Items with Descriptive Scope: 2 PT
Abdel-Razek, R H and McCaffer, R (1987) A change in the UK construction industry structure: Implications for estimating. Construction Management and Economics, 5(3), pp. 227-242. ISSN 01446193
Alnabhan, M S (2019) A framework to expedite alternative dispute resolution in the Kuwaiti construction industry. PhD thesis, Loughborough University, UK.
Borges, S K (1987) Roller-compacted concrete pavement: U.S. Air force decision model. Journal of Construction Engineering and Management, 113(3), pp. 480-487. ISSN 0733-9364
Bygballe, L E; Håkansson, H and Jahre, M (2013) A critical discussion of models for conceptualizing the economic logic of construction. Construction Management and Economics, 31(2), pp. 104-118. ISSN 1466433X
Clegg, S R (1974) Power in organization theory: A conceptual and emperical enquiry into rules and power in the organization, employing conversational materials collected on a construction site. PhD thesis, University of Bradford, UK.
Daniel, E I; Pasquire, C; Dickens, G and Ballard, H G (2017) The relationship between the last planner® system and collaborative planning practice in UK construction. Engineering, Construction and Architectural Management, 24(3), pp. 407-425. ISSN 0969-9988
Eccles, R G J (1979) Organization and market structure in the construction industry: A study of subcontracting. PhD thesis, Harvard University, USA.
Ejohwomu, O A; Oshodi, O S and Lam, K C (2017) Nigeria's construction industry: Barriers to effective communication. Engineering, Construction and Architectural Management, 24(4), pp. 652-667. ISSN 0969-9988
Ezulike, E I and Hoare, D J (1998) The need for education in alternative dispute resolution (ADR) in the construction industry. Engineering, Construction and Architectural Management, 5(2), pp. 144-149. ISSN 0969-9988
Fogarty, H (2009) Contractor perspective of the new Irish public works contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(1), pp. 29-34. ISSN 17514312
Haltenhoff, C E (1986) Educating professional construction managers. Journal of Construction Engineering and Management, 112(2), pp. 153-162. ISSN 0733-9364
Han, Y; Fang, X; Zhao, X and Wang, L (2024) Exploring the impact of incentive policy on the development of prefabricated buildings: A scenario-based system dynamics model. Engineering, Construction and Architectural Management, 31(12), pp. 4697-4725. ISSN 0969-9988
Haycraft, W R (2011) History of construction equipment. Journal of Construction Engineering and Management, 137, pp. 720-723. ISSN 0733-9364
Hemström, K; Mahapatra, K and Gustavsson, L (2017) Architects' perception of the innovativeness of the Swedish construction industry. Construction Innovation, 17(2), pp. 244-260. ISSN 1471-4175
Hester, W T; Kuprenas, J A and Thomas, H R (1987) Arbitration: A look at its form and performance. Journal of Construction Engineering and Management, 113(3), pp. 353-367. ISSN 0733-9364
Hudson, D N (1997) Benchmarking construction project execution. PhD thesis, University of Texas at Austin, USA.
Jashapara, A (1995) Learning in organizations: A study of the UK construction industry. PhD thesis, Brunel University, UK.
Jørgensen, K and Rasmussen, G M G (2009) Critical events in construction process. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Kululanga, G K and Price, A D F (2005) Measuring quality of writing of construction specifications. Journal of Construction Engineering and Management, 131(8), pp. 859-865. ISSN 0733-9364
Lai, L W C (2000) The Coasian market-firm dichotomy and subcontracting in the construction industry. Construction Management and Economics, 18(3), pp. 355-362. ISSN 01446193
Lane, P M M (2009) The nature of claims: managing the risks. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 185-190. ISSN 17514312
Laufer, A; Tucker, R L; Shapira, A and Shenhar, A J (1994) The multiplicity concept in construction project planning. Construction Management and Economics, 12(1), pp. 53-65. ISSN 01446193
Lin, Y H; Huang, Z and Gao, Y (2025) Mediating role of relational capital in the influence of organizational culture on international project performance for construction enterprises. Engineering, Construction and Architectural Management, 32(10), pp. 6787-6813. ISSN 0969-9988
Lin, S (2022) Risk analysis and management for excavation engineering via multi-criteria decision making modeling. PhD thesis, National University of Singapore, Singapore.
Loosemore, M (1998) The methodological challenges posed by the confrontational nature of the construction industry. Engineering, Construction and Architectural Management, 5(3), pp. 285-293. ISSN 0969-9988
McCabe, S (1997) Using suitable tools for researching what quality managers in construction organizations actually do. Journal of Construction Procurement, 3(2), pp. 72-87. ISSN 1358-9180
Meiling, J and Johnsson, H (2008) Feedback in industrialised housing: Why does it not happen? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Muya, M; Price, A D F and Thorpe, A (1998) Supplier evaluation of logistics factors and their contribution to improved customer service. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Opoku, A (2025) A new era of transformation for "construction economics and building". Construction Economics and Building, 25(1), pp. 1-3. ISSN 2204-9029
O’connor, J T and Caraway, P H (1993) Need for specification format that accommodates engineered projects. Journal of Construction Engineering and Management, 119(4), pp. 757-768. ISSN 0733-9364
Perry, H A (1965) A study of the procedures for training in the manual skills at a time of technical change in the contemporary construction industry of the United States, with some comparative reference to that of Great Britain. PhD thesis, University of London, London School of Economics, UK.
Rajagopalan, K S (1988) Supports for traveling cranes: Case history. Journal of Construction Engineering and Management, 114(1), pp. 114-120. ISSN 0733-9364
Ringwald, R C (1985) Formwork design. Journal of Construction Engineering and Management, 111(4), pp. 391-403. ISSN 0733-9364
Shields, B A (2018) Parallel machine replacement: an analysis in construction industry with considerations of horizon uncertainty, multi-purpose machines and transportation. PhD thesis, University of Tennessee, USA.
Smyth, H (1983) The historical growth of property companies and the construction industry in Britain between 1939 and 1979. PhD thesis, University of Bristol, UK.
Stipanowich, T J (1997) At the cutting edge: Conflict avoidance and resolution in the US construction industry. Construction Management and Economics, 15(6), pp. 505-512. ISSN 01446193
Thabet, W Y and Beliveau, Y J (1994) HVLS: Horizontal and vertical logic scheduling for multistory projects. Journal of Construction Engineering and Management, 120(4), pp. 875-892. ISSN 0733-9364
Tucker, R L (1988) Perfection of the buggy whip. Journal of Construction Engineering and Management, 114(2), pp. 157-171. ISSN 0733-9364
Uher, T E (1991) Risks in subcontracting: Subcontract conditions. Construction Management and Economics, 9(6), pp. 495-508. ISSN 01446193
Wall, C J and Fellows, R (2010) The dispute resolution adviser (dra) system in Hong Kong. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(4), pp. 179-184. ISSN 17514312
Wang, H; Guo, T and Sun, H (2020) Bond–slip constitutive relation of mortar anchor under different loading rates. Journal of Engineering, Design and Technology, 18(4), pp. 761-772. ISSN 1726-0531
Up a level