics, 34(1), pp. 61-75. ISSN 01446193

Murtagh, N R A H R (2015) Harnessing the motivations of architectural designers to engage with sustainable construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Musenero, L; Baroudi, B and Gunawan, I (2021) Application of dual concern theory in elucidating conflict behavior in infrastructure public-private partnership projects. Journal of Construction Engineering and Management, 147(7): 04021061, ISSN 0733-9364

Musenero, L; Baroudi, B and Gunawan, I (2023) Critical issues affecting dispute resolution practice in infrastructure public-private partnerships. Journal of Construction Engineering and Management, 149(3): 04023001, ISSN 0733-9364

Mushi, F V; Nguluma, H and Kihila, J (2022) A critical review of African green building research. Building Research & Information, 50(6), pp. 610-627. ISSN 0961-3218

Mushtaq, K A B; Hassan, M U; Ahmad, T and Choudhry, R M (2026) Impact of BIM on quality of planning and design in highway infrastructure projects: SEM-based inquiry. Journal of Construction Engineering and Management, 152(2): 04025262, ISSN 0733-9364

Musonda, I; Lusenga, E and Okoro, C (2021) Rating and characterization of an organization's safety culture to improve performance. International Journal of Construction Management, 21(2), pp. 181-193. ISSN 1562-3599

Musselwhite, D; Gledson, B and Greenwood, D (2021) Matters affecting construction project-level planning effectiveness: A literature review. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Mustaffa, N K (2022) Alternative configurations of earthmoving loading practices toward emissions reduction. Journal of Construction Engineering and Management, 148(1): 04021177, ISSN 0733-9364

Mustaffa, Nur Kamaliah (2018) Emissions, production and cost in construction operations. PhD thesis, University of New South Wales, Australia.

Mwakabole, G C; Gurmu, A T and Tivendale, L (2019) Investigation of the challenges facing public-private partnership projects in Australia. Construction Economics and Building, 19(1), pp. 57-74. ISSN 2204-9029

Myrtveit, I and Stensrud, E (2005) Identifying high performance construction projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Müller, B (2016) Policy gaps: Future challenges for research. Building Research & Information, 44(3), pp. 338-341. ISSN 0961-3218

Müller, P (2010) Procedural modeling of buildings. DSc thesis, ETH Zürich, Switzerland.

Na, R (2013) Property rights analysis of building material pricing. PhD thesis, University of Hong Kong, Hong Kong.

Naas, J D (1990) Identifying and predicting present and future occupational competencies for commercial construction superintendents in Illinois. PhD thesis, Southern Illinois University at Carbondale, USA.

Nabizadeh, M; Khalilzadeh, M; Ebrahimnejad, S and Ershadi, M J (2021) Developing a fuzzy goal programming model for health, safety and environment risks based on hybrid fuzzy FMEA-vikor method. Journal of Engineering, Design and Technology, 19(2), pp. 317-338. ISSN 1726-0531

Naga Vamsi Krishna, J; Kota, S and Venkataraman, P B (2021) An impact of simulation labs on engineering students' academic performance: A critical investigation. Journal of Engineering, Design and Technology, 19(1), pp. 103-126. ISSN 1726-0531

Nahvi, A (2019) Integrated stochastic economics performance evaluation of horizontal infrastructure systems. PhD thesis, Iowa State University, USA.

Nam, C H and Tatum, C B (1992) Noncontractual methods of integration on construction projects. Journal of Construction Engineering and Management, 118(2), pp. 385-398. ISSN 0733-9364

Naoui, M A; Lejdel, B; Ayad, M; Amamra, A and kazar, O (2021) Using a distributed deep learning algorithm for analyzing big data in smart cities. Smart and Sustainable Built Environment, 10(1), pp. 90-105. ISSN 2046-6099

Napolitan, C L (1995) Improvement to the forecast precision of the factor model for masonry productivity. PhD thesis, Pennsylvania State University, USA.

Nardecchia, F; Mattoni, B; Burattini, C and Bisegna, F (2020) The impact of humidity on vortex creation around isolated buildings. Building Research & Information, 48(5), pp. 551-571. ISSN 0961-3218

Nasirzadeh, F; Rostamnezhad, M; Carmichael, D G; Khosravi, A and Aisbett, B (2022) Labour productivity in Australian building construction projects: A roadmap for improvement. International Journal of Construction Management, 22(11), pp. 2079-2088. ISSN 1562-3599

Nasrallah, W F and Bou-Matar, R (2008) Exponential, gamma, and power law distributions in information flow on a construction site. Journal of Construction Engineering and Management, 134(6), pp. 442-450. ISSN 0733-9364

Nassar, K and Hosny, O (2012) Solving the least-cost route cut and fill sequencing problem using particle swarm. Journal of Construction Engineering and Management, 138(8), pp. 931-942. ISSN 0733-9364

Navon, R (1995) Resource-based model for automatic cash-flow forecasting. Construction Management and Economics, 13(6), pp. 501-510. ISSN 01446193

Navon, R and Arkin, H (1993) Economic comparison of an air-conditioner and a desert cooler for residences in arid areas. Construction Management and Economics, 11(1), pp. 62-70. ISSN 01446193

Navon, R; Arkin, H and Burg, I (1997) Economic evaluation of HVAC systems with ice storage designed using an optimization technique. Construction Management and Economics, 15(5), pp. 429-439. ISSN 01446193

Navon, R and Berkovich, O (2005) Development and on-site evaluation of an automated materials management and control model. Journal of Construction Engineering and Management, 131(12), pp. 1328-1336. ISSN 0733-9364

Navon, R and Maor, D (1995) Equipment replacement and optimal size of a civil engineering fleet. Construction Management and Economics, 13(2), pp. 173-183. ISSN 01446193

Navon, R; Rubinovitz, Y and Coffler, M (1996) Fully automated rebar CAD/CAM system: Economic evaluation and field implementation. Journal of Construction Engineering and Management, 122(2), pp. 101-108. ISSN 0733-9364

Neil, J M (1978) Construction cost estimating concepts and their application. PhD thesis, Texas A&M University, USA.

Ness, K (2010) The discourse of 'respect for people' in UK construction. Construction Management and Economics, 28(5), pp. 481-493. ISSN 1466433X

Neve, H H; Wandahl, S; Kaeseler, S M and Tandrup, A (2017) Integrating IPD and exploring potentials. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Newman, W H (1934) The building industry and business cycles. PhD thesis, University of Chicago, USA.

Newsham, G; Brand, J; Donnelly, C; Veitch, J; Aries, M and Charles, K (2009) Linking indoor environment conditions to job satisfaction: A field study. Building Research & Information, 37(2), pp. 129-147. ISSN 0961-3218

Newsham, G R; Birt, B J; Arsenault, C; Thompson, A J L; Veitch, J A; Mancini, S; Galasiu, A D; Gover, B N; MacDonald, I A and Burns, G J (2013) Do green buildings have better indoor environments? New evidence. Building Research & Information, 41(4), pp. 415-434. ISSN 0961-3218

Newton, P W and Tucker, S N (2011) Pathways to decarbonizing the housing sector: A scenario analysis. Building Research & Information, 39(1), pp. 34-50. ISSN 0961-3218

Newton, S (1991) An agenda for cost modelling research. Construction Management and Economics, 9(2), pp. 97-112. ISSN 01446193

Ng, S T; Luu, D T; Chen, S E and Lam, K C (2002) Fuzzy membership functions of procurement selection criteria. Construction Management and Economics, 20(3), pp. 285-296. ISSN 01446193

Ng, S T and Zhang, Y (2008) Optimizing construction time and cost using ant colony optimization approach. Journal of Construction Engineering and Management, 134(9), pp. 721-728. ISSN 0733-9364

Nguyen, B T H; Wong, P S P and Ahankoob, A (2025) Enhancing flood risk governance in Australia: Challenges, opportunities, and international insights. Construction Economics and Building, 25(3-4), pp. 254-271. ISSN 2204-9029

Nguyen, D A; Garvin, M J and Gonzalez, E E (2018) Risk allocation in U.S. Public-private partnership highway project contracts. Journal of Construction Engineering and Management, 144(5): 04018017, ISSN 0733-9364

Nguyen, L D; Le-Hoai, L; Tran, D Q; Dang, C N and Nguyen, C V (2019) Effect of project complexity on cost and schedule performance in transportation projects. Construction Management and Economics, 37(7), pp. 384-399. ISSN 01446193

Nguyen, L H (2019) Relationships between critical factors related to team behaviors and client satisfaction in construction project organizations. Journal of Construction Engineering and Management, 145(3): 04019002, ISSN 0733-9364

Nguyen, Q T (2009) Developing a strategic model for small-and-medium-sized construction firms in Vietnam. PhD thesis, University of Leeds, UK.

Nguyen, T T N; Nguyen, T A; Do, S T and Nguyen, V T (2024) Developing a structural model of stakeholders' behavior toward BIM adoption in construction enterprises. International Journal of Construction Management, 24(10), pp. 1038-1053. ISSN 1562-3599

Nguyen, Tuan Son (2019) Investigation into stakeholder management in complex projects. PhD thesis, Griffith University, Australia.

Nguyen Van, T; Nguyen Hieu, T and De Troyer, F (2016) Managing pile foundation and land cost for high-rise buildings in the early design stages. Architectural Engineering and Design Management, 12(3), pp. 151-169. ISSN 1745-2007

Nicholls, R (1991) Sandwich-barrel shell construction by inflation. Journal of Construction Engineering and Management, 117(1), pp. 131-147. ISSN 0733-9364

Nickdoost, N; Choi, J; Abdelrazig, Y A and Sobanjo, J (2022) A project life-cycle approach to managing procrastination in construction projects: State-of-the-art review. Journal of Construction Engineering and Management, 148(5): 03122001, ISSN 0733-9364

Nicol, L A and Knoepfel, P (2014) Resilient housing: A new resource-oriented approach. Building Research & Information, 42(2), pp. 229-239. ISSN 0961-3218

Nigra, M; Lo Verso, V R M; Robiglio, M; Pellegrino, A and Martina, M (2022) 'Re-coding' environmental regulation–a new simplified metric for daylighting verification during the window and indoor space design process. Architectural Engineering and Design Management, 18(4), pp. 521-544. ISSN 1745-2007

Nijhuis, Steven André (2022) Improving project management teaching in higher education: Towards a validated competence profile for the design of a profession specific learning line. PhD thesis, University of Twente, Netherlands.

Niknam, M (2015) A semantics-based approach to construction cost estimating. PhD thesis, Marquette University, USA.

Nilsson, S (2003) Durability of district heating pipes. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Ning, X; Shan, M; Li, Z and Nie, Z (2025) Prediction of construction material prices based on the sliding window catboost model. Journal of Construction Engineering and Management, 151(12): 04025196, ISSN 0733-9364

Ning, Y and Ling, F Y Y (2013) Reducing hindrances to adoption of relational behaviors in public construction projects. Journal of Construction Engineering and Management, 139(11): 4013017, ISSN 0733-9364

Niskanen, T and Lauttalammi, J (1989) Accident risks during handling of materials at building construction sites. Construction Management and Economics, 7(4), pp. 283-301. ISSN 01446193

Nisonen, E; Bernal, D M and Pelsmakers, S (2025) The unfitness of dwellings: Why spatial and conceptual boundaries matter. Buildings & Cities, 6(1), pp. 619-633. ISSN 2632-6655

Nitithamyong, P and Skibniewski, M J (2006) Success/failure factors and performance measures of web-based construction project management systems: Professionals' viewpoint. Journal of Construction Engineering and Management, 132(1), pp. 80-87. ISSN 0733-9364

Niu, Y; Nwagboso, C; Proverbs, D and Olomolaiye, P (2004) Developing supply chain integration in building technologies cluster. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Niza, I L; da Luz, I M; de Souza, M P and Broday, E E (2025) Hierarchical and two-step clustering to assess symptoms of sick building syndrome in office spaces in an educational building. Architectural Engineering and Design Management, 21(4), pp. 603-620. ISSN 1745-2007

Nizam Shaikh, R (2019) BIM-based investigation of total energy consumption in delivering buildings as a product. PhD thesis, University of Liverpool, UK.

Noghabaei, M (2021) Visual and behavioral data analysis in immersive virtual environments for enhancing construction safety, planning, and control. PhD thesis, North Carolina State University, USA.

Noorizadeh, A; Peltokorpi, A and Avkiran, N K (2019) Supplier performance evaluation in construction projects: Challenges and possible solutions. Journal of Construction Engineering and Management, 145(4): 04019007, ISSN 0733-9364

Noronha, S (2013) 3-d building detection and description from multiple intensity images using hierarchical grouping and matching of features. PhD thesis, University of Southern California, USA.

Nosair, I A R (1987) The relevance of computerised modelling techniques to construction management problems and training in Egypt. PhD thesis, University of Manchester, UK.

Nuhu, B K; Aliyu, I; Adegboye, M A; Ryu, J K; Olaniyi, O M and Lim, C G (2021) Distributed network-based structural health monitoring expert system. Building Research & Information, 49(1), pp. 144-159. ISSN 0961-3218

Nuruddin, A R; Abu Bakar, S P S and Jaafar, M (2015) Unveiling the challenges faced by Malaysian housing developers through government policy changes. Journal of Construction in Developing Countries, 20(2), pp. 37-52. ISSN 1823-6499

Nwadike, A and Wilkinson, S (2022) Challenges facing building code compliance in New Zealand. International Journal of Construction Management, 22(13), pp. 2493-2503. ISSN 1562-3599

Nwagwu, C C; Akin, S and Hertwich, E G (2024) Modelling Nigerian residential dwellings: bottom-up approach and scenario analysis. Buildings & Cities, 5(1), pp. 521-539. ISSN 2632-6655

O'Brien, W J (1998) Capacity costing approaches for construction supply-chain management. PhD thesis, Stanford University, USA.

O'Brien, W J and Fischer, M A (2000) Importance of capacity constraints to construction cost and schedule. Journal of Construction Engineering and Management, 126(5), pp. 366-373. ISSN 0733-9364

O'Connor, J T; Choi, J O and Winkler, M (2016) Critical success factors for commissioning and start-up of capital projects. Journal of Construction Engineering and Management, 142(11): 04016060, ISSN 0733-9364

O'Reilly, M P and Mawdesley, M J (1994) The evaluation of construction disputes: A risk approach. Engineering, Construction and Architectural Management, 1(2), pp. 103-114. ISSN 0969-9988

Obasi, S N N; Pemberton, J and Awe, O O (2025) A comparative study of soil classification machine learning models for construction management. International Journal of Construction Management, 25(5), pp. 584-593. ISSN 1562-3599

Obi, L I; Arif, M and Kulonda, D J (2017) Prioritizing cost management system considerations for Nigerian housing projects. Journal of Financial Management of Property and Construction, 22(2), pp. 135-153. ISSN 1366-4387

Ochieng, E G and Price, A D F (2010) Factors influencing effective performance of multi-cultural construction project teams. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Ofori, G (2003) Frameworks for analysing international construction. Construction Management and Economics, 21(4), pp. 379-391. ISSN 01446193

Ofori, G and Kien, H L (2004) Translating Singapore architects' environmental awareness into decision making. Building Research & Information, 32(1), pp. 27-37. ISSN 0961-3218

Ogbu, C P (2017) Marketing strategies and performance of indigenous construction firms in Nigeria. Journal of Construction in Developing Countries, 22(1), pp. 1-19. ISSN 1823-6499

Ogunsemi, D R and Jagboro, G O (2006) Time-cost model for building projects in Nigeria. Construction Management and Economics, 24(3), pp. 253-258. ISSN 01446193

Oguz Erkal, E D; Hallowell, M R; Ghriss, A and Bhandari, S (2024) Predicting serious injury and fatality exposure using machine learning in construction projects. Journal of Construction Engineering and Management, 150(3): 04023169, ISSN 0733-9364

Oh, J; Touran, A; D'Angelo, D; Clark, T; Fisher, C; Gaskins, C and Ashuri, B (2025) Empirical assessment of variability in project effectiveness and change orders across project delivery methods. Journal of Construction Engineering and Management, 151(11): 04025170, ISSN 0733-9364

Oh, K (1991) An appraisal of computer-based visual simulation methods for the analysis of a designed environment. PhD thesis, University of California, Berkeley, USA.

Ohueri, C C; Masrom, M A N and Lohana, S (2025) Advances in immersive virtual reality–based construction management student learning. Journal of Construction Engineering and Management, 151(1): 03124009, ISSN 0733-9364

Ok, S C and Sinha, S K (2006) Construction equipment productivity estimation using artificial neural network model. Construction Management and Economics, 24(10), pp. 1029-1044. ISSN 1466433X

Oke, A; Omoraka, A and Olatunbode, A (2020) Appraisal of factors affecting bidding decisions in Nigeria. International Journal of Construction Management, 20(2), pp. 169-175. ISSN 1562-3599

Oke, A E; Ogunsemi, D R and Adeyelu, M F (2018) Quantity surveyors and skills required for procurement management. International Journal of Construction Management, 18(6), pp. 507-516. ISSN 1562-3599

Okere, G O (2012) An investigative study of contract administration practices of general contractors on federal and state DOT projects. PhD thesis, Indiana State University, USA.

Olander, S and Landin, A (2008) A comparative study of factors affecting the external stakeholder management process. Construction Management and Economics, 26(6), pp. 553-561. ISSN 1466433X

Olanipekun, A O; Xia, B; Hon, C and Hu, Y (2017) Project owners' motivation for delivering green building projects. Journal of Construction Engineering and Management, 143(9): 04017068, ISSN 0733-9364

Olatunbosun, S; Odediran, S; Ekundayo, D and Aigbavboa, C (2024) Factors inhibiting energy access in the delivery of construction projects in Lagos metropolis, Nigeria. International Journal of Construction Management, 24(11), pp. 1215-1224. ISSN 1562-3599

Olatunde, N A and Odeyinka, H A (2021) Extent of stakeholder management practices in building projects procured by private corporate organisations in Nigeria. Built Environment Project and Asset Management, 11(5), pp. 819-834. ISSN 2044-124X

Oliveira, L A; Burattino Melhado, S and Vittorino, F (2015) Selection of building technology based on sustainability requirements: Brazilian context. Architectural Engineering and Design Management, 11(5), pp. 390-404. ISSN 1745-2007

Ollár, A (2024) Spatial design for circularity in residential buildings: Exploring the case of the kitchen. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Oloke, D; Manase, D and Olomolaiye, P (2005) Construction health and safety (H&S) performance: A conceptual framework for enhancing information and communication technology (ICT) impacts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Olomolaiye, P O (1990) An evaluation of the relationships between bricklayers' motivation and productivity. Construction Management and Economics, 8(3), pp. 301-313. ISSN 01446193

Oloufa, A A (1988) A framework for the operational simulation of construction projects. PhD thesis, University of California, Berkeley, USA.

Oloufa, A A; Eltahan, A A and Papacostas, C S (1994) Integrated GIS for construction site investigation. Journal of Construction Engineering and Management, 120(1), pp. 211-222. ISSN 0733-9364

Olsen, J; Lee, Z H and Pong, W (2007) Optimal selection of concrete anchors for connection cost reduction. Construction Management and Economics, 25(4), pp. 423-434. ISSN 1466433X

Olukolajo, M A; Ogungbenro, M T and Adewusi, A O (2018) Tenants' characteristics and rent default tendencies in Akure residential property market. African Journal of Built Environment Research, 2(1), pp. 41-54. ISSN 2414-0236

Oluwatayo, A A; Amole, D and Uwakonye, O (2016) Organisational life cycle, business orientation and performances of architectural firms in Nigeria. Construction Economics and Building, 16(1), pp. 50-63. ISSN 2204-9029

Omopariola, E D; Olugboyega, O; Windapo, A O and Albert, I (2022) Establishing the cost and time performances of projects executed by South African construction companies using different payment systems. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Onsarigo, L; Duncan, K and Atalah, A (2020) The effect of prevailing wages on building costs, bid competition, and bidder behaviour: Evidence from Ohio school construction. Construction Management and Economics, 38(10), pp. 917-933. ISSN 01446193

Onubi, H O and Carpio, M (2025) Voluntary workplace proenvironmental behavior on construction project sites: Antecedent roles of green human resource management practices, environmental awareness, and job control. Journal of Construction Engineering and Management, 151(4): 04025007, ISSN 0733-9364

Onukwube, H N and Iyagba, R (2011) Construction professionals job performance and characteristics: A comparison of indigenous and expatriate construction companies in Nigeria. Construction Economics and Building, 11(2), pp. 72-83. ISSN 2204-9029

Oo, B L and Tang, O S (2023) Information feedback in construction contract bidding: Perceptions of Hong Kong contractors. International Journal of Construction Management, 23(6), pp. 1044-1052. ISSN 1562-3599

Ooi, J T L (1999) Financial structure of UK property companies: A research agenda. Journal of Financial Management of Property and Construction, 4(1), pp. 5-30. ISSN 1366-4387

Opawole, A; Alao, O O; Yusuf, A O; Adu, E T and Ofoetan, M A (2022) Evaluation of compliance of concreting materials to standards in building projects in Lagos state, Nigeria. Journal of Construction Business and Management, 5(2), pp. 1-19. ISSN 2521-0165

Orabi, W; El-Rayes, K; Senouci, A B and Al-Derham, H (2009) Optimizing postdisaster reconstruction planning for damaged transportation networks. Journal of Construction Engineering and Management, 135(10), pp. 1039-1048. ISSN 0733-9364

Ormerod, M G and Newton, R A (2005) Moving beyond accessibility: The principles of universal (inclusive) design as a dimension in nD modelling of the built environment. Architectural Engineering and Design Management, 1(2), pp. 103-110. ISSN 1745-2007

Orth, D L (2003) Predicting student success in a building construction management program. PhD thesis, Purdue University, USA.

Ortlepp, R; Gruhler, K and Schiller, G (2018) Materials in Germany's domestic building stock: Calculation model and uncertainties. Building Research & Information, 46(2), pp. 164-178. ISSN 0961-3218

Oshidero, D. F. O. and Coley, D. A. (2026) Talking carbon: A lexical approach to predictive embodied carbon analysis via machine learning. Architectural Engineering and Design Management, 22(1), pp. 235-268. ISSN 1745-2007

Osman, A E (2006) Life cycle optimization model for integrated cogeneration and energy systems applications in buildings. PhD thesis, University of Pittsburgh, USA.

Osuizugbo, I C; Orekan, A A; Omer, M and Simon, R F (2025) An exploratory factor analysis on technological-related barriers to the construction of zero-energy buildings in Nigeria. International Journal of Building Pathology and Adaptation, 43(7), pp. 1897-1918. ISSN 2398-4708

Osuizugbo, I C; Fauzi, M A; Omer, M M; Njogo, B O and Orekan, A A (2024) Research trends on early contractor involvement in construction projects: A bibliometric analysis. Construction Economics and Building, 24(4-5), pp. 160-178. ISSN 2204-9029

Otegbulu, A C; Osagie, J U and Famuyiwa, F (2009) A value hierarchy study of building services/components in commercial and residential developments: A comparative analysis. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Othman, Z M Z (2007) Classifying the aptitude of Civil Engineering Project Managers using Multivariate Discriminant Analysis. PhD thesis, Loughborough University, UK.

Ottaviani, F M; De Marco, A; Narbaev, T and Ballesteros-Pérez, P (2026) Work rate-based indicators for improving project performance regression models. International Journal of Construction Management, 26(1), pp. 99-112. ISSN 1562-3599

Ouf, M M; Issa, M H and Mallory-Hill, S (2014) A protocol to evaluate school buildings' energy consumption. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Owusu-Manu, D G; Badu, E; Holt, G D and Edwards, D (2015) Determinants of management innovation in the Ghanaian construction consulting sector. Construction Economics and Building, 15(1), pp. 75-88. ISSN 2204-9029

Owusu-Manu, D G; Kukah, A S K; Edwards, D J and Ameyaw, E E (2023) Fuzzy synthetic evaluation of moral hazard and adverse selection of public private partnership projects. International Journal of Construction Management, 23(11), pp. 1805-1814. ISSN 1562-3599

Oyedele, J B; McGreal, S; Adair, A and Ogedengbe, P (2013) Performance and role of European listed infrastructure in a mixed-asset portfolio. Journal of Financial Management of Property and Construction, 18(2), pp. 160-183. ISSN 1366-4387

Oyewobi, L O; Windapo, A O and Rotimi, J O B (2017) Determinants of construction organisational performance: A partial least square-path analytic method. Journal of Financial Management of Property and Construction, 22(1), pp. 37-61. ISSN 1366-4387

Oyewole, M O; Komolafe, M O and Gbadegesin, J T (2023) Understanding stakeholders' opinion and willingness on the adoption of sustainable residential property features in a developing property market. International Journal of Construction Management, 23(2), pp. 358-370. ISSN 1562-3599

Ozaki, R (2003) Customer-focused approaches to innovation in housebuilding. Construction Management and Economics, 21(6), pp. 557-564. ISSN 01446193

Ozcan, D G (2017) An analytic network process model to examine LEED-certified buildings' operational performance. Built Environment Project and Asset Management, 7(4), pp. 366-376. ISSN 2044-124X

Ozorhon, B and Oral, K (2017) Drivers of innovation in construction projects. Journal of Construction Engineering and Management, 143(4): 04016118, ISSN 0733-9364

Padala, S P S and Maheswari, J U (2023) Modeling a construction project in a matrix-based framework for managing requirement changes. International Journal of Construction Management, 23(14), pp. 2369-2390. ISSN 1562-3599

Padilla, E M and Carr, R I (1991) Resource strategies for dynamic project management. Journal of Construction Engineering and Management, 117(2), pp. 279-293. ISSN 0733-9364

Pagdadis, S (1990) An advanced technologies assessment strategy for construction automation. PhD thesis, University of Texas at Austin, USA.

Palagi, S (2020) Achieving risk reduction and livability: Connecting relocation decision making to outcomes at relocation communities. PhD thesis, University of Colorado at Boulder, USA.

Palaneeswaran, E; Love, P E D; Kumaraswamy, M M and Ng, T S T (2008) Mapping rework causes and effects using artificial neural networks. Building Research & Information, 36(5), pp. 450-465. ISSN 0961-3218

Palaniappan, S; Bashford, H; Li, K; Fafitis, A and Stecker, L (2009) Carbon emissions based on transportation for post-tensioned slab foundation construction: A production home building study in the greater phoenix arizona area. International Journal of Construction Education and Research, 5(4), pp. 236-260. ISSN 1557-8771

Palit, N (2017) Analysis of the project supply chains: coordination and fair allocation. PhD thesis, University of Sheffield, UK.

Palmer, A and McGeorge, D (1998) Value management as a tool of the stakeholder concept. Journal of Financial Management of Property and Construction, 3(1), pp. 73-82. ISSN 1366-4387

Pan W, T R (2013) Defects of new-build dwellings constructed to building regulations and to the 'code for sustainable homes'. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Pandey, S; Paudel, S; Devkota, K; Kshetri, K and Asteris, P G (2025) Machine learning unveils the complex nonlinearity of concrete materials' uniaxial compressive strength. International Journal of Construction Management, 25(6), pp. 635-649. ISSN 1562-3599

Panthaworn, P (2005) An exploratory study of motivation of management personnel in the heavy construction industry. PhD thesis, University of Texas at Austin, USA.

Panthi, K; Das, K and Abdel-Salam, T (2017) Sustainability and cost assessment of coastal vacation homes for energy retrofits. Built Environment Project and Asset Management, 7(2), pp. 185-198. ISSN 2044-124X

Panwar, A and Jha, K N (2021) Integrating quality and safety in construction scheduling time-cost trade-off model. Journal of Construction Engineering and Management, 147(2): 04020160, ISSN 0733-9364

Paquin, J P; Morin, P P; Lambert, A and Koplyay, T (2022) Assessing project contingency reserves with the expected cost overrun risk measure. Journal of Construction Engineering and Management, 148(10): 04022102, ISSN 0733-9364

Parasonis, J; Keizikas, A and Kalibatiene, D (2012) The relationship between the shape of a building and its energy performance. Architectural Engineering and Design Management, 8(4), pp. 246-256. ISSN 1745-2007

Pargieła, K; Jasińska, A; Malczewska, A; Grzelka, K; Koszyk, J and Ambroziński, Ł (2025) Application of mobile laser scanner to augment stationary collected point clouds. Building Research & Information, 53(6), pp. 675-699. ISSN 0961-3218

Park, H; Meacham, B J; Dembsey, N A and Goulthorpe, M (2014) Integration of fire safety and building design. Building Research & Information, 42(6), pp. 696-709. ISSN 0961-3218

Park, H-K (2001) Cash flow forecasting model using moving weights of cost categories for general contractor on jobsite. PhD thesis, University of Wisconsin - Madison, USA.

Park, J; Marks, E; Cho, Y K and Suryanto, W (2016) Performance test of wireless technologies for personnel and equipment proximity sensing in work zones. Journal of Construction Engineering and Management, 142(1): 04015049, ISSN 0733-9364

Park, S-B (2003) Study of multicriteria decision-making: Development of a decision model to determine when to conduct nighttime construction road work. PhD thesis, Oregon State University, USA.

Park, T; Kim, B and Kim, H (2013) Real option approach to sharing privatization risk in underground infrastructures. Journal of Construction Engineering and Management, 139(6), pp. 685-693. ISSN 0733-9364

Parker, D; MacFarlane, J; Peng, V and Murray, J (2003) Forecasting property market cycles: An application of the RICS model to the Sydney CBD office market. Journal of Financial Management of Property and Construction, 8(3), pp. 178-192. ISSN 1366-4387

Pascale, F; Pantzartzis, E; Krystallis, I and Price, A D F (2020) Rationales and practices for dynamic stakeholder engagement and disengagement. Evidence from dementia-friendly health and social care environments. Construction Management and Economics, 38(7), pp. 623-639. ISSN 01446193

Pasiphol, S (1994) New concepts for total float distribution in CPM project scheduling. PhD thesis, University of Texas at Austin, USA.

Patel, T; Scheepbouwer, E and van der Walt, J D (2025) Optimizing infrastructure procurement: A predictive model for procurement delivery method selection in New Zealand context. International Journal of Construction Management, 25(14), pp. 1736-1748. ISSN 1562-3599

Paterson, Ian (1981) Contractors' risk and insurance in the Australian building industry. PhD thesis, University of New South Wales, Australia.

Patil, N A and Laishram, B (2016) Public‒private partnerships from sustainability perspective: a critical analysis of the Indian case. International Journal of Construction Management, 16(2), pp. 161-174. ISSN 1562-3599

Patlakas, P; Musso, M and Larkham, P (2022) A digital curation model for post-occupancy evaluation data. Architectural Engineering and Design Management, 18(2), pp. 128-148. ISSN 1745-2007

Patsiatzis, Dimitrios I (2003) Optimal process plant layout using mathematical programming. PhD thesis, University College London, UK.

Patterson, D E (1997) Earthworks planning for linear construction projects. PhD thesis, University of Nottingham, UK.

Patton, J R (2013) Task diminishment: Construction value loss due to sub-optimal task execution. PhD thesis, Indiana State University, USA.

Pavlovas, V (2006) Energy savings in existing Swedish apartment buildings: Some aspects on demand controlled ventilation and individual metering. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Payne, S L (2009) The institutional capacity of the UK speculative housebuilding industry – responding to the brownfield development policy agenda. PhD thesis, University of Glasgow, UK.

Paz, Diogo Henrique Fernandes da (2019) Development of a system to support integrated management of construction and demolition waste. PhD thesis, Universidade Federal de Pernambuco, Brazil.

Pellegrino, R; Costantino, N; Pietroforte, R and Sancilio, S (2012) Construction of multi-storey concrete structures in Italy: Patterns of productivity and learning curves. Construction Management and Economics, 30(2), pp. 103-115. ISSN 1466433X

Pelsmakers, S; Croxford, B and Elwell, C A (2019) Suspended timber ground floors: Measured heat loss compared with models. Building Research & Information, 47(2), pp. 127-140. ISSN 0961-3218

Peng, L.; Yang, H.; Ju, A.; Li, X. and Jiang, Z. (2026) Data-driven real-time digital twin framework for tunnel boring machine monitoring. Journal of Construction Engineering and Management, 152(9): 04026134, ISSN 0733-9364

Peng, M (2006) Item-level quantity-based preliminary cost estimating system for highway structures and miscellaneous construction. PhD thesis, University of Texas at Austin, USA.

Peng, Min (2006) Item-level quantity-based preliminary cost estimating system for highways structures and miscellaneous construction. PhD thesis, University of Texas at Austin, USA.

Pereira, E; Ali, M; Wu, L and Abourizk, S (2020) Distributed simulation-based analytics approach for enhancing safety management systems in industrial construction. Journal of Construction Engineering and Management, 146(1): 04019091, ISSN 0733-9364

Pereira, N J G (2023) The impact of human errors on the performance to failure of concrete bridges. PhD thesis, Universidade do Minho, Portugal.

Pereira, P F; Ramos, N M M and Simões, M L (2020) Data-driven occupant actions prediction to achieve an intelligent building. Building Research & Information, 48(5), pp. 485-500. ISSN 0961-3218

Perez Cordoba, X A (2013) Life-cycle cost optimization for foundation engineering. PhD thesis, Cornell University, USA.

Perkinson, G M; Sanvido, V E and Grobler, F (1994) A facility programming information framework. Engineering, Construction and Architectural Management, 1(1), pp. 69-84. ISSN 0969-9988

Perrin, R and Price, A D F (2004) Developing teams and the allocation of rewards within a team environment. Journal of Construction Procurement, 10(2),

Persad, K R (1989) Management of the preconstruction process for highway projects using manpower demand prediction models. PhD thesis, University of Texas at Austin, USA.

Petlíková, K (2021) Application of biological algorithms in standardization of construction work. PhD thesis, Czech Technical University, Czech Republic.

Petrova, E (2019) AI for BIM-based sustainable building design: Integrating knowledge discovery and semantic data modelling for evidence-based design decision support. PhD thesis, Aalborg University, Denmark.

Petrova, E; Pauwels, P; Svidt, K and Jensen, R L (2019) Towards data-driven sustainable design: Decision support based on knowledge discovery in disparate building data. Architectural Engineering and Design Management, 15(5), pp. 334-356. ISSN 1745-2007

Pickhaver, J A (2006) Numerical modelling of building response to tunnelling. PhD thesis, University of Oxford, UK.

Pieper, P J (1984) The measurement of real investment in structures and the construction productivity decline (deflation). PhD thesis, Northwestern University, USA.

Pietroforte, R and Bon, R (1999) The Italian residential construction sector: An input-output historical analysis. Construction Management and Economics, 17(3), pp. 297-303. ISSN 01446193

Pietroforte, R and Stefani, T P (2004) Asce journal of construction engineering and management: Review of the years 1983-2000. Journal of Construction Engineering and Management, 130(3), pp. 440-448. ISSN 0733-9364

Piper, B E B (2014) Optimization methods for improving the resilience of civil infrastructure systems subject to natural hazards. PhD thesis, North Carolina State University, USA.

Piña, A E; Lu, S L and Phua, F T T (2021) Women owner-managers of small construction firms: A complementary perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Plebankiewicz, E and Kubek, D (2016) Multicriteria selection of the building material supplier using AHP and fuzzy AHP. Journal of Construction Engineering and Management, 142(1): 04015057, ISSN 0733-9364

Plessis, C D (2007) A strategic framework for sustainable construction in developing countries. Construction Management and Economics, 25(1), pp. 67-76. ISSN 1466433X

Pocock, J B (1996) The relationship between alternative project approaches, integration, and performance. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Pocock, J B; Liu, L Y and Kim, M K (1997) Impact of management approach on project interaction and performance. Journal of Construction Engineering and Management, 123(4), pp. 411-418. ISSN 0733-9364

Poh, P S H and Chen, J (1998) The Singapore buildable design appraisal system: A preliminary review of the relationship between buildability, site productivity and cost. Construction Management and Economics, 16(6), pp. 681-692. ISSN 01446193

Poirier, E; Forgues, D and Staub-French, S (2016) Collaboration through innovation: Implications for expertise in the AEC sector. Construction Management and Economics, 34(11), pp. 769-789. ISSN 01446193

Pokharel, H K (2023) Improving quality: Exploring ceramic water filters in developing communities. PhD thesis, University of Rhode Island, USA.

Polanco-Guzmán, I; Rodríguez-Troncoso, M; Hammad, A W A; Haddad, A N; Tam, V W Y and Vasco, D A (2023) An improved ventilation system for settling stage of a wastewater treatment plant: A computational simulation analysis. International Journal of Construction Management, 23(2), pp. 205-224. ISSN 1562-3599

Polat, G and Arditi, D (2005) The JIT materials management system in developing countries. Construction Management and Economics, 23(7), pp. 697-712. ISSN 01446193

Poleacovschi, C; Javernick-Will, A; Tong, T and Wanberg, J (2019) Engineers seeking knowledge: Effect of control systems on accessibility of tacit and codified knowledge. Journal of Construction Engineering and Management, 145(2): 04018128, ISSN 0733-9364

Polesie, P M A (2012) Reducing the use of resources in medium-sized Swedish construction enterprises: Production managers' views. Construction Management and Economics, 30(3), pp. 193-202. ISSN 01446193

Poma, E; Palma, D; Molina, M and Graf, F (2024) The kindergarten of Crosara by Sergio Los: Reassessing a pioneering thermally efficient building. Building Research & Information, 52(3), pp. 358-372. ISSN 0961-3218

Pomares, J C; González, A and Saura, P (2018) Simple and resistant construction built with concrete voussoirs for developing countries. Journal of Construction Engineering and Management, 144(8): 04018076, ISSN 0733-9364

Portugal, M. A. and Scur, G. (2026) Sustainability in stalled public works: A framework for measuring economic, social and environmental impacts. Construction Management and Economics, 44(7), pp. 481-498. ISSN 0144-6193

Postnikova, O; Bamgbade, J A and Wong, N H (2022) Performance index for public housing in East Malaysia. Architectural Engineering and Design Management, 18(5), pp. 652-670. ISSN 1745-2007

Pramudya, A A and Wibowo, A (2022) Ranking risks of BOT toll road investment projects in Indonesia using fuzzy interpretive structural modelling. Construction Economics and Building, 22(4), pp. 59-80. ISSN 2204-9029

Pramudya, A A; Wibowo, A; Santosa, W and Permana, F J (2025) A claim-based risk mapping of contractor's all-risk insurance in Indonesia. Construction Economics and Building, 25(1), pp. 122-142. ISSN 2204-9029

Price, A D F (1986) An evaluation of production output for in situ concrete work. PhD thesis, Loughborough University, UK.

Price, T; Wamuziri, S and Gupta, N (2009) Magnet safety in magnetic resonance imaging suite construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Prince, J R (2004) Evaluating the impact of onsite design on project performance. PhD thesis, Clemson University, USA.

Proverbs, D G; Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of reinforcement fixing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(4), pp. 350-358. ISSN 0969-9988

Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) Construction resource/method factors influencing productivity for high rise concrete construction. Construction Management and Economics, 17(5), pp. 577-587. ISSN 01446193

Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) European construction contractors: A productivity appraisal of in situ concrete operations. Construction Management and Economics, 17(2), pp. 221-230. ISSN 01446193

Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) Factors in formwork selection: A comparative investigation. Building Research & Information, 27(2), pp. 109-119. ISSN 0961-3218

Pu, H; Fan, X; Li, W; Zhang, W; Schonfeld, P; Wei, F and Xu, Z (2023) Realizing a quick partial BIM update of subgrade in railway stations. Journal of Construction Engineering and Management, 149(9): 04023073, ISSN 0733-9364

Puddicombe, M S and Johnson, B (2011) Research and theory building in construction management. International Journal of Construction Education and Research, 7(2), pp. 126-142. ISSN 1557-8771

Pugh, T E (1994) Design-construction interface performance on traditional capital improvement projects. PhD thesis, University of Texas at Austin, USA.

Pulket, T (2008) Universal prediction model for construction litigation. PhD thesis, Illinois Institute of Technology, USA.

Pulugurta, H (2007) Development of pavement condition forecasting models. PhD thesis, University of Toledo, USA.

Puolitaival, T; Kähkönen, K and Kestle, L (2023) The framing of construction management responsibilities in job advertisements in the UK and the USA. Construction Management and Economics, 41(4), pp. 307-321. ISSN 01446193

Puplampu, A B and Tutesigensi, A (2008) Blended learning for project management. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Puri, V (2012) Incorporation of continuous activities into activity cycle diagram based discrete event simulation for construction operations. PhD thesis, Purdue University, USA.

Qadourah, J A (2024) Evaluating solar-active shading solutions: a study of energy performance in Mediterranean residential architecture. Architectural Engineering and Design Management, 20(5), pp. 1222-1237. ISSN 1745-2007

Qian, Q and Zhang, L (2018) Impact of regulatory focus on choice of project-governance modes: Role of tolerance of opportunistic behavior. Journal of Construction Engineering and Management, 144(8): 04018070, ISSN 0733-9364

Qiao, Y; Fricker, J D and Labi, S (2019) Influence of project bundling on maintenance of traffic costs across highway project types. Journal of Construction Engineering and Management, 145(8): 05019010, ISSN 0733-9364

Qiu, W; Ma, P; Peng, Q; Zhao, L; Liu, L and Zhou, F (2024) An evaluation method for multisource information fusion in tunneling water inrush disasters. Journal of Construction Engineering and Management, 150(10): 04024133, ISSN 0733-9364

Queiroz, N; Fernandes, L and Fernando Oscar Ruttkay, P (2024) Comparison of fast daylighting climate-based simulation methods for parametric design: Two-phase, three-phase method and path tracing. Architectural Engineering and Design Management, 20(3), pp. 559-577. ISSN 1745-2007

Quigley, D; Heaney, G and Odeyinka, H (2012) Factors of sustainability in building design: Establishing their relative significance. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Quinn, J T (1991) Analysis of optimal and nearly optimal plans for multipurpose river projects. PhD thesis, Harvard University, USA.

Rabeneck, A (2008) A sketch-plan for construction of built environment theory. Building Research & Information, 36(3), pp. 269-279. ISSN 0961-3218

Radebe, T B; Huan, Z and Baloyi, J (2021) Simulation of eutectic plates in medium refrigerated transport. Journal of Engineering, Design and Technology, 19(1), pp. 62-80. ISSN 1726-0531

Radu, A C (2015) Life-cycle estimates of structures subjected to seismic loads. PhD thesis, Cornell University, USA.

Radujković, M; Sjekavica Klepo, M and Bosch-Rekveldt, M (2021) Breakdown of engineering projects' success criteria. Journal of Construction Engineering and Management, 147(11): 04021144, ISSN 0733-9364

Rafiei, M H and Adeli, H (2018) Novel machine-learning model for estimating construction costs considering economic variables and indexes. Journal of Construction Engineering and Management, 144(12): 04018106, ISSN 0733-9364

Raftery, J J (1984) An investigation of the suitability of cost models for use in building design. PhD thesis, Liverpool Polytechnic, UK.

Rahman, M M and Kumaraswamy, M M (2012) Multicountry perspectives of relational contracting and integrated project teams. Journal of Construction Engineering and Management, 138(4), pp. 469-480. ISSN 0733-9364

Rainer, R K (1968) Predicting productivity of one or two elevators for construction of high-rise buildings. PhD thesis, Oklahoma State University, USA.

Raisbeck, P; Millie, R and Maher, A (2010) Assessing integrated project delivery: A comparative analysis of IPD and alliance contracting procurement routes. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Rajabi Asadabadi, M and Zwikael, O (2024) Unrealistic project goals: Detection and modification. Journal of Construction Engineering and Management, 150(3): 04023166, ISSN 0733-9364

Rajan, T A; Gopinath, G and Behera, M (2014) PPPs and project overruns: Evidence from road projects in India. Journal of Construction Engineering and Management, 140(5): 04013070, ISSN 0733-9364

Rajan Annamalai, T and Jain, N (2013) Project finance and investments in risky environments: Evidence from the infrastructure sector. Journal of Financial Management of Property and Construction, 18(3), pp. 251-267. ISSN 1366-4387

Raji, B (2018) Sustainable high-rises: Design strategies for energy-efficient and comfortable tall office buildings in various climates. PhD thesis, Delft University of Technology, Netherlands.

Rakesh Kumar, G (2025) Seismic vulnerability assessment of buildings using rapid visual screening for hybrid UMNN-RFO approach. International Journal of Construction Management, 25(10), pp. 1177-1185. ISSN 1562-3599

Ramirez Flores, R A (2015) A stochastic approach for pavement condition projections and budget needs for the MTC pavement management system. PhD thesis, University of Texas at El Paso, USA.

Ramos, G; Lamberts, R; Abrahão, K C F J; Bandeira, F B; Barbosa Teixeira, C F; Brito de Lima, M; Broday, E E; Castro, A P A S; de Queiroz Leal, L; De Vecchi, R; De Zorzi, L D M; Dornelles, K A; Duarte, S; Faisca, R G; Fontenelle, M; Freitas, T; Gregorio Atem, C; Grigoletti, G; Maciel, L; de Moraes, C M; Mueller, C M; Sartori, T; Silva, B; Silva, C; Vilar da Silva, M; Silveira, A L; Souza, R V G and Xavier, A A (2021) Adaptive behaviour and air conditioning use in Brazilian residential buildings. Building Research & Information, 49(5), pp. 496-511. ISSN 0961-3218

Ramprasad, V and Subbaiyan, G (2017) Perceived indoor environmental quality of classrooms and outcomes: A study of a higher education institution in India. Architectural Engineering and Design Management, 13(3), pp. 202-222. ISSN 1745-2007

Ramzanpour, M; Sharghi, A; Nourtaghani, A and Saleh Sedghpour, B (2023) The reduction of low-income housing stigma with facade features; low- and medium-sized cities. Architectural Engineering and Design Management, 19(3), pp. 250-266. ISSN 1745-2007

Rana, J; Hasan, R; Sobuz, H R and Tam, V W Y (2022) Impact assessment of window to wall ratio on energy consumption of an office building of subtropical monsoon climatic country Bangladesh. International Journal of Construction Management, 22(13), pp. 2528-2553. ISSN 1562-3599

Ranasinghe, K A M K (1990) Analytical method for quantification of economic risks during feasibility analysis for large engineering projects. PhD thesis, University of British Columbia, Canada.

Ranasinghe, M (1994) Quantification and management of uncertainty in activity duration networks. Construction Management and Economics, 12(1), pp. 15-29. ISSN 01446193

Ranasinghe, M (1994) Contingency allocation and management for building projects. Construction Management and Economics, 12(3), pp. 233-243. ISSN 01446193

Ranasinghe, M (2000) Impact of correlation and induced correlation on the estimation of project cost of buildings. Construction Management and Economics, 18(4), pp. 395-406. ISSN 01446193

Ranasinghe, M and Russell, A D (1992) Analytical approach for economic risk quantification of large engineering projects : Validation. Construction Management and Economics, 10(1), pp. 45-68. ISSN 01446193

Ranasinghe, U; Jefferies, M; Davis, P and Pillay, M (2023) Enabling a resilient work environment: An analysis of causal relationships between resilience engineering factors in construction refurbishment projects. Journal of Construction Engineering and Management, 149(9): 04023078, ISSN 0733-9364

Randolph Thomas, H and Napolitan, C L (1995) Quantitative effects of construction changes on labor productivity. Journal of Construction Engineering and Management, 121(3), pp. 290-296. ISSN 0733-9364

Rao, G N (1997) Cost risk assessment in environmental remediation: Towards a causal-chain approach. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Rashid, K B A (2002) An assessment on the systems of registration of contracting firms in Malaysia. Journal of Construction Procurement, 8(2), pp. 148-159. ISSN 1358-9180

Rashid, K B A and Morledge, R (1998) Construction procurement processes in Malaysia: Constraints and strategies. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Rashidi, A; Jazebi, F and Brilakis, I (2011) Neurofuzzy genetic system for selection of construction project managers. Journal of Construction Engineering and Management, 137(1), pp. 17-29. ISSN 0733-9364

Rasmussen, F N; Ganassali, S; Zimmermann, R K; Lavagna, M; Campioli, A and Birgisdóttir, H (2019) LCA benchmarks for residential buildings in Northern Italy and Denmark: Learnings from comparing two different contexts. Building Research & Information, 47(7), pp. 833-849. ISSN 0961-3218

Reddy, A S; Kumar, P R and Raj, P A (2022) Entropy-based fuzzy TOPSIS framework for selection of a sustainable building material. International Journal of Construction Management, 22(7), pp. 1194-1205. ISSN 1562-3599

Rehm, M and Ade, R (2013) Construction costs comparison between green and conventional office buildings. Building Research & Information, 41(2), pp. 198-208. ISSN 0961-3218

Reidy, Angela D (2018) Incorporating sustainability in investment decision making for infrastructure projects. PhD thesis, Queensland University of Technology, Australia.

Reinoso, E; Jaimes, M A and Torres, M A (2016) Evaluation of building code compliance in Mexico city: Mid-rise dwellings. Building Research & Information, 44(2), pp. 202-213. ISSN 0961-3218

Ren, F; Huang, Y; Xia, Z; Xu, X; Li, X; Chi, J; Li, J; Wang, Y and Song, J (2025) Do public-private partnerships (PPPs) promote the sustainable development of infrastructure (sdi)? Evidence from China. Engineering, Construction and Architectural Management, 32(11), pp. 7587-7621. ISSN 0969-9988

Ren, S (1997) GIS-based tools for earthquake risk assessment of point and spatially distributed lifeline systems. PhD thesis, State University of New York at Buffalo, USA.

Ren, S; Qiang, G; Tang, S; Zhang, C; Hyung-Joon, S and Wu, K (2024) An automatic design-feedback process for structural prefabricated components quantity take-off calculation using BIM. Architectural Engineering and Design Management, 20(2), pp. 287-302. ISSN 1745-2007

Ren, Z; Anumba, C J and Ugwu, O (2000) Towards a multi-agent system for construction claims negotiation. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Rezaei, Mohammad (2019) Characterizing controlled low-strength materials (CLSM) for narrow-trench reinstatement. PhD thesis, University of Alberta, Canada.

Rezakhani, P (2017) Hybrid fuzzy-bayesian dynamic decision support tool for resource-based scheduling of construction projects. PhD thesis, University of Missouri - Kansas City, USA.

Riad, N I; Arditi, D and Mohammadi, J (1994) Integrated system for managing owner-directed project acceleration. Journal of Construction Engineering and Management, 120(1), pp. 77-95. ISSN 0733-9364

Rich, F A (2020) Managing the wear of heavy construction equipment steel track undercarriage by soil sand content. PhD thesis, Indiana State University, USA.

Ridyard, James (1976) Computer based management games for the building industry. PhD thesis, University of New South Wales, Australia.

Robert Thomas, R (2020) Examining the relationship of bid difference and disadvantaged business enterprise participation goals in highway construction projects. PhD thesis, Purdue University, USA.

Roberts, W E (1985) An analysis of conflict arising between architects and school personnel when planning, designing, and constructing school facilities. EdD thesis, Northern Arizona University, USA.

Robinson, H S; Carrillo, P M; Anumba, C J and Al-Ghassani, A M (2001) Linking knowledge management strategy to business performance in construction organizations. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Robison, R A V and Foulds, C (2018) Constructing policy success for UK energy feedback. Building Research & Information, 46(3), pp. 316-331. ISSN 0961-3218

Roca-Puigròs, M; Billy, R G; Gerber, A; Wäger, P and Müller, D B (2020) Pathways toward a carbon-neutral Swiss residential building stock. Buildings & Cities, 1(1), pp. 579-593. ISSN 2632-6655

Rocha, C G D; Anzanello, M J and Gerchman, M (2018) Method to assess the match between clients' input and decoupling points in customized building projects. Journal of Construction Engineering and Management, 144(5): 04018018, ISSN 0733-9364

Rodger, R G (1976) Scottish urban housebuilding, 1870-1914. PhD thesis, University of Edinburgh, UK.

Roghabadi, M A and Moselhi, O (2022) Forecasting project duration using risk-based earned duration management. International Journal of Construction Management, 22(16), pp. 3077-3087. ISSN 1562-3599

Rojas, E M (2008) Single versus multiple prime contracting. Journal of Construction Engineering and Management, 134(10), pp. 758-765. ISSN 0733-9364

Rojas, E M and Kell, I (2008) Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools. Journal of Construction Engineering and Management, 134(6), pp. 387-397. ISSN 0733-9364

Rokooei, S (2016) Project management education research excellence within cyber-infrastructure environment. PhD thesis, University of Nebraska - Lincoln, USA.

Ronzani, M (2019) Designing for complexity: Data visualizations in megaproject management. PhD thesis, University of Edinburgh, UK.

Rooke, J; Molloy, E M; Sinclair, M; Koskela, L; Siriwardena, M; Kagioglou, M and Siemieniuch, C (2008) Models and metaphors: Complexity theory and through-life management in the built environment. Architectural Engineering and Design Management, 4(1), pp. 47-57. ISSN 1745-2007

Roos, J A (2002) Defining and analyzing innovators in the Japanese residential construction market. PhD thesis, University of Washington, USA.

Rose, C; Proverbs, D; Manktelow, K and Booth, C (2009) Developing an understanding of the factors affecting the complex process of flood coping strategies in the household sector. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Rosner, J W; Thal Jr, A E and West, C J (2009) Analysis of the design-build delivery method in Air Force construction projects. Journal of Construction Engineering and Management, 135(8), pp. 710-717. ISSN 0733-9364

Roy, R and Gaze, C (1999) Introduction of new technology for a customer-focused speculative housebuilding industry. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Royapoor, M (2015) An investigation into the energy and control implications of adaptive comfort in a modern office building. PhD thesis, University of Newcastle upon Tyne, UK.

Rozenfeld, O; Sacks, R and Rosenfeld, Y (2009) 'Chaste': Construction hazard assessment with spatial and temporal exposure. Construction Management and Economics, 27(7), pp. 625-638. ISSN 1466433X

Ruegg, R T and Fuller, S K (1985) The economics of fire protection: Fast-response residential sprinklers. Construction Management and Economics, 3(1), pp. 43-57. ISSN 01446193

Ruiz, Phelipe Viana (2023) Game-based learning in the teaching of civil construction techniques. PhD thesis, Universidade Estadual de Campinas, Brazil.

Russell, A D and Fayek, A (1994) Automated corrective action selection assistant. Journal of Construction Engineering and Management, 120(1), pp. 11-33. ISSN 0733-9364

Russell, A D and Ranasinghe, M (1992) Analytical approach for economic risk quantification of large engineering projects. Construction Management and Economics, 10(4), pp. 277-301. ISSN 01446193

Russell, J S; Jaselskis, E J and Lawrence, S P (1997) Continuous assessment of project performance. Journal of Construction Engineering and Management, 123(1), pp. 64-71. ISSN 0733-9364

Rustom, R N and Amer, M I (2006) Modeling the factors affecting quality in building construction projects in Gaza Strip. Journal of Construction Research, 7(1), pp. 33-47. ISSN 1609-9451

Rutter, D and Gidado, K (2004) Value for money and facilities performance: A systems approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Rutter, D and Gidado, K (2005) PFI projects: Their scope for delivering vfm. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Rylander, D (2021) Productivity improvements in construction transport operation through lean thinking and systems of systems. PhD thesis, Malardalen University, Sweden.

Sabitu Oyegoke, A (2001) UK and US construction management contracting procedures and practices: A comparative study. Engineering, Construction and Architectural Management, 8(5-6), pp. 403-417. ISSN 0969-9988

Sackey, E and Akotia, J (2017) Spanning the multilevel boundaries of construction organisations: Towards the delivery of BIM-compliant projects. Construction Innovation, 17(3), pp. 273-293. ISSN 1471-4175

Sacks, R (2016) What constitutes good production flow in construction? Construction Management and Economics, 34(9), pp. 641-656. ISSN 01446193

Sacks, R; Esquenazi, A and Goldin, M (2007) LEAPCON: Simulation of lean construction of high-rise apartment buildings. Journal of Construction Engineering and Management, 133(7), pp. 529-539. ISSN 0733-9364

Sacks, R and Goldin, M (2007) Lean management model for construction of high-rise apartment buildings. Journal of Construction Engineering and Management, 133(5), pp. 374-384. ISSN 0733-9364

Sadeh, H; Mirarchi, C; Shahbodaghlou, F and Pavan, A (2023) BIM feasibility for small and medium-sized contractors and subcontractors. International Journal of Construction Management, 23(6), pp. 999-1008. ISSN 1562-3599

Saeidlou, S and Ghadiminia, N (2024) A construction cost estimation framework using DNN and validation unit. Building Research & Information, 52(1-2), pp. 38-48. ISSN 0961-3218

Said, H. and Cao, J. (2026) Optimizing building prefabrication strategies by balancing modularity and complicatedness. Journal of Construction Engineering and Management, 152(7): 04026097, ISSN 0733-9364

Said, H M M and Lucko, G (2016) Float types in construction spatial scheduling. Journal of Construction Engineering and Management, 142(12): 04016077, ISSN 0733-9364

Sajjad, M; Jayasinghe, C and Perera, P (2024) Damage assessment automation for single storey detached masonry houses: a probabilistic approach. Building Research & Information, 52(5), pp. 551-563. ISSN 0961-3218

Saka, N and Mudi, A (2007) Practices and challenges of supply chain management by building contracting firms in the Lagos metropolitan area. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Salama, M; Al-Sharif, F; Kaka, A P and Leishman, C (2006) Cost modelling for standardised design projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Salama, M; Aziz, H A E; Sawah, H E and Samadony, A E (2006) Investigating the criteria for contractors' selection and bid evaluation in Egypt. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Salama, T; Salah, A and Moselhi, O (2021) Integrating critical chain project management with last planner system for linear scheduling of modular construction. Construction Innovation, 21(4), pp. 525-554. ISSN 1471-4175

Salami, B A; Sanni-Anibire, M O and Olurin, J O (2025) Preventing construction site theft in Nigeria: An exploratory factor analysis of the root causes. International Journal of Building Pathology and Adaptation, 43(7), pp. 1816-1839. ISSN 2398-4708

Salary, S and Reyes, M (2025) Identifying the impact of preconstruction elements on project budget. Journal of Construction Engineering and Management, 151(6): 04025058, ISSN 0733-9364

Saleh, Iraj (1997) The shadow pricing of labour in cost benefit analysis of infrastructure projects: Theory and application to sydney's second airport project. PhD thesis, University of Western Sydney, Australia.

Salehipour, A; Naeni, L M; Khanbabaei, R and Javaheri, A (2016) Lessons learned from applying the individuals control charts to monitoring autocorrelated project performance data. Journal of Construction Engineering and Management, 142(5): 04015105, ISSN 0733-9364

Salem, D and Elwakil, E (2023) Asset condition assessment model for healthcare facilities. International Journal of Construction Management, 23(1), pp. 182-203. ISSN 1562-3599

Salem, O M (1999) Infrastructure construction and rehabilitation: Risk-based life cycle cost analysis. PhD thesis, University of Alberta, Canada.

Salhab, D; Møller, D E; Lindhard, S M; Hamzeh, F; Randrup, M and Pilgaard, A (2022) Accounting for variability: Identifying critical activities as a supplement to the critical path. Journal of Construction Engineering and Management, 148(5): 04022019, ISSN 0733-9364

Salim, M D and Bernold, L E (1994) Effects of design-integrated process planning on productivity in rebar placement. Journal of Construction Engineering and Management, 120(4), pp. 720-738. ISSN 0733-9364

Salminen, J (2005) Measuring performance and determining success factors of construction sites. PhD thesis, Helsinki University of Technology, Finland.

Salter, J; Lu, Y; Kim, J C; Kellett, R; Girling, C; Inomata, F and Krahn, A (2020) Iterative 'what-if' neighborhood simulation: Energy and emissions impacts. Buildings & Cities, 1(1), pp. 293-307. ISSN 2632-6655

Samara, A; Sweis, R J; Tarawneh, B; Albalkhy, W; Sweis, G and Alhomsi, S (2022) Sustainability management of international development projects by international non-governmental organizations: The case of ingos working with refugees in Jordan. International Journal of Construction Management, 22(9), pp. 1657-1666. ISSN 1562-3599

Sampaio, A Z; Henriques, P G and Ferreira, P S (2004) Virtual reality technology applied in civil engineering education: Visual simulation of construction processes. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Samuel, D (2014) Predicting significant contract risks at the tender evaluation stage. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(2), pp. 100-107. ISSN 17514304

Samwinga, V and Proverbs, D (2003) The repair of flood damaged property: A critical review of the needs of homeowners. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Sanchez, B and Haas, C (2018) Capital project planning for a circular economy. Construction Management and Economics, 36(6), pp. 303-312. ISSN 01446193

Sanders, S R (1989) An analysis of factors affecting labor productivity in masonry construction. PhD thesis, Pennsylvania State University, USA.

Sandhyavitri, A (2022) Stochastic analyses for managing risk of delay in duri oil construction projects, Indonesia. International Journal of Construction Management, 22(4), pp. 711-731. ISSN 1562-3599

Sandy, G C (1981) An evaluative comparison of the satisfaction with the utility of new buildings versus library additions and addition/renovations. PhD thesis, Florida State University, USA.

Sani, H (1988) An investigation into the influences upon and determinants of perceived quality achievement in the management of construction projects by multivariate analysis. PhD thesis, Heriot-Watt University, UK.

Sanni, A O (2016) Factors determining the success of public private partnership projects in Nigeria. Construction Economics and Building, 16(2), pp. 42-55. ISSN 2204-9029

Sanvido, V E (1988) Conceptual construction process model. Journal of Construction Engineering and Management, 114(2), pp. 294-310. ISSN 0733-9364

Sarie Eldin, H S (1995) Consortia agreements in the international construction industry: With special reference to Egypt. PhD thesis, Queen Mary University of London, UK.

Sarihi, M; Shahhosseini, V and Banki, M T (2020) Multiskilled project management workforce assignment across multiple projects regarding competency. Journal of Construction Engineering and Management, 146(12): 04020134, ISSN 0733-9364

Sarihi, M; Shahhosseini, V and Banki, M T (2023) Development and comparative analysis of the fuzzy inference system-based construction labor productivity models. International Journal of Construction Management, 23(3), pp. 423-433. ISSN 1562-3599

Sarkar, D; Bapat, H; Bhattacharjee, B and Jha, B (2025) Automation and optimization in daylight analysis and life cycle assessment for automated daylight monitoring device for a metro rail station box in Ahmedabad, India. International Journal of Construction Management, 25(1), pp. 124-138. ISSN 1562-3599

Sarkar, D; Gohel, J and Dabasia, K (2021) Optimization of ready mixed concrete delivery for commercial batching plants of Ahmedabad, India. International Journal of Construction Management, 21(10), pp. 1024-1043. ISSN 1562-3599

Saurin, T A; Formoso, C T and Guimaraes, L B M (2004) Safety and production: An integrated planning and control model. Construction Management and Economics, 22(2), pp. 159-169. ISSN 01446193

Scavuzzo, M M (2019) Project manager emotional intelligence and project success: A quantitative study. PhD thesis, Saint Leo University, USA.

Schiller, G (2007) Urban infrastructure: Challenges for resource efficiency in the building stock. Building Research & Information, 35(4), pp. 399-411. ISSN 0961-3218

Schlegel, M; Trutnevyte, E and Scholz, R W (2012) Patterns of residential heat demand in rural Switzerland. Building Research & Information, 40(2), pp. 140-153. ISSN 0961-3218

Schmidt, J Q (2024) Overcoming barriers to adoption of smart stormwater technologies. PhD thesis, University of Michigan, USA.

Schofield, K E (2012) Risk factors for injuries in small and medium sized construction companies. PhD thesis, University of Minnesota, USA.

Schulte Jr., W D (1999) The effect of international corporate strategies and information and communication technologies on competitive advantage and firm performance: An exploratory study of the international engineering, procurement and construction (IEPC) industry. PhD thesis, George Washington University, USA.

Schweiker, M and Wagner, A (2017) Influences on the predictive performance of thermal sensation indices. Building Research & Information, 45(7), pp. 745-758. ISSN 0961-3218

Schöttle, A and Arroyo, P (2017) Comparison of weighting-rating-calculating, best value, and choosing by advantages for bidder selection. Journal of Construction Engineering and Management, 143(8): 05017015, ISSN 0733-9364

Scott, D and Anumba, C J (1996) An intelligent approach to the engineering management of subsidence cases. Engineering, Construction and Architectural Management, 3(3), pp. 233-248. ISSN 0969-9988

Seboni, L and Tutesigensi, A (2015) A mathematical model for allocating project managers to projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Selinger, S (1983) Economic service life of building construction equipment. Journal of Construction Engineering and Management, 109(4), pp. 398-405. ISSN 0733-9364

Selman, A D; Klitgaard, A; Jørsfeldt, L M and Heiselberg, H (2024) Shaping the future: The role of educators in construction programs towards climate legislation in a Danish context. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Selvam, G; Madhavi, T C; Naazeema Begum, T P and Sudheesh, M (2020) Impact of labour productivity in estimating the duration of construction projects. International Journal of Construction Management, 22(12), pp. 2398-2404. ISSN 1562-3599

Senarath, J R and Fernando, N G (2017) Developing labour productivity norms for aluminium system formwork in Sri Lanka. Built Environment Project and Asset Management, 7(2), pp. 199-211. ISSN 2044-124X

Seneviratne, K; Rameezdeen, R and Amaratunga, D (2015) Contractor capacity and waste generation: An empirical investigation. Journal of Construction in Developing Countries, 20(2), pp. 25-36. ISSN 1823-6499

Senior, B A and Halpin, D W (1998) Simplified simulation system for construction projects. Journal of Construction Engineering and Management, 124(1), pp. 72-81. ISSN 0733-9364

Senouci, A B and Eldin, N N (2004) Use of genetic algorithms in resource scheduling of construction projects. Journal of Construction Engineering and Management, 130(6), pp. 869-877. ISSN 0733-9364

Seo, J; Haas, C T; Saidi, K and Sreenivasan, S V (2000) Graphical control interface for construction and maintenance equipment. Journal of Construction Engineering and Management, 126(3), pp. 210-218. ISSN 0733-9364

Seppänen, O; Evinger, J and Mouflard, C (2014) Effects of the location-based management system on production rates and productivity. Construction Management and Economics, 32(6), pp. 608-624. ISSN 01446193

Seppänen, O (2025) Integrated forecasting approach for takt and location-based scheduling. Journal of Construction Engineering and Management, 151(12): 04025199, ISSN 0733-9364

Serag, E; Oloufa, A; Malone, L and Radwan, E (2010) Model for quantifying the impact of change orders on project cost for U.S. roadwork construction. Journal of Construction Engineering and Management, 136(9), pp. 1015-1027. ISSN 0733-9364

Seymour, D; Shammas-Toma, M and Clark, L (1997) Limitations of the use of tolerances for communicating design requirements to site. Engineering, Construction and Architectural Management, 4(1), pp. 3-22. ISSN 0969-9988

Shafique, F and Mollaoglu, S (2022) Shared transformational leadership for green architecture engineering and construction project teams: A study of LEED projects. Journal of Construction Engineering and Management, 148(12): 04022137, ISSN 0733-9364

Shah, M N; Dixit, S; Kumar, R; Jain, R and Anand, K (2021) Causes of delays in slum reconstruction projects in India. International Journal of Construction Management, 21(5), pp. 452-467. ISSN 1562-3599

Shah R, W S R A (2013) Challenges and solutions for management of FRP usage in the UK rail sector. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Shahandashti, S M; Razavi, S N; Soibelman, L; Berges, M; Caldas, C H; Brilakis, I; Teizer, J; Vela, P A; Haas, C; Garrett, J; Akinci, B and Zhu, Z (2011) Data-fusion approaches and applications for construction engineering. Journal of Construction Engineering and Management, 137, pp. 863-869. ISSN 0733-9364

Shahbodaghlou, F (1987) A feasibility model for use of weather protection in cold region construction. PhD thesis, Purdue University, USA.

Shahedi, F; Etemadfard, H; Omrani, F and Ghalehnovi, M (2024) Cost performance modeling for steel fabrication shops with machine learning algorithms. Journal of Construction Engineering and Management, 150(9): 04024114, ISSN 0733-9364

Shalwani, A (2021) Empirical analysis of issue management in small vertical construction projects: Relationship between project performance, project team actions, and issue types. PhD thesis, University of Kansas, USA.

Shams, D S and Alkhalifa, F (2025) Sustainability assessment of new building designs: A review for a region and occupancy-specific accessible tool. Architectural Engineering and Design Management, 21(2), pp. 191-210. ISSN 1745-2007

Shamshiri, A; Ryu, K R; Park, J Y and Choi, K (2023) Project phase-based contingency adjustment framework for infrastructure renewal projects. Journal of Construction Engineering and Management, 149(2): 04022176, ISSN 0733-9364

Shan, B; Chen, B; Wen, J and Xiao, Y (2023) Thermal performance of cross-laminated timber (CLT) and cross-laminated bamboo and timber (clbt) panels. Architectural Engineering and Design Management, 19(5), pp. 511-530. ISSN 1745-2007

Shan, Y; Goodrum, P M; Zhai, D; Haas, C and Caldas, C H (2011) The impact of management practices on mechanical construction productivity. Construction Management and Economics, 29(3), pp. 305-316. ISSN 1466433X

Shanbari, H A (2016) Evaluating the use of video games in construction management education. PhD thesis, University of Florida, USA.

Shanmuganayagam, V (1989) Current float techniques for resources scheduling. Journal of Construction Engineering and Management, 115(3), pp. 401-411. ISSN 0733-9364

Shapira, A (1995) Rational design of shoring-tower-based formwork. Journal of Construction Engineering and Management, 121(3), pp. 255-260. ISSN 0733-9364

Shapira, A (1995) Formwork design for high elevated slab construction. Construction Management and Economics, 13(3), pp. 243-252. ISSN 01446193

Shapira, A and Goldenberg, M (2005) AHP-based equipment selection model for construction projects. Journal of Construction Engineering and Management, 131(12), pp. 1263-1273. ISSN 0733-9364

Shapira, A and Goldenberg, M (2007) "Soft" considerations in equipment selection for building construction projects. Journal of Construction Engineering and Management, 133(10), pp. 749-760. ISSN 0733-9364

Shapira, A and Lyachin, B (2009) Identification and analysis of factors affecting safety on construction sites with tower cranes. Journal of Construction Engineering and Management, 135(1), pp. 24-33. ISSN 0733-9364

Shararah, H H (1981) Evaluation of wall construction techniques based upon economical factors influencing labor and materials. PhD thesis, Oklahoma State University, USA.

Sharma, V K; Sharma, S K and Singh, A P (2022) Risk enablers modelling for infrastructure projects using Bayesian belief network. International Journal of Construction Management, 22(6), pp. 993-1010. ISSN 1562-3599

Shash, A A (1998) Bidding practices of subcontractors in Colorado. Journal of Construction Engineering and Management, 124(3), pp. 219-231. ISSN 0733-9364

Shash, A A and Abdul-Hadi, N H (1993) The effect of contractor size on mark-up size decision in Saudi Arabia. Construction Management and Economics, 11(6), pp. 421-429. ISSN 01446193

Shash, A A H (1988) A probabilistic model for U.S. Nuclear power construction times. PhD thesis, University of Texas at Austin, USA.

Shashwat, S; Zingre, K and Thurairajah, N (2022) Enhancing building energy efficiency estimation by integrating microclimate conditions. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Shaw, C (2023) Understanding the need for a comparative framework when selecting an appropriate building technology for sustainable human settlements in South Africa. PhD thesis, University of Pretoria, South Africa.

Shaw, D; Miles, J and Gray, A (2007) Conceptual design of 'geodesic-like' domes using computational geometry. Architectural Engineering and Design Management, 3(4), pp. 238-248. ISSN 1745-2007

Shaw, D T (1989) SITE CODE: A knowledge-based model of municipal site development regulations for computer-aided design. PhD thesis, University of Texas at Austin, USA.

Shayboun, M; Koch, C and Kifokeris, D (2021) A comparison of accident causation models (ACMS) and machine learning (ML) for applied analysis within accident reports. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Shehab, T; Blampied, N; Nasr, E and Sindhu, L (2024) Ann-based estimation model for the preconstruction cost of pavement rehabilitation projects. International Journal of Construction Management, 24(8), pp. 894-901. ISSN 1562-3599

Shen, J; Liu, S and Zhang, J (2024) Using text mining and Bayesian network to identify key risk factors for safety accidents in metro construction. Journal of Construction Engineering and Management, 150(6): 04024052, ISSN 0733-9364

Shen, L Y and Wu, Y Z (2005) Risk concession model for build/operate/transfer contract projects. Journal of Construction Engineering and Management, 131(2), pp. 211-220. ISSN 0733-9364

Shen, Q; Lo, K K and Wang, Q (1998) Priority setting in maintenance management: A modified multi-attribute approach using analytic hierarchy process. Construction Management and Economics, 16(6), pp. 693-702. ISSN 01446193

Shen, Y; Koh, T Y; Rowlinson, S and Bridge, A J (2015) Empirical investigation of factors contributing to the psychological safety climate on construction sites. Journal of Construction Engineering and Management, 141(11): 04015038, ISSN 0733-9364

Sher, W; Williams, A and Northcote, M (2015) The lived experience of online educators: Insights from construction management. Construction Economics and Building, 15(2), pp. 49-62. ISSN 2204-9029

Sherratt, F; Sherratt, S and Ivory, C (2020) Challenging complacency in construction management research: The case of PPPs. Construction Management and Economics, 38(12), pp. 1086-1100. ISSN 01446193

Sheth, A; Price, A D F; Glass, J and Achour, N (2008) Reviewing the sustainability of existing healthcare facilities. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Sheykhi, R (2016) Risk-based decision making support for construction corporate resource management. PhD thesis, Florida International University, USA.

Shi, J J (1999) A neural network based system for predicting earthmoving production. Construction Management and Economics, 17(4), pp. 463-471. ISSN 01446193

Shi, J J (2002) Three methods for verifying and validating the simulation of a construction operation. Construction Management and Economics, 20(6), pp. 483-491. ISSN 01446193

Shi-Dong, L and Zhao-Dong, X (2024) Research on IFC instance data based on topology induction network. Architectural Engineering and Design Management, 20(3), pp. 526-558. ISSN 1745-2007

Shibeika, A; Davies, R and Gray, C (2009) Care pathways and the built environment: Conceptual framework for understanding. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Shields, T J; Silcock, G W and Donegan, H A (1990) Towards the development of a fire safety systems evaluation for public assembly buildings. Construction Management and Economics, 8(2), pp. 147-158. ISSN 01446193

Shiers, D; Lavers, A and Keeping, M (2007) Indicators of the impact of environmental factors on UK construction law: Developments in the new millennium. Construction Management and Economics, 25(7), pp. 821-829. ISSN 1466433X

Shih, N J and Lan, W J (1997) Incorporating a 3D urban environmental model (3DUEM) into government and architectural firms. Building Research & Information, 25(1), pp. 18-24. ISSN 0961-3218

Shim, E (2008) The decision-making modeling for concurrent planning of construction projects. PhD thesis, Texas A&M University, USA.

Shimbo, Lúcia Zanin (2010) Social housing, market housing: The confluence of state, construction companies and financial capital. PhD thesis, Universidade de São Paulo, Brazil.

Shipworth, D (2002) A stochastic framework for embodied greenhouse gas emissions modelling of construction materials. Building Research & Information, 30(1), pp. 16-24. ISSN 0961-3218

Shipworth, D (2006) Qualitative modelling of sustainable energy scenarios: An extension of the bon qualitative input-output model. Construction Management and Economics, 24(7), pp. 695-703. ISSN 1466433X

Shirley, C L M (2000) Firm inventory behavior and the returns from infrastructure investment. PhD thesis, University of California, Berkeley, USA.

Shirong, L (1996) New approach for optimization of overall construction schedule. Journal of Construction Engineering and Management, 122(1), pp. 7-13. ISSN 0733-9364

Shirowzhan, S; Sepasgozar, S M E and Trinder, J (2021) Developing metrics for quantifying buildings' 3D compactness and visualizing point cloud data on a web-based app and dashboard. Journal of Construction Engineering and Management, 147(3): 04020178, ISSN 0733-9364

Shiyanbola, R E and Olaleye, A (2022) An investigation of housing provision strategies adopted by private developers in Lagos, Nigeria. International Journal of Construction Management, 22(2), pp. 317-330. ISSN 1562-3599

Shoghli, O (2014) A decision support system for multi-objective multi-asset roadway asset management (DSRAM). PhD thesis, Virginia Polytechnic Institute and State University, USA.

Shohet, I M and Laufer, A (1996) Exterior cladding methods: A technoeconomic analysis. Journal of Construction Engineering and Management, 122(3), pp. 242-247. ISSN 0733-9364

Shohet, I M and Paciuk, M (2004) Service life prediction of exterior cladding components under standard conditions. Construction Management and Economics, 22(10), pp. 1081-1090. ISSN 01446193

Shohet, I M and Paciuk, M (2006) Service life prediction of exterior cladding components under failure conditions. Construction Management and Economics, 24(2), pp. 131-148. ISSN 01446193

Shooshtarian, S; Hosseini, M R; Kocaturk, T; Arnel, T and T. Garofano, N (2023) Circular economy in the Australian AEC industry: Investigation of barriers and enablers. Building Research & Information, 51(1), pp. 56-68. ISSN 0961-3218

Short, C A; Song, J; Mottet, L; Chen, S; Wu, J and Ge, J (2018) Challenges in the low-carbon adaptation of China's apartment towers. Building Research & Information, 46(8), pp. 899-930. ISSN 0961-3218

Short, C A; Woods, A W; Drumright, L; Zia, R and Mingotti, N (2022) An alternative approach to delivering safe, sustainable surgical theatre environments. Buildings & Cities, 3(1), pp. 316-333. ISSN 2632-6655

Shorthouse, E (2015) Climate change and buildings: the impact on human health. PhD thesis, University of Exeter, UK.

Shrestha, A; Chan, T K; Aibinu, A A; Chen, C and Martek, I (2018) Risk allocation inefficiencies in Chinese PPP water projects. Journal of Construction Engineering and Management, 144(4): 04018013, ISSN 0733-9364

Shrestha, K (2023) Cost comparison of highway rest area operations: In-house workforce versus outsourcing methods. Journal of Construction Engineering and Management, 149(8): 04023062, ISSN 0733-9364

Shrestha, P P and Fernane, J D (2017) Performance of design-build and design-bid-build projects for public universities. Journal of Construction Engineering and Management, 143(3): 04016101, ISSN 0733-9364

Shrestha, R B and Ogunlan, S (2006) Comparative study of power purchase agreements in the Nepalese environment. Journal of Financial Management of Property and Construction, 11(3), pp. 133-148. ISSN 1366-4387

Shrestha, R B and Ogunlana, S (2007) Direct stakeholder's perception of PPA clauses in the Nepalese environment. Journal of Construction in Developing Countries, 12(2), pp. 21-41. ISSN 1823-6499

Shuler, S; Schmidt, C and Goldbaum, J (2010) Life-cycle economic performance for hot mix asphalt pavement rehabilitation strategies. International Journal of Construction Education and Research, 6(2), pp. 152-162. ISSN 1557-8771

Siddika, A and Lu, M (2023) Project schedule acceleration optimization integrated with energy source-based assessment of occupational health and safety risks. Journal of Construction Engineering and Management, 149(12): 04023120, ISSN 0733-9364

Sidwell, A C; Budiawan, D and ma, T (2001) The significance of the tendering contract on the opportunities for clients to encourage contractorled innovation. Construction Innovation, 1(2), pp. 107-116. ISSN 1471-4175

Siew, R Y J (2015) Alternative framework for assessing sustainable building funds: Green building fund. Building Research & Information, 43(2), pp. 160-169. ISSN 0961-3218

Siew, R Y J; Balatbat, M C A and Carmichael, D G (2013) The relationship between sustainability practices and financial performance of construction companies. Smart and Sustainable Built Environment, 2(1), pp. 6-27. ISSN 2046-6099

Siew, Yung (2014) Evaluating and enhancing the impact of sustainability reporting tools (SRTs). PhD thesis, University of New South Wales, Australia.

Signor, R; Love, P E D; Belarmino, A T N and Alfred Olatunji, O (2020) Detection of collusive tenders in infrastructure projects: Learning from operation car wash. Journal of Construction Engineering and Management, 146(1): 05019015, ISSN 0733-9364

Silva, A; Neves, L C; Gaspar, P L and de Brito, J (2016) Probabilistic transition of condition: Render facades. Building Research & Information, 44(3), pp. 301-318. ISSN 0961-3218

Silva-Jauregui, D (1982) The economics of capacity expansion in the mexican cement industry. PhD thesis, Northwestern University, USA.

Simmons, K M and Sutter, D (2007) Tornado shelters and the housing market. Construction Management and Economics, 25(11), pp. 1119-1126. ISSN 01446193

Simmons, R (2015) Constraints on evidence-based policy: Insights from government practices. Building Research & Information, 43(4), pp. 407-419. ISSN 0961-3218

Simon, L; Jefferies, M; Davis, P and Newaz, M T (2020) Developing a theoretical success factor framework for the tendering phase of social infrastructure PPPs. International Journal of Construction Management, 20(6), pp. 613-627. ISSN 1562-3599

Simon, S and O’brien, W (2023) Pilot study to measure the energy and carbon impacts of teleworking. Buildings & Cities, 4(1), pp. 174-192. ISSN 2632-6655

Simpeh, E K; Ndihokubwayo, R; Love, P E D and Thwala, W D (2015) A rework probability model: A quantitative assessment of rework occurrence in construction projects. International Journal of Construction Management, 15(2), pp. 109-116. ISSN 1562-3599

Simpeh, E K; Smallwood, J J; Ahadzie, D K and Mensah, H (2023) Analytical taxonomy of challenges to the implementation of green building projects in South Africa. International Journal of Construction Management, 23(2), pp. 286-296. ISSN 1562-3599

Sindhu, J; Choi, K; Lavy, S; Rybkowski, Z K; Bigelow, B F and Li, W (2018) Effects of front-end planning under fast-tracked project delivery systems for industrial projects. International Journal of Construction Education and Research, 14(3), pp. 163-178. ISSN 1557-8771

Sinesilassie, E G; Tabish, S Z S and Jha, K N (2017) Critical factors affecting schedule performance: A case of Ethiopian public construction projects: Engineers' perspective. Engineering, Construction and Architectural Management, 24(5), pp. 757-773. ISSN 0969-9988

Sing, C P; Love, P E D; Fung, I W H and Edwards, D J (2014) Personality and occupational accidents: Bar benders in Guangdong Province, Shenzhen, China. Journal of Construction Engineering and Management, 140(7): 05014005, ISSN 0733-9364

Singer, H and Özşahin, Ş (2022) Prioritization of laminate flooring selection criteria from experts' perspectives: A spherical fuzzy AHP-based model. Architectural Engineering and Design Management, 18(6), pp. 911-926. ISSN 1745-2007

Singh, G; Kiangi, G E; Sabah, A N A and Greenslade, O C (1986) Application of a micro computer in investment decisions using dynamic programming. Construction Management and Economics, 4(3), pp. 188-199. ISSN 01446193

Singh, J and Anumba, C J (2024) Building commissioning process and documentation: A literature review and directions for future research. International Journal of Construction Management, 24(1), pp. 75-85. ISSN 1562-3599

Singh, J; Cheng, J C P and Anumba, C J (2021) BIM-based approach for automatic pipe systems installation coordination and schedule optimization. Journal of Construction Engineering and Management, 147(11): 04021143, ISSN 0733-9364

Singla, H. K. and Phadtare, M. (2026) Measuring construction contractor satisfaction from the lens of client performance: Empirical investigation in India. Journal of Construction Engineering and Management, 152(9): 04026133, ISSN 0733-9364

Siu, M F F; Lu, M; AbouRizk, S and Tidder, V (2016) Quantitative assessment of budget sufficiency and resource utilization for resource-constrained project schedules. Journal of Construction Engineering and Management, 142(6): 04016003, ISSN 0733-9364

Sivapragasam, C; Ajith, S and Arumugaprabu, V (2023) A conceptual framework for minimizing construction site accidents using task-personnel nexus matrix. International Journal of Construction Management, 23(9), pp. 1603-1610. ISSN 1562-3599

Skaik, S; Coggins, J and Mills, A (2015) Investigating the factors influencing the quality of adjudication of complex payment disputes in Australia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Skibniewski, M J and Chao, L C (1992) Evaluation of advanced construction technology with AHP method. Journal of Construction Engineering and Management, 118(3), pp. 577-593. ISSN 0733-9364

Skitmore, M (1991) The construction contract bidder homogeneity assumption: An empirical test. Construction Management and Economics, 9(5), pp. 403-429. ISSN 01446193

Skitmore, M (1992) Parameter prediction for cash flow forecasting models. Construction Management and Economics, 10(5), pp. 397-413. ISSN 01446193

Skitmore, M and Runeson, G (2006) Bidding models: Testing the stationarity assumption. Construction Management and Economics, 24(8), pp. 791-803. ISSN 1466433X

Skitmore, R M and Marsden, D E (1988) Which procurement system? Towards a universal procurement selection technique. Construction Management and Economics, 6(1), pp. 71-89. ISSN 01446193

Skitmore, R M; Pettitt, A N and McVinish, R (2007) Gates' bidding model. Journal of Construction Engineering and Management, 133(11), pp. 855-863. ISSN 0733-9364

Skrzypczak, I; Oleniacz, G; Leśniak, A; Zima, K; Mrówczyńska, M and Kazak, J K (2022) Scan-to-BIM method in construction: Assessment of the 3D buildings model accuracy in terms inventory measurements. Building Research & Information, 50(8), pp. 859-880. ISSN 0961-3218

Smadi, O G (2000) Knowledge-based expert system pavement management optimization. PhD thesis, Iowa State University, USA.

Smalley, L J (1987) Project management in the republic of South Africa. DCom thesis, University of South Africa, South Africa.

Smallwood, J (2005) The role of optimum health and safety (H&S) in construction marketing. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Smallwood, J J and Haupt, T C (2009) Construction ergonomics: Perspectives of female and male production workers. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Smit, P J (1987) Aspects of strategic management in the residential building industry, Pretoria, 1986. DCom thesis, University of South Africa, South Africa.

Smith, G R (1986) A conceptual construction project planning model (fuzzy sets, networks). PhD thesis, Purdue University, USA.

Smith, G R and Hancher, D E (1989) Estimating precipitation impacts for scheduling. Journal of Construction Engineering and Management, 115(4), pp. 552-566. ISSN 0733-9364

Smith, N J and Gannon, M (2008) Political risk in light rail transit PPP projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 179-185. ISSN 17514312

Smith, S (1998) Stochastic analysis of cyclic construction processes. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Smith, S D (1999) Earthmoving productivity estimation using linear regression techniques. Journal of Construction Engineering and Management, 125(3), pp. 133-141. ISSN 0733-9364

Smith, S D (2019) Safety first? Production pressures and the implications on safety and health. Construction Management and Economics, 37(4), pp. 238-242. ISSN 01446193

Smith, S D; Sherratt, F and Oswald, D C (2017) The antecedents and development of unsafety. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(2), pp. 59-67. ISSN 17514304

Sobhiyah, M H; Seymour, D E and Perry, J G (1997) The role of project start-up in the organisational development of project management: The case in Iran. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Soetanto, R (2010) Act-UK simulation centre: Opportunities and challenges for research. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Soetanto, R and Proverbs, D G (2002) Modelling client satisfaction levels: The impact of contractor performance. Construction Economics and Building, 2(1), pp. 13-27. ISSN 2204-9029

Soetanto, R and Proverbs, D G (2002) Modelling the satisfaction of contractors: The impact of client performance. Engineering, Construction and Architectural Management, 9(5-6), pp. 453-465. ISSN 0969-9988

Sohail, M and Edum-Fotwe, F T (2000) Cost-duration tool for policy decision on micro and small projects. Journal of Financial Management of Property and Construction, 5(3), pp. 111-122. ISSN 1366-4387

Sohoni, P and Jha, K N (2022) Evaluating the factors for shore selection in multi-storey building construction. International Journal of Construction Management, 22(10), pp. 1983-1992. ISSN 1562-3599

Sohrabi, M (2025) Statistical methods for enhanced coastal flood risk assessment and adaptation planning. PhD thesis, University of Alabama, USA.

Sommerville, J (1996) An analysis of recruitment sources and employee turnover in Scottish construction organizations. Construction Management and Economics, 14(2), pp. 147-154. ISSN 01446193

Sommerville, J; Craig, N and Callaghan, N (2011) Consumer demand for zero carbon homes within the UK. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Son, J; Jeong, J; Jeong, J; Kumi, L and Mun, H (2026) Data-driven approach to analyzing factors influencing construction accident severity using shap analysis. Journal of Construction Engineering and Management, 152(3): 04025282, ISSN 0733-9364

Son, J (1997) Multi-heuristic approach to resource leveling in construction: A hybrid model. PhD thesis, Purdue University, USA.

Son, J (2011) An integrated model of evolution of project teams in large-scale construction projects. PhD thesis, University of Washington, USA.

Son, J and Mattila, K G (2004) Binary resource leveling model: Activity splitting allowed. Journal of Construction Engineering and Management, 130(6), pp. 887-894. ISSN 0733-9364

Son, J; Mattila, K G and Myers, D S (2005) Determination of haul distance and direction in mass excavation. Journal of Construction Engineering and Management, 131(3), pp. 302-309. ISSN 0733-9364

Son, J and Skibniewski, M J (1999) Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach. Journal of Construction Engineering and Management, 125(1), pp. 23-31. ISSN 0733-9364

Son, K; Choi, K; Woods, P and Park, Y J (2012) Urban sustainability predictive model using GIS: Appraised land value versus LEED sustainable site credits. Journal of Construction Engineering and Management, 138(9), pp. 1107-1112. ISSN 0733-9364

Sonet, U N and Klufallah, M (2024) Evaluation of indicators for participatory and collaborative design process for public parks in Malaysia: Analytical hierarchy process. Journal of Construction in Developing Countries, 29(2), pp. 1-18. ISSN 1823-6499

Song, J; Fan, S; Lin, W; Mottet, L; Woodward, H; Davies Wykes, M; Arcucci, R; Xiao, D; Debay, J E; ApSimon, H; Aristodemou, E; Birch, D; Carpentieri, M; Fang, F; Herzog, M; Hunt, G R; Jones, R L; Pain, C; Pavlidis, D; Robins, A G; Short, C A and Linden, P F (2018) Natural ventilation in cities: The implications of fluid mechanics. Building Research & Information, 46(8), pp. 809-828. ISSN 0961-3218

Songer, A D; Diekmann, J E and Karet, D (2001) Animation-based construction schedule review. Construction Innovation, 1(3), pp. 181-190. ISSN 1471-4175

Songer, A D; Diekmann, J E; Rasheed, K A and Hays, B (2001) Construction scheduling using 3-D CAD and walk-thru. Construction Innovation, 1(3), pp. 191-207. ISSN 1471-4175

Sonmez, R (2004) Selection of a probability distribution function for construction cost estimation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Sonmez, R (2008) Parametric range estimating of building costs using regression models and bootstrap. Journal of Construction Engineering and Management, 134(12), pp. 1011-1016. ISSN 0733-9364

Sospeter, N G and Kikwasi, G J (2020) Barriers to mentoring of graduates in quantity surveying firms: Finding a good fit. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Sousa, V; Almeida, N M and Dias, L A (2014) Role of statistics and engineering judgment in developing optimized time-cost relationship models. Journal of Construction Engineering and Management, 140(8): 04014034, ISSN 0733-9364

Souza, Fernando da Silva (2021) Reinsertion of construction and demolition waste into the production chain of civil construction in Rio Branco, Acre. PhD thesis, Universidade Federal de Ouro Preto, Brazil.

Spillane, J P and Oyedele, L O (2017) Effective material logistics in urban construction sites: A structural equation model. Construction Innovation, 17(4), pp. 406-428. ISSN 1471-4175

Sporrong, J and Bröchner, J (2009) Public procurement incentives for sustainable design services: Swedish experiences. Architectural Engineering and Design Management, 5(1-2), pp. 24-35. ISSN 1745-2007

Srivastava, M (2020) Cooperative learning in design studios: A pedagogy for net-positive performance. Buildings & Cities, 1(1), pp. 594-609. ISSN 2632-6655

Stamatiou, D R I; Kirytopoulos, K A; Ponis, S T; Gayialis, S and Tatsiopoulos, I (2019) A process reference model for claims management in construction supply chains: The contractors' perspective. International Journal of Construction Management, 19(5), pp. 382-400. ISSN 1562-3599

Standinger, M L (2000) The evaluation of time claims in construction projects. PhD thesis, Loughborough University, UK.

Stansfield, F R (1995) Work in the IT industry on usability provides an agenda for improvement of construction procurement methods. Journal of Construction Procurement, 1(2), pp. 124-149. ISSN 1358-9180

Steadman, P (2006) Allometry and built form: Revisiting Ranko Bon's work with the harvard philomorphs. Construction Management and Economics, 24(7), pp. 755-765. ISSN 1466433X

Steadman, P; Hamilton, I and Evans, S (2014) Energy and urban built form: An empirical and statistical approach. Building Research & Information, 42(1), pp. 17-31. ISSN 0961-3218

Steemers, K; Baker, N; Crowther, D; Dubiel, J and Nikolopoulou, M (1998) Radiation absorption and urban texture. Building Research & Information, 26(2), pp. 103-112. ISSN 0961-3218

Stein, M (2012) Decision making with implementation dependent feedback. PhD thesis, National University of Singapore, Singapore.

Stenbeck, T (2008) Quantifying effects of incentives in a rail maintenance performance-based contract. Journal of Construction Engineering and Management, 134(4), pp. 265-272. ISSN 0733-9364

Stephenson, J (2015) The organisation of work and wages in the London building trades in the long eighteenth century. PhD thesis, London School of Economics and Political Science, UK.

Stevens, J D (1981) A study of the relationship between perturbations in construction time schedules and potential construction claims. PhD thesis, University of Washington, USA.

Stewart, W S and Tatum, C B (1988) Segmental placement of Renton outfall: Construction innovation. Journal of Construction Engineering and Management, 114(3), pp. 390-407. ISSN 0733-9364

Stino, R M (1999) Effect of spatial variables on bricklaying productivity and ergonomics. PhD thesis, University of Michigan, USA.

Stocks, S N and Singh, A (1999) Studies on the impact of functional analysis concept design on reduction in change orders. Construction Management and Economics, 17(3), pp. 251-267. ISSN 01446193

Stojanovic, V; Trapp, M; Richter, R; Hagedorn, B and Döllner, J (2018) Towards the generation of digital twins for facility management based on 3D point clouds. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Stokes, C and Dainty, A (2011) Knowledge co-production in construction management research. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Stout, Timothy J (2023) Schedule forecast optimization for the construction and commissioning of nuclear power plants. DEngr thesis, George Washington University, USA.

Stoy, C and Kytzia, S (2006) Benchmarking electricity consumption. Construction Management and Economics, 24(10), pp. 1083-1089. ISSN 1466433X

Stoy, C and Schalcher, H R (2007) Residential building projects: Building cost indicators and drivers. Journal of Construction Engineering and Management, 133(2), pp. 139-145. ISSN 0733-9364

Stumpf, I (2000) Competitive pressures on middle-market contractors in the UK. Engineering, Construction and Architectural Management, 7(2), pp. 159-168. ISSN 0969-9988

Su, Y.; Gao, X. and Zheng, Z. (2026) Unsupervised deep learning and Bayesian network-based identification of key risk factors in construction quality defects. Journal of Construction Engineering and Management, 152(7): 04026083, ISSN 0733-9364

Su, C T; Santoro, M C and Mendes, A B (2018) Constructive heuristics for project scheduling resource availability cost problem with tardiness. Journal of Construction Engineering and Management, 144(8): 04018074, ISSN 0733-9364

Su, Y Y; Hashash, Y M A and Liu, L Y (2006) Integration of construction as-built data via laser scanning with geotechnical monitoring of urban excavation. Journal of Construction Engineering and Management, 132(12), pp. 1234-1241. ISSN 0733-9364

Succar, B; Sher, W and Williams, A (2012) Measuring BIM performance: Five metrics. Architectural Engineering and Design Management, 8(2), pp. 120-142. ISSN 1745-2007

Sudprasert, S (2021) Utilization of an evaporative air cooler to achieve thermal comfort in Thailand. Building Research & Information, 49(3), pp. 325-335. ISSN 0961-3218

Sugimoto, M and Asanprakit, A (2010) Stack pipe model for pipe jacking method. Journal of Construction Engineering and Management, 136(6), pp. 683-692. ISSN 0733-9364

Sugrue, D P (2021) Alternative financing for harbor infrastructure using big data analytics in the great lakes waterway. PhD thesis, University of Michigan, USA.

Suk, Sung Joon (2012) Analysis of project management attributes for the successful delivery of capital facility projects. PhD thesis, University of Texas at Austin, USA.

Summerfield, A J; Lowe, R J and Oreszczyn, T (2010) Two models for benchmarking UK domestic delivered energy. Building Research & Information, 38(1), pp. 12-24. ISSN 0961-3218

Summerfield, A J; Pathan, A; Lowe, R J and Oreszczyn, T (2010) Changes in energy demand from low-energy homes. Building Research & Information, 38(1), pp. 42-49. ISSN 0961-3218

Sun, N.; Wang, J. and Liao, P. C. (2026) EEG-based neural mechanisms of confidence and metacognition in construction safety hazard recognition. Journal of Construction Engineering and Management, 152(8): 04026127, ISSN 0733-9364

Sun, C and Xu, J (2011) Estimation of time for wenchuan earthquake reconstruction in China. Journal of Construction Engineering and Management, 137(3), pp. 179-187. ISSN 0733-9364

Sun, L (2012) Establishing confidence in safety assessment evidence. PhD thesis, University of York, UK.

Sun, M (1993) Technology transfer, architectural design and integrated building design systems. PhD thesis, University of Newcastle upon Tyne, UK.

Sun, Q; Zhang, S; Ke, Y; Ma, X and Galvin, S (2023) Comparative analysis on the PPP research in Chinese and international journals: A bibliometric perspective. International Journal of Construction Management, 23(2), pp. 307-318. ISSN 1562-3599

Sun, Y and Zhang, L (2015) Balancing public and private stakeholder interests in BOT concessions: Minimum revenue guarantee and royalty scheme applied to a water treatment project in China. Journal of Construction Engineering and Management, 141(2): 04014070, ISSN 0733-9364

Sun, Z (2000) Reliability-based method for stability of mine entry design and evaluation. PhD thesis, West Virginia University, USA.

Sunindijo, R Y and Zou, P X W (2011) Influence of technical skill on safety task implementation and safety climate development in construction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Supriadi, L S R and Pheng, L S (2013) Business continuity management for Indonesian contractors. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(1), pp. 31-42. ISSN 17514304

Suraji, A (2001) Development and validation of a theory of construction accident causation. PhD thesis, University of Manchester, UK.

Sutrisna, M; Ramanayaka, C D D and Goulding, J S (2018) Developing work breakdown structure matrix for managing offsite construction projects. Architectural Engineering and Design Management, 14(5), pp. 381-397. ISSN 1745-2007

Swaffield, J A and Jack, L B (2004) Simulation and analysis of airborne cross-contamination routes due to the operation of building drainage and vent systems. Building Research & Information, 32(6), pp. 451-467. ISSN 0961-3218

Swaffield, L M and Pasquire, C L (1996) A critique of mechanical and electrical services cost planning: Existing methods and published information. Journal of Financial Management of Property and Construction, 1(3), pp. 23-42. ISSN 1366-4387

Sweis, R J; Al Sharef, R; Jandali, D; Obeidat, B Y and Andrawes, N (2018) The relationship between project team members' effectiveness and acknowledgment of talent: Team members' perspective. International Journal of Construction Education and Research, 14(2), pp. 141-60. ISSN 1557-8771

Syal, M; Duah, D; Samuel, S; Mazor, M; Mo, Y and Cyr, T (2014) Information framework for intelligent decision support system for home energy retrofits. Journal of Construction Engineering and Management, 140(1): 04013030, ISSN 0733-9364

Symonds, P; Simpson, C H; Petrou, G; Ferguson, L; Mavrogianni, A and Davies, M (2024) Linking housing, socio-demographic, environmental and mental health data at scale. Buildings & Cities, 5(1), pp. 470-488. ISSN 2632-6655

Szalay, Z (2008) Modelling building stock geometry for energy, emission and mass calculations. Building Research & Information, 36(6), pp. 557-567. ISSN 0961-3218

Sędzicki, D.; Nyka, L. and Cudzik, J. (2026) Algorithmic optimization of climbing plant positioning and cnc fabrication for urban microclimate enhancement. Building Research & Information, 54(5), pp. 588-610. ISSN 0961-3218

Tabassi, A A; Ramli, M; Roufechaei, K M and Tabasi, A A (2014) Team development and performance in construction design teams: An assessment of a hierarchical model with mediating effect of compensation. Construction Management and Economics, 32(9), pp. 932-949. ISSN 01446193

Tabatabai-Gargari, M and Elzarka, H M (1998) Integrated CAD/KBS approach for automating preconstruction activities. Journal of Construction Engineering and Management, 124(4), pp. 257-262. ISSN 0733-9364

Tabish, S Z S and Jha, K N (2012) Success traits for a construction project. Journal of Construction Engineering and Management, 138(10), pp. 1131-1138. ISSN 0733-9364

Taemthong, W (2002) Accounting for the impact of learning and scheduled overtime: Developing dynamic models to estimate and control labor time and labor cost. PhD thesis, University of Michigan, USA.

Tai, H W; Chen, J H; Cheng, J Y; Wei, H H; Hsu, S C and Liu, H C (2021) Determining worker training time for precast component production in construction: Empirical study in Taiwan. Journal of Construction Engineering and Management, 147(1): 0001964, ISSN 0733-9364

Talaq, J (2004) Antecedents and consequences of motivation: an examination of motivation as mediator to human and organisational performance. PhD thesis, University of Wolverhampton, UK.

Talhouni, B T K (1990) Measurement and analysis of construction labour productivity. PhD thesis, University of Dundee, UK.

Tam, C M and Tong, T K L (2005) Multiple gmdh models for estimating resource requirements. Construction Innovation, 5(2), pp. 115-131. ISSN 1471-4175

Tam, C M; Tong, T K L and Tse, S L (2002) Artificial neural networks model for predicting excavator productivity. Engineering, Construction and Architectural Management, 9(5-6), pp. 446-452. ISSN 0969-9988

Tam, C M; Tong, T K L and Tse, S L (2004) Modelling hook times of mobile cranes using artificial neural networks. Construction Management and Economics, 22(8), pp. 839-849. ISSN 01446193

Tam, V W Y; Fung, I W H; Wang, J and Ma, M (2022) Effects of locations, structures and neighbourhoods to housing price: An empirical study in Shanghai, China. International Journal of Construction Management, 22(7), pp. 1288-1307. ISSN 1562-3599

Tamke, M; Sinke Baranovskaya, Y; Monteiro, F; Lienhard, J; La Magna, R and Ramsgaard Thomsen, M (2021) Computational knit–design and fabrication systems for textile structures with customised and graded CNC knitted fabrics. Architectural Engineering and Design Management, 17(3-4), pp. 175-195. ISSN 1745-2007

Tan, Q and Ye, M (2024) Allocation of environmental responsibilities in the prefabricated construction supply chain: Exploring the influence of government subsidies. Journal of Construction Engineering and Management, 150(11): 04024167, ISSN 0733-9364

Tan, R R (1996) Information technology and perceived competitive advantage: An empirical study of engineering consulting firms in Taiwan. Construction Management and Economics, 14(3), pp. 227-240. ISSN 01446193

Tang, X.; Zhang, S.; Wang, M. and Sepasgozar, S. M. E. (2026) Understanding the construction digital technology assimilation process in AEC companies: Exploration based on grounded theory and verification of SEM. Journal of Construction Engineering and Management, 152(9): 04026143, ISSN 0733-9364

Tang, L C M and Leung, A Y T (2009) An entropy-based financial decision support system (E-FDSS) for project analysis in construction SMEs. Construction Management and Economics, 27(5), pp. 499-513. ISSN 1466433X

Tangwe, S L; Simon, M and Meyer, E L (2017) Prediction of coefficient of performance and simulation design of an air-source heat pump water heater. Journal of Engineering, Design and Technology, 15(3), pp. 378-394.

Tansley, D S W (1989) A knowledge-based system approach to helping engineers understand codes of practice. PhD thesis, Loughborough University, UK.

Tantiprabha, P (1990) Acquisition of strategic management concepts from construction project data: An inductive learning approach. PhD thesis, University of Texas at Austin, USA.

Tao, Y; Song, S; Dong, L; Zhong, F and Zhang, L (2025) Indoor environmental evaluation of traditional Chinese medicine clinic–taking the treatment space as an example. Building Research & Information, 53(4), pp. 492-508. ISSN 0961-3218

Tarekegn Gurmu, A (2023) Preconstruction phase management practices enhancing labor productivity in multistory building projects. Journal of Construction Engineering and Management, 149(6): 04023032, ISSN 0733-9364

Tarpio, J and Lehtovuori, P (2026) Horizontal building extensions: Potential in Finnish blocks of flats. Buildings & Cities, 7(1), pp. 445-466. ISSN 2632-6655

Tatari, M O (2009) Empirical analysis of construction enterprise information systems: Assessing the critical factors and benefits. PhD thesis, University of Maryland, College Park, USA.

Tatari, O and Kucukvar, M (2012) Eco-efficiency of construction materials: Data envelopment analysis. Journal of Construction Engineering and Management, 138(6), pp. 733-741. ISSN 0733-9364

Tatum, C B (1987) Improving constructibility during conceptual planning. Journal of Construction Engineering and Management, 113(2), pp. 191-207. ISSN 0733-9364

Tatum, C B (1987) Process or innovation in construction firm. Journal of Construction Engineering and Management, 113(4), pp. 648-663. ISSN 0733-9364

Tatum, C B (2005) Building better: Technical support for construction. Journal of Construction Engineering and Management, 131(1), pp. 23-32. ISSN 0733-9364

Tatum, C B; Vorster, M; Klingler, M G and Paulson Jr, B C (2006) Systems analysis of technical advancement in earthmoving equipment. Journal of Construction Engineering and Management, 132(9), pp. 976-986. ISSN 0733-9364

Tavakolan, M; Chokan, F and Dadashi Haji, M (2024) Simultaneous project portfolio selection and scheduling from contractor perspective. International Journal of Construction Management, 24(3), pp. 298-313. ISSN 1562-3599

Tawalare, A; Laishram, B and Thottathil, F (2020) Relational partnership in public construction organizations: Front-line employee perspective. Journal of Construction Engineering and Management, 146(1): 04019086, ISSN 0733-9364

Tayebi Jebeli, M; Asadollahfardi, G and Abbasi Khalil, A (2022) Novel application of micro-nanobubble water for recycling waste foundry sand: Toward green concrete. Journal of Construction Engineering and Management, 148(9): 04022096, ISSN 0733-9364

Taylor, D A (2012) Featural and holistic processing in facial composite construction: The role of cognitive style and processing sets. PhD thesis, University of Westminster, UK.

Taylor, J and Howden-Chapman, P (2021) The significance of urban systems on sustainability and public health. Buildings & Cities, 2(1), pp. 874-887. ISSN 2632-6655

Taylor, J; Simpson, C H; Vanhatalo, J; Sohail, H; Brousse, O and Heaviside, C (2025) Analysing cold-climate urban heat islands using personal weather station data. Buildings & Cities, 6(1), pp. 182-200. ISSN 2632-6655

Taylor, R G and Bowen, P A (1987) Building price-level forecasting: An examination of techniques and applications. Construction Management and Economics, 5(1), pp. 21-44. ISSN 01446193

Taylor, T R B; Uddin, M; Goodrum, P M; McCoy, A and Shan, Y (2012) Change orders and lessons learned: Knowledge from statistical analyses of engineering change orders on Kentucky highway projects. Journal of Construction Engineering and Management, 138(12), pp. 1360-1369. ISSN 0733-9364

Teixeira Brasil, Jose Artur (2025) A digital twin framework for monitoring, modeling, and forecasting the performance of permeable pavement systems. PhD thesis, The University of Texas at San Antonio, USA.

Teller, J (2021) Urban density and covid-19: Towards an adaptive approach. Buildings & Cities, 2(1), pp. 150-165. ISSN 2632-6655

Teo, M and Loosemore, M (2014) Getting to the heart of community action against construction projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Terwel, K C (2014) Structural safety: Study into critical factors in the design and construction process. PhD thesis, Delft University of Technology, Netherlands.

Terzioglu, T and Polat, G (2026) Evaluating interactions between formwork system selection criteria for building construction projects: A rough DEMATEL approach. Journal of Construction Engineering and Management, 152(1): 04025225, ISSN 0733-9364

Tew, A D (2003) An examination of the procurement of insurance-funded repairs to privately owned dwellings. PhD thesis, Loughborough University, UK.

Tezel, A and Aziz, Z (2017) Visual management in highways construction and maintenance in England. Engineering, Construction and Architectural Management, 24(3), pp. 486-513. ISSN 0969-9988

Thach, H. P.; Nguyen, L. D. and Nguyen, V. T. (2026) Integrating coastal segmentation on predictive modeling for data-driven bridge asset management. International Journal of Construction Management, 26(10), pp. 2228-2244. ISSN 1562-3599

Thodelius, C (2018) Rethinking injury events: Explorations in spatial aspects and situational prevention strategies. PhD thesis, Chalmers University of Technology, Sweden.

Thomas, H R and Horman, M J (2006) Fundamental principles of workforce management. Journal of Construction Engineering and Management, 132(1), pp. 97-104. ISSN 0733-9364

Thomas, H R; Horman, M J; De Souza, U E L and Zavřski, I (2002) Reducing variability to improve performance as a lean construction principle. Journal of Construction Engineering and Management, 128(2), pp. 144-154. ISSN 0733-9364

Thomas, H R; Horman, M J; Minchin Jr, R E and Chen, D (2003) Improving labor flow reliability for better productivity as lean construction principle. Journal of Construction Engineering and Management, 129(3), pp. 251-261. ISSN 0733-9364

Thomas, H R; Sanders, S R and Bilai, S (1992) Comparison of labor productivity. Journal of Construction Engineering and Management, 118(4), pp. 635-650. ISSN 0733-9364

Thomas, H R and Yiakoumls, I (1987) Factor model of construction productivity. Journal of Construction Engineering and Management, 113(4), pp. 623-639. ISSN 0733-9364

Thomas, H R and Završki, I (1999) Construction baseline productivity: Theory and practice. Journal of Construction Engineering and Management, 125(5), pp. 295-303. ISSN 0733-9364

Thomas, J C and Le Van, A (2021) Deflections of pneumatic masts and columns. Architectural Engineering and Design Management, 17(3-4), pp. 299-315. ISSN 1745-2007

Thomas, M U (2010) Models for managing contingency construction operations. Journal of Construction Engineering and Management, 136(3), pp. 391-398. ISSN 0733-9364

Thompson, O (2020) Towards a comprehensive understanding of human behaviour in dwelling fires. PhD thesis, University of Greenwich, UK.

Thompson Jr., R C (2012) Risk measurement, allocation, and pricing in network schedule systems. PhD thesis, Catholic University of America, USA.

Thomsen, A and Van Der Flier, K (2009) Replacement or renovation of dwellings: The relevance of a more sustainable approach. Building Research & Information, 37(5-6), pp. 649-659. ISSN 0961-3218

Thomsen, A and Van Der Flier, K (2011) Understanding obsolescence: A conceptual model for buildings. Building Research & Information, 39(4), pp. 352-362. ISSN 0961-3218

Thurairajah, N; Rathnasinghe, A; Brough, J and Jayathilaka, G (2022) The toxic triangle of small and medium-sized enterprise housebuilding: A review of the UK housing industry's dilemma. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Thuse, D G (1988) Road transport investment model using dynamic programming. PhD thesis, Indian Institute of Technology, Bombay, India.

Tian, D; Li, M; Han, S and Shen, Y (2022) A novel and intelligent safety-hazard classification method with syntactic and semantic features for large-scale construction projects. Journal of Construction Engineering and Management, 148(10): 04022109, ISSN 0733-9364

Tian, D; Liu, H; Chen, S; Li, M and Liu, C (2022) Human error analysis for hydraulic engineering: Comprehensive system to reveal accident evolution process with text knowledge. Journal of Construction Engineering and Management, 148(9): 04022093, ISSN 0733-9364

Tierney, G and Tennant, S (2015) House building in Scotland: The sustainability performance gap. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Tischer, T E and Kuprenas, J A (2003) Bridge falsework productivity: measurement and influences. Journal of Construction Engineering and Management, 129(3), pp. 243-250. ISSN 0733-9364

Tiwari, A; Singh, S; Routroy, S; Gopinath, A and Sahu, P K (2025) Analysing critical risk factors of Indian road construction projects: a fuzzy DEMATEL approach. International Journal of Construction Management, 25(4), pp. 469-480. ISSN 1562-3599

Tokede, O. O.; Weththasinghe, K. K.; Kumer Shill, S.; Wijayasundara, M. and Subhani, M. (2025) Comparative evaluation of different material options for moment-resisting framing systems in buildings. Architectural Engineering and Design Management, 21(6), pp. 1541-1561. ISSN 1745-2007

Tokede O, S B B A (2013) Preserving continuity in whole-life cost models for net-zero carbon buildings. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Toland, M D; Bowen, P and Dueber, D M (2020) Multidimensional item response theory analysis of work-related, after-hours contact, and psychosocial measurement scales for construction professionals. Journal of Construction Engineering and Management, 146(7): 04020062, ISSN 0733-9364

Toller, S; Carlsson, A; Wadeskog, A; Miliutenko, S and Finnveden, G (2013) Indicators for environmental monitoring of the Swedish building and real estate management sector. Building Research & Information, 41(2), pp. 146-155. ISSN 0961-3218

Tolstoy, D and Axelsson, B (2018) The development of international purchasing capabilities: A comparative study of the four largest Swedish construction firms. International Journal of Construction Management, 18(2), pp. 163-176. ISSN 1562-3599

Tomczak, M and Jaśkowski, P (2020) New approach to improve general contractor crew's work continuity in repetitive construction projects. Journal of Construction Engineering and Management, 146(5): 1824, ISSN 0733-9364

Tomlinson, C and Nelson, B (2010) The security consultant in the design process: A risk-led approach. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(2), pp. 51-57. ISSN 17514312

Tong, T K L; Tam, C M and Chan, A P C (2001) Genetic algorithm optimization in building portfolio management. Construction Management and Economics, 19(6), pp. 601-609. ISSN 01446193

Tonini de Araújo, M; de Souza, H A and Gomes, A P (2022) Computer simulation of moisture transfer in walls: Impacts on the thermal performance of buildings. Architectural Engineering and Design Management, 18(4), pp. 453-472. ISSN 1745-2007

Toole, T M (1994) Task and environmental uncertainty and adoption of technological innovations by home builders. PhD thesis, Massachusetts Institute of Technology, USA.

Toole, T M (1998) Uncertainty and home builders' adoption of technological innovations. Journal of Construction Engineering and Management, 124(4), pp. 323-332. ISSN 0733-9364

Torbica, Z M and Stroh, R C (1999) Impact of total quality management on home-buyer satisfaction. Journal of Construction Engineering and Management, 125(3), pp. 198-203. ISSN 0733-9364

Touran, A (1990) Integration of simulation with expert systems. Journal of Construction Engineering and Management, 116(3), pp. 480-493. ISSN 0733-9364

Touran, A and Ladick, D R (1989) Application of robotics in bridge deck fabrication. Journal of Construction Engineering and Management, 115(1), pp. 35-52. ISSN 0733-9364

Touran, A and Lopez, R (2006) Modeling cost escalation in large infrastructure projects. Journal of Construction Engineering and Management, 132(8), pp. 853-860. ISSN 0733-9364

Traynor, E H (1980) The application of factor analysis in the design of a cost control system. Construction Papers, 1(1), pp. 29-43. ISSN 0144-8587

Treloar, G J; Love, P E D; Faniran, O O and Iyer-Raniga, U (2000) A hybrid life cycle assessment method for construction. Construction Management and Economics, 18(1), pp. 5-9. ISSN 01446193

Treloar, G J; Love, P E D and Holt, G D (2001) Using national input–output data for embodied energy analysis of individual residential buildings. Construction Management and Economics, 19(1), pp. 49-61. ISSN 01446193

Treloar, G J; Love, P E D and Smith, J (1999) Streamlined life cycle assessment: A method for considering environmental impact of road construction. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Tribelsky, E and Sacks, R (2011) An empirical study of information flows in multidisciplinary civil engineering design teams using lean measures. Architectural Engineering and Design Management, 7(2), pp. 85-101. ISSN 1745-2007

Tsai, M-T (2008) Real option-based procurement for transportation services. PhD thesis, University of California, Irvine, USA.

Tse, R Y C and Love, P E D (2001) Property rights implications of public-private joint ventures: A comment. Construction Management and Economics, 19(7), pp. 663-668. ISSN 01446193

Tse, R Y C and Love, P E D (2003) An economic analysis of the effect of delays on project costs. Journal of Construction Research, 4(2), pp. 155-160. ISSN 1609-9451

Tse, R Y C and Webb, J R (2000) The relationship between GDP and construction flows: A re-examination. Journal of Construction Research, 1(1), pp. 61-68. ISSN 1609-9451

Tse, R Y C and Webb, J R (2006) An economic analysis of housing construction evidence from Hong Kong. Journal of Construction Research, 7(1), pp. 1-12. ISSN 1609-9451

Tserng, H P; Liao, H H; Tsai, L K and Chen, P C (2011) Predicting construction contractor default with option-based credit models-models' performance and comparison with financial ratio models. Journal of Construction Engineering and Management, 137(6), pp. 412-420. ISSN 0733-9364

Tsimberdonis, A I and Murphree, E L (1994) Equipment management through operational failure costs. Journal of Construction Engineering and Management, 120(3), pp. 522-535. ISSN 0733-9364

Tsimopoulou, V (2015) Economic optimisation of flood risk management projects. PhD thesis, Delft University of Technology, Netherlands.

Tsolas, I E (2011) Modelling profitability and effectiveness of Greek-listed construction firms: An integrated DEA and ratio analysis. Construction Management and Economics, 29(8), pp. 795-807. ISSN 1466433X

Tsolas, I E (2013) Modeling profitability and stock market performance of listed construction firms on the athens exchange: Two-stage DEA approach. Journal of Construction Engineering and Management, 139(1), pp. 111-119. ISSN 0733-9364

Tucker, S N (1986) Formulating construction cash flow curves using a reliability theory analogy. Construction Management and Economics, 4(3), pp. 179-188. ISSN 01446193

Tucker, S N (1988) A single alternative formula for department of health and social security S-curves. Construction Management and Economics, 6(1), pp. 13-23. ISSN 01446193

Tudor, L G (1987) Modeling OSHA's inspection decision and the compliance decision of the firm. PhD thesis, George Washington University, USA.

Turkoglu, H; Arditi, D and Polat, G (2024) Augmented time-cost trade-off optimization using particle swarm optimization. Journal of Construction Engineering and Management, 150(5): 04024031, ISSN 0733-9364

Turkoglu, H; Polat, G and Akin, F D (2023) Crashing construction projects considering schedule flexibility: An illustrative example. International Journal of Construction Management, 23(4), pp. 619-628. ISSN 1562-3599

Turkoglu, H; Arditi, D and Polat, G (2025) Golden eagle optimizer-based multi-objective optimization model for scheduling construction projects. Construction Management and Economics, 43(9), pp. 704-722. ISSN 0144-6193

Turksezer, Z I; Iacovino, C; Giordano, P F and Limongelli, M P (2021) Development and implementation of indicators to assess bridge inspection practices. Journal of Construction Engineering and Management, 147(12): 04021165, ISSN 0733-9364

Turner, J; Daniel, E I and Chinyio, E (2024) The race to net zero: Is the UK falling behind in research to other countries when it comes to sustainability in residential housing? In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Turner, M and Simmons, D R (2020) Taking a partnered approach to managing academic stress: An undergraduate study. International Journal of Construction Education and Research, 16(4), pp. 251-269. ISSN 1557-8771

Tuuli, M M and Rowlinson, S (2009) Performance consequences of psychological empowerment. Journal of Construction Engineering and Management, 135(12), pp. 1334-1347. ISSN 0733-9364

Tähtinen, L and Toivonen, S (2025) Expanding horizons: A framework for developing futures-oriented resilience in the built environment. Building Research & Information, 53(3), pp. 281-304. ISSN 0961-3218

Ucci, M; Law, S; Andrews, R; Fisher, A; Smith, L; Sawyer, A and Marmot, A (2015) Indoor school environments, physical activity, sitting behaviour and pedagogy: A scoping review. Building Research & Information, 43(5), pp. 566-581. ISSN 0961-3218

Uddin, M; Mahboub, K C and Goodrum, P M (2011) Effects of nonnormal distributions on highway construction acceptance pay factor calculation. Journal of Construction Engineering and Management, 137(2), pp. 108-118. ISSN 0733-9364

Ugwu, O O and Tah, J H M (2002) Development and application of a hybrid genetic algorithm for resource optimization and management. Engineering, Construction and Architectural Management, 9(4), pp. 304-317. ISSN 0969-9988

Uher, Thomas Edward (1990) The effect of risks and uncertainties on subcontract bid prices. Unpublished PhD thesis, University of New South Wales, Australia.

Uhlik III, F T (1984) Optimizing earthwork estimating for highway construction. PhD thesis, Pennsylvania State University, USA.

Un, B; Erdiş, E; Aydınlı, S; Genç, O and Alboga, O (2025) Forecasting the outcomes of construction contract disputes using machine learning techniques. Engineering, Construction and Architectural Management, 32(10), pp. 6421-6444. ISSN 0969-9988

Ure, J D; South, A J; Farnsworth, C B; Bown, M and Thompson, N (2024) Enlarging the role of CEM professionals in corporate sustainability: ESG programs and the built environment. Journal of Construction Engineering and Management, 150(8): 04024095, ISSN 0733-9364

Usher, D (1990) Privatisation, partnerships and the building industry. PhD thesis, University of Bristol, UK.

V E, S; Shin, C and Cho, Y (2021) Efficient energy consumption prediction model for a data analytic-enabled industry building in a smart city. Building Research & Information, 49(1), pp. 127-143. ISSN 0961-3218

Valdes-Vasquez, R and Klotz, L E (2013) Social sustainability considerations during planning and design: Framework of processes for construction projects. Journal of Construction Engineering and Management, 139(1), pp. 80-89. ISSN 0733-9364

Valentin, W S and Vorster, F S (2012) Understanding construction project failure in Southern Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 19-26. ISSN 17514312

Van Den Berg, M; Voordijk, H; Adriaanse, A and Hartmann, T (2017) Experiencing supply chain optimizations: A serious gaming approach. Journal of Construction Engineering and Management, 143(11): 04017082, ISSN 0733-9364

Van Hove, M Y C; Deurinck, M; Lameire, W; Laverge, J; Janssens, A and Delghust, M (2023) Large-scale statistical analysis and modelling of real and regulatory total energy use in existing single-family houses in flanders. Building Research & Information, 51(2), pp. 203-222. ISSN 0961-3218

Van Linden, S and Van Den Bossche, N (2021) Comparative study on the feasibility of watertight face-sealed building joints under simulated wind-driven rain conditions. Building Research & Information, 49(7), pp. 748-762. ISSN 0961-3218

Van Nederveen, S; Beheshti, R and De Ridder, H (2010) Supplier-driven integrated design. Architectural Engineering and Design Management, 6(4), pp. 241-253. ISSN 1745-2007

Van Tol, A A (2005) Agent embedded simulation modeling framework for construction engineering and management applications. PhD thesis, University of Alberta, Canada.

Van der Zwart, J (2014) Building for a better hospital: Value-adding management and design of healthcare real estate. PhD thesis, Delft University of Technology, Netherlands.

Varghese, K (1992) Automated route planning for large vehicles on industrial construction sites. PhD thesis, University of Texas at Austin, USA.

Vasenin, M (2022) A data-driven approach to green investments: environmental performance, mispricing, and momentum. PhD thesis, Northumbria University, UK.

Vassigh, S; Davis, D; Behzadan, A H; Mostafavi, A; Rashid, K; Alhaffar, H; Elias, A and Gallardo, G (2020) Teaching building sciences in immersive environments: A prototype design, implementation, and assessment. International Journal of Construction Education and Research, 16(3), pp. 180-196. ISSN 1557-8771

Vatankhah, M; Vakilinezhad, R; Zakeri, S M H and Fattahi, K (2024) Optimizing energy and daylight performance of vernacular dwellings for contemporary architecture: A parametric analysis. Architectural Engineering and Design Management, 20(6), pp. 1795-1814. ISSN 1745-2007

Vatterott, A G (2018) A multi-skilled approach to property maintenance considering temporal, spatial and resource constraints. PhD thesis, University of Missouri - Saint Louis, USA.

Vennström, A (2008) The construction client as a change agent contextual support and obstacles. PhD thesis, Luleå University of Technology, Sweden.

Viet-Ngu, H; Susilawati, C and Joko Purnomo, R (2024) Analysis of productivity performance of real estate and construction firms in Indonesia. Construction Management and Economics, 42(3), pp. 215-228. ISSN 01446193

Vigren, O (2024) Ecosystems in construction management and urban development: A comprehensive review of conceptualizations and contributions. Construction Management and Economics, 42(2), pp. 162-181. ISSN 01446193

Villacis Jr., J E (1999) The component architecture toolkit. PhD thesis, Indiana University, USA.

Visser, A T (1981) An evaluation of unpaved road performance and maintenance. PhD thesis, University of Texas at Austin, USA.

Vojinovic, Z and Kecman, V (2001) Modelling empirical data to support project cost estimating: Neural networks versus traditional methods. Construction Innovation, 1(4), pp. 227-243. ISSN 1471-4175

Volker, L and Prins, M (2006) Critical reflections on measuring the effect of steering activities in architectural design. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Volker, L; Scharpff, J C D; de Weerdt, M M and Herder, P M (2012) Designing a dynamic network-based approach for asset management activities. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Voordijk, H (2023) Technical mediation and digital technologies in construction practice. Architectural Engineering and Design Management, 19(2), pp. 110-124. ISSN 1745-2007

Vásquez-Hernández, A.; Pellicer, E.; Alarcón, L. F.; Capellaro Ferreira, T. and Martínez, P. (2026) Breaking the mirror: How conventional construction firms embrace industrialized construction. Journal of Construction Engineering and Management, 152(10): 04026163, ISSN 0733-9364

Vásquez-Hernández, A.; Pellicer, E.; Alarcón, L. F. and Tzortzopoulos, P. (2026) Typologies of industrialized construction adoption: Configurations in conventional construction firms. Journal of Construction Engineering and Management, 152(7): 04026093, ISSN 0733-9364

Waidyasekara, K G A S; De Silva, L and Rameezdeen, R (2017) Application of "R" principles to enhance the efficiency of water usage in construction sites. Built Environment Project and Asset Management, 7(4), pp. 400-412. ISSN 2044-124X

Wakchaure, S S and Jha, K N (2011) Prioritization of bridges for maintenance planning using data envelopment analysis. Construction Management and Economics, 29(9), pp. 957-968. ISSN 1466433X

Wakchaure, S S and Jha, K N (2012) Determination of bridge health index using analytical hierarchy process. Construction Management and Economics, 30(2), pp. 133-149. ISSN 1466433X

Walker, D H T (1995) An investigation into construction time performance. Construction Management and Economics, 13(3), pp. 263-274. ISSN 01446193

Walker, D H T (1995) The influence of client and project team relationships upon construction time performance. Journal of Construction Procurement, 1(1), pp. 4-20. ISSN 1358-9180

Walker, D H T (1998) The contribution of the client representative to the creation and maintenance of good project inter-team relationships. Engineering, Construction and Architectural Management, 5(1), pp. 51-57. ISSN 0969-9988

Wall, D M (1993) Building maintenance in the context of developing countries. Construction Management and Economics, 11(3), pp. 186-193. ISSN 01446193

Wall, D M (1997) Distributions and correlations in Monte Carlo simulation. Construction Management and Economics, 15(3), pp. 241-258. ISSN 01446193

Wallace, W A (1987) Capital costs versus costs-in-use: A content analysis of design team member communication patterns. Construction Management and Economics, 5(4), ISSN 01446193

Walraven, A and de Vries, B (2009) From demand driven contractor selection towards value driven contractor selection. Construction Management and Economics, 27(6), pp. 597-604. ISSN 1466433X

Walsh, K D; Sawhney, A and Bashford, H H (2007) Production equations for unsteady-state construction processes. Journal of Construction Engineering and Management, 133(3), pp. 254-261. ISSN 0733-9364

Walters, D J (2015) How do project managers become experts: An examination of the engineering procurement and construction management (EPCM) industry. EdD thesis, Northern Illinois University, USA.

Wamuziri, S (2009) Using electronic reverse auctions in project procurement: Perceptions of construction contractors. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Wamuziri, S (2013) Payment options in collaborative procurement of major construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(1), pp. 12-20. ISSN 17514304

Wamuziri, S and Seywright, A (2005) Risk sharing and effective incentives in collaborative procurement. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Wamuziri, Sam (2026) Risk mitigation strategies in financing renewable energy projects in Sub-Saharan Africa. Journal of Construction Business and Management, 8(S1), pp. 62-71. ISSN 2521-0165

Wang, D; Xu, G and Fang, S (2026) Data-driven analysis of public concerns in major construction accidents and intervention strategies. Journal of Construction Engineering and Management, 152(6): 04026060, ISSN 0733-9364

Wang, F.; Zhou, J. and Zheng, X. (2026) Identification of hydraulic engineering construction accident causes using instruction tuning and structured prompting in large language models. Journal of Construction Engineering and Management, 152(8): 04026122, ISSN 0733-9364

Wang, Z; Yan, X; Liu, Q; Ma, X and Li, H (2026) Vision-based collision prevention on construction sites: Integrating trajectory prediction and uncertainty modeling. Journal of Construction Engineering and Management, 152(1): 04025214, ISSN 0733-9364

Wang, C; Qiao, H; Li, Q; Su, R and An, B (2024) Advances in recycled concrete research: Improving shrinkage for sustainable building applications. Architectural Engineering and Design Management, 20(6), pp. 1589-1611. ISSN 1745-2007

Wang, C; Shen, W; Cui, B and Zeng, Y (2025) Numerical study on the thermal environment of the vertical greening system based on infrared thermal imaging. Architectural Engineering and Design Management, 21(2), pp. 315-337. ISSN 1745-2007

Wang, C; Zhang, S; Du, C; Pan, F and Xue, L (2016) A real-time online structure-safety analysis approach consistent with dynamic construction schedule of underground caverns. Journal of Construction Engineering and Management, 142(9): 04016042, ISSN 0733-9364

Wang, D; Dai, F and Ning, X (2015) Risk assessment of work-related musculoskeletal disorders in construction: State-of-the-art review. Journal of Construction Engineering and Management, 141(6): 04015008, ISSN 0733-9364

Wang, H and Meng, X (2016) Improving information/knowledge management through the use of BIM: A literature review. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Wang, H; Sexton, M and Lu, S L (2016) The business logic of Chinese construction companies investing in the UK infrastructure sector. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Wang, H; Yang, Q; Liu, Q; Zhao, C and Zhou, W (2024) Automatic planning for cable crane operations in concrete dam construction. Journal of Construction Engineering and Management, 150(12): 04024177, ISSN 0733-9364

Wang, J (2004) Hybrid genetic algorithms for reliability assessment of structural system. PhD thesis, City University of New York, USA.

Wang, J; Han, C and Li, X (2023) Modified streamlined optimization algorithm for time-cost tradeoff problems of complex large-scale construction projects. Journal of Construction Engineering and Management, 149(5): 04023022, ISSN 0733-9364

Wang, J; Huang, W and Chen, Y (2025) Solving stochastic time-cost trade-off problems via modified double-loop procedure with adaptive domain decomposition method. Journal of Construction Engineering and Management, 151(2): 04024199, ISSN 0733-9364

Wang, J; Xiahou, X; Lin, Y; Liu, Y; Han, Z and Song, Y (2025) A novel approach for pipeline generation using a mixed GA and tree strategy. Journal of Construction Engineering and Management, 151(9): 04025122, ISSN 0733-9364

Wang, J P W (2015) A system framework of the cost and energy relationship of zero carbon buildings from the life cycle perspective. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Wang, K (2017) Real options models for better investment decisions in road infrastructure under demand uncertainty. PhD thesis, University of California, Irvine, USA.

Wang, L (2018) Deconstructable systems for sustainable design of steel and composite structures. PhD thesis, Northeastern University, USA.

Wang, N; Horner, R M W and El-Haram, M (2004) Fuzzy logic approach to a generic elemental whole life costing model. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Wang, P; Wang, K; Huang, Y; Fenn, P and Stewart, I (2022) Auditing construction cost from an in-process perspective based on a Bayesian predictive model. Journal of Construction Engineering and Management, 148(4): 04022003, ISSN 0733-9364

Wang, Q (2017) Automated geometry quality assessment of precast concrete elements using 3D laser scan data. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Wang, R D; Zayed, T; Eltoukhy, A E E and Wu, H (2024) Integrated planning approach for optimizing tower crane and truck locations in modular integrated construction. Journal of Construction Engineering and Management, 150(9): 04024121, ISSN 0733-9364

Wang, S (2017) Integrated approach and analysis of reliability, robustness, resilience and infrastructure applications. PhD thesis, University of Washington, USA.

Wang, S; Tang, W and Li, Y (2013) Relationship between owners' capabilities and project performance on development of hydropower projects in China. Journal of Construction Engineering and Management, 139(9), pp. 1168-1178. ISSN 0733-9364

Wang, T (2022) Motivating management: evidence from construction project teams. PhD thesis, University of Hong Kong, Hong Kong.

Wang, T; Tang, W; Qi, D; Shen, W and Huang, M (2016) Enhancing design management by partnering in delivery of international EPC projects: Evidence from Chinese construction companies. Journal of Construction Engineering and Management, 142(4): 04015099, ISSN 0733-9364

Wang, T-K (2010) An information model for subcontractor resource allocation. PhD thesis, University of Texas at Austin, USA.

Wang, W (2010) Multivariate stochastic copula-based deterioration models in infrastructure economic risk management. DES thesis, Columbia University, USA.

Wang, W; Gao, S; Mi, L; Xing, J; Shang, K; Qiao, Y; Fu, Y; Ni, G and Xu, N (2021) Exploring the adoption of BIM amidst the COVID-19 crisis in China. Building Research & Information, 49(8), pp. 930-947. ISSN 0961-3218

Wang, W; Zhao, J; Zhang, W and Wang, Y (2015) Conceptual framework for risk propensity, risk perception, and risk behaviour of construction project managers. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Wang, W C and Demsetz, L A (2000) Application example for evaluating networks considering correlation. Journal of Construction Engineering and Management, 126(6), pp. 467-474. ISSN 0733-9364

Wang, Y (2022) Monitoring, modelling and analysis of occupants' operation of windows, use of air purifiers and smart air quality control in low-energy residential buildings. PhD thesis, University College London, UK.

Wang, Y; Goodrum, P M; Haas, C T and Glover, R W (2009) Analysis of observed skill affinity patterns and motivation for multiskilling among craft workers in the U.S. Industrial construction sector. Journal of Construction Engineering and Management, 135(10), pp. 999-1008. ISSN 0733-9364

Wang, Y; Lin, M; Xu, K; Zhang, S and Ma, H (2021) Energy consumption analysis of glass house using electrochromic window in the subtropical region. Journal of Engineering, Design and Technology, 19(1), pp. 203-218. ISSN 1726-0531

Wang, Y; Shao, Z and Tiong, R L K (2021) Data-driven prediction of contract failure of public-private partnership projects. Journal of Construction Engineering and Management, 147(8): 0002124, ISSN 0733-9364

Wanigarathna, N; Henjewele, C; Jones, K G; Pascale, F and Morga, M (2022) Modelling earthquake damage repair costs: Improving accuracy for preparedness decision making. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Wanous, M; Boussabaine, H and Lewis, J (2004) A neurofuzzy decision-support model for mark-up estimation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Wantanakorn, D (2000) Effects of management errors on construction projects. PhD thesis, University of Nottingham, UK.

Warszawski, A (2003) Parametric analysis of the financing cost in a building project. Construction Management and Economics, 21(5), pp. 447-459. ISSN 01446193

Warwick, E (2015) Policy to reality: Evaluating the evidence trajectory for English eco-towns. Building Research & Information, 43(4), pp. 486-498. ISSN 0961-3218

Watanabe, R; Watanabe, T and Skitmore, M (2025) Evaluating the implementation of innovative technology in japan's bidding system: A dynamic stackelberg game theoretical analysis. Construction Management and Economics, 43(9), pp. 657-684. ISSN 0144-6193

Watfa, M K; Abdelrehim, A; Shahin, N and Jaafar, K (2023) A structural equation model to assess the impact of sustainability management on the success of construction projects. International Journal of Construction Management, 23(10), pp. 1653-1664. ISSN 1562-3599

Watton, J; Unterhitzenberger, C; Locatelli, G and Invernizzi, D C (2023) The cost drivers of infrastructure projects: Definition, classification, and conceptualization. Journal of Construction Engineering and Management, 149(11): 03123006, ISSN 0733-9364

Weatherford, D D (1980) Responsibilities of foremen as perceived by foremen and superintendents in a selected construction company in Texas. EdD thesis, East Texas State University, USA.

Webb, R M; Smallwood, J and Haupt, T C (2004) The potential of 4d cad as a tool for construction management. Journal of Construction Research, 5(1), pp. 43-60. ISSN 1609-9451

Wee, S (1993) A prototype of an expert system for pavement maintenance and rehabilitation strategy in the state of Ohio (espresso). PhD thesis, Ohio State University, USA.

Wei, Yuchen (2021) Reliability analysis method and network optimization of 5g backhaul network for operators. MPhil thesis, University of Sydney, Australia.

Weidman, J; Dickerson, D E and Koebel, C T (2016) Effective intervention strategy to improve worker readiness to adopt ventilated tools. Journal of Construction Engineering and Management, 142(8): 4016028, ISSN 0733-9364

Weijs-Perrée, M; van de Koevering, J; Appel-Meulenbroek, R and Arentze, T (2019) Analysing user preferences for co-working space characteristics. Building Research & Information, 47(5), pp. 534-548. ISSN 0961-3218

Wenninger, S (2022) Data-driven support and risk modeling for a successful heat transition in the building sector. PhD thesis, Universitaet Bayreuth, Germany.

West, L-J (1982) An investigation into the career choice and occupational perceptions of professional builders and quantity surveyors. PhD thesis, Heriot-Watt University, UK.

West, T and Worthington, A C (2006) Macroeconomic risk factors in Australian commercial real estate, listed property trust and property sector stock returns. Journal of Financial Management of Property and Construction, 11(2), pp. 105-116. ISSN 1366-4387

Wethyavivorn, P; Charoenngam, C and Teerajetgul, W (2009) Strategic assets driving organizational capabilities of Thai construction firms. Journal of Construction Engineering and Management, 135(11), pp. 1222-1231. ISSN 0733-9364

Wheat, P E (2013) Econometric cost analysis in vertically separated railways. PhD thesis, University of Leeds, UK.

Whitehead, R C (1995) Factors influencing labour productivity on construction sites. PhD thesis, University of Dundee, UK.

Whitmore, D; Krystallis, I; Papadonikolaki, E; Ford, J; Cleaver, M and Alexander, D (2024) Digital twins in the asset life cycle: are we there yet? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 184-192. ISSN 17514304

Wibowo, A and Sundermeier, M (2020) Developing a fuzzy value-for-money analysis model for annuity-based public-private partnership infrastructure projects under consideration of risk mitigation capability. Journal of Construction Engineering and Management, 146(7): 04020081, ISSN 0733-9364

Wiethe, C (2022) Applying artificial intelligence and quantitative finance for a successful heat transition in the building sector. PhD thesis, Universitaet Bayreuth, Germany.

Wijeratne, P U; Gunarathna, C; Yang, R J; Wu, P; Hampson, K and Shemery, A (2024) BIM enabler for facilities management: A review of 33 cases. International Journal of Construction Management, 24(3), pp. 251-260. ISSN 1562-3599

Wild, A (2002) The management college that never was. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Wild, S (1996) Observations on the use of ground waste clay brick as a cement replacement material. Building Research & Information, 24(1), pp. 35-40. ISSN 0961-3218

Wilkinson, P; Glockling, J; Bouchlaghem, D and Ruikar, K (2013) Using business impact analyses to enhance resilient fire engineering building design. Architectural Engineering and Design Management, 9(4), pp. 229-249. ISSN 1745-2007

Wilkinson, S (2003) Strategy-formation within large private quantity surveying practices Volume I of II. PhD thesis, University of Salford, UK.

Willand, N; Moore, T; Horne, R and Robertson, S (2020) Retrofit poverty: Socioeconomic spatial disparities iretrofit subsidies uptake. Buildings & Cities, 1(1), pp. 14-35. ISSN 2632-6655

Williams, T (1999) Allocation of contingency in activity duration networks. Construction Management and Economics, 17(4), pp. 441-447. ISSN 01446193

Williams, T P (2002) Predicting completed project cost using bidding data. Construction Management and Economics, 20(3), pp. 225-235. ISSN 01446193

Willoughby, K A (1999) Modelling assistance for project procurement and disposal decisions. PhD thesis, University of Calgary, Canada.

Wilmot, C G and Mei, B (2005) Neural network modeling of highway construction costs. Journal of Construction Engineering and Management, 131(7), pp. 765-771. ISSN 0733-9364

Wilson, J G and Gupta, N K (1996) Assessment of structure formation in fresh concrete by measurement of its electrical resistance. Building Research & Information, 24(4), pp. 209-212. ISSN 0961-3218

Wilson, O D and Kenley, R (1987) Estimates given and tenders received: A comparison. Construction Management and Economics, 5(3), pp. 211-226. ISSN 01446193

Winch, G; Usmani, A and Edkins, A (1998) Towards total project quality: A gap analysis approach. Construction Management and Economics, 16(2), pp. 193-207. ISSN 01446193

Winch, G M (2000) Innovativeness in British and French construction: The evidence from transmanche-link. Construction Management and Economics, 18(7), pp. 807-817. ISSN 01446193

Windapo, A; Adediran, A and Olugboyega, O (2019) Procurement strategies influencing small and medium contractor development in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(6), pp. 253-263. ISSN 17514304

Wing, C K (1999) On the issue of plan shape complexity: Plan shape indices revisited. Construction Management and Economics, 17(4), pp. 473-482. ISSN 01446193

Wirahadikusumah, R and Abraham, D M (2003) Application of dynamic programming and simulation for sewer management. Engineering, Construction and Architectural Management, 10(3), pp. 193-208. ISSN 0969-9988

Wirahadikusumah, R; Abraham, D M and Castello, J (1999) Markov decision process for sewer rehabilitation. Engineering, Construction and Architectural Management, 6(4), pp. 358-370. ISSN 0969-9988

Wong, F (1997) Implementation of safety policy and safety system for construction companies in Hong Kong: Senior management's perspective. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Wong, F K W; Chan, S C M; Tse, R Y C and Love, P E D (2000) Improving safety knowledge through training: The case of Hong Kong. Journal of Construction Research, 1(2), pp. 169-175. ISSN 1609-9451

Wong, F K W; Hui, E C M and Leung, B Y P (2001) A comparative study of the housing reforms in the major cities of China: Beijing, Shanghai, Guangzhou and Shenzhen. Journal of Financial Management of Property and Construction, 6(2), pp. 95-107. ISSN 1366-4387

Wong, J; Wong, P and Heng, L (2007) An investigation of leadership styles and relationship cultures of Chinese and expatriate managers in multinational construction companies in Hong Kong. Construction Management and Economics, 25(1), pp. 95-106. ISSN 1466433X

Wong, J K W; Oladinrin, O T; Ho, C M F; Guilbert, E and Kam, R (2022) Assessment of video-based e-learning in a construction measurement course. International Journal of Construction Management, 22(1), pp. 1-7. ISSN 1562-3599

Wong, J M W and Ng, S T (2010) Forecasting construction tender price index inm Hong Kong using vector error correction model. Construction Management and Economics, 28(12), pp. 1255-1268. ISSN 1466433X

Wong, L; Wang, Y; Law, T and Lo, C T (2016) Association of root causes in fatal fall-from-height construction accidents in Hong Kong. Journal of Construction Engineering and Management, 142(7): 4016018, ISSN 0733-9364

Wong, P F; Tan, X Y and Lou, E C W (2025) Assessing the adoption of blockchain technology in smart sustainable cities: Insights from construction practitioners in Malaysia. International Journal of Construction Education and Research, 21(2), pp. 141-163. ISSN 1557-8771

Wong, P S P and Cheung, S O (2005) From monitoring to learning: A conceptual framework. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Wong, P S P; Cheung, S O and Hardcastle, C (2007) Embodying learning effect in performance prediction. Journal of Construction Engineering and Management, 133(6), pp. 474-482. ISSN 0733-9364

Wong, P S P; Cheung, S O and Ho, P K M (2005) Contractor as trust initiator in construction partnering: prisoner's dilemma perspective. Journal of Construction Engineering and Management, 131(10), pp. 1045-1053. ISSN 0733-9364

Woo, S (1999) Monte Carlo simulation of labor performance during overtime and its impact on project duration. PhD thesis, University of Texas at Austin, USA.

Wood, H L (2010) Modelling project complexity at the pre construction stage. PhD thesis, University of Brighton, UK.

Wooldridge, S C (2002) Balancing capital and condition: An emerging approach to facility investment strategy. PhD thesis, Massachusetts Institute of Technology, USA.

Woolery, J C and Crandall, K C (1983) Stochastic network model for planning scheduling. Journal of Construction Engineering and Management, 109(3), pp. 342-354. ISSN 0733-9364

Worrall, H; Norman, G and Flanagan, R (1995) Intervention analysis and overseas trade in UK construction-related materials and components. Construction Management and Economics, 13(6), pp. 475-484. ISSN 01446193

Wu, C; Song, X; Wang, T and Fang, D (2015) Core dimensions of the construction safety climate for a standardized safety-climate measurement. Journal of Construction Engineering and Management, 141(8): 04015018, ISSN 0733-9364

Wu, D; Chan, E H W and Shen, L (2004) Scoring system for measuring contractor's environmental performance. Journal of Construction Research, 5(1), pp. 139-147. ISSN 1609-9451

Wu, J (2008) A behavioral analysis of learning processes amongst construction project team members in China. PhD thesis, University of Hong Kong, Hong Kong.

Wu, P (2019) Global warming potential of China's manufacturing industry and its implication on construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Wu, S; Yu, L; Cao, T; Yuan, C and Du, Y (2023) How dependence asymmetry and explicit contract shape contractor-subcontractor collaboration: A psychological perspective of fairness. Journal of Construction Engineering and Management, 149(11): 04023103, ISSN 0733-9364

Wu, X; Tian, Z; Tian, C; Wang, Y and Li, J (2019) New design-day method for building cooling load calculation in China. Building Research & Information, 47(8), pp. 901-911. ISSN 0961-3218

Wu, Z; Jia, J; Xiao, L; Zhang, Y and Ma, G (2025) Accurate extraction of construction safety requirements tailored to project characteristics: Integrating multivariate NLP techniques. Journal of Construction Engineering and Management, 151(10): 04025140, ISSN 0733-9364

Wuni, I Y; Shen, G Q; Osei-Kyei, R and Agyeman-Yeboah, S (2022) Modelling the critical risk factors for modular integrated construction projects. International Journal of Construction Management, 22(11), pp. 2013-2026. ISSN 1562-3599

Xia, B; Chan, A; Molenaar, K and Skitmore, M (2012) Determining the appropriate proportion of owner-provided design in design-build contracts: Content analysis approach. Journal of Construction Engineering and Management, 138(9), pp. 1017-1022. ISSN 0733-9364

Xia, N; Tang, Y; Li, D and Pan, A (2021) Safety behavior among construction workers: Influences of personality and leadership. Journal of Construction Engineering and Management, 147(4): 04021019, ISSN 0733-9364

Xia, P; Xu, F; Zhou, T and Du, J (2022) Benchmarking human versus robot performance in emergency structural inspection. Journal of Construction Engineering and Management, 148(8): 04022070, ISSN 0733-9364

Xiao, H and Proverbs, D (2002) The performance of contractors in Japan, the UK and the USA: A comparative evaluation of construction cost. Construction Management and Economics, 20(5), pp. 425-435. ISSN 01446193

Xiao, H and Proverbs, D G (2003) Cost certainty and time certainty: An international investigation. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Xie, H (2012) Improving dynamic project control in tunnel construction. PhD thesis, University of Alberta, Canada.

Xie, J and Thomas Ng, S (2013) Multiobjective Bayesian network model for public-private partnership decision support. Journal of Construction Engineering and Management, 139(9), pp. 1069-1081. ISSN 0733-9364

Xie, W; Zhao, T; Wang, H and Tang, J (2017) Construction techniques used to automatically pass standard box girders through special passenger-line tunnels. Journal of Construction Engineering and Management, 143(5): 05016027, ISSN 0733-9364

Xiong, B; Ye, K; Skitmore, M; Jiang, W and Qin, B (2022) Chinese perceptions of corporate social responsibility: An analysis of annual reports in the housing sector (Chinese perceptions of corporate social responsibility). International Journal of Construction Management, 22(13), pp. 2586-2597. ISSN 1562-3599

Xiong, Bo (2016) Improving cost estimation performance: An investigation of prediction technique and person-environment interaction. PhD thesis, Queensland University of Technology, Australia.

Xiong, R and Tang, P (2021) Machine learning using synthetic images for detecting dust emissions on construction sites. Smart and Sustainable Built Environment, 10(3), pp. 487-503. ISSN 2046-6099

Xiong, W; Zhang, X and Chen, H (2016) Early-termination compensation in public-private partnership projects. Journal of Construction Engineering and Management, 142(4): 04015098, ISSN 0733-9364

Xiong, Y and Kuang, Y (2008) Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off. Journal of Construction Engineering and Management, 134(2), pp. 153-156. ISSN 0733-9364

Xu, T and Tiong, R L K (2001) Risk assessment on contractors' pricing strategies. Construction Management and Economics, 19(1), pp. 77-84. ISSN 01446193

Xu, Y and Juan, Y K (2022) Optimal decision-making model for outdoor environment renovation of old residential communities based on well community standards in China. Architectural Engineering and Design Management, 18(5), pp. 571-592. ISSN 1745-2007

Xu, Z; Guo, X; Zhao, Y and Liu, X (2023) Performance of CFRP-bolted timber joints with slotted-in corrugated steel plates. Journal of Construction Engineering and Management, 149(12): 04023134, ISSN 0733-9364

Xu, Z; Liang, Y; Xu, Y; Fang, Z and Stilla, U (2022) Geometric modeling and surface-quality inspection of prefabricated concrete components using sliced point clouds. Journal of Construction Engineering and Management, 148(9): 04022087, ISSN 0733-9364

Xue, G; Liu, S; Ren, L and Gong, D (2023) Adaptive cross-scenario few-shot learning framework for structural damage detection in civil infrastructure. Journal of Construction Engineering and Management, 149(5): 04023020, ISSN 0733-9364

Xue, H; Zhang, S; Chen, J; Cong, W; Wu, G and Zhao, X (2024) Effects of organizational elements on emerging information and construction management technology implementation in building professionals: Moderating role of top management support. Journal of Construction Engineering and Management, 150(10): 04024123, ISSN 0733-9364

Xue, Y; Le, Y; Zhang, X and Jiang, K (2023) Exploring schedule risks in large airport operational readiness: Risk identification and the systematic model. Journal of Construction Engineering and Management, 149(12): 04023123, ISSN 0733-9364

Yahya, K and Boussabaine, A H (2004) Developing a framework for assessing eco-costs of construction site activities. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Yakovlev, G I; Gordina, A; Drochytka, R; Buryanov, A F and Smirnova, O (2021) Structure and properties of modified gypsum binder. Smart and Sustainable Built Environment, 10(4), pp. 702-710. ISSN 2046-6099

Yakubu, O A (2010) Cost and time control practice of construction projects in the UK: The pursuit of effective management control. PhD thesis, University of the West of England, Bristol, UK.

Yamaguchi, H; Uher, T E and Runeson, G (2002) Negotiation analysis of risk allocation for PFI projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Yan, L and Fu-Yan, L (2017) Investigation on influence of speed on rolling resistance of belt conveyor based on viscoelastic property of rubber. Journal of Engineering, Design and Technology, 15(2), pp. 254-267.

Yan, L; Pan, Y and Chen, Y (2024) Understanding the double-edged sword effect of contract flexibility on contractor's opportunistic behavior in construction project: Moderating role of BIM application degree. Journal of Construction Engineering and Management, 150(10): 04024124, ISSN 0733-9364

Yang, I T (2006) Using Gaussian copula to simulate repetitive projects. Construction Management and Economics, 24(9), pp. 901-909. ISSN 1466433X

Yang, I T (2008) Distribution-free Monte Carlo simulation: Premise and refinement. Journal of Construction Engineering and Management, 134(5), pp. 352-360. ISSN 0733-9364

Yang, I T; Lin, Y C and Lee, H Y (2014) Use of support vector regression to improve computational efficiency of stochastic time-cost trade-off. Journal of Construction Engineering and Management, 140(1): 04013036, ISSN 0733-9364

Yang, J (2001) A decision support system for material routing in construction sites. PhD thesis, University of Wolverhampton, UK.

Yang, J; Liu, Q; Ye, G; Du, Q; Bai, L and Yue, H (2025) Mediating mechanism of construction noise on workers' safety behavior: Evidence from EEG data. Journal of Construction Engineering and Management, 151(10): 04025148, ISSN 0733-9364

Yang, J; Wu, Y and Li, D (2024) Block planning based on grid's topology for the dismantling of long-span spatial lattice structures. Journal of Construction Engineering and Management, 150(9): 04024118, ISSN 0733-9364

Yang, L-R (2003) Influence of technology on project success measures. PhD thesis, University of Texas at Austin, USA.

Yang, W and Kohler, N (2008) Simulation of the evolution of the Chinese building and infrastructure stock. Building Research & Information, 36(1), pp. 1-19. ISSN 0961-3218

Yang, Z (2004) Assessing cumulative damage in concrete and quantifying its influence on life cycle performance modeling. PhD thesis, Purdue University, USA.

Yasin, F and Egbu, C (2010) Exploitation of knowledge mapping benefits in the facilities performance evaluation process: A conceptual framework. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Yatiwella, T; Ramachandra, T and Sachchithananthan, M (2025) Forecasting embodied carbon emission: Case of two-storey residential buildings in Sri Lanka. Built Environment Project and Asset Management, 15(5), pp. 937-950. ISSN 2044-124X

Ye, M; Lu, W; Flanagan, R and Ye, K (2018) Diversification in the international construction business. Construction Management and Economics, 36(6), pp. 348-361. ISSN 01446193

Ye, S and Tiong, R L K (2003) The effect of concession period design on completion risk management of BOT projects. Construction Management and Economics, 21(5), pp. 471-482. ISSN 01446193

Ye, S and Tiong, R L K (2003) Effects of tariff design in risk management of privately financed infrastructure projects. Journal of Construction Engineering and Management, 129(6), pp. 610-618. ISSN 0733-9364

Yeh, Y C; Hsu, D S and Kuo, Y H (1991) Expert system for diagnosing damage of prestressed concrete pile. Journal of Construction Engineering and Management, 117(1), pp. 13-26. ISSN 0733-9364

Yeung, D K L and Skitmore, M (2005) Data pooling for early-stage price forecasts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Yevu, S K; Yu, A T W; Darko, A and Addy, M N (2021) Evaluation model for influences of driving forces for electronic procurement systems application in Ghanaian construction projects. Journal of Construction Engineering and Management, 147(8): 04021076, ISSN 0733-9364

Yevu, S K; Yu, A T W; Tetteh, M O and Antwi-Afari, M F (2022) Analytical methods for information technology benefits in the built environment: Towards an integration model. International Journal of Construction Management, 22(8), pp. 1383-1394. ISSN 1562-3599

Yi, K J; Lee, H S and Choi, Y K (2002) Network creation and development for repetitive-unit projects. Journal of Construction Engineering and Management, 128(3), pp. 257-264. ISSN 0733-9364

Yin, Chin Nyuk (1981) The doctrine of fundamental breach in contract law. PhD thesis, Australian National University, Australia.

Yin, D; Deng, X and Lu, K (2025) Automatic generation of pipelines from 2D CAD drawings to 3D IFC models using a parametric method. International Journal of Construction Management, 25(6), pp. 699-717. ISSN 1562-3599

Yin, X (2018) Development of straw bale building in northern China. PhD thesis, University of Bath, UK.

Yin, X; Bouferguene, A and Al-Hussein, M (2020) Data-driven sewer pipe data random generation and validation. Journal of Construction Engineering and Management, 146(12): 04020131, ISSN 0733-9364

Yin, X; Chen, Y; Bouferguene, A; Zaman, H; Al-Hussein, M and Russell, R (2020) Data-driven framework for modeling productivity of closed-circuit television recording process for sewer pipes. Journal of Construction Engineering and Management, 146(8): 04020093, ISSN 0733-9364

Yin, Y; Wang, J; Zou, B; Zhang, J; Su, Y and Sun, Q (2023) Evaluation of controlled blasting quality for rock-mass tunneling based on multiple indices. Journal of Construction Engineering and Management, 149(1): 04022155, ISSN 0733-9364

Yiu, T W; Cheung, S O and Mok, F M (2006) Logistic likelihood analysis of mediation outcomes. Journal of Construction Engineering and Management, 132(10), pp. 1026-1036. ISSN 0733-9364

Yiğit, A Y; Gamze Hamal, S N; Ulvi, A and Yakar, M (2024) Comparative analysis of mobile laser scanning and terrestrial laser scanning for the indoor mapping. Building Research & Information, 52(4), pp. 402-417. ISSN 0961-3218

Yogeswaran, K and Kumaraswamy, M M (1999) To instruct or not? The engineer's dilemma. Construction Management and Economics, 17(6), pp. 731-743. ISSN 01446193

Yohanis, Y G and Norton, B (1998) Estimating at the earliest stages of design the financial cost and operational energy requirement of buildings. Journal of Financial Management of Property and Construction, 3(2), pp. 41-58. ISSN 1366-4387

Yong, Y C and Mustaffa, N E (2013) Critical success factors for Malaysian construction projects: An empirical assessment. Construction Management and Economics, 31(9), pp. 959-978. ISSN 1466433X

Yoo, W S (2007) An information-based decision making framework for evaluating and forecasting a project cost and completion date. PhD thesis, Ohio State University, USA.

Yoo, Wi Sung and Hadipriono Tan, Fabian (2007) An information-based decision making framework for evaluation and forecasting a project cost and completion date. PhD thesis, The Ohio State University, USA.

Yoo, Y J (2014) The development of green building performance assessment tool (GBPAT). PhD thesis, University of Wisconsin - Madison, USA.

You, H; Xu, F and Du, J (2023) Improved boundary identification of stacked objects with sparse lidar augmentation scanning. Journal of Construction Engineering and Management, 149(11): 04023104, ISSN 0733-9364

Yu, M.; Zhao, J.; Lin, H. and Yuan, M. (2026) Keep company with the wolf, learn to howl: The impact of self-focused collective moral judgment on the misconduct of creative members in construction projects. Journal of Construction Engineering and Management, 152(7): 04026085, ISSN 0733-9364

Yu, W D and Lo, S S (2005) Time-dependent construction social costs model. Construction Management and Economics, 23(3), pp. 327-337. ISSN 01446193

Yu, W D; Wang, K W and Wang, M T (2013) Pricing strategy for best value tender. Journal of Construction Engineering and Management, 139(6), pp. 675-684. ISSN 0733-9364

Yu, Y; Zhao, B; Yu, J; Xu, Y; Chang, W S; Chen, Y and Guo, H (2025) Study of phase change material on alleviating building overheating risk in cold regions of China. Building Research & Information, 53(1-2), pp. 183-203. ISSN 0961-3218

Yuan, Z; Li, Z; Lei, Z; Yang, Y; Zhang, W; Lin, W and Cao, L (2025) Enhancing the production performance of prefabricated buildings through the integrated optimization of precast component layout and worker allocation. Journal of Construction Engineering and Management, 151(2): 04024200, ISSN 0733-9364

Yun, G Y (2008) Occupant behaviour in buildings: Thermal performance implications of window use patterns. PhD thesis, University of Cambridge, UK.

Yun, S and Caldas, C H (2009) Analysing decision variables that influence preliminary feasibility studies using data mining techniques. Construction Management and Economics, 27(1), pp. 73-87. ISSN 1466433X

Yung, P. and Blacker, S. (2026) Macroeconomic determinants of individual construction trader bankruptcy in the UK. Construction Management and Economics, 44(9), pp. 653-673. ISSN 0144-6193

Yusoff, W F M; Shaharil, M I; Mohamed, M F; Rasani, M R M; Sapian, A R and Dahlan, N D (2023) Review of openings with shading devices at naturally ventilated buildings. Architectural Engineering and Design Management, 19(5), pp. 463-479. ISSN 1745-2007

Yusuf, F (1997) Information and process modelling for IT implementation at the briefing stage. PhD thesis, University of Salford, UK.

Zafaranchi, M and Sözer, H (2024) Comparing energy profiles of different building types by determining their sensitivities. Architectural Engineering and Design Management, 20(6), pp. 1489-1510. ISSN 1745-2007

Zahoor, H; Chan, A P C; Utama, W P; Gao, R and Memon, S A (2017) Determinants of safety climate for building projects: SEM-based cross-validation study. Journal of Construction Engineering and Management, 143(6): 05017005, ISSN 0733-9364

Zakariya, K; Ibrahim, P H and Abdul Wahab, N A (2019) Conceptual framework of rural landscape character assessment to guide tourism development in rural areas. Journal of Construction in Developing Countries, 24(1), pp. 85-99. ISSN 1823-6499

Zakharova, J; Afefy, H M; Hamood, A; Hampton, P; Gowayed, M A; Ragab, M and Abouali, M G (2025) Can the degree apprenticeship become the degree of difference in Egypt? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(2), pp. 76-82. ISSN 17514304

Zapata Quimbayo, C A and Mejía Vega, C A (2023) Credit risk in infrastructure PPP projects under the real options approach. Construction Management and Economics, 41(4), pp. 293-306. ISSN 01446193

Zapata Quimbayo, C A; Mejía Vega, C A and Marques, N L (2019) Minimum revenue guarantees valuation in PPP projects under a mean reverting process. Construction Management and Economics, 37(3), pp. 121-138. ISSN 01446193

Zara, R B; Moro, G N; Martins, R d S V and Giglio, T G F (2025) Application of a decision tree approach to predict energy consumption in lightweight buildings under subtropical climate. Smart and Sustainable Built Environment, 14(7), pp. 2069-2089. ISSN 2046-6099

Zarghami, S A (2022) Forecasting project duration in the face of disruptive events: A resource-based approach. Journal of Construction Engineering and Management, 148(5): 04022016, ISSN 0733-9364

Zarghami, S A (2022) Prioritizing construction activities: Addressing the flaws of schedule-based indexes. Journal of Construction Engineering and Management, 148(8): 04022069, ISSN 0733-9364

Zarghami, S A (2024) No scheduling problem but rather a rescheduling problem: Measuring robustness of schedule network in construction projects. Journal of Construction Engineering and Management, 150(2): 04023157, ISSN 0733-9364

Zarrinmehr, S (2016) A computational model for simulation, visualization and evaluation of mandatory and optional building occupancy scenarios. PhD thesis, Texas A&M University, USA.

Zawdie, G and Langford, D A (2002) Influence of construction-based infrastructure on the development process in Sub-Saharan Africa. Building Research & Information, 30(3), pp. 160-170. ISSN 0961-3218

Zayed, T M and Halpin, D W (2004) Quantitative assessment for piles productivity factors. Journal of Construction Engineering and Management, 130(3), pp. 405-414. ISSN 0733-9364

Zeng, Y (2010) Risk management for enterprise resource planning system implementations in project-based firms. PhD thesis, University of Maryland, College Park, USA.

Zhai, D; Goodrum, P M; Haas, C T and Caldas, C H (2009) Relationship between automation and integration of construction information systems and labor productivity. Journal of Construction Engineering and Management, 135(8), pp. 746-753. ISSN 0733-9364

Zhai, H and Russell, J S (1999) Stochastic modelling and prediction of contractor default risk. Construction Management and Economics, 17(5), pp. 563-576. ISSN 01446193

Zhang, J and Jiang, S (2026) Unsafe behaviors in workers at heights: A spacetime-based coupling analysis method and its safety implications. Journal of Construction Engineering and Management, 152(1): 04025233, ISSN 0733-9364

Zhang, J.; Wang, Y.; Wang, R. D.; Li, X.; Zhang, Z. and Yang, Z. (2026) A multitower crane layout planning framework for modular integrated construction considering material relay handling. Journal of Construction Engineering and Management, 152(8): 04026109, ISSN 0733-9364

Zhang, C; Chen, K; Yang, J; Fu, J; Wang, S and Xie, Y (2022) Reuse of discharged soil from slurry shield tunnel construction as synchronous grouting material. Journal of Construction Engineering and Management, 148(2): 04021193, ISSN 0733-9364

Zhang, D; Haas, C T; Goodrum, P M; Caldas, C H and Granger, R (2012) Construction small-projects rework reduction for capital facilities. Journal of Construction Engineering and Management, 138(12), pp. 1377-1385. ISSN 0733-9364

Zhang, H; Wang, Y and Lin, Y (2013) Simulation analysis of buyer searching process in China's primary housing market. International Journal of Construction Management, 13(2), pp. 67-80. ISSN 1562-3599

Zhang, J (2015) Automated code compliance checking in the construction domain using semantic natural language processing and logic-based reasoning. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Zhang, K; Cui, Q and DeCorla-Souza, P (2025) Performance and efficiency diffusion of us surface transportation public-private partnerships. Journal of Construction Engineering and Management, 151(1): 04024192, ISSN 0733-9364

Zhang, L (2021) Artificial neural network intelligent technique and multiple nonlinear regression for prediction and optimization of the transmittance of lightpipes and implementation in BIM. PhD thesis, University of Nottingham, UK.

Zhang, L and El-Gohary, N M (2017) Human-centered value analysis: Building-value aggregation based on human values and building-system integration. Journal of Construction Engineering and Management, 143(8): 04017040, ISSN 0733-9364

Zhang, L and El-Gohary, N M (2020) Automated IFC-based building information modelling and extraction for supporting value analysis of buildings. International Journal of Construction Management, 20(4), pp. 269-288. ISSN 1562-3599

Zhang, L and El-Gohary, N M (2021) Axiology-based valuation modeling for human-centered decision making in building planning and design. Journal of Construction Engineering and Management, 147(11): 04021138, ISSN 0733-9364

Zhang, L; Yuan, J; Xia, N; Bouferguene, A and Al-Hussein, M (2020) Improving information sharing in major construction projects through OC and POC: RDT perspective. Journal of Construction Engineering and Management, 146(7): 04020068, ISSN 0733-9364

Zhang, M (2011) Uncertainty and imprecision in safety assessment of offshore structures. PhD thesis, National University of Singapore, Singapore.

Zhang, M; Cheng, W and Wang, Y (2018) Multiple-fault classification for hot-mix asphalt production by machine learning. Journal of Construction Engineering and Management, 144(5): 04018024, ISSN 0733-9364

Zhang, M and Ge, S (2022) Vision and trajectory-based dynamic collision prewarning mechanism for tower cranes. Journal of Construction Engineering and Management, 148(7): 04022057, ISSN 0733-9364

Zhang, P (2018) Mapping buried utilities in difficult environments. PhD thesis, University of Nottingham, UK.

Zhang, P; Sing, M C P; Guo, S; Chan, I Y S and Fung, I W H (2025) Causal factors of near misses and accidents in urban railway construction: A complex network approach. Journal of Construction Engineering and Management, 151(7): 04025081, ISSN 0733-9364

Zhang, S; Jiang, P; Zhang, Z and Wang, C (2021) Webgis-based collaborative construction quality control of rcc gravity dam using sensing devices. Journal of Construction Engineering and Management, 147(3): 06020004, ISSN 0733-9364

Zhang, S; Li, J; Li, Y and Zhang, X (2021) Revenue risk allocation mechanism in public-private partnership projects: Swing option approach. Journal of Construction Engineering and Management, 147(1): 04020153, ISSN 0733-9364

Zhang, S; Liu, X; Gao, Y and Ma, P (2019) Effect of level of owner-provided design on contractor's design quality in DB/EPC projects. Journal of Construction Engineering and Management, 145(1): 04018121, ISSN 0733-9364

Zhang, S; Migliaccio, G C; Zandbergen, P A and Guindani, M (2014) Empirical assessment of geographically based surface interpolation methods for adjusting construction cost estimates by project location. Journal of Construction Engineering and Management, 140(6): 4014015, ISSN 0733-9364

Zhang, S; Zhang, S; Gao, Y and Ding, X (2016) Contractual governance: Effects of risk allocation on contractors' cooperative behavior in construction projects. Journal of Construction Engineering and Management, 142(6): 04016005, ISSN 0733-9364

Zhang, X; Otto, F and Oeser, M (2021) Modeling pavement surface deflections under accelerated pavement testing using the PCA method. Journal of Construction Engineering and Management, 147(12): 04021169, ISSN 0733-9364

Zhang, Y; Chang, R; Mao, W; Zuo, J; Zhang, W E and Liu, L (2025) Low-cost ios-based automated detection of under-construction interior drywalls: An exploratory study. Journal of Construction Engineering and Management, 151(10): 05025012, ISSN 0733-9364

Zhang, Y; Tzortzopoulos, P and Kagioglou, M (2019) Healing built-environment effects on health outcomes: Environment-occupant-health framework. Building Research & Information, 47(6), pp. 747-766. ISSN 0961-3218

Zhang, Y; Xiao, B and Li, X (2024) Integrating virtual reality and consensus models for streamlined built environment design collaboration. Journal of Construction Engineering and Management, 150(4): 04024010, ISSN 0733-9364

Zhang, Z J; Li, M G; Chen, J J; Wang, J H and Zeng, F Y (2017) Innovative construction method for oversized excavations with bipartition walls. Journal of Construction Engineering and Management, 143(8): 04017056, ISSN 0733-9364

Zhao, S.; Guo, Y.; Wen, S.; Guo, Z.; Miao, A.; Li, D. and Guo, C. (2026) Worker health and safety in high-altitude tunnel construction: A study on oxygen supply standards and measures based on physiological indicators. International Journal of Construction Management, 26(8), pp. 1562-1583. ISSN 1562-3599

Zhao, X (2024) Construction risk management research: Intellectual structure and emerging themes. International Journal of Construction Management, 24(5), pp. 540-550. ISSN 1562-3599

Zhao, Y (2021) Modernizing log construction system: A study on technology advancement and design strategy. PhD thesis, The Chinese University of Hong Kong, Hong Kong.

Zhao, Z Y; Lv, Q L; Zuo, J and Zillante, G (2010) Prediction system for change management in construction project. Journal of Construction Engineering and Management, 136(6), pp. 659-669. ISSN 0733-9364

Zheng, X; Chau, K W and Hui, E C M (2012) The impact of property price on construction output. Construction Management and Economics, 30(12), pp. 1025-1037. ISSN 1466433X

Zheng, X; Hu, X; Wu, C; Li, Y and Yang, D (2025) Revisiting the relationships between governance mechanisms and project performance: Meta-analysis of main and moderating effects. Journal of Construction Engineering and Management, 151(11): 04025164, ISSN 0733-9364

Zhong, Z and Gou, Z (2023) High-rise apartment quality evaluation and related demographic factors: Lesson from rentsafeto programme. Building Research & Information, 51(4), pp. 430-445. ISSN 0961-3218

Zhou, L; Wang, C; Niu, P; Zhang, H; Zhang, N; Xie, Q; Wang, J; Zhang, X and Liu, J (2025) A morphology-euclidean-linear recognition method for rebar point clouds of highway tunnel linings during the construction phase. Engineering, Construction and Architectural Management, 32(10), pp. 6509-6535. ISSN 0969-9988

Zhou, X (2011) Three essays on construction procurement industry and public policies. PhD thesis, University of Oklahoma, USA.

Zhou, Y and Elhag, T (2007) Financial assessment using neural networks. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Zhou, Y; Wang, D; Liu, G; Wang, J and Li, K (2017) A method for tenant selection of China's construction industrial parks through industrial symbiosis. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Zhu, L; Wei, X and Liang, R (2024) Navigating uncertainty: Optimizing contractor selection for megaprojects in group decision-making with multiple criteria. Journal of Construction Engineering and Management, 150(11): 04024157, ISSN 0733-9364

Zhu, Y and Issa, R (2017) Computer simulation for construction education using the structure-behavior-function theory: A pilot study on learning estimating concepts. International Journal of Construction Education and Research, 13(2), pp. 142-60. ISSN 1557-8771

Zou, H and Zhou, G (2024) Multimode variable resource-constrained time/cost trade-off problem in repetitive projects with adjustment strategy. International Journal of Construction Management, 24(12), pp. 1271-1281. ISSN 1562-3599

Zou, Y and Lee, S H (2008) The impacts of change management practices on project change cost performance. Construction Management and Economics, 26(4), pp. 387-393. ISSN 1466433X

Zoya Kpamma, E and Adjei-Kumi, T (2011) Management of waste in the building design process: The Ghanaian consultants' perspective. Architectural Engineering and Design Management, 7(2), pp. 102-112. ISSN 1745-2007

Zulu, S L (2007) The impact of project management process quality on construction project performance: A structural equation model. PhD thesis, Heriot-Watt University, UK.

Zuluaga Mayorga, S (2024) Exploring the value of infrastructure systems and its impacts on decision-making for sustainability. PhD thesis, University of Toronto, Canada.

Zuofa, T and Ochieng, E G (2011) Project managers perception of risk factors in heavy engineering construction projects: Case of offshore projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

de Leon, D E (1996) Integrating socioeconomics in the development of criteria for optimal aseismic design of r/c buildings. PhD thesis, University of California, Irvine, USA.

de Neufville, R and King, D (1991) Risk and need-for-work premiums in contractor bidding. Journal of Construction Engineering and Management, 117(4), pp. 659-673. ISSN 0733-9364

de Souza, M P; Fialho, B C; Ferreira, R C; Fabricio, M M and Codinhoto, R (2023) Modelling and coordination of building design: An experience of BIM learning/upskilling. Architectural Engineering and Design Management, 19(1), pp. 74-91. ISSN 1745-2007

de la Garza, J M and Melin, J W (1986) Prepayment ability to offset inflation. Journal of Construction Engineering and Management, 112(4), pp. 514-529. ISSN 0733-9364

li, H; yu, L and Cheng, E W L (2005) A GIS-based site selection system for real estate projects. Construction Innovation, 5(4), pp. 231-241. ISSN 1471-4175

van Marken Lichtenbelt, W; Hanssen, M; Pallubinsky, H; Kingma, B and Schellen, L (2017) Healthy excursions outside the thermal comfort zone. Building Research & Information, 45(7), pp. 819-827. ISSN 0961-3218

van Nguyen, M V (2025) Assessing the readiness for sustainable building material adoption: A study from construction organizations of different sizes. Engineering, Construction and Architectural Management, 32(10), pp. 6834-6866. ISSN 0969-9988

van den Hurk, M (2015) What's the deal? Standardizing contracts for public-private partnerships. PhD thesis, Universiteit Antwerpen, Belgium.

von Malmborg, F; Rohdin, P and Wihlborg, E (2024) Climate declarations for buildings as a new policy instrument in Sweden: a multiple streams perspective. Building Research & Information, 52(4), pp. 479-496. ISSN 0961-3218

wu, S; Lee, A; Koh, W W I; Aouad, G and fu, C (2004) An IFC-based space analysis for building accessibility layout for all users. Construction Innovation, 4(3), pp. 129-141. ISSN 1471-4175

Çıdık, M S and Boyd, D (2022) Value implication of digital transformation: The impact of the commodification of information. Construction Management and Economics, 40(11-12), pp. 903-917. ISSN 01446193

Ökmen, O and Öztas, A (2010) Construction cost analysis under uncertainty with correlated cost risk analysis model. Construction Management and Economics, 28(2), pp. 203-212. ISSN 1466433X

Ökmen, Ö and Öztaş, A (2008) Construction project network evaluation with correlated schedule risk analysis model. Journal of Construction Engineering and Management, 134(1), pp. 49-63. ISSN 0733-9364

Öney-Yazıcı, E and Dulaimi, M F (2015) Understanding designing for construction safety: The interaction between confidence and attitude of designers and safety culture. Architectural Engineering and Design Management, 11(5), pp. 325-337. ISSN 1745-2007

Özdoganm, I D and Talat Birgönül, M (2000) A decision support framework for project sponsors in the planning stage of build-operate-transfer (BOT) projects. Construction Management and Economics, 18(3), pp. 343-353. ISSN 01446193

This list was generated on Sat Aug 22 02:54:11 2026 UTC.