Items with Descriptive Scope: 2 PC

Number of items: 3190.

Aalami, F B (1998) Using construction method models to generate four-dimensional production models. PhD thesis, Stanford University, USA.

Abad, F and Naeni, L M (2020) A hybrid framework to assess the risk of change in construction projects using fuzzy fault tree and fuzzy event tree analysis. International Journal of Construction Management, 22(12), pp. 2385-2397. ISSN 1562-3599

Abbasianjahromi, H; Shadhy, V P and Beykian, A (2021) Developing a smart helmet based on the internet of things to manage hearing problems in the construction projects. Journal of Construction in Developing Countries, 26(2), pp. 231-250. ISSN 1823-6499

Abd El-Razek, M E and Basha, I M (2001) Constructability improvement of bridges using stepping formwork. Journal of Construction Engineering and Management, 127(3), pp. 206-213. ISSN 0733-9364

Abdalla-Salem, S B (2009) Computer-aided planning and building process. PhD thesis, Technische Universitaet Berlin, Germany.

Abdallah, E T; Allen, R C; Asbaugh, B W; Berrio, M M; Berg, A; Chin, R M; Delfs, E; Earley, J D; Evans, L D; Frair, P B; Howard, H P; Knowlton, J S; Manzi, J E; Mattis, L W; Miklitsch, F J; Myers, R W; O’connor, J; Sarraf, F Y; Sprouse, J R; Thompson, L J; Treadwell, E F; Turner, J F; White, A E; Wiese, J L; Allison, W A; Fisk, E R; Goldbloom, J; Jones, E; Litvin, J and Paulson, B (1987) Specification engineer: Job descriptions. Journal of Construction Engineering and Management, 113(2), pp. 179-181. ISSN 0733-9364

Abdel Aziz, A M (2007) Successful delivery of public-private partnerships for infrastructure development. Journal of Construction Engineering and Management, 133(12), pp. 918-931. ISSN 0733-9364

Abdel-Fattah, A (2013) Dynamic site layout planning model. PhD thesis, University of Calgary, Canada.

Abdel-Monem, M and Hegazy, T (2013) Enhancing construction as-built documentation using interactive voice response. Journal of Construction Engineering and Management, 139(7), pp. 895-898. ISSN 0733-9364

Abdel-Razek, R H (1987) Computerised analyses of estimating inaccuracy and tender variability: causes, evaluation and consequences. PhD thesis, Loughborough University, UK.

Abdel-Razek, R H (1997) How construction managers would like their performance to be evaluated. Journal of Construction Engineering and Management, 123(3), pp. 208-213. ISSN 0733-9364

AbdelRazig, Y A and Chang, L M (2000) Intelligent model for constructed facilities surface assessment. Journal of Construction Engineering and Management, 126(6), pp. 422-432. ISSN 0733-9364

Abdelhamid, T S and Everett, J G (1999) Physiological demands of concrete slab placing and finishing work. Journal of Construction Engineering and Management, 125(1), pp. 47-52. ISSN 0733-9364

Abdelmohsen, A Z and El-Rayes, K (2016) Optimal trade-offs between construction cost and traffic delay for highway work zones. Journal of Construction Engineering and Management, 142(7): 5016004, ISSN 0733-9364

Abdul Rahman, A R B (2018) Teaching non-technological skills for successful building information modeling (BIM) projects. PhD thesis, Arizona State University, USA.

Abdul Shukor, S (2013) A geometrical-based approach to recognise structure of complex interiors. PhD thesis, University of Warwick, UK.

Abdul-Aziz, A R (1994) Global strategies: A comparison between Japanese and American construction firms. Construction Management and Economics, 12(6), pp. 473-484. ISSN 01446193

Abdul-Aziz, A R and Cha, S Y (2010) Patterns of mergers and acquisitions (M&As) of cross-border contractors from selected countries. International Journal of Construction Management, 10(4), pp. 1-21. ISSN 1562-3599

Abdul-Aziz, A R and Wong, S S (2009) Locational factors and foreign market-entry considerations for Malaysian contractors. Construction Economics and Building, 9(1), pp. 27-36. ISSN 2204-9029

Abeid, J and Arditi, D (2002) Time-lapse digital photography applied to project management. Journal of Construction Engineering and Management, 128(6), pp. 530-535. ISSN 0733-9364

Abeysekera, V and Shelke, M (2018) Construction as biological cells: An exploratory study. International Journal of Construction Management, 18(4), pp. 276-292. ISSN 1562-3599

Abeysinghe, G and Urand, D (1999) Why use enactable models of construction processes? Journal of Construction Engineering and Management, 125(6), pp. 437-447. ISSN 0733-9364

Abeytunga, P K (1978) The role of the first line supervisor in construction safety: the potential for training. PhD thesis, Aston University, UK.

Abourizk, S; Knowles, P and Hermann, U R (2001) Estimating labor production rates for industrial construction activities. Journal of Construction Engineering and Management, 127(6), pp. 502-511. ISSN 0733-9364

Abourizk, S and Shi, J (1994) Automated construction-simulation optimization. Journal of Construction Engineering and Management, 120(2), pp. 374-385. ISSN 0733-9364

Abourizk, S M and Halpin, D W (1992) Statistical properties of construction duration data. Journal of Construction Engineering and Management, 118(3), pp. 525-544. ISSN 0733-9364

Abraham, D (2011) Development of a true-cost concept for renewal of municipal underground pipeline systems. PhD thesis, University of Texas at Arlington, USA.

Abraham, D M and Dickinson, R J (1998) Disposal costs for environmentally regulated facilities: LCC approach. Journal of Construction Engineering and Management, 124(2), pp. 146-154. ISSN 0733-9364

Abraham, D M and Joanne Yeh, M H (1999) Breakwater construction: An effective method for industrial waste utilization. Engineering, Construction and Architectural Management, 6(2), pp. 145-154. ISSN 0969-9988

Abu Dabous, S; Ibrahim, F and Alzghoul, A (2025) Modelling bridge deterioration using long short-term memory neural networks: A deep learning-based approach. Smart and Sustainable Built Environment, 14(5), pp. 1632-1655. ISSN 2046-6099

Abu Hammad, A A (2003) A decision support system for manufactured housing production process planning and facility layout. PhD thesis, University of Cincinnati, USA.

Abu Samra, S; Ahmed, M; Hammad, A and Zayed, T (2018) Multiobjective framework for managing municipal integrated infrastructure. Journal of Construction Engineering and Management, 144(1): 04017091, ISSN 0733-9364

Abu-Hijleh, S F and Ibbs, C W (1989) Schedule-based construction incentives. Journal of Construction Engineering and Management, 115(3), pp. 430-443. ISSN 0733-9364

Abuharris, A and Ruddock, L (2005) Land-use planning and sustainable tourism development in Libya. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Abuwarda, Z and Hegazy, T (2016) Flexible activity relations to support optimum schedule acceleration. Journal of Construction Engineering and Management, 142(11): 06016004, ISSN 0733-9364

Abuwarda, Z; Mostafa, K; Morita, P and Hegazy, T (2024) Optimizing construction work-rest schedules and worker reassignment utilizing wristband physiological data. Journal of Construction Engineering and Management, 150(11): 04024149, ISSN 0733-9364

Acharya, P; Sharma, K; Pokharel, G R and Adhikari, R (2022) Reviewing the progress of reconstruction five years after the 2015 gorkha earthquake, Nepal. Building Research & Information, 50(6), pp. 595-609. ISSN 0961-3218

Adam, A; Josephson, P-E B and Lindahl, G (2017) Aggregation of factors causing cost overruns and time delays in large public construction projects: Trends and implications. Engineering, Construction and Architectural Management, 24(3), pp. 393-406. ISSN 0969-9988

Adams, C D (1995) Procurement of microtunnelling projects. PhD thesis, University of Manchester, UK.

Adams, D and Hastings, E M (2000) Making urban renewal pay: The Hong Kong experience. Journal of Financial Management of Property and Construction, 5(1-2), pp. 79-84. ISSN 1366-4387

Adamu, N; Zubairu, I K; Ibrahim, Y M and Ibrahim, A M (2011) Evaluating the impact of product diversification on financial performance of selected Nigerian construction firms. Journal of Construction in Developing Countries, 16(2), pp. 91-114. ISSN 1823-6499

Addis, B and Al-Ghamdi, M (1998) The role of technical marketing in effective utilization of quality management in consulting engineering firms. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Addis, M (2014) Tacit and explicit knowledge in construction management. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Addis, M (2016) Tacit and explicit knowledge in construction management. Construction Management and Economics, 34(7-8), pp. 439-445. ISSN 01446193

Ade, R and Rehm, M (2020) Reaching for the stars: Green construction cost premiums for homestar certification. Construction Management and Economics, 38(6), pp. 570-580. ISSN 01446193

Ade, R and Rehm, M (2022) A summertime thermal analysis of New Zealand homestar certified apartments for older people. Building Research & Information, 50(6), pp. 681-693. ISSN 0961-3218

Ade, R; Rehm, M and Vishnupriya, V (2024) A wintertime thermal analysis of New Zealand Homestar certified apartments for older people. Building Research & Information, 52(6), pp. 680-692. ISSN 0961-3218

Adeli, H and Karim, A (1997) Scheduling/cost optimization and neural dynamics model for construction. Journal of Construction Engineering and Management, 123(4), pp. 450-458. ISSN 0733-9364

Adeli, H and Wu, M (1998) Regularization neural network for construction cost estimation. Journal of Construction Engineering and Management, 124(1), pp. 18-23. ISSN 0733-9364

Adetola, A E (2014) A conceptual collaborative engagement framework for road infrastructure management in Nigeria. PhD thesis, University of Central Lancashire, UK.

Adighibe, Charles Nnason (2015) Public private partnership infrastructure delivery: Benefits and costs for society. PhD thesis, Queensland University of Technology, Australia.

Adjei-Kumi, T (1997) The development of an intelligent system for visual simulation of construction projects. PhD thesis, University of Strathclyde, UK.

Adukpo, S E and Leiringer, R (2016) Client project governance capabilities: Unpacking the concept and governance mechanisms in practice. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Affonso, E O T; Branco, R R; Guedes, A L A; Chinelli, C K; Tam, V W Y; Haddad, A N and Soares, C A P (2025) Framework for assessing the smart buildings intelligence degree. International Journal of Construction Management, 25(10), pp. 1154-1176. ISSN 1562-3599

Aflatooni, Mehran (2015) Synthetic rating system for railway bridge management. PhD thesis, Queensland University of Technology, Australia.

Afroz, R (2020) Developing a low-carbon architecture pedagogy in Bangladesh. Buildings & Cities, 1(1), pp. 637-649. ISSN 2632-6655

Aguilar, A J; de la Hoz-Torres, M L; Oltra-Nieto, L; Ruiz, D P and Martínez-Aires, M D (2022) Impact of COVID-19 protocols on IEQ and students' perception within educational buildings in southern Spain. Building Research & Information, 50(7), pp. 755-770. ISSN 0961-3218

Ahmadi, M; Ahmadi, A and Yousefi, S (2025) Human behavior and decision-making in earthquake emergencies: Insights from virtual reality and serious games. International Journal of Construction Management, 25(11), pp. 1254-1272. ISSN 1562-3599

Ahmadi, S Y; Lather, J I; Wittich, C E and Madson, K (2025) Current and future trends for resilient inland waterway transportation systems during flood disruptions. Journal of Construction Engineering and Management, 151(6): 04025046, ISSN 0733-9364

Ahmed, A and Gidado, K (2008) Evaluating the potential of renewable energy technologies for buildings in Nigeria. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Ahmed, H I (2023) Behavior of magnetic self-compacting polypropylene fiber-reinforced concrete. Journal of Construction Engineering and Management, 149(3): 04022179, ISSN 0733-9364

Ahmed, H I (2023) Mechanical behavior, microstructure, and chloride-penetration resistance of glass waste nanopowder magnetic concrete. Journal of Construction Engineering and Management, 149(1): 04022152, ISSN 0733-9364

Ahmed, M O; Khalef, R; Ali, G G and El-Adaway, I H (2021) Evaluating deterioration of tunnels using computational machine learning algorithms. Journal of Construction Engineering and Management, 147(10): 04021125, ISSN 0733-9364

Ahrari, A (2012) A decision support system for dynamic integrated project scheduling and equipment operation planning. PhD thesis, University of Maryland, College Park, USA.

Ahrentzen, S and Tural, E (2015) The role of building design and interiors in ageing actively at home. Building Research & Information, 43(5), pp. 582-601. ISSN 0961-3218

Ahuja, H N and Arunachalam, V (1984) Risk evaluation in resource allocation. Journal of Construction Engineering and Management, 110(3), pp. 324-336. ISSN 0733-9364

Ahuja, H N and Nandakumar, V (1985) Simulation model to forecast project completion time. Journal of Construction Engineering and Management, 111(4), pp. 325-342. ISSN 0733-9364

Aikivuori, A (1996) Periods and demand for private sector housing refurbishment. Construction Management and Economics, 14(1), pp. 3-12. ISSN 01446193

Aivaliotis, V; Giannakopoulou, Y; Gratsiou, M and Panagiotakopoulos, D (1991) Economies of scale and strategic planning for municipal waste treatment plants in Greece. Construction Management and Economics, 9(6), pp. 553-564. ISSN 01446193

Aje, O I; Olatunji, O A and Olalusi, O A (2017) Overrun causations under advance payment regimes. Built Environment Project and Asset Management, 7(1), pp. 86-98. ISSN 2044-124X

Ajelabi, I K (2013) Product based project portfolio and information sharing. PhD thesis, University of Reading, UK.

Akin, F D; Damci, A and Arditi, D (2024) Optimum finance-based scheduling. Journal of Construction Engineering and Management, 150(9): 04024104, ISSN 0733-9364

Akin, F D; Polat, G; Turkoglu, H and Damci, A (2021) A crashing-based time-cost trade-off model considering quality cost and contract clauses. International Journal of Construction Management, 23(6), pp. 954-963. ISSN 1562-3599

Akin, S; Eghbali, A; Nwagwu, C and Hertwich, E (2025) Western Asian and Northern African residential building stocks: archetype analysis. Buildings & Cities, 6(1), pp. 219-238. ISSN 2632-6655

Akinlolu, M; Haupt, T C; Edwards, D J and Simpeh, F (2022) A bibliometric review of the status and emerging research trends in construction safety management technologies. International Journal of Construction Management, 22(14), pp. 2699-2711. ISSN 1562-3599

Akintoye, A (1995) Just-in-time application and implementation for building material management. Construction Management and Economics, 13(2), pp. 105-113. ISSN 01446193

Akintoye, A and Skitmore, M (1991) Profitability of UK construction contractors. Construction Management and Economics, 9(4), pp. 311-325. ISSN 01446193

Akturk, B and Cakmak, P (2025) Digital twins for enhanced construction project management. Smart and Sustainable Built Environment, 14(7), pp. 2176-2200. ISSN 2046-6099

Akyol, B and Resatoglu, R (2019) Investigating the effect of solid and lightweight hollow block slabs on construction cost. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(2), pp. 70-79. ISSN 17514304

Al Haj, R A and El-Sayegh, S M (2015) Time-cost optimization model considering float-consumption impact. Journal of Construction Engineering and Management, 141(5): 04015001, ISSN 0733-9364

Al Jassmi, H; Al Ahmad, M and Ahmed, S (2021) Automatic recognition of labor activity: A machine learning approach to capture activity physiological patterns using wearable sensors. Construction Innovation, 21(4), pp. 555-575. ISSN 1471-4175

Al-Balushi, R A; Fortune, C and Kaka, A (2005) The implementation of corporate strategies through the use of an enterprise project management model (epmm): The case of telecommunication operator. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Al-Fares, M A (1995) On the development of an integrated system for the automation of on-site reinforced concrete construction. PhD thesis, University of Wisconsin - Madison, USA.

Al-Gahtani, K; Alsulaihi, I; Ali, M and Marzouk, M (2017) Production of green concrete using recycled waste aggregate and byproducts. Built Environment Project and Asset Management, 7(4), pp. 413-425. ISSN 2044-124X

Al-Gahtani, K S (2009) Float allocation using the total risk approach. Journal of Construction Engineering and Management, 135(2), pp. 88-95. ISSN 0733-9364

Al-Ghassani, A M; Kamara, J M; Anumba, C J and Carrillo, P M (2004) An innovative approach to identifying knowledge management problems. Engineering, Construction and Architectural Management, 11(5), pp. 349-357. ISSN 0969-9988

Al-Hajj, A and Horner, M W (1998) Modelling the running costs of buildings. Construction Management and Economics, 16(4), pp. 459-470. ISSN 01446193

Al-Hajj, A N (1991) Simple cost-significant models for total life-cycle costing in buildings. PhD thesis, University of Dundee, UK.

Al-Hussein, M; Alkass, S and Moselhi, O (2001) An algorithm for mobile crane selection and location on construction sites. Construction Innovation, 1(2), pp. 91-105. ISSN 1471-4175

Al-Janabi, A and Al-Khatri, H (2025) Thermal and economic impact of geothermal passive cooling for eco-house applications in the maritime desert climate. Building Research & Information, 53(1-2), pp. 220-241. ISSN 0961-3218

Al-Jibouri, S H and Mawdesley, M J (2001) Design and experience with a computer game for teaching construction project planning and control. Engineering, Construction and Architectural Management, 8(5-6), pp. 418-427. ISSN 0969-9988

Al-Joma, M and Mangin, J C (2004) A scheduling model for repetitive activities. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Al-Khaiat, H and Fereig, S M (1996) The role of precast concrete systems in Kuwaiti housing projects. Building Research & Information, 24(6), pp. 374-378. ISSN 0961-3218

Al-Maiyah, S; Brett Martinson, D and Elkadi, H (2024) Evaluation of the indoor environment in a historic museum during the COVID-19 lockdown in Northwest England. Building Research & Information, 52(7), pp. 748-764. ISSN 0961-3218

Al-Meshekeh, H S (2001) The effect of conflict management upon project effectiveness. Journal of Construction Procurement, 7(2), pp. 15-30. ISSN 1358-9180

Al-Otaibi, N T N H (1995) A knowledge-based systems approach to materials management for large construction projects. PhD thesis, University of Toronto, Canada.

Al-Qawasmi, J (2019) Examining indicators coverage in a sample of sustainable building assessment systems. Architectural Engineering and Design Management, 15(2), pp. 101-120. ISSN 1745-2007

Al-Remal, A M (2013) Risk-based design of structures for fire. PhD thesis, University of Edinburgh, UK.

Al-Sharif, F F A (2007) Financial model for private finance initiative projects applied to school buildings. PhD thesis, Heriot-Watt University, UK.

Al-Sobiei, O S (2001) Assessment of risk allocation in construction projects. PhD thesis, Illinois Institute of Technology, USA.

Al-Subaihawi, S W (2023) Real-time hybrid simulation of complex structural systems subjected to multi-natural hazards. PhD thesis, Lehigh University, USA.

Al-Sudairi, A A and Al-Motairi, M S (2010) Multi objective land use allocation model using priority-based goal programming technique. Construction Management and Economics, 28(2), pp. 151-161. ISSN 1466433X

Al-Yami, A M and Price, A D F (2006) A framework for implementing sustainable construction in building briefing project. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Alajmi, A M R F (2009) The delivery of value for money in public sector projects in Qatar. PhD thesis, University of Leeds, UK.

Alani, Y (2023) A semantic framework for the life cycle of water assets data exchange. PhD thesis, Teesside University, UK.

Alaqad, M; Gidado, K and Piroozfar, P (2015) Integrating value, risk and environmental management at the strategic definition stage. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Alaux, N; Kulmer, V; Vogel, J and Passer, A (2025) Preserving buildings: Emission reductions from circular economy strategies in Austria. Buildings & Cities, 6(1), pp. 881-898. ISSN 2632-6655

Alavipour, S M (2017) Project scheduling using optimized financing. PhD thesis, Illinois Institute of Technology, USA.

Alavipour, S M R and Arditi, D (2018) Optimizing financing cost in construction projects with fixed project duration. Journal of Construction Engineering and Management, 144(4): 04018012, ISSN 0733-9364

Albadra, D; Elamin, Z; Adeyeye, K; Polychronaki, E; Coley, D A; Holley, J and Copping, A (2021) Participatory design in refugee camps: Comparison of different methods and visualization tools. Building Research & Information, 49(2), pp. 248-264. ISSN 0961-3218

Albayyaa, H; Hagare, D and Saha, S (2021) Energy conservation assessment of traditional and modern houses in sydney. Building Research & Information, 49(6), pp. 613-623. ISSN 0961-3218

Algarni, S K (2022) Machine learning for improved detection and segmentation of building boundary. PhD thesis, Cardiff University, UK.

Alharthi, A; Soetanto, R and Edum-Fotwe, F (2014) The changing role of the public client in construction procurement. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Alhozaimy, A M and Al-Negheimish, A I (1999) Introducing and managing quality scheme for rmc industry in Saudi Arabia. Journal of Construction Engineering and Management, 125(4), pp. 249-255. ISSN 0733-9364

Ali, A H; Zayed, T; Abdulai, S F and Wang, R D (2025) A comprehensive framework for examining the influence of tower crane safe operations on sustainable practices in modular integrated construction. Engineering, Construction and Architectural Management, 32(11), pp. 7776-7803. ISSN 0969-9988

Ali, G M; Kosa, J; Bouferguene, A and Al-Hussein, M (2021) Competitive assessment of ice and frozen silt mat for crane ground support using finite-element analysis. Journal of Construction Engineering and Management, 147(6): 04021038, ISSN 0733-9364

Ali, K N (2004) Towards an online knowledge management system for reactive maintenance projects. PhD thesis, University of Salford, UK.

Ali, M M and Elazouni, A (2009) Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities. Construction Management and Economics, 27(9), pp. 839-856. ISSN 1466433X

Alikhani, H and Latifi, M (2024) Evaluation of the healing performance of hot-mix asphalt containing waste steel shavings under different microwave induction healing cycles. Journal of Construction Engineering and Management, 150(1): 04023153, ISSN 0733-9364

Alim, S (1985) Fuzzy expert systems in civil engineering. PhD thesis, Imperial College London, UK.

Alim, S and Polak, J (2016) Public-private partnerships for future urban infrastructure. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 150-158. ISSN 17514304

Aljarbou, M H (2022) A new sustainable public-private partnership (PPP) procurement system for infrastructure projects in the Kingdom of Saudi Arabia. PhD thesis, University of Bristol, UK.

Alkasisbeh, M R (2018) An integrated decision support framework for life-cycle building asset management. PhD thesis, Western Michigan University, USA.

Alkass, S; Arouian, A and Moselhi, O (1993) Computer-aided equipment selection for transporting and placing concrete. Journal of Construction Engineering and Management, 119(3), pp. 445-465. ISSN 0733-9364

Alkass, S and Harris, F (1988) Expert system for earthmoving equipment selection in road construction. Journal of Construction Engineering and Management, 114(3), pp. 426-440. ISSN 0733-9364

Alkhadim, M (2019) Risk management: the effect of perceived safety on users behaviour in crowded large space buildings. PhD thesis, University of Brighton, UK.

Alkhard, A (2024) Leveraging digital asset management and meta-data integration for enhanced asset management. Construction Economics and Building, 24(3), pp. 76-94. ISSN 2204-9029

Alkhateeb, A M; Hyari, K H and Hiyassat, M A (2021) Analyzing bidding competitiveness and success rate of contractors competing for public construction projects. Construction Innovation, 21(4), pp. 576-591. ISSN 1471-4175

Alkriz, K and Mangin, J C (2005) A new model for optimizing the location of cranes and construction facilities using genetic algorithms. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Allen, D; Hartley, R; Whitehead, P; Smith, M; Dickinson, I and Gorse, C (2010) The potential for using interactive scenarios in the teaching and learning of health and safety. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Alloh, B O (2014) The application of planning law for environmental protection and improvement in Nigeria. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Allport, R J and Anderson, R J (2011) Managing strategic risk: the worldwide experience of metros. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(4), pp. 173-180. ISSN 17514304

Almasoud, A S (1996) A simulation model for repetitive project scheduling. PhD thesis, University of Colorado at Boulder, USA.

Almeida, N; Sousa, V; Alves Dias, L and Branco, F (2010) A framework for combining risk-management and performance-based building approaches. Building Research & Information, 38(2), pp. 157-174. ISSN 0961-3218

Almås, A J and Hygen, H O (2012) Impacts of sea level rise towards 2100 on buildings in Norway. Building Research & Information, 40(3), pp. 245-259. ISSN 0961-3218

Alotaibi, A (2019) A framework for implementing social responsibility in mega-projects in Saudi Arabia. PhD thesis, Loughborough University, UK.

Alsafouri, S (2017) Information technology and human factors to enhance design and constructability review processes in construction. PhD thesis, Arizona State University, USA.

Alshawi, M; Engström, S and Hedgren, E (2012) Sustaining inertia? Construction clients' decision-making and information-processing approach to industrialized building innovations. Construction Innovation, 12(4), pp. 393-413. ISSN 1471-4175

Alshawi, M and Faraj, I (2002) Integrated construction environments: Technology and implementation. Construction Innovation, 2(1), pp. 33-51. ISSN 1471-4175

Alshawi, M and Underwood, J (1996) Improving the constructability of design solutions through an integrated system. Engineering, Construction and Architectural Management, 3(1-2), pp. 47-67. ISSN 0969-9988

Alshboul, O and Shehadeh, A (2026) Adaptive integration of BIM and Navisworks for real-time clash detection using the XGBoost algorithm. Journal of Construction Engineering and Management, 152(1): 04025232, ISSN 0733-9364

Alshboul, O; Shehadeh, A and Hamedat, O (2023) Development of integrated asset management model for highway facilities based on risk evaluation. International Journal of Construction Management, 23(8), pp. 1355-1364. ISSN 1562-3599

Alsugair, A M (1992) An intelligent resource allocation system. PhD thesis, Texas A&M University, USA.

Altomonte, S (2005) CH2: lighting and physiology. Construction Economics and Building, 5(2), pp. 40-46. ISSN 2204-9029

Altuglu, V (2005) Essays on infrastructure development subsidization by product firms. PhD thesis, Columbia University, USA.

Altun, M (2024) Data-driven and knowledge-assisted model-based frameworks for supporting facility maintenance. PhD thesis, Middle East Technical University, Turkey.

Altuwaim, A and El-Rayes, K (2018) Optimizing the scheduling of repetitive construction to minimize interruption cost. Journal of Construction Engineering and Management, 144(7): 4018051, ISSN 0733-9364

Altuwaim, A and El-Rayes, K (2021) Multiobjective optimization model for planning repetitive construction projects. Journal of Construction Engineering and Management, 147(7): 04021072, ISSN 0733-9364

Altuwaim, A A (2018) Optimal scheduling and resource utilization for repetitive construction projects. PhD thesis, University of Illinois, USA.

Alvanchi, A; Lee, S and Abourizk, S (2012) Dynamics of working hours in construction. Journal of Construction Engineering and Management, 138(1), pp. 66-77. ISSN 0733-9364

Alves, N M F and Bártolo, P J S (2002) Reversing design through computer vision. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Alwasel, A; Abdel-Rahman, E M; Haas, C T and Lee, S (2017) Experience, productivity, and musculoskeletal injury among masonry workers. Journal of Construction Engineering and Management, 143(6): 05017003, ISSN 0733-9364

Alzaben, A A (2016) Under the shadow of sharia law: the implementation of Government Procurement Agreement provisions by Saudi Arabian government tenders and procurement law. PhD thesis, University of Hull, UK.

Alzraiee, H (2022) Cost estimate system using structured query language in BIM. International Journal of Construction Management, 22(14), pp. 2731-2743. ISSN 1562-3599

Amadi, C; Carrillo, P and Tuuli, M (2014) Stakeholder management in public private partnership projects in Nigeria: Towards a research agenda. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Amarkhil, Q; Elwakil, E; Hubbard, B and Byrd, V L (2023) A framework to standardize causes of construction delay. International Journal of Construction Management, 23(11), pp. 1791-1804. ISSN 1562-3599

Amin, S (2020) A study of risk cognition archetypes of professionals in multi-disciplinary construction consultancies. PhD thesis, Loughborough University, UK.

Amirkhanian, S N and Baker, N J (1992) Expert system for equipment selection for earth-moving operations. Journal of Construction Engineering and Management, 118(2), pp. 318-331. ISSN 0733-9364

Ammar, Ashtarout (2023) Digital twins for ancillary transportation asset data management. PhD thesis, University of Kentucky, USA.

Ammar, M A (2003) Float analysis of non-serial repetitive activities. Construction Management and Economics, 21(5), pp. 535-542. ISSN 01446193

Ammar, M A (2011) Optimization of project time-cost trade-off problem with discounted cash flows. Journal of Construction Engineering and Management, 137(1), pp. 65-71. ISSN 0733-9364

Ammar, M A (2013) LOB and CPM integrated method for scheduling repetitive projects. Journal of Construction Engineering and Management, 139(1), pp. 44-50. ISSN 0733-9364

Ammar, M A (2020) Efficient modeling of time-cost trade-off problem by eliminating redundant paths. International Journal of Construction Management, 20(7), pp. 812-821. ISSN 1562-3599

Ammar, M A and Mohieldin, Y A (2002) Resource constrained project scheduling using simulation. Construction Management and Economics, 20(4), pp. 323-330. ISSN 01446193

Amoatey, C and Hayibor, M V K (2017) Critical success factors for local government project stakeholder management. Built Environment Project and Asset Management, 7(2), pp. 143-156. ISSN 2044-124X

Amod, S; Wall, K and Rust, C (2012) SAICE's report cards on the state of infrastructure. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(2), pp. 119-127. ISSN 17514312

Anastasopoulos, P C; Haddock, J E and Peeta, S (2014) Cost overrun in public-private partnerships: Toward sustainable highway maintenance and rehabilitation. Journal of Construction Engineering and Management, 140(6): 4014018, ISSN 0733-9364

Andam, K A (1979) Computer aided design of precast concrete industrial buildings. PhD thesis, University of Newcastle upon Tyne, UK.

Anderies, J M (2014) Embedding built environments in social-ecological systems: Resilience-based design principles. Building Research & Information, 42(2), pp. 130-142. ISSN 0961-3218

Andersen, C E; Kanafani, K; Zimmermann, R K; Rasmussen, F N and Birgisdóttir, H (2020) Comparison of GHG emissions from circular and conventional building components. Buildings & Cities, 1(1), pp. 379-392. ISSN 2632-6655

Anderson, A; Dossick, C S and Osburn, L (2020) Curriculum to prepare AEC students for BIM-enabled globally distributed projects. International Journal of Construction Education and Research, 16(4), pp. 270-289. ISSN 1557-8771

Anderson, A K (2015) Visualization, communication, and copresence: Using building information models in virtual worlds. PhD thesis, University of Washington, USA.

Anderson, B (2023) A residential emissions-based carbon levy: City and neighbourhood consequences. Buildings & Cities, 4(1), pp. 545-564. ISSN 2632-6655

Andreas, H; Dorée, A and Martin, L (2010) A constructivist approach for teaching research methodology in construction management. International Journal of Construction Education and Research, 6(4), pp. 253-270. ISSN 1557-8771

Anh Tuan, B L; Tesfamariam, M G; Chen, Y Y; Hwang, C L; Lin, K L and Young, M P (2014) Production of lightweight aggregate from sewage sludge and reservoir sediment for high-flowing concrete. Journal of Construction Engineering and Management, 140(5): 04014005, ISSN 0733-9364

Anisuddin, S and Khaleeq, S (2005) Deterioration and rehabilitation of concrete structures in hot and arid regions. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Anjaneyappa, V; Amarnath, M S and Srinivasamurthy, B R (2014) Compacting characteristics of light compacting equipment. Journal of Construction Engineering and Management, 140(5): 04014003, ISSN 0733-9364

Anson, M and Wang, S Q (1998) Performance of concrete placing in Hong Kong buildings. Journal of Construction Engineering and Management, 124(2), pp. 116-124. ISSN 0733-9364

Antoni, A; Yonathan, A; Suryo, H E; Felio, C; Ghozali, K E and Hardjito, D (2021) Exploring the potential of low cement concrete through a student concrete competition. International Journal of Construction Education and Research, 17(1), pp. 37-51. ISSN 1557-8771

Antoniadis, D N; Edum-Fotwe, F T; Thorpe, A and McCaffer, R (2009) Complexity effect of project team member selection practices in construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Antoniou, F; Konstantinidis, D; Aretoulis, G and Xenidis, Y (2018) Preliminary construction cost estimates for motorway underpass bridges. International Journal of Construction Management, 18(4), pp. 321-330. ISSN 1562-3599

Antunes, R; González, V A; Walsh, K; Rojas, O; O'Sullivan, M and Odeh, I (2018) Benchmarking project-driven production in construction using productivity function: Capacity and cycle time. Journal of Construction Engineering and Management, 144(3): 04017118, ISSN 0733-9364

Antwi-Afari, M F; Li, H; Edwards, D J; Pärn, E A; Seo, J and Wong, A (2017) Effects of different weights and lifting postures on balance control following repetitive lifting tasks in construction workers. International Journal of Building Pathology and Adaptation, 35(3), pp. 247-263.

Antwi-Afari, M F; Li, H; Umer, W; Yu, Y and Xing, X (2020) Construction activity recognition and ergonomic risk assessment using a wearable insole pressure system. Journal of Construction Engineering and Management, 146(7): 04020077, ISSN 0733-9364

Anumba, C J; Abdullah, A and Ruikar, K (2008) An integrated system for demolition techniques selection. Architectural Engineering and Design Management, 4(2), pp. 130-148. ISSN 1745-2007

Aouad, G F; Hinks, J; Cooper, R; Sheath, D M; Kagioglou, M and Sexton, M (1998) An information technology (IT) map for a generic design and construction process protocol. Journal of Construction Procurement, 4(2), pp. 132-151. ISSN 1358-9180

Aoude, H S (1996) Computerized construction delay management system. PhD thesis, Polytechnic University (New York), USA.

Appau, K A (1994) An integrated model of computer-aided cost estimating/scheduling in construction management. PhD thesis, Georgia Institute of Technology, USA.

Arai, K and Morimoto, E (2021) What is required for recovering from disaster: Theoretical and empirical verification. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Aranda-Mena, G and Gameson, R (2012) An alignment model for the research higher degree supervision process using repertory grids: reflections on application in practice in built environment research. Construction Economics and Building, 12(3), pp. 66-81. ISSN 2204-9029

Arashida, R. and Horita, M. (2026) A data-driven framework for causal modeling of design change propagation in civil infrastructure. Journal of Construction Engineering and Management, 152(10): 04026158, ISSN 0733-9364

Arashpour, M; Heidarpour, A; Akbar Nezhad, A; Hosseinifard, Z; Chileshe, N and Hosseini, R (2020) Performance-based control of variability and tolerance in off-site manufacture and assembly: Optimization of penalty on poor production quality. Construction Management and Economics, 38(6), pp. 502-514. ISSN 01446193

Araujo, Bruno César Pino Oliveira de (2016) Occupational trajectories of young engineers in Brazil. PhD thesis, Universidade de São Paulo, Brazil.

Arbabi, A; Taherkhani, R and Ansari, R (2025) A novel approach for integrating BIM and green building rating systems in the construction projects design phase. Engineering, Construction and Architectural Management, 32(10), pp. 6814-6833. ISSN 0969-9988

Arboleda, C A and Abraham, D M (2004) Fatalities in trenching operations-analysis using models of accident causation. Journal of Construction Engineering and Management, 130(2), pp. 273-280. ISSN 0733-9364

Arciszewski, T (2014) Future of engineering education. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(1), pp. 46-59. ISSN 17514304

Arditi, D; Elhassan, A and Toklu, Y C (2002) Constructability analysis in the design firm. Journal of Construction Engineering and Management, 128(2), pp. 117-126. ISSN 0733-9364

Arditi, D and Gutierrez, A E (1991) Performance of us contractors in foreign markets. Construction Management and Economics, 9(5), pp. 431-449. ISSN 01446193

Arditi, D; Khisty, C J and Yasamis, F (1997) Incentive/disincentive provisions in highway contracts. Journal of Construction Engineering and Management, 123(3), pp. 302-307. ISSN 0733-9364

Arditi, D and Lee, D E (2004) Service quality performance of design/build contractors using quality function deployment. Construction Management and Economics, 22(2), pp. 123-127. ISSN 01446193

Arditi, D and Ongkasuwan, D (2009) Duties and responsibilities of construction managers: Perceptions of parties involved in construction. Journal of Construction Engineering and Management, 135(12), pp. 1370-1374. ISSN 0733-9364

Arditi, D and Pattanakitchamroon, T (2008) Analysis methods in time-based claims. Journal of Construction Engineering and Management, 134(4), pp. 242-252. ISSN 0733-9364

Arditi, D; Tokdemir, O B and Suh, K (2002) Challenges in line-of-balance scheduling. Journal of Construction Engineering and Management, 128(6), pp. 545-556. ISSN 0733-9364

Arimoro, A E (2018) Ensuring a healthy legal and regulatory environment for public-private partnership in Nigeria. PhD thesis, Kingston University, UK.

Aritua, B; Smith, N J and Athiyo, R (2008) Private finance for the delivery of school projects in England. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 141-146. ISSN 17514312

Ariyachandra, M R M F and Brilakis, I (2020) Detection of railway masts in airborne lidar data. Journal of Construction Engineering and Management, 146(9): 04020105, ISSN 0733-9364

Arlani, A G and Rakhra, A S (1988) Building code assessment framework. Construction Management and Economics, 6(2), pp. 117-131. ISSN 01446193

Armitage, P; Godoy-Shimizu, D; Steemers, K and Chenvidyakarn, T (2015) Using display energy certificates to quantify public sector office energy consumption. Building Research & Information, 43(6), pp. 691-709. ISSN 0961-3218

Arnold, J A (2000) Information interoperation for internet-based component engineering analysis. PhD thesis, Stanford University, USA.

Arpaci, E Y G; Akbulut, D E and Yildiz, O (2024) Enhancing water resistance of earthen buildings by using admixture materials. Architectural Engineering and Design Management, 20(2), pp. 320-336. ISSN 1745-2007

Arvanitis, D (2017) Collaboration and contract management in the context of offshore oil and gas contracts: an English law analysis. PhD thesis, City, University of London, UK.

Asadollahfardi, G; Katebi, A; Taherian, P and Panahandeh, A (2021) Environmental life cycle assessment of concrete with different mixed designs. International Journal of Construction Management, 21(7), pp. 665-676. ISSN 1562-3599

Ashley, D B and Bonner, J J (1987) Political risks in international construction. Journal of Construction Engineering and Management, 113(3), pp. 447-467. ISSN 0733-9364

Ashraf, H and Rowlinson, S (2015) The importance of context in conflict management: Explicating the notion of conflict management climate and agenda setting for future research. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Ashteyat, A; Obaidat, A T; Obeidat, Y T and Bani Awwad, A (2025) The behavior of strengthened RC beams under pure torsion using nsm-CFRP rope. International Journal of Building Pathology and Adaptation, 43(6), pp. 1577-1594. ISSN 2398-4708

Asiedu, R O (2017) Using lateritic gravel as all-in aggregate for concrete production. Journal of Engineering, Design and Technology, 15(3), pp. 305-316.

Asif, M (1988) Simple generic models for cost-significant estimating of construction project costs. PhD thesis, University of Dundee, UK.

Asimakopoulou, E; Anumba, C J and Bouchlaghem, N M (2004) Emergency response management: A review of current approaches. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Aslan, M (2021) A model for exploring legitimization strategies used in architectural design competitions. PhD thesis, Izmir Institute of Technology, Turkey.

Aslani, P (2007) Dynamic resource -constrained scheduling. PhD thesis, Polytechnic University, USA.

Assad, A; Moselhi, O and Zayed, T (2021) Resilience-driven sustainability-based rehabilitation planning for water distribution networks. Journal of Construction Engineering and Management, 147(8): 04021079, ISSN 0733-9364

Assaf, G and Assaad, R H (2025) A decision-support system for choosing between traditional and alternative project delivery methods for bundled projects. Engineering, Construction and Architectural Management, 32(11), pp. 7181-7216. ISSN 0969-9988

Assaf, S A; Al-Hammad, A M and Ubaid, A (1996) Factors effecting construction contractors' performance. Building Research & Information, 24(3), pp. 157-163. ISSN 0961-3218

Astaneh Asl, B (2019) Effects of using virtual reality on AEC team collaboration. PhD thesis, University of Washington, USA.

Astrand, R N (2003) Selection model to choose innovative building systems for progressive housing with special reference to metro Manila, Philippines. PhD thesis, McGill University, Canada.

Athanasakis, D (2007) Has multiparty arbitration failed in construction disputes? Legal and practical issues in drafting joinder provisions. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Atkin, B L and Gill, E M (1986) Cad and management of construction projects. Journal of Construction Engineering and Management, 112(4), pp. 557-565. ISSN 0733-9364

Atkinson, J G B (2008) Market influences on low carbon energy designs in buildings. EngD thesis, University of Surrey, UK.

Attia, D A; Maarouf, I; Taha, D and Nassar, D (2020) Detecting failures in conservation practice in relation to cultural significance: The case of heritage buildings in Khartoum. Building Research & Information, 48(2), pp. 124-139. ISSN 0961-3218

Auchterlounie, T (2006) An example of partnering between a North American speculative housebuilder and their subcontractors. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Augenbroe, G; Verheij, H and Schwarzm Ller, G (2002) Project web sites with design management extensions. Engineering, Construction and Architectural Management, 9(3), pp. 259-271. ISSN 0969-9988

Augugliaro, F (2015) Physical interaction, aerial construction, and coordinated flight for flying machines. DSc thesis, ETH Zürich, Switzerland.

Aune, M (2012) Making energy visible in domestic property markets: The influence of advertisements. Building Research & Information, 40(6), pp. 713-723. ISSN 0961-3218

Avci, A B (2026) Machine learning-based prediction of thermal comfort: Exploring building types, climate, ventilation strategies, and seasonal variations. Building Research & Information, 54(1), pp. 100-117. ISSN 0961-3218

Awil, A U; Rashid, A and Aziz, A (2002) International markets: Malaysian construction contractors and the stage theory. Construction Economics and Building, 2(1), pp. 94-106. ISSN 2204-9029

Aye, L; Bamford, N; Charters, B and Robinson, J (2002) The carbon footprint of a new commercial building. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Aye, L; Charters, W W S; Chiazor, M A and Robinson, J R W (2004) Indoor environment quality and sustainable development for commercial buildings in Australia. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Ayyub, B M and Haidar, A (1985) Decisions in construction operations. Journal of Construction Engineering and Management, 111(4), pp. 343-357. ISSN 0733-9364

Azambuja, M M B (2009) A decision support system for rapid evaluation and selection of engineered equipment suppliers. PhD thesis, University of Texas at Austin, USA.

Azar, E (2014) A comprehensive framework to assess, model, and enhance the human role in conserving energy in commercial buildings. PhD thesis, University of Wisconsin - Madison, USA.

Aziabah Akanvose, A B (2018) Better public housing management in Ghana: An approach to improve maintenance and housing quality. PhD thesis, Delft University of Technology, Netherlands.

Azimzadeh, F (2000) COSTEFF model: A computer-based knowledge source for improving cost effectiveness of engineering and construction projects. DEng thesis, Lamar University - Beaumont, USA.

Azzouz, A and Hill, P (2017) How BIM is assessed using arup's BIM maturity measure? In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Baatz, N (2008) Problem management/dispute resolution in partnering contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 115-120. ISSN 17514312

Baatz, N (2012) The UK Construction Act process plant exclusion. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(4), pp. 205-206. ISSN 17514312

Baba, F; Awad, J; Elkahlout, Y and Sherzad, M (2025) Optimizing cooling setpoint using adaptive thermal comfort concept for school building in desert climates under current and future climates. Smart and Sustainable Built Environment, 14(7), pp. 2048-2068. ISSN 2046-6099

Babalola, A (2023) The role of the private sector in the development of Sub-Sahara Africa: why governance matters. DBA thesis, University of Manchester, UK.

Babatunde, S O and Perera, S (2017) Barriers to bond financing for public-private partnership infrastructure projects in emerging markets: A case of Nigeria. Journal of Financial Management of Property and Construction, 22(1), pp. 2-19. ISSN 1366-4387

Baborska-Narozny, M; Szulgowska-Zgrzywa, M; Mokrzecka, M; Chmielewska, A; Fidorow-Kaprawy, N; Stefanowicz, E; Piechurski, K and Laska, M (2020) Climate justice: Air quality and transitions from solid fuel heating. Buildings & Cities, 1(1), pp. 120-140. ISSN 2632-6655

Bachman, L R (2013) New professionalism: The post-industrial context. Building Research & Information, 41(6), pp. 752-760. ISSN 0961-3218

Backus, T A (1961) A study of construction and maintenance costs in relationship to true economy of school operation. EdD thesis, Florida State University, USA.

Badger, W; Sullivan, K; Wiezel, A and Bopp, P H (2009) Profiling the leadership of project managers. International Journal of Construction Education and Research, 5(2), pp. 121-146. ISSN 1557-8771

Badger, W; Wiezel, A; Bopp, P H and Dunn, S (2010) Leadership transition and growth. International Journal of Construction Education and Research, 6(1), pp. 46-69. ISSN 1557-8771

Baek, F; Sohn, J; Bae, J; Kim, D and Lee, S (2026) Physical, cognitive, and emotional responses and their interrelated effects on human-robot team performance in construction. Journal of Construction Engineering and Management, 152(1): 04025224, ISSN 0733-9364

Baek, M and Ashuri, B (2019) Analysis of the variability of submitted unit price bids for asphalt line items in highway projects. Journal of Construction Engineering and Management, 145(4): 04019020, ISSN 0733-9364

Bai, Y and Amirkhanian, S N (1994) Knowledge-based expert system for concrete mix design. Journal of Construction Engineering and Management, 120(2), pp. 357-373. ISSN 0733-9364

Bai, Y and Burkett, W R (2006) Rapid bridge replacement: Processes, techniques, and needs for improvements. Journal of Construction Engineering and Management, 132(11), pp. 1139-1147. ISSN 0733-9364

Baiden, B K; Price, A D F and Dainty, A R J (2003) Looking beyond processes: Human factors in team integration. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Baird, A (1995) Pioneering the NEC system of documents. Engineering, Construction and Architectural Management, 2(4), pp. 249-269. ISSN 0969-9988

Bajc, T and Kerčov, A (2025) Assessment of students' productivity in context of indoor environmental quality and personal factors. Building Research & Information, 53(5), pp. 620-635. ISSN 0961-3218

Bakens, W (1997) International trends in building and construction research. Journal of Construction Engineering and Management, 123(2), pp. 102-112. ISSN 0733-9364

Bakens, W; Foliente, G and Jasuja, M (2005) Engaging stakeholders in performance-based building: Lessons from the performance-based building (PeBBu) network. Building Research & Information, 33(2), pp. 149-158. ISSN 0961-3218

Baker, A J (2019) 'Suitable and sufficient'? UK regulation of post-construction fire safety. PhD thesis, University of Edinburgh, UK.

Bakhshi, J; Golzad, H; Martek, I; Hosseini, M R and Papadonikolaki, E (2025) Unveiling the complexity code: Navigating BIM-enabled projects with a project management complexity index. Engineering, Construction and Architectural Management, 32(11), pp. 7703-7732. ISSN 0969-9988

Bakhtawar, B; Thaheem, M J; Arshad, H and Qadeer, A (2018) How to embrace the stakeholder in public private partnership decision-making? A theoretical discourse. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Bakkeren, W J C (1997) Computer-integrated structural engineering: Supporting the structural engineer's participation in a computer-integrated construction process. PhD thesis, Delft University of Technology, Netherlands.

Balasubramanian, V and Prasad, G S (2007) Manual bar bending-an occupational hazard for construction workers in developing nations. Journal of Construction Engineering and Management, 133(10), pp. 791-797. ISSN 0733-9364

Balderston, F E (1953) Scale, vertical integration and costs in residential construction firms. PhD thesis, Princeton University, USA.

Baldwin, A N; Austin, S A; Hassan, T M and Thorpe, A (1999) Modelling information flow during the conceptual and schematic stages of building design. Construction Management and Economics, 17(2), pp. 155-167. ISSN 01446193

Ballal, T M A and Sher, W D (2003) Artificial neural network for the selection of buildable structural systems. Engineering, Construction and Architectural Management, 10(4), pp. 263-271. ISSN 0969-9988

Ballard, G; Harper, N and Zabelle, T (2003) Learning to see work flow: An application of lean concepts to precast concrete fabrication. Engineering, Construction and Architectural Management, 10(1), pp. 6-14. ISSN 0969-9988

Ballard, G and Howell, G (1998) Shielding production: Essential step in production control. Journal of Construction Engineering and Management, 124(1), pp. 11-17. ISSN 0733-9364

Ballard, G and Howell, G A (2003) Lean project management. Building Research & Information, 31(2), pp. 119-133. ISSN 0961-3218

Ballesteros-Pérez, P; Skitmore, M; Das, R and Del Campo-Hitschfeld, M L (2015) Quick abnormal-bid-detection method for construction contract auctions. Journal of Construction Engineering and Management, 141(7): 4015010, ISSN 0733-9364

Ballesteros-Pérez, P; Skitmore, M; Pellicer, E and Zhang, X (2016) Scoring rules and competitive behavior in best-value construction auctions. Journal of Construction Engineering and Management, 142(9): 04016035, ISSN 0733-9364

Balloffet, A F (1992) Applications of decision support systems in water resources planning: The goal-setting stage. PhD thesis, Colorado State University, USA.

Balogun, T B (2014) Towards a life cycle framework for bridge management systems in the UK: Insights from a critical review of international approaches and models. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Balouktsi, M (2020) Carbon metrics for cities: Production and consumption implications for policies. Buildings & Cities, 1(1), pp. 233-259. ISSN 2632-6655

Balsas, C J L (2017) The right to walk in cities, a comparative review of Macau, Lisbon and Las Vegas. International Journal of Law in the Built Environment, 9(2), pp. 123-142. ISSN 1756-1450

Bambrick, B (1994) Construction of an island. Journal of Construction Engineering and Management, 120(1), pp. 223-227. ISSN 0733-9364

Bamford, N; Charters, W; Lacey, R; Mills, A; Radovic, D; Robinson, J; Williams, P and Yencken, D (1998) Environment and sustainability in commercial office buildings. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Banakar, Fereshteh (2024) Extending BIM (building information modelling) object model for road infrastructure operation and maintenance. PhD thesis, Queensland University of Technology, Australia.

Banfill, P F G (1983) The effect of admixtures on the rheology of fresh concrete. Construction Papers, 2(1), pp. 63-77. ISSN 0144-8587

Bangaru, S S (2021) Fatigue monitoring through wearable sensors for construction workers. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Bangaru, S S; Wang, C; Zhou, X; Jeon, H W and Li, Y (2020) Gesture recognition-based smart training assistant system for construction worker earplug-wearing training. Journal of Construction Engineering and Management, 146(12): 04020144, ISSN 0733-9364

Barber Jr., H M (2003) Characteristics of construction safety trainers, the challenges they experience, how they meet these challenges, and the relationships between selected characteristics of safety trainers and accident rates experienced by their trainees. PhD thesis, Florida State University, USA.

Barbosa, Adriano Aurelio Ribeiro (2014) Implementing a sound power method for testing noise on masonry saw. PhD thesis, Universidade Estadual de Campinas, Brazil.

Barker, H (1989) Use of geotextiles and geocomposites in the united kingdom. Journal of Construction Engineering and Management, 115(2), pp. 258-269. ISSN 0733-9364

Barnes, G R (2016) Market creation in the European Union: the case of the public procurement directives. PhD thesis, University of Leeds, UK.

Barnes, W C (1993) Microcomputers in management of construction operations. Journal of Construction Engineering and Management, 119(2), pp. 403-412. ISSN 0733-9364

Baron, T (1983) The challenge for the UK housing industry in the 1980s and the planning system. Construction Management and Economics, 1(1), pp. 17-29. ISSN 01446193

Baron, T (1984) Housing in the inner cities. Construction Management and Economics, 2(1), pp. 13-24. ISSN 01446193

Barras, G C and Mayo, R E (1995) Minidirectional drilling for installation of underground electrical conduit. Journal of Construction Engineering and Management, 121(4), pp. 364-369. ISSN 0733-9364

Barraza, G A (2011) Probabilistic estimation and allocation of project time contingency. Journal of Construction Engineering and Management, 137(4), pp. 259-265. ISSN 0733-9364

Barrett, P (1989) Practice management in selected construction-related professions. PhD thesis, London South Bank University, UK.

Bartram, N (1981) Evaluation and development of drainage and pipeline construction processes. PhD thesis, Aston University, UK.

Bashat, I M; Gab-Allah, A A and Amer, M I (1995) Construction of ameria caisson in Egypt. Journal of Construction Engineering and Management, 121(1), pp. 13-19. ISSN 0733-9364

Bassanino, M; Fernando, T and Wu, K C (2014) Can virtual workspaces enhance team communication and collaboration in design review meetings? Architectural Engineering and Design Management, 10(3-4), pp. 200-217. ISSN 1745-2007

Bastian-Pinto, C. L.; Brandão, L. E.; Stanganello, A.; Pellegrino, R. and Marques, N. L. (2026) Assessing the role of term extension clauses in mitigating disruptive events in infrastructure concessions. Construction Management and Economics, 44(6), pp. 412-429. ISSN 0144-6193

Bateman, G H (2009) The IChemE international forms of contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 169-174. ISSN 17514304

Batra, S and Halder, A (2025) Toward a flourishing workplace: Exploring the impact of digitalization on young construction professionals' physical-mental well-being. Engineering, Construction and Architectural Management, 32(10), pp. 6760-6786. ISSN 0969-9988

Battikha, M G (2002) Qualicon: Computer-based system for construction quality management. Journal of Construction Engineering and Management, 128(2), pp. 164-173. ISSN 0733-9364

Battikha, M G and Davidson, C H (1996) Cause and effect 3-D model for measuring performance in construction acceleration: A decision support system. Building Research & Information, 24(6), pp. 351-357. ISSN 0961-3218

Bayat, M; Khanzadi, M and Nasirzadeh, F (2020) Bargaining game model to determine concessionary items in build-operate-transfer contracts. Journal of Construction Engineering and Management, 146(2): 04019109, ISSN 0733-9364

Bayraktar, M E; Hastak, M; Gokhale, S and Safi, B (2011) Decision tool for selecting the optimal techniques for cost and schedule reduction in capital projects. Journal of Construction Engineering and Management, 137(9), pp. 645-655. ISSN 0733-9364

Beach, T; Yeung, J; Ghoroghi, A and Rezgui, Y (2025) Moving automated compliance checking to the operational phase of the building life-cycle: analysis and feasibility study in the UK. International Journal of Construction Management, 25(7), pp. 840-849. ISSN 1562-3599

Beainy, F; Commuri, S and Zaman, M (2012) Quality assurance of hot mix asphalt pavements using the intelligent asphalt compaction analyzer. Journal of Construction Engineering and Management, 138(2), pp. 178-187. ISSN 0733-9364

Beaumont, B (2009) Confidentiality in arbitration: A myth or an achievable goal? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 141-146. ISSN 17514312

Becerra, J; Ortiz, P; Zaderenko, A P and Karapanagiotis, I (2020) Assessment of nanoparticles/nanocomposites to inhibit micro-algal fouling on limestone façades. Building Research & Information, 48(2), pp. 180-190. ISSN 0961-3218

Bechem, E E (2023) A human touch to public-private partnerships for sustainable infrastructure development in the central African sub-region. PhD thesis, University of Manchester, UK.

Bediawan, D (2003) Determinants of process innovation on construction projects from contractors' perspective. PhD thesis, Queensland University of Technology, Australia.

Beheiry, S M A; Chong, W K and Haas, C T (2006) Examining the business impact of owner commitment to sustainability. Journal of Construction Engineering and Management, 132(4), pp. 384-392. ISSN 0733-9364

Behm, M and Choon Hock, P (2012) Safe design of skyrise greenery in Singapore. Smart and Sustainable Built Environment, 1(2), pp. 186-205. ISSN 2046-6099

Belias, E and Licina, D (2022) Outdoor pm2.5 air filtration: Optimising indoor air quality and energy. Buildings & Cities, 3(1), pp. 186-203. ISSN 2632-6655

Beliveau, Y; Dixit, S and Dal, T (1993) Dynamic damping of payload motion for cranes. Journal of Construction Engineering and Management, 119(3), pp. 631-644. ISSN 0733-9364

Beliveau, Y J; Michael Williams, J; Gerald King, M and Niles, A R (1995) Real-time position measurement integrated with CAD: Technologies and their protocols. Journal of Construction Engineering and Management, 121(4), pp. 346-354. ISSN 0733-9364

Bell, K L (1994) The strategic management of projects to enhance value for money for BAA plc. PhD thesis, Heriot-Watt University, UK.

Bell, L C and Stukhart, G (1986) Attributes of materials management systems. Journal of Construction Engineering and Management, 112(1), pp. 14-21. ISSN 0733-9364

Bell, R (2012) Mentoring in the oil and gas industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(2), pp. 95-101. ISSN 17514312

Bellamy, T; Williams, A; Sher, W; Sherratt, S and Gameson, R (2005) Design communication: Issues confronting both co-located and virtual teams. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Belusko, M; Timothy, M and Leary, O (2010) Cost analyses of measures to improve residential energy ratings to 6 stars: Playford North development, South Australia. Construction Economics and Building, 10(1-2), pp. 36-47. ISSN 2204-9029

Ben-Haim, Y and Laufer, A (1998) Robust reliability of projects with activity-duration uncertainty. Journal of Construction Engineering and Management, 124(2), pp. 125-131. ISSN 0733-9364

Bendixen, M and Koch, C (2007) Negotiating visualizations in briefing and design. Building Research & Information, 35(1), pp. 42-53. ISSN 0961-3218

Benes, J and Diepeveen, W J (1985) Flexible planning in construction firms. Construction Management and Economics, 3(1), pp. 25-31. ISSN 01446193

Benjaoran, V; Dawood, N and Hobbs, B (2005) Flowshop scheduling model for bespoke precast concrete production planning. Construction Management and Economics, 23(1), pp. 93-105. ISSN 01446193

Benjaoran, V and Peansupap, V (2020) Grid-based construction site layout planning with particle swarm optimisation and travel path distance. Construction Management and Economics, 38(8), pp. 673-688. ISSN 01446193

Benjaoran, V; Tabyang, W and Sooksil, N (2015) Precedence relationship options for the resource levelling problem using a genetic algorithm. Construction Management and Economics, 33(9), pp. 711-723. ISSN 01446193

Bennett, J (1993) Japan's building industry: The new model. Construction Management and Economics, 11(1), pp. 3-17. ISSN 01446193

Bennett, J and Ferry, D (1990) Specialist contractors: A review of issues raised by their new role in building. Construction Management and Economics, 8(3), pp. 259-283. ISSN 01446193

Bergsdal, H; Brattebø, H and Müller, D B (2014) Dynamic material flow analysis for PCBs in the Norwegian building stock. Building Research & Information, 42(3), pp. 359-370. ISSN 0961-3218

Berkeley, D; Humphreys, P C and Thomas, R D (1991) Project risk action management. Construction Management and Economics, 9(1), pp. 3-17. ISSN 01446193

Bernold, L E (1989) Simulation of nonsteady construction processes. Journal of Construction Engineering and Management, 115(2), pp. 163-178. ISSN 0733-9364

Bernold, L E and Chang, P (1992) Potential gains through welded-wire fabric reinforcement. Journal of Construction Engineering and Management, 118(2), pp. 244-257. ISSN 0733-9364

Bernold, L E; Lorenc, S J and Davis, M L (2001) Technological intervention to eliminate back injury risks for nailing. Journal of Construction Engineering and Management, 127(3), pp. 245-250. ISSN 0733-9364

Bernold, L E; Lorenc, S J and Luces, E (1997) Intelligent technology for truck crane accident prevention. Journal of Construction Engineering and Management, 123(3), pp. 276-284. ISSN 0733-9364

Bernold, L E and Salim, M (1993) Placement-oriented design and delivery of concrete reinforcement. Journal of Construction Engineering and Management, 119(2), pp. 323-335. ISSN 0733-9364

Berryman, C W; Jensen, W G and Zhu, J (2006) Maximization of fly ash in the manufacture of reinforced concrete pipe. International Journal of Construction Education and Research, 2(3), pp. 209-216. ISSN 1557-8771

Bersson, T F (2012) A framework for application of system engineering process models to sustainable design of high performance buildings. PhD thesis, George Washington University, USA.

Berton, J L (1965) An evaluation of the marketing program of Arkansas lumber manufacturers in selling to the residential construction industry. PhD thesis, University of Arkansas, USA.

Best, R (2010) Using purchasing power parity to assess construction productivity. Construction Economics and Building, 10(4), pp. 1-10. ISSN 2204-9029

Best, R and Purdey, B (2012) Assessing occupant comfort in an iconic sustainable education building. Construction Economics and Building, 12(3), pp. 55-65. ISSN 2204-9029

Betti, G (2025) A framework for 1.5°c-aligned GHG budgets in architecture. Buildings & Cities, 6(1), pp. 996-1009. ISSN 2632-6655

Betts, M (1987) British public expenditure on construction less than claimed? Construction Management and Economics, 5(1), pp. 13-20. ISSN 01446193

Betts, M F (1985) The employment implications of public construction investment. PhD thesis, University of Reading, UK.

Betts, M P (1987) Coordinated information retrieval for building contractors' tendering. PhD thesis, Polytechnic of the South Bank, UK.

Betz, T; Brucker, R; Wilson, C and Wilson, R (2025) Developing corrosion-related reliability models using natural language processing. Built Environment Project and Asset Management, 15(6), pp. 1106-1121. ISSN 2044-124X

Bhokha, S and Ogunlana, S O (1999) Application of artificial neural network to forecast construction duration of buildings at the pre-design stage. Engineering, Construction and Architectural Management, 6(2), pp. 133-144. ISSN 0969-9988

Bhuiyan, S I; Jones, K and Wanigarathna, N (2015) An approach to sustainable refurbishment of existing building. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Bhutto, K; Griffith, A and Stephenson, P (2004) Integration of quality, health and safety and environment management systems in contractor organisations. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Bick, P (1997) Statutory reform of aspects of construction law in Australia. Construction Management and Economics, 15(6), pp. 549-558. ISSN 01446193

Bienvenido-Huertas, D; Rubio-Bellido, C; Sánchez-García, D and Moyano, J (2019) Internal surface condensation risk in façades of Spanish social dwellings. Building Research & Information, 47(8), pp. 928-947. ISSN 0961-3218

Biersteker, E and Marrewijk, A V (2023) Integrating knowledge in infrastructure projects: The interplay between formal and informal knowledge governance mechanisms. Construction Management and Economics, 41(10), pp. 859-874. ISSN 01446193

Bildsten, L (2014) Buyer-supplier relationships in industrialized building. Construction Management and Economics, 32(1-2), pp. 146-159. ISSN 01446193

Bing, L and Tiong, R L K (1999) Risk management model for international construction joint ventures. Journal of Construction Engineering and Management, 125(5), pp. 377-384. ISSN 0733-9364

Bing, L; Tiong, R L K; Fan, W W and Chew, D A S (1999) Risk management in international construction joint ventures. Journal of Construction Engineering and Management, 125(4), pp. 277-284. ISSN 0733-9364

Bingham, E; Edward Gibson, G and El Asmar, M (2019) Identifying team selection and alignment factors by delivery method for transportation projects. Journal of Construction Engineering and Management, 145(10): 04019061, ISSN 0733-9364

Bingham, E; Gibson, G E and Asmar, M E (2018) Measuring user perceptions of popular transportation project delivery methods using least significant difference intervals and multiple range tests. Journal of Construction Engineering and Management, 144(6): 04018033, ISSN 0733-9364

Bingol, B N and Polat, G (2015) Time-cost-quality trade-off model for subcontractor selection using discrete particle swarm optimization algorithm. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Binti Ismail, S H (2016) Musculoskeletal modelling for ergonomics: shoulder & low back loading in bricklaying. PhD thesis, Imperial College London, UK.

Bird, R and Wearne, S (2017) Contract structure for nuclear power projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(3), pp. 131-137. ISSN 17514304

Birgonul, M T and Ozdogan, I (1998) A proposed framework for governmental organizations in the implementation of build-operate-transfer (BOT) model. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Birrell, G S (1985) General contractors' management: How subs evaluate it. Journal of Construction Engineering and Management, 111(3), pp. 244-259. ISSN 0733-9364

Bispham, J (2008) Historic imported softwood in eastern England: past knowledge, current perceptions and conservation. PhD thesis, Anglia Ruskin University, UK.

Bjork, B C (2012) A comparison of subscription and open access journals in construction management and related fields. Construction Economics and Building, 12(2), pp. 27-42. ISSN 2204-9029

Bjork, B-C (1996) Requirements and information structures for building product data models. DTech thesis, Teknillinen Korkeakoulu (Helsinki), Finland.

Blanke, G and Kotb, S (2015) Construction disputes under UAE law: Some initial considerations. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 269-276. ISSN 17514304

Blong, R (2004) Residential building damage and natural perils: Australian examples and issues. Building Research & Information, 32(5), pp. 379-390. ISSN 0961-3218

Bloore, R D S (1991) The ascertainment of claims for delay and disruption. PhD thesis, University of Surrey, UK.

Bogenstätter, U (2000) Prediction and optimization of life-cycle costs in early design. Building Research & Information, 28(5-6), pp. 376-386. ISSN 0961-3218

Bogus, S M (2004) Concurrent engineering strategies for reducing design delivery time. PhD thesis, University of Colorado at Boulder, USA.

Boles, W W; Maxwell, D A; Scott, W D; Heermann, P D; Yarborough, T and Underwood, J (1995) Construction automation and robotics–pathway to implementation. Journal of Construction Engineering and Management, 121(1), pp. 143-152. ISSN 0733-9364

Bonnal, P; Gourc, D and Lacoste, G (2004) Where do we stand with fuzzy project scheduling? Journal of Construction Engineering and Management, 130(1), pp. 114-123. ISSN 0733-9364

Borba, Maria Lucia Guilherme (2014) Technical-scientific and sociopolitical aspects of urban water management: Stormwater drainage in the city of São Paulo. PhD thesis, Universidade de São Paulo, Brazil.

Bordass, B (2000) Cost and value: Fact and fiction. Building Research & Information, 28(5-6), pp. 338-352. ISSN 0961-3218

Borrallo-Jiménez, M; Esquivias, P M; Fernández-Agüera, J and LopezDeAsiain, M (2025) Hybrid ventilation in a nearly zero-energy building as a function of users' habits for better indoor air quality and thermal comfort in a warm climate. Building Research & Information, 53(1-2), pp. 77-94. ISSN 0961-3218

Borràs, J G; Mas, Á; Lerma, C; Vercher, J and Gil, E (2024) Separation layers and their influence on green roof water storage. Architectural Engineering and Design Management, 20(6), pp. 1629-1647. ISSN 1745-2007

Bortolini, R and Forcada, N (2020) Analysis of building maintenance requests using a text mining approach: Building services evaluation. Building Research & Information, 48(2), pp. 207-217. ISSN 0961-3218

Bos-de Vos, M (2018) Open for business: Project-specific value capture strategies of architectural firms. PhD thesis, Delft University of Technology, Netherlands.

Bouchlaghem, N M (1996) A computer model for the design of window shading devices. Building Research & Information, 24(2), pp. 104-107. ISSN 0961-3218

Boudet, H S; Jayasundera, D C and Davis, J (2011) Drivers of conflict in developing country infrastructure projects: Experience from the water and pipeline sectors. Journal of Construction Engineering and Management, 137(7), pp. 498-511. ISSN 0733-9364

Boudjabeur, S (1997) Design and build defined. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Boukendour, S and Hughes, W P (2014) Collaborative incentive contracts: Stimulating competitive behaviour without competition. Construction Management and Economics, 32(3), pp. 279-289. ISSN 01446193

Bourdic, L and Salat, S (2012) Building energy models and assessment systems at the district and city scales: A review. Building Research & Information, 40(4), pp. 518-526. ISSN 0961-3218

Bourdic, L; Salat, S and Nowacki, C (2012) Assessing cities: A new system of cross-scale spatial indicators. Building Research & Information, 40(5), pp. 592-605. ISSN 0961-3218

Boussabaine, A H (2001) Neurofuzzy modelling of construction projects' duration ii: Application. Engineering, Construction and Architectural Management, 8(2), pp. 114-129. ISSN 0969-9988

Boussabaine, A H and Elhag, T M S (1999) Knowledge discovery in residential construction project cost data. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Bouwer, K A (2016) Building disappointment: the limits and potential of tort liability for energy efficiency problems in domestic buildings. PhD thesis, University College London, UK.

Bower, D A (1995) The creation of a proactive link between time and money. PhD thesis, University of Manchester, UK.

Bowlby, W and Cohn, L F (1983) Prediction of highway construction noise levels. Journal of Construction Engineering and Management, 109(2), pp. 163-180. ISSN 0733-9364

Boyd, David (2006) Developing a knowledge centric approach to construction education. Architectural Engineering and Design Management, 2(1-2), pp. 149-159. ISSN 1745-2007

Boyes, Mark (2019) Embedding divergent thinking into project team decision making. PhD thesis, RMIT University, Australia.

Boysen, J (1982) Aggregate project model for resource allocation within multiproject construction systems. PhD thesis, University of California, Berkeley, USA.

Brady, L and Hanmer-Dwight, R (2016) The management and control of energy at the design stage of buildings. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Bragadin, M A and Kähkönen, K (2016) Schedule health assessment of construction projects. Construction Management and Economics, 34(12), pp. 875-897. ISSN 01446193

Brandao, L E T and Saraiva, E (2008) The option value of government guarantees in infrastructure projects. Construction Management and Economics, 26(11), pp. 1171-1180. ISSN 1466433X

Brandon, P S (1984) Cost versus quality: A zero sum game? Construction Management and Economics, 2(2), pp. 111-126. ISSN 01446193

Brandon, P S (1990) The development of an expert system for the strategic planning of construction projectss. Construction Management and Economics, 8(3), pp. 285-300. ISSN 01446193

Brandon, P S (1999) Sustainability in management and organization: The key issues? Building Research & Information, 27(6), pp. 390-396. ISSN 0961-3218

Brawn, D (2012) Extensions of time and liquidated damages in construction contracts in England and Wales. International Journal of Law in the Built Environment, 4(1), pp. 75-90. ISSN 1756-1450

Bresnen, M J; Bryman, A E; Ford, J R; Beardsworth, A D and Keil, E T (1986) Leader orientation of construction site managers. Journal of Construction Engineering and Management, 112(3), pp. 370-386. ISSN 0733-9364

Bridgewater, C (1992) A new approach to the design of buildings for automated construction. PhD thesis, University of Reading, UK.

Brodetskaia, I; Sacks, R and Shapira, A (2011) A workflow model for systems and interior finishing works in building construction. Construction Management and Economics, 29(12), pp. 1209-1227. ISSN 1466433X

Bromilow, F J and Tucker, S N (1983) Terotechnological optimality in construction. Construction Papers, 2(1), pp. 41-50. ISSN 0144-8587

Broome, J C and Perry, J G (1995) Experiences of the use of the New Engineering Contract. Engineering, Construction and Architectural Management, 2(4), pp. 271-285. ISSN 0969-9988

Brown, Z and Cole, R J (2009) Influence of occupants' knowledge on comfort expectations and behaviour. Building Research & Information, 37(3), pp. 227-245. ISSN 0961-3218

Browning, F R (1994) Planning system for hazardous waste site characterization. PhD thesis, University of Missouri - Rolla, USA.

Bruun, E P G (2024) Structural scaffold-free cooperative robotic fabrication. PhD thesis, Princeton University, USA.

Bröchner, J; Ang, G K I and Fredriksson, G (1999) Sustainability and the performance concept: Encouraging innovative environmental technology in construction. Building Research & Information, 27(6), pp. 367-372. ISSN 0961-3218

Bubshait, A A and Tahir, B (1997) Effect of silica fume on the concrete-steel bond. Building Research & Information, 25(6), pp. 365-369. ISSN 0961-3218

Bubshait, A A; Tahir, B M and Jannadi, M O (1996) Use of microsilica in concrete construction. Building Research & Information, 24(1), pp. 41-49. ISSN 0961-3218

Buchholz, M and Lützkendorf, T (2023) European building passports: Developments, challenges and future roles. Buildings & Cities, 4(1), pp. 902-919. ISSN 2632-6655

Bui, Diep Thi (2018) Improving the decision-making process for demolition waste management in urban redevelopment projects in Vietnam. PhD thesis, Queensland University of Technology, Australia.

Burati, J L; Farrington, J J and Ledbetter, W B (1992) Causes of quality deviations in design and construction. Journal of Construction Engineering and Management, 118(1), pp. 34-49. ISSN 0733-9364

Burchett, J F and Tummala, V M R (1998) The application of the risk management process in capital investment decisions for EHV transmission line projects. Construction Management and Economics, 16(2), pp. 235-244. ISSN 01446193

Burford, N K and Smith, F W (1999) Developing a new military shelter system: A technical study in advanced materials and structures. Building Research & Information, 27(2), pp. 64-83. ISSN 0961-3218

Burgett, J M and Chini, A R (2013) Effective energy efficiency measures for existing residential homes in the Florida market. International Journal of Construction Education and Research, 9(1), pp. 61-80. ISSN 1557-8771

Burney, D and Claflin, A (2016) Practical considerations for implementing research on the indoor built environment. Building Research & Information, 44(3), pp. 342-344. ISSN 0961-3218

Burns, S A; Liu, L and Feng, C W (1996) The LP/IP hybrid method for construction time-cost trade-off analysis. Construction Management and Economics, 14(3), pp. 265-276. ISSN 01446193

Burroughs, S (2006) Strength of compacted earth: Linking soil properties to stabilizers. Building Research & Information, 34(1), pp. 55-65. ISSN 0961-3218

Buser, M; Carlsson, V and Koch, C (2019) Interactive shaping of expertise: The play between house-owner and SME contractors negotiating renovation. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Buser, M and Koch, C (2014) Is this none of the contractor's business? Social sustainability challenges informed by literary accounts. Construction Management and Economics, 32(7-8), pp. 749-759. ISSN 01446193

Butcher, T and Gentchev, V (2009) Public-private partnerships in central and eastern Europe. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(3), pp. 97-105. ISSN 17514312

Buttler, T (2016) Collecting lessons learned: How project-based organizations in the oil and gas industry learn from their projects. PhD thesis, Delft University of Technology, Netherlands.

Buyukyoran, F and Gundes, S (2018) Optimized real options-based approach for government guarantees in PPP toll road projects. Construction Management and Economics, 36(4), pp. 203-216. ISSN 01446193

Byrd, H; Matthewman, S and Rasheed, E (2022) Air-conditioning in New Zealand: Power and policy. Buildings & Cities, 3(1), pp. 1-9. ISSN 2632-6655

Bártolo, H M G and Bártolo, P J S (2002) Borrowing from nature to support architectural design. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Bártolo, H M G and Bártolo, P J S (2003) Design reasoning. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Cadenazzi, T; Keles, B; Rahman, M K and Nanni, A (2022) Life-cycle cost and life-cycle assessment of a monumental fiber-reinforced polymer reinforced concrete structure. Journal of Construction Engineering and Management, 148(9): 05022007, ISSN 0733-9364

Caerteling, J S; Halman, J I M; Song, M and Doŕe, A G (2009) Impact of government and corporate strategy on the performance of technology projects in road construction. Journal of Construction Engineering and Management, 135(11), pp. 1211-1221. ISSN 0733-9364

Cai, J; Yang, L; Zhang, Y; Li, S and Cai, H (2021) Multitask learning method for detecting the visual focus of attention of construction workers. Journal of Construction Engineering and Management, 147(7): 04021063, ISSN 0733-9364

Cai, S and Gou, Z (2023) Synchronization of water-energy consumption in residential and non-residential buildings during COVID-19. Building Research & Information, 51(6), pp. 682-700. ISSN 0961-3218

Cai, S; Ma, Z; Skibniewski, M J and Guo, J (2020) Construction automation and robotics: From one-offs to follow-ups based on practices of Chinese construction companies. Journal of Construction Engineering and Management, 146(10): 05020013, ISSN 0733-9364

Calderon, C and Keirstead, J (2012) Modelling frameworks for delivering low-carbon cities: Advocating a normalized practice. Building Research & Information, 40(4), pp. 504-517. ISSN 0961-3218

Callaghan, Stephen (2023) Model and strategies for early contractor involvement in large linear engineering construction projects. PhD thesis, Queensland University of Technology, Australia.

Calvetti, D; Magalhães, P N M; Sujan, S F; Gonçalves, M C and Campos De Sousa, H J (2020) Challenges of upgrading craft workforce into Construction 4.0: Framework and agreements. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(4), pp. 158-165. ISSN 17514304

Camacho-Montano, S C; Cook, M and Wagner, A (2020) Avoiding overheating in existing school buildings through optimized passive measures. Building Research & Information, 48(4), pp. 349-363. ISSN 0961-3218

Camacho-Montano, S C; Wagner, A; Erhorn-Kluttig, H; Mumovic, D and Summerfield, A (2019) Clearing the air on EU guidance projects for school buildings. Building Research & Information, 47(5), pp. 624-634. ISSN 0961-3218

Camfield, F E (1998) Guidelines for quarrystone armor units. Journal of Construction Engineering and Management, 124(6), pp. 465-479. ISSN 0733-9364

Camilleri, M; Jaques, R and Isaacs, N (2001) Impacts of climate change on building performance in New Zealand. Building Research & Information, 29(6), pp. 440-450. ISSN 0961-3218

Cammarano, S; Pellegrino, A; Lo Verso, V R M and Aghemo, C (2015) Assessment of daylight in rooms with different architectural features. Building Research & Information, 43(2), pp. 222-237. ISSN 0961-3218

Campion, N A (2015) Advancing life cycle assessment: Perspectives from the building and healthcare industries. PhD thesis, University of Pittsburgh, USA.

Cancian, Glen A (2016) Heuristic based optimisation of pavement management scheduling. PhD thesis, Griffith University, Australia.

Canter, D (2008) Do we need a metatheory of the built environment? Building Research & Information, 36(6), pp. 663-667. ISSN 0961-3218

Cao, D and Wang, G (2014) Contractor-subcontractor relationships with the implementation of emerging interorganizational technologies: Roles of cross-project learning and pre-contractual opportunism. International Journal of Construction Education and Research, 10(4), pp. 268-284. ISSN 1557-8771

Cao, Q; Zou, X and Zhang, L (2022) Multiobjective robust optimization model for generating stable and makespan-protective repetitive schedules. Journal of Construction Engineering and Management, 148(9): 04022099, ISSN 0733-9364

Carlos, J S (2017) The impact of refurbished windows on Portuguese old school buildings. Architectural Engineering and Design Management, 13(3), pp. 185-201. ISSN 1745-2007

Carmichael, D G; Nguyen, T A and Shen, X (2019) Single treatment of PPP road project options. Journal of Construction Engineering and Management, 145(2): 04018122, ISSN 0733-9364

Carmo, Lie Uema do (2012) Construction contracts of large projects. PhD thesis, Universidade de São Paulo, Brazil.

Carr, R I (2000) Construction congestion cost (CO3) basic model. Journal of Construction Engineering and Management, 126(2), pp. 105-113. ISSN 0733-9364

Carr, R I (2000) Construction congestion cost (CO3) traffic impact and construction cost. Journal of Construction Engineering and Management, 126(2), pp. 114-121. ISSN 0733-9364

Carrillo, P and Heavey, I A N (2000) UK contractors' acquisitions strategy for central and eastern Europe. Engineering, Construction and Architectural Management, 7(3), pp. 322-328. ISSN 0969-9988

Carter, D J (2004) Developments in tubular daylight guidance systems. Building Research & Information, 32(3), pp. 220-234. ISSN 0961-3218

Carter, K and Fortune, C (2007) Sustainable development policy perceptions and practice in the UK social housing sector. Construction Management and Economics, 25(4), pp. 399-408. ISSN 1466433X

Carvalho, R; Zhang, F; Liu, T; Yu, R; Chen, E and Oh, E (2026) Amenity preferences and design evaluation in Australian build-to-rent compact apartments: A VR/EEG study. Building Research & Information, 54(2), pp. 158-178. ISSN 0961-3218

Carvalho, J P A (2023) Integration of BIM in building sustainability assessment methods. PhD thesis, Universidade do Minho, Portugal.

Casady, C B and Baxter, D (2020) Pandemics, public-private partnerships (PPPs), and force majeure: COVID-19 expectations and implications. Construction Management and Economics, 38(12), pp. 1077-1085. ISSN 01446193

Casey, C E (2013) Defining success in family firms using configurational fit: A quantitative study of family-owned construction firms. PhD thesis, Capella University, USA.

Cattaneo, S and Mola, F (2012) Assessing the quality control of self-consolidating concrete properties. Journal of Construction Engineering and Management, 138(2), pp. 197-205. ISSN 0733-9364

Cattell, D W (2012) An overview of component unit pricing theory. Construction Management and Economics, 30(1), pp. 81-92. ISSN 1466433X

Cattell, D W; Bowen, P A and Kaka, A P (2010) The risks of unbalanced bidding. Construction Management and Economics, 28(4), pp. 333-344. ISSN 1466433X

Cattell, D W; Bowen, P A and Kaka, A R (2008) A simplified unbalanced bidding model. Construction Management and Economics, 26(12), pp. 1283-1290. ISSN 1466433X

Cavalcante, C A V; Alencar, M H and Lopes, R S (2017) Multicriteria model to support maintenance planning in residential complexes under warranty. Journal of Construction Engineering and Management, 143(4): 04016110, ISSN 0733-9364

Celoza, A and Alazzam, M (2026) Managing risk, innovation, and collaboration through supplier qualification. Journal of Construction Engineering and Management, 152(1): 04025223, ISSN 0733-9364

Celoza, Amelia McLean (2022) The impact of contractual and legal factors on information management in AEC project delivery. PhD thesis, University of Texas at Austin, USA.

Cepeda, D M; Sohail, M and Ogunlowo, O O (2018) Understanding the critical success factors for delivery of megaprojects in Colombia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 45-57. ISSN 17514304

Cesare, C M D and Ruddock, L (1997) Equity in property taxation: A model for establishing a fair property tax system. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Cha, G; Park, S and Oh, T (2019) A terrestrial lidar-based detection of shape deformation for maintenance of bridge structures. Journal of Construction Engineering and Management, 145(12): 04019075, ISSN 0733-9364

Chan, Y K; Huang, C H; Chao Yi, N; Tseng, H H; Lin, C H; Chang, R F and Chan, M H (2026) A study of detection systems for safety guardrails at construction sites: Innovative applications of image processing and perspective correction. Journal of Construction Engineering and Management, 152(4): 04026018, ISSN 0733-9364

Chan, A P C and Oppong, G D (2017) Managing the expectations of external stakeholders in construction projects. Engineering, Construction and Architectural Management, 24(5), pp. 736-756. ISSN 0969-9988

Chan, C M R and Harris, F C (1989) A database/spreadsheet application for equipment selection. Construction Management and Economics, 7(3), pp. 235-247. ISSN 01446193

Chan, K H (2010) Critica factors in adopting cooling media for central air-conditioning systems in Hong Kong. Architectural Engineering and Design Management, 6(1), pp. 31-47. ISSN 1745-2007

Chan, P (2012) Constructing a sense of time in projects: Implications of a bergsonian view of time. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Chan, P W; Fishman, T; Gruis, V; Hu, M; Schruijer, S; van Marrewijk, A and Vrijhoef, R (2023) Questioning collaboration in the circular built environment: Multi-cycle, multi-scalar and multi-level perspectives in the renovation sector. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Chan, T K and Abdul-Aziz, A-R (2017) Financial performance and operating strategies of Malaysian property development companies during the global financial crisis. Journal of Financial Management of Property and Construction, 22(2), pp. 174-191. ISSN 1366-4387

Chan, W T and Hu, H (2002) Constraint programming approach to precast production scheduling. Journal of Construction Engineering and Management, 128(6), pp. 513-521. ISSN 0733-9364

Chand, Shelvin (2018) Automated design of heuristics for the resource constrained project scheduling problem. PhD thesis, University of New South Wales, Australia.

Chandrasiri, A P and Geekiyanage, D (2018) Real-time object detection system for building energy conservation: An IP camera-based system. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Chang, A S; Du, S J and Shen, F Y (2012) Engineer self-evaluation checklist for effective site visits. Journal of Construction Engineering and Management, 138(10), pp. 1220-1229. ISSN 0733-9364

Chang, A S T (2001) Work-time model for engineers. Journal of Construction Engineering and Management, 127(2), pp. 163-172. ISSN 0733-9364

Chang, A S T and Tsai, Y W (2003) Engineering information classification system. Journal of Construction Engineering and Management, 129(4), pp. 454-460. ISSN 0733-9364

Chang, C K and Sullivan, K T (2006) Workload ratio as an indicator of schedule acceleration and its relationship with labour efficiency. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Chang, C Y; Chou, H Y and Wang, M T (2006) Characterizing the corporate governance of UK listed construction companies. Construction Management and Economics, 24(6), pp. 647-656. ISSN 1466433X

Chang, D Y-M (1986) RESQUE: A resource based simulation system for construction process planning. PhD thesis, University of Michigan, USA.

Chang, T C; William, C and Crandall, K C (1990) Network resource allocation with support of a fuzzy expert system. Journal of Construction Engineering and Management, 116(2), pp. 239-260. ISSN 0733-9364

Chang Recavarren, L G (2023) Establishing the effect of building design on construction work. PhD thesis, Arizona State University, USA.

Changwang, S; Shaowei, H; Haifen, Z; Fuqu, P; Changxi, S and Hao, Q (2024) Automatic detection of water supply pipe defects based on underwater image enhancement and improved yolox. Journal of Construction Engineering and Management, 150(10): 04024134, ISSN 0733-9364

Chanyotha, S (1991) Generic cost estimates, site screening, and site design of low- and intermediate-level waste system. PhD thesis, University of Arizona, USA.

Chapman, C and Ward, S (2008) Developing and implementing a balanced incentive and risk sharing contract. Construction Management and Economics, 26(6), pp. 659-669. ISSN 1466433X

Chapman, M L (2011) First ever appeal under section 110 of the uk water resources act 1991. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(4), pp. 203-208. ISSN 17514304

Charlesraj, V P C; Maheswari, J U; Kalidindi, S N and Varghese, K (2004) Knowledge management for planning construction projects using dependency structure matrix. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Charoenngam, C (1993) A knowledge-base representation for a construction measurement control information system (CMCIS). PhD thesis, University of Texas at Austin, USA.

Charoenngam, C; Coquinco, S T and Hadikusumo, B H W (2003) Web-based application for managing change orders in construction projects. Construction Innovation, 3(4), pp. 197-215. ISSN 1471-4175

Chassiakos, A P and Sakellaropoulos, S P (2005) Time-cost optimization of construction projects with generalized activity constraints. Journal of Construction Engineering and Management, 131(10), pp. 1115-1124. ISSN 0733-9364

Chau, K W; Anson, M and Zhang, J P (2004) Four-dimensional visualization of construction scheduling and site utilization. Journal of Construction Engineering and Management, 130(4), pp. 598-606. ISSN 0733-9364

Chau, K W; Wong, S K and Yiu, C Y (2003) Price discovery function of forward contracts in the real estate market: An empirical test. Journal of Financial Management of Property and Construction, 8(3), pp. 129-138. ISSN 1366-4387

Cheetham, D W (1982) Labour management practices on construction sites and some of their consequences. Construction Papers, 1(3), pp. 37-53. ISSN 0144-8587

Cheetham, D W (1997) The search for quality: Improving the audit. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Cheetham, D W (2000) Improving site safety: Enforcement of the cdm regulations. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Cheetham, D W and Banfill, P F G (1983) The uses of polyvinylchloride and bitumens in building with special reference to their possible interactions. Construction Papers, 2(2), pp. 91-103. ISSN 0144-8587

Chehayeb, N N and AbouRizk, S M (1998) Simulation-based scheduling with continuous activity relationships. Journal of Construction Engineering and Management, 124(2), pp. 107-115. ISSN 0733-9364

Chellappa, V and Salve, U R (2025) Exploring causes of falls and preventive measures in vertical formwork operations in Indian construction. Built Environment Project and Asset Management, 15(6), pp. 1089-1105. ISSN 2044-124X

Chellappa, V and Gunasekaran, A L (2022) Drivers for implementing design for safety in construction: A review. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(1), pp. 39-49. ISSN 17514304

Chen, B; Mao, C K and Hu, J L (2015) The optimal debt ratio of public-private partnership projects. International Journal of Construction Management, 15(3), pp. 239-253. ISSN 1562-3599

Chen, C (2008) Risks in PPP: Process and institutional analyses. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Chen, H; Hu, H; Tang, M; Yang, X and Zhu, J (2018) Hybrid bored prestressed concrete cased piles: Equipment and construction procedures. Journal of Construction Engineering and Management, 144(12): 06018006, ISSN 0733-9364

Chen, H; Zhu, Y and Luo, X (2022) Tablegraph: An image segmentation-based table knowledge interpretation model for civil and construction inspection documentation. Journal of Construction Engineering and Management, 148(10): 04022103, ISSN 0733-9364

Chen, H; Lei, Y; Wu, X and Liu, Y (2025) Evaluation of fuzzy uncertainty risk identification for waste-to-energy public-private partnership projects on the basis of the cloud model and fuzzy cognitive map. Journal of Construction Engineering and Management, 151(12): 04025191, ISSN 0733-9364

Chen, J J (1996) The impact of public construction investment upon special economic zones: the Chinese experience. Construction Management and Economics, 14(2), pp. 175-182. ISSN 01446193

Chen, J J and Wills, D (1997) Development of urban housing policies in China. Construction Management and Economics, 15(3), pp. 283-290. ISSN 01446193

Chen, Kaiwen (2020) Analysis and management of UAV-captured images towards automation of building facade inspections. PhD thesis, Virginia Tech, USA.

Chen, P H and Chang, L M (2002) Feasibility analysis of Taiwan high speed rail project. Journal of Construction Procurement, 8(1), pp. 64-78. ISSN 1358-9180

Chen, Q; Adey, B T; Haas, C T and Hall, D M (2022) Exploiting digitalization for the coordination of required changes to improve engineer-to-order materials flow management. Construction Innovation, 22(1), pp. 76-100. ISSN 1471-4175

Chen, Q; Long, D; Wang, S; Chen, Q and Yuan, B (2025) Real-time detection of personal protective equipment violations for construction workers using semisupervised learning and video clips. Journal of Construction Engineering and Management, 151(3): 04024213, ISSN 0733-9364

Chen, Q; Reichard, G and Beliveau, Y (2010) Object model framework for interface modeling and IT-oriented interface management. Journal of Construction Engineering and Management, 136(2), pp. 187-198. ISSN 0733-9364

Chen, R; Tan, Y; Zhang, B; Shen, W; Liu, G and Wang, Z (2018) Installation of integral prefabricated bridge abutment and pier with flexible water stop curtain. Journal of Construction Engineering and Management, 144(9): 04018087, ISSN 0733-9364

Chen, S; Chen, D; Li, L; Miramini, S and Zhang, L (2024) Optimized bridge maintenance strategies: A system reliability-based approach to enhancing road network performance. Journal of Construction Engineering and Management, 150(3): 04023167, ISSN 0733-9364

Chen, S; Zeng, N; Li, F; Yue, H; Wang, Q and Li, Q (2025) Proactive safety risk control system for deep foundation pit construction: Situational tailoring of integrated cybernetics and dual-system theory. Journal of Construction Engineering and Management, 151(4): 04025018, ISSN 0733-9364

Chen, S-M (2002) Intelligent scheduling model and multi-dimensional CM information system. PhD thesis, Columbia University, USA.

Chen, W; Hu, C; Zou, R; Yang, Q; Chen, Y; Xing, J and Mou, C (2025) Evolutionary method of digital twin model for building physics mechanism. Architectural Engineering and Design Management, 21(2), pp. 356-378. ISSN 1745-2007

Chen, X; Feng, J; Zhao, Y and Lu, T (2025) Feasibility of a program delay claims scheme: Synergistic effect and risk-cost optimization. Journal of Construction Engineering and Management, 151(10): 04025151, ISSN 0733-9364

Chen, Y; Chen, S; Hu, C; Jin, L and Zheng, X (2020) Novel probabilistic cost estimation model integrating risk allocation and claim in hydropower project. Journal of Construction Engineering and Management, 146(8): 04020092, ISSN 0733-9364

Chen, Z; li, H and Wong, C T C (2003) Webfill before landfill: An e-commerce model for waste exchange in Hong Kong. Construction Innovation, 3(1), pp. 27-43. ISSN 1471-4175

Cheng, M Y; Vu, Q T and Wu, T C (2026) Highway bridge crack inspection verification and training using an automated augmented reality system. Journal of Construction Engineering and Management, 152(3): 04025279, ISSN 0733-9364

Cheng, E W L and Li, H (2004) Development of a practical model of partnering for construction projects. Journal of Construction Engineering and Management, 130(6), pp. 790-798. ISSN 0733-9364

Cheng, E W L; li, H; Love, P and Irani, Z (2004) A learning culture for strategic partnering in construction. Construction Innovation, 4(1), pp. 53-65. ISSN 1471-4175

Cheng, M Y; Huang, K Y and Hutomo, M (2018) Multiobjective dynamic-guiding PSO for optimizing work shift schedules. Journal of Construction Engineering and Management, 144(9): 04018089, ISSN 0733-9364

Cheng, M Y and O'Connor, J T (1996) Arcsite: Enhanced GIS for construction site layout. Journal of Construction Engineering and Management, 122(4), pp. 329-336. ISSN 0733-9364

Cheng, M Y and Yang, S C (2001) GIS-based cost estimates integrating with material layout planning. Journal of Construction Engineering and Management, 127(4), pp. 291-299. ISSN 0733-9364

Cheng, M-Y (1992) Automated site layout of temporary construction facilities using geographic information systems (GIS). PhD thesis, University of Texas at Austin, USA.

Chennarapu, H; Garala, T K; Chennareddy, R; Balunaini, U and Venkata Narasimha Reddy, G (2018) Compaction quality control of earth fills using dynamic cone penetrometer. Journal of Construction Engineering and Management, 144(9): 04018086, ISSN 0733-9364

Cherneff, J M (1990) Knowledge-based interpretation of architectural drawings. PhD thesis, Massachusetts Institute of Technology, USA.

Cheung, S O; Levina, B and Niu, Y (2017) Concentration analysis of new private residential units market in Hong Kong. Construction Economics and Building, 17(2), pp. 1-23. ISSN 2204-9029

Cheung, S O; Ng, S T; Lam, K C and Sin, W S (2001) A fuzzy sets model for construction dispute evaluation. Construction Innovation, 1(2), pp. 117-127. ISSN 1471-4175

Cheung, S O; Yiu, T W and Lam, M C (2013) Interweaving trust and communication with project performance. Journal of Construction Engineering and Management, 139(8), pp. 941-950. ISSN 0733-9364

Cheung, S-O; Lam, K-C; Wong, S-S and Wong, S-H (2001) The fee sensitive risk exposures of project authorized person in Hong Kong. Construction Economics and Building, 1(2), pp. 65-72. ISSN 2204-9029

Chevallier, N J and Russell, A D (2001) Developing a draft schedule using templates and rules. Journal of Construction Engineering and Management, 127(5), pp. 391-398. ISSN 0733-9364

Chew, M Y L (2002) Resistance of polyurethane sealants to hot water. Building Research & Information, 30(5), pp. 367-371. ISSN 0961-3218

Chew, M Y L and De Silva, N (2003) Maintainability problems of wet areas in high-rise residential buildings. Building Research & Information, 31(1), pp. 60-69. ISSN 0961-3218

Chiang, Lee-Yun (2023) Affordable housing as an infrastructure asset: A public-private partnerships approach. PhD thesis, Griffith University, Australia.

Chiang, Y H; Cheng, E W L and Lam, P T I (2010) Employing the net present value-consistent IRR methods for PFI contracts. Journal of Construction Engineering and Management, 136(7), pp. 811-814. ISSN 0733-9364

Chiang, Y H; Choy, L H T and Li, J (2012) Public expenditure and property cycle: The case in Shanghai. Journal of Construction in Developing Countries, 17(1), pp. 87-101. ISSN 1823-6499

Ching-Lung, F (2024) Using convolutional neural networks to identify illegal roofs from unmanned aerial vehicle images. Architectural Engineering and Design Management, 20(2), pp. 390-410. ISSN 1745-2007

Chivatá Cárdenas, Ibsen (2012) Integrating knowledge for managing risk in infrastructure projects: The case of tunnel works. PhD thesis, University of Twente, Netherlands.

Cho, C-S; Mazze, C E; Dika, S L and Gehrig, G B (2015) Enhancing construction education: Implementing habitat for humanity projects as service-learning for construction materials. International Journal of Construction Education and Research, 11(1), pp. 4-20. ISSN 1557-8771

Cho, M (1994) Productivity analysis in construction using an expert system approach. PhD thesis, University of Manchester, UK.

Cho, Y K; Bode, T; Song, J and Jeong, J H (2012) Thermography-driven distress prediction from hot mix asphalt road paving construction. Journal of Construction Engineering and Management, 138(2), pp. 206-214. ISSN 0733-9364

Choi, J (2006) Quantifying the effects of interference through use of an alternative method of productivity estimation. PhD thesis, University of Florida, USA.

Choi, J; Hong, D H; Lee, S H; Lee, H Y; Hong, T; Lee, D E and Park, H S (2023) Multi-objective green design model for prestressed concrete slabs in long-span buildings. Architectural Engineering and Design Management, 19(5), pp. 531-549. ISSN 1745-2007

Choi, K; Lee, H W; Bae, J and Bilbo, D (2016) Time-cost performance effect of change orders from accelerated contract provisions. Journal of Construction Engineering and Management, 142(3): 04015085, ISSN 0733-9364

Choi, K; Lee, H W; Mao, Z; Lavy, S and Ryoo, B Y (2016) Environmental, economic, and social implications of highway concrete rehabilitation alternatives. Journal of Construction Engineering and Management, 142(2): 04015079, ISSN 0733-9364

Choi, K; Son, K; Woods, P and Park, Y J (2012) LEED public transportation accessibility and its economic implications. Journal of Construction Engineering and Management, 138(9), pp. 1095-1102. ISSN 0733-9364

Choi, S D (2008) Postural balance and adaptations in transitioning sloped surfaces. International Journal of Construction Education and Research, 4(3), pp. 189-199. ISSN 1557-8771

Choi, S D; Griinke, D and Lederer, M (2006) Fall protection equipment effects on productivity and safety in residential roofing construction. Journal of Construction Research, 7(1), pp. 149-157. ISSN 1609-9451

Choi, Y; Kim, D C; Kim, S S; Nam, M S and Kim, T H (2013) Implementation of noise-free and vibration-free PHC screw piles on the basis of full-scale tests. Journal of Construction Engineering and Management, 139(8), pp. 960-967. ISSN 0733-9364

Chong, H Y; Zhang, Y; Lee, C Y; Wang, F and Zhang, Y (2025) Synchronizing BIM cost models and bills of quantities for lifecycle audit trail cost management. Engineering, Construction and Architectural Management, 32(10), pp. 6566-6592. ISSN 0969-9988

Chong, D; Wang, Y; Chen, L and Yu, B (2016) Modeling and validation of energy consumption in asphalt mixture production. Journal of Construction Engineering and Management, 142(12): 04016069, ISSN 0733-9364

Chong, W K O (2005) Construction production rate information system for highway projects. PhD thesis, University of Texas at Austin, USA.

Chou, J-S (2005) Item-level quantity-based preliminary cost estimating system for highway earthwork, landscape, subgrade treatments, base, surface courses, pavement and traffic control. PhD thesis, University of Texas at Austin, USA.

Choudhari, S and Tindwani, A (2017) Logistics optimisation in road construction project. Construction Innovation, 17(2), pp. 158-179. ISSN 1471-4175

Chowdhury, A N; Chen, P H and Tiong, R L K (2011) Analysing the structure of public-private partnership projects using network theory. Construction Management and Economics, 29(3), pp. 247-260. ISSN 1466433X

Chowdhury, R (2009) Life cycle based analysis of various materials used in road construction. PhD thesis, University of Toledo, USA.

Chowdhury, S; Zhu, J; Rasoulkhani, K; Mostafavi, A; Jaselskis, E; Stoa, R; Li, Q; Banerjee, S; Alsharef, A and Brannen, L (2020) Guidelines for robust adaptation to environmental regulations in infrastructure projects. Journal of Construction Engineering and Management, 146(10): 04020121, ISSN 0733-9364

Christian, J and Hachey, D (1995) Effects of delay times on production rates in construction. Journal of Construction Engineering and Management, 121(1), pp. 20-26. ISSN 0733-9364

Christian, J and Mir, S U (1987) Use of integrated microcomputer package for formwork design. Journal of Construction Engineering and Management, 113(4), pp. 603-610. ISSN 0733-9364

Christiansen, T R (1994) Modeling efficiency and effectiveness of coordination in engineering design teams. PhD thesis, Stanford University, USA.

Chua, D K H; Kog, Y C; Loh, P K and Jaselskis, E J (1997) Model for construction budget performance: neural network approach. Journal of Construction Engineering and Management, 123(3), pp. 214-222. ISSN 0733-9364

Chun, S and Nam, K (2022) Analyzation and prioritization of healthcare environment criteria for designing geriatric long-term care private hospitals in South Korea using an analytic hierarchy process. Architectural Engineering and Design Management, 18(5), pp. 723-738. ISSN 1745-2007

Chung, T H; Abraham, D M and Gokhale, S B (2004) Decision support system for microtunneling applications. Journal of Construction Engineering and Management, 130(6), pp. 835-843. ISSN 0733-9364

Cidik, M S; Boyd, D and Thurairajah, N (2014) Leveraging collaboration through the use of building information models. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Cieraad, F D; Schraven, D F J and de Bruijne, M L C (2018) Investments under pressure: A real options approach to prepare for emergency asylum shelter in a multi actor setting. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Ciribizni, A and Galimberti, G (2005) H&S planning and 4D project scheduling. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Clarke, B G (2011) Educating engineers in the workplace. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(2), pp. 89-98. ISSN 17514312

Clarke, L and Herrmann, G (2004) Cost vs. Production: Labour deployment and productivity in social housing construction in England, Scotland, Denmark and Germany. Construction Management and Economics, 22(10), pp. 1057-1066. ISSN 01446193

Clarke, L and Wall, C (1998) UK construction skills in the context of European developments. Construction Management and Economics, 16(5), pp. 553-567. ISSN 01446193

Cleveland, T G and Fashokun, A (2006) Construction-associated solids loads with a temporary sediment control bmp. Journal of Construction Engineering and Management, 132(10), pp. 1122-1125. ISSN 0733-9364

Cloete, Brent; Agumba, Justus; Adebowale, Oluseyi Julius and Meyer, Chris (2026) From readiness to implementation: A framework for BIM adoption in facilities management organisations. Journal of Construction Business and Management, 8(2), pp. 43-53. ISSN 2521-0165

Close, R and Loosemore, M (2014) Breaking down the site hoardings: Attitudes and approaches to community consultation during construction. Construction Management and Economics, 32(7-8), pp. 816-828. ISSN 01446193

Close R, L M (2013) Community consultation during construction: Attitudes, experiences and skills. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Coble, R J and Haupt, T C (2000) Effecting safety in affordable housing projects using automation. Journal of Construction Research, 1(1), pp. 1-8. ISSN 1609-9451

Coffey, B; Borgeson, S; Selkowitz, S; Apte, J; Mathew, P and Haves, P (2009) Towards a very low-energy building stock: Modelling the US commercial building sector to support policy and innovation planning. Building Research & Information, 37(5-6), pp. 610-624. ISSN 0961-3218

Cohenca, D; Laufer, A and Ledbetter, W B (1989) Factors affecting construction planning efforts. Journal of Construction Engineering and Management, 115(1), pp. 70-89. ISSN 0733-9364

Cole, R J (1999) Building environmental assessment methods: Clarifying intentions. Building Research & Information, 27(4-5), pp. 230-246. ISSN 0961-3218

Cole, R J (2000) Building environmental assessment methods: Assessing construction practices. Construction Management and Economics, 18(8), pp. 949-957. ISSN 01446193

Cole, R J (2001) Lessons learned, future directions and issues for GBC. Building Research & Information, 29(5), pp. 355-373. ISSN 0961-3218

Cole, R J (2005) Building environmental assessment methods: Redefining intentions and roles. Building Research & Information, 33(5), pp. 455-467. ISSN 0961-3218

Cole, R J (2012) Transitioning from green to regenerative design. Building Research & Information, 40(1), pp. 39-53. ISSN 0961-3218

Cole, R J; Busby, P; Guenther, R; Briney, L; Blaviesciunaite, A and Alencar, T (2012) A regenerative design framework: Setting new aspirations and initiating new discussions. Building Research & Information, 40(1), pp. 95-111. ISSN 0961-3218

Cole, R J and Sterner, E (2000) Reconciling theory and practice of life-cycle costing. Building Research & Information, 28(5-6), pp. 368-375. ISSN 0961-3218

Cole, R J and Valdebenito, M J (2013) The importation of building environmental certification systems: International usages of BREEAM and LEED. Building Research & Information, 41(6), pp. 662-676. ISSN 0961-3218

Collinge, W H (2017) Client requirement representations and transformations in construction project design. Journal of Engineering, Design and Technology, 15(2), pp. 222-241.

Colwell, D A F and Ariaratnam, S T (2003) Evaluation of high-density polyethylene pipe installed using horizontal directional drilling. Journal of Construction Engineering and Management, 129(1), pp. 47-55. ISSN 0733-9364

Comerio, M C (2004) Public policy for reducing earthquake risks: A US perspective. Building Research & Information, 32(5), pp. 403-413. ISSN 0961-3218

Conejos, Sheila (2013) Designing for future building adaptive reuse. PhD thesis, Bond University, Australia.

Connaughton, J; Meikle, J and Teerikangas, S (2015) Mergers, acquisitions and the evolution of construction professional services firms. Construction Management and Economics, 33(2), pp. 146-159. ISSN 01446193

Conradie, D; van Reenen, T and Bole, S (2018) Degree-day building energy reference map for South Africa. Building Research & Information, 46(2), pp. 191-16. ISSN 0961-3218

Conteh, Augustine (2023) Values of real assets: Focus on infrastructure and housing in Australia. PhD thesis, Griffith University, Australia.

Cooke, T (2013) Can knowledge sharing mitigate the effect of construction project complexity? Construction Innovation, 13(1), pp. 5-9. ISSN 1471-4175

Cooke, T; Lingard, H and Blismas, N (2007) On-line oh&s risk assessment for construction designers: The 'toolshed' prototype. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Cooper, G (2008) Escaping the house: Comfort and the California garden. Building Research & Information, 36(4), pp. 373-380. ISSN 0961-3218

Cooper, I (1999) Which focus for building assessment methods: environmental performance or sustainability? Building Research & Information, 27(4-5), pp. 321-331. ISSN 0961-3218

Cooper, I (2001) Post-occupancy evaluation: where are you? Building Research & Information, 29(2), pp. 158-163. ISSN 0961-3218

Cooper, I (2002) Transgressing discipline boundaries: Is bequest an example of 'the new production of knowledge'? Building Research & Information, 30(2), pp. 116-129. ISSN 0961-3218

Corbett, P and Rowley, P (1999) The use of bcis elemental cost data by quantity surveyors as part of cost planning techniques: The practitioners' perspective. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Corcoran, J (2011) Engaging the workforce to establish a safety-conscious culture. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(2), pp. 71-78. ISSN 17514312

Costa, Rafael de Oliveira (2021) Applicability of international environmental law in the construction of corporate social responsibility. PhD thesis, Universidade de São Paulo, Brazil.

Cote, B; Robinson, B; Gabr, M A and Borden, R H (2013) Performance-cost analysis of stabilized undercut subgrades. Journal of Construction Engineering and Management, 139(2), pp. 121-127. ISSN 0733-9364

Coupar, G (2009) Modern approaches to repairs and maintenance procurement within the social housing sector. PhD thesis, Nottingham Trent University, UK.

Cowie, G F (1987) Enough scope yields better estimates. Journal of Construction Engineering and Management, 113(2), pp. 315-320. ISSN 0733-9364

Cox, A and Furlong, P (1995) European procurement rules and national preference: Explaining the local sourcing of public works contracts in the EU in 1993. Journal of Construction Procurement, 1(2), pp. 87-99. ISSN 1358-9180

Craig, R (1999) How innovative is the common law of tendering? Journal of Construction Procurement, 5(1), pp. 15-26. ISSN 1358-9180

Craig, R (2000) Re-engineering the tender code for construction works. Construction Management and Economics, 18(1), pp. 91-100. ISSN 01446193

Craig, R W (2000) Controversial aspects of Commonwealth Construction and Engineering Procurement Law. PhD thesis, Loughborough University, UK.

Craig, R W and Barnes, W C (2007) Professional employees' exposure to risk of negligence claims from the client. Construction Management and Economics, 25(7), pp. 811-819. ISSN 1466433X

Crawford, R H; Treloar, G J; Ilozor, B D and Love, P E D (2003) Comparative greenhouse emissions analysis of domestic solar hot water systems. Building Research & Information, 31(1), pp. 34-47. ISSN 0961-3218

Crawley, J; Domoney, L; O'Donovan, A; Wingfield, J; Dinu, C; Kinnane, O and O'Sullivan, P (2026) Towards a universal framework for heat pump monitoring at scale. Buildings & Cities, 7(1), pp. 75-91. ISSN 2632-6655

Crawley, D and Aho, I (1999) Building environmental assessment methods: Applications and development trends. Building Research & Information, 27(4-5), pp. 300-308. ISSN 0961-3218

Crosthwaite, D (2000) The international performance of British construction companies 1990-1996. Building Research & Information, 28(4), pp. 280-290. ISSN 0961-3218

Cruywagen, J H H (2015) Towards the establishment of a relevant tender price index for the South African building industry. PhD thesis, University of Pretoria, South Africa.

Cruz, Arturo (2020) Developing a model for maintenance-focused heritage building conservation. PhD thesis, Queensland University of Technology, Australia.

Cruz, L M M; Echeverri, J J D; Arroyave, M G; Bejarano, D H and Florez, O F M (2017) Bioclimatic conditions: A forgotten factor in the domestic habitat in the city of Palmira, Colombia. Journal of Construction in Developing Countries, 22(2), pp. 81-100. ISSN 1823-6499

Cruz Ortiz, M R P (2019) Expanding modular design: All-rise mass timber residences in Hawaii. DArch thesis, University of Hawai'i at Manoa, USA.

Cruz-Bello, G M; Galeana-Pizaña, J M and González-Arellano, S (2023) Urban growth in peri-urban, rural and urban areas: Mexico city. Buildings & Cities, 4(1), pp. 1-16. ISSN 2632-6655

Cuce, A P M (2016) Innovative heating, cooling and ventilation technologies for low-carbon buildings. PhD thesis, University of Nottingham, UK.

Cuervo, J C and Pheng, L S (2003) Ownership advantages/disadvantages of Singapore transnational construction corporations. Construction Management and Economics, 21(1), pp. 81-94. ISSN 01446193

Cuervo, J C and Pheng, L S (2004) Global performance measures for transnational construction corporations. Construction Management and Economics, 22(8), pp. 851-860. ISSN 01446193

Cui, B; Wang, C; Li, Y; Li, H; Li, C and Cui, B (2024) Image enhancement-based detection of concrete cracks under turbid water bodies. Architectural Engineering and Design Management, 20(6), pp. 1687-1708. ISSN 1745-2007

Cui, Q; Johnson, P; Quick, A and Hastak, M (2008) Valuing the warranty ceiling clause on New Mexico Highway 44 using a binomial lattice model. Journal of Construction Engineering and Management, 134(1), pp. 10-17. ISSN 0733-9364

Cummings, S; McDougall, J A and Swaffield, J A (2007) Hydraulic assessment of non-circular-section building drainage. Building Research & Information, 35(3), pp. 316-328. ISSN 0961-3218

Curran, M (2020) External stakeholder management and engagement on urban construction projects in the UK and Ireland. PhD thesis, Queen's University Belfast, UK.

Curwell, S; Yates, A; Howard, N; Bordass, B and Doggart, J (1999) The green building challenge in the UK. Building Research & Information, 27(4-5), pp. 286-293. ISSN 0961-3218

Cusack, M M (1985) A simplified approach to the planning and control of cost and project duration. Construction Management and Economics, 3(3), pp. 183-198. ISSN 01446193

D'Amato, M and Kauko, T (2012) Sustainability and risk premium estimation in property valuation and assessment of worth. Building Research & Information, 40(2), pp. 174-185. ISSN 0961-3218

D'Orazio, M; Bernardini, G and Di Giuseppe, E (2024) Improving sustainable management of university buildings based on occupancy data. Journal of Construction Engineering and Management, 150(1): 04023154, ISSN 0733-9364

Da Rocha, C G and Kemmer, S L (2013) Method to implement delayed product differentiation in construction of high-rise apartment building projects. Journal of Construction Engineering and Management, 139(10): 05013001, ISSN 0733-9364

Da Rocha, C G; Kemmer, S L and Meneses, L (2016) Managing customization strategies to reduce workflow variations in house building projects. Journal of Construction Engineering and Management, 142(8): 5016005, ISSN 0733-9364

Da Silva, N A F (2015) Building certification schemes and the quality of indoor environment. PhD thesis, National University of Singapore, Singapore.

Dagenais, D A (2007) Introduction to good faith in construction contracts. Construction Management and Economics, 25(7), pp. 715-721. ISSN 1466433X

Daghsen, K.; Gonzalez-Moreno, S. and Picallo-Perez, A. (2026) Energy rehabilitation of a university building system as a technical response to the Spanish blackout. Building Research & Information, 54(6), pp. 733-752. ISSN 0961-3218

Daheshpour, K (2018) Network level decision support system to assess railway track maintenance needs. PhD thesis, University of Birmingham, UK.

Dai, H; Cao, G and Su, H (2006) Management and construction of the three gorges project. Journal of Construction Engineering and Management, 132(6), pp. 615-619. ISSN 0733-9364

Dainty, A; Leiringer, R; Fernie, S and Harty, C (2017) BIM and the small construction firm: A critical perspective. Building Research & Information, 45(6), pp. 696-709. ISSN 0961-3218

Dainty, A R J; Raidén, A B and Neale, R H (2004) Psychological contract expectations of construction project managers. Engineering, Construction and Architectural Management, 11(1), pp. 33-44. ISSN 0969-9988

Dakhli, Z and Lafhaj, Z (2017) Experimental and numerical prototyping of a complex cement column formwork for construction. Architectural Engineering and Design Management, 13(2), pp. 147-165. ISSN 1745-2007

Dal Borgo, Eleonora (2017) Sustainable production planning optimisation for project-based enterprises. PhD thesis, Università degli Studi di Udine, Italy.

Dalgliesh, C D; Bowen, P A and Hill, R C (1997) Environmental sustainability in the delivery of affordable housing in South Africa. Engineering, Construction and Architectural Management, 4(1), pp. 23-39. ISSN 0969-9988

Damci, A (2022) Revisiting the concept of natural rhythm of production in line of balance scheduling. International Journal of Construction Management, 22(12), pp. 2335-2344. ISSN 1562-3599

Damnjanovic, I and Zhang, Z (2008) Risk-based model for valuation of performance-specified pavement maintenance contracts. Journal of Construction Engineering and Management, 134(7), pp. 492-500. ISSN 0733-9364

Dang, C N; Le-Hoai, L; Kim, S-Y; Nguyen, C V; Lee, Y-D and Lee, S-H (2017) Identification of risk patterns in Vietnamese road and bridge construction: Contractor's perspective. Built Environment Project and Asset Management, 7(1), pp. 59-72. ISSN 2044-124X

Dang, T and Bargstädt, H J (2016) 4D relationships: The missing link in 4D scheduling. Journal of Construction Engineering and Management, 142(2): 04015072, ISSN 0733-9364

Danlei, Z (2019) The social and market outcomes of green buildings from developer and resident perspectives: The case of Singapore. PhD thesis, National University of Singapore, Singapore.

Dann, N; Hills, S and Worthing, D (2006) Assessing how organizations approach the maintenance management of listed buildings. Construction Management and Economics, 24(1), pp. 97-104. ISSN 01446193

Danso, H; Martinson, B; Ali, M and Mant, C (2015) Performance characteristics of enhanced soil blocks: A quantitative review. Building Research & Information, 43(2), pp. 253-262. ISSN 0961-3218

Danso, H; Obeng-Ahenkora, N K and Manu, D (2021) Prices trend of selected building and construction materials on Ghanaian construction market: 2011–2016. International Journal of Construction Management, 21(3), pp. 284-291. ISSN 1562-3599

Danso-Amoako, M O (2006) Developing a framework to support data exchange from heterogeneous data sources via industry foundation classes (IFC) and web services. PhD thesis, University of Florida, USA.

Daouk, M E (2024) The future of Approved Inspectors: liable or not liable? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(1), pp. 25-31. ISSN 17514304

Dardouri, S; BuHamdan, S; Al Balkhy, W; Dakhli, Z; Danel, T and Lafhaj, Z (2023) RFID platform for construction materials management. International Journal of Construction Management, 23(14), pp. 2509-2519. ISSN 1562-3599

Darko, A; Glushakova, I; Boateng, E B and Chan, A P C (2023) Using machine learning to improve cost and duration prediction accuracy in green building projects. Journal of Construction Engineering and Management, 149(8): 04023061, ISSN 0733-9364

Das, P K (2006) A sustainability impact-assessment tool for selected building technologies in rural India: the case of the Andhra Pradesh primary education project. PhD thesis, University of Newcastle upon Tyne, UK.

Davey, C L; McDonald, J; Lowe, D; Duff, R; Powell, J A and Powell, J E (2006) Defects liability management by design. Building Research & Information, 34(2), pp. 145-153. ISSN 0961-3218

Davies, John P (2009) Alliance contracts and public sector governance. PhD thesis, Griffith University, Australia.

Davies, M; Jackaway, A; Hardy, R; Dewey, E and Littler, J (2000) A translucent louvre system: Design concepts, modelling work and monitored data. Building Research & Information, 28(1), pp. 42-50. ISSN 0961-3218

Davis, C and Cochrane, S R (1987) Optimization of future manpower requirements in a multi-discipline consultancy. Construction Management and Economics, 5(1), pp. 45-56. ISSN 01446193

Davis, K A (2013) Using low- and no-stakes quizzing for student self-evaluation of readiness for exams. International Journal of Construction Education and Research, 9(4), pp. 256-271. ISSN 1557-8771

Davis, M C (2011) Psychological and organisational issues in the design of buildings and workplaces. PhD thesis, University of Leeds, UK.

Davis, M R (2018) Achieving diversity on local publicly funded construction projects in the state of California: Knowledge, motivation, and organization factors influencing prime contractor selection of minority subcontractors. EdD thesis, University of Southern California, USA.

Davis, P R (2007) Maintaining relationship based procurement. Construction Economics and Building, 7(2), pp. 37-44. ISSN 2204-9029

Davis, P R and Walker, D H T (2004) Relationship based procurement. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Davis, R and Watson, P (1999) The utilization of formulae in overhead and profit claims. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Davison, N; Goodier, C; Gibb, A; Austin, S; Saker, J and Gregory, C (2006) Factors influencing the market for branded mass customised buildings. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Dawodu, A; Cheshmehzangi, A and Sharifi, A (2021) A multi-dimensional energy-based analysis of neighbourhood sustainability assessment tools: Are institutional indicators really missing? Building Research & Information, 49(5), pp. 574-592. ISSN 0961-3218

Day, K (2024) Emulating the past, envisioning the future: A study of CAD file preservation in Australian architectural practices. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Day, K D (1989) The administration of the 'botched' FIDIC contract: the problems arising out of the administration of a wrongly 'slanted' contract for turnkey projects. PhD thesis, University of Southampton, UK.

Dayanand, N (1996) Scheduling payments in projects: An optimization framework. PhD thesis, Carnegie Mellon University, USA.

Dağkıran, G (2015) A multi agent risk analysis and sharing platform for international construction projects. PhD thesis, Middle East Technical University, Turkey.

De Araujo, V (2023) Timber construction as a multiple valuable sustainable alternative: Main characteristics, challenge remarks and affirmative actions. International Journal of Construction Management, 23(8), pp. 1334-1343. ISSN 1562-3599

De Asís Ramírez, F; Seco, A and Miqueleiz, L (2013) The arbitration process in civil engineering. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(1), pp. 43-46. ISSN 17514304

De Dear, R (2011) Revisiting an old hypothesis of human thermal perception: Alliesthesia. Building Research & Information, 39(2), pp. 108-117. ISSN 0961-3218

De La Fuente, A; Casanovas-Rubio, M D M; Pons, O and Armengou, J (2019) Sustainability of column-supported RC slabs: Fiber reinforcement as an alternative. Journal of Construction Engineering and Management, 145(7): 04019042, ISSN 0733-9364

De La Garza, J M (2007) Sponsored research and its impact on universities, faculty, and journals. Journal of Construction Engineering and Management, 133(9), pp. 708-709. ISSN 0733-9364

De La Garza, J M; Prateapusanond, A and Ambani, N (2007) Preallocation of total float in the application of a critical path method based construction contract. Journal of Construction Engineering and Management, 133(11), pp. 836-845. ISSN 0733-9364

De Oliveira, A L and Prudêncio, L R (2015) Evaluation of the superficial texture of concrete pavers using digital image processing. Journal of Construction Engineering and Management, 141(10): 04015034, ISSN 0733-9364

De Saram, D D and Tang, S L (2005) Pain and suffering costs of persons in construction accidents: Hong Kong experience. Construction Management and Economics, 23(6), pp. 645-658. ISSN 01446193

Deakin, M (1997) The development of computer-based information systems for local authority property management: The underlying issues. Journal of Financial Management of Property and Construction, 2(1), pp. 59-82. ISSN 1366-4387

Deakin, M (2000) The development of property asset management: Towards a pro-investment form. Journal of Financial Management of Property and Construction, 5(1-2), pp. 15-31. ISSN 1366-4387

Dean, Y and Warwick, S (1998) Buildings, the suppression of seasonal response and the effects on health. Building Research & Information, 26(3), pp. 146-156. ISSN 0961-3218

Debela, G Y (2021) Assessment of government policies and regulations in the process of adopting Public-Private Partnership for infrastructure development in Ethiopia. PhD thesis, University of Birmingham, UK.

Debella, F M (2020) Profitability improvement of construction firms through continuous improvement using rapid improvement principles and best practices. PhD thesis, Purdue University, USA.

Demir, T; Bryde, D J; Fearon, D and Ochieng, E G (2011) Comp(TQC): A new way for integrating time, quality and cost perspectives when doing qualitative risk analysis. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Deng, H; Hong, H; Luo, D; Deng, Y and Su, C (2020) Automatic indoor construction process monitoring for tiles based on BIM and computer vision. Journal of Construction Engineering and Management, 146(1): 04019095, ISSN 0733-9364

Devaney, S and Roberts, D (2012) Who gets the jobs? Factors influencing the employability of property and construction graduates in the UK. Construction Management and Economics, 30(3), pp. 233-246. ISSN 1466433X

Dhaenens, A; Zheng, W; Sanders, K and Sumelius, J (2026) Mind the gap: Employee work arrangements, work-family balance satisfaction, and turnover in international property development. Journal of Construction Engineering and Management, 152(1): 04025231, ISSN 0733-9364

Dhanasekar, M (2000) Identification of optimal size resources for a repetitive housing construction. Engineering, Construction and Architectural Management, 7(4), pp. 347-361. ISSN 0969-9988

Dharwadkar, P V (1994) A prototype object-oriented system for three-dimensional CAD and schedule integration. PhD thesis, University of Texas at Austin, USA.

Dias, A and Ioannou, P G (1995) Debt capacity and optimal capital structure for privately financed infrastructure projects. Journal of Construction Engineering and Management, 121(4), pp. 404-414. ISSN 0733-9364

Diekmann, J E (1983) Probabilistic estimating: Mathematics and applications. Journal of Construction Engineering and Management, 109(3), pp. 297-308. ISSN 0733-9364

Dilger, W H; Tadros, G S and Giannelia, P (1992) Method proposed for construction of multispan cable-stayed bridges. Journal of Construction Engineering and Management, 118(2), pp. 273-282. ISSN 0733-9364

Ding, G and Forsythe, P J (2013) Sustainable construction: Life cycle energy analysis of construction on sloping sites for residential buildings. Construction Management and Economics, 31(3), pp. 254-265. ISSN 1466433X

Ding, G K C (2007) Life cycle energy assessment of Australian secondary schools. Building Research & Information, 35(5), pp. 487-500. ISSN 0961-3218

Ding, Z; Jiang, S; Ng, F and Zhu, M (2017) A new TRIZ-based patent knowledge management system for construction technology innovation. Journal of Engineering, Design and Technology, 15(4), pp. 456-470.

Dioguardi, G (1983) Macrofirms: Construction firms for the computer age. Journal of Construction Engineering and Management, 109(1), pp. 13-24. ISSN 0733-9364

Dixit, V (2022) Risk assessment of different sourcing contract scenarios in project procurement. International Journal of Construction Management, 22(8), pp. 1537-1549. ISSN 1562-3599

Dixon, W S (2014) Quantitative tool for measuring safety culture on busy construction sites in Great Britain. DProf thesis, University of Salford, UK.

Doan, P and Menyah, K (2013) Impact of irreversibility and uncertainty on the timing of infrastructure projects. Journal of Construction Engineering and Management, 139(3), pp. 331-338. ISSN 0733-9364

Dobraszczyk, P A (2006) Into the belly of the beast: Exploring London's main drainage system, c.1848-1868. PhD thesis, University of Reading, UK.

Domingo, N (2011) Reducing construction waste in healthcare projects: a project lifecycle approach. PhD thesis, Loughborough University, UK.

Dong, S (2012) A single element based modeling approach for simulating construction operations. PhD thesis, University of Nebraska - Lincoln, USA.

Donohoe, S (2010) Attitudes to sustainable construction and contracts: International perspectives and approaches. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Donohoe, S and Coggins, J (2011) Liquidated damages in construction contracts: Is there a schism between the Australian and English courts? In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Dorst, K (2007) Building for the visual age. Building Research & Information, 35(5), pp. 581-583. ISSN 0961-3218

Dou, Y; Li, T; Li, L; Zhang, Y and Li, Z (2023) Tracking the research on ten emerging digital technologies in the AECO industry. Journal of Construction Engineering and Management, 149(3): 03123003, ISSN 0733-9364

Dowding, C H (1994) Ground motions and air-blast effects of explosive demolition of structures. Journal of Construction Engineering and Management, 120(4), pp. 838-856. ISSN 0733-9364

Drew, D; Kwong, C; Zou, P and Shen, L Y (2002) Determining the optimal fee-technical proposal combination in two envelope fee bidding. Construction Economics and Building, 2(2), pp. 1-9. ISSN 2204-9029

Drew, D S; Lai, P Y; Li, H and Lo, H P (2002) Correcting the fee-technical score variability imbalance in two-envelope fee tendering. Construction Management and Economics, 20(2), pp. 157-166. ISSN 01446193

Drew, D S and Skitmore, M (2006) Testing Vickery's revenue equivalence theory in construction auctions. Journal of Construction Engineering and Management, 132(4), pp. 425-428. ISSN 0733-9364

Drew D.S, T S L Y (2002) Developing a tendering strategy in two-envelope fee tendering based on technical score-fee variability. Construction Management and Economics, 20(1), pp. 67-81. ISSN 01446193

Drummond, P and Ekins, P (2016) Reducing CO2 emissions from residential energy use. Building Research & Information, 44(5-6), pp. 585-603. ISSN 0961-3218

Du, H (2012) Modelling of building performance under the UK climate change projections and the prediction of future heating and cooling design loads in building spaces. PhD thesis, University of Northumbria at Newcastle, UK.

Du, J; Liu, C and Picken, D (2007) A preliminary study on human resources management in international construction. Construction Economics and Building, 7(2), pp. 1-11. ISSN 2204-9029

Du, J; Liu, R and Issa, R R A (2014) BIM cloud score: Benchmarking BIM performance. Journal of Construction Engineering and Management, 140(11): 4014054, ISSN 0733-9364

Du Plessis, C (2005) Action for sustainability: Preparing an African plan for sustainable building and construction. Building Research & Information, 33(5), pp. 405-415. ISSN 0961-3218

Du Plessis, C; Irurah, D K and Scholes, R J (2003) The built environment and climate change in South Africa. Building Research & Information, 31(3-4), pp. 240-256. ISSN 0961-3218

Du Plessis, C and Sherratt, F (2020) Construction 4.0 and built assets in-use: Creating an e-topia or dystopia? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(4), pp. 182-189. ISSN 17514304

Duanshun, Li (2018) Towards fully integrated and automated construction planning on earthworks projects. PhD thesis, University of Alberta, Canada.

Duckles, B M (2009) The green building industry in California: From ideals to buildings. PhD thesis, University of Arizona, USA.

Duff, A R (1987) Interference in stochastic flow-line models. Journal of Construction Engineering and Management, 113(3), pp. 385-398. ISSN 0733-9364

Duggan, G P; Bauleo, P; Authier, M; Aloise-Young, P A; Care, J and Zimmerle, D (2023) Electricity consumption in commercial buildings during COVID-19. Buildings & Cities, 4(1), pp. 851-866. ISSN 2632-6655

Dulung, A Z A (2007) Computer aided decision support system for the selection of subcontractors in building refurbishment works. PhD thesis, National University of Singapore, Singapore.

Duncan, J (2005) Performance-based building: Lessons from implementation in New Zealand. Building Research & Information, 33(2), pp. 120-127. ISSN 0961-3218

Dunne, J (2007) Design knowledge extraction: A community-based approach to public open space design in Mexico city. Architectural Engineering and Design Management, 3(3), pp. 160-168. ISSN 1745-2007

Dunston, P S and Reed, A G (2000) Benefits of small projects team initiative. Journal of Construction Engineering and Management, 126(1), pp. 22-28. ISSN 0733-9364

Duwebi, N; Gorse, C; Sturges, J and Bates, M (2017) Reporting corporate sustainability and the challenges of political rhetoric. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Eadie, R; Perera, S; Heaney, G and Carlisle, J (2007) Construction contractor's perspective on web-based advertising of public sector construction contracts. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Easa, S M and Can, E K (1985) Optimization model for aggregate blending. Journal of Construction Engineering and Management, 111(3), pp. 216-230. ISSN 0733-9364

Easa, S M and Can, E K (1985) Stochastic priority model for aggregate blending. Journal of Construction Engineering and Management, 111(4), pp. 358-373. ISSN 0733-9364

East, E W and Liu, L Y (2006) Multiproject planning and resource controls for facility management. Journal of Construction Engineering and Management, 132(12), pp. 1294-1305. ISSN 0733-9364

Eaton, D; Akbiyikli, R and Dickinson, M (2006) An evaluation of the stimulants and impediments to innovation within PFI/PPP projects. Construction Innovation, 6(2), pp. 63-67. ISSN 1471-4175

Eaton, D and Morton, P (2008) A minority report: Engaging girls in quantity surveying. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Ebrahiminejad, M; Shakeri, E and Ardeshir, A (2014) Establishing abatement alternatives in construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Echeverry, D; Ibbs, C W and Kim, S (1991) Sequencing knowledge for construction scheduling. Journal of Construction Engineering and Management, 117(1), pp. 118-130. ISSN 0733-9364

Echeverry, D; Majana, E and Acevedo, F (2007) Affordable housing in Latin America: Improved role of the academic sector in the case of Colombia. Journal of Construction Engineering and Management, 133(9), pp. 684-689. ISSN 0733-9364

Ed Koehn, E; Kothari, R K and Pan, C S (1995) Safety in developing countries: Professional and bureaucratic problems. Journal of Construction Engineering and Management, 121(3), pp. 261-265. ISSN 0733-9364

Edet, C B and Gidado, K (2008) PFI hospitals in the UK: Measuring the medical practitioners level of satisfaction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Edward Back, W and Sanders, S R (1998) Industry expectations for engineering graduates. Engineering, Construction and Architectural Management, 5(2), pp. 137-143. ISSN 0969-9988

Edwards, D J and Holt, G D (2006) Hand-arm vibration controls: A perspective based on performance and cost dimensions. Journal of Financial Management of Property and Construction, 11(1), pp. 21-32. ISSN 1366-4387

Edwards, D J and Holt, G D (2011) Mini-excavator safety: Toward innovative stability testing, procurement, and manufacture. Journal of Construction Engineering and Management, 137(12), pp. 1125-1133. ISSN 0733-9364

Edwards, D J; Yang, J; Cabahug, R and Love, P E D (2005) Intelligence and maintenance proficiency: An examination of plant operators. Construction Innovation, 5(4), pp. 243-254. ISSN 1471-4175

Egbu, C; Vines, M P and Tookey, J (2003) The role of knowledge management in e-procurement initiatives for construction organizations. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Egbu, J U; Wood, G and Egbu, C O (2010) Critical success factors associated with effective knowledge sharing in the provision of floating support services in sheltered housing for the elderly. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Eid, M S (2017) Sustainable infrastructure development: A holistic system based decision making framework integrating vulnerability indicators and stakeholders objectives. PhD thesis, University of Tennessee, USA.

Eisenberg, D A (2016) Transforming building regulatory systems to address climate change. Building Research & Information, 44(5-6), pp. 468-473. ISSN 0961-3218

Eisenberg, D A (2018) How to think about resilient infrastructure systems. PhD thesis, Arizona State University, USA.

El-Anwar, O and Aziz, T A (2014) Integrated urban-construction planning framework for slum upgrading projects. Journal of Construction Engineering and Management, 140(4): B4014003, ISSN 0733-9364

El-Anwar, O; El-Rayes, K and Elnashai, A S (2010) Maximizing the sustainability of integrated housing recovery efforts. Journal of Construction Engineering and Management, 136(7), pp. 794-802. ISSN 0733-9364

El-Assaly, A E E-D (1997) Development of a statistical/mechanistic model to predict the consumption of nonrenewable materials in highway construction programs. PhD thesis, University of Florida, USA.

El-Diraby, T E and O'Connor, J T (2001) Model for evaluating bridge construction plans. Journal of Construction Engineering and Management, 127(5), pp. 399-405. ISSN 0733-9364

El-Rayes, K (2001) Object-oriented model for repetitive construction scheduling. Journal of Construction Engineering and Management, 127(3), pp. 199-205. ISSN 0733-9364

El-Rayes, K and Hyari, K (2005) Conlight: Lighting design model for nighttime highway construction. Journal of Construction Engineering and Management, 131(4), pp. 467-476. ISSN 0733-9364

El-Rayes, K and Hyari, K (2005) Optimal lighting arrangements for nighttime highway construction projects. Journal of Construction Engineering and Management, 131(12), pp. 1292-1300. ISSN 0733-9364

El-Rayes, K and Jun, D H (2009) Optimizing resource leveling in construction projects. Journal of Construction Engineering and Management, 135(11), pp. 1172-1180. ISSN 0733-9364

El-Rayes, K and Moselhi, O (1998) Resource-driven scheduling of repetitive activities. Construction Management and Economics, 16(4), pp. 433-446. ISSN 01446193

El-Rayes, K and Moselhi, O (2001) Impact of rainfall on the productivity of highway construction. Journal of Construction Engineering and Management, 127(2), pp. 125-131. ISSN 0733-9364

El-Rayes, K and Moselhi, O (2001) Optimizing resource utilization for repetitive construction projects. Journal of Construction Engineering and Management, 127(1), pp. 18-26. ISSN 0733-9364

El-Rayes, K; Ramanathan, R and Moselhi, O (2002) An object-oriented model for planning and control of housing construction. Construction Management and Economics, 20(3), pp. 201-210. ISSN 01446193

El-Rayes, K A (1998) Optimized scheduling for repetitive construction projects. PhD thesis, Concordia University, Canada.

El-Razek, M E A (1999) New method for construction of diaphragm walls. Journal of Construction Engineering and Management, 125(4), pp. 233-241. ISSN 0733-9364

El-Sayegh, S M and Al-Haj, R (2017) A new framework for time-cost trade-off considering float loss impact. Journal of Financial Management of Property and Construction, 22(1), pp. 20-36. ISSN 1366-4387

El-Sersy, A H E (1992) An intelligent data model for schedule updating. PhD thesis, University of California, Berkeley, USA.

Elazouni, A (2009) Heuristic method for multi-project finance-based scheduling. Construction Management and Economics, 27(2), pp. 199-211. ISSN 1466433X

Elazouni, A and Abido, M A (2014) Enhanced trade-off of construction projects: Finance-resource-profit. Journal of Construction Engineering and Management, 140(9): 04014043, ISSN 0733-9364

Elazouni, A M (1997) Constructability improvement of steel silos during field operations. Journal of Construction Engineering and Management, 123(1), pp. 21-25. ISSN 0733-9364

Elazouni, A M and Abd El-Razek, M E (2000) Adapting lift-slab technology to construct submerged pile caps. Journal of Construction Engineering and Management, 126(2), pp. 149-157. ISSN 0733-9364

Elazouni, A M and Basha, I M (1996) Evaluating the performance of construction equipment operators in Egypt. Journal of Construction Engineering and Management, 122(2), pp. 109-114. ISSN 0733-9364

Elazouni, A M and Gab-Allah, A A (2004) Finance-based scheduling of construction projects using integer programming. Journal of Construction Engineering and Management, 130(1), pp. 15-24. ISSN 0733-9364

Elazouni, A M and Metwally, F G (2005) Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms. Journal of Construction Engineering and Management, 131(4), pp. 400-412. ISSN 0733-9364

Elazouni, A M and Metwally, F G (2007) Expanding finance-based scheduling to devise overall-optimized project schedules. Journal of Construction Engineering and Management, 133(1), pp. 86-90. ISSN 0733-9364

Elbing, C and Devapriya, K A K (2004) Structured risk management process to achieve value for money in Public Private Partnerships. Journal of Financial Management of Property and Construction, 9(3), pp. 121-128. ISSN 1366-4387

Eldin, N and Hikle, V (2003) Pilot study of quality function deployment in construction projects. Journal of Construction Engineering and Management, 129(3), pp. 314-329. ISSN 0733-9364

Eldin, N N (1989) Measurement of work progress: Quantitative technique. Journal of Construction Engineering and Management, 115(3), pp. 462-474. ISSN 0733-9364

Eldin, N N and Mayfield, J (2005) Determination of most economical scrapers fleet. Journal of Construction Engineering and Management, 131(10), pp. 1109-1114. ISSN 0733-9364

Elhag, T M S and Boussabaine, A H (1998) An artificial neural system for cost estimation of construction projects. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Elhag, T M S and Boussabaine, A H (2001) Tender price estimation using artificial neural networks. Journal of Financial Management of Property and Construction, 6(3), pp. 193-208. ISSN 1366-4387

Elhag, T M S and Boussabaine, A H (2002) Tender price estimation using artificial neural networks II: Modelling. Journal of Financial Management of Property and Construction, 7(1), pp. 49-64. ISSN 1366-4387

Elinwa, A U and Buba, S A (1993) Construction cost factors in Nigeria. Journal of Construction Engineering and Management, 119(4), pp. 698-713. ISSN 0733-9364

Elliot, C and Palmer, A (1996) Life cycle energy analysis of the building resource. Journal of Financial Management of Property and Construction, 1(2), pp. 5-16. ISSN 1366-4387

Elliott, J W; Glick, S and Valdes-Vasquez, R (2019) Student perceptions of model-based estimating. International Journal of Construction Education and Research, 15(2), pp. 118-135. ISSN 1557-8771

Elnaas, H; Ashton, P and Gidado, K (2009) Decision making process for using off-site manufacturing systems for housing projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Emmer, M J (2009) A decision process model for closing the structural steel materials loop in construction. PhD thesis, University of Florida, USA.

Emmitt, S (1999) Architectural management: An evolving field. Engineering, Construction and Architectural Management, 6(2), pp. 188-196. ISSN 0969-9988

Emuze, F; Norgbey, W S and Smallwood, J (2015) Provincial roads capex programme in South Africa: Planning and management inadequacies. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

English, J; Haupt, T C and Smallwood, J J (2006) Women, construction and health and safety (H&S): South African and Tanzanian perspectives. Journal of Engineering, Design and Technology, 4(1), pp. 18-28. ISSN 1726-0531

Enshassi, A (1996) Training for Palestinian engineers to face the challenges of multinational enterprises in the Gaza Strip. Building Research & Information, 24(4), pp. 222-227. ISSN 0961-3218

Enshassi, A (1996) A monitoring and controlling system in managing infrastructure projects. Building Research & Information, 24(3), pp. 183-189. ISSN 0961-3218

Enshassi, A (1996) Materials control and waste on building sites. Building Research & Information, 24(1), pp. 31-34. ISSN 0961-3218

Enshassi, A and Burgess, R (1991) Managerial effectiveness and the style of management in the middle East: An empirical analysis. Construction Management and Economics, 9(1), pp. 79-92. ISSN 01446193

Enshassi, A; Elzebdeh, S and Mohamed, S (2017) Drivers affecting household residents' water and related energy consumption in residential buildings. International Journal of Building Pathology and Adaptation, 35(2), pp. 159-175.

Epstein, W C (1995) Development of a systematic approach for knowledge acquisition and experience capture of veteran practitioners in the highway construction industry. PhD thesis, University of Florida, USA.

Erikson, C A (1979) Risk sharing in construction contracts. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Eriksson, P E (2017) Procurement strategies for enhancing exploration and exploitation in construction projects. Journal of Financial Management of Property and Construction, 22(2), pp. 211-230. ISSN 1366-4387

Eriksson, V; Hulthén, K; Sundquist, V; Fredriksson, A and Janné, M (2021) The role of public actors in construction logistics: Effects on and of relational interfaces. Construction Management and Economics, 39(10), pp. 791-806. ISSN 01446193

Erkan, İ (2021) Cognitive response and how it is affected by changes in temperature. Building Research & Information, 49(4), pp. 399-416. ISSN 0961-3218

Eskander, A K (1998) Total project management delay analysis method (TPM-DAM) with emphasis on project preplanning. PhD thesis, Polytechnic University, USA.

Eskins, W A (1998) Construction of the new Coleman Bridge: Fifth Roebling lecture, 1997. Journal of Construction Engineering and Management, 124(3), pp. 173-175. ISSN 0733-9364

Espinoza, D and Morris, J W F (2013) Decoupled NPV: A simple, improved method to value infrastructure investments. Construction Management and Economics, 31(5), pp. 471-496. ISSN 1466433X

Essah, E A; Russell, S J; Waring, S D; Ferguson, J; Williams, C; Walsh, K; Dyer, S and Raynor, R (2020) Method for evaluating the snagging propensity of roofing membranes in buildings by roosting bats. Building Research & Information, 48(8), pp. 886-898. ISSN 0961-3218

Essah, E A; Sanders, C H; Baker, P and Kalagasidis, A S (2009) Condensation and moisture transport in cold roofs: Effects of roof underlay. Building Research & Information, 37(2), pp. 117-128. ISSN 0961-3218

Evans, R C; Kaka, A P and Lewis, J (1997) Adopting a semi-ideographic approach to cash flow forecasting. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Evans, S; Godoy-Shimizu, D; Steadman, P; Amrith, S; Humphrey, D and Ruyssevelt, P (2023) Getting to net zero: Islington's social housing stock. Buildings & Cities, 4(1), pp. 524-544. ISSN 2632-6655

Everett, J G (1999) Overexertion injuries in construction. Journal of Construction Engineering and Management, 125(2), pp. 109-114. ISSN 0733-9364

Everett, J G and Kelly, D L (1998) Drywall joint finishing: Productivity and ergonomics. Journal of Construction Engineering and Management, 124(5), pp. 347-353. ISSN 0733-9364

Everett, J G and Saito, H (1996) Construction automation: Demands and satisfiers in the United States and Japan. Journal of Construction Engineering and Management, 122(2), pp. 147-151. ISSN 0733-9364

Everett, J G and Slocum, A H (1993) Cranium: Device for improving crane productivity and safety. Journal of Construction Engineering and Management, 119(1), pp. 23-39. ISSN 0733-9364

Everett, J G and Thompson, W S (1995) Experience modification rating for workers' compensation insurance. Journal of Construction Engineering and Management, 121(1), pp. 66-79. ISSN 0733-9364

Everett, J G and Yang, I T (1997) Workers' comp. Premiums: Disparities in penalties for identical losses. Journal of Construction Engineering and Management, 123(3), pp. 312-317. ISSN 0733-9364

Ewart, I J (2019) The social consequences of minor innovations in construction. Construction Management and Economics, 37(9), pp. 537-549. ISSN 01446193

Ewenstein, B and Whyte, J K (2007) Visual representations as 'artefacts of knowing'. Building Research & Information, 35(1), pp. 81-89. ISSN 0961-3218

Eyiah, A K (2003) Construction bank in a developing country: The way forward. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Eyre, N; Fawcett, T; Topouzi, M; Killip, G; Oreszczyn, T; Jenkinson, K and Rosenow, J (2023) Fabric first: Is it still the right approach? Buildings & Cities, 4(1), pp. 965-972. ISSN 2632-6655

Eyssautier-Chuine, S; Mouhoubi, K; Reffuveille, F and Bodnar, J L (2020) Thermographic imaging for early detection of biocolonization on buildings. Building Research & Information, 48(8), pp. 856-865. ISSN 0961-3218

Fahmie, M M (1994) A knowledge-based expert system approach to analyze and evaluate highway construction schedules. PhD thesis, Florida University, USA.

Faisal, Fahim (2016) The role of government and development partner certification in public-private partnership infrastructure project financing. PhD thesis, Queensland University of Technology, Australia.

Fallon, L J (1984) The role of housing in the economic development of puerto rico, 1950 to 1970. PhD thesis, University of Miami, USA.

Famiyeh, S; Amoatey, C T; Adaku, E and Agbenohevi, C S (2017) Major causes of construction time and cost overruns: A case of selected educational sector projects in Ghana. Journal of Engineering, Design and Technology, 15(2), pp. 181-198.

Fan, S L and Tserng, H P (2006) Object-oriented scheduling for repetitive projects with soft logics. Journal of Construction Engineering and Management, 132(1), pp. 35-48. ISSN 0733-9364

Fan, X (2024) Artificial intelligence aided resilient and sustainable water infrastructure systems. PhD thesis, Case Western Reserve University, USA.

Fan, Y and Kokko, E (1997) Three-dimensional gaseous transfer within cellular plastic insulation and its consequences. Building Research & Information, 25(1), pp. 25-35. ISSN 0961-3218

Fang, F and Aboushhiwa, R A (2012) Strategies to address skills shortages in South African civil engineering. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(2), pp. 103-109. ISSN 17514312

Fang, X; Yang, L; Zhang, C; Yang, J and Zhou, W (2025) Large diameter shafts in fractured strata: Equipment and construction procedures. Journal of Construction Engineering and Management, 151(9): 06025001, ISSN 0733-9364

Fang, Y and Cho, Y K (2017) Effectiveness analysis from a cognitive perspective for a real-time safety assistance system for mobile crane lifting operations. Journal of Construction Engineering and Management, 143(4): 05016025, ISSN 0733-9364

Faniran, O O; Love, P E D and Li, H (1999) Optimal allocation of construction planning resources. Journal of Construction Engineering and Management, 125(5), pp. 311-319. ISSN 0733-9364

Faniran, O O; Oluwoye, J O and Lenard, D (1994) Effective construction planning. Construction Management and Economics, 12(6), pp. 485-499. ISSN 01446193

Farahani, A; Wallbaum, H and Dalenbäck, J O (2019) Optimized maintenance and renovation scheduling in multifamily buildings: a systematic approach based on condition state and life cycle cost of building components. Construction Management and Economics, 37(3), pp. 139-155. ISSN 01446193

Farahani, A; Wallbaum, H and Dalenbäck, J O (2020) Cost-optimal maintenance and renovation planning in multifamily buildings with annual budget constraints. Journal of Construction Engineering and Management, 146(3): 04020009, ISSN 0733-9364

Farbarik, J J (1994) Evaluation of the efficacy of using bid data to predict construction cost overruns. PhD thesis, University of Washington, USA.

Farias, Izaura Pereira (2014) Proposal of a construction waste management model for the eastern zone of the city of Teresina, Piauí. PhD thesis, Universidade Estadual Paulista Júlio de Mesquita Filho, Brazil.

Farid, F (1990) Pricing construction contracts under Tax Reform Act of 1986. Journal of Construction Engineering and Management, 116(2), pp. 300-315. ISSN 0733-9364

Farid, F and Boyer, L T (1985) Fair and reasonable markup (FARM) pricing model. Journal of Construction Engineering and Management, 111(4), pp. 374-390. ISSN 0733-9364

Farid, F; Boyer, L T and Kangari, R (1989) Required return on investments in construction. Journal of Construction Engineering and Management, 115(1), pp. 109-125. ISSN 0733-9364

Farid, F and Koning, T L (1994) Simulation verifies queuing program for selecting loader-truck fleets. Journal of Construction Engineering and Management, 120(2), pp. 386-404. ISSN 0733-9364

Farmer, H K (2003) Managing maintenance of multiple domestic accommodation. PhD thesis, Loughborough University, UK.

Farnham, C; Zhang, L; Yuan, J; Emura, K; Alam, A M and Mizuno, T (2017) Measurement of the evaporative cooling effect: Oscillating misting fan. Building Research & Information, 45(7), pp. 783-799. ISSN 0961-3218

Farnsworth, C B; Smith, J P and Bingham, E D (2022) A cross-sectional study exploring IJCER impact in construction scholarship. International Journal of Construction Education and Research, 18(2), pp. 179-198. ISSN 1557-8771

Farrell, M L (1997) Illiquidity, uncertainty and the impact of the term structure of interest rates on the valuation of real estate in a context of Knight-Keynes uncertainty. Journal of Financial Management of Property and Construction, 2(3), pp. 5-30. ISSN 1366-4387

Farrell, M L (1999) The evolution of value theory and the practice of real estate valuation. Journal of Financial Management of Property and Construction, 4(2), pp. 5-32. ISSN 1366-4387

Farrell, P and Gale, A (2000) The site manager: Role, education and training in the UK. Journal of Construction Research, 1(1), pp. 43-52. ISSN 1609-9451

Farrell, P and Middlemass, R (2005) Barriers to disabled students in built environment degree programmes. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Farrow, C B and Wetzel, E (2021) An active learning classroom in construction management education: Student perceptions of engagement and learning. International Journal of Construction Education and Research, 17(4), pp. 299-317. ISSN 1557-8771

Farshchian, M M; Heravi, G and Abourizk, S (2017) Optimizing the owner's scenarios for budget allocation in a portfolio of projects using agent-based simulation. Journal of Construction Engineering and Management, 143(7): 04017022, ISSN 0733-9364

Fawcett, T and Topouzi, M (2020) Residential retrofit in the climate emergency: The role of metrics. Buildings & Cities, 1(1), pp. 475-490. ISSN 2632-6655

Federico, D A; Berta, M; Bottero, M; Mallia, G and Morgese, V (2024) Multicriteria-decision support for master plan scheduling: Urban regeneration of an industrial area in Northern Italy. Construction Management and Economics, 42(5), pp. 476-501. ISSN 01446193

Fedoruk, L E; Cole, R J; Robinson, J B and Cayuela, A (2015) Learning from failure: Understanding the anticipated-achieved building energy performance gap. Building Research & Information, 43(6), pp. 750-763. ISSN 0961-3218

Feiruzi, A (2024) The turnover dynamics of residential buildings. PhD thesis, Lancaster University, UK.

Fellows, R and Liu, A (2010) Conflict on multi-national construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(3), pp. 101-109. ISSN 17514312

Feng, C-W (1998) Applications of genetic algorithms for multi-objective resource allocation of construction projects under certainty. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Feng, X; Ahmed, V and Mahdjoubi, L (2003) Spatial visualization of building components. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Fenis, S M; Diekmann, J E and Huang, P Y (1995) A GIS-based pipeline planning system. Engineering, Construction and Architectural Management, 2(3), pp. 227-238. ISSN 0969-9988

Fenn, J E; Hutchings, D M and Burr, K L (2008) The purposes for state residential general contractor licensing in the United States. International Journal of Construction Education and Research, 4(2), pp. 67-81. ISSN 1557-8771

Fereshtehnejad, S (2018) Multi-hazard lifecycle methods for aging structures and infrastructure systems. PhD thesis, Ohio State University, USA.

Ferrada, X and Serpell, A (2014) Selection of construction methods for construction projects: A knowledge problem. Journal of Construction Engineering and Management, 140(4): B4014002, ISSN 0733-9364

Ferreira, C; Canhoto Neves, L; Silva, A and de Brito, J (2019) Stochastic Petri-net models to predict the degradation of ceramic claddings. Building Research & Information, 47(6), pp. 697-715. ISSN 0961-3218

Ferreira, M; Almeida, M; Rodrigues, A and Silva, S M (2016) Comparing cost-optimal and net-zero energy targets in building retrofit. Building Research & Information, 44(2), pp. 188-201. ISSN 0961-3218

Ferreira, Tiago de Vasconcelos Gonçalves (2025) High-resolution dynamic model integrated with BIM for performance evaluation in building water distribution systems. PhD thesis, Universidade de São Paulo, Brazil.

Finnie, D; Ali, N A and Park, K (2019) Design development post contract signing in New Zealand: Client's or contractor's cost? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(4), pp. 146-156. ISSN 17514304

Firat Dogu, A; Damci, A; Arditi, D and Demirkesen, S (2024) An advanced decision-support system for ranking unbalanced bids. Construction Management and Economics, 42(7), pp. 610-623. ISSN 01446193

Firth, S K; Lomas, K J and Wright, A J (2010) Targeting household energy-efficiency measures using sensitivity analysis. Building Research & Information, 38(1), pp. 25-41. ISSN 0961-3218

Fischer, M A and Aalami, F B (1996) Scheduling with computer-interpretable construction method models. Journal of Construction Engineering and Management, 122(4), pp. 337-347. ISSN 0733-9364

Fischer, M A and Tatum, C B (1997) Characteristics of design-relevant constructability knowledge. Journal of Construction Engineering and Management, 123(3), pp. 253-260. ISSN 0733-9364

Fisher, A D and Robitaille, A M (2011) Replacement of the movable span of the Thames River Bridge: How 19th century technology impacted 21st century construction. Journal of Construction Engineering and Management, 137, pp. 895-900. ISSN 0733-9364

Fisher, D J; Anderson, S D and Rahman, S P (2000) Integrating constructability tools into constructability review process. Journal of Construction Engineering and Management, 126(2), pp. 89-96. ISSN 0733-9364

Fisher, D J; O'Neill, M W and Contreras, J C (1995) DS^2: Drilled shaft decision support system. Journal of Construction Engineering and Management, 121(1), pp. 86-94. ISSN 0733-9364

Fisher, D J and Rajan, N (1996) Automated constructibility analysis of work-zone traffic-control planning. Journal of Construction Engineering and Management, 122(1), pp. 36-43. ISSN 0733-9364

Fitzpatrick, D J (1977) A technological and economic assessment of housebuilding materials. PhD thesis, University of Surrey, UK.

Flanagan, R and Norman, G (1982) Risk analysis: An extension of price prediction techniques for building work. Construction Papers, 1(3), pp. 27-34. ISSN 0144-8587

Flanagan, R; Norman, G and Worrall, H (1995) Trade performance of the UK building materials and components industries. Engineering, Construction and Architectural Management, 2(2), pp. 141-162. ISSN 0969-9988

Fondahl, J W (1991) The development of the construction engineer: Past progress and future problems. Journal of Construction Engineering and Management, 117(3), pp. 380-392. ISSN 0733-9364

Forbes, D; El-Haram, M; Horner, M; Hatton, D and Evans, A (2009) Estimating the labour demand for housing construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Forbes, D R; McGurnaghan, H; Graham, L D and Smith, S D (2004) Concrete placing productivity using a novel neural network design. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Forbes, D R; Smith, S D and Horner, R M W (2008) A comparison of techniques for identifying risks in sustainability assessment of housing. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Forcada, N; MacArulla, M; Gangolells, M and Casals, M (2014) Assessment of construction defects in residential buildings in Spain. Building Research & Information, 42(5), pp. 629-640. ISSN 0961-3218

Forcada, N; Macarulla, M; Gangolells, M and Casals, M (2016) Handover defects: Comparison of construction and post-handover housing defects. Building Research & Information, 44(3), pp. 279-288. ISSN 0961-3218

Forcada, N; Macarulla, M and Love, P E D (2013) Assessment of residential defects at post-handover. Journal of Construction Engineering and Management, 139(4), pp. 372-378. ISSN 0733-9364

Ford, B; Wilson, R; Gillott, M; Ibraheem, O; Salmeron, J and Sanchez, F J (2012) Passive downdraught evaporative cooling: Performance in a prototype house. Building Research & Information, 40(3), pp. 290-304. ISSN 0961-3218

Ford, D N (2002) Achieving multiple project objectives through contingency management. Journal of Construction Engineering and Management, 128(1), pp. 30-39. ISSN 0733-9364

Ford, D N; Lander, D M and Voyer, J J (2002) A real options approach to valuing strategic flexibility in uncertain construction projects. Construction Management and Economics, 20(4), pp. 343-351. ISSN 01446193

Forde, B and Stiemer, S F (1985) Steel construction evaluation by MLR-strategies. Journal of Construction Engineering and Management, 111(2), pp. 149-156. ISSN 0733-9364

Forsythe, P (2017) Quantifying the recurring nature of fitout to assist LCA studies in office buildings. International Journal of Building Pathology and Adaptation, 35(3), pp. 233-246.

Forsythe, P and Ding, G (2014) Greenhouse gas emissions from excavation on residential construction sites. Construction Economics and Building, 14(4), pp. 1-10. ISSN 2204-9029

Fortune, C and Hinks, J (1997) Model selection criteria in building project price forecast formulation. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Foster, P; Abdelal, G; Lim, J B P; Hajsadeghi, M and McCrum, D (2016) Finite element modelling of cyclic behaviour of cold-formed steel bolted moment-resisting connections. Journal of Construction in Developing Countries, 21(1), pp. 167-180. ISSN 1823-6499

Foster, S (2021) Improved thermal comfort for Hawai'i's elementary schools: Designing an educational building for thermal comfort using passive design techniques in the hot and humid climate. DArch thesis, University of Hawai'i at Manoa, USA.

Franco, Luiz Sergio (1992) Application of constructive rationalization guidelines for the technological development of constructive processes in unreinforced structural masonry. PhD thesis, Universidade de São Paulo, Brazil.

Franco-Duran, D M and Garza, J M D L (2019) Review of resource-constrained scheduling algorithms. Journal of Construction Engineering and Management, 145(11): 03119006, ISSN 0733-9364

Frederiksen, N; Gottlieb, S C; de Gier, A; Johansen, P and Sørensen, A S (2022) Understanding the marketing department's role in the social and environmental ventures of construction companies. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Freeman, P K (2004) Allocation of post-disaster reconstruction financing to housing. Building Research & Information, 32(5), pp. 427-437. ISSN 0961-3218

Freitas, Márcia Regina de (2008) Computacional tool for support planning and elaboration of construction site layout. PhD thesis, Universidade de São Paulo, Brazil.

Friedman, A and Cammalleri, V (1996) Advanced wood-frame construction details in Canada. Building Research & Information, 24(5), pp. 270-278. ISSN 0961-3218

Friedman, A and Cammalleri, V (1996) The impact of R-2000 building technology on Canadian housing. Building Research & Information, 24(1), pp. 5-13. ISSN 0961-3218

Friedman, A and Cammalleri, V (1997) Selection criteria for energy-efficient windows. Building Research & Information, 25(4), pp. 234-238. ISSN 0961-3218

Frischknecht, R; Alig, M; Nathani, C; Hellmüller, P and Stolz, P (2020) Carbon footprints and reduction requirements: The Swiss real estate sector. Buildings & Cities, 1(1), pp. 325-336. ISSN 2632-6655

Frutos, J D and Borenstein, D (2003) Object-oriented model for customer-building company interaction in mass customization environment. Journal of Construction Engineering and Management, 129(3), pp. 302-313. ISSN 0733-9364

Fu, C (2006) Integration and interoperability of IT applications and information in construction - a study in nD modelling. PhD thesis, University of Salford, UK.

Fu, W K (2004) The effect of experience in construction contract bidding. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Fu, W K; Drew, D S and Lo, H P (2003) Competitiveness of inexperienced and experienced contractors in bidding. Journal of Construction Engineering and Management, 129(4), pp. 388-395. ISSN 0733-9364

Fu, Y; Chen, Y; Zhang, S and Wang, W (2015) Promoting cooperation in construction projects: An integrated approach of contractual incentive and trust. Construction Management and Economics, 33(8), pp. 653-670. ISSN 01446193

Fu, Y and Zhu, J (2021) Trusted data infrastructure for smart cities: A blockchain perspective. Building Research & Information, 49(1), pp. 21-37. ISSN 0961-3218

Fuerst, F; Van De Wetering, J and Wyatt, P (2013) Is intrinsic energy efficiency reflected in the pricing of office leases? Building Research & Information, 41(4), pp. 373-383. ISSN 0961-3218

Fuertes, A and Khatabakhshrad, M (2024) Health and safety risk management in a changing climate: Contrasting supervisors and workers perceptions and approaches to heat coping strategies on construction sites. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Fujimoto, A; Matsui, K; Ozawa, K and Muratsubaki, Y (2000) New design standard for civil engineering structures based on the minimum labour concept. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Fuller, R J (2004) Operating experiences with an advanced fabric energy storage system. Construction Economics and Building, 4(2), pp. 1-10. ISSN 2204-9029

Fuller, R J and Luther, M B (2002) Thermal simulation of an Australian university building. Building Research & Information, 30(4), pp. 255-263. ISSN 0961-3218

Fuller, R J and Luther, M B (2003) Simulation of condensation problems in a roller-skating centre. Building Research & Information, 31(1), pp. 48-59. ISSN 0961-3218

Furber, A; Crapper, M; Gillie, M; Stratford, T; Bisby, L; Blackford, J and White, D (2014) Innovative learning at the University of Edinburgh. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(1), pp. 13-24. ISSN 17514304

Furuya, N; Yamaoka, R and Paulson, B C (1994) Construction of Akashi-Kaikyo bridge west anchorage. Journal of Construction Engineering and Management, 120(2), pp. 337-356. ISSN 0733-9364

Futcher, J; Mills, G and Emmanuel, R (2018) Interdependent energy relationships between buildings at the street scale. Building Research & Information, 46(8), pp. 829-844. ISSN 0961-3218

Gade, A N; Jensen, R L; Larsen, T S; Nissen, S B and Andresen, I (2021) Value-based decision making in the pre-design stage of sustainable building renovation projects–exploring two methods for weighting criteria. International Journal of Construction Management, 21(6), pp. 648-663. ISSN 1562-3599

Gaete Cruz, M (2025) The challenge of collaboration in urban design: Co-designing resilient public spaces in Chile. PhD thesis, Delft University of Technology, Netherlands.

Gaikwad, S V; Calahorra-Jimenez, M; Molenaar, K R and Torres-Machi, C (2021) Challenges in engineering estimates for best value design-build highway projects. Journal of Construction Engineering and Management, 147(7): 04021065, ISSN 0733-9364

Gajpal, Y; Islam, M A and Elazouni, A (2026) Towards competitive contractors' bids: Optimizing selections of subcontractors and payment lags using branch and bound algorithm. Construction Management and Economics, 44(4), pp. 260-278. ISSN 0144-6193

Gajpal, Y and Elazouni, A (2015) Enhanced heuristic for finance-based scheduling of construction projects. Construction Management and Economics, 33(7), pp. 531-553. ISSN 01446193

Galha, H M (1999) Economic quality design. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Gallardo, C; Sandberg, N H and Brattebø, H (2014) Dynamic-MFA examination of Chilean housing stock: Long-term changes and earthquake damage. Building Research & Information, 42(3), pp. 343-358. ISSN 0961-3218

Gallego, E; Fuentes, J M; Ramírez, A and Ayuga, F (2010) Design of tall formworks by a finite-element model. Journal of Construction Engineering and Management, 136(7), pp. 803-810. ISSN 0733-9364

Galvin, R (2014) Why German homeowners are reluctant to retrofit. Building Research & Information, 42(4), pp. 398-408. ISSN 0961-3218

Galvin, R (2023) How prebound effects compromise the market premium for energy efficiency in German house sales. Building Research & Information, 51(5), pp. 501-517. ISSN 0961-3218

Gambatese, J A and James, D E (2001) Dust suppression using truck-mounted water spray system. Journal of Construction Engineering and Management, 127(1), pp. 53-59. ISSN 0733-9364

Ganah, A A M and John, G A (2017) BIM and project planning integration for on-site safety induction. Journal of Engineering, Design and Technology, 15(3), pp. 341-354.

Ganah, A A M; Pye, A and Hall, G (2008) The role of knowledge transfer in sustainability research in the built environment discipline. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Gann, D M (1993) Innovation in the built environment: The rise of digital buildings. DPhil thesis, University of Sussex, UK.

Gann, D M (1996) Construction as a manufacturing process? Similarities and differences between industrialized housing and car production in Japan. Construction Management and Economics, 14(5), pp. 437-450. ISSN 01446193

Gann, D M; Wang, Y and Hawkins, R (1998) Do regulations encourage innovation? The case of energy efficiency in housing. Building Research & Information, 26(5), pp. 280-296. ISSN 0961-3218

Gannon M, M S A J (2013) Tied supply chains in construction projects: Lessons from London underground's public-private-partnership. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Gao, H and Zou, L (2025) How to improve customer trust in residential quality: An analysis of quality information disclosure strategies considering blockchain. Journal of Construction Engineering and Management, 151(9): 04025117, ISSN 0733-9364

Garas, F and Hunter, I A N (1999) The elsewise initiative. Engineering, Construction and Architectural Management, 6(1), pp. 3-6. ISSN 0969-9988

Garcia, C; Huebschman, R; Abraham, D M and Bullock, D M (2006) Using GPS to measure the impact of construction activities on rural interstates. Journal of Construction Engineering and Management, 132(5), pp. 508-515. ISSN 0733-9364

Garcia-Holguera, M; Clark, O G; Sprecher, A and Gaskin, S (2016) Ecosystem biomimetics for resource use optimization in buildings. Building Research & Information, 44(3), pp. 263-278. ISSN 0961-3218

Garcia-Lopez, N P and Fischer, M (2024) Managing on-site production using an activity and flow-based construction model. Journal of Construction Engineering and Management, 150(1): 04023144, ISSN 0733-9364

Garriss, S (2008) Efficient, usable proof-construction strategies for distributed access-control systems. PhD thesis, Carnegie Mellon University, USA.

Garsden, B R (1995) Postconstruction evaluation. Journal of Construction Engineering and Management, 121(1), pp. 37-42. ISSN 0733-9364

Gashahun, A D (2022) Investigating sand quality effect on concrete strength: A case of debre markos and its vicinities. International Journal of Construction Management, 22(12), pp. 2234-2242. ISSN 1562-3599

Gauthier, S and Shipworth, D (2015) Behavioural responses to cold thermal discomfort. Building Research & Information, 43(3), pp. 355-370. ISSN 0961-3218

Gavieta, R C and Onate, C E (1997) Building regulations and disaster mitigation: The Philippines. Building Research & Information, 25(2), pp. 120-123. ISSN 0961-3218

Gawlitta, M and Kleinow, J (2015) Analysis of infrastructure financing by debt funds in the EU. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(1), pp. 12-21. ISSN 17514304

Georges, L; Haase, M; Houlihan Wiberg, A; Kristjansdottir, T and Risholt, B (2015) Life cycle emissions analysis of two nZEB concepts. Building Research & Information, 43(1), pp. 82-93. ISSN 0961-3218

Georgiadou, M C; Greenwood, D; Schiano-Phan, R and Russo, F (2024) Assessing retrofit policies for fuel-poor homes in London. Buildings & Cities, 5(1), pp. 133-149. ISSN 2632-6655

Georgiou, J; Smith, J and Love, P (2003) Building registration: Training and housing quality. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Georgiou, Jim (2016) Legislative control and the quality of housing in Victoria. PhD thesis, University of Melbourne, Australia.

Gerber, B and Ekenel, M (2013) Building code requirements for inspection of adhesive anchors in concrete. Journal of Construction Engineering and Management, 139(10): 06013001, ISSN 0733-9364

Gerrish, T; Ruikar, K; Cook, M; Johnson, M and Phillip, M (2017) Using BIM capabilities to improve existing building energy modelling practices. Engineering, Construction and Architectural Management, 24(2), pp. 190-208. ISSN 0969-9988

Getto, G (2011) Toward a rhetoric of infrastructure: Doing new media writing with communities. PhD thesis, Michigan State University, USA.

Getvoldsen, K S; Chandragiri, A K; Khalafallah, A M; Belizaire, M; Weirs, J; Raheem, H M J; Gerges, M and Butt, T E (2024) Sustainability’s three principal dimensions versus Climate Change Act 2008: A retrospective numerical modelling. Construction Economics and Building, 24(3), pp. 5-22. ISSN 2204-9029

GhaffarianHoseini, A; Tien, D D; Naismith, N; Tookey, J and GhaffarianHoseini, A (2017) Amplifying the practicality of contemporary building information modelling implementations for New Zealand green building certification (Green Star). Engineering, Construction and Architectural Management, 24(4), pp. 696-714. ISSN 0969-9988

Ghafoori, M (2023) Developing building maintenance and upgrade system (BMUS) to minimize operational cost of existing buildings within available budgets. PhD thesis, University of Colorado at Denver, USA.

Ghansah, F A and Lu, W (2025) Evaluating the critical resultant impacts of the COVID-19 pandemic on quality assurance of cross-border construction logistics and supply chain. Engineering, Construction and Architectural Management, 32(10), pp. 6665-6689. ISSN 0969-9988

Gharouni Jafari, K; Noorzai, E and Hosseini, M R (2021) Assessing the capabilities of computing features in addressing the most common issues in the AEC industry. Construction Innovation, 21(4), pp. 875-898. ISSN 1471-4175

Ghasemi, K; Behzadfar, M and Hamzenejad, M (2021) Iranian bazaars and the social sustainability of modern commercial spaces in Iranian cities. Journal of Construction in Developing Countries, 26(1), pp. 1-18. ISSN 1823-6499

Gheisari, M; Irizarry, J and Horn, D B (2010) Situation awareness approach to construction safety management improvement. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Ghosh, A (2017) Briefing: Recent developments in construction and engineering insurance law. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(1), pp. 3-5. ISSN 1751-4304

Ghosh, B and Karmakar, S (2025) Development and application of a digitalized construction quality document management system for advanced construction using building information modeling. Journal of Construction Engineering and Management, 151(6): 04025053, ISSN 0733-9364

Giang, D T H (2013) Developing critical capacities for the efficient use of public investments in infrastructure to support trade and economic development in Vietnam. PhD thesis, National University of Singapore, Singapore.

Gibson, G E; Sanboskani, H; El Asmar, M and Aramali, V (2022) Employing technology to enable remote research charrettes as a method for engaging industry and uncovering best practices: A novel approach for a post-COVID-19 world. Journal of Construction Engineering and Management, 148(11): 04022122, ISSN 0733-9364

Gibson Jr, G E and Gebken Ii, R J (2003) Design quality in pre-project planning: Applications of the project definition rating index. Building Research & Information, 31(5), pp. 346-356. ISSN 0961-3218

Gidado, K I (1996) Project complexity: The focal point of construction production planning. Construction Management and Economics, 14(3), pp. 213-225. ISSN 01446193

Gilani, G; Pons, O and De La Fuente, A (2022) Sustainability-oriented approach to assist decision makers in building facade management. Journal of Construction Engineering and Management, 148(1): 04021182, ISSN 0733-9364

Gilani, S and O’Brien, W (2021) Natural ventilation usability under climate change in Canada and the United States. Building Research & Information, 49(4), pp. 367-386. ISSN 0961-3218

Gilbert, P (2009) Social stakes of urban renewal: Recent French housing policy. Building Research & Information, 37(5-6), pp. 638-648. ISSN 0961-3218

Gill, N; Tommelein, I D; Stout, A and Garrett, T (2005) Embodying product and process flexibility to cope with challenging project deliveries. Journal of Construction Engineering and Management, 131(4), pp. 439-448. ISSN 0733-9364

Gilmour D, B D F R I J T A (2013) A knowledge map of sustainability for urban redevelopment projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Girmscheid, G and Brockmann, C (2010) Inter- and intraorganizational trust in international construction joint ventures. Journal of Construction Engineering and Management, 136(3), pp. 353-360. ISSN 0733-9364

Gjerde, M (2017) A change of scene: How the canterbury earthquake sequence led to a departure from concrete technologies. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Gjerde, M (2018) Managing New Zealand urban streetscape design: Understanding people's preferences. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Glass, A (2011) Analysis of building-integrated renewable energy systems in modern UK homes. EngD thesis, University of Manchester, UK.

Glass, J and Dainty, A R J (2011) The sustainable construction business: A missing ingredient in creating a sustainable built environment? International Journal of Construction Management, 11(2), pp. 1-18. ISSN 1562-3599

Glew, D; Johnston, D; Miles-Shenton, D and Thomas, F (2020) Retrofitting suspended timber ground-floors; comparing aggregated and disaggregated evaluation methods. Building Research & Information, 48(5), pp. 572-586. ISSN 0961-3218

Globa, A; Costin, G; Tokede, O; Wang, R; Khoo, C K and Moloney, J (2022) Hybrid kinetic facade: Fabrication and feasibility evaluation of full-scale prototypes. Architectural Engineering and Design Management, 18(6), pp. 791-811. ISSN 1745-2007

Gluch, P and Svensson, I (2016) The organizational nexus of changing management practices for sustainable renovation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Godfrey, R J (2007) Analysis of construction worker injury information from a workers' compensation database. PhD thesis, University of Florida, USA.

Godoy-Shimizu, D; Armitage, P; Steemers, K and Chenvidyakarn, T (2011) Using display energy certificates to quantify schools' energy consumption. Building Research & Information, 39(6), pp. 535-552. ISSN 0961-3218

Godoy-Shimizu, D; Hong, S M; Korolija, I; Schwartz, Y; Mavrogianni, A and Mumovic, D (2022) Pathways to improving the school stock of England towards net zero. Buildings & Cities, 3(1), pp. 939-963. ISSN 2632-6655

Goedert, J D; Foster, E T; Jewell, J and Bartek, J (2009) Automated tool tracking on the construction site. International Journal of Construction Education and Research, 5(1), pp. 12-23. ISSN 1557-8771

Goh, Y L (2004) The effect of higher workers' compensation premium rates on construction worker wages and the reporting of injuries. PhD thesis, University of Utah, USA.

Gokarakonda, S; Shrestha, S; Caleb, P R; Rathi, V; Jain, R; Thomas, S; Topp, K and Niazi, Z (2019) Decoupling in India's building construction sector: Trends, technologies and policies. Building Research & Information, 47(1), pp. 91-107. ISSN 0961-3218

Goncalves, V L; Costanzo, V; Fabbri, K and Rakha, T (2022) Overheating assessment in Passivhaus dwellings: The influence of prediction tools. Buildings & Cities, 3(1), pp. 153-167. ISSN 2632-6655

Gonsalves, N; Akanmu, A; Gao, X; Agee, P and Shojaei, A (2023) Industry perception of the suitability of wearable robot for construction work. Journal of Construction Engineering and Management, 149(5): 04023017, ISSN 0733-9364

Gonzalez, Alvaro Eduardo (2016) Organisational design & mirroring in construction. MPhil thesis, University of Sydney, Australia.

González-Prieto, D; Fernández-Nava, Y; Marañón, E and Prieto, M M (2021) Environmental life cycle assessment based on the retrofitting of a twentieth-century heritage building in Spain, with electricity decarbonization scenarios. Building Research & Information, 49(8), pp. 859-877. ISSN 0961-3218

Good, Tammy L (2023) Manager performance on public construction projects: A descriptive analysis study. DBA thesis, Keiser University (Florida), USA.

Goodhew, S; Bird, P and Paterson, I (1997) The financial implications of using natural ventilation to reduce the levels of radon gas within an existing 'period' dwelling. Journal of Financial Management of Property and Construction, 2(2), pp. 85-104. ISSN 1366-4387

Gordon, C M (1994) Choosing appropriate construction contracting method. Journal of Construction Engineering and Management, 120(1), pp. 196-210. ISSN 0733-9364

Gordon, J E (1977) An analysis of the bidding process of design/build/bidding in new school construction. EdD thesis, Indiana University, USA.

Gormley-Gallagher, A.; Amezaga, J.; Shucksmith, J.; Savic, D.; Templeton, M.; McAdam, E. and Jeffrey, P. (2015) Briefing: Negotiating value at the research-practice interface in the water sector. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(1), pp. 8-11. ISSN 1751-4304

Gorse, C; Dickinson, I; Bown, A and Shepherd, T (2008) Developing maths skills in a virtual construction context: Benefits and challenges. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Gorse, C; Dickinson, I; Platten, A; Walker, C and Hobday, J (2009) Disseminating sustainable practice: An evaluation of the impact of virtual site. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Gorse, C; McKinney, I; Shepherd, A; Morley, D and Ellis, R (2006) Internal support mechanisms in groups and teams. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Gorse, C; Sutton, R; Johnston, D and Miles-Shenton, D (2011) Heat loss through the building fabric: Low carbon construction practice. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Gorse, C A and Emmitt, S (2005) Group interaction research methods. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Gorse, C A and Emmitt, S (2009) Informal interaction in construction progress meetings. Construction Management and Economics, 27(10), pp. 983-993. ISSN 1466433X

Gorse, C A; Emmitt, S; Lowis, M and Howarth, A (2001) Project performance and management and design team communication. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Gorse, C A; Emmitt, S; Lowis, M and Howarth, A (2002) Interaction characteristics of successful contractors' representatives. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Gorse, C A and Sanderson, A M (2007) Exploring group work dynamics. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Gosling, J; Hewlett, B and Naim, M (2011) A framework for categorising engineer-to-order construction projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Gosling, J; Naim, M; Towill, D and Moone, B (2014) The impact of supplier development initiatives on key performance indicators. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Gosling, J; Pero, M; Schoenwitz, M; Towill, D and Cigolini, R (2016) Defining and categorizing modules in building projects: An international perspective. Journal of Construction Engineering and Management, 142(11): 04016062, ISSN 0733-9364

Goubran, S; Masson, T and Walker, T (2020) Diagnosing the local suitability of high-rise timber construction. Building Research & Information, 48(1), pp. 101-123. ISSN 0961-3218

Goulding, J; Sexton, M; Zhang, X; Kagioglou, M; Aouad, G F and Barrett, P (2007) Technology adoption: Breaking down barriers using a virtual reality design support tool for hybrid concrete. Construction Management and Economics, 25(12), pp. 1239-1250. ISSN 1466433X

Goyal, S; Pitt, M and Sapri, M (2005) Innovation as a facilities management tool. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Graca, Moacyr Eduardo Alves da (1985) Formulation of a model for evaluation of the determinant conditions for secondary vent need in buildings' drainage systems. PhD thesis, Universidade de São Paulo, Brazil.

Graham, P M and Walker, D H T (2000) First steps towards acheiving environmental sustainability for developed projects: An holistic life-cycle procurement objective. Journal of Construction Procurement, 6(1), pp. 67-84. ISSN 1358-9180

Gram-Hanssen, K; Georg, S; Christiansen, E and Heiselberg, P (2018) What next for energy-related building regulations? The occupancy phase. Building Research & Information, 46(7), pp. 790-803. ISSN 0961-3218

Gransberg, D D (1996) Optimizing haul unit size and number based on loading facility characteristics. Journal of Construction Engineering and Management, 122(3), pp. 248-253. ISSN 0733-9364

Gransberg, D D (2010) Quantifying the impact of peer evaluations on student team project grading. International Journal of Construction Education and Research, 6(1), pp. 3-17. ISSN 1557-8771

Gransberg, D D; Karaca, I and Senadheera, S (2004) Calculating roller requirements for chip seal projects. Journal of Construction Engineering and Management, 130(3), pp. 378-384. ISSN 0733-9364

Gransberg, D D; Lopez Del Puerto, C and Humphrey, D (2007) Relating cost growth from the initial estimate to design fee for transportation projects. Journal of Construction Engineering and Management, 133(6), pp. 404-408. ISSN 0733-9364

Grant, A and Ries, R (2013) Impact of building service life models on life cycle assessment. Building Research & Information, 41(2), pp. 168-186. ISSN 0961-3218

Grant, E (2013) "Pack 'em, rack 'em and stack 'em": The appropriateness of the use and reuse of shipping containers for prison accommodation. Construction Economics and Building, 13(2), pp. 35-44. ISSN 2204-9029

Gravitt, D D (2004) The development and validation of a bar code based residential construction quality inspection procedure. PhD thesis, Indiana State University, USA.

Gray, C (1986) Intelligent' construction time and cost analysis. Construction Management and Economics, 4(2), pp. 135-150. ISSN 01446193

Gray, C and Al-Bizri, S (2007) Modelling trade contractor information production. Architectural Engineering and Design Management, 3(1), pp. 39-48. ISSN 1745-2007

Gray, C and Little, J (1985) A systematic approach to the selection of an appropriate crane for a construction site. Construction Management and Economics, 3(2), pp. 121-144. ISSN 01446193

Gribble, S J; Scott, D; Mawdesley, M and Al-Jibouri, S (2006) Learning to be real engineers: The dam game simulation. Architectural Engineering and Design Management, 2(1-2), pp. 101-114. ISSN 1745-2007

Griffis, F H and Butler, M (1988) Case for cost-plus contracting. Journal of Construction Engineering and Management, 114(1), pp. 83-94. ISSN 0733-9364

Griffith, A (2011) Fulfilling contractors' corporate social responsibilities using standards-based management systems. International Journal of Construction Management, 11(2), pp. 37-47. ISSN 1562-3599

Griffith, A; King, A and Knight, A (2003) Examining the dynamics of novation from the principal contractor's and architect's perspectives. Construction Economics and Building, 3(1), pp. 13-18. ISSN 2204-9029

Griffith, A and Phillips, N (2001) The influence of the construction (design and management) regulations 1994 upon the procurement and management of small building works. Construction Management and Economics, 19(5), pp. 533-540. ISSN 01446193

Grimm, Alec G (2023) Modeling and monitoring construction site sediment control measures to improve design, performance, and longevity. PhD thesis, Ohio State University, USA.

Grimm, C T (1994) Void mortar joints: Bane of brick masonry. Journal of Construction Engineering and Management, 120(1), pp. 152-161. ISSN 0733-9364

Grimsey, D and Graham, R (1997) PFI in the NHS (Private finance initiative in the UK national health service). Engineering, Construction and Architectural Management, 4(3), pp. 215-231. ISSN 0969-9988

Grimsrud, D; Bridges, B and Schulte, R (2006) Continuous measurements of air quality parameters in schools. Building Research & Information, 34(5), pp. 447-458. ISSN 0961-3218

Grisham, T and Walker, D H T (2006) Nurturing a knowledge environment for international construction organizations through communities of practice. Construction Innovation, 6(4), pp. 217-231. ISSN 1471-4175

Grobler, L J and Singh, V (1999) Research information: The green buildings for Africa programme. Building Research & Information, 27(3), pp. 183-193. ISSN 0961-3218

Gruen, A; Behnisch, M and Kohler, N (2009) Perspectives in the reality-based generation, nD modelling, and operation of buildings and building stocks. Building Research & Information, 37(5-6), pp. 503-519. ISSN 0961-3218

Guan, K; Feng, K and Zeng, S X (2001) Urban housing reform and development in China. Building Research & Information, 29(4), pp. 286-292. ISSN 0961-3218

Guerrini, Fabio Muller (1999) A integrated model of management production for civil construction companies. PhD thesis, Universidade de São Paulo, Brazil.

Gugel, J G and Russell, J S (1994) Model for constructability approach selection. Journal of Construction Engineering and Management, 120(3), pp. 509-521. ISSN 0733-9364

Guggemos, A A (2003) Environmental impacts of on-site construction processes: Focus on structural frames. PhD thesis, University of California, Berkeley, USA.

Gui, X; Xiong, Y and Gou, Z (2024) A study of rainwater tank adoption in Australian households: Selecting the right size for better water-saving performance. Architectural Engineering and Design Management, 20(6), pp. 1648-1668. ISSN 1745-2007

Guillermo, M A; Grau, D; Acevedo, S C and Rivera, T E (2014) How the design and assessment of instruction/learning strategies influence the academic performance of civil engineering students at Universidad Industrial de Santander, Colombia. Journal of Construction Engineering and Management, 140(4): B4014004, ISSN 0733-9364

Gull, I (2011) Testing of strength of recycled waste concrete and its applicability. Journal of Construction Engineering and Management, 137(1), pp. 1-5. ISSN 0733-9364

Gullette, G; Thebpanya, P and Singto, S (2022) Socioeconomic and livelihood impacts within Bangkok's expanding metropolitan region. Buildings & Cities, 3(1), pp. 808-823. ISSN 2632-6655

Gummerson, R J; Hall, C and Hoff, W D (1980) Capillary water transport in masonry structures: Building construction applications of Darcy’s law. Construction Papers, 1(1), pp. 17-27. ISSN 0144-8587

Gunawardena, K and Steemers, K (2023) Assessing the influence of neighbourhood-scale vertical greening application. Buildings & Cities, 4(1), pp. 103-123. ISSN 2632-6655

Gunning, J G and Cooke, E (1996) The influence of occupational stress on construction professionals. Building Research & Information, 24(4), pp. 213-221. ISSN 0961-3218

Guo, D; Song, Z; Xu, T; Zhang, Y and Ding, L (2022) Coupling analysis of tunnel construction risk in complex geology and construction factors. Journal of Construction Engineering and Management, 148(9): 04022097, ISSN 0733-9364

Guo, F; Jahren, C T; Hao, J and Zhang, C (2020) Implementation of CIM-related technologies within transportation projects. International Journal of Construction Management, 20(5), pp. 510-519. ISSN 1562-3599

Guo, H; Yu, Y; Ding, Q and Skitmore, M (2018) Image-and-skeleton-based parameterized approach to real-time identification of construction workers' unsafe behaviors. Journal of Construction Engineering and Management, 144(6): 04018042, ISSN 0733-9364

Guo, S (2025) Optimizing profit distribution in IPD projects: A fuzzy cooperative game approach to address resource-based input uncertainty. Journal of Construction Engineering and Management, 151(9): 04025118, ISSN 0733-9364

Guo, X; Tian, J; Zhang, S and Zhang, Y (2025) Policy network evaluation of China's rental housing market from the perspective of text measurement. International Journal of Construction Management, 25(2), pp. 182-193. ISSN 1562-3599

Gupta, J P (1966) Building site activity: An input/output model. PhD thesis, University of Manchester, UK.

Gupta, R; Gregg, M; Passmore, S and Stevens, G (2015) Intent and outcomes from the retrofit for the future programme: Key lessons. Building Research & Information, 43(4), pp. 435-451. ISSN 0961-3218

Gustavsson, T K (2018) Liminal roles in construction project practice: Exploring change through the roles of partnering manager, building logistic specialist and BIM coordinator. Construction Management and Economics, 36(11), pp. 599-610. ISSN 01446193

Guthrie, J L (2000) Group-level reengineering process. EngD thesis, University of Kansas, USA.

Gómez-Cabrera, A; Gutierrez-Bucheli, L and Muñoz, S (2024) Causes of time and cost overruns in construction projects: A scoping review. International Journal of Construction Management, 24(10), pp. 1107-1125. ISSN 1562-3599

Görsch, C; Seppänen, O; Peltokorpi, A and Lavikka, R (2024) Unlocking productivity: Revealing waste and hidden disturbances impacting mep workers. Journal of Construction Engineering and Management, 150(9): 04024108, ISSN 0733-9364

Göswein, V; Arehart, J; Phan-Huy, C; Pomponi, F and Habert, G (2022) Barriers and opportunities of fast-growing biobased material use in buildings. Buildings & Cities, 3(1), pp. 745-755. ISSN 2632-6655

Ha, S K; Jang, J G; Park, S H and Lee, H K (2015) Advanced spray multiple layup process for quality control of sprayed FRP composites used to retrofit concrete structures. Journal of Construction Engineering and Management, 141(1): 04014060, ISSN 0733-9364

Haas, C and Einstein, H H (2002) Updating the decision aids for tunneling. Journal of Construction Engineering and Management, 128(1), pp. 40-48. ISSN 0733-9364

Haas, C T and Kim, Y (2002) Automation in infrastructure construction. Construction Innovation, 2(3), pp. 191-210. ISSN 1471-4175

Habert, G; Röck, M; Steininger, K; Lupísek, A; Birgisdottir, H; Desing, H; Chandrakumar, C; Pittau, F; Passer, A; Rovers, R; Slavkovic, K; Hollberg, A; Hoxha, E; Jusselme, T; Nault, E; Allacker, K and Lützkendorf, T (2020) Carbon budgets for buildings: Harmonising temporal, spatial and sectoral dimensions. Buildings & Cities, 1(1), pp. 429-452. ISSN 2632-6655

Habib, A; Alnaemi, A and Habib, M (2025) Developing a framework for integrating blockchain technology into earthquake risk mitigation and disaster management strategies of smart cities. Smart and Sustainable Built Environment, 14(5), pp. 1513-1537. ISSN 2046-6099

Hadikusumo, B H W (2001) Virtually real construction site processes: hazard identification and accident precaution planning using design-for-safety-process (DFSP) tool. PhD thesis, University of Hong Kong, Hong Kong.

Hadipriono, F C; Lim, C L and Wong, K H (1986) Event tree analysis to prevent failures in temporary structures. Journal of Construction Engineering and Management, 112(4), pp. 500-513. ISSN 0733-9364

Hadipriono, F C and Wang, H K (1986) Analysis of causes of falsework failures in concrete structures. Journal of Construction Engineering and Management, 112(1), pp. 112-121. ISSN 0733-9364

Hagan, E B (1997) The use of stabilized soil to enhance rural housing. Building Research & Information, 25(4), pp. 210-217. ISSN 0961-3218

Haji-Metussin, Haji-Abdul Manaf (2000) Organisational changes related to the adoption of ISO 9000 and their significance for the pursuit of total quality management: A study of the process of ISO 9000 adoption in Brunei darussalam construction related industry. PhD thesis, University of Kent, UK.

Haller, M and Stehn, L (2010) Standardizing the pre-design-phase for improved efficiency in off-site housing projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Halliday, J (1995) Use of the New Engineering Contract in Hong Kong. Engineering, Construction and Architectural Management, 2(4), pp. 307-315. ISSN 0969-9988

Halligan, D W; Hester, W T and Thomas, H R (1987) Managing unforeseen site conditions. Journal of Construction Engineering and Management, 113(2), pp. 273-287. ISSN 0733-9364

Hallowell, M and Toole, T M (2009) Contemporary design-bid-build model. Journal of Construction Engineering and Management, 135(6), pp. 540-549. ISSN 0733-9364

Hallowell, M R; Bhandari, S and Alruqi, W (2020) Methods of safety prediction: Analysis and integration of risk assessment, leading indicators, precursor analysis, and safety climate. Construction Management and Economics, 38(4), pp. 308-321. ISSN 01446193

Haltenhoff, C E (1987) Construction management performance under dual services agreements. Journal of Construction Engineering and Management, 113(4), pp. 640-647. ISSN 0733-9364

Hamiani, A (1987) Consite: A knowledge-based expert system framework for construction site layout. PhD thesis, University of Texas at Austin, USA.

Hamilton, A; Mitchell, G and Yli-Karjanmaa, S (2002) The BEQUEST toolkit: A decision support system for urban sustainability. Building Research & Information, 30(2), pp. 109-115. ISSN 0961-3218

Hammarlund, Y (1995) Environments of construction. Engineering, Construction and Architectural Management, 2(3), pp. 209-225. ISSN 0969-9988

Hampson, K and Fischer, M (1997) Structural designs and construction technologies for California highway bridges. Journal of Construction Engineering and Management, 123(3), pp. 269-275. ISSN 0733-9364

Hampson, K and Tatum, C B (1997) Technology strategy and competitive performance in bridge construction. Journal of Construction Engineering and Management, 123(2), pp. 153-161. ISSN 0733-9364

Hamzaoui, F; Amine Allal, M; Taillandier, F and Achoui, M (2022) Risk management in construction projects by coupling the SMACC agent with the MADS MOSAR method: application to the dam project in Mascara, Algeria. International Journal of Construction Management, 22(4), pp. 644-658. ISSN 1562-3599

Hamzeh, F R; El Samad, G and Emdanat, S (2019) Advanced metrics for construction planning. Journal of Construction Engineering and Management, 145(11): 04019063, ISSN 0733-9364

Han, T; Zhou, G; Xie, Y; Qiao, F; Feng, J; Liu, P and Wang, S (2026) Time-cost trade-off optimization in ultralong tunnel construction based on working face planning. Journal of Construction Engineering and Management, 152(3): 04026007, ISSN 0733-9364

Han, J; Gu, F and Wu, G (2023) Managing cooperation in multipartner project teams with heterogeneous team members. Journal of Construction Engineering and Management, 149(10): 04023101, ISSN 0733-9364

Han, S; Jiang, Y and Bai, Y (2022) Fast-pgmed: Fast and dense elevation determination for earthwork using drone and deep learning. Journal of Construction Engineering and Management, 148(4): 04022008, ISSN 0733-9364

Han, S; Jiang, Y; Huang, Y; Wang, M; Bai, Y and Spool-White, A (2023) Scan2drawing: Use of deep learning for as-built model landscape architecture. Journal of Construction Engineering and Management, 149(5): 04023027, ISSN 0733-9364

Hand, J W (1998) Removing barriers to the use of simulation in the building design professions. PhD thesis, University of Strathclyde, UK.

Handa, V K (1996) Construction engineers driving into the 21st century. Journal of Construction Engineering and Management, 122(1), pp. 1-6. ISSN 0733-9364

Handa, V K and Barcia, R M (1986) Construction production planning. Journal of Construction Engineering and Management, 112(2), pp. 163-177. ISSN 0733-9364

Handa, V K and Barcia, R M (1986) Linear scheduling using optimal control theory. Journal of Construction Engineering and Management, 112(3), pp. 387-393. ISSN 0733-9364

Handa, V K and Rivers, D (1983) Downgrading construction incidents. Journal of Construction Engineering and Management, 109(2), pp. 190-205. ISSN 0733-9364

Hanioglu, M N (2014) Influence of owner-organization impression and contract framing on construction contractors' risk perceptions. PhD thesis, Illinois Institute of Technology, USA.

Hanioglu, M N and Arditi, D (2013) Teaming/timing sequences in hotel development projects. Construction Management and Economics, 31(4), pp. 369-385. ISSN 1466433X

Hanmer, C; Few, J; Hollick, F; Elam, S and Oreszczyn, T (2026) Tracking energy signatures of British homes from 2020 to 2025. Buildings & Cities, 7(1), pp. 176-195. ISSN 2632-6655

Hanna, A S (1989) An interactive knowledge-based formwork selection system for buildings. PhD thesis, Pennsylvania State University, USA.

Hanna, A S and Senouci, A B (1995) Design optimization of concrete-slab forms. Journal of Construction Engineering and Management, 121(2), pp. 215-221. ISSN 0733-9364

Hanna, A S; Tadt, E J and Whited, G C (2012) Request for information: Benchmarks and metrics for major highway projects. Journal of Construction Engineering and Management, 138(12), pp. 1347-1352. ISSN 0733-9364

Hanna, A S; Willenbrock, J H and Sanvido, V E (1992) Knowledge acquisition and development for formwork selection system. Journal of Construction Engineering and Management, 118(1), pp. 179-198. ISSN 0733-9364

Hanna, K E; Morcous, G and Tadros, M K (2009) Effectiveness of class c fly ash on mitigating alkali-silica reaction in concrete pavement. International Journal of Construction Education and Research, 5(3), pp. 167-181. ISSN 1557-8771

Hanna, S (2012) Addressing complex design problems through inductive learning. PhD thesis, University College London, UK.

Hansen, K L and Vanegas, J A (2003) Improving design quality through briefing automation. Building Research & Information, 31(5), pp. 379-386. ISSN 0961-3218

Hansen, S and Siregar, P H R (2020) Analytic hierarchy process-based decision-making framework for formwork system selection by contractors. Journal of Construction in Developing Countries, 25(2), pp. 237-255. ISSN 1823-6499

Harbin, K B (2020) A decision analysis tool for building renovations regarding adaptive reuse. PhD thesis, University of Alabama, USA.

Hariga, M and El-Sayegh, S M (2011) Cost optimization model for the multiresource leveling problem with allowed activity splitting. Journal of Construction Engineering and Management, 137(1), pp. 56-64. ISSN 0733-9364

Harmelink, D J (1995) Linear scheduling model: The development of a linear scheduling model with microcomputer applications for highway construction project control. PhD thesis, Iowa State University, USA.

Harmelink, D J (2001) Linear scheduling model: Float characteristics. Journal of Construction Engineering and Management, 127(4), pp. 255-260. ISSN 0733-9364

Harmon, K M J (2003) Effectiveness of dispute review boards. Journal of Construction Engineering and Management, 129(6), pp. 674-679. ISSN 0733-9364

Haronian, E and Sacks, R (2021) Production control in earthworks: Concepts and metrics. Journal of Construction Engineering and Management, 147(10): 04021127, ISSN 0733-9364

Harper, D G and Bernold, L E (2005) Success of supplier alliances for capital projects. Journal of Construction Engineering and Management, 131(9), pp. 979-985. ISSN 0733-9364

Harputlugil, G U; Harputlugil, T and De Wilde, P (2009) Thermal design of Turkish schools: Prospects for an improved pre-design process. Architectural Engineering and Design Management, 5(3), pp. 153-164. ISSN 1745-2007

Harrington, S and Mulville, M (2023) The suitability of sensor-based demand controlled ventilation systems in retrofit dwellings: A longitudinal study. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Harrington, S and Mulville, M (2025) Defining demand: The suitability of sensor-based demand-controlled ventilation within deep energy retrofit dwellings. Building Research & Information, 53(5), pp. 656-674. ISSN 0961-3218

Harris, D J and Dudek, S J M (1997) Heat losses from suspended timber floors. Building Research & Information, 25(4), pp. 226-233. ISSN 0961-3218

Harris, James Egerson (2025) Relationship between time assessment, cost projection, and project performance in the U.S. Government. DBA thesis, Walden University, USA.

Harris, R A; Bowlby, W and Cohn, L F (1987) Method for analyzing construction haul noise impacts. Journal of Construction Engineering and Management, 113(1), pp. 6-16. ISSN 0733-9364

Harris, R B (1990) Packing method for resource leveling (PACK). Journal of Construction Engineering and Management, 116(2), pp. 331-350. ISSN 0733-9364

Hartmann, A (2006) The context of innovation management in construction firms. Construction Management and Economics, 24(6), pp. 567-578. ISSN 1466433X

Hartmann, A; Reymen, I M M J and Van Oosterom, G (2008) Factors constituting the innovation adoption environment of public clients. Building Research & Information, 36(5), pp. 436-449. ISSN 0961-3218

Hartmann, A D A M L (2008) A role-play approach for teaching research methodology in construction management. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Hartmann, T and Fischer, M (2007) Supporting the constructability review with 3D/4D models. Building Research & Information, 35(1), pp. 70-80. ISSN 0961-3218

Harty, J (2012) The impact of digitalisation on the management role of architectural technology. PhD thesis, Robert Gordon University, UK.

Harvett, Craig (2013) A study of uncertainty and risk management practice related to perceived project complexity. PhD thesis, Bond University, Australia.

Hasan, S; Al-Hussein, M; Hermann, U H and Safouhi, H (2010) Interactive and dynamic integrated module for mobile cranes supporting system design. Journal of Construction Engineering and Management, 136(2), pp. 179-186. ISSN 0733-9364

Hasbini, M A (2017) The great recession of 2007 and the housing market crash: Why did so many builders fail? Lessons for the local homebuilding industry. PhD thesis, University of South Florida, USA.

Hashem M. Mehany, M S and Gebken, R (2021) Assessing the importance and cognition level of acce’s student learning outcomes: Industry, educator, and student perceptions. International Journal of Construction Education and Research, 17(4), pp. 333-351. ISSN 1557-8771

Hassan, S; Abo Eleinen, O; Hassan, A and Megahed, N (2025) Life cycle assessment and generative design: Development of a national LCA tool for exterior walls. Engineering, Construction and Architectural Management, 32(11), pp. 7755-7775. ISSN 0969-9988

Hassan, A and El-Rayes, K (2020) Quantifying the interruption impact of activity delays in non-serial repetitive construction projects. Construction Management and Economics, 38(6), pp. 515-533. ISSN 01446193

Hassan, F U; Le, T and Le, C (2023) Automated approach for digitalizing scope of work requirements to support contract management. Journal of Construction Engineering and Management, 149(4): 04023005, ISSN 0733-9364

Hassan, F U; Le, T and Lv, X (2021) Addressing legal and contractual matters in construction using natural language processing: A critical review. Journal of Construction Engineering and Management, 147(9): 03121004, ISSN 0733-9364

Hassan, M (2010) Evaluation of the environmental and economic impacts of warm-mix asphalt using life-cycle assessment. International Journal of Construction Education and Research, 6(3), pp. 238-250. ISSN 1557-8771

Hassan, O A B (2017) Practical expressions to calculate the main vertical actions on load-bearing columns/walls to Eurocode. Journal of Engineering, Design and Technology, 15(4), pp. 418-435.

Hassan, T M (1996) Simulating information flow to assist building design management. PhD thesis, Loughborough University, UK.

Hassanain, M A; Bin-Mohanna, A; Al-Hammad, A-M and Sanni-Anibire, M O (2017) Challenges to the implementation of building management systems in Saudi Arabia. Built Environment Project and Asset Management, 7(2), pp. 130-142. ISSN 2044-124X

Hassanein, A and Moselhi, O (2004) Planning and scheduling highway construction. Journal of Construction Engineering and Management, 130(5), pp. 638-646. ISSN 0733-9364

Hassanein, A and Moselhi, O (2005) Accelerating linear projects. Construction Management and Economics, 23(4), pp. 377-385. ISSN 01446193

Hassler, U (2009) Long-term building stock survival and intergenerational management: The role of institutional regimes. Building Research & Information, 37(5-6), pp. 552-568. ISSN 0961-3218

Hastak, M; Gokhale, S; Goyani, K; Hong, T and Safi, B (2007) Project manager's decision aid for a radical project cycle reduction. Journal of Construction Engineering and Management, 133(6), pp. 437-446. ISSN 0733-9364

Hastak, M; Gokhale, S; Goyani, K; Hong, T and Safi, B (2008) Analysis of techniques leading to radical reduction in project cycle time. Journal of Construction Engineering and Management, 134(12), pp. 915-927. ISSN 0733-9364

Hatamleh, M T; Alzarrad, A; Alghossoon, A; Alhusban, M and Ogunrinde, O (2025) Strategies for improving project risk management via communication and integration: The case of Jordan. Engineering, Construction and Architectural Management, 32(10), pp. 7006-7031. ISSN 0969-9988

Hatush, Z; Saleh, S and Shiki, A (2005) Effect of critical delay factors on cost: Overrun during the design stage. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Haupt, T C (2003) Student attitudes towards cooperative construction education experiences. Construction Economics and Building, 3(1), pp. 31-42. ISSN 2204-9029

Haupt, T C and Smallwood, J (2003) HIV/AIDS in construction: Are older workers aware? Journal of Engineering, Design and Technology, 1(1), pp. 43-54. ISSN 1726-0531

Haupt, T C and Smallwood, J (2004) HIV and AIDS in SA construction: attitudes and perceptions of workers. Journal of Construction Research, 5(2), pp. 311-327. ISSN 1609-9451

Hauptfleisch, A C (1989) The development of building process relationships with special reference to South Africa. PhD thesis, University of Pretoria, South Africa.

Hawwash, K and Barnes, M (1997) The potential for adopting the NEC's family of contracts on PFI projects. Engineering, Construction and Architectural Management, 4(3), pp. 203-214. ISSN 0969-9988

Haymaker, J (2004) The perspective approach: Enabling engineers to construct and integrate views and generate an evolving project model. PhD thesis, Stanford University, USA.

Healy, S (2008) Air-conditioning and the 'homogenization' of people and built environments. Building Research & Information, 36(4), pp. 312-322. ISSN 0961-3218

Heaphy, I (2013) NEC versus fidic. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(1), pp. 21-30. ISSN 17514304

Heath, T; Scott, D and Boyland, M (1994) A prototype computer-based design management tool. Construction Management and Economics, 12(6), pp. 543-549. ISSN 01446193

Heerwagen, J H; Kampschroer, K; Powell, K M and Loftness, V (2004) Collaborative knowledge work environments. Building Research & Information, 32(6), pp. 510-528. ISSN 0961-3218

Heesom, D and Mahdjoubi, L (2004) Trends of 4D CAD applications for construction planning. Construction Management and Economics, 22(2), pp. 171-182. ISSN 01446193

Hegab, M; Smith, G R and Salem, O M (2006) Soil penetration modeling in microtunneling projects. Journal of Construction Engineering and Management, 132(6), pp. 598-605. ISSN 0733-9364

Hegab, M Y and Smith, G R (2007) Delay time analysis in microtunneling projects. Journal of Construction Engineering and Management, 133(2), pp. 191-195. ISSN 0733-9364

Hegazy, T (2006) Computerized system for efficient delivery of infrastructure maintenance/repair programs. Journal of Construction Engineering and Management, 132(1), pp. 26-34. ISSN 0733-9364

Hegazy, T; Abdel-Monem, M; Saad, D A and Rashedi, R (2013) Hands-on exercise for enhancing students' construction management skills. Journal of Construction Engineering and Management, 139(9), pp. 1135-1143. ISSN 0733-9364

Hegazy, T and Ayed, A (1998) Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineering and Management, 124(3), pp. 210-218. ISSN 0733-9364

Hegazy, T; Elbeltagi, E and Zhang, K (2005) Keeping better site records using intelligent bar charts. Journal of Construction Engineering and Management, 131(5), pp. 513-521. ISSN 0733-9364

Hegazy, T; Elhakeem, A and Elbeltagi, E (2004) Distributed scheduling model for infrastructure networks. Journal of Construction Engineering and Management, 130(2), pp. 160-167. ISSN 0733-9364

Hegazy, T and Ersahin, T (2001) Simplified spreadsheet solutions: I: Subcontractor information system. Journal of Construction Engineering and Management, 127(6), pp. 461-468. ISSN 0733-9364

Hegazy, T and Menesi, W (2010) Critical path segments scheduling technique. Journal of Construction Engineering and Management, 136(10), pp. 1078-1085. ISSN 0733-9364

Hegazy, T; Saad, D A and Mostafa, K (2020) Enhanced repetitive-scheduling computation and visualization. Journal of Construction Engineering and Management, 146(10): 04020118, ISSN 0733-9364

Hegazy, T; Zaneldin, E and Grierson, D (2001) Improving design coordination for building projects. I: Information model. Journal of Construction Engineering and Management, 127(4), pp. 322-329. ISSN 0733-9364

Heidari, A; Imani, D M and Khalilzadeh, M (2021) A hub location model in the sustainable supply chain considering customer segmentation. Journal of Engineering, Design and Technology, 19(6), pp. 1387-1420. ISSN 1726-0531

Heineck, L F (1983) On the analyses of activity durations on three house building sites. PhD thesis, University of Leeds, UK.

Heintz, J L (2002) Collaborative design planning networks. Engineering, Construction and Architectural Management, 9(3), pp. 181-191. ISSN 0969-9988

Hejducki, Z (2004) Sequencing problems in methods of organising construction processes. Engineering, Construction and Architectural Management, 11(1), pp. 20-32. ISSN 0969-9988

Hejducki, Z and Mrozowicz, J (2001) Stream methods of construction work organization: An introduction to the problem. Engineering, Construction and Architectural Management, 8(2), pp. 80-89. ISSN 0969-9988

Hemmati Farahani, M; Namazzadeh, M; Hemmati Farahani, A and Ataei, D (2023) Pathology and potential analysis of renewable energy use in Tehran municipal buildings. International Journal of Construction Management, 23(7), pp. 1174-1186. ISSN 1562-3599

Henderson, J R (2013) Enhancing buildability through improving design-construction feedback loops within complex projects. PhD thesis, Loughborough University, UK.

Hendrickson, C; Martinelli, D and Rehak, D (1987) Hierarchical rule-based activity duration estimation. Journal of Construction Engineering and Management, 113(2), pp. 288-301. ISSN 0733-9364

Hendy, C R; Spencer, P C and Sundaram, M (2013) Technical networks: The framework for disseminating knowledge. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(2), pp. 77-85. ISSN 17514312

Henneberry, J and Rowley, S (2002) Property market processes and development outcomes in cities and regions. Journal of Financial Management of Property and Construction, 7(1), pp. 3-15. ISSN 1366-4387

Henry, E and Brothers, H S (2001) Cost analysis between SABER and design bid build contracting methods. Journal of Construction Engineering and Management, 127(5), pp. 359-366. ISSN 0733-9364

Hepner, C M and Boser, R A (2006) Architects' perceptions of LEED indoor environmental quality checklist items on employee productivity. International Journal of Construction Education and Research, 2(3), pp. 193-208. ISSN 1557-8771

Herbert, Y; Dale, A and Stashok, C (2022) Canadian cities: Climate change action and plans. Buildings & Cities, 3(1), pp. 854-873. ISSN 2632-6655

Herbsman, Z and Mitrani, J D (1984) INES: An interactive estimating system. Journal of Construction Engineering and Management, 110(1), pp. 19-33. ISSN 0733-9364

Hernandezgaytan, V H (2022) The reemergence of a geotechnical, special inspection, and construction material testing firm. DEng thesis, Texas A&M University, USA.

Herring, H (2009) National building stocks: Addressing energy consumption or decarbonization? Building Research & Information, 37(2), pp. 192-195. ISSN 0961-3218

Hesse, A D (1991) The management of risks in the procurement of very large construction projects (Britain and New Commonwealth): Comparative change in procurement methods for very large construction projects. PhD thesis, University College London, UK.

Hettige, N; Perera, B A K S and Mallawaarachchi, H (2017) A framework for adopting green leasing in developing countries: The case of Sri Lanka. Built Environment Project and Asset Management, 7(4), pp. 377-387. ISSN 2044-124X

Hewlett, B; Sherratt, F and Edmondson, V (2022) Managing designing for safety: A framework for whole-Team decision making and risk control. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(1), pp. 15-26. ISSN 17514304

Heylighen, A; Neuckermans, H; Casaer, M and Dewulf, G P M (2007) Building memories. Building Research & Information, 35(1), pp. 90-100. ISSN 0961-3218

Heylighen, A; Schijlen, J; Van der Linden, V; Meulenijzer, D and Vermeersch, P-W (2016) Socially innovating architectural design practice by mobilising disability experience. An exploratory study. Architectural Engineering and Design Management, 12(4), pp. 253-265. ISSN 1745-2007

Hicks, J C (1992) Heavy construction estimates, with and without computers. Journal of Construction Engineering and Management, 118(3), pp. 545-560. ISSN 0733-9364

Hicks, J C (1993) Haul-unit performance. Journal of Construction Engineering and Management, 119(3), pp. 646-653. ISSN 0733-9364

Hidalgo-Sánchez, F M; Torres-González, M; Mascort-Albea, E J; Canivell, J; Romero-Hernández, R and Martín-del-Río, J J (2023) NDT spatial data integration for monumental buildings: Technical information management for the royal alcazar of seville. Building Research & Information, 51(6), pp. 625-647. ISSN 0961-3218

Hide, G (2010) Managing a programme under the NEC3 ECC contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(3), pp. 111-119. ISSN 17514312

Hiete, M; Kühlen, A and Schultmann, F (2011) Analysing the interdependencies between the criteria of sustainable building rating systems. Construction Management and Economics, 29(4), pp. 323-328. ISSN 1466433X

Hilf, J W (1987) Rolled concrete dams using gap-graded aggregate. Journal of Construction Engineering and Management, 113(1), pp. 27-33. ISSN 0733-9364

Hill, C (2000) Professionally accredited industrial experience: A proposal. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Hill, C (2001) Work based learning for construction management courses. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Hill, R C and Bowen, P A (1997) Sustainable construction: Principles and a framework for attainment. Construction Management and Economics, 15(3), pp. 223-239. ISSN 01446193

Hillig, J B; Dan-Asabe, D; Donyavi, S; Dursun, O and Thampuratty, A (2010) Fidic's red book 1999 edition: A study review. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(3), pp. 129-133. ISSN 17514312

Himpe, E; Trappers, L; Debacker, W; Delghust, M; Laverge, J; Janssens, A; Moens, J and Van Holm, M (2013) Life cycle energy analysis of a zero-energy house. Building Research & Information, 41(4), pp. 435-449. ISSN 0961-3218

Hindle, R D and Rwelamila, P (1998) Resistance to change: Architectural education in a turbulent environment. Engineering, Construction and Architectural Management, 5(2), pp. 150-158. ISSN 0969-9988

Hindman, D P; Bamberg, C R and Nussbaum, M A (2014) Bracing of wood composite I-joists to resist lateral buckling from walking loads. Journal of Construction Engineering and Management, 140(9): 04014037, ISSN 0733-9364

Hindman, D P; Timko, P D and Nussbaum, M A (2013) Mechanical response of unbraced wood composite I-joist to walking loads. Journal of Construction Engineering and Management, 139(11): 4013023, ISSN 0733-9364

Hinze, J (2005) Use of trench boxes for worker protection. Journal of Construction Engineering and Management, 131(4), pp. 494-500. ISSN 0733-9364

Hinze, J; Bren, D C and Piepho, N (1995) Experience modification rating as measure of safety performance. Journal of Construction Engineering and Management, 121(4), pp. 455-458. ISSN 0733-9364

Hinze, J and Bren, K (1996) Identifying OSHA paragraphs of particular interest. Journal of Construction Engineering and Management, 122(1), pp. 98-100. ISSN 0733-9364

Hinze, J; Godfrey, R and Sullivan, J (2013) Integration of construction worker safety and health in assessment of sustainable construction. Journal of Construction Engineering and Management, 139(6), pp. 594-600. ISSN 0733-9364

Hinze, J; Hirakawa, J and Benjamin, N (1989) Comparison of labor agreements. Journal of Construction Engineering and Management, 115(1), pp. 90-107. ISSN 0733-9364

Hinze, J; Huang, X and Terry, L (2005) The nature of struck-by accidents. Journal of Construction Engineering and Management, 131(2), pp. 262-268. ISSN 0733-9364

Hinze, J and Nelson, A (1996) Enhancing performance of soundless chemical demolition agents. Journal of Construction Engineering and Management, 122(2), pp. 193-195. ISSN 0733-9364

Hinze, J and Olbina, S (2009) Empirical analysis of the learning curve principle in prestressed concrete piles. Journal of Construction Engineering and Management, 135(5), pp. 425-431. ISSN 0733-9364

Hinze, J and Raboud, P (1988) Safety on large building construction projects. Journal of Construction Engineering and Management, 114(2), pp. 286-293. ISSN 0733-9364

Hinze, J and Roxo, J (1984) Is injury occurrence related to lunar cycles? Journal of Construction Engineering and Management, 110(4), pp. 409-419. ISSN 0733-9364

Hitchcock, R J (1996) Improving life-cycle information management through documentation of project objectives and design rationale. PhD thesis, University of California, Berkeley, USA.

Hiyassat, M A S (2000) Modification of minimum moment approach in resource leveling. Journal of Construction Engineering and Management, 126(4), pp. 278-284. ISSN 0733-9364

Hiyassat, M A S (2001) Applying modified minimum moment method to multiple resource leveling. Journal of Construction Engineering and Management, 127(3), pp. 192-198. ISSN 0733-9364

Hjelseth, E (2010) Exchange of relevant information in BIM objects defined by the role-and life-cycle information model. Architectural Engineering and Design Management, 6(4), pp. 279-287. ISSN 1745-2007

Hjerpe, M; Glaas, E and Storbjörk, S (2025) Introducing a severe impacts approach to guide adaptation to pluvial floods in residential and public buildings. Building Research & Information, 53(7), pp. 817-832. ISSN 0961-3218

Ho, S P and Liu, L Y (2002) An option pricing-based model for evaluating the financial viability of privatized infrastructure projects. Construction Management and Economics, 20(2), pp. 143-156. ISSN 01446193

Ho, S P and Liu, L Y (2003) How to evaluate and invest in emerging A/E/C technologies under uncertainty. Journal of Construction Engineering and Management, 129(1), pp. 16-24. ISSN 0733-9364

Ho Song, M and Fischer, M (2020) Empirical determination of the smallest batch sizes for daily planning. Journal of Construction Engineering and Management, 146(3): 04020011, ISSN 0733-9364

Hoare, D and Broome, J (2001) Bills of quantities versus activity schedules for civil engineering projects. Journal of Construction Procurement, 7(1), pp. 11-26. ISSN 1358-9180

Hobson Jr., D E (1996) Developing a decision model that replicates industry experts using minimal information. PhD thesis, University of Kansas, USA.

Hodgson, W (2021) Using participatory housing construction methods to develop small sites in public ownership. PhD thesis, University of London, University College London, UK.

Hofmann, Giane Alfenas Antunes (2019) Parameters for the prevention of pathologies in steel-structured buildings. PhD thesis, Universidade Federal de Ouro Preto, Brazil.

Hogan, J M (1983) The "great debate" over Panama: An analysis of controversy over the Carter-Torrijos Treaties of 1977. PhD thesis, University of Wisconsin - Madison, USA.

Hogendorn, C P (2000) Unbundled infrastructure firms: Competition and continuing regulation. PhD thesis, University of Pennsylvania, USA.

Hogg, K (2003) The role of the quantity surveying profession in accommodating client risk. Journal of Financial Management of Property and Construction, 8(1), pp. 49-56. ISSN 1366-4387

Hollnagel, E (2014) Resilience engineering and the built environment. Building Research & Information, 42(2), pp. 221-228. ISSN 0961-3218

Holm, M G (2000) Service management in housing refurbishment: A theoretical approach. Construction Management and Economics, 18(5), pp. 525-533. ISSN 01446193

Holmes, S H; Phillips, T and Wilson, A (2016) Overheating and passive habitability: Indoor health and heat indices. Building Research & Information, 44(1), pp. 1-19. ISSN 0961-3218

Holt, G D; Olomolaiye, P O and Harris, F C (1994) Evaluating performance potential in the selection of construction contractors. Engineering, Construction and Architectural Management, 1(1), pp. 29-50. ISSN 0969-9988

Hooper, M and Ekholm, A (2012) A BIM-Info delivery protocol. Construction Economics and Building, 12(4), pp. 39-52. ISSN 2204-9029

Hope, A (2011) Greener homes for the future?: sustainability in PFI local authority social housing. PhD thesis, Northumbria University, UK.

Horne, M; Hill, R and Giddings, R (1999) Visualization of photovoltaic clad buildings. Building Research & Information, 27(2), pp. 96-108. ISSN 0961-3218

Horner, M and Zakieh, R (1996) Characteristic items: a new approach to pricing and controlling construction projects. Construction Management and Economics, 14(3), pp. 241-252. ISSN 01446193

Horsley, A; France, C and Quatermass, B (2003) Delivering energy efficient buildings: A design procedure to demonstrate environmental and economic benefits. Construction Management and Economics, 21(4), pp. 345-356. ISSN 01446193

Horstmann, R (1997) Behavioral and financial impact of customer satisfaction and service quality: An empirical assessment in the facilities management industry. DBA thesis, Nova Southeastern University, USA.

Hosseini, M R; Jupp, J; Papadonikolaki, E; Mumford, T; Joske, W and Nikmehr, B (2021) Position paper: Digital engineering and building information modelling in Australia. Smart and Sustainable Built Environment, 10(3), pp. 331-344. ISSN 2046-6099

Hosseinian, S M (2016) An optimal time incentive/disincentive -based compensation in contracts with multiple agents. Construction Economics and Building, 16(4), pp. 35-53. ISSN 2204-9029

Hosseinian, Seyedmahdi (2013) Optimal outcome sharing arrangements in construction target contracts. PhD thesis, University of New South Wales, Australia.

Hou, J-H (2006) Object modeling and proper abstractions: The case of stair design. DDes thesis, Harvard University, USA.

Howell, G; Laufer, A and Ballard, G (1993) Interaction between subcycles: One key to improved methods. Journal of Construction Engineering and Management, 119(4), pp. 714-728. ISSN 0733-9364

Howell, G A (2011) New operating system for project management: Consequences and opportunities. Journal of Construction Engineering and Management, 137, pp. 882-886. ISSN 0733-9364

Hsu, C L; Wang, J T and Hou, H Y (2023) A blockchain-based parametric model library for knowledge sharing in building information modeling collaboration. Journal of Construction Engineering and Management, 149(11): 04023107, ISSN 0733-9364

Hsu, Y (2017) Design-oriented strategy typology and innovation framework. Journal of Engineering, Design and Technology, 15(1), pp. 13-30.

Hu, C and Liu, D (2018) Improved critical path method with trapezoidal fuzzy activity durations. Journal of Construction Engineering and Management, 144(9): 04018090, ISSN 0733-9364

Hu, E; Zou, L and Langston, C (2004) A new interlink decision making index for making multi-criteria decision. Construction Economics and Building, 4(2), pp. 33-42. ISSN 2204-9029

Hu, F; Liao, R and Chen, J (2023) Calculation methods to optimize the number of pedestals and evaluate production plans for precast yards fabricating prestressed bridge beams and precast segments for poststressed segmental erection. Journal of Construction Engineering and Management, 149(1): 04022146, ISSN 0733-9364

Hu, H (2014) Development of interoperable data protocol for integrated bridge project delivery. PhD thesis, State University of New York at Buffalo, USA.

Hu, Songbo (2023) Identification and prevention of crane operational hazards by integrating BIM and pathfinding algorithm in construction planning. PhD thesis, Monash University, Australia.

Hu, W; Shu, X; Jia, X and Huang, B (2017) Recommendations on intelligent compaction parameters for asphalt resurfacing quality evaluation. Journal of Construction Engineering and Management, 143(9): 04017065, ISSN 0733-9364

Hu, Xiaoqiang (2023) New approaches to improving highway design, safety, and visual presentation. PhD thesis, Purdue University, USA.

Hu, Z (2023) Personalized safety behavior management for construction workers considering cognitive factors. PhD thesis, National University of Singapore, Singapore.

Huang, Mengqi (2022) BIM for underground stations: Supporting decision making on lifecycle stages. PhD thesis, Monash University, Australia.

Huang, P-Y (1994) Extensible object-oriented computer-aided design system. PhD thesis, University of Colorado at Boulder, USA.

Huang, X and Bernold, L E (1997) CAD-integrated excavation and pipe laying. Journal of Construction Engineering and Management, 123(3), pp. 318-323. ISSN 0733-9364

Huang, X; Zhang, J; Meng, X; Wang, R; Li, J; Tao, X; Yang, Z and Li, L (2025) Verifiable safety path planning: Utilizing planar analysis for improved lifting operations. Journal of Construction Engineering and Management, 151(9): 04025123, ISSN 0733-9364

Huang, Y C (2006) Graphical-based multistage scheduling method for RC buildings. Construction Management and Economics, 24(1), pp. 5-18. ISSN 01446193

Huang, Y L (2008) The pricing of conditional performance guarantees with risky collateral. Construction Management and Economics, 26(9), pp. 967-978. ISSN 1466433X

Huang, Y L and Chou, S P (2006) Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects. Construction Management and Economics, 24(4), pp. 379-389. ISSN 01446193

Huang, Y L and Pi, C C (2009) Valuation of multi-stage BOT projects involving dedicated asset investments: A sequential compound option approach. Construction Management and Economics, 27(7), pp. 653-666. ISSN 1466433X

Hubbard, B J and Middaugh, B (2013) Leveraging bluetooth consumer electronics as proximity sensors to construction health hazards. International Journal of Construction Education and Research, 9(2), pp. 117-131. ISSN 1557-8771

Hughes, M; Palmer, J; Cheng, V and Shipworth, D (2013) Sensitivity and uncertainty analysis of england's housing energy model. Building Research & Information, 41(2), pp. 156-167. ISSN 0961-3218

Hughes, W P; Ancell, D; Gruneberg, S and Hirst, L (2004) Exposing the myth of the 1:5:200 ratio relating initial cost, maintenance and staffing costs of office buildings. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Hugo, J M (2023) Heat stress: Adaptation measures in South African informal settlements. Buildings & Cities, 4(1), pp. 55-73. ISSN 2632-6655

Hui, C M; Chiang, Y H and Tang, B S (1997) Asian real estate markets: Boom and oversupply? Journal of Financial Management of Property and Construction, 2(3), pp. 63-76. ISSN 1366-4387

Hui, E C M and Fung, H H K (2009) Real estate development as real options. Construction Management and Economics, 27(3), pp. 221-227. ISSN 1466433X

Hulme, T W and Burchell, A J (1992) Bored tunneling for Singapore metro. Journal of Construction Engineering and Management, 118(2), pp. 363-384. ISSN 0733-9364

Hulshizer, A J and Desai, A J (1984) Shock vibration effects on freshly placed concrete. Journal of Construction Engineering and Management, 110(2), pp. 266-285. ISSN 0733-9364

Hummer, J E; Arocho, I and Rasdorf, W (2017) Approach to assessing tradeoffs between construction equipment fleet emissions and cost. Journal of Construction Engineering and Management, 143(5): 04016122, ISSN 0733-9364

Hussey, H and Atanasov, V (2024) Improving the methods of description of building works in the UK. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Huuhka, S (2016) Vacant residential buildings as potential reserves: A geographical and statistical study. Building Research & Information, 44(8), pp. 816-839. ISSN 0961-3218

Hwang, B G; Thomas, S R; Degezelle, D and Caldas, C H (2008) Development of a benchmarking framework for pharmaceutical capital projects. Construction Management and Economics, 26(2), pp. 177-195. ISSN 1466433X

Hyari, K; El-Mashaleh, M and Kandil, A (2010) Optimal assignment of multiskilled labor in building construction projects. International Journal of Construction Education and Research, 6(1), pp. 70-80. ISSN 1557-8771

Hyari, K and El-Rayes, K (2006) Lighting requirements for nighttime highway construction. Journal of Construction Engineering and Management, 132(5), pp. 435-443. ISSN 0733-9364

Hyari, K H (2016) Handling unbalanced bidding in construction projects: Prevention rather than detection. Journal of Construction Engineering and Management, 142(2): 04015060, ISSN 0733-9364

Hyari, K H; El-Rayes, K and El-Mashaleh, M (2009) Automated trade-off between time and cost in planning repetitive construction projects. Construction Management and Economics, 27(8), pp. 749-761. ISSN 1466433X

Hyari, K H; Shatarat, N and Khalafallah, A (2017) Handling risks of quantity variations in unit-price contracts. Journal of Construction Engineering and Management, 143(10): 04017079, ISSN 0733-9364

Hyari, K H; Tarawneh, Z S and Katkhuda, H N (2016) Detection model for unbalanced pricing in construction projects: A risk-based approach. Journal of Construction Engineering and Management, 142(12): 04016078, ISSN 0733-9364

Höök, M and Stehn, L (2008) Applicability of lean principles and practices in industrialized housing production. Construction Management and Economics, 26(10), pp. 1091-1100. ISSN 1466433X

Ibañez-Guzmán, J (1995) Modelling of on-site work cells for the simulation of automated and semi-automated construction. Construction Management and Economics, 13(5), pp. 427-434. ISSN 01446193

IbañezGuzmán, J and Malcolm, A A (2002) Autonomous vehicles in the construction process. Construction Innovation, 2(3), pp. 211-224. ISSN 1471-4175

Ibbs, C W (1985) Product specification practices and problems. Journal of Construction Engineering and Management, 111(2), pp. 157-172. ISSN 0733-9364

Ibbs, C W (1986) Brand name or equalproduct specifications. Journal of Construction Engineering and Management, 112(1), pp. 1-13. ISSN 0733-9364

Ibbs, C W (1991) Innovative contract incentive features for construction. Construction Management and Economics, 9(2), pp. 157-169. ISSN 01446193

Ibbs, C W (1997) Quantitative impacts of project change: Size issues. Journal of Construction Engineering and Management, 123(3), pp. 308-311. ISSN 0733-9364

Ibbs, C W; Bates, L C and Echeverry, D (1987) Owner-furnished equipment (OFE) contract practices. Journal of Construction Engineering and Management, 113(2), pp. 249-263. ISSN 0733-9364

Ibbs, C W and Terveer, K R (1984) Integrated construction preventive maintenance system. Journal of Construction Engineering and Management, 110(1), pp. 43-59. ISSN 0733-9364

Ibrahim, A; Nnaji, C; Namian, M and Shakouri, M (2024) Evaluating the impact of hazard information on fieldworkers' safety risk perception. Journal of Construction Engineering and Management, 150(3): 04023174, ISSN 0733-9364

Ibrahim, Y M (2008) Developing a model for vision-based progress measurement and visualisation of as-built construction operations. PhD thesis, Heriot-Watt University, UK.

Ibrahim, Y M and Kaka, A P (2007) The impact of diversification on the performance of UK construction firms. Journal of Financial Management of Property and Construction, 12(2), pp. 73-86. ISSN 1366-4387

Idris, M M (1998) Assessment of the factors influencing the maintenance programme of a large university building in Riyadh. Construction Management and Economics, 16(6), pp. 673-679. ISSN 01446193

Idrus, A and Newman, J (2003) Ifess: A computer tool to aid structural engineers at the conceptual design stage. Construction Innovation, 3(3), pp. 127-143. ISSN 1471-4175

Igwe, C; Nasiri, F and Hammad, A (2022) Construction workspace management: Critical review and roadmap. International Journal of Construction Management, 22(10), pp. 1960-1973. ISSN 1562-3599

Ikaheimonen, J (1998) Construction loads on shores and stability of horizontal formwork. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.

Ikedi, C U; Okoroh, M I; Dean, A and Omer, S A (2010) Impact assessment for building integrated photovoltaic (BIPV). In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Imam, H (2021) Roles of shared leadership, autonomy, and knowledge sharing in construction project success. Journal of Construction Engineering and Management, 147(7): 04021067, ISSN 0733-9364

Imbert, I D C (1990) Human issues affecting construction in developing countries. Construction Management and Economics, 8(2), pp. 219-228. ISSN 01446193

Ingemansson Havenvid, M; Hulthen, K; Linne, A and Sundquist, V (2015) New ways of organising construction due to user demands. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Ingirige, B; Haigh, R; Malalgoda, C and Palliyaguru, R (2008) Exploring good practice knowledge transfer related to post-tsunami housing (re-)construction in Sri Lanka. Journal of Construction in Developing Countries, 13(2), pp. 21-42. ISSN 1823-6499

Inyim, P (2015) Time, cost, and environmental impact analysis for sustainable design at multiple building levels. PhD thesis, Florida International University, USA.

Ioannou, P G (1988) Pilot tunnels: Contractor's position. Journal of Construction Engineering and Management, 114(4), pp. 594-613. ISSN 0733-9364

Ioannou, P G (2019) Friedman's bidding model: Errors and corrections. Journal of Construction Engineering and Management, 145(10): 04019058, ISSN 0733-9364

Ioannou, P G (2022) Risk-sensitive competitive bidding model and impact of risk aversion and cost uncertainty on optimum bid. Journal of Construction Engineering and Management, 148(3): 04021205, ISSN 0733-9364

Ioannou, P G and Yang, I T (2016) Repetitive scheduling method: Requirements, modeling, and implementation. Journal of Construction Engineering and Management, 142(5): 04016002, ISSN 0733-9364

Iranagh, M A and Sonmez, R (2012) A genetic algorithm for resource levelling of construction projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Irizarry, J (2011) Application of methods analysis to steel erection tasks: Identification of factors affecting labor performance. International Journal of Construction Management, 11(4), pp. 31-47. ISSN 1562-3599

Irizarry, J; Gheisari, M; Zolfagharian, S and Meadati, P (2013) Human computer interaction modes for construction education applications: Experimenting with small format interactive displays. International Journal of Construction Education and Research, 9(2), pp. 83-101. ISSN 1557-8771

Irizarry, J; Meadati, P; Barham, W S and Akhnoukh, A (2012) Exploring applications of building information modeling for enhancing visualization and information access in engineering and construction education environments. International Journal of Construction Education and Research, 8(2), pp. 119-145. ISSN 1557-8771

Isaac, S and Navon, R (2008) Feasibility study of an automated tool for identifying the implications of changes in construction projects. Journal of Construction Engineering and Management, 134(2), pp. 139-145. ISSN 0733-9364

Isaac, S and Navon, R (2014) Can project monitoring and control be fully automated? Construction Management and Economics, 32(6), pp. 495-505. ISSN 01446193

Isaacs, J; Falconer, R; Gilmour, D and Blackwood, D (2010) Modelling and visualizing sustainability assessment in urbanenvironments. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Isaacs, N; Saville-Smith, K; Camilleri, M and Burrough, L (2010) Energy in New Zealand houses: Comfort, physics and consumption. Building Research & Information, 38(5), pp. 470-480. ISSN 0961-3218

Ishtiaque, T A; Wondimu, P A; Memic, N; Andersen, B S; Lædre, O and Klakegg, O J (2025) Ranking the benefits of early contractor involvement: a client's perspective. International Journal of Construction Management, 25(6), pp. 728-739. ISSN 1562-3599

Isidore, L J and Back, W E (2001) Probabilistic optimal-cost scheduling. Journal of Construction Engineering and Management, 127(6), pp. 431-437. ISSN 0733-9364

Islam, Md Mainul M (2009) Optimizing concessionary items' values for procuring privately financed infrastructure projects. PhD thesis, Griffith University, Australia.

Ismael, D and Shealy, T (2024) Reframing sustainability rating systems to emphasize interconnected benefits increases sustainable design practices among engineers. Journal of Construction Engineering and Management, 150(8): 04024086, ISSN 0733-9364

Ismail, Sushilawati (2018) Developing a framework for sustainable industrialised building systems for infrastructure projects in Malaysia. PhD thesis, Queensland University of Technology, Australia.

Itard, L and Klunder, G (2007) Comparing environmental impacts of renovated housing stock with new construction. Building Research & Information, 35(3), pp. 252-267. ISSN 0961-3218

Iyer, K C and Sagheer, M (2010) Hierarchical structuring of PPP risks using interpretative structural modeling. Journal of Construction Engineering and Management, 136(2), pp. 151-159. ISSN 0733-9364

Jaafar, K and El-Halawani, L I (2022) Simulation-based multi-objective optimization model for machinery allocation in shallow foundation. International Journal of Construction Management, 22(15), pp. 2845-2854. ISSN 1562-3599

Jaafar, M; Abdul-Aziz, A R and Ali, R (2010) Entrepreneurship: A critical outlook on housing developers in Malaysia. International Journal of Construction Management, 10(4), pp. 75-99. ISSN 1562-3599

Jaafari, A (1984) Criticism of CPM for project planning analysis. Journal of Construction Engineering and Management, 110(2), pp. 222-233. ISSN 0733-9364

Jackson, S (2002) Development of a tool for whole life design appraisal. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Jacobs, C and Jacobs, K (2003) An integrated approach to curriculum at foundation level. Journal of Engineering, Design and Technology, 1(1), pp. 89-101. ISSN 1726-0531

Jafari, A (2013) A contractor pre-qualification model based on the quality function deployment method. Construction Management and Economics, 31(7), pp. 746-760. ISSN 1466433X

Jafari, A and Love, P E D (2013) Quality costs in construction: Case of Qom monorail project in iran. Journal of Construction Engineering and Management, 139(9), pp. 1244-1249. ISSN 0733-9364

Jafari, D M (2012) Resolution of multiparty construction disputes under the Singapore international arbitration legal framework. PhD thesis, National University of Singapore, Singapore.

Jafary, P.; Shojaei, D.; Rajabifard, A. and Ngo, T. (2026) AI-augmented construction cost estimation: An ensemble natural language processing (NLP) model to align quantity take-offs with cost indexes. International Journal of Construction Management, 26(8), pp. 1508-1526. ISSN 1562-3599

Jagboro, G O (1998) The effect of payment for advance purchase of building materials on contractor's cash-flow projections. Journal of Financial Management of Property and Construction, 3(3), pp. 71-83. ISSN 1366-4387

Jagboro, G O and Alli, O R (1999) A study of the monetary value of extension of time in building project. Journal of Financial Management of Property and Construction, 4(3), pp. 39-46. ISSN 1366-4387

Jahren, C T; Ellsworth, B J and Bergeson, K (1999) Constructability test for cold in-place asphalt recycling. Journal of Construction Engineering and Management, 125(5), pp. 325-329. ISSN 0733-9364

Jain, N R; Rawal, R; Vardhan, V and Dey, S (2021) Performance metrics for room air-conditioners: Energy, comfort and environmental impacts. Buildings & Cities, 2(1), pp. 666-687. ISSN 2632-6655

Jain, S; Singhal, S and Jain, N K (2021) Construction and demolition waste (C&DW) in India: Generation rate and implications of C&DW recycling. International Journal of Construction Management, 21(3), pp. 261-270. ISSN 1562-3599

James, P and Matipa, W M (2004) Sustainable construction in a developing country: An assessment of how the professional's practice impact the environment. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Jamieson, I A (1997) Development of a concurrent engineering construction process protocol. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Jamieson, I A (1998) The development of a concurrently engineered procurement process. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Jannadi, O A and Almishari, S (2003) Risk assessment in construction. Journal of Construction Engineering and Management, 129(5), pp. 492-500. ISSN 0733-9364

Jansen, B (2024) The circular kitchen: Perspectives for design and implementation. PhD thesis, Delft University of Technology, Netherlands.

Jaselskis, E; Ruwanpura, J; Becker, T; Silva, L; Jewell, P and Floyd, E (2011) Innovation in construction engineering education using two applications of internet-based information technology to provide real-time project observations. Journal of Construction Engineering and Management, 137, pp. 829-835. ISSN 0733-9364

Jaselskis, E J and Ashley, D B (1991) Optimal allocation of project management resources for achieving success. Journal of Construction Engineering and Management, 117(2), pp. 321-340. ISSN 0733-9364

Jaselskis, E J and Talukhaba, A (1998) Bidding considerations in developing countries. Journal of Construction Engineering and Management, 124(3), pp. 185-193. ISSN 0733-9364

Javernick Will, A N (2009) Mobilizing institutional knowledge for international projects: The relative importance, acquisition and transfer of institutional knowledge for international firms. PhD thesis, Stanford University, USA.

Jazayeri, E (2019) Hazard recognition and risk perception among union electricians. PhD thesis, University of Kentucky, USA.

Jazayeri, E and Dadi, G B (2020) Hazard recognition and risk perception skills among union electricians. Journal of Construction Engineering and Management, 146(9): 04020108, ISSN 0733-9364

Jeelani, I; Albert, A; Azevedo, R and Jaselskis, E J (2017) Development and testing of a personalized hazard-recognition training intervention. Journal of Construction Engineering and Management, 143(5): 04016120, ISSN 0733-9364

Jeeninga, H and Kets, A (2004) Evolution of energy policy in the Netherlands: Past, present and future. Building Research & Information, 32(1), pp. 38-41. ISSN 0961-3218

Jenny, R J (1983) Compressed air use in soft ground tunneling. Journal of Construction Engineering and Management, 109(2), pp. 206-213. ISSN 0733-9364

Jens, K and Gregg, J S (2022) Building performances in open and enclosed spaces: A method for balancing operational costs and space utilization with a focus on user needs and satisfaction. Architectural Engineering and Design Management, 18(2), pp. 149-164. ISSN 1745-2007

Jensen Jr, D A and Craig Jr, J W (1998) The impact of TAMRA '88 on US construction accounting practices. Construction Management and Economics, 16(3), pp. 303-313. ISSN 01446193

Jeon, J; Zhang, Y; Yang, L; Xu, X; Cai, H and Tran, D (2023) Risk breakdown matrix for risk-based inspection of transportation infrastructure projects. Journal of Construction Engineering and Management, 149(4): 04023007, ISSN 0733-9364

Jeong, J G (2006) A framework for supply chain modeling and optimization for the manufactured housing industry. PhD thesis, Purdue University, USA.

Jergeas, G F and Hartman, F T (1994) Contractors' construction-claims avoidance. Journal of Construction Engineering and Management, 120(3), pp. 553-560. ISSN 0733-9364

Ji, Y; Lee, A and Fernando, T (2020) Dynamic thermal simulation of advanced natural ventilation in buildings: Current and future usage, UK exemplar. Architectural Engineering and Design Management, 16(4), pp. 293-309. ISSN 1745-2007

Jia, A. Y. and Luk, C. W. (2026) From techno-optimism to value co-creation: A circular value system analysis on the modular transitional housing programme in Hong Kong. Construction Management and Economics, 44(7), pp. 537-563. ISSN 0144-6193

Jiang, A (2012) Negotiating construction contracts through practical cash flow planning and analysis model. International Journal of Construction Management, 12(2), pp. 23-33. ISSN 1562-3599

Jiang, D; Chen, J J and Isaac, D (1999) Real estate and foreign investment in China. Journal of Financial Management of Property and Construction, 4(1), pp. 75-87. ISSN 1366-4387

Jiang, G and Shi, J (2005) Exact algorithm for solving project scheduling problems under multiple resource constraints. Journal of Construction Engineering and Management, 131(9), pp. 986-992. ISSN 0733-9364

Jiang, S; Wang, S; Sun, H; Liu, W; Xiao, B; Cha, H S and Zhang, J (2025) Enhancing quality management: Lightweight detection and risk warning of concrete cracks and rebar exposure using improved YOLOv8. Journal of Construction Engineering and Management, 151(8): 04025087, ISSN 0733-9364

Jiang, X; Zhou, H; Li, M; Lu, K; Lyu, S; Omrani, S and Skitmore, M (2024) Sustainable construction projects management in the AEC industry: Analysis and visualization. International Journal of Construction Management, 24(4), pp. 384-399. ISSN 1562-3599

Jiang, Z; Han, Y; Cheng, Y; Wang, Z and Meng, H (2025) An improved yolov8-dyhead-wiseiou model for positioning and counting detection of grouting sleeves in a prefabricated wall. Journal of Construction Engineering and Management, 151(4): 04025016, ISSN 0733-9364

Jin, Z; Gambatese, J A and Nnaji, C (2024) Musculoskeletal disorder risk assessment in modern ready-made concrete formwork construction. Journal of Construction Engineering and Management, 150(6): 05024005, ISSN 0733-9364

Joao, Z R (2021) Road construction assessment model (RC-AM) to prevent contract overbilling in Angola. PhD thesis, George Washington University, USA.

Johansen, E (2002) The application of a pilot pull planning system to construction projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Johansen, E and Wilson, B (2006) Investigating first planning in construction. Construction Management and Economics, 24(12), pp. 1305-1314. ISSN 1466433X

John, G A (2000) A virtual environment for safety-integrated site layout design and organisation. PhD thesis, Teesside University, UK.

Johnson, H M; Singh, A and Young, R H F (1998) Fall protection analysis for workers on residential roofs. Journal of Construction Engineering and Management, 124(5), pp. 418-428. ISSN 0733-9364

Johnson, K A L (2013) Managing design for the delivery of best value. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(3), pp. 111-120. ISSN 17514312

Johnson, L R (1969) A competitive strategy model for highway construction proposals. PhD thesis, Oklahoma State University, USA.

Johnston, D W; Ahluwalia, N T and Gwyn, M B (2007) Improving the professional engineering licensure process for construction engineers. Journal of Construction Engineering and Management, 133(9), pp. 669-677. ISSN 0733-9364

Johnstone, I M (2001) Periodic refurbishment and reductions in national costs to sustain dwelling services. Construction Management and Economics, 19(1), pp. 97-108. ISSN 01446193

Johnstone, I M (2004) Development of a model to estimate the benefit-cost ratio performance of housing. Construction Management and Economics, 22(6), pp. 607-617. ISSN 01446193

Jones, A M (1990) Design and construction for traditional house building. PhD thesis, Aston University, UK.

Jones, P (2018) A 'smart' bottom-up whole-systems approach to a zero-carbon built environment. Building Research & Information, 46(5), pp. 566-577. ISSN 0961-3218

Jones, W; Gibb, A; Goodier, C and Bust, P (2015) Managing the unknown: The health risks of nanomaterials in the built environment. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Jongeling, R (2006) A process model for work-flow management in construction. PhD thesis, Luleå University of Technology, Sweden.

Jonsson, H and Rudberg, M (2017) KPIs for measuring performance of production systems for residential building: A production strategy perspective. Construction Innovation, 17(3), pp. 381-403. ISSN 1471-4175

Joseph, R; Proverbs, D; Lamond, J and Wassell, P (2011) A critical synthesis of the indirect tangible impacts of flooding on households. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Josephson, P E and Chao, M (2014) Use and non-use of time in construction of new multi-dwelling buildings in Sweden. International Journal of Construction Management, 14(1), pp. 28-35. ISSN 1562-3599

Ju, J.; Liu, X.; Xu, F.; Cao, B.; Chen, W.; Wang, X. and Tian, G. (2026) Operational phase recognition and power matching under shoveling conditions in an autonomous loading mobile concrete mixer. Journal of Construction Engineering and Management, 152(9): 04026131, ISSN 0733-9364

Jung, W; Han, S H; Park, H and Kim, D Y (2010) Empirical assessment of internationalization strategies for small and medium construction companies. Journal of Construction Engineering and Management, 136(12), pp. 1306-1316. ISSN 0733-9364

Jørgensen, B; Emmitt, S and Bonke, S (2004) Studying cultural issues: The implementation of facilitated process-orientated cooperation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Kaasalainen, T and Huuhka, S (2016) Homogenous homes of Finland: 'Standard' flats in non-standardized blocks. Building Research & Information, 44(3), pp. 229-247. ISSN 0961-3218

Kaatz, E; Root, D S; Bowen, P A and Hill, R C (2006) Advancing key outcomes of sustainability building assessment. Building Research & Information, 34(4), pp. 308-320. ISSN 0961-3218

Kaatz, E; Root, D S; Hilland, R C and Bowen, P A (2006) Fostering sustainability and enhancing quality in construction with building sustainability assessment. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Kaboli, A S and Carmichael, D G (2016) An examination of the dret model and the influence of payload, haul grade and truck type on earthmoving emissions. International Journal of Construction Management, 16(2), pp. 95-108. ISSN 1562-3599

Kader, A S A (1997) Cost modelling for inland waterway transport systems. PhD thesis, Liverpool John Moores University, UK.

Kagan, H A; Leary, D J and Pratter, G E K (1986) Design engineers' responsibilities during construction. Journal of Construction Engineering and Management, 112(3), pp. 394-402. ISSN 0733-9364

Kajewski, S L (2005) Multilevel formwork load distribution with posttensioned slabs. Journal of Construction Engineering and Management, 131(2), pp. 203-210. ISSN 0733-9364

Kaka, A and Lewis, J (2003) Development of a company-level dynamic cash flow forecasting model. Construction Management and Economics, 21(7), pp. 693-705. ISSN 01446193

Kaka, A and Price, A D F (1991) Relationship between value and duration of construction projects. Construction Management and Economics, 9(4), pp. 383-400. ISSN 01446193

Kaka, A P (1999) The development of a benchmark model that uses historical data for monitoring the progress of current construction projects. Engineering, Construction and Architectural Management, 6(3), pp. 256-266. ISSN 0969-9988

Kaka, A P and Cheetham, D W (1997) The effect of some tendering and payment strategies on contractors' financial performance. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Kaka, A P and Khosrowshahi, F (1996) Effect of different procurement routes on contractors' cash flows. Engineering, Construction and Architectural Management, 3(1-2), pp. 133-145. ISSN 0969-9988

Kaka, A P and Price, A D F (1993) Modelling standard cost commitment curves for contractors' cash flow forecasting. Construction Management and Economics, 11(4), pp. 271-283. ISSN 01446193

Kakoto, T; Skibnlewski, M J and Hancher, D E (1989) Comparison of U.S. And Japanese practices in public construction. Journal of Construction Engineering and Management, 115(4), pp. 499-516. ISSN 0733-9364

Kalantari, S; Cruz-Garza, J; Xu, T B; Mostafavi, A and Gao, E (2023) Store layout design and consumer response: A behavioural and EEG study. Building Research & Information, 51(8), pp. 897-914. ISSN 0961-3218

Kalian, A A A (1998) Computer aided manufacturing for prefabricated concrete buildings. PhD thesis, Teesside University, UK.

Kallantzis, A; Soldatos, J and Lambropoulos, S (2007) Linear versus network scheduling: A critical path comparison. Journal of Construction Engineering and Management, 133(7), pp. 483-491. ISSN 0733-9364

Kalowski, J (2008) Community consultation: Lessons from Sydney. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(2), pp. 65-69. ISSN 17514312

Kalua, A; Jeong Jo, S; Fateminasab, S; Al-Rqaibat, S and Opitz, C (2020) Impact of ventilation method on residential indoor pm dispersion during dust storm events in Saudi Arabia. Architectural Engineering and Design Management, 16(3), pp. 191-208. ISSN 1745-2007

Kalz, D E; Pfafferott, J; Herkel, S and Wagner, A (2009) Building signatures correlating thermal comfort and low-energy cooling: In-use performance. Building Research & Information, 37(4), pp. 413-432. ISSN 0961-3218

Kamara, J M (2017) Maintaining focus on clients' requirements using the DQI tool: Towards a requirements-oriented project process. Built Environment Project and Asset Management, 7(3), pp. 271-283. ISSN 2044-124X

Kamara, J M; Anumba, C J and Evbuomwan, N F O (2000) Establishing and processing client requirements: A key aspect of concurrent engineering in construction. Engineering, Construction and Architectural Management, 7(1), pp. 15-28. ISSN 0969-9988

Kamara, J M; Anumba, C J and Hobbs, B (1999) From briefing to client requirements processing. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Kamardeen, I (2010) Knowledge-based occupational health and safety planning for construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Kamardeen, I (2011) Web-based tool for affective safety training in construction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Kamat, V R; Martinez, J C; Fischer, M; Golparvar-Fard, M; Pea-Mora, F and Savarese, S (2011) Research in visualization techniques for field construction. Journal of Construction Engineering and Management, 137, pp. 853-862. ISSN 0733-9364

Kan, C; Fang, Y; Anumba, C J and Messner, J I (2018) A cyber-physical system (CPS) for planning and monitoring mobile cranes on construction sites. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(6), pp. 240-250. ISSN 17514304

Kang, L S and Paulson, B C (1998) Information management to integrate cost and schedule for civil engineering projects. Journal of Construction Engineering and Management, 124(5), pp. 381-389. ISSN 0733-9364

Kang, M M K (2014) Development of an expert system for sustainable pavement preservation strategies (es2p2s). PhD thesis, University of Wisconsin - Madison, USA.

Kangari, R (1982) Construction project selection under risk: Market model approach. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kangari, R; Pruitt, J D and Cheema, T S (1988) Slipforming IBM tower. Journal of Construction Engineering and Management, 114(3), pp. 472-488. ISSN 0733-9364

Kangari, R and Riggs, L S (1988) Portfolio management in construction. Construction Management and Economics, 6(2), pp. 161-169. ISSN 01446193

Kanit, R; Gunduz, M and Ozkan, O (2009) Investigating the effectiveness of certain priority rules on resource scheduling of housing estate projects. Journal of Construction Engineering and Management, 135(7), pp. 609-613. ISSN 0733-9364

Kannan, G (2011) Field studies in construction equipment economics and productivity. Journal of Construction Engineering and Management, 137, pp. 823-828. ISSN 0733-9364

Kapambwe, F C (2003) An evaluation of the implications of equity foreign direct investment risks in BOT infrastructure projects for overseas contractors in sub-Saharan Africa. PhD thesis, University of Reading, UK.

Kar, S; Kothari, C and Jha, K N (2021) Developing an optimum material procurement schedule by integrating construction program and budget using NSGA-II. Journal of Construction Engineering and Management, 147(4): 04021017, ISSN 0733-9364

Karam, K S; Karam, J S and Einstein, H H (2007) Decision analysis applied to tunnel exploration planning. II: Consideration of uncertainty. Journal of Construction Engineering and Management, 133(5), pp. 354-363. ISSN 0733-9364

Karatas, A and El-Rayes, K (2014) Optimal trade-offs between social quality of life and life-cycle cost in housing units. Journal of Construction Engineering and Management, 140(12): 04014058, ISSN 0733-9364

Karim, A and Adeli, H (1999) A new generation software for construction scheduling and management. Engineering, Construction and Architectural Management, 6(4), pp. 380-390. ISSN 0969-9988

Karimi, B (2018) Evaluation of emissions reduction strategies for heavy duty diesel construction equipment. PhD thesis, Oklahoma State University, USA.

Karrbom Gustavsson, T; Hallin, A and Dobers, P (2024) Stakeholder involvement in distributed projects: A performative approach to large scale urban sustainable development projects and the case of Stockholm Royal Seaport. Construction Management and Economics, 42(2), pp. 146-161. ISSN 01446193

Karshenas, S (1981) Probabilistic evaluation of safety of buildings during construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Karshenas, S (1984) Predesign cost estimating method for multistory buildings. Journal of Construction Engineering and Management, 110(1), pp. 79-86. ISSN 0733-9364

Karshenas, S (1989) Truck capacity selection for earthmoving. Journal of Construction Engineering and Management, 115(2), pp. 212-227. ISSN 0733-9364

Karshenas, S and Haber, D (1990) Economic optimization of construction project scheduling. Construction Management and Economics, 8(2), pp. 135-146. ISSN 01446193

Kartam, N A (1996) Making effective use of construction lessons learned in project life cycle. Journal of Construction Engineering and Management, 122(1), pp. 14-21. ISSN 0733-9364

Kartam, N A-F (1989) Investigating the utility of artificial intelligence techniques for automatic generation of construction project plans. PhD thesis, Stanford University, USA.

Kartarn, S; Ballard, G and Ibbs, C W (1997) Introducing a new concept and approach to modeling construction. Journal of Construction Engineering and Management, 123(1), pp. 89-97. ISSN 0733-9364

Karumanasseri, G and Abourizk, S (2002) Decision support system for scheduling steel fabrication projects. Journal of Construction Engineering and Management, 128(5), pp. 392-399. ISSN 0733-9364

Kashani, H; Ashuri, B; Shahandashti, S M and Lu, J (2015) Investment valuation model for renewable energy systems in buildings. Journal of Construction Engineering and Management, 141(2): 04014074, ISSN 0733-9364

Kashiwagi, D and Byfield, R (2002) State of Utah performance information procurement system tests. Journal of Construction Engineering and Management, 128(4), pp. 338-347. ISSN 0733-9364

Kashiwagi, K; Rubin, R A and Harris, M R (1988) Construction law and practice in Japan. Journal of Construction Engineering and Management, 114(1), pp. 104-113. ISSN 0733-9364

Kasim, N B; Anumba, C J and Dainty, A R J (2005) Improving materials management practices on fast-track construction projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kasprowicz, T; Starczyk-Kołbyk, A and Wójcik, R R (2023) The randomized method of estimating the net present value of construction projects efficiency. International Journal of Construction Management, 23(12), pp. 2126-2133. ISSN 1562-3599

Kasprzak, C and Dubler, C (2012) Aligning BIM with FM: Streamlining the process for future projects. Construction Economics and Building, 12(4), pp. 68-77. ISSN 2204-9029

Kašpar, H M P (2022) Robert Adam and networks for building in eighteenth-century Britain. PhD thesis, University of Leeds, UK.

Kavishe, N and An, M (2016) Challenges for implementing public private partnership in housing projects in dar es salaam city, Tanzania. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Kavishe, N and Chileshe, N (2022) Development and validation of public-private partnerships framework for delivering housing projects in developing countries: A case of Tanzania. International Journal of Construction Management, 22(5), pp. 873-890. ISSN 1562-3599

Kawakubo, S; Murakami, S; Ikaga, T and Asami, Y (2018) Sustainability assessment of cities: SDGs and GHG emissions. Building Research & Information, 46(5), pp. 528-539. ISSN 0961-3218

Kazemi, R M; Riley, D; Asadi, S and Delgoshaei, P (2017) Improving the performance profile of energy conservation measures at the Penn State University Park campus. Engineering, Construction and Architectural Management, 24(4), pp. 610-628. ISSN 0969-9988

Ke, G; Changbin, L and Fellows, R (1996) Multi level structures and housing accommodation standards for cities in China. Journal of Financial Management of Property and Construction, 1(3), pp. 71-82. ISSN 1366-4387

Ke, Y (2014) Is public-private partnership a panacea for infrastructure development? The case of Beijing national stadium. International Journal of Construction Management, 14(2), pp. 90-100. ISSN 1562-3599

Kedir, F N (2022) The performance and potential of industrialized construction for resource-efficient housing construction: A multi-scalar approach across product, system, and context. DSc thesis, ETH Zürich, Switzerland.

Kelley, M N (1991) Ft. Drum estimating and bidding from contractor's point of view. Journal of Construction Engineering and Management, 117(3), pp. 565-571. ISSN 0733-9364

Kelly, M J (2009) Retrofitting the existing UK building stock. Building Research & Information, 37(2), pp. 196-200. ISSN 0961-3218

Kelso M, R (2003) Automated commissioning of HVAC systems using first principle models. PhD thesis, Loughborough University, UK.

Kendall, S H (1990) Control of parts: Parts making in the building industry. PhD thesis, Massachusetts Institute of Technology, USA.

Kenley, R and Wilson, O D (1989) A construction project net cash flow model. Construction Management and Economics, 7(1), pp. 3-18. ISSN 01446193

Kennington, J (1993) Development of an integrated HVAC design environment. PhD thesis, University College, Galway, Ireland.

Kerali, A G and Thomas, T H (2004) Simple durability test for cement stabilized blocks. Building Research & Information, 32(2), pp. 140-145. ISSN 0961-3218

Kerns, W R (1971) Criteria for determining economic priorities in awarding sewage facility construction grants. PhD thesis, Pennsylvania State University, USA.

Kerr, W C; Tamaro, G J and Hahn, D M (1992) Exchange place station subsurface reconstruction and improvements. Journal of Construction Engineering and Management, 118(1), pp. 166-178. ISSN 0733-9364

Keswani, K (1997) The contribution of building centres to low-cost housing in India. Building Research & Information, 25(1), pp. 50-64. ISSN 0961-3218

Khabir, S and Vakilinezhad, R (2023) Energy and thermal analysis of DSF in the retrofit design of office buildings in hot climates. Architectural Engineering and Design Management, 19(6), pp. 642-664. ISSN 1745-2007

Khalafallah, A and El-Rayes, K (2006) Minimizing construction-related hazards in airport expansion projects. Journal of Construction Engineering and Management, 132(6), pp. 562-572. ISSN 0733-9364

Khalafallah, A and El-Rayes, K (2008) Minimizing construction-related security risks during airport expansion projects. Journal of Construction Engineering and Management, 134(1), pp. 40-48. ISSN 0733-9364

Khalafallah, A; Kartam, N and Razeq, R A (2019) Bilevel standards-compliant platform for evaluating building contractor safety. Journal of Construction Engineering and Management, 145(10): 4019054, ISSN 0733-9364

Khalef, R; Ali, G G; El-adaway, I H and Gad, G M (2022) Managing construction projects impacted by the COVID-19 pandemic: A contractual perspective. Construction Management and Economics, 40(4), pp. 313-330. ISSN 01446193

Khalid, G (1994) Obsolescence in hedonic price estimation of the financial impact of commercial office buildings: The case of Kuala Lumpur. Construction Management and Economics, 12(1), pp. 37-44. ISSN 01446193

Khalili, A (2013) An IFC-based framework for optimizing level of prefabrication in industrialized building systems. PhD thesis, National University of Singapore, Singapore.

Khanzadi, M; Nasirzadeh, F and Dashti, M S (2018) Fuzzy cognitive map approach to analyze causes of change orders in construction projects. Journal of Construction Engineering and Management, 144(2): 04017111, ISSN 0733-9364

Khataei, S (2024) A BIM-integrated agent-based simulation method for time-space conflict detection among mobile resources in construction projects. PhD thesis, Middle East Technical University, Turkey.

Khatibi, H; Wilkinson, S; Heiman, D; Baghersad, M; Ghaedi, K and Javanmardi, A (2022) Indicators bank for smart and resilient cities: Design of excellence. Built Environment Project and Asset Management, 12(1), pp. 5-19. ISSN 2044-124X

Khatleli, N (2016) The impediments to efficient megaproject implementation in South Africa. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Khoo, C C (1991) Cost analysis of building design for energy conservation in singapore. PhD thesis, National University of Singapore, Singapore.

Khosrowshahi, F (1997) The optimum project duration and cost curve for Hong Kong public housing projects. Engineering, Construction and Architectural Management, 4(4), pp. 249-269. ISSN 0969-9988

Khosrowshahi, F (1998) A hybrid of executive management decision support tools. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Khosrowshahi, F and Alani, M (2003) Event and effect model of building maintenance. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Kibert, C J and Fard, M M (2012) Differentiating among low-energy, low-carbon and net-zero-energy building strategies for policy formulation. Building Research & Information, 40(5), pp. 625-637. ISSN 0961-3218

Kibwami, N and Tutesigensi, A (2015) Extending the clean development mechanism concept to building projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Kidd, A; Appelbe, S and Morgan, A (2015) The use and abuse of programmes in construction contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 294-301. ISSN 17514304

Kikuchi, S; Kronprasert, N and Easa, S M (2012) Aggregate blending using fuzzy optimization. Journal of Construction Engineering and Management, 138(12), pp. 1411-1420. ISSN 0733-9364

Kiliccote, H (1997) A standards processing framework. PhD thesis, Carnegie Mellon University, USA.

Kim, S; Yaşar, M and Shahandashti, M (2025) The effects of disasters on construction wages: Role played by spatial proximity. Construction Economics and Building, 25(3-4), pp. 186-209. ISSN 2204-9029

Kim, B; Lee, H; Park, H and Kim, H (2013) Estimation of greenhouse gas emissions from land-use changes due to road construction in the republic of Korea. Journal of Construction Engineering and Management, 139(3), pp. 339-346. ISSN 0733-9364

Kim, C W; Kim, T; Lee, U K; Cho, H and Kang, K I (2016) Advanced steel beam assembly approach for improving safety of structural steel workers. Journal of Construction Engineering and Management, 142(4): 05015019, ISSN 0733-9364

Kim, H; Orr, K; Shen, Z; Moon, H; Ju, K and Choi, W (2014) Highway alignment construction comparison using object-oriented 3D visualization modeling. Journal of Construction Engineering and Management, 140(10): 05014008, ISSN 0733-9364

Kim, H J and Reinschmidt, K F (2011) Effects of contractors' risk attitude on competition in construction. Journal of Construction Engineering and Management, 137(4), pp. 275-283. ISSN 0733-9364

Kim, H S (1998) Evaluation of quality during early design: A prerequisite to defining value for money for the client. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Kim, I (1994) Data representations in an integrated architectural design environment: Unified data organisation and management. PhD thesis, University of Strathclyde, UK.

Kim, J; Lee, S Y and McGeorge, D (2000) A study of real estate trust institutions in Korea. Journal of Construction Research, 1(1), pp. 33-42. ISSN 1609-9451

Kim, J J and William Ibbs, C (1995) Work-package-process model for piping construction. Journal of Construction Engineering and Management, 121(4), pp. 381-387. ISSN 0733-9364

Kim, J S (1995) Reliability-based design of a retaining wall. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Kim, K (2003) A resource-constrained CPM (RCPM) scheduling and control technique with multiple calendars. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Kim, K and De La Garza, J M (2003) Phantom float. Journal of Construction Engineering and Management, 129(5), pp. 507-517. ISSN 0733-9364

Kim, K and De La Garza, J M (2005) Evaluation of the resource-constrained critical path method algorithms. Journal of Construction Engineering and Management, 131(5), pp. 522-532. ISSN 0733-9364

Kim, M P and Adams, K (1989) An expert system for construction contract claims. Construction Management and Economics, 7(3), pp. 249-262. ISSN 01446193

Kim, N; Anderson, B A and Ahn, C R (2021) Reducing risk habituation to struck-by hazards in a road construction environment using virtual reality behavioral intervention. Journal of Construction Engineering and Management, 147(11): 04021157, ISSN 0733-9364

Kim, S (1998) Sustainable building practices: minimising the life-cycle environmental impact of high-rise apartments in Korea. PhD thesis, University of Edinburgh, UK.

Kim, T; Lee, D; Cha, M; Lim, H; Lee, M; Cho, H and Kang, K I (2020) Simulation-based lift planning model for the lift transfer operation system. Journal of Construction Engineering and Management, 146(9): 04020098, ISSN 0733-9364

Kim, T W and Fischer, M (2014) Automated generation of user activity-space pairs in space-use analysis. Journal of Construction Engineering and Management, 140(5): 04014007, ISSN 0733-9364

Kim, T-y (2001) Trends of selected construction industry practices. PhD thesis, University of Texas at Austin, USA.

Kindangen, J I (1996) Artificial neural networks and naturally ventilated buildings. Building Research & Information, 24(4), pp. 203-208. ISSN 0961-3218

Kindangen, J I (1997) Window and roof configurations for comfort ventilation. Building Research & Information, 25(4), pp. 218-225. ISSN 0961-3218

King, R (1987) Designing plans for constructibility. Journal of Construction Engineering and Management, 113(1), pp. 1-5. ISSN 0733-9364

Kingma, B R M; Schweiker, M; Wagner, A and van Marken Lichtenbelt, W D (2017) Exploring internal body heat balance to understand thermal sensation. Building Research & Information, 45(7), pp. 808-818. ISSN 0961-3218

Kirby, J G; Furry, D A and Hicks, D K (1988) Improvements in design review management. Journal of Construction Engineering and Management, 114(1), pp. 69-82. ISSN 0733-9364

Kirgiz, M S (2011) Chemical properties of blended cement pastes. Journal of Construction Engineering and Management, 137(12), pp. 1036-1042. ISSN 0733-9364

Kishk, M (2002) Towards effective consideration of non-financial factors in the design and management of construction assets. Journal of Financial Management of Property and Construction, 7(3), pp. 163-174. ISSN 1366-4387

Kishk, M; Al-Hajj, A and Pollock, R (2002) An innovative integrated approach to whole life costing. Journal of Financial Management of Property and Construction, 7(1), pp. 31-40. ISSN 1366-4387

Kishk, M; Al-Hajj, A and Pollock, R (2003) Effective measurement and visualization of whole-life costs of building elements. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Kishk, M; Al-Hajj, A; Pollock, R and Aouad, G F (2002) A generic database for whole life costing applications in construction. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kishk, M; Al-Hajj, A; Pollock, R and Aouad, G F (2003) Effective feedback of whole-life data to the design process. Journal of Financial Management of Property and Construction, 8(2), pp. 89-98. ISSN 1366-4387

Kishk, M; Laing, R and Edge, M (2006) An extended whole-life application for the selection of hospital finishes. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Kishk, M; Laing, R; Scott, J and Edge, M (2007) A generic finishes database for healthcare facilities. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Kishk, M; Pollock, R; Atta, J and Power, L (2005) A structured model for performance assessment in property management. Journal of Financial Management of Property and Construction, 10(3), pp. 159-170. ISSN 1366-4387

Kiviniemi, A (2005) Requirements management interface to building product models. PhD thesis, Stanford University, USA.

Klanšek, U (2016) Mixed-integer nonlinear programming model for nonlinear discrete optimization of project schedules under restricted costs. Journal of Construction Engineering and Management, 142(3): 04015088, ISSN 0733-9364

Klapa, P. and Mitka, B. (2026) UAV data for BIM-based building assessment across construction stages: Sensor utility evaluation. Building Research & Information, 54(5), pp. 552-572. ISSN 0961-3218

Kleiner, B M; Smith-Jackson, T L; Mills, T H; O'Brien, M and Haro, E (2008) Design, development, and deployment of a rapid universal safety and health system for construction. Journal of Construction Engineering and Management, 134(4), pp. 273-279. ISSN 0733-9364

Knost, Benjamin (2022) Incorporating resilience in infrastructure investment decisions: Developed framework, specifications, estimations, and evaluation. PhD thesis, Ohio State University, USA.

Ko, T; Jeong, H D and Lee, G (2021) Natural language processing-driven model to extract contract change reasons and altered work items for advanced retrieval of change orders. Journal of Construction Engineering and Management, 147(11): 04021147, ISSN 0733-9364

Kobayashi, Y (2001) Three-dimensional city modeler with fuzzy multiple layers perceptron: Application of soft computing in computer-aided architectural design systems. PhD thesis, University of California, Los Angeles, USA.

Koc, K; Budayan, C; Ekmekcioǧlu, Ö and Tokdemir, O B (2024) Predicting cost impacts of nonconformances in construction projects using interpretable machine learning. Journal of Construction Engineering and Management, 150(1): 04023143, ISSN 0733-9364

Koch, C (2003) Knowledge management in consulting engineering joining IT and human resources to support the production of knowledge. Engineering, Construction and Architectural Management, 10(6), pp. 391-401. ISSN 0969-9988

Koch, C (2004) Can knowledge management become global? Consulting engineering companies in the knowledge economy. Journal of Construction Research, 5(1), pp. 107-124. ISSN 1609-9451

Koch, C (2017) Reduction or revaluing in cost constrained design? -reverse innovation conceptualized. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Koch, C and Beemsterboer, S (2017) Making an engine: Performativities of building information standards. Building Research & Information, 45(6), pp. 596-609. ISSN 0961-3218

Koch, C and Bendixen, M (2005) Multiple perspectives on organizing: Projects between tyranny and perforation. Building Research & Information, 33(6), pp. 536-546. ISSN 0961-3218

Koch, C and Bertelsen, N H (2011) The devil in the detail: The story of a sustainable trail blazer. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Koch, C and Gottlieb, S (2003) Consulting engineering under Europeanization: Denmark-based professional service firms in turbulence. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Koch, C; Gottlieb, S C; Rönn, M and Braide, A (2021) The quandaries of design developer competitions. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Koch, C and Kifokeris, D (2021) Heavy-duty construction equipment: Dinosaurs of black energy? In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Koch, C and Larsen, C S (2007) User driven innovation in mobile technologies? In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Koch, C and Simonsen, R (2002) Seeping in? Embankment of product innovations in urban renewal. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Koch, C and Simonsen, R (2006) Operations strategy and innovation? A contractor implementing lean. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Koch, C and Vogelius, P (2006) Evaluation of web and pda-based quality assurance system on a building site. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Koch, M; Emilsson, K; Lee, J and Johansson, H (2024) Structural barriers to sufficiency: the contribution of research on elites. Buildings & Cities, 5(1), pp. 268-282. ISSN 2632-6655

Koehn, E (1975) Probabilistic system for project management. PhD thesis, Wayne State University, USA.

Koehn, E and Caplan, S B (1987) Work improvement data for small and medium size contractors. Journal of Construction Engineering and Management, 113(2), pp. 327-339. ISSN 0733-9364

Kohansal, M E; Akaf, H R; Gholami, J and Moshari, S (2022) Investigating the simultaneous effects of building orientation and thermal insulation on heating and cooling loads in different climate zones. Architectural Engineering and Design Management, 18(4), pp. 410-433. ISSN 1745-2007

Kohler, N and Hassler, U (2002) The building stock as a research object. Building Research & Information, 30(4), pp. 226-236. ISSN 0961-3218

Kohler, N and Hassler, U (2012) Alternative scenarios for energy conservation in the building stock. Building Research & Information, 40(4), pp. 401-416. ISSN 0961-3218

Kohler, N and Lützkendorf, T (2002) Integrated life-cycle analysis. Building Research & Information, 30(5), pp. 338-348. ISSN 0961-3218

Kohler, N and Yang, W (2007) Long-term management of building stocks. Building Research & Information, 35(4), pp. 351-362. ISSN 0961-3218

Kokkaew, N (2010) Risk flexibility analysis in infrastructure project finance. PhD thesis, Columbia University, USA.

Kolera, B T and Bernold, L E (2006) Intelligent utility locating tool for excavators. Journal of Construction Engineering and Management, 132(9), pp. 919-927. ISSN 0733-9364

Kometa, S T; Olomolaiye, P O and Harris, F C (1995) Quantifying client-generated risk by project consultants. Construction Management and Economics, 13(2), pp. 137-147. ISSN 01446193

Kong, R; Bai, S; Tang, C; Liang, Y; Wang, Q and Li, M (2026) A multidimensional factor evaluation method for tunnel contour quality assessment using lidar scanning data. Journal of Construction Engineering and Management, 152(3): 04025274, ISSN 0733-9364

Kong, C W; li, H and Love, P E D (2001) An e-commerce system for construction material procurement. Construction Innovation, 1(1), pp. 43-54. ISSN 1471-4175

Kong, Z; Ma, H; Lv, K and Shi, J J (2023) Liability of foreignness in public-private partnership projects. Journal of Construction Engineering and Management, 149(9): 04023085, ISSN 0733-9364

Konno, Y (2014) Japanese competitive bid entry qualifications: An examination of public works. Construction Management and Economics, 32(10), pp. 957-967. ISSN 01446193

Konon, W and Schuring, J R (1985) Vibration criteria for historic buildings. Journal of Construction Engineering and Management, 111(3), pp. 208-215. ISSN 0733-9364

Konstantinou, E and Brilakis, I (2018) Matching construction workers across views for automated 3D vision tracking on-site. Journal of Construction Engineering and Management, 144(7): 04018061, ISSN 0733-9364

Koo, H J and O'Connor, J T (2022) A strategy for building design quality improvement through BIM capability analysis. Journal of Construction Engineering and Management, 148(8): 04022066, ISSN 0733-9364

Koolwijk, J; van Oel, C; Vrijhoef, R and Wamelink, J W F (2015) Partnering in construction: A field study to further develop the framework of supply chain integration. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Koops, L S W (2017) Creating public value: Optimizing cooperation between public and private partners in infrastructure projects. PhD thesis, Delft University of Technology, Netherlands.

Korman, T M; Fischer, M A and Tatum, C B (2003) Knowledge and reasoning for MEP coordination. Journal of Construction Engineering and Management, 129(6), pp. 627-634. ISSN 0733-9364

Korpela, J; Miettinen, R; Salmikivi, T and Ihalainen, J (2015) The challenges and potentials of utilizing building information modelling in facility management: The case of the center for properties and facilities of the University of Helsinki. Construction Management and Economics, 33(1), pp. 3-17. ISSN 01446193

Korpela J, M R (2013) BIM in facility management and maintenance: The case of Kaisa Library of Helsinki University. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Kou, J.; Zhou, Z.; Guo, L.; Yang, Y.; Han, Y.; Zhang, C. and Ni, X. (2026) Multiangle computer vision-based assessment of work-related musculoskeletal disorders in construction workers. Journal of Construction Engineering and Management, 152(9): 04026141, ISSN 0733-9364

Kpamma, Z E; Adjei-Kumi, T; Ayarkwa, J and Adinyira, E (2017) Participatory design, wicked problems, choosing by advantages. Engineering, Construction and Architectural Management, 24(2), pp. 289-307. ISSN 0969-9988

Kraiem, Z M and Diekmann, J E (1987) Concurrent delays in construction projects. Journal of Construction Engineering and Management, 113(4), pp. 591-602. ISSN 0733-9364

Krechowicz, M (2020) Comprehensive risk management in horizontal directional drilling projects. Journal of Construction Engineering and Management, 146(5): 04020034, ISSN 0733-9364

Kreiner, K and Damkjær, L (2009) Learning and imagination in construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Kridan, A B and Goulding, J S (2006) Assessing the role of knowledge management processes in implementing a knowledge management system: An application of the capability maturity model to the Libyan banking sector. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Kuittinen, M (2023) Building within planetary boundaries: Moving construction to stewardship. Buildings & Cities, 4(1), pp. 565-574. ISSN 2632-6655

Kuittinen, M and Häkkinen, T (2020) Reduced carbon footprints of buildings: New Finnish standards and assessments. Buildings & Cities, 1(1), pp. 182-197. ISSN 2632-6655

Kululanga, G K; Edum-Fotwe, F T; McCaffer, R and Price, A D F (1997) Learning techniques employed by construction contractors' organisations. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Kululanga, G K and McCaffer, R (2001) Measuring knowledge management for construction organizations. Engineering, Construction and Architectural Management, 8(5-6), pp. 346-354. ISSN 0969-9988

Kumar, B and Hayne, G (2017) Implementation of level 2 Building Information Modelling strategy for asset procurement. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(5), pp. 190-206. ISSN 17514304

Kumar, S (2023) Optimization of sustainability and resilience for transportation projects. PhD thesis, Colorado State University, USA.

Kumar, S and Bansal, V K (2019) Use of GIS in locating TFs safely on a construction site in hilly regions. International Journal of Construction Management, 19(4), pp. 341-353. ISSN 1562-3599

Kumar, S; Yadav, N; Singh, M and Kachhawa, S (2019) Estimating India's commercial building stock to address the energy data challenge. Building Research & Information, 47(1), pp. 24-37. ISSN 0961-3218

Kumaraswamy, M; Mahesh, G; Mahalingam, A; Loganathan, S and Kalidindi, S N (2017) Developing a clients' charter and construction project KPIs to direct and drive industry improvements. Built Environment Project and Asset Management, 7(3), pp. 253-270. ISSN 2044-124X

Kumaraswamy, M; Wong, K K W and Chung, J (2017) Focusing megaproject strategies on sustainable best value of stakeholders. Built Environment Project and Asset Management, 7(4), pp. 441-455. ISSN 2044-124X

Kumaraswamy, M M; Miller, C J; Rahman, M M; Pickernell, D G; Ng, S T and Wong, I P Y (2006) Developing web-based tools for teaching, training, learning and development: The role of academic institutions. Architectural Engineering and Design Management, 2(1-2), pp. 123-135. ISSN 1745-2007

Kumaraswamy, M M; Ng, S T; Ugwu, O O; Palaneeswaran, E and Rahman, M M (2004) Empowering collaborative decisions in complex construction project scenarios. Engineering, Construction and Architectural Management, 11(2), pp. 133-142. ISSN 0969-9988

Kumaraswamy Associate Professor, M; Kong, H and Xue Qing Doctoral, Z (2004) Focusing on best value from a source selection perspective. Construction Economics and Building, 4(1), pp. 21-34. ISSN 2204-9029

Kunz, J and Fischer, M (2020) Virtual design and construction. Construction Management and Economics, 38(4), pp. 355-363. ISSN 01446193

Kuo, Y-c (2004) Highway earthwork and pavement production rates for construction time estimation. PhD thesis, University of Texas at Austin, USA.

Kurokawa, M (2015) Tracing client interests in the course of a project: Why are some client interests incorporated whereas others are not? PhD thesis, University of Reading, UK.

Kurokawa, M; Schweber, L and Hughes, W P (2014) Incorporation of different and changing client interests in the course of a project. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Kurokawa, M; Schweber, L and Hughes, W P (2015) Tracing client interests in the course of the project: Why are some client interests incorporated whereas others are not? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Kurwi, S; Demian, P and Hassan, T M (2017) Integrating BIM and GIS in railway projects: A critical review. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Kusljic, D and Marenjak, S (2012) Evaluating political aspects of success for PPP/PFI sports hall in Croatia. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Kuttantharappel Soman, R (2020) Automated look-ahead schedule generation using linked-data based constraint checking for construction projects. PhD thesis, Imperial College London, UK.

Kuusk, K and Kalamees, T (2016) Retrofit cost-effectiveness: Estonian apartment buildings. Building Research & Information, 44(8), pp. 920-934. ISSN 0961-3218

Kwak, Y H (2002) Analyzing asian infrastructure development privatization market. Journal of Construction Engineering and Management, 128(2), pp. 110-116. ISSN 0733-9364

Kwok, T L (1998) Strategic alliances in construction: A study of contracting relationships and competitive advantage in public sector building works. PhD thesis, Queensland University of Technology, Australia.

Kwon, N; Park, M; Lee, H S; Ahn, J and Shin, M (2016) Construction noise management using active noise control techniques. Journal of Construction Engineering and Management, 142(7): 4016014, ISSN 0733-9364

Kwon, T W; Lee, K T; Kim, J H and Kim, J J (2023) Proposal of hierarchical organization structure for negotiation consensus in multinational joint-client megaprojects: Case of us force relocation program in Korea. Journal of Construction Engineering and Management, 149(2): 05022019, ISSN 0733-9364

Kähkönen, K E E (1993) Modelling activity dependencies for building construction project scheduling. PhD thesis, University of Reading, UK.

Känsälä, K; Rantala, S; Kauppila, O and Leviäkangas, P (2018) Acceleration sensor technology for rail track asset condition monitoring. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(1), pp. 32-40. ISSN 17514304

Kärnä, S (2009) Concepts and attributes of customer satisfaction in construction. PhD thesis, Aalto University, Finland.

König, H and De Cristofaro, M L (2012) Benchmarks for life cycle costs and life cycle assessment of residential buildings. Building Research & Information, 40(5), pp. 558-580. ISSN 0961-3218

Laar, M and Grimme, F W (2002) German developments in daylight guidance systems: An overview. Building Research & Information, 30(4), pp. 282-301. ISSN 0961-3218

Labik, O; Nahmens, I; Ikuma, L and Harvey, C (2023) On-site versus in-factory installation of solar-plus-storage in modular construction. Journal of Construction Engineering and Management, 149(5): 05023003, ISSN 0733-9364

Lacasse, M A (1999) Materials and technology for sustainable construction. Building Research & Information, 27(6), pp. 405-408. ISSN 0961-3218

Lafhaj, Z; Rebai, S; Hamdi, O; Jabbar, R; Ayech, H and Yim, P (2025) Copula: A decentralized solution for construction project monitoring using blockchain. Smart and Sustainable Built Environment, 14(5), pp. 1483-1512. ISSN 2046-6099

Lahdenper, P and Tanhuanp, V (2000) Creation of a new design management system based on process optimization and proactive strategy. Engineering, Construction and Architectural Management, 7(3), pp. 267-277. ISSN 0969-9988

Lahdenperä, P (1999) Restructuring the building industry for improved performance. Journal of Construction Procurement, 5(2), pp. 118-128. ISSN 1358-9180

Lahdenperä, P (2010) Conceptualizing a two-stage target-cost arrangement for competitive cooperation. Construction Management and Economics, 28(7), pp. 783-796. ISSN 1466433X

Lahdenperä, P (2012) Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery. Construction Management and Economics, 30(1), pp. 57-79. ISSN 1466433X

Lahdenperä, P (2024) Design–build with a development phase: An initiation and the first trials. Construction Economics and Building, 24(4-5), pp. 18-42. ISSN 2204-9029

Lai, A W Y and Pang, P S M (2010) Measuring performance for building maintenance providers. Journal of Construction Engineering and Management, 136(8), pp. 864-876. ISSN 0733-9364

Laishram, B S and Kalidindi, S N (2009) Desirability rating analysis for debt financing of public-private partnership road projects. Construction Management and Economics, 27(9), pp. 823-837. ISSN 1466433X

Lal, H (2013) Nuclear decommissioning contracts: The legal and commercial issues. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(2), pp. 94-102. ISSN 17514304

Lam, G T W; Cheung, S O and Ng, S T (1999) The effectiveness of design and build conditions of contract. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Lam, J C and Hui, S C M (1996) A review of building energy standards and implications for Hong Kong. Building Research & Information, 24(3), pp. 131-140. ISSN 0961-3218

Lam, K C; Hu, T; Ng, S T; Skitmore, M and Cheoung, S O (2001) A fuzzy neural network approach for contractor prequalification. Construction Management and Economics, 19(2), pp. 175-188. ISSN 01446193

Lam, K C; Ning, X and Lam, M C K (2009) Conjoining MMAS to GA to solve construction site layout planning problem. Journal of Construction Engineering and Management, 135(10), pp. 1049-1057. ISSN 0733-9364

Lamb, D J and Merna, T (2004) Reappraisal of public private partnerships: An overview of refinancing, restructuring and termination. Journal of Financial Management of Property and Construction, 9(3), pp. 155-162. ISSN 1366-4387

Lamb, S and Kwok, K C S (2017) Sopite syndrome in wind-excited buildings: Productivity and wellbeing impacts. Building Research & Information, 45(3), pp. 347-358. ISSN 0961-3218

Lamberti, G; Boghetti, R; Fantozzi, F; Leccese, F and Salvadori, G (2025) Analysing the potential of open hotel review databases for IEQ assessment: A text mining approach. Building Research & Information, 53(1-2), pp. 261-279. ISSN 0961-3218

Lambropoulos, S; Manolopoulos, N and Pantouvakis, J P (1996) Semantic: Smart earthmoving analysis and estimation of cost. Construction Management and Economics, 14(2), pp. 79-92. ISSN 01446193

Lammie, J L and Shah, D P (1984) Construction management: MARTA in retrospect. Journal of Construction Engineering and Management, 110(4), pp. 459-475. ISSN 0733-9364

Lamond, J; Proverbs, D and Antwi, A (2007) The impact of flood insurance on residential property prices: Towards a new theoretical framework for the United Kingdom market. Journal of Financial Management of Property and Construction, 12(3), pp. 129-138. ISSN 1366-4387

Lan, A and Galy, B (2017) Evaluation of a horizontal lifeline system used during installation of residential roofs. Journal of Construction Engineering and Management, 143(5): 06016008, ISSN 0733-9364

Landgren, M; Skovmand Jakobsen, S; Wohlenberg, B and Jensen, L M B (2019) Integrated design processes–a mapping of guidelines with Danish conventional 'silo' design practice as the reference point. Architectural Engineering and Design Management, 15(4), pp. 233-248. ISSN 1745-2007

Landin, A M and Persson, M H (1998) Evaluation of quality systems for specialist contractors. Engineering, Construction and Architectural Management, 5(3), pp. 210-219. ISSN 0969-9988

Lane, P M M (2012) Can construction arbitration learn from adjudication? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 35-39. ISSN 17514312

Lane, P M M and Watson, M J (2010) Effectiveness of dispute adjudication boards, South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(4), pp. 171-177. ISSN 17514312

Langdon, R R; Bradley, L; Newton, C J and Sawang, S (2024) The potential for workplaces to provide social support for distressed infrastructure workers. Journal of Construction Engineering and Management, 150(12): 04024171, ISSN 0733-9364

Langford, D A; Dimitrijevic, B and Arnett, S (2001) Network of construction creativity clubs. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Langford, D A and Robson, P (2003) The representation of the professions in the cinema: The case of construction engineers and lawyers. Construction Management and Economics, 21(8), pp. 799-807. ISSN 01446193

Langston, C (2013) Development of generic key performance indicators for PMBOK® using a 3D project integration model. Construction Economics and Building, 13(4), pp. 78-91. ISSN 2204-9029

Langston, C; Chan, E H W and Yung, E H K (2018) Embodied carbon and construction cost differences between Hong Kong and Melbourne buildings. Construction Economics and Building, 18(4), pp. 84-102. ISSN 2204-9029

Langston, Craig A (1994) The determination of equivalent value in life-cost studies: An intergenerational approach. PhD thesis, University of Technology Sydney, Australia.

Lansley, P (1983) A practical approach to auditing organizational flexibility. Construction Management and Economics, 1(2), pp. 145-156. ISSN 01446193

Lansley, P (1994) Analysing construction organizations. Construction Management and Economics, 12(4), pp. 337-348. ISSN 01446193

Lansley, P (2001) Building research and the quality-of-life. Building Research & Information, 29(1), pp. 62-74. ISSN 0961-3218

Lansley, P R (1999) Determinants of performance of UK universities in built environment and town and country planning research. Engineering, Construction and Architectural Management, 6(4), pp. 391-402. ISSN 0969-9988

Lansley, P R and Quince, T (1981) Organizational responses to a major recession. Construction Papers, 1(2), pp. 5-16. ISSN 0144-8587

Larsson, N (2001) IISBE: The international initiative for sustainable built environment. Building Research & Information, 29(2), pp. 175-177. ISSN 0961-3218

Larsson, N (2003) Adapting to climate change in Canada. Building Research & Information, 31(3-4), pp. 231-239. ISSN 0961-3218

Larsson, N K (1999) Development of a building performance rating and labelling system in Canada. Building Research & Information, 27(4-5), pp. 332-341. ISSN 0961-3218

Lau, E and Rowlinson, S (2009) The expectations, needs, risks and constraints for project performance. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Lau, K K L; Ng, E; Ren, C; Ho, J C K; Wan, L; Shi, Y; Zheng, Y; Gong, F; Cheng, V; Yuan, C; Tan, Z and Wong, K S (2018) Defining the environmental performance of neighbourhoods in high-density cities. Building Research & Information, 46(5), pp. 540-551. ISSN 0961-3218

Laufer, A (1992) A micro view of the project planning process. Construction Management and Economics, 10(1), pp. 31-43. ISSN 01446193

Laufer, A and Tucker, R L (1987) Is construction project planning really doing its job? A critical examination of focus, role and process. Construction Management and Economics, 5(3), pp. 243-266. ISSN 01446193

Laveglia, A; Trezza, M A and Rahhal, V F (2022) Does the colour of the waste glass affect their efficiency as supplementary cementitious material? International Journal of Construction Management, 22(16), pp. 3098-3108. ISSN 1562-3599

Lavy, S; Garcia, J A; Scinto, P and Dixit, M K (2014) Key performance indicators for facility performance assessment: Simulation of core indicators. Construction Management and Economics, 32(12), pp. 1183-1204. ISSN 01446193

Lavy, S and Shohet, I M (2007) On the effect of service life conditions on the maintenance costs of healthcare facilities. Construction Management and Economics, 25(10), pp. 1087-1098. ISSN 1466433X

Lawani, K; Hare, B and Cameron, I (2019) Evaluating wind technicians' performance on safety-critical rescue steps. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(1), pp. 17-24. ISSN 17514304

Lawrence, M (2017) Nomination of subcontractors in the UAE. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(4), pp. 167-171. ISSN 17514304

Lawson, W D (2004) Trust and trustworthiness in professional-client relationships: Procurement of architect /engineer services by Texas municipalities. PhD thesis, Texas Tech University, USA.

Lawson, W R (1996) Life cycle energy analysis of buildings revisited. Journal of Financial Management of Property and Construction, 1(3), pp. 83-94. ISSN 1366-4387

Layman, M C (1987) School site development without school district financial support. PhD thesis, University of Kansas, USA.

Le, H Q (2009) Mobile multi-site construction project management for developing countries. PhD thesis, Technische Universitaet Darmstadt, Germany.

Le, K T (2017) Material inventory control and management system in construction using GIS applications and a "hybrid" tracking system. PhD thesis, Illinois Institute of Technology, USA.

Le, T; Caldas, C H; Gibson, G E and Thole, M (2009) Assessing scope and managing risk in the highway project development process. Journal of Construction Engineering and Management, 135(9), pp. 900-910. ISSN 0733-9364

Le, Y; Wang, Y; Luo, C and Peng, Y (2013) Integration of financial and contract management on the Shanghai Expo construction program. Journal of Construction Engineering and Management, 139(6), pp. 738-748. ISSN 0733-9364

Le Roux, G and Nkado, R N (2001) Legislation governing continuing professional development in the built environment professions in South Africa. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

LeBlond, D; Owen, F; Gibson Jr, G E; Haas, C T and Traver, A E (1998) Control improvement for advanced construction equipment. Journal of Construction Engineering and Management, 124(4), pp. 289-296. ISSN 0733-9364

Leaman, A; Stevenson, F and Bordass, B (2010) Building evaluation: Practice and principles. Building Research & Information, 38(5), pp. 564-577. ISSN 0961-3218

Leandro, R; O'Connor, J T and Khwaja, N (2018) Development and application of a production-rate resource for contract time determination. Journal of Construction Engineering and Management, 144(12): 06018005, ISSN 0733-9364

Ledbetter, B S (1985) Pioneering construction engineering education. Journal of Construction Engineering and Management, 111(1), pp. 41-51. ISSN 0733-9364

Ledbetter, W B (1994) Quality performance on successful project. Journal of Construction Engineering and Management, 120(1), pp. 34-46. ISSN 0733-9364

Leder, S; Newsham, G R; Veitch, J A; Mancini, S and Charles, K E (2016) Effects of office environment on employee satisfaction: A new analysis. Building Research & Information, 44(1), pp. 34-50. ISSN 0961-3218

Lee, J. S. (2026) Visualising the impact of change orders on productivity in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 134-142. ISSN 1751-4304

Lee, C; Hong, T; Lee, G and Jeong, J (2012) Life-cycle cost analysis on glass type of high-rise buildings for increasing energy efficiency and reducing CO2 emissions in Korea. Journal of Construction Engineering and Management, 138(7), pp. 897-904. ISSN 0733-9364

Lee, C C T and Egbu, C (2005) Capturing client needs in refurbishment projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Lee, D; Lee, S G and Kim, S (2017) Composite phase-change material mold for cost-effective production of free-form concrete panels. Journal of Construction Engineering and Management, 143(6): 04017012, ISSN 0733-9364

Lee, D; Nie, G Y and Han, K (2024) Automatic and real-time joint tracking and three-dimensional scanning for a construction welding robot. Journal of Construction Engineering and Management, 150(3): 04023165, ISSN 0733-9364

Lee, D; Wen, L; Choi, J O and Lee, S (2023) Sensor-integrated hybrid blockchain system for supply chain coordination in volumetric modular construction. Journal of Construction Engineering and Management, 149(1): 04022147, ISSN 0733-9364

Lee, D E and Arditi, D (2006) Total quality performance of design/build firms using quality function deployment. Journal of Construction Engineering and Management, 132(1), pp. 49-57. ISSN 0733-9364

Lee, E B (2000) Constructability and productivity analysis for long life pavement rehabilitation strategies (LLPRS). PhD thesis, University of California, Berkeley, USA.

Lee, E B; Harvey, J T and Thomas, D (2005) Integrated design/construction/operations analysis for fast-track urban freeway reconstruction. Journal of Construction Engineering and Management, 131(12), pp. 1283-1291. ISSN 0733-9364

Lee, G and Lee, S (2022) Importance of testing with independent subjects and contexts for machine-learning models to monitor construction workers' psychophysiological responses. Journal of Construction Engineering and Management, 148(9): 04022082, ISSN 0733-9364

Lee, G H; Kim, J I; Koo, C and Kim, T W (2022) Automated generation of precast concrete slab stacks for transportation in offsite construction projects. Journal of Construction Engineering and Management, 148(8): 04022072, ISSN 0733-9364

Lee, H W; Choi, K and Gambatese, J A (2014) Real options valuation of phased investments in commercial energy retrofits under building performance risks. Journal of Construction Engineering and Management, 140(6): 5014004, ISSN 0733-9364

Lee, J and Hyun, H (2019) Multiple modular building construction project scheduling using genetic algorithms. Journal of Construction Engineering and Management, 145(1): 04018116, ISSN 0733-9364

Lee, J; Lorenc, S J and Bernold, L E (2003) Comparative performance evaluation of tele-operated pipe laying. Journal of Construction Engineering and Management, 129(1), pp. 32-40. ISSN 0733-9364

Lee, J H (2004) Object-based learning method in civil engineering. PhD thesis, Purdue University, USA.

Lee, J I; Lee, H S and Park, M (2018) Contractor liquidity evaluation model for successful public housing projects. Journal of Construction Engineering and Management, 144(12): 04018109, ISSN 0733-9364

Lee, J S (2005) Developing spatio-temporal models for retrofit and reconstruction strategy under unscheduled events. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Lee, K H (2004) Site-specific load models and hazards for probability-based design. PhD thesis, Oregon State University, USA.

Lee, S (2000) Spatial model and decentralized path planning for construction automation. PhD thesis, University of Wisconsin - Madison, USA.

Lehner, M; Richter, J L; Kreinin, H; Mamut, P; Vadovics, E; Henman, J; Mont, O and Fuchs, D (2024) Living smaller: Acceptance, effects and structural factors in the EU. Buildings & Cities, 5(1), pp. 215-230. ISSN 2632-6655

Leijten, M (2017) What lies beneath: Bounded manageability in complex underground infrastructure projects. PhD thesis, Delft University of Technology, Netherlands.

Leishman, C and Warren, F (2006) Private housing design customization through house type substitution. Construction Management and Economics, 24(2), pp. 149-158. ISSN 01446193

Leistner, S; Honold, C; Maierhofer, M; Haase, W; Blandini, L; Sobek, W; Roth, D; Binz, H and Menges, A (2022) Research on integral design and planning processes for adaptive buildings. Architectural Engineering and Design Management, 18(3), pp. 241-260. ISSN 1745-2007

Leon, M; Ahiaga-Dagbui, D; Fleming, C and Laing, R (2017) Exploring visual asset management collaboration: Learning from the oil and gas sector. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Lester, D and Torero, J (2019) Using megaproject performance outcomes to enhance decision-making behaviors in civil engineering graduates. Construction Economics and Building, 19(1), pp. 96-110. ISSN 2204-9029

Leu, S S and Hwang, S T (2001) Optimal repetitive scheduling model with shareable resource constraint. Journal of Construction Engineering and Management, 127(4), pp. 270-280. ISSN 0733-9364

Leu, S S and Yang, C H (1999) GA-based multicriteria optimal model for construction scheduling. Journal of Construction Engineering and Management, 125(6), pp. 420-427. ISSN 0733-9364

Leu, S S and Yang, C H (1999) A genetic-algorithm-based resource-constrained construction scheduling system. Construction Management and Economics, 17(6), pp. 767-776. ISSN 01446193

Leung, A Y T; Xu, J and Ge, J X (2005) Analysis of dynamical impacts of interest rate on expected housing price. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Leung, B Y P and Hui, E C M (2005) Pricing of pre-sale properties with construction uncertainties. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Leung, M Y; Chong, A; Ng, S T and Cheung, M C K (2004) Demystifying stakeholders' commitment and its impacts on construction projects. Construction Management and Economics, 22(7), pp. 701-715. ISSN 01446193

Leung, M Y and Liu, A M M (1998) Developing a value management model by value-goal system approach. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Leung, M Y; Ng, S T and Cheung, S O (2004) Measuring construction project participant satisfaction. Construction Management and Economics, 22(3), pp. 319-331. ISSN 01446193

Leung, R H M (2019) How one shall interpret 'spirit of mutual trust and co-operation' in NEC contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(1), pp. 14-20. ISSN 17514304

Lewis, B T (1983) Building maintenance planning and estimating system. Construction Management and Economics, 1(3), pp. 217-231. ISSN 01446193

Lewis, S J and Greenwood, D J (2002) The treatment of risk in construction contracts under PFI/PPP. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Lewis, T M (2005) Public procurement and corruption in Trinidad and Tobago. Journal of Construction Procurement, 11(1),

Lhee, S C; Issa, R R A and Flood, I (2012) Prediction of financial contingency for asphalt resurfacing projects using artificial neural networks. Journal of Construction Engineering and Management, 138(1), pp. 22-30. ISSN 0733-9364

Li, J.; Chen, Z.; Li, Z.; Kong, L. and Zhang, H. (2026) Integrating computer vision and audio signals for concrete vibration activity recognition and assessment. Journal of Construction Engineering and Management, 152(7): 04026099, ISSN 0733-9364

Li, L; Cui, X; Wang, J; Jin, H and Xu, H (2026) Automated tracking of worker and heavy equipment on tunnel construction sites: Deep-learning framework. Journal of Construction Engineering and Management, 152(2): 04025237, ISSN 0733-9364

Li, L; Jiang, S; Yuan, J; Zhang, L; Xu, X; Wang, J; Zhou, Y; Li, Y and Xu, J (2025) From data silos to seamless integration and coordination: A data-asset centric approach to smart hospital facility management. Engineering, Construction and Architectural Management, 32(11), pp. 7804-7831. ISSN 0969-9988

Li, C (2023) Efficient and accurate assessment of fire spread over external claddings in high-rise buildings. PhD thesis, University of Manchester, UK.

Li, C Q (1997) Deterioration of concrete building structures. Building Research & Information, 25(4), pp. 196-201. ISSN 0961-3218

Li, D; Li, X; Feng, H; Wang, Y and Fan, S (2022) ISM-based relationship among critical factors that affect the choice of prefabricated concrete buildings in China. International Journal of Construction Management, 22(6), pp. 977-992. ISSN 1562-3599

Li, H (1996) The role of IT manager in construction process re-engineering. Building Research & Information, 24(2), pp. 124-127. ISSN 0961-3218

Li, H; Cao, J N and Love, P E D (1999) Using machine learning and GA to solve time-cost trade-off problems. Journal of Construction Engineering and Management, 125(5), pp. 347-353. ISSN 0733-9364

Li, H; Kong, C W; Pang, Y C; Shi, W Z and Yu, L (2003) Internet-based geographical information systems system for e-commerce application in construction material procurement. Journal of Construction Engineering and Management, 129(6), pp. 689-697. ISSN 0733-9364

Li, H and Love, P (1997) Using improved genetic algorithms to facilitate time-cost optimization. Journal of Construction Engineering and Management, 123(3), pp. 233-237. ISSN 0733-9364

Li, H and Love, P E D (1998) Developing a theory of construction problem solving. Construction Management and Economics, 16(6), pp. 721-727. ISSN 01446193

Li, H; Lv, L; Zuo, J; Su, L; Wang, L and Yuan, C (2020) Dynamic reputation incentive mechanism for urban water environment treatment PPP projects. Journal of Construction Engineering and Management, 146(8): 0001879, ISSN 0733-9364

Li, H and Shen, Q (2002) Supporting the decision-making process for sustainable housing. Construction Management and Economics, 20(5), pp. 387-390. ISSN 01446193

Li, J and Florez-Perez, L (2021) Impact of property tax on housing price: An analysis for real estate development and sustainable renewal. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Li, K Y K and Chan, A T (2004) Management of radon in tunnel drilling. Journal of Construction Engineering and Management, 130(5), pp. 699-707. ISSN 0733-9364

Li, P; Tang, Y; Zheng, Z; Wang, Z and Zhuang, Y (2024) Semiautomated railway line information modeling based on asset management data. Journal of Construction Engineering and Management, 150(10): 04024130, ISSN 0733-9364

Li, Q; Yang, Y; Yao, G; Wei, F; Xue, G and Qin, H (2024) Multiobject real-time automatic detection method for production quality control of prefabricated laminated slabs. Journal of Construction Engineering and Management, 150(3): 05023017, ISSN 0733-9364

Li, S D and Xu, Z D (2022) System configuration design of BIM object-oriented database for civil engineering. Journal of Construction Engineering and Management, 148(12): 04022130, ISSN 0733-9364

Li, T H Y; Ng, S T and Wong, K K W (2009) A study on the social impact assessment of infrastructure projects in China. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Li, X; Ogier, J and Cullen, J (2006) An economic modelling approach for public sector construction workload planning. Construction Management and Economics, 24(11), pp. 1137-1147. ISSN 1466433X

Li, Y and Chen, J (2022) Computer vision-based counting model for dense steel pipe on construction sites. Journal of Construction Engineering and Management, 148(1): 04021178, ISSN 0733-9364

Li, Y; Pan, X; Han, Y and Taylor, J E (2021) Sustainable healthcare facilities: A scoping review. Journal of Construction Engineering and Management, 147(12): 03121007, ISSN 0733-9364

Li, Y C; Luk, W H and Cheng, E (2016) Hong Kong's first public sector NEC contract: Lessons learnt. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(6), pp. 231-237. ISSN 17514304

Li, Y; Zhang, L; Liu, X and Li, X (2025) A project scheduling optimization model for reducing construction dust emissions based on variability in meteorological conditions. Journal of Construction Engineering and Management, 151(11): 04025171, ISSN 0733-9364

Li, Z; Anson, M and Li, G (2001) A procedure for quantitatively evaluating site layout alternatives. Construction Management and Economics, 19(5), pp. 459-467. ISSN 01446193

Liang, H; Weng, Y; Tang, S W Y and Yeoh, J K W (2024) Automated filtering of façade defect images using a similarity method for enhanced inspection documentation. Building Research & Information, 52(1-2), pp. 194-206. ISSN 0961-3218

Liang, J (1998) System integration and database management for computer-aided design of tall building structures. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Liang, L Y; Thompson, R G and Young, D M (2004) Optimising the design of sewer networks using genetic algorithms and tabu search. Engineering, Construction and Architectural Management, 11(2), pp. 101-112. ISSN 0969-9988

Liang, R; Li, R and Chong, H Y (2023) Sustainable supplier selection for prefabricated megaprojects during COVID-19: A novel large group decision-making model. Building Research & Information, 51(5), pp. 533-554. ISSN 0961-3218

Liang, S (2013) Legal aspects of privately financed infrastructure projects (PFIPs) in China: the case for international standards. PhD thesis, University of Leeds, UK.

Liang, X; Gidado, K and Painting, N (2004) The identification of key obstacles that hinder foreign private finance investments in highway projects in China. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Liang, Y (2006) Integrated IT systems for construction site management. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lichtenberg, J (2005) Slimbouwen®: A strategy for innovation. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Lienhard, J and Eversmann, P (2021) New hybrids–from textile logics towards tailored material behaviour. Architectural Engineering and Design Management, 17(3-4), pp. 169-174. ISSN 1745-2007

Liguori, D; Sommerville, J and Manase, D (2012) Probabilistic pre-requisites contributing to successful housing association partnering. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Lim, B T C (1987) Causal modelling construction project performance. PhD thesis, Heriot-Watt University, UK.

Lim, T (2009) Essence of time in construction contracts. Construction Economics and Building, 9(2), pp. 1-6. ISSN 2204-9029

Lin, F.; Cheng, Y. and Zhang, J. (2026) Efficient rebar layout estimation enabled by a custom detection network and enhanced visual measurement. Journal of Construction Engineering and Management, 152(9): 04026152, ISSN 0733-9364

Lin, J J and Golparvar-Fard, M (2021) Visual and virtual production management system for proactive project controls. Journal of Construction Engineering and Management, 147(7): 2045, ISSN 0733-9364

Lin, K L and Haas, C T (1996) An interactive planning environment for critical operations. Journal of Construction Engineering and Management, 122(3), pp. 212-230. ISSN 0733-9364

Lin, K Y and Soibelman, L (2007) Knowledge-assisted retrieval of online product information in architectural/engineering/construction. Journal of Construction Engineering and Management, 133(11), pp. 871-879. ISSN 0733-9364

Lin, K-L (1995) Planning for critical construction operations involving large semi-stationary equipment. PhD thesis, University of Texas at Austin, USA.

Lin, K-Y (2005) Knowledge-assisted retrieval of online product information in A/E/C (architecture/engineering/construction). PhD thesis, University of Illinois at Urbana-Champaign, USA.

Lin, K-Y (2013) Investigating reducing building energy use at urban scale in Taipei. PhD thesis, Cardiff University, UK.

Lin, Y; Wu, D; Wang, X; Wang, X and Gao, S (2012) Statics-based simulation approach for two-crane lift. Journal of Construction Engineering and Management, 138(10), pp. 1139-1149. ISSN 0733-9364

Lin, Y H; Lee, P C and Chang, T P (2008) Integrating grey number and minkowski distance function into grey relational analysis technique to improve the decision quality under uncertain information. Construction Management and Economics, 26(2), pp. 115-123. ISSN 1466433X

Linda Fan, C N; Christabel Ho, M H and Ng, V (2001) Effect of professional socialization on quantity surveyors' ethical perceptions in Hong Kong. Engineering, Construction and Architectural Management, 8(4), pp. 304-312. ISSN 0969-9988

Lindhard, S (2014) Understanding the effect of variation in a production system. Journal of Construction Engineering and Management, 140(11): 4014051, ISSN 0733-9364

Lindhard, S M; Hamzeh, F; Gonzalez, V A; Wandahl, S and Ussing, L F (2019) Impact of activity sequencing on reducing variability. Journal of Construction Engineering and Management, 145(3): 04019001, ISSN 0733-9364

Lines, B C; Kakarapalli, R and Nguyen, P H D (2022) Does best value procurement cost more than low-bid? A total project cost perspective. International Journal of Construction Education and Research, 18(1), pp. 85-100. ISSN 1557-8771

Ling, F Y Y and Kwok, D H Y (2007) Enablers for Singapore contractors to internationalize construction services. Construction Management and Economics, 25(3), pp. 267-275. ISSN 1466433X

Lingard, H and Francis, V (2005) Does work-family conflict mediate the relationship between job schedule demands and burnout in male construction professionals and managers? Construction Management and Economics, 23(7), pp. 733-745. ISSN 01446193

Lingard, H and Francis, V (2006) Does a supportive work environment moderate the relationship between work-family conflict and burnout among construction professionals? Construction Management and Economics, 24(2), pp. 185-196. ISSN 01446193

Lins, G (1992) Controlling in construction management. DrTech thesis, Leopold-Franzens Universitaet Innsbruck, Austria.

Liska, R W and Snell, B (1992) Financial incentive programs for average-size construction firm. Journal of Construction Engineering and Management, 118(4), pp. 667-676. ISSN 0733-9364

Lisø, K R; Aandahl, G; Eriksen, S and Alfsen, K H (2003) Preparing for climate change impacts in norway's built environment. Building Research & Information, 31(3-4), pp. 200-209. ISSN 0961-3218

Lisø, K R; Hygen, H O; Kvande, T and Thue, J V (2006) Decay potential in wood structures using climate data. Building Research & Information, 34(6), pp. 546-551. ISSN 0961-3218

Lisø, K R; Myhre, L; Kvande, T; Thue, J V and Nordvik, V (2007) A Norwegian perspective on buildings and climate change. Building Research & Information, 35(4), pp. 437-449. ISSN 0961-3218

Littlefair, P; Ortiz, J and Bhaumik, C D (2010) A simulation of solar shading control on UK office energy use. Building Research & Information, 38(6), pp. 638-646. ISSN 0961-3218

Liu, J; Jiang, M; Wang, Z; Lu, M; Wang, L and Zhang, X (2025) A business model canvas for construction waste resource use under dual carbon targets. International Journal of Construction Management, 25(13), pp. 1570-1582. ISSN 1562-3599

Liu, J; Jiang, S; Sun, H; Liu, W and Xiao, B (2026) Quality inspection information extraction: Intelligent parsing of construction quality inspection specifications based on natural language processing. Journal of Construction Engineering and Management, 152(4): 04026027, ISSN 0733-9364

Liu, W; Meng, Q; Li, Z; Chong, H Y; Li, K and Tang, H (2025) Linking organizational safety support and construction workers' safety behavior: The roles of safety motivation, emotional exhaustion and psychosocial safety climate. Engineering, Construction and Architectural Management, 32(10), pp. 6536-6565. ISSN 0969-9988

Liu, A M M and Fellows, R (2001) An eastern perspective on partnering. Engineering, Construction and Architectural Management, 8(1), pp. 1-19. ISSN 0969-9988

Liu, C; Lyle, B and Langston, C (2003) Estimating demolition costs for single residential buildings. Construction Economics and Building, 3(2), pp. 33-42. ISSN 2204-9029

Liu, G; Ma, Z; Li, J; Li, S; Zhou, X and Song, Y (2024) Framework of digital lean construction and implementation of its management platform for the construction phase. Journal of Construction Engineering and Management, 150(6): 04024051, ISSN 0733-9364

Liu, J and Rahbar, F (2004) Project time-cost trade-off optimization by maximal flow theory. Journal of Construction Engineering and Management, 130(4), pp. 607-609. ISSN 0733-9364

Liu, L; Burns, S A and Feng, C W (1995) Construction time-cost trade-off analysis using LP/IP hybrid method. Journal of Construction Engineering and Management, 121(4), pp. 446-454. ISSN 0733-9364

Liu, L and Zhu, K (2007) Improving cost estimates of construction projects using phased cost factors. Journal of Construction Engineering and Management, 133(1), pp. 91-95. ISSN 0733-9364

Liu, M (2019) Video-based human motion capture and force estimation for comprehensive on-site ergonomic risk assessment. PhD thesis, University of Michigan, USA.

Liu, S; Jin, H; Liu, C; Xie, B and Mills, A (2022) Development and testing of a rent determination framework for PPP rental villages. International Journal of Construction Management, 22(2), pp. 192-204. ISSN 1562-3599

Liu, Y; Wang, X; Guo, S; Shi, X and Wang, D (2024) Analyzing the optimization of subsidies for PPP urban rail transit projects: A choice between passenger demand, vehicle kilometer, or an improved efficiency-oriented framework. Journal of Construction Engineering and Management, 150(1): 04023142, ISSN 0733-9364

Llabres-Morey, M A; Hormigos-Jimenez, S and Del Río Merino, M (2025) CO2 concentration in six schools located in palma: A comparative evaluation. Building Research & Information, 53(8), pp. 983-1013. ISSN 0961-3218

Llabrés-Morey, M A; Hormigos-Jimenez, S and Río Merino, M (2025) Co₂ concentration in six schools located in palma: A comparative evaluation. Building Research & Information, 53(8), pp. 983-1013. ISSN 0961-3218

Llabrés-Morey, M A; Hormigos-Jimenez, S and del Rio Merino, M (2025) Evaluation of CO2 and tvoc concentration in a school in palma during the month of june. Building Research & Information, 53(1-2), pp. 95-119. ISSN 0961-3218

Lockley, S R; Watson, R and Shaaban, S (2002) Managing e-commerce in construction: Revolution or e-business as usual? Engineering, Construction and Architectural Management, 9(3), pp. 232-240. ISSN 0969-9988

Loehlein, G (2000) Role of the reichsforschungsgesellschaft fuer wirtschaftlichkeit im bau - und wohnungswesen e.v in supporting non-traditional construction methods in German public housing in the late 1920s. PhD thesis, Cardiff University, UK.

Lofqvist, P (1994) Knowledge-based systems for preliminary design of structures. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Lomas, K J (2009) Decarbonizing national housing stocks: Strategies, barriers and measurement. Building Research & Information, 37(2), pp. 187-191. ISSN 0961-3218

Lombardi, P (1997) Decision making in urban regeneration plans. Engineering, Construction and Architectural Management, 4(2), pp. 127-142. ISSN 0969-9988

Lombardi Filho, Pedro (2022) Management of small volumes of asbestos-cement materials in Brazil: From use to waste. PhD thesis, Universidade de São Paulo, Brazil.

Long, C D (1938) Long cycles in the building industry: Business public, and residential building in the United States cities, 1856-1935. PhD thesis, Princeton University, USA.

Loosemore, M (1999) Responsibility, power and construction conflict. Construction Management and Economics, 17(6), pp. 699-709. ISSN 01446193

Loosemore, M and Teo, M M M (2002) The crisis management practices of Australian construction companies. Construction Economics and Building, 2(2), pp. 15-26. ISSN 2204-9029

Loper, J H; Marquis, E L and Rhomberg, E J (1988) Precast prestressed long-span bridges. Journal of Construction Engineering and Management, 114(1), pp. 95-103. ISSN 0733-9364

Lopez Del Puerto, C; Strong, K and Miller, M (2013) Analysis of owners safety management approaches in design-build projects. International Journal of Construction Education and Research, 9(4), pp. 307-316. ISSN 1557-8771

Lopez-Ordoñez, C; Garcia-Nevado, E; Coch, H and Morganti, M (2025) Heat stress in social housing districts: Tree cover-built form interaction. Buildings & Cities, 6(1), pp. 415-432. ISSN 2632-6655

Loraine, R K (1994) Project specific partnering. Engineering, Construction and Architectural Management, 1(1), pp. 5-16. ISSN 0969-9988

Lorterapong, P and Ussavadilokrit, M (2013) Construction scheduling using the constraint satisfaction problem method. Journal of Construction Engineering and Management, 139(4), pp. 414-422. ISSN 0733-9364

Lostuvali, B; Alves, T C L and Modrich, R U (2014) Learning from the cathedral hill hospital project during the design and preconstruction phases. International Journal of Construction Education and Research, 10(3), pp. 160-180. ISSN 1557-8771

Love, P E D (2026) Quantifying the costs of field rework in construction. Journal of Construction Engineering and Management, 152(1): 06025003, ISSN 0733-9364

Love, P E D and Matthews, J (2023) Hold-ups and failures in negotiated order: Unearthing the nuances of rework causation in construction. Journal of Construction Engineering and Management, 149(3): 06023001, ISSN 0733-9364

Love, P E D; Matthews, J and Fang, W (2020) Rework in construction: A focus on error and violation. Journal of Construction Engineering and Management, 146(9): 06020001, ISSN 0733-9364

Love, P E D; Matthews, J and Fang, W (2021) Envisioning rework in practice: Emergent insights from a longitudinal study. Journal of Construction Engineering and Management, 147(1): 06020002, ISSN 0733-9364

Love, P E D; Matthews, J and Fang, W (2021) Reflections on the risk and uncertainty of rework in construction. Journal of Construction Engineering and Management, 147(4), ISSN 0733-9364

Love, P E D; Teo, P and Morrison, J (2018) Revisiting quality failure costs in construction. Journal of Construction Engineering and Management, 144(2): 05017020, ISSN 0733-9364

Love, P E D (2025) Boosting: Improving people's decision-making competences in construction. Journal of Construction Engineering and Management, 151(12): 06025002, ISSN 0733-9364

Low, S P and Wu, M (2005) Just-in-time management in the ready mixed concrete industries of Chongqing, China and Singapore. Construction Management and Economics, 23(8), pp. 815-829. ISSN 01446193

Lowe, D and Skitmore, M (1994) Experiential learning in cost estimating. Construction Management and Economics, 12(5), pp. 423-431. ISSN 01446193

Lowe, J G (1983) Control of direct labour: a critical review. Construction Papers, 2(2), pp. 53-60. ISSN 0144-8587

Lowe, R (2006) Defining absolute environmental limits for the built environment. Building Research & Information, 34(4), pp. 405-415. ISSN 0961-3218

Lowe, R (2007) Technical options and strategies for decarbonizing UK housing. Building Research & Information, 35(4), pp. 412-425. ISSN 0961-3218

Lowe, R (2009) Policy and strategy challenges for climate change and building stocks. Building Research & Information, 37(2), pp. 206-212. ISSN 0961-3218

Lu, Y; Ma, L and Yao, H (2025) Effect of contractual functions on contractors' consummate performance behaviors in construction projects. Engineering, Construction and Architectural Management, 32(11), pp. 7678-7702. ISSN 0969-9988

Lu, H; Behbahani, S; Azimi, M; Matthews, J C; Han, S and Iseley, T (2020) Trenchless construction technologies for oil and gas pipelines: State-of-the-art review. Journal of Construction Engineering and Management, 146(6): 03120001, ISSN 0733-9364

Lu, M; Anson, M; Tang, S L and Ying, Y C (2003) Hkconsim: A practical simulation solution to planning concrete plant operations in Hong Kong. Journal of Construction Engineering and Management, 129(5), pp. 547-554. ISSN 0733-9364

Lu, R (2010) Impacts of local item dependence of testlet items with the multistage tests for pass-fail decisions. PhD thesis, University of Maryland, College Park, USA.

Lu, S L; Sexton, M G; Abbott, C and Jones, V (2007) What are the key turning points in female career progression? The case of a senior manager in a small construction firm. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Luck, R (2007) Using artefacts to mediate understanding in design conversations. Building Research & Information, 35(1), pp. 28-41. ISSN 0961-3218

Luck, R (2010) Using objects to coordinate design activity in interaction. Construction Management and Economics, 28(6), pp. 641-655. ISSN 1466433X

Lucko, G (2011) Integrating efficient resource optimization and linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 137(1), pp. 45-55. ISSN 0733-9364

Lucko, G (2013) Supporting financial decision-making based on time value of money with singularity functions in cash flow models. Construction Management and Economics, 31(3), pp. 238-253. ISSN 1466433X

Lucko, G; Araújo, L G and Cates, G R (2016) Slip chart-inspired project schedule diagramming: Origins, buffers, and extension to linear schedules. Journal of Construction Engineering and Management, 142(5): 04015101, ISSN 0733-9364

Luiten, G T (1994) Computer aided design for construction in the building industry. PhD thesis, Delft University of Technology, Netherlands.

Luiten, G T and Fischer, M A (1998) Opportunities for computer-aided design for construction. Engineering, Construction and Architectural Management, 5(2), pp. 127-136. ISSN 0969-9988

Luiten, G T and Tolman, F P (1997) Automating communication in civil engineering. Journal of Construction Engineering and Management, 123(2), pp. 113-120. ISSN 0733-9364

Lukito, Jose Arif (2018) Framework for climate change adaptation for incorporation in public asset management: An Indonesian context. PhD thesis, Queensland University of Technology, Australia.

Lundberg, E J and Beliveau, Y J (1989) Automated lay-down yard control system: ALYC. Journal of Construction Engineering and Management, 115(4), pp. 535-544. ISSN 0733-9364

Lundin, J A (2005) Safety in case of fire: The effect of changing regulations. PhD thesis, Lund University, Sweden.

Luo, S; Liu, Z; Yang, X; Lu, Q and Yin, J (2019) Construction technology of warm and hot mix epoxy asphalt paving for long-span steel bridge. Journal of Construction Engineering and Management, 145(12): 04019074, ISSN 0733-9364

Luo, X; Li, H; Huang, T and Skitmore, M (2016) Quantifying hazard exposure using real-time location data of construction workforce and equipment. Journal of Construction Engineering and Management, 142(8): 4016031, ISSN 0733-9364

Luo, Y Z; Shen, Y B and Xu, X (2007) Construction method for cylindrical latticed shells based on expandable mechanisms. Journal of Construction Engineering and Management, 133(11), pp. 912-915. ISSN 0733-9364

Lurie, J (2008) On-demand performance bonds: Reducing the risk of abuse. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 121-125. ISSN 17514312

Lv, L; Wang, Z; Li, H; Zhang, C and Qiao, R (2022) Erratum: Tournament incentive mechanisms design for long-distance water diversion projects incorporating preference heterogeneity (journal of construction engineering and management DOI: 10.1061/(ASCE)CO.1943-7862.0002284). Journal of Construction Engineering and Management, 148(9): 08222001, ISSN 0733-9364

Lytle, A M (2011) A framework for object recognition in construction using building information modeling and high frame rate three-dimensional imaging. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Löffler, M (1997) Foamglass as spacer in multiple-glazing. Building Research & Information, 25(2), pp. 107-110. ISSN 0961-3218

Lützkendorf, T (2018) Assessing the environmental performance of buildings: Trends, lessons and tensions. Building Research & Information, 46(5), pp. 594-614. ISSN 0961-3218

Lützkendorf, T; Fan, W and Lorenz, D (2011) Engaging financial stakeholders: Opportunities for a sustainable built environment. Building Research & Information, 39(5), pp. 483-503. ISSN 0961-3218

Lützkendorf, T and Lorenz, D (2006) Using an integrated performance approach in building assessment tools. Building Research & Information, 34(4), pp. 334-356. ISSN 0961-3218

Lützkendorf, T and Lorenz, D (2011) Capturing sustainability-related information for property valuation. Building Research & Information, 39(3), pp. 256-273. ISSN 0961-3218

Lützkendorf, T and Speer, T M (2005) Alleviating asymmetric information in property markets: Building performance and product quality as signals for consumers. Building Research & Information, 33(2), pp. 182-195. ISSN 0961-3218

Lœdre, O; Austeng, K; Haugen, T I and Klakegg, O J (2006) Procurement routes in public building and construction projects. Journal of Construction Engineering and Management, 132(7), pp. 689-696. ISSN 0733-9364

Ma, A (2009) Engineer's role in resolving disputes in offshore projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 191-196. ISSN 17514312

Ma, C P and Winch, G (2000) It implementation performance and organisational characteristics in Taiwanese contractors. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Ma, G; Wu, M; Jia, J and Yang, W (2021) Two-level quality decision support system for building structural damage prediction and maintenance solution recommendation in the operation and maintenance phase. Journal of Construction Engineering and Management, 147(6): 04021044, ISSN 0733-9364

Ma, H; Zhang, H and Chang, P (2020) 4D-based workspace conflict detection in prefabricated building constructions. Journal of Construction Engineering and Management, 146(9): 04020112, ISSN 0733-9364

Ma, J; Zhao, Y; Zheng, D; Liao, X and Lu, J (2025) CSADnet: Attention-based semantic segmentation method for spraying scene images of building gables. Journal of Construction Engineering and Management, 151(8): 04025109, ISSN 0733-9364

Ma, K; Shen, W; Chen, W and Dangana, Z (2023) Facilitating net-zero target in the building sector through online transaction platforms: Feedback from industrial practitioners. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Ma, Q; Li, S and Cheung, S O (2022) Unveiling embedded risks in integrated project delivery. Journal of Construction Engineering and Management, 148(1): 04021180, ISSN 0733-9364

Ma, Z (2015) A BIM-based approach to reusing construction firm's management information. Construction Economics and Building, 12(4), pp. 29-38. ISSN 2204-9029

Machado, M V; La Roche, P M; Mustieles, F and De Oteiza, I (2000) The fourth house: The design of a bioclimatic house in Venezuela. Building Research & Information, 28(3), pp. 196-211. ISSN 0961-3218

Machline, E; Pearlmutter, D and Schwartz, M (2018) Parisian eco-districts: Low energy and affordable housing? Building Research & Information, 46(6), pp. 636-652. ISSN 0961-3218

Mackenzie, N and Tuckwood, B (2012) A model to manage the water industry supply chain effectively. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(3), pp. 181-192. ISSN 17514312

Maftei, L (2015) The use of immersive virtual reality technology in the design process: a reflective practice approach. PhD thesis, University of Reading, UK.

Maftei, L and Harty, C F (2012) Exploring cave: Using immersive environments for design work. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Mahamedi, E; Wonders, M; Kassem, M; Woo, W L and Greenwood, D (2022) Digital twin and building performance: A review and proposed framework. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Mahamid, I (2017) Analysis of schedule deviations in road construction projects and the effects of project physical characteristics. Journal of Financial Management of Property and Construction, 22(2), pp. 192-210. ISSN 1366-4387

Mahmoodzadeh, A; Nejati, H R; Flaih, L R; Ibrahim, H H; Alenizi, F A and Alassaf, Y (2024) A rigorous examination of twelve cutting-edge machine-learning techniques for predicting time and cost in tunneling projects. Journal of Construction Engineering and Management, 150(12): 04024176, ISSN 0733-9364

Mahmoud, A S; Sanni-Anibire, M O and Hassanain, M A (2017) Performance-based fire safety evacuation of an auditorium facility using a theoretical calculation method. International Journal of Building Pathology and Adaptation, 35(2), pp. 124-138.

Maiocco Jr., F R (2004) Funding public school construction in the United States. PhD thesis, Washington State University, USA.

Male, S (1990) Professional authority, power and emerging forms of 'profession' in quantity surveying. Construction Management and Economics, 8(2), pp. 191-204. ISSN 01446193

Male, S and Mitrovic, D (1999) Trends in world markets and the LSE industry. Engineering, Construction and Architectural Management, 6(1), pp. 7-20. ISSN 0969-9988

Maleetipwan-Mattsson, P; Laike, T and Johansson, M (2017) The effects of user interface designs on lighting use. Journal of Engineering, Design and Technology, 15(1), pp. 58-78.

Malik, K (2017) Assessment of energy consumption pattern and energy conservation potential at Indian airports. Journal of Construction in Developing Countries, 22(S1), pp. 97-119. ISSN 1823-6499

Malin, N (2000) The cost of green materials. Building Research & Information, 28(5-6), pp. 408-412. ISSN 0961-3218

Malmqvist, T (2008) Environmental rating methods: Selecting indoor environmental quality (IEQ) aspects and indicators. Building Research & Information, 36(5), pp. 466-485. ISSN 0961-3218

Malmqvist, T and Glaumann, M (2006) Selecting problem-related environmental indicators for housing management. Building Research & Information, 34(4), pp. 321-333. ISSN 0961-3218

Maloney, W F (1983) Productivity improvement: The influence of labor. Journal of Construction Engineering and Management, 109(3), pp. 321-334. ISSN 0733-9364

Maloney, W F (2002) Construction product/service and customer satisfaction. Journal of Construction Engineering and Management, 128(6), pp. 522-529. ISSN 0733-9364

Maloney, W F (2003) Labor-management cooperation and customer satisfaction. Journal of Construction Engineering and Management, 129(2), pp. 165-172. ISSN 0733-9364

Maloney, W F and Jones, T W (1984) Labor-management cooperation: Operation MOST. Journal of Construction Engineering and Management, 110(2), pp. 205-221. ISSN 0733-9364

Maloney, W F and McFillen, J M (1987) Worker perceptions of contractor behavior. Journal of Construction Engineering and Management, 113(3), pp. 416-426. ISSN 0733-9364

Mamari, M A; Khan, H M; Al Saadi, S and Al Hashim, A (2025) Impact of windcatcher on the thermal comfort and indoor air quality in a modern house. Building Research & Information, 53(1-2), pp. 204-219. ISSN 0961-3218

Mang, P and Reed, B (2015) The nature of positive. Building Research & Information, 43(1), pp. 7-10. ISSN 0961-3218

Manley, S and de Graft-Johnson, A (2008) Women in architecture: Five years on. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Manrique, J D; Al-Hussein, M; Bouferguene, A; Safouhi, H and Nasseri, R (2011) Combinatorial algorithm for optimizing wood waste in framing designs. Journal of Construction Engineering and Management, 137(3), pp. 188-197. ISSN 0733-9364

Mansfield, J R (1997) Authorised property unit trusts: Opportunities and threats. Journal of Financial Management of Property and Construction, 2(1), pp. 35-44. ISSN 1366-4387

Mansoor, A; Liu, S; Ali, G M; Bouferguene, A and Al-Hussein, M (2023) A deep-learning classification framework for reducing communication errors in dynamic hand signaling for crane operation. Journal of Construction Engineering and Management, 149(2): 4022167, ISSN 0733-9364

Mansoor, A; Liu, S; Bouferguene, A and Al-Hussein, M (2024) Crane signalman hand-signal classification framework using sensor-based smart construction glove and machine-learning algorithms. Journal of Construction Engineering and Management, 150(8): 04024094, ISSN 0733-9364

Marchant, David (2015) Capturing and integrating the design brief in building information models. PhD thesis, University of New South Wales, Australia.

Marchiori, Fernanda Fernandes (2009) Developing a method to prepare unit cost item nets for buildings estimating. PhD thesis, Universidade de São Paulo, Brazil.

Marinelli, M (2022) A dfx-based approach for incorporating sustainability in infrastructure project planning. Built Environment Project and Asset Management, 12(1), pp. 20-37. ISSN 2044-124X

Marinelli, M and Lambropoulos, S (2013) Algorithmic method for scraper load-time optimization. Journal of Construction Engineering and Management, 139(5), pp. 459-465. ISSN 0733-9364

Maritz, M J and Putlitz, U (2014) Standard form construction contracts; why the need for regular changes? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Marnewick, C (2008) Ensuring succesful erp implementations using the vision-to-project framework. PhD thesis, University of Johannesburg, South Africa.

Marocco, M and Garofolo, I (2021) Operational text-mining methods for enhancing building maintenance management. Building Research & Information, 49(8), pp. 893-911. ISSN 0961-3218

Marques, N L; Bastian-Pinto, C D L and Brandão, L E T (2021) Crossing the Brownian Bridge: Valuing infrastructure capacity expansion policies as real options. Construction Management and Economics, 39(3), pp. 261-276. ISSN 01446193

Marques, R C and Berg, S (2011) Risks, contracts, and private-sector participation in infrastructure. Journal of Construction Engineering and Management, 137(11), pp. 925-932. ISSN 0733-9364

Marrana, T C; Silvestre, J D; De Brito, J and Gomes, R (2017) Lifecycle cost analysis of flat roofs of buildings. Journal of Construction Engineering and Management, 143(6): 04017014, ISSN 0733-9364

Marrero, M and Ramirez-De-Arellano, A (2010) The building cost system in andalusia: Application to construction and demolition waste management. Construction Management and Economics, 28(5), pp. 495-507. ISSN 1466433X

Marsh, A T M and Kulshreshtha, Y (2022) The state of earthen housing worldwide: How development affects attitudes and adoption. Building Research & Information, 50(5), pp. 485-501. ISSN 0961-3218

Marshall, H (2012) Adjudication enforcement: Partial final determinations and insolvency. International Journal of Law in the Built Environment, 4(1), pp. 60-74. ISSN 1756-1450

Martek, I; Edwards, D J; Seaton, S and Jones, D (2022) An appraisal of Australia's approach to promoting urban sustainability. Built Environment Project and Asset Management, 12(2), pp. 262-276. ISSN 2044-124X

Marti, P; Trümpi, S and Heinzmann, D (2009) Hydraulic joint for pipe jacking. Journal of Construction Engineering and Management, 135(6), pp. 439-447. ISSN 0733-9364

Martin, G L (1988) Training programs for engineering consulting firms. Journal of Construction Engineering and Management, 114(1), pp. 121-132. ISSN 0733-9364

Martin, L and Root, D (2010) Learning experiences for South African SMEs: Interactions with established contractors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Martin-Du Pan, O; Eames, P; Rowley, P; Bouchlaghem, D and Susman, G (2015) Current and future operation scenarios for a 50,000 MWh district heating system. Architectural Engineering and Design Management, 11(4), pp. 280-304. ISSN 1745-2007

Martinez, P; Livojevic, M; Jajal, P; Aldrich, D R; Al-Hussein, M and Ahmad, R (2020) Simulation-driven design of wood framing support systems for off-site construction machinery. Journal of Construction Engineering and Management, 146(7): 04020075, ISSN 0733-9364

Marton, J (2004) In search of organisational legitimacy construction sites. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Martínez Fernández, P; Villalba Sanchís, I; Insa Franco, R and Yepes, V (2022) Slab track optimization using metamodels to improve rail construction sustainability. Journal of Construction Engineering and Management, 148(7): 04022053, ISSN 0733-9364

Marzouk, M (2008) A superiority and inferiority ranking model for contractor selection. Construction Innovation, 8(4), pp. 250-268. ISSN 1471-4175

Marín, L S and Roelofs, C (2017) Promoting construction supervisors' safety-efficacy to improve safety climate: Training intervention trial. Journal of Construction Engineering and Management, 143(8): 4017037, ISSN 0733-9364

Maslova, S and Burgess, G (2023) Delivering human-centred housing: Understanding the role of post-occupancy evaluation and customer feedback in traditional and innovative social housebuilding in England. Construction Management and Economics, 41(4), pp. 277-292. ISSN 01446193

Massyn, M and Lamont, S (2009) Applying the briefing process on the people s housing process projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Masterson, J (2008) Employer perspective of the new Irish public works contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 99-105. ISSN 17514312

Mastrucci, A and Rao, N D (2019) Bridging India's housing gap: Lowering costs and CO2 emissions. Building Research & Information, 47(1), pp. 8-23. ISSN 0961-3218

Mat Noor, Noorsidi Aizuddin (2014) Framework of whole life cycle costing for Malaysian high rise residential property development. PhD thesis, Queensland University of Technology, Australia.

Matar, M M; Georgy, M E and Ibrahim, M E (2008) Sustainable construction management: Introduction of the operational context space (OCS). Construction Management and Economics, 26(3), pp. 261-275. ISSN 1466433X

Matipa, W M; Cunningham, P and Naik, B (2010) Assessing the impact of new rules of cost planning on building information model (BIM) schema pertinent to quantity surveying practice. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Matsuzaki, M; Uchikawa, C and Mitamura, T (1990) Advanced fabrication and erection techniques for long suspension bridge cables. Journal of Construction Engineering and Management, 116(1), pp. 112-129. ISSN 0733-9364

Mattar, S G (1983) Segmental post-tensioned dolphin at Tagrin Point. Journal of Construction Engineering and Management, 109(3), pp. 276-285. ISSN 0733-9364

Mattila, K G and Abraham, D M (1998) Linear scheduling: Past research efforts and future directions. Engineering, Construction and Architectural Management, 5(3), pp. 294-303. ISSN 0969-9988

Mattila, K G and Bowman, M R (2004) Accuracy of highway contractor's schedules. Journal of Construction Engineering and Management, 130(5), pp. 647-655. ISSN 0733-9364

Mawad, S and Bakry, I (2023) Enhanced method to plan the operations of vertical supply systems of high-rise projects. International Journal of Construction Management, 23(4), pp. 629-638. ISSN 1562-3599

Mawdesley, M J; Al-Jibouri, S H and Clark-Hughes, J (2002) A proactive control approach to agreeing entitlement to claims in construction. Journal of Financial Management of Property and Construction, 7(1), pp. 41-48. ISSN 1366-4387

Mawdesley, M J; Al-jibouri, S H and Yang, H (2002) Genetic algorithms for construction site layout in project planning. Journal of Construction Engineering and Management, 128(5), pp. 418-426. ISSN 0733-9364

Maxwell, D A; Back, W E and Toon, J (1998) Optimization of crew configurations using activity-based costing. Journal of Construction Engineering and Management, 124(2), pp. 162-168. ISSN 0733-9364

Mayer, M (2020) Material recovery certification for construction workers. Buildings & Cities, 1(1), pp. 550-564. ISSN 2632-6655

Mayo, F B (1957) The management of government civil engineering works with special reference to the controls involved. PhD thesis, University of Manchester, UK.

Mazzola, C; Zanelli, A; Stimpfle, B and Canobbio, R (2021) Temporactive pavilion: Second design-to-construction loop of an ultra-lightweight temporary architecture. Architectural Engineering and Design Management, 17(3-4), pp. 216-228. ISSN 1745-2007

Mbabazi, A; Hegazy, T and Saccomanno, F (2005) Modified but-for method for delay analysis. Journal of Construction Engineering and Management, 131(10), pp. 1142-1144. ISSN 0733-9364

McCabe, S; Crook, D; Rooke, J and Seymour, D (1997) Construction's experiences of attempting to become world class: The role of academics in assisting practitioners. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

McCain, M L (1986) Skill and deskilling in the English building trades in the nineteenth-century. PhD thesis, Georgetown University, USA.

McCann, M (1986) An application of convex programming to construction scheduling. PhD thesis, Iowa State University, USA.

McCausland, K (2021) The design, development and evaluation of GIS applications as decision support tools for ecologically aware infrastructure design. EngD thesis, University of Reading, UK.

McCord, K (2022) Augmented reality for hands-on construction education. PhD thesis, Arizona State University, USA.

McCutcheon, R (1979) Modern construction technology in low-income housing policy: The case of industrialised building. PhD thesis, University of Sussex, UK.

McCutcheon, R T (2001) Employment generation in public works: Recent South Africa experience. Construction Management and Economics, 19(3), pp. 275-284. ISSN 01446193

McFarland, A E (2010) An end user approach to teaching specifications. International Journal of Construction Education and Research, 6(2), pp. 83-103. ISSN 1557-8771

McGartland, M R and Hendrickson, C T (1985) Expert systems for construction project monitoring. Journal of Construction Engineering and Management, 111(3), pp. 293-307. ISSN 0733-9364

McGeorge, D; Eng, C S and Plenty, T (1998) A public sector approach to risk management as part of a total asset management strategy. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

McGibbney, L J (2012) Better regulation of construction activity through data modelling. PhD thesis, Glasgow Caledonian University, UK.

McKay, L J; Gibb, A G F; Haslam, R and Pendlebury, M (2003) The development of an accident causal model for off-site production in construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

McLernon, T (2014) A study of the management of time by comparing and evaluating the provisions for the management of time in the JCT standard building contract (JCT sbc), the new engineering and construction contract (nec3) and the new complex projects contract 2013 (cpc20. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

McMillan, L (2023) Artificial intelligence–enabled self-healing infrastructure systems. PhD thesis, University College London, UK.

McRobert, Alexandra Aimee (2021) Holistic housebuilding: Towards a framework for improving housing affordability. PhD thesis, Monash University, Australia.

McWilliam, R C (2002) The evolution of British standards. PhD thesis, University of Reading, UK.

Meacham, B; Bowen, R; Traw, J and Moore, A (2005) Performance-based building regulation: Current situation and future needs. Building Research & Information, 33(2), pp. 91-106. ISSN 0961-3218

Meacham, B J (2010) Accommodating innovation in building regulation: Lessons and challenges. Building Research & Information, 38(6), pp. 686-698. ISSN 0961-3218

Meacham, B J (2022) Fire performance and regulatory considerations with modern methods of construction. Buildings & Cities, 3(1), pp. 464-487. ISSN 2632-6655

Meaker, T A (1994) The role of intervention in strategic change. PhD thesis, City, University of London, UK.

Mediastika, C E; Sudarsono, A S and Kristanto, L (2022) Indonesian shopping malls: A soundscape appraisal by sighted and visually impaired people. Architectural Engineering and Design Management, 18(3), pp. 184-203. ISSN 1745-2007

Meduri, A (2025) Multi-modal sensor based high frequency non linear model predictive control for robots. PhD thesis, New York University Tandon School of Engineering, USA.

Mehdi Riazi, Salman Riazi (2014) The use of supply chain management to reduce delays as result of pre-construction deficiencies in Malaysian public sector construction projects. PhD thesis, Queensland University of Technology, Australia.

Meijer, F; Itard, L and Sunikka-Blank, M (2009) Comparing European residential building stocks: Performance, renovation and policy opportunities. Building Research & Information, 37(5-6), pp. 533-551. ISSN 0961-3218

Meijer, F and Visscher, H (2017) Quality control of constructions: European trends and developments. International Journal of Law in the Built Environment, 9(2), pp. 143-161. ISSN 1756-1450

Meikle, J (2001) A review of recent trends in house construction and land prices in Great Britain. Construction Management and Economics, 19(3), pp. 259-265. ISSN 01446193

Meikle, J L and Connaughton, J N (1994) How long should housing last? Some implications of the age and probable life of housing in England. Construction Management and Economics, 12(4), pp. 315-321. ISSN 01446193

Mellado, F; Wong, P F; Amano, K; Johnson, C and Lou, E C W (2020) Digitisation of existing buildings to support building assessment schemes: Viability of automated sustainability-led design scan-to-BIM process. Architectural Engineering and Design Management, 16(2), pp. 84-99. ISSN 1745-2007

Mellado Mascaraque, M Á; Castilla Pacual, F J; Oteiza, I and Aparicio Secanellas, S (2020) Hygrothermal assessment of a traditional earthen wall in a dry mediterranean climate. Building Research & Information, 48(6), pp. 632-644. ISSN 0961-3218

Memić, N; Tadayon, A; Ishtiaque, T A; Klakegg, O J; Wondimu, P A and Lædre, O (2025) How to find the optimal time for contractor involvement in infrastructure projects? Engineering, Construction and Architectural Management, 32(11), pp. 7651-7677. ISSN 0969-9988

Menches, C L and Chen, J (2013) Using ecological momentary assessment to understand a construction worker's daily disruptions and decisions. Construction Management and Economics, 31(2), pp. 180-194. ISSN 1466433X

Meng, X (2002) Guarantees for contractor's performance and owner's payment in China. Journal of Construction Engineering and Management, 128(3), pp. 232-237. ISSN 0733-9364

Meng, Y; Antwi-Afari, M F; Mehmood, I; Anwer, S and Umer, W (2024) Building information modelling-based digital twin applications in construction safety management: A review. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Mengiste, E; Garcia de Soto, B and Hartmann, T (2024) Automated integration of as-is point cloud information with as-planned BIM for interior construction. International Journal of Construction Management, 24(2), pp. 137-150. ISSN 1562-3599

Merchant, A and Bajaj, D (2002) An analysis of the use of the "design-build" project delivery system by interior design firms, and its effectiveness in delivering fit-out projects. Journal of Construction Procurement, 8(1), pp. 17-34. ISSN 1358-9180

Meredith, J E (1999) Strategic management for construction organizations: Assessment and development of strategies to enhance corporate success. PhD thesis, Georgia Institute of Technology, USA.

Merrow, E W and Croker, W H (1995) Improved business results through benchmarking. Engineering, Construction and Architectural Management, 2(3), pp. 167-178. ISSN 0969-9988

Mesa Jiménez, J J (2021) Artificial intelligence for optimisation and demand side response in built environment. PhD thesis, Brunel University, UK.

Mesrop, A (2021) Algorithmic design and evaluation of emergency shelters. Architectural Engineering and Design Management, 17(3-4), pp. 229-241. ISSN 1745-2007

Mian, Daniyal (2015) A model to assess the impact of innovation activity on project performance in consulting engineering firms. PhD thesis, Queensland University of Technology, Australia.

Milberg, C T and Tommelein, I D (2020) Methods for managing tolerance compatibility: Windows in cast-in-place concrete. Journal of Construction Engineering and Management, 146(2), ISSN 0733-9364

Miles, R S and Ballard, G (2002) Problems in the interface between mechanical design and construction: A research proposal. Journal of Construction Research, 3(1), pp. 83-95. ISSN 1609-9451

Millan, H (1986) Management of risk in project control of offshore engineering constructions. PhD thesis, University of Bradford, UK.

Miller, J B (1995) Aligning infrastructure development strategy to meet current public needs. PhD thesis, Massachusetts Institute of Technology, USA.

Miller, R H (1973) Life cycle system model for estimating construction equipment ownership costs. PhD thesis, Oklahoma State University, USA.

Mills, A; Love, P E D and Williams, P (2009) Defect costs in residential construction. Journal of Construction Engineering and Management, 135(1), pp. 12-16. ISSN 0733-9364

Mills, E (2003) Climate change, insurance and the buildings sector: Technological synergisms between adaptation and mitigation. Building Research & Information, 31(3-4), pp. 257-277. ISSN 0961-3218

Min, Y and Lee, H W (2024) Adoption inequalities and causal relationship between residential electric vehicle chargers and heat pumps. Journal of Construction Engineering and Management, 150(5): 04024025, ISSN 0733-9364

Minchin, R E; Thurn, S B; Ellis, R D and Lewis, D W (2013) Using contractor bid amounts to estimate the impact of night construction on cost for transportation construction. Journal of Construction Engineering and Management, 139(8), pp. 1055-1062. ISSN 0733-9364

Miners, T W (1969) Communications and cost control in the building industry with special reference to the role of the quantity surveyor. Dr thesis, University of Pretoria, South Africa.

Miocevic, D; Maricic, M; Arslanagic-Kalajdzic, M and Dedic, G (2025) Emotional intelligence and relational energy in cooperative arrangements in construction projects: Complements or substitutes? Construction Management and Economics, 43(8), pp. 583-598. ISSN 0144-6193

Mirahadi, S (2020) EvacuSafe: A smart evacuation management system for buildings. PhD thesis, University of Toronto, Canada.

Mirmoghtadaee, M (2009) Process of housing transformation in Iran. Journal of Construction in Developing Countries, 14(1), pp. 69-80. ISSN 1823-6499

Mirzadeh, I (2014) More roads for the money. PhD thesis, KTH Royal Institute of Technology, Sweden.

Mishra, S P; Parbat, D K and Modak, J P (2014) Field data-based mathematical simulation of manual rebar cutting. Journal of Construction in Developing Countries, 19(1), pp. 111-126. ISSN 1823-6499

Miskawi, Z (1989) An S-curve equation for project control. Construction Management and Economics, 7(2), pp. 115-124. ISSN 01446193

Missa, P and Ahmed, V (2010) Bme migrants' employment in construction: A multicultural perspective. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Mistry, D and Davis, P R (2009) A client's perspective of critical success factors in project alliances. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Mitropoulos, P; Abdelhamid, T S and Howell, G A (2005) Systems model of construction accident causation. Journal of Construction Engineering and Management, 131(7), pp. 816-825. ISSN 0733-9364

Mitropoulos, P and Tatum, C B (1999) Technology adoption decisions in construction organizations. Journal of Construction Engineering and Management, 125(5), pp. 330-338. ISSN 0733-9364

Mitrovic, D; Male, S; Hunter, I A N and Watson, A (1999) Large scale engineering project process and user requirements. Engineering, Construction and Architectural Management, 6(1), pp. 38-50. ISSN 0969-9988

Modak, J P; Sohoni, V V and Aware, H V (1997) Manually powered manufacture of keyed bricks. Building Research & Information, 25(6), pp. 354-364. ISSN 0961-3218

Modeen, T; Pasquire, C and Soar, R (2005) Ubiquitous customization: Utilizing rapid manufacturing in the production of design and architecture. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Mofolasayo, A (2025) Multi-variable evaluation of factors that contribute to the environmental impact of onsite and offsite building construction: An illustration using roof panel fastening schedule. International Journal of Construction Management, 25(16), pp. 1938-1951. ISSN 1562-3599

Mohajeri, N; Walch, A; Gudmundsson, A; Heaviside, C; Askari, S; Wilkinson, P and Davies, M (2021) COVID-19 mobility restrictions: Impacts on urban air quality and health. Buildings & Cities, 2(1), pp. 759-778. ISSN 2632-6655

Mohamadi, Y; Celik, T and Celik, T (2024) Optimising building envelope and insulation materials for energy efficiency and life-cycle cost in Cypriot residences. Architectural Engineering and Design Management, 20(5), pp. 1060-1078. ISSN 1745-2007

Mohamed, Mohd Amizan Bin (2022) The impacts of forex fluctuations on construction business performance: An organisational capabilities (oc) perspective. PhD thesis, Queensland University of Technology, Australia.

Mohamed, O and Egbu, C (2010) Measuring the impact of knowledge sharing on the planning permission process in Malaysian local authorities. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Mohamed, S F and Anumba, C J (2004) Towards a framework for integrating knowledge management processes into site management practices. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Mohamed, T (2023) Modelling interaction between schedule performance and schedule determinants of construction projects. PhD thesis, Loughborough University, UK.

Mohamed, Y and AbouRizk, S (2005) Technical knowledge consolidation using theory of inventive problem solving. Journal of Construction Engineering and Management, 131(9), pp. 993-1001. ISSN 0733-9364

Mohamedein, S. M. and Nassar, A. H. (2026) Calculating cost contingency for residential construction projects in Egypt using a machine learning algorithm. International Journal of Construction Management, 26(9), pp. 1761-1776. ISSN 1562-3599

Mohammed, S (2022) Effect of political corruption on project failure. A multilevel inquiry on the effects of corruption on public sector construction project failure in emerging and advanced market economies. DBA thesis, Northcentral University, USA.

Mohandes, S R; Singh, A K; Fazeli, A; Banihashemi, S; Arashpour, M; Cheung, C; Ejohwomu, O and Zayed, T (2025) Determining the stationary digital twins implementation barriers for sustainable construction projects. Smart and Sustainable Built Environment, 14(5), pp. 1538-1563. ISSN 2046-6099

Mohsen, O; Petre, C and Mohamed, Y (2023) Machine-learning approach to predict total fabrication duration of industrial pipe spools. Journal of Construction Engineering and Management, 149(2): 04022172, ISSN 0733-9364

Mohseni, Mehdi (2012) Dynamic vulnerability assessment of highway and railway bridges. PhD thesis, University of Nebraska - Lincoln, USA.

Moir S, C K (2013) An appreciation of BREEAM relative to the cosmonomic idea of reality. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Molad, C and Edward Back, W (1995) EDI's role as an enabler for electronic commerce and information integration. Engineering, Construction and Architectural Management, 2(2), pp. 93-104. ISSN 0969-9988

Mondragon Solis, Fernando Alberto (2013) Jobsite information processing: Cognitive analysis of construction field managers and applications. PhD thesis, University of Texas at Austin, USA.

Monnot, J M and Williams, R C (2011) Construction equipment telematics. Journal of Construction Engineering and Management, 137, pp. 793-796. ISSN 0733-9364

Montali, J; Overend, M; Pelken, P M and Sauchelli, M (2018) Knowledge-based engineering in the design for manufacture of prefabricated façades: Current gaps and future trends. Architectural Engineering and Design Management, 14(1-2), pp. 78-94. ISSN 1745-2007

Montazami, A and Nicol, F (2013) Overheating in schools: Comparing existing and new guidelines. Building Research & Information, 41(3), pp. 317-329. ISSN 0961-3218

Monzer, N; Fayek, A R; Lourenzutti, R and Siraj, N B (2019) Aggregation-based framework for construction risk assessment with heterogeneous groups of experts. Journal of Construction Engineering and Management, 145(3): 04019003, ISSN 0733-9364

Moohialdin, Ammar (2020) A real-time worker activity intensity identification system for construction workers under hot and humid weather conditions. PhD thesis, Queensland University of Technology, Australia.

Moon, S; Lee, G; Chi, S and Oh, H (2021) Automated construction specification review with named entity recognition using natural language processing. Journal of Construction Engineering and Management, 147(1): 04020147, ISSN 0733-9364

Moon, S; Yang, B and Choi, E (2018) Safety guideline for safe concrete placement utilizing the information on the structural behavior of formwork. Journal of Construction Engineering and Management, 144(12): 04018108, ISSN 0733-9364

Moore, D (1996) The renaissance: The beginning of the end for implicit buildability. Building Research & Information, 24(5), pp. 259-269. ISSN 0961-3218

Moore, D (1996) Buildability assessment and the development of an automated design aid for managing the transfer of construction process knowledge. Engineering, Construction and Architectural Management, 3(1-2), pp. 29-46. ISSN 0969-9988

Moore, D R and Dainty, A R J (2001) Intra-team boundaries as inhibitors of performance improvemeent in UK design and build projects: A call for change. Construction Management and Economics, 19(6), pp. 559-562. ISSN 01446193

Moore, D R; Paterson, G and Martinez, R S (2004) Sustainable communities: A proposal linking the management of forestation and agricultural waste with the development of recyclable housing. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Moore, S A; Gelfand, S and Whitsett, D (2015) Epistemological conflict: Modern and non-modern frameworks for sustainability. Building Research & Information, 43(6), pp. 659-674. ISSN 0961-3218

Mootanah, D P (1998) The effective management of risk in concession projects. Journal of Financial Management of Property and Construction, 3(2), pp. 27-40. ISSN 1366-4387

Moreno, H S; Llop, N L and Garcia Teruel, R M (2017) Shared ownership and temporal ownership in Catalan law. International Journal of Law in the Built Environment, 9(1), pp. 63-78. ISSN 1756-1450

Moret, Y (2011) Modeling cost and time uncertainty in rail line construction. PhD thesis, Massachusetts Institute of Technology, USA.

Morgado, J; Flores-Colen, I; De Brito, J and Silva, A (2017) Maintenance planning of pitched roofs in current buildings. Journal of Construction Engineering and Management, 143(7): 05017010, ISSN 0733-9364

Morgan, D C (1986) Site layout and construction planning. PhD thesis, University of Nottingham, UK.

Morimoto, E and Arai, K (2024) Public procurement and business performance in COVID-19 situation: Decline in firms' entry. International Journal of Construction Management, 24(14), pp. 1589-1598. ISSN 1562-3599

Moriyani, M A; Le, C; Le, T and Pirim, H (2026) Beyond one-size-fits-all: A novel data-driven framework for quantifying bidding competition intensity in highway design-bid-build contracts. Journal of Construction Engineering and Management, 152(3): 04026006, ISSN 0733-9364

Morosi, J A; Boldes, U and Colman, J (1996) Ornament and function. Building Research & Information, 24(6), pp. 323-328. ISSN 0961-3218

Morris, P W G (1972) A study of selected building projects in the context of theories of organization. PhD thesis, University of Manchester Institute of Science and Technology, UK.

Morrison, N (1984) The accuracy of quantity surveyors' cost estimating. Construction Management and Economics, 2(1), pp. 57-75. ISSN 01446193

Mort, J (2009) Adjudication: Possible amendment to the 1996 act. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(2), pp. 51-58. ISSN 17514312

Moselhi, O and Hassanein, A (2003) Optimized scheduling of linear projects. Journal of Construction Engineering and Management, 129(6), pp. 664-673. ISSN 0733-9364

Mostafa, S; Chileshe, N and Zuo, J (2014) A synergistic supply chain enhancing offsite manufacturing uptake in Australian house building. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Mostofi, F and Toǧan, V (2023) A data-driven recommendation system for construction safety risk assessment. Journal of Construction Engineering and Management, 149(12): 04023139, ISSN 0733-9364

Mostofi, F; Toǧan, V; Başaǧa, H B; Çltlpltloǧlu, A and Tokdemir, O B (2023) Multiedge graph convolutional network for house price prediction. Journal of Construction Engineering and Management, 149(11): 04023112, ISSN 0733-9364

Motawa, I A; Price, A D F and Sher, W (1998) The introduction and management of innovative construction processes and products. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Mousaei, A; Taghaddos, H; Nekouvaght Tak, A; Behzadipour, S and Hermann, U (2021) Optimized mobile crane path planning in discretized polar space. Journal of Construction Engineering and Management, 147(5): 04021036, ISSN 0733-9364

Moussavi Nadoushani, Zahra Sadat (2018) A computational approach for estimating and minimizing construction-related and end-of-life carbon footprint of concrete structures. PhD thesis, University of New South Wales, Australia.

Moyanga, D T; Famakin, I O and Awodele, O A (2025) Theoretical model for predicting survival of quantity surveying firms in Nigeria. International Journal of Construction Management, 25(10), pp. 1218-1226. ISSN 1562-3599

Mpakati-Gama, E C; Brown, A and Sloan, B (2016) Embodied energy and carbon analysis of urban residential buildings in Malawi. International Journal of Construction Management, 16(1), pp. 1-12. ISSN 1562-3599

Mrazovic, N and Fischer, M (2022) Assessment framework for additive manufacturing in the AEC industry. Journal of Construction Engineering and Management, 148(5): 04022013, ISSN 0733-9364

Mucheti, A S and Albuquerque, P J R D (2022) Influence of execution speed on displacements of soil-nailed structures with vertical face in urban areas. Journal of Construction Engineering and Management, 148(7): 04022048, ISSN 0733-9364

Muguda, S; Hughes, P N; Augarde, C E; Perlot, C; Walter Bruno, A and Gallipoli, D (2022) Cross-linking of biopolymers for stabilizing earthen construction materials. Building Research & Information, 50(5), pp. 502-514. ISSN 0961-3218

Muhammad, A; Usman, N and Gambo, N (2022) Effect of binary blended pozzolanic materials on properties of self-compacting concrete. International Journal of Construction Management, 22(7), pp. 1323-1332. ISSN 1562-3599

Mukhopadhyay, J (2020) Observations of energy consumption and IEQ in a 'tiny house'. Building Research & Information, 48(6), pp. 613-631. ISSN 0961-3218

Mulholland, S M (2021) Incentivizing effort in highly collaborative construction and design teams. PhD thesis, University of Colorado at Denver, USA.

Mulu, T and Smith, N J (2008) Innovative road infrastructure financing in Jamaica and the developing countries. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Mulville, M and Stravoravdis, S (2016) The impact of regulations on overheating risk in dwellings. Building Research & Information, 44(5-6), pp. 520-534. ISSN 0961-3218

Murakami, S; Kawakubo, S; Asami, Y; Ikaga, T; Yamaguchi, N and Kaburagi, S (2011) Development of a comprehensive city assessment tool: CASBEE-city. Building Research & Information, 39(3), pp. 195-210. ISSN 0961-3218

Murphy, M E and Nahod, M-M (2017) Stakeholder competency in evaluating the environmental impacts of infrastructure projects using BIM. Engineering, Construction and Architectural Management, 24(5), pp. 718-735. ISSN 0969-9988

Murray, M (2003) Building perceptions with metaphors: A study of the communication and decision making behaviour of construction professionals within projects. PhD thesis, University of Strathclyde, UK.

Murray, M and Zagaretos, P (2001) The influence of cultural differences on the performance of international contractors. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Musallami, A A and Assaf, S (1996) Public owners' satisfaction with consultancy practices in Saudi Arabia. Building Research & Information, 24(3), pp. 148-151. ISSN 0961-3218

Mustaffa, N K and Carmichael, D G (2019) Concreting operations: the relationship between unit costs and unit emissions. International Journal of Construction Management, 19(5), pp. 427-435. ISSN 1562-3599

Mustapha, F; Al-Abed, A and Wild, S (1995) A model for assessing the effectiveness of public housing in Sana'a (Republic of Yemen). Construction Management and Economics, 13(6), pp. 457-465. ISSN 01446193

Muya, M; Price, A D F; Thorpe, A and Edum-Fotwe, F (1999) Application of analytic hierarchy process to the evaluation of logistics factors and their contribution to improvements in construction materials supply. Journal of Construction Procurement, 5(2), pp. 99-117. ISSN 1358-9180

Mwamila, B L M and Karumuna, B L (1999) Semi-prefabrication concrete techniques in developing countries. Building Research & Information, 27(3), pp. 165-182. ISSN 0961-3218

Münster, H (2021) Future sources of competitive advantage in the German self-propelled construction equipment industry. PhD thesis, University of Gloucestershire, UK.

Na, L J; Ofori, G and Park, M (2006) Stimulating construction innovation in Singapore through the national system of innovation. Journal of Construction Engineering and Management, 132(10), pp. 1069-1082. ISSN 0733-9364

Naderi, S; Shabanlou, S; Javaheri-Tafti, M R and Yaghoubi, B (2025) Optimal design of diversion dams based on Upgraded Multi-Objective Particle Swarm Optimization (UMOPSO). International Journal of Construction Management, 25(8), pp. 876-886. ISSN 1562-3599

Nagashima, M; Tsuchiya, M and Asada, M (2011) Reducing the economic risk of lng tank construction under conditions of fluctuating resource prices. Journal of Construction Engineering and Management, 137(5), pp. 382-391. ISSN 0733-9364

Naief, A (2017) Physical asset management practices in the Saudi public sector. Built Environment Project and Asset Management, 7(1), pp. 19-31. ISSN 2044-124X

Nair, S G; Nguyen, Q D; Zhu, Q; Karimi, M; Gan, Y; Wang, X; Castel, A; Irga, P; da Rocha, C G d; Torpy, F; Wilkinson, S; Moreau, D and Delhomme, F (2025) Suitability of calcined clay and ground granulated blast furnace slag geopolymer binder for hempcrete applications. Built Environment Project and Asset Management, 15(5), pp. 924-936. ISSN 2044-124X

Najafi, M (1993) Evaluation of a new microtunneling propulsion system. DEng thesis, Louisiana Tech University, USA.

Nakajima, T (1972) Modeling and optimization of the building process for systems building. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Nam, C H; Gasiorowski, J G and Tatum, C B (1991) Microlevel study of integration in high-strength concrete innovation. Journal of Construction Engineering and Management, 117(2), pp. 294-309. ISSN 0733-9364

Nam, C H and Tatum, C B (1988) Major characteristics of constructed products and resulting limitations of construction technology. Construction Management and Economics, 6(2), pp. 133-147. ISSN 01446193

Nam, C H and Tatum, C B (1992) Government-industry cooperation: Fast-track concrete innovation. Journal of Construction Engineering and Management, 118(3), pp. 454-471. ISSN 0733-9364

Nam, C H and Tatum, C B (1992) Strategies for technology push: Lessons from construction innovations. Journal of Construction Engineering and Management, 118(3), pp. 507-524. ISSN 0733-9364

Namian, M (2017) Factors affecting construction hazard recognition and safety risk perception. PhD thesis, North Carolina State University, USA.

Namian, M; Albert, A and Feng, J (2018) Effect of distraction on hazard recognition and safety risk perception. Journal of Construction Engineering and Management, 144(4): 04018008, ISSN 0733-9364

Namian, M; Albert, A; Zuluaga, C M and Behm, M (2016) Role of safety training: Impact on hazard recognition and safety risk perception. Journal of Construction Engineering and Management, 142(12): 04016073, ISSN 0733-9364

Naresh, A L and Jahren, C T (1997) Communications and tracking for construction vehicles. Journal of Construction Engineering and Management, 123(3), pp. 261-268. ISSN 0733-9364

Nasarre-Aznar, S and Molina-Roig, E (2017) A legal perspective of current challenges of the Spanish residential rental market. International Journal of Law in the Built Environment, 9(2), pp. 108-122. ISSN 1756-1450

Nash, W R (1985) Raise boring in civil and mining applications. Journal of Construction Engineering and Management, 111(1), pp. 15-30. ISSN 0733-9364

Nasirian, A; Arashpour, M; Abbasi, B and Akbarnezhad, A (2019) Optimal work assignment to multiskilled resources in prefabricated construction. Journal of Construction Engineering and Management, 145(4): 1627, ISSN 0733-9364

Nasirian, A; Arashpour, M; Abbasi, B; Zavadskas, E K and Akbarnezhad, A (2019) Skill set configuration in prefabricated construction: Hybrid optimization and multicriteria decision-making approach. Journal of Construction Engineering and Management, 145(9): 04019050, ISSN 0733-9364

Nasirzadeh, F; Ghayoumian, M; Khanzadi, M and Rostamnezhad Cherati, M (2020) Modelling the social dimension of sustainable development using fuzzy cognitive maps. International Journal of Construction Management, 20(3), pp. 223-236. ISSN 1562-3599

Nassar, K M and Hegab, M Y (2006) Developing a complexity measure for project schedules. Journal of Construction Engineering and Management, 132(6), pp. 554-561. ISSN 0733-9364

Nath, N D (2021) Human-centered computing and visual analytics for future of work in construction. PhD thesis, Texas A&M University, USA.

Nathan, K V S K (1994) Submission to ICSID in breach of the convention: disputes in international civil engineering contracts. PhD thesis, Queen Mary University of London, UK.

Navon, R (1996) Company-level cash-flow management. Journal of Construction Engineering and Management, 122(1), pp. 22-35. ISSN 0733-9364

Navon, R and Kolton, O (2006) Model for automated monitoring of fall hazards in building construction. Journal of Construction Engineering and Management, 132(7), pp. 733-740. ISSN 0733-9364

Navon, R; Shapira, A and Shechori, Y (2000) Automated rebar constructability diagnosis. Journal of Construction Engineering and Management, 126(5), pp. 389-397. ISSN 0733-9364

Navon, R and Shpatnitsky, Y (2005) A model for automated monitoring of road construction. Construction Management and Economics, 23(9), pp. 941-951. ISSN 01446193

Ndekugri, I (1999) Performance bonds and guarantees: Construction owners and professionals beware. Journal of Construction Engineering and Management, 125(6), pp. 428-436. ISSN 0733-9364

Ndekugri, I; Ankrah, N A; Adaku, E and Mzyece, D (2021) An analysis of health and safety provisions in NEC contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(2), pp. 65-75. ISSN 17514304

Ndekugri, I; Smith, N and Hughes, W P (2007) The engineer under FIDIC's conditions of contract for construction. Construction Management and Economics, 25(7), pp. 791-799. ISSN 1466433X

Neely, E S and Neathammer, R (1991) Life-cycle maintenance costs by facility use. Journal of Construction Engineering and Management, 117(2), pp. 310-320. ISSN 0733-9364

Nelms, C E; Russell, A D and Lence, B J (2007) Assessing the performance of sustainable technologies: A framework and its application. Building Research & Information, 35(3), pp. 237-251. ISSN 0961-3218

Nemati, Saeed (2019) Foam-filled structural panels using pneumatic fabric formwork for rapidly assembled buildings. PhD thesis, Western Sydney University, Australia.

Nepal, Jaya (2015) Reliability-based performance assessment and optimum maintenance of corroded reinforced concrete structures. PhD thesis, University of Greenwich, UK.

Nesan, L J (2005) Factors influencing tacit knowledge in construction. Construction Economics and Building, 5(1), pp. 48-57. ISSN 2204-9029

Netto, A M (2001) Third party rights for latent defects in buildings. PhD thesis, King's College London, UK.

Newaz, M T; Jefferies, M; Davis, P and Pillay, M (2016) Using the psychological contract to measure safety outcomes on construction sites. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Newton, S (1992) Methods of analysing risk exposure in the cost estimates of high quality offices. Construction Management and Economics, 10(5), pp. 431-449. ISSN 01446193

Ng, A W Y and Chan, A H S (2017) Mental models of construction workers for safety-sign representation. Journal of Construction Engineering and Management, 143(2): 04016091, ISSN 0733-9364

Ng, K F (2017) Sustainable housing and railway developments over space and time. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Ng, S T; Kumaraswamy, M and Chow, L K (2001) Selecting consultants through combined technical and fee assessment: A Hong Kong study. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Ng, S T; Mak, M M Y; Skitmore, R M; Lam, K C and Varnam, M (2001) The predictive ability of bromilow's time-cost model. Construction Management and Economics, 19(2), pp. 165-173. ISSN 01446193

Ng, S T and Xie, J (2008) A simulation model for evaluating the tariff stability of concession-based PPP proposals. Construction Innovation, 8(2), pp. 106-119. ISSN 1471-4175

Ngoc-Thoan, N; Bui, D Q T; Tran, C N N and Tran, D H (2024) Improved detection network model based on yolov5 for warning safety in construction sites. International Journal of Construction Management, 24(9), pp. 1007-1017. ISSN 1562-3599

Ngowi, A B (1997) Impact of culture on construction procurement. Journal of Construction Procurement, 3(1), pp. 3-15. ISSN 1358-9180

Nguyen, T; Elelu, K; Le, T and Le, C (2026) Enhancing auditory safety warnings in highway construction zones with loud noise using generative artificial intelligence. Journal of Construction Engineering and Management, 152(3): 04025283, ISSN 0733-9364

Nguyen, B K (2012) Developing a framework for assessing sustainability of tall-building projects. PhD thesis, University of Sheffield, UK.

Nguyen, H T and Hadikusumo, B (2017) Impacts of human resource development on engineering, procurement, and construction project success. Built Environment Project and Asset Management, 7(1), pp. 73-85. ISSN 2044-124X

Nguyen, L D; Kneppers, J; García De Soto, B and Ibbs, W (2010) Analysis of adverse weather for excusable delays. Journal of Construction Engineering and Management, 136(12), pp. 1258-1267. ISSN 0733-9364

Nguyen, T-H (1999) Automated deduction of topological information in a computer-based building design system. PhD thesis, Pennsylvania State University, USA.

Nguyen, Tuan Anh (2019) Options and flexibility in PPP toll road projects. PhD thesis, University of New South Wales, Australia.

Nicholas, J; Holt, G D and Edwards, D J (2001) Towards a risk assessment model for evaluating construction contractors' creditworthiness. Journal of Financial Management of Property and Construction, 6(1), pp. 31-40. ISSN 1366-4387

Nicholas, J; Holt, G D and Harris, P T (1998) Financial business relationships: A conceptual model for evaluating contractors' creditworthiness. Journal of Financial Management of Property and Construction, 3(3), pp. 17-36. ISSN 1366-4387

Nicholls, R (1992) Construction of grout-impregnated fabric-reinforced pipes. Journal of Construction Engineering and Management, 118(2), pp. 283-302. ISSN 0733-9364

Nieto-Morote, A and Ruz-Vila, F (2012) Last planner control system applied to a chemical plant construction. Journal of Construction Engineering and Management, 138(2), pp. 287-293. ISSN 0733-9364

Nigra, M and Dimitrijevic, B (2018) Is radical innovation in architecture crucial to sustainability? Lessons from three Scottish contemporary buildings. Architectural Engineering and Design Management, 14(4), pp. 272-291. ISSN 1745-2007

Nikkhoo, P (2022) A systematic method to reduce the duration impact of change events on construction projects. PhD thesis, Stanford University, USA.

Nimbarte, A D (2009) Modeling the risk factors associated with the neck disorders during manual material handling tasks. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Nimcharoenwon, P and Miller, G (2001) Combating the 'sick building syndrome' by improving indoor air quality. Construction Economics and Building, 1(2), pp. 82-89. ISSN 2204-9029

Ninos, G E (1983) Control of construction contracts: analysis of systems for the control of progress, quality and cost of construction to the client, based upon six cases in building or civil engineering in the UK. PhD thesis, University of Bradford, UK.

Nishida, Y and Hua, Y (2011) Motivating stakeholders to deliver change: Tokyo's cap-and-trade program. Building Research & Information, 39(5), pp. 518-533. ISSN 0961-3218

Niskanen, T and Lauttalammi, J (1989) Accident prevention in materials handling at building construction sites. Construction Management and Economics, 7(3), pp. 263-279. ISSN 01446193

Niu, Y; Lu, W; Liu, D; Chen, K C; Anumba, C A and Huang, G G (2017) An sco-enabled logistics and supply chain-management system in construction. Journal of Construction Engineering and Management, 143(3): 04016103, ISSN 0733-9364

Niveditha, M. and Palanisamy, T. (2026) Upcycling iron-rich industrial waste into a carbon-sequestering composite binder through optimized carbonation curing for structural applications. International Journal of Construction Management, 26(8), pp. 1471-1489. ISSN 1562-3599

Noorifard, A; Mehdizadeh Saradj, F and Tabeshpour, M R (2023) A model for determining the arrangement and geometric specifications of infill walls in the architectural design to improve the seismic behavior of buildings. Architectural Engineering and Design Management, 19(5), pp. 439-462. ISSN 1745-2007

Noorzai, E; Bakmohammadi, P and Garmaroudi, M A (2023) Optimizing daylight, energy and occupant comfort performance of classrooms with photovoltaic integrated vertical shading devices. Architectural Engineering and Design Management, 19(4), pp. 394-418. ISSN 1745-2007

Nordby, A S (2011) Carbon reductions and building regulations: The case of Norwegian mountain cabins. Building Research & Information, 39(6), pp. 553-565. ISSN 0961-3218

Nordby, A S; Berge, B; Hakonsen, F and Hestnes, A G (2009) Criteria for salvageability: The reuse of bricks. Building Research & Information, 37(1), pp. 55-67. ISSN 0961-3218

Norton, M and Lane, A (2012) 'New water architecture': An integrated water management model. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(3), pp. 159-171. ISSN 17514312

Novi, F and Piccardo, C (2015) Technology as a key for design imagination, an Italian experience with beginner architecture students. Architectural Engineering and Design Management, 11(3), pp. 185-197. ISSN 1745-2007

Noyce, D A and Hanna, A S (1997) Planned schedule compression concept file for electrical contractors. Journal of Construction Engineering and Management, 123(2), pp. 189-197. ISSN 0733-9364

Nuntasunti, S and Bernold, L E (2006) Experimental assessment of wireless construction technologies. Journal of Construction Engineering and Management, 132(9), pp. 1009-1018. ISSN 0733-9364

Nyallu, B A; Deng, X and Mgimba, M M (2025) The influences of internal work locus of control on knowledge loss and organizational performance: Role of job rotation in Chinese construction firms. Engineering, Construction and Architectural Management, 32(11), pp. 7236-7265. ISSN 0969-9988

Nzabonimpa, J D and Hong, W K (2018) Novel precast erection method of interlocking mechanical joints using couplers. Journal of Construction Engineering and Management, 144(6): 04018036, ISSN 0733-9364

O'Connor, J T (1983) Improving industrial project constructability (productivity, value engineering). PhD thesis, University of Texas at Austin, USA.

O'Connor, J T and El-Diraby, T E (2000) Urban freeway bridge reconstruction planning: Case of mockingbird bridge. Journal of Construction Engineering and Management, 126(1), pp. 61-67. ISSN 0733-9364

O'Connor, J T and Mock, B D (2019) Construction, commissioning, and startup execution: Problematic activities on capital projects. Journal of Construction Engineering and Management, 145(4): 04019009, ISSN 0733-9364

O'Connor, J T; Shrestha, B K; Winkler, M and Ouk Choi, J (2021) Relationship between commissioning and start-up success factors achievement and performance in capital projects. Journal of Construction Engineering and Management, 147(3): 04021001, ISSN 0733-9364

O'Connor, J T and Tucker, R L (1986) Industrial project constructability improvement. Journal of Construction Engineering and Management, 112(1), pp. 69-82. ISSN 0733-9364

O'Shaughnessy, R D (1992) Criteria civil engineers use in deciding whether or not to participate in non-credit continuing engineering education programs. EdD thesis, University of Illinois at Urbana-Champaign, USA.

Odubiyi, A O and Davidson, I E (2005) England and Wales electricity industry: experiences in deregulation. Journal of Engineering, Design and Technology, 3(1), pp. 24-29. ISSN 1726-0531

Oduro Asamoah, R; Offei-Nyako, K and Twumasi-Ampofo, K (2023) Relative importance of triggers influencing cost contingency determination for building contracts: the perspective of quantity surveyors. International Journal of Construction Management, 23(5), pp. 790-798. ISSN 1562-3599

Oduyemi, O; Okoroh, M and Dean, A (2015) Developing an artificial neural network model for life cycle costing in buildings. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Oei, F J and Ogunlana, S O (2006) Assessment of the development role of a statutory body from a customer perspective: A relationship marketing approach. Journal of Construction in Developing Countries, 11(2), pp. 31-52. ISSN 1823-6499

Ofori, G (2007) Clients' role in attainment of sustainability in housing: The case of Singapore and lessons for developing countries. Journal of Construction in Developing Countries, 12(2), pp. 1-20. ISSN 1823-6499

Ofori-Boadu, A N; Shofoluwe, M A and Pyle, R (2017) Development of a housing eligibility assessment scoring method for low-income urgent repair programs. International Journal of Building Pathology and Adaptation, 35(3), pp. 194-217.

Ogden, R G; Kendrick, C C and Walliman, N S R (2004) Modelling of enhanced passive and conventional cooling systems. Building Research & Information, 32(1), pp. 17-26. ISSN 0961-3218

Ogunlana, O (1991) Learning from experience in design cost estimating. Construction Management and Economics, 9(2), pp. 133-150. ISSN 01446193

Ogunlana, S O; Bhokha, S and Pinnemitr, N (2001) Application of artifical neural network (ANN) to forecast construction cost of buildings at the pre-design stage. Journal of Financial Management of Property and Construction, 6(3), pp. 179-192. ISSN 1366-4387

Ohrn, G (2009) The influence of job-order-contracting as a construction project delivery method on owner satisfaction. PhD thesis, Indiana State University, USA.

Ohura, T and Kato, M (1993) Erection and field test of concrete arch bridge applying composite tube. Journal of Construction Engineering and Management, 119(4), pp. 666-680. ISSN 0733-9364

Ojo, A E and Akinradewo, F O (2011) Essentials in arbitration clause for construction contract dispute resolution in Nigeria. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Okasha, N M K (2010) Integration of system-based performance measures and structural health monitoring for optimized structural management under uncertainty. PhD thesis, Lehigh University, USA.

Oke, A E; Aliu, J; Farhana, M Z; Jesudaju, O T and Lee, H P (2025) A capability assessment model for implementing digital technologies in Nigerian heavy construction firms. Smart and Sustainable Built Environment, 14(5), pp. 1608-1631. ISSN 2046-6099

Okoroh, M I (2000) An evaluation of residential speculative developers' subcontractors perceived risks. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Oladapo, O and Liyanage, C L (2010) Control of healthcare associated infections: A concerted effort. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Olander, S (2006) External stakeholder analysis in construction project management. PhD thesis, Lund University, Sweden.

Olatunde, N A; Ogunsemi, D R and Oke, A E (2017) Impact of team members' composition on construction projects delivery in selected higher institutions in Nigeria. Journal of Engineering, Design and Technology, 15(3), pp. 355-377.

Olatunji, O A; Rotimi, J O B; Rotimi, F E and Silva, C C W (2025) Causal relationship between project financing and overruns in major dam projects in Africa. Engineering, Construction and Architectural Management, 32(10), pp. 6480-6508. ISSN 0969-9988

Olatunji, O A; Aje, O I and Makanjuola, S (2017) Bid or no-bid decision factors of indigenous contractors in Nigeria. Engineering, Construction and Architectural Management, 24(3), pp. 378-392. ISSN 0969-9988

Olatunji, S O; Olawumi, T O and Aje, I O (2017) Rethinking partnering among quantity-surveying firms in Nigeria. Journal of Construction Engineering and Management, 143(11): 05017018, ISSN 0733-9364

Olayiwola, J; Yusuf, A; Akanmu, A; Gonsalves, N and Abraham, Y (2024) Efficacy of annotated video-based learning environment for drawing students' attention to construction practice concepts. Journal of Construction Engineering and Management, 150(1): 04023155, ISSN 0733-9364

Olbina, S and Glick, S (2023) Using integrated hands-on and virtual reality (VR) or augmented reality (AR) approaches in construction management education. International Journal of Construction Education and Research, 19(3), pp. 341-360. ISSN 1557-8771

Oleinik, P (2018) Method for creating a work management plan of a construction company. International Journal of Construction Management, 18(5), pp. 446-451. ISSN 1562-3599

Oliver, G (2007) Erosion of drawing as a thinking and collaborative tool. Building Research & Information, 35(5), pp. 571-575. ISSN 0961-3218

Olomolaiye, Anthony O (2007) The impact of human resource management on knowledge management for performance improvements in construction organisations. PhD thesis, Glasgow Caledonian University, UK.

Olomolaiye, P O and Ogunlana, S O (1989) An evaluation of production outputs in key building trades in Nigeria. Construction Management and Economics, 7(1), pp. 75-86. ISSN 01446193

Olugboyega, O; Binga, B; Oseghale, G E and Aigbavboa, C (2023) Effect of anti-corruption systems' logic on corruption manifestations in project planning and execution in Nigeria. Construction Economics and Building, 23(3-4), pp. 186-207. ISSN 2204-9029

Olugboyega, O; Edwards, D J; Windapo, A O; Omopariola, E D and Martek, I (2021) Development of a conceptual model for evaluating the success of BIM-based construction projects. Smart and Sustainable Built Environment, 10(4), pp. 681-701. ISSN 2046-6099

Olugboyega, O; Ejohwomu, O and Omopariola, E D (2023) BIM-a and BIM-VR systems for construction worker’s safety cognition development. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Olugboyega, O and Windapo, A (2022) Investigating the strategic planning of BIM adoption on construction projects in a developing country. Journal of Construction in Developing Countries, 27(2), pp. 183-204. ISSN 1823-6499

Omidvar, G (2014) Core competencies for construction project managers in Malaysia. PhD thesis, University of Malaya, Malaysia.

Onat, N (1998) An approach to the determination of adaptable spatial design concept in housing production by using prefabricated building elements. PhD thesis, Dokuz Eylul Universitesi, Turkey.

Onososen, A; Musonda, I; Molusiwa, R and Dzuwa, C (2023) Addressing collaborative challenges in human-robot teams through the development of an immersive virtual environment. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Onsarigo, L M (2016) Cost comparison of horizontal auger boring and open-cut construction methods for culvert installations. PhD thesis, Indiana State University, USA.

Oo, B L; Drew, D S and Runeson, G (2010) Competitor analysis in construction bidding. Construction Management and Economics, 28(12), pp. 1321-1329. ISSN 1466433X

Oo, B L; Ling, F Y Y and Soo, A (2015) Construction procurement: Modelling bidders' learning in recurrent bidding. Construction Economics and Building, 15(4), pp. 16-29. ISSN 2204-9029

Oo, B-L and Drew, D S (2008) Adapting building design to access by individuals with intellectual disability. Construction Economics and Building, 8(1), pp. 11-22. ISSN 2204-9029

Opawole, A and Jagboro, G O (2017) Factors affecting the performance of private party in concession-based PPP projects in Nigeria. Journal of Engineering, Design and Technology, 15(1), pp. 44-57.

Opoku, R; Mensah, H and Ahadzie, D K (2022) Guest editorial: Global energy transformation for combating climate change in the built environment: Challenges and opportunities in developing countries. International Journal of Building Pathology and Adaptation, 40(2), pp. 161-164. ISSN 23984708

Orabi, W and El-Rayes, K (2012) Optimizing the rehabilitation efforts of aging transportation networks. Journal of Construction Engineering and Management, 138(4), pp. 529-539. ISSN 0733-9364

Orstavik, F (2018) Negotiating and knowing built quality. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Orstavik, F and Harty, C (2017) The unexplored brutality of performance recipes. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Osei-Kyei, R and Chan, A P C (2017) Risk assessment in public-private partnership infrastructure projects: Empirical comparison between Ghana and Hong Kong. Construction Innovation, 17(2), pp. 204-223. ISSN 1471-4175

Oswald, D (2020) Safety indicators: Questioning the quantitative dominance. Construction Management and Economics, 38(1), pp. 11-17. ISSN 01446193

Oswald, T H (1995) A model for using quality function deployment in engineering project development. PhD thesis, Clemson University, USA.

Othman, A A E and Mahmoud, N A (2022) Public-private partnerships as an approach for alleviating risks associated with adaptive reuse of heritage buildings in Egypt. International Journal of Construction Management, 22(9), pp. 1713-1735. ISSN 1562-3599

Oti, A H; Tah, J H M and Abanda, F H (2018) Integration of lessons learned knowledge in building information modeling. Journal of Construction Engineering and Management, 144(9): 04018081, ISSN 0733-9364

Ou, J; Chen, Z; Long, W; Chen, D and Zhang, Y (2024) Vibrational performance of wood floors in traditional residential timber structures in southwest China. Architectural Engineering and Design Management, 20(6), pp. 1529-1542. ISSN 1745-2007

Ouyang, Y; Huang, G and He, S (2025) Impacts of adverse environmental factors on construction workers' attention allocation during hazard identification: A study of noise and heat exposure. Engineering, Construction and Architectural Management, 32(11), pp. 7469-7485. ISSN 0969-9988

Ouyang, Y and Liang, L (2026) Fulfilling CSR builds resilience in construction firms: The moderating role of environmental uncertainties. Journal of Construction Engineering and Management, 152(5): 04026055, ISSN 0733-9364

Ouyang, Y and Luo, X (2024) Effects of physical fatigue on construction workers' visual search patterns during hazard identification. Journal of Construction Engineering and Management, 150(9): 04024120, ISSN 0733-9364

Owen, K J (2002) Success factors in the procurement of privately financed tolled transportation infrastructure projects in the UK. PhD thesis, Nottingham Trent University, UK.

Owers, R and Weber, S L (1997) Strategic plan for southwest Indian community's construction business. Journal of Construction Engineering and Management, 123(3), pp. 331-337. ISSN 0733-9364

Owolabi, A A; Anumba, C J and El-Hamalawi, A (2003) Towards implementing integrated building product libraries. Construction Innovation, 3(3), pp. 175-194. ISSN 1471-4175

Owusu, M D; Badu, E; Edwards, D J and Adjei-Kumi, T (2007) Finance for non-financial construction managers: Empirical analysis of financial variables that influence acquisition decision-making process. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Owusu-Manu, D-G; Edwards, D J; Kutin-Mensah, E K; Kilby, A; Parn, E and Love, P E (2017) The impact of socio-political and economic environments on private sector participation in energy infrastructure delivery in Ghana. Journal of Engineering, Design and Technology, 15(2), pp. 166-180.

Oyefusi, O N; Arowoiya, V A and Chan, M (2025) Hybrid MCDM approach for analyzing barriers and formulating strategies for the adoption of modular construction in developing countries. Engineering, Construction and Architectural Management, 32(10), pp. 6627-6664. ISSN 0969-9988

Oyetunji, A A and Anderson, S D (2006) Relative effectiveness of project delivery and contract strategies. Journal of Construction Engineering and Management, 132(1), pp. 3-13. ISSN 0733-9364

Ozkan, A; Kesik, T; Yilmaz, A Z and O’Brien, W (2019) Development and visualization of time-based building energy performance metrics. Building Research & Information, 47(5), pp. 493-517. ISSN 0961-3218

O’Connor, J T (1985) Impacts of constructability improvement. Journal of Construction Engineering and Management, 111(4), pp. 404-410. ISSN 0733-9364

O’Connor, J T; Hugo, F and Stamm, E M (1991) Improving highway specifications for constructibility. Journal of Construction Engineering and Management, 117(2), pp. 242-258. ISSN 0733-9364

O’Connor, J T; Rusch, S E and Schulz, M J (1987) Constructability concepts for engineering and procurement. Journal of Construction Engineering and Management, 113(2), pp. 235-248. ISSN 0733-9364

Pace, C B (1999) A factor-based three dimensional model of the process of new technology development in the construction engineering industry. PhD thesis, University of California, Berkeley, USA.

Paek, J H; Lee, Y W and Ock, J H (1993) Pricing construction risk: Fuzzy set application. Journal of Construction Engineering and Management, 119(4), pp. 743-756. ISSN 0733-9364

Paik, S.; Chung, D.; Kim, Y.; Kim, J. and Kim, H. (2026) Autonomous UAV navigation for close-range image acquisition of scaffold joints. Journal of Construction Engineering and Management, 152(7): 04026081, ISSN 0733-9364

Paik, S.; Kim, J.; Lian, Y.; Kim, J. and Kim, H. (2026) Safety analysis of scaffold joints through image generation from point cloud data. Journal of Construction Engineering and Management, 152(8): 04026121, ISSN 0733-9364

Paik, S M; Leviakangas, P and Choi, J (2022) Making most of BIM in design: Analysis of the importance of design coordination. International Journal of Construction Management, 22(12), pp. 2225-2233. ISSN 1562-3599

Paik, S; Kim, J; Kim, Y and Kim, H (2025) Safety analysis and localization of scaffold joints using uav-acquired images. Journal of Construction Engineering and Management, 151(12): 04025194, ISSN 0733-9364

Painting, N J; Piroozfar, P A E and Farr, E R P (2014) Refurbishment of higher education premises: Stakeholder engagement in the process and product. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Palaneeswaran, E; Kumaraswamy, M and Ng, T (2003) Targeting optimum value in public sector projects through "best value"-focused contractor selection. Engineering, Construction and Architectural Management, 10(6), pp. 418-431. ISSN 0969-9988

Palaneeswaran, E and Kumaraswamy, M M (1999) Dynamic contractor pre-qualification. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Palaneeswaran, E; Kumaraswamy, M M and Ng, S T (2003) Formulating a framework for relationally integrated construction supply chains. Journal of Construction Research, 4(2), pp. 189-205. ISSN 1609-9451

Pallubinsky, H; Kingma, B R M; Schellen, L; Dautzenberg, B; van Baak, M A and van Marken Lichtenbelt, W D (2017) The effect of warmth acclimation on behaviour, thermophysiology and perception. Building Research & Information, 45(7), pp. 800-807. ISSN 0961-3218

Pan, N F (2006) Evaluation of building performance using fuzzy FTA. Construction Management and Economics, 24(12), pp. 1241-1252. ISSN 1466433X

Pan, W; Dainty, A R J and Gibb, A G F (2012) Establishing and weighting decision criteria for building system selection in housing construction. Journal of Construction Engineering and Management, 138(11), pp. 1239-1250. ISSN 0733-9364

Pan, W and Sidwell, R (2011) Demystifying the cost barriers to offsite construction in the UK. Construction Management and Economics, 29(11), pp. 1081-1099. ISSN 1466433X

Panayiotou, A (2017) Infrastructure as a financial asset class. PhD thesis, University of London, University College London, UK.

Pandian, A N and Palanivelu, A (2021) Metaheuristic optimization based placement of svcs with multiple objectives. Journal of Engineering, Design and Technology, 19(6), pp. 1586-1600. ISSN 1726-0531

Papamichael, K (1999) Application of information technologies in building design decisions. Building Research & Information, 27(1), pp. 20-34. ISSN 0961-3218

Papamichael, K (2000) Green building performance prediction/assessment. Building Research & Information, 28(5-6), pp. 394-402. ISSN 0961-3218

Parikka-Alhola, K and Nissinen, A (2012) Environmental impacts of transport as award criteria in public road construction procurement. International Journal of Construction Management, 12(2), pp. 35-49. ISSN 1562-3599

Park, J. and Moon, S. (2026) Advancing BIM adoption in infrastructure: Addressing standard development, geographic coordinate systems, and common data environment. International Journal of Construction Management, 26(8), pp. 1584-1598. ISSN 1562-3599

Park, A (2022) Essays on the theory of bargaining and economics of matching platforms. PhD thesis, University of California, Los Angeles, USA.

Park, J (2017) Dynamic multi-dimensional BIM for total construction as-built documentation. PhD thesis, Purdue University, USA.

Park, J; Cai, H; Dunston, P S and Ghasemkhani, H (2017) Database-supported and web-based visualization for daily 4D BIM. Journal of Construction Engineering and Management, 143(10): 04017078, ISSN 0733-9364

Park, K; Hwang, Y; Seo, S and Seo, H (2003) Quantitative assessment of environmental impacts on life cycle of highways. Journal of Construction Engineering and Management, 129(1), pp. 25-31. ISSN 0733-9364

Park, M W; Elsafty, N and Zhu, Z (2015) Hardhat-wearing detection for enhancing on-site safety of construction workers. Journal of Construction Engineering and Management, 141(9): 4015024, ISSN 0733-9364

Park, M-W (2012) Automated 3D vision-based tracking of construction entities. PhD thesis, Georgia Institute of Technology, USA.

Parkinson, T; Schiavon, S; Kim, J and Betti, G (2023) Common sources of occupant dissatisfaction with workspace environments in 600 office buildings. Buildings & Cities, 4(1), pp. 17-35. ISSN 2632-6655

Parkinson, T and de Dear, R (2016) Thermal pleasure in built environments: Spatial alliesthesia from contact heating. Building Research & Information, 44(3), pp. 248-262. ISSN 0961-3218

Pasha, A H S (1984) The provision of affordable housing in Central Sudan. PhD thesis, University of Bristol, UK.

Pasley, G P (1997) Steelteam: Creating a collaborative design environment for the steel building industry. PhD thesis, University of Kansas, USA.

Patel, K and Ruparathna, R (2023) Life cycle sustainability assessment of road infrastructure: A building information modeling-(BIM) based approach. International Journal of Construction Management, 23(11), pp. 1837-1846. ISSN 1562-3599

Patlakas, P (2022) Techniques for the utilisation and management of post occupancy evaluation data by non-experts. PhD thesis, Birmingham City University, UK.

Patrick, M; Grewal, G; Chelagat, W and Shannon, G (2020) Planetary health justice: Feminist approaches to building in rural Kenya. Buildings & Cities, 1(1), pp. 308-324. ISSN 2632-6655

Patsiadas, P and Angelides, D C (2008) Legislative frameworks for port concessions in Greece. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 157-162. ISSN 17514312

Patterson, R (2009) Using NEC contracts to manage risk and avoid disputes. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 157-167. ISSN 17514312

Patterson, R L and Trebes, B (2013) NEC contracts for design-build-operate contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(5), pp. 260-268. ISSN 17514312

Patterson, R L and Trebes, B (2015) NEC for DBFO: Taking best practice procurement into PPPs. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(5), pp. 213-219. ISSN 17514304

Paulson, B C (1985) Automation and robotics for construction. Journal of Construction Engineering and Management, 111(3), pp. 190-207. ISSN 0733-9364

Paulson, B C (1995) Computers and construction-midcareer reflections. Journal of Construction Engineering and Management, 121(2), pp. 197-200. ISSN 0733-9364

Paulson, B C (2003) Design and construction for the rest of us. Journal of Construction Research, 4(2), pp. 115-127. ISSN 1609-9451

Paulson, B C; Beisman, G H; Bell, L C; Bjornsson, H C; Bowerman, M D; Carr, R I; Coppi, D F; Crandall, K C; DeLong, C E; Halpin, D W; Hogg, P; Levin, P; Lluch, J F; Logcher, R D; Melin, J W; Moore, W C; Mueller, F W; Nowak, J A; O'Connor, M J; Pinnell, S S; Sears, G A; Stark, R M; Stevens, J D; Tarkoy, P J and Youngs, J R (1985) Application of small computers in construction. Journal of Construction Engineering and Management, 111(3), pp. 173-189. ISSN 0733-9364

Pavitt, T C and Gibb, A G F (2003) Interface management within construction: In particular, building facade. Journal of Construction Engineering and Management, 129(1), pp. 8-15. ISSN 0733-9364

Payne, H (1997) Key legal issues in projects procured under the private finance initiative. Engineering, Construction and Architectural Management, 4(3), pp. 195-202. ISSN 0969-9988

Pearlmutter, D; Freidin, C and Huberman, N (2007) Alternative materials for desert buildings: A comparative life cycle energy analysis. Building Research & Information, 35(2), pp. 144-155. ISSN 0961-3218

Pearson, A L; Barnard, L T; Pearce, J; Kingham, S and Howden-Chapman, P (2014) Housing quality and resilience in New Zealand. Building Research & Information, 42(2), pp. 182-190. ISSN 0961-3218

Peer, S (1987) Principles of an integrated construction company mis with emphasis on its quantity-based sub-system. Construction Management and Economics, 5(3), pp. 199-209. ISSN 01446193

Pellegrini-Masini, G; Bowles, G; Peacock, A D; Ahadzi, M and Banfill, P F G (2010) Whole life costing of domestic energy demand reduction technologies: Householder perspectives. Construction Management and Economics, 28(3), pp. 217-229. ISSN 1466433X

Pelsmakers, S and Warwick, E (2022) Housing adaptability: New research, emerging practices and challenges. Buildings & Cities, 3(1), pp. 605-618. ISSN 2632-6655

Peltomaa, J; Mela, H and Hildén, M (2020) Housing managers as middle actors implementing sustainable housing policies in Finland. Building Research & Information, 48(1), pp. 53-66. ISSN 0961-3218

Peng, C L; Scorpio, D E and Kibert, C J (1997) Strategies for successful construction and demolition waste recycling operations. Construction Management and Economics, 15(1), pp. 49-58. ISSN 01446193

Peng, J L (2002) Stability analyses and design recommendations for practical shoring systems during construction. Journal of Construction Engineering and Management, 128(6), pp. 536-544. ISSN 0733-9364

Peng, J L (2004) Structural modeling and design considerations for double-layer shoring systems. Journal of Construction Engineering and Management, 130(3), pp. 368-377. ISSN 0733-9364

Peng, J L; Yen, T; Lin, Y; Wu, K L and Chen, W F (1997) Performance of scaffold frame shoring under pattern loads and load paths. Journal of Construction Engineering and Management, 123(2), pp. 138-145. ISSN 0733-9364

Perera, A A D A J (1989) Cost effective designs. PhD thesis, Loughborough University, UK.

Perera, B A K S; Wijewickrama, M K C S; Goonawardana, P J A and Jayalath, C (2021) Improving the efficacy of delay notification process of construction projects in Sri Lanka. International Journal of Construction Management, 21(7), pp. 755-768. ISSN 1562-3599

Perez-Perez, Y; Golparvar-Fard, M and El-Rayes, K (2021) Scan2bim-net: Deep learning method for segmentation of point clouds for scan-to-BIM. Journal of Construction Engineering and Management, 147(9): 04021107, ISSN 0733-9364

Peri, C A (2003) Impact of media on spatial communication: From paper to collaborative virtual environments. PhD thesis, University of California, Berkeley, USA.

Perkins, R A (2009) Sources of changes in design: build contracts for a governmental owner. Journal of Construction Engineering and Management, 135(7), pp. 588-593. ISSN 0733-9364

Perkowski, J C (1988) Technical trends in the e and c business: The next 10 years. Journal of Construction Engineering and Management, 114(4), pp. 565-576. ISSN 0733-9364

Perng, Y H and Chang, C L (2004) How does government procurement law affect bidding price competition in Taiwan? Building Research & Information, 32(6), pp. 497-509. ISSN 0961-3218

Perttula, P; Korhonen, P; Lehtelä, J; Rasa, P L; Kitinoja, J P; Mäkimattila, S and Leskinen, T (2006) Improving the safety and efficiency of materials transfer at a construction site by using an elevator. Journal of Construction Engineering and Management, 132(8), pp. 836-843. ISSN 0733-9364

Pesek, A E (2017) Impact of construction document deficiencies on heavy/civil low-bid infrastructure projects and the introduction of a contractor document review assessment. PhD thesis, Arizona State University, USA.

Petroutsatou, K; Georgopoulos, E; Lambropoulos, S and Pantouvakis, J P (2012) Early cost estimating of road tunnel construction using neural networks. Journal of Construction Engineering and Management, 138(6), pp. 679-687. ISSN 0733-9364

Pham, V H S and Pham, D H (2025) Dynamic multiobjective optimization model for construction site layout in prefabricated projects. Journal of Construction Engineering and Management, 151(10): 04025150, ISSN 0733-9364

Pham Vu Hong, S and Nguyen Thanh, V (2023) Application of artificial intelligence algorithm to optimize the design of water distribution system. International Journal of Construction Management, 23(16), pp. 2830-2840. ISSN 1562-3599

Phelan, R S; Radjy, F; Haas, C and Hendrickson, C (1990) Computer-aided concrete-placement optimization. Journal of Construction Engineering and Management, 116(1), pp. 172-187. ISSN 0733-9364

Pheng, L S and Hongbin, J (2003) Internationalization of Chinese construction enterprises. Journal of Construction Engineering and Management, 129(6), pp. 589-598. ISSN 0733-9364

Phua, F (2006) Examining the effects of senior executives' perceived environmental uncertainty on the strategic functions of construction firms. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Phua, F T T (2017) Does the built-environment industry attract risk-taking individuals? Construction Management and Economics, 35(4), pp. 207-217. ISSN 01446193

Pietroforte, R (1997) Communication and governance in the building process. Construction Management and Economics, 15(1), pp. 71-82. ISSN 01446193

Pietroforte, R and Miller, J B (2002) Procurement methods for us infrastructure: Historical perspectives and recent trends. Building Research & Information, 30(6), pp. 425-434. ISSN 0961-3218

Pihl, D; Forman, M; Frandsen, A K; Nielsen, A K B and Primdahl, M B (2022) Digital infrastructures of facilities management: How data systems and work environments affect each other. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Pilgrim, M; Bouchlaghem, D; Loveday, D and Holmes, M (2002) Towards best practice in building analysis data representation. Construction Innovation, 2(2), pp. 117-130. ISSN 1471-4175

Pinero, J C (2003) A framework for monitoring performance-based road maintenance. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Pinheiro, Gustavo Focesi (2022) The importance of municipal public policies for the design of sustainable buildings and cities. Unpublished PhD thesis, Universidade Estadual de Campinas, Brazil.

Pinheiro, Gustavo Focesi (2022) The importance of municipal public policies for the design of sustainable buildings and cities: Focus on the city of Campinas – SP. PhD thesis, Universidade Estadual de Campinas, Brazil.

Pinheiro Catalão, F; Cruz, C O and Miranda Sarmento, J (2019) Exogenous determinants of cost deviations and overruns in local infrastructure projects. Construction Management and Economics, 37(12), pp. 697-711. ISSN 01446193

Pirooz Far Poorang, A E (2008) Mass-constomisation: The application on design, fabrication and implementation (DFI) processes of building envelopes. PhD thesis, University of Sheffield, UK.

Pishdad-Bozorgi, P (2017) Future smart facilities: State-of-the-art BIM-enabled facility management. Journal of Construction Engineering and Management, 143(9): 02517006, ISSN 0733-9364

Pishdad-Bozorgi, P; De La Garza, J M and Austin, R B (2016) Readiness assessment for flash tracking. Journal of Construction Engineering and Management, 142(12): 06016005, ISSN 0733-9364

Plaut, J M; Dunbar, B; Wackerman, A and Hodgin, S (2012) Regenerative design: The lenses framework for buildings and communities. Building Research & Information, 40(1), pp. 112-122. ISSN 0961-3218

Pocock, J B; Hyun, C T; Liu, L Y and Kim, M K (1996) Relationship between project interaction and performance indicators. Journal of Construction Engineering and Management, 122(2), pp. 165-176. ISSN 0733-9364

Poh, Y P and Tah, J H M (2006) Integrated duration-cost influence network for modelling risk impacts on construction tasks. Construction Management and Economics, 24(8), pp. 861-868. ISSN 1466433X

Poirier, E A; Pavard, A and De Paula, N (2024) Determining factors influencing BIM adoption: A competency-driven approach. Journal of Construction Engineering and Management, 150(8): 04024080, ISSN 0733-9364

Polat, G; Arditi, D; Ballard, G and Mungen, U (2006) Economics of on-site vs off-site fabrication of rebar. Construction Management and Economics, 24(11), pp. 1185-1198. ISSN 1466433X

Pongpeng, J and Liston, J (2003) Tensem: A multicriteria and multidecision-makers' model in tender evaluation. Construction Management and Economics, 21(1), pp. 21-30. ISSN 01446193

Pontikis, K L (1998) Apartment building process: The design and construction of the korinthos apartment building in Cyprus. PhD thesis, University of California, Berkeley, USA.

Pooladvand, S and Hasanzadeh, S (2023) Impacts of stress on workers' risk-taking behaviors: Cognitive tunneling and impaired selective attention. Journal of Construction Engineering and Management, 149(8): 04023060, ISSN 0733-9364

Poon, C S; Yu, A T W and Jaillon, L (2004) Reducing building waste at construction sites in Hong Kong. Construction Management and Economics, 22(5), pp. 461-470. ISSN 01446193

Poon, C S; Yu, A T W; Wong, S W and Cheung, E (2004) Management of construction waste in public housing projects in Hong Kong. Construction Management and Economics, 22(7), pp. 675-689. ISSN 01446193

Poon, J; Potts, K and Cooper, P (1999) Development of a new best practice model for building projects. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Poon, S-W (2002) Analysing and predicting falsework failure in Hong Kong. PhD thesis, Loughborough University, UK.

Poortman, E R and Norbert M. Bons, H (1994) Information for the management of the building? Materials flow. Engineering, Construction and Architectural Management, 1(2), pp. 139-146. ISSN 0969-9988

Popovic, D (2020) The development and use of product platforms in single-family industrialized house building. PhD thesis, Jönköping University, Sweden.

Pornchokchai, S and Perera, R (2003) Housing market in Bangkok after the financial crisis of 1997: Lessons learned from the perspective of housing developers. Journal of Financial Management of Property and Construction, 8(3), pp. 167-178. ISSN 1366-4387

Porwal, A and Hewage, K N (2012) Building information modeling-based analysis to minimize waste rate of structural reinforcement. Journal of Construction Engineering and Management, 138(8), pp. 943-954. ISSN 0733-9364

Poston, A; Emmanuel, R and Thomson, C (2010) Developing holistic frameworks for the next generation of sustainability assessment methods for the built environment. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Potts, K F (1988) An alternative payment system for major 'fast track' construction projects. Construction Management and Economics, 6(1), pp. 25-33. ISSN 01446193

Potts, M; McDermott, P and Stephenson, A (2016) A systems approach to strategic infrastructure delivery. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(3), pp. 95-105. ISSN 17514304

Poulsom, M W (2017) S.62 LPA 1925: Restating the case for reform. International Journal of Law in the Built Environment, 9(1), pp. 79-91. ISSN 1756-1450

Pout, C and Hitchin, E R (2009) Future environmental impacts of room air-conditioners in Europe. Building Research & Information, 37(4), pp. 358-368. ISSN 0961-3218

Powell, M (1997) Life-cycling around Cambridge: A quest for a 'professionalism' of building. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Pratama, L A (2023) Immersive visualization intervention on pull planning. PhD thesis, University of Washington, USA.

Preece, C; Moodley, K and Cox, I (2001) Assessing the effectiveness of websites as an interactive business communications tool. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Preece, C N and Shafiei, M (1998) Development of client care initiatives in construction contracting organizations. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Prego, F J; Solla, M; Núñez-Nieto, X and Arias, P (2016) Assessing the applicability of ground-penetrating radar to quality control in tunneling construction. Journal of Construction Engineering and Management, 142(5): 06015006, ISSN 0733-9364

Price, T; Wamuziri, S and Gupta, N (2010) MRI suites and residual design risk from static magnetic fields. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(1), pp. 7-15. ISSN 17514312

Pridmore, A B (2009) Development of composite renewal systems for rapid rehabilitation and construction of bridge decks. PhD thesis, University of California, San Diego, USA.

Priemus, H (2004) Dutch contracting fraud and governance issues. Building Research & Information, 32(4), pp. 306-312. ISSN 0961-3218

Prieto, A J; Silva, A; de Brito, J and Macias-Bernal, J M (2018) Serviceability of facade claddings. Building Research & Information, 46(2), pp. 179-12. ISSN 0961-3218

Psilander, K (2002) Axiomatic design in the customizing home building industry. Engineering, Construction and Architectural Management, 9(4), pp. 318-324. ISSN 0969-9988

Puddicombe, M S (2006) The limitations of planning: The importance of learning. Journal of Construction Engineering and Management, 132(9), pp. 949-955. ISSN 0733-9364

Pulaski, M H and Horman, M J (2005) Continuous value enhancement process. Journal of Construction Engineering and Management, 131(12), pp. 1274-1282. ISSN 0733-9364

Pullen, S; Arman, M; Zillante, G; Zuo, J; Chileshe, N and Wilson, L (2010) Developing an assessment framework for affordable and sustainable housing. Construction Economics and Building, 10(1-2), pp. 48-64. ISSN 2204-9029

Pultar, M (1990) Progress-based construction scheduling. Journal of Construction Engineering and Management, 116(4), pp. 670-688. ISSN 0733-9364

Punwani, A (1997) A study of the growth-investment-financing nexus of the major UK construction groups. Construction Management and Economics, 15(4), pp. 349-361. ISSN 01446193

Pushpakumara, B H J; Gunasekara, M T and Gannile, Y M T D (2023) Variation of mechanical and chemical properties of old and new clay bricks. Journal of Construction Engineering and Management, 149(4): 04023006, ISSN 0733-9364

Pärn, E A and Edwards, D (2017) Vision and advocacy of optoelectronic technology developments in the AECO sector. Built Environment Project and Asset Management, 7(3), pp. 330-348. ISSN 2044-124X

Pérez-Bella, J M; Domínguez-Hernández, J; Rodríguez-Soria, B; Del Coz-Díaz, J J and Cano-Suñén, E (2013) A new method for determining the water tightness of building facades. Building Research & Information, 41(4), pp. 401-414. ISSN 0961-3218

Pérez-Valcárcel, J; Aragón, J; Muñiz, S; Freire-Tellado, M and Mosquera, E (2024) Transportable temporary homes with folding roof. Architectural Engineering and Design Management, 20(2), pp. 337-357. ISSN 1745-2007

Qian, L Z; Chen, T H; Anumba, C and Choy, C F (2017) Development of a web-based system for managing suppliers' performance and knowledge sharing in construction projects. Built Environment Project and Asset Management, 7(2), pp. 117-129. ISSN 2044-124X

Quagraine, V K (2007) New strategies to improve the management capacity of contractors for labor-based methods in road rehabilitation in Ghana. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Quast, P (1998) Output feedback minimum cost variance control schemes with application to seismic protection of civil engineering structures. PhD thesis, University of Notre Dame, USA.

Que, B C (2002) Incorporating practicability into genetic algorithm-based time-cost optimization. Journal of Construction Engineering and Management, 128(2), pp. 139-143. ISSN 0733-9364

Qui, N T (2013) Automated schedule generation and analysis from a construction requirement perspective. PhD thesis, National University of Singapore, Singapore.

Rabie, M and El-Sayegh, S (2017) Modelling of tri-parameter bidding integrating cost, time and risk: A stochastic approach. Journal of Financial Management of Property and Construction, 22(2), pp. 117-134. ISSN 1366-4387

Rad, H N and Khosrowshahi, F (1999) Visualization of the impact of time on internal flooring. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Raduenz, Henrique (2022) On machine learning-based control for energy management in construction machines. PhD thesis, Universidade Federal de Santa Catarina, Brazil.

Raed, H (1999) Empowerment via progressive participation: Jordanian experience of the low income housing production. PhD thesis, University College London, UK.

Raghav, N and Bhola, A K (2024) Secured platform for healthcare data: Privacy preservation based blockchain environment. Journal of Engineering, Design and Technology, 22(2), pp. 365-384. ISSN 1726-0531

Rahat, R; Ferrer, V; Pradhananga, P and ElZomor, M (2023) Developing an effective front-end planning framework for sustainable infrastructure projects. International Journal of Construction Management, 23(16), pp. 2841-2858. ISSN 1562-3599

Rahimian, A; Sadeghzadeh, K; Mohandes, S R; Martek, I; Manu, P; Antwi-Afari, M F; Mirvalad, S and Odeh, I (2025) Toward developing a predictive model for interpersonal communication quality in construction projects: An ensemble artificial intelligence-based approach. Engineering, Construction and Architectural Management, 32(10), pp. 7032-7061. ISSN 0969-9988

Rahman, M M and Kumaraswamy, M M (2005) Assembling integrated project teams for joint risk management. Construction Management and Economics, 23(4), pp. 365-375. ISSN 01446193

Rahman, S; Perera, S; Odeyinka, H and Bi, Y (2008) A conceptual knowledge-based cost model for optimizing the selection of materials and technology for building design. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Rai, H; Jagannathan, M and Venkata Santosh Kumar, D (2021) Claim tenability assessment in Indian real estate projects using ann and decision tree models. Built Environment Project and Asset Management, 11(3), pp. 468-487. ISSN 2044-124X

Rai, Sanish (2016) Building occupancy simulation and data assimilation using a graph based agent oriented model. PhD thesis, Georgia State University, USA.

Raidén, A B; Dainty, A R J and Neale, R H (2004) Exemplary human resource development (hrd) within a large construction contractor. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Raisbeck, P; Duffield, C and Xu, M (2010) Comparative performance of PPPs and traditional procurement in Australia. Construction Management and Economics, 28(4), pp. 345-359. ISSN 1466433X

Ramabodu, M S (2013) Rules of tendering and the influence of the privilege clause in South Africa. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Raman, P G (1977) Information and architectural design: A study of certain theoretical aspects. PhD thesis, University of Edinburgh, UK.

Ramaswamy, S D and Pertusier, E M (1986) Construction of barrettes for high-rise foundations. Journal of Construction Engineering and Management, 112(4), pp. 455-462. ISSN 0733-9364

Rameezdeen, R and Rodrigo, A (2014) Modifications to standard forms of contract: The impact on readability. Construction Economics and Building, 14(2), pp. 31-40. ISSN 2204-9029

Ramsey, D; El Asmar, M and Gibson, G E (2016) Quantitative performance assessment of single-step versus two-step design-build procurement. Journal of Construction Engineering and Management, 142(9): 04016033, ISSN 0733-9364

Ranasinghe, A (2012) Construction arbitration in Sri Lanka. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(2), pp. 91-94. ISSN 17514312

Ranasinghe, M (1996) Mine restoration bond for clay mining and its impact on the prices of building materials in Sri Lanka. Construction Management and Economics, 14(2), pp. 165-174. ISSN 01446193

Randall, T (2011) Construction engineering requirements for integrating laser scanning technology and building information modeling. Journal of Construction Engineering and Management, 137, pp. 797-805. ISSN 0733-9364

Randolph Thomas, H; Smith, G R and Cummings, D J (1995) Enforcement of liquidated damages. Journal of Construction Engineering and Management, 121(4), pp. 459-463. ISSN 0733-9364

Randolph Thomas, H; Smith, G R and Cummings, D J (1995) Have I reached substantial completion? Journal of Construction Engineering and Management, 121(1), pp. 121-129. ISSN 0733-9364

Raoufi, M and Fayek, A R (2021) How to improve crew motivation and performance on construction sites. Journal of Construction Engineering and Management, 147(9): 02521001, ISSN 0733-9364

Rasli, N B I; Ismail, M R; Ramli, N A; Shith, S; Nazir, A U M; Yusof, N F M and Zainordin, N S (2019) Compliance of indoor air contaminants within the main prayer halls of mosques in Malacca with Malaysia's indoor air quality standard. Journal of Construction in Developing Countries, 24(2), pp. 105-121. ISSN 1823-6499

Rasmussen, F. N.; Birkved, M. and Birgisdóttir, H. (2020) Low-carbon design strategies for new residential buildings: Lessons from architectural practice. Architectural Engineering and Design Management, 16(5), pp. 374-390. ISSN 1745-2007

Rasmussen, F N; Birkved, M and Birgisdóttir, H (2020) Low- carbon design strategies for new residential buildings: lessons from architectural practice. Architectural Engineering and Design Management, 16(5), pp. 374-390. ISSN 1745-2007

Rasul, N; Malik, M S A; Bakhtawar, B and Thaheem, M J (2021) Risk assessment of fast-track projects: A systems-based approach. International Journal of Construction Management, 21(11), pp. 1099-1114. ISSN 1562-3599

Rathi, R N; Tulasi Devi, S L and Rajamalla, A P (2025) Evaluating the impact of lockdowns and interest rate cuts on construction stock price returns: A did approach. International Journal of Construction Management, 25(16), pp. 2051-2062. ISSN 1562-3599

Rausch, C; Lu, R; Talebi, S and Haas, C (2023) Deploying 3D scanning based geometric digital twins during fabrication and assembly in offsite manufacturing. International Journal of Construction Management, 23(3), pp. 565-578. ISSN 1562-3599

Raymond, A J; Kendall, A; Dejong, J T; Kavazanjian, E; Woolley, M A and Martin, K K (2021) Life cycle sustainability assessment of fugitive dust control methods. Journal of Construction Engineering and Management, 147(3): 04020181, ISSN 0733-9364

Reda, R and Carr, R I (1989) Time-cost trade-off among related activities. Journal of Construction Engineering and Management, 115(3), pp. 475-486. ISSN 0733-9364

Reda, R M (1990) RPM: Repetitive project modeling. Journal of Construction Engineering and Management, 116(2), pp. 316-330. ISSN 0733-9364

Redden, L and Bugg, R A (2022) Efficacy and benefits of a required service-learning course in construction management education. International Journal of Construction Education and Research, 18(4), pp. 315-332. ISSN 1557-8771

Reed, B (2007) Forum: Shifting from 'sustainability' to regeneration. Building Research & Information, 35(6), pp. 674-680. ISSN 0961-3218

Rees, W E (1999) The built environment and the ecosphere: A global perspective. Building Research & Information, 27(4-5), pp. 206-220. ISSN 0961-3218

Regan, M; Smith, J and Love, P E D (2011) Impact of the capital market collapse on public-private partnership infrastructure projects. Journal of Construction Engineering and Management, 137(1), pp. 6-16. ISSN 0733-9364

Rehak, D R (1981) Computer aided engineering problems and prospects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Reinhardt, J (2003) Navigational models for effective and efficient interaction with integrated product and process models on construction sites. PhD thesis, Carnegie Mellon University, USA.

Reis, Sonia (2023) Career optimism of civil engineers in Australia. PhD thesis, Queensland University of Technology, Australia.

Reiter, Dana L (2018) Increasing the effectiveness of stakeholder engagement in the use of environmental decision support systems. PhD thesis, Queensland University of Technology, Australia.

Remøy, H and Van Der Voordt, T (2014) Adaptive reuse of office buildings into housing: Opportunities and risks. Building Research & Information, 42(3), pp. 381-390. ISSN 0961-3218

Ren, X (2024) Human and organizational factors influencing structural safety: Analysing critical hofs behind human errors in structural design and construction. PhD thesis, Delft University of Technology, Netherlands.

Ren, Z; Carter, C D; Hassan, T M and Anumba, C J (2005) Trust building for SMEs through an e-engineering hub. Journal of Construction Procurement, 11(1),

Renger, B C; Birkeland, J L and Midmore, D J (2015) Net-positive building carbon sequestration. Building Research & Information, 43(1), pp. 11-24. ISSN 0961-3218

Renukappa, S; Suresh, S; Shetty, N; Gandhi, L; Abdalla, W; Yabbati, N and Hiremath, R (2025) The role of smart cities in managing the COVID-19 outbreak in India. Smart and Sustainable Built Environment, 14(5), pp. 1459-1482. ISSN 2046-6099

Reposa Jr, J H (2009) Comparison of usgbc LEED for homes and the nahb national green building program. International Journal of Construction Education and Research, 5(2), pp. 108-120. ISSN 1557-8771

Resendiz-Carrillo, D (1990) Risk-based framework for the selection of socially optimal dam safety goals. PhD thesis, Carnegie Mellon University, USA.

Reymen, I M M J; Dewulf, G P M R and Blokpoel, S B (2008) Framework for managing uncertainty in property projects. Building Research & Information, 36(6), pp. 580-592. ISSN 0961-3218

Reyna, S M; Vanegas, J A and Khan, A H (1994) Construction technologies for sewer rehabilitation. Journal of Construction Engineering and Management, 120(3), pp. 467-487. ISSN 0733-9364

Reynolds, M F (1990) Facilities planning and construction internship. DEng thesis, Texas A&M University, USA.

Rezazadeh Azar, E; Dickinson, S and McCabe, B (2013) Server-customer interaction tracker: Computer vision-based system to estimate dirt-loading cycles. Journal of Construction Engineering and Management, 139(7), pp. 785-794. ISSN 0733-9364

Rezvani, A; Ashkanasy, N and Khosravi, P (2020) Key attitudes: Unlocking the relationships between emotional intelligence and performance in construction projects. Journal of Construction Engineering and Management, 146(4): 04020025, ISSN 0733-9364

Riad, N I (1990) MODA: An expert system for managing owner-directed acceleration. PhD thesis, Illinois Institute of Technology, USA.

Ribeiro, C; Pereira, P F; Ramos, N M M; Flores-Colen, I and Valentim, N (2024) Assessment of the impacts of balconies on indoor environmental quality in mild climate conditions, Portugal. Building Research & Information, 52(3), pp. 292-310. ISSN 0961-3218

Ribeiro, J A N P (2013) Essays on the use of real options approach in construction projects and build-own-transfer projects. PhD thesis, Universidade do Porto, Portugal.

Richards, J L (1973) An integrated approach to construction management. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Riggio, M; Alhariri, N and Hansen, E (2020) Paths of innovation and knowledge management in timber construction in North America: A focus on water control design strategies in CLT building enclosures. Architectural Engineering and Design Management, 16(1), pp. 58-83. ISSN 1745-2007

Righetto, E.; Micelli, E. and Pellegrino, M. (2026) Can the deep retrofit of the housing stock cost less? Learning curves and the costs of off-site industrialised construction in France. Construction Management and Economics, 44(5), pp. 359-380. ISSN 0144-6193

Riley, D R; Diller, B E and Kerr, D (2005) Effects of delivery systems on change order size and frequency in mechanical construction. Journal of Construction Engineering and Management, 131(9), pp. 953-962. ISSN 0733-9364

Ringwald, R C (1986) General overhead distribution to project costs. Journal of Construction Engineering and Management, 112(1), pp. 83-89. ISSN 0733-9364

Rochell, K; Bulkeley, H and Runhaar, H (2024) Nature for resilience reconfigured: Global-to-local translation of frames in Africa. Buildings & Cities, 5(1), pp. 1-15. ISSN 2632-6655

Rodriguez Bernal, C M (2017) Student-centred strategies to integrate theoretical knowledge into project development within architectural technology lecture-based modules. Architectural Engineering and Design Management, 13(3), pp. 223-242. ISSN 1745-2007

Rodriguez-Ramos, W E and Francis, R L (1983) Single crane location optimization. Journal of Construction Engineering and Management, 109(4), pp. 387-397. ISSN 0733-9364

Roehrich, J K and Lewis, M A (2010) Towards a model of governance in complex (product-service) inter-organizational systems. Construction Management and Economics, 28(11), pp. 1155-1164. ISSN 1466433X

Rogerson, J H; Morris, J P and Jared, G E M (2000) Development of a generic design-decision planner. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Roggema, R and Van Den Dobbelsteen, A (2012) Swarm planning for climate change: An alternative pathway for resilience. Building Research & Information, 40(5), pp. 606-624. ISSN 0961-3218

Rohlman, R E (1978) Construction management: A comparison of management services, time, cost and supervision performance factors on public school projects in Michigan. PhD thesis, University of Michigan, USA.

Roofigari-Esfahan, N; Paez, A and N.razavi, S (2015) Location-aware scheduling and control of linear projects: Introducing space-time float prisms. Journal of Construction Engineering and Management, 141(1): 06014008, ISSN 0733-9364

Rosander, L (2022) Same same but different: Dynamics of a pre-procurement routine and its influence on relational contracting models. Construction Management and Economics, 40(11-12), pp. 955-972. ISSN 01446193

Rosander, L and Kadefors, A (2023) Implementing relational contracting in a public client organization: The influence of policy clashes, resources and project autonomy. Construction Management and Economics, 41(8), pp. 651-669. ISSN 01446193

Ross, D G (1970) The construction of the railroads of Central America. PhD thesis, University of California, Santa Barbara, USA.

Rostami, A and Oduoza, C F (2017) Key risks in construction projects in Italy: Contractors' perspective. Engineering, Construction and Architectural Management, 24(3), pp. 451-462. ISSN 0969-9988

Roupé, M; Johansson, M; Maftei, L; Lundstedt, R and Viklund-Tallgren, M (2020) Virtual collaborative design environment: Supporting seamless integration of multitouch table and immersive VR. Journal of Construction Engineering and Management, 146(12): 04020132, ISSN 0733-9364

Rousseau, D and Chen, Y (2001) Sustainability options for China's residential building sector. Building Research & Information, 29(4), pp. 293-301. ISSN 0961-3218

Rovers, R (2014) New energy retrofit concept: 'Renovation trains' for mass housing. Building Research & Information, 42(6), pp. 757-767. ISSN 0961-3218

Rovira-Beleta, E; Cuerva, E; Pires de Souza, E; Planas, C and Alavedra, P (2015) Accessibility of emergency evacuation of persons with disabilities in public swimming pools in barcelona, Spain: A review of literature and regulations. Architectural Engineering and Design Management, 11(6), pp. 475-487. ISSN 1745-2007

Rowings, J E; Jahren, C T and Jaselskis, E J (2017) Perspectives of the journal of construction engineering and management spanning three decades. Journal of Construction Engineering and Management, 143(9): 02517008, ISSN 0733-9364

Rowings, J E and Kaspar, S L (1991) Constructability of cable-stayed bridges. Journal of Construction Engineering and Management, 117(2), pp. 259-278. ISSN 0733-9364

Rowings, J E and Walker, R O (1984) Construction energy use. Journal of Construction Engineering and Management, 110(4), pp. 447-458. ISSN 0733-9364

Rowlinson, S; Matthews, J; Phua, F; McDermott, P and Chapman, T (2000) Emerging issues in procurement systems. Journal of Construction Procurement, 6(2), ISSN 1358-9180

Rowlinsson, S and Yates, D (2003) Ndcad: A virtual change agent for professions and procurement systems? Construction Management and Economics, 21(8), pp. 849-857. ISSN 01446193

Roy, R; Brown, J and Gaze, C (2003) Re-engineering the construction process in the speculative house-building sector. Construction Management and Economics, 21(2), pp. 137-146. ISSN 01446193

Roy, R; Low, M and Waller, J (2005) Documentation, standardization and improvement of the construction process in house building. Construction Management and Economics, 23(1), pp. 57-67. ISSN 01446193

Roy, R; Waller, J and Low, M (2002) Development of a process documentation system for the house-building industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Royer, K (1986) The federal government and the critical path. Journal of Construction Engineering and Management, 112(2), pp. 220-225. ISSN 0733-9364

Ruchinskaya, T (1996) The contribution of the Scottish architect Adam Menelaws to Moscow architecture in the early 19th century. Building Research & Information, 24(2), pp. 75-80. ISSN 0961-3218

Ruchinskaya, T (1996) Introduction of the architectural scheme of York Gate (1825, Regent's Park, London) in Moscow at the beginning of the 19th century. Building Research & Information, 24(2), pp. 69-74. ISSN 0961-3218

Ruddock, L (2002) Measuring the global construction industry: Improving the quality of data. Construction Management and Economics, 20(7), pp. 553-556. ISSN 01446193

Ruikar, D (2004) Design process improvement using a model based approach. PhD thesis, University of Nottingham, UK.

Ruiz, A; Vinke-De Kruijf, J; Santos, J; Keijzer, E; Volker, L and Dorée, A (2024) The slow implementation of sustainable innovations in the asphalt paving sector: the role of actors and their interactions. Construction Management and Economics, 42(10), pp. 902-925. ISSN 01446193

Runeson, G and Bennett, J (1983) Tendering and the price level in the New Zealand building industry. Construction Papers, 2(2), pp. 29-35. ISSN 0144-8587

Runeson, G r (1996) Models of construction price determination: A comparative appraisal. PhD thesis, Queensland University of Technology, Australia.

Rusch, R and Best, R (2014) Sustainability: Its adaptation and relevance in remote area housing. Construction Economics and Building, 14(1), pp. 88-104. ISSN 2204-9029

Russell, A D (1993) Computerized daily site reporting. Journal of Construction Engineering and Management, 119(2), pp. 385-402. ISSN 0733-9364

Russell, A D and Wong, W C M (1993) New generation of planning structures. Journal of Construction Engineering and Management, 119(2), pp. 196-214. ISSN 0733-9364

Russell, J S (1992) Decision models for analysis and evaluation of construction contractors. Construction Management and Economics, 10(3), pp. 185-202. ISSN 01446193

Russell, J S and Gugel, J G (1993) Comparison of two corporate constructability programs. Journal of Construction Engineering and Management, 119(4), pp. 769-784. ISSN 0733-9364

Russell, J S; Skibniewski, M J and Cozier, D R (1990) Qualifier-2: Knowledge-based system for contractor prequalification. Journal of Construction Engineering and Management, 116(1), pp. 157-171. ISSN 0733-9364

Russell, J S; Skibniewski, M J and Vanegas, J A (1990) Framework for construction robot fleet management system. Journal of Construction Engineering and Management, 116(3), pp. 448-462. ISSN 0733-9364

Rutherford, A W (1989) Organizational evolution I-595 Port Everglades expressway. Journal of Construction Engineering and Management, 115(3), pp. 357-369. ISSN 0733-9364

Rwelamila, P D (1994) Group dynamics and construction project manager. Journal of Construction Engineering and Management, 120(1), pp. 3-10. ISSN 0733-9364

Rwelamila, P D and Machete, S M (1997) Marketing development in civil engineering consultancy firms in South Africa. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Rwelamila, P M D (2007) Project management competence in public sector infrastructure organisations. Construction Management and Economics, 25(1), pp. 55-66. ISSN 1466433X

Rwelamila, P M D and Purushottam, N (2015) Green campus initiatives as projects: Can creating conducive internal university project environment a key to success? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Ryan, C.; Spillane, J. P. and Bradley, J. G. (2025) The jurisdiction of adjudicators under the construction contracts act 2013: A case review. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 7-15. ISSN 1751-4304

Ryu, H G; Lee, H S and Yu, J H (2003) A method for analysing delay duration considering lost productivity through construction productivity data model. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Ryu, J; Alwasel, A; Haas, C T and Abdel-Rahman, E M (2020) Analysis of relationships between body load and training, work methods, and work rate: Overcoming the novice mason's risk hump. Journal of Construction Engineering and Management, 146(8): 04020097, ISSN 0733-9364

Ryu, J; Banting, B; Abdel-Rahman, E M and Haas, C T (2023) Ergonomic characteristics of expert masons. Journal of Construction Engineering and Management, 149(1): 04022150, ISSN 0733-9364

Ryu, J; Diraneyya, M M; Haas, C T and Abdel-Rahman, E M (2021) Analysis of the limits of automated rule-based ergonomic assessment in bricklaying. Journal of Construction Engineering and Management, 147(2): 04020163, ISSN 0733-9364

S Nmez, M; Yang, J B and Holt, G D (2001) Addressing the contractor selection problem using an evidential reasoning approach. Engineering, Construction and Architectural Management, 8(3), pp. 198-210. ISSN 0969-9988

Saari, A and Aalto, L (2006) Indoor environment quality contracts in building projects. Building Research & Information, 34(1), pp. 66-74. ISSN 0961-3218

Sacks, R; Eastman, C M and Lee, G (2004) Process model perspectives on management and engineering procedures in the precast/prestressed concrete industry. Journal of Construction Engineering and Management, 130(2), pp. 206-215. ISSN 0733-9364

Sacks, R; Navon, R; Brodetskaia, I and Shapira, A (2005) Feasibility of automated monitoring of lifting equipment in support of project control. Journal of Construction Engineering and Management, 131(5), pp. 604-614. ISSN 0733-9364

Sacks, R; Perlman, A and Barak, R (2013) Construction safety training using immersive virtual reality. Construction Management and Economics, 31(9), pp. 1005-1017. ISSN 1466433X

Sacks, R; Rozenfeld, O and Rosenfeld, Y (2009) Spatial and temporal exposure to safety hazards in construction. Journal of Construction Engineering and Management, 135(8), pp. 726-736. ISSN 0733-9364

Sacks, R; Seppänen, O; Priven, V and Savosnick, J (2017) Construction flow index: A metric of production flow quality in construction. Construction Management and Economics, 35(1-2), pp. 45-63. ISSN 01446193

Sacks, R; Treckmann, M and Rozenfeld, O (2009) Visualization of work flow to support lean construction. Journal of Construction Engineering and Management, 135(12), pp. 1307-1315. ISSN 0733-9364

Sacks, R; Whyte, J; Swissa, D; Raviv, G; Zhou, W and Shapira, A (2015) Safety by design: Dialogues between designers and builders using virtual reality. Construction Management and Economics, 33(1), pp. 55-72. ISSN 01446193

Sadeghpour, F (2004) A CAD-based model for site layout. PhD thesis, Concordia University, Canada.

Sadeghpour, F; Moselhi, O and Alkass, S T (2006) Computer-aided site layout planning. Journal of Construction Engineering and Management, 132(2), pp. 143-151. ISSN 0733-9364

Sadiqi, Zabihullah (2014) Post-disaster reconstruction projects: A logical framework for community participation. PhD thesis, Queensland University of Technology, Australia.

Sadooghi, P and Kherani, N P (2022) Influence of metallo-dielectric optical properties on thermal resistance and solar heat gain coefficient of multi-pane glazing systems in hot and cold climates. Architectural Engineering and Design Management, 18(6), pp. 894-910. ISSN 1745-2007

Sadri, S L (1993) An integrated information system for building construction projects. PhD thesis, Georgia Institute of Technology, USA.

Safa, M; Reinsma, S; Haas, C T; Goodrum, P M and Caldas, C H (2018) A decision-making method for choosing concrete forming systems. International Journal of Construction Management, 18(1), pp. 53-64. ISSN 1562-3599

Safa, M; Shahi, A; Haas, C T and Hipel, K W (2017) Construction contract management using value packaging systems. International Journal of Construction Management, 17(1), pp. 50-64. ISSN 1562-3599

Safikhani, S.; Shafaat, A. and Sartipipour, M. (2026) Automated project rescheduling with preemptive activity splitting for baseline restoration. Journal of Construction Engineering and Management, 152(6): 04026065, ISSN 0733-9364

Sage, D J; Dainty, A R J and Brookes, N J (2010) Who reads the project file? Exploring the power effects of knowledge tools in construction project management. Construction Management and Economics, 28(6), pp. 629-639. ISSN 1466433X

Said, H and El-Rayes, K (2011) Optimizing material procurement and storage on construction sites. Journal of Construction Engineering and Management, 137(6), pp. 421-431. ISSN 0733-9364

Said, H M M (2010) Optimizing site layout and material logistics planning during the construction of critical infrastructure projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Saja, Abdul Majeed Aslam (2020) Surrogate approach to assess social resilience in disaster management. PhD thesis, Queensland University of Technology, Australia.

Sajadfar, Narges (2022) Application of machine learning to automate classification and information extraction in industrial construction documents. PhD thesis, University of Alberta, Canada.

Sakpere, W E; Mlitwa, N B W and Oshin, M A (2017) Towards an efficient indoor navigation system: A near field communication approach. Journal of Engineering, Design and Technology, 15(4), pp. 505-527.

Sal Moslehian, A; Kocaturk, T and Tucker, R (2021) An integral view of innovation in hospital building design: Understanding the context of the research/practice gap. Building Research & Information, 49(3), pp. 265-280. ISSN 0961-3218

Salagnac, J L (2007) Lessons from the 2003 heat wave: A French perspective. Building Research & Information, 35(4), pp. 450-457. ISSN 0961-3218

Salamah, A A A (1989) COAD: A knowledge-based expert system for conceptual estimates and designs. PhD thesis, University of Colorado at Boulder, USA.

Salcedo Rahola, T B (2015) Integrated project delivery methods for energy renovation of social housing. PhD thesis, Delft University of Technology, Netherlands.

Salih, F and El-Adaway, I H (2024) Quantifying the impact of technology utilization on schedule and cost performance in construction projects. Journal of Construction Engineering and Management, 150(8): 04024078, ISSN 0733-9364

Salleh, K R and Ruddock, L (1999) The development of a hedonic price model of retail property facilities design. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Salter, A and Torbett, R (2003) Innovation and performance in engineering design. Construction Management and Economics, 21(6), pp. 573-580. ISSN 01446193

Samaras, G D; Gkanas, N I and Vitsa, K C (2014) Assessing risk in dam projects using AHP and ELECTRE I. International Journal of Construction Management, 14(4), pp. 255-266. ISSN 1562-3599

Samarasinghalage, T and Yang, R (2024) Evolutionary-based multi-objective optimization of BIPV envelope design: BIPV curtain wall. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Sameer, H and Bringezu, S (2021) Building information modelling application of material, water, and climate footprint analysis. Building Research & Information, 49(6), pp. 593-612. ISSN 0961-3218

Sammour, F; Xu, J; Wang, X; Hu, M and Zhang, Z (2026) Responsible AI in construction safety: Systematic evaluation of large language models and prompt engineering. Journal of Construction Engineering and Management, 152(1): 04025217, ISSN 0733-9364

Sanad, H M; Ammar, M A and Ibrahim, M E (2008) Optimal construction site layout considering safety and environmental aspects. Journal of Construction Engineering and Management, 134(7), pp. 536-544. ISSN 0733-9364

Sanchez-Guevara, C; Fernandez, A S and Aja, A H (2015) Income, energy expenditure and housing in Madrid: Retrofitting policy implications. Building Research & Information, 43(6), pp. 737-749. ISSN 0961-3218

Sandberg, N H and Bratteb, H (2012) Analysis of energy and carbon flows in the future Norwegian dwelling stock. Building Research & Information, 40(2), pp. 123-139. ISSN 0961-3218

Sanders, C H and Phillipson, M C (2003) UK adaptation strategy and technical measures: The impacts of climate change on buildings. Building Research & Information, 31(3-4), pp. 210-221. ISSN 0961-3218

Sanders, S A and Shapira, A (2011) Windmill erection and maintenance: Challenges for crane design. Journal of Construction Engineering and Management, 137, pp. 777-784. ISSN 0733-9364

Sandhaus, G (1998) Neural networks for cost estimating in project management. PhD thesis, Swansea University, UK.

Sanoubar, S (2022) Temporal and spatial considerations in maintenance planning. PhD thesis, University of Pittsburgh, USA.

Sansone, R (2020) Latent matters: Megaprojects and political imaginaries in post-revolution Tunis. PhD thesis, University of Manchester, UK.

Sanusi, I E (2019) Optimal and adaptive control frameworks using reinforcement learning for time-varying dynamical systems. PhD thesis, University of Sheffield, UK.

Sanvido, V; Grobler, F; Parfitt, K; Guvenis, M and Coyle, M (1992) Critical success factors for construction projects. Journal of Construction Engineering and Management, 118(1), pp. 94-111. ISSN 0733-9364

Sanvido, V E and Paulson, B C (1991) Site analysis using controller-function charts. Journal of Construction Engineering and Management, 117(2), pp. 226-241. ISSN 0733-9364

Sapri, M and Pitt, M (2005) Performance measurement in facilities management; state of knowledge. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Sarah Slaughter, E (1999) Assessment of construction processes and innovations through simulation. Construction Management and Economics, 17(3), pp. 341-350. ISSN 01446193

Sardén, Y and Engström, S (2010) Modern methods of construction: A solution for an industry characterized by uncertainty? In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Sarhan, S and Pretlove, S (2021) Lean and sustainable construction: State of the art and future directions. Construction Economics and Building, 21(3), pp. 1-10. ISSN 2204-9029

Sari, R. and Pekeriçli, M. K. (2026) Possibility of personalization and customization of the workplace by knowledge workers. Building Research & Information, 54(4), pp. 410-428. ISSN 0961-3218

Sarikas, R H (1981) Regulatory and financial aspects of the utility industry rate treatment of construction work in progress. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Sarireh, M (2022) Examining the suitability of Tripoli as admixture in cement paste. International Journal of Construction Management, 22(16), pp. 3169-3174. ISSN 1562-3599

Sarireh, M (2023) Testing the use of volcanic tuff in base and sub-base pavement construction in Jordan. International Journal of Construction Management, 23(1), pp. 126-134. ISSN 1562-3599

Sarkar, A; Godbole, P N and Chakrabarti, S C (1996) Potential for expert systems in the assessment and repair of fire damaged buildings in India. Building Research & Information, 24(1), pp. 51-58. ISSN 0961-3218

Sarkar, D (2018) Hybrid approach for resource optimization and management of bridge projects using bootstrap technique and genetic algorithm. International Journal of Construction Management, 18(3), pp. 207-220. ISSN 1562-3599

Sarkar, D and Dutta, G (2010) Design and application of risk adjusted cumulative sum for strength monitoring of ready mixed concrete. Journal of Construction Engineering and Management, 136(6), pp. 623-631. ISSN 0733-9364

Sarkar, D; Patel, H and Dave, B (2022) Development of integrated cloud-based internet of things (IoT) platform for asset management of elevated metro rail projects. International Journal of Construction Management, 22(10), pp. 1993-2002. ISSN 1562-3599

Sarkar, D and Sheth, A (2023) Public private partnership model for sustainable bus rapid transit system in Ahmedabad, India. International Journal of Construction Management, 23(7), pp. 1233-1243. ISSN 1562-3599

Sarma, K C (2001) Fuzzy discrete multicriteria cost optimization of steel structures using genetic algorithm. PhD thesis, Ohio State University, USA.

Sarpin, Norliana (2015) Developing people capabilities for the promotion of sustainability in facility management practices. PhD thesis, Queensland University of Technology, Australia.

Sassi, P (2008) Defining closed-loop material cycle construction. Building Research & Information, 36(5), pp. 509-519. ISSN 0961-3218

Sattary, S and Thorpe, D (2011) Reducing embodied energy in Australian building construction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Sattary, S and Thorpe, D (2012) Optimizing embodied energy of building construction through bioclimatic principles. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Satti, H M (2006) Integrating building code analysis within the architectural design process into the building information model. PhD thesis, Illinois Institute of Technology, USA.

Sauer, C M; Skaik, S and Tumpa, R J (2025) Architects and designers on linkedin: Perceptions and strategies for professional success. Engineering, Construction and Architectural Management, 32(10), pp. 6398-6420. ISSN 0969-9988

Sauer, A and Gebken, R J (2023) Exploring sense of community for underrepresented populations within construction programs in asc regions 4 and 5. International Journal of Construction Education and Research, 19(3), pp. 321-340. ISSN 1557-8771

Saunders, A (1998) Aspects of funding for BOOT projects. Engineering, Construction and Architectural Management, 5(1), pp. 22-30. ISSN 0969-9988

Sawhney, A and Mund, A (2001) Intellicranes: An integrated crane type and model selection system. Construction Management and Economics, 19(2), pp. 227-237. ISSN 01446193

Saxena, S K; Lourie, D E; Shah, N S and Singhal, K (1984) Equipment cost analysis for waste embankments. Journal of Construction Engineering and Management, 110(1), pp. 60-71. ISSN 0733-9364

Sayed, Ahmed Yehia Abdel Aziz El (2025) Design of novel formwork system and development of numerical model for comparison between formwork systems. PhD thesis, The American University in Cairo, Egypt.

Sayın, S and Çelebi, G (2020) A practical approach to performance-based building design in architectural project. Building Research & Information, 48(4), pp. 446-468. ISSN 0961-3218

Sborz, J; Kalbusch, A and Henning, E (2024) Factors that determine hot and cold-water consumption in social housing apartments. Architectural Engineering and Design Management, 20(6), pp. 1669-1686. ISSN 1745-2007

Schade, J; Olofsson, T and Schreyer, M (2011) Decision-making in a model-based design process. Construction Management and Economics, 29(4), pp. 371-382. ISSN 1466433X

Schaufelberger, J E and Wipadapisut, I (2003) Alternate financing strategies for build-operate-transfer projects. Journal of Construction Engineering and Management, 129(2), pp. 205-213. ISSN 0733-9364

Schellen, L; Loomans, M; De Wit, M and Van Marken Lichtenbelt, W (2013) The influence of different cooling techniques and gender on thermal perception. Building Research & Information, 41(3), pp. 330-341. ISSN 0961-3218

Scheublin, F J M (2001) Project alliance contract in the Netherlands. Building Research & Information, 29(6), pp. 451-455. ISSN 0961-3218

Schexnayder, C (2007) Praeludium to the 50th anniversary special issue. Journal of Construction Engineering and Management, 133(9), pp. 610-618. ISSN 0733-9364

Schexnayder, C; Celaya, M; Recavarren, G C; Fiori, C and Jaselskis, E J (2011) Engineering with the elements. Journal of Construction Engineering and Management, 137, pp. 755-761. ISSN 0733-9364

Schexnayder, C; Weber, S L and Brooks, B T (1999) Effect of truck payload weight on production. Journal of Construction Engineering and Management, 125(1), pp. 1-7. ISSN 0733-9364

Schexnayder, C J and David, S A (2002) Past and future of construction equipment: part iv. Journal of Construction Engineering and Management, 128(4), pp. 279-286. ISSN 0733-9364

Schexnayder, C J; Weber, S L and David, S A (2004) Transportation agency use of owner-controlled insurance programs. Journal of Construction Engineering and Management, 130(4), pp. 517-524. ISSN 0733-9364

Schexnayder, C J J (1980) Heavy construction equipment replacement economics. PhD thesis, Purdue University, USA.

Schilderman, T (2004) Adapting traditional shelter for disaster mitigation and reconstruction: Experiences with community-based approaches. Building Research & Information, 32(5), pp. 414-426. ISSN 0961-3218

Schlick, H (1986) Construction of semi-prefabricated masonry facade. Journal of Construction Engineering and Management, 112(1), pp. 62-68. ISSN 0733-9364

Schnabel, J J and Martin, R E (1983) Parking garage supported on structural fill. Journal of Construction Engineering and Management, 109(3), pp. 286-296. ISSN 0733-9364

Schroeder, H P (1991) Dycam 1.0: Dynamic construction activity model, a decision support tool for construction planning. PhD thesis, University of Colorado at Boulder, USA.

Schroeder, W L; Rybel, V W and Cochran, L (1986) Dewatering for opal springs powerhouse excavation. Journal of Construction Engineering and Management, 112(3), pp. 440-451. ISSN 0733-9364

Schubert, F N (1991) U.S. Army corps of engineers and Afghanistan's highways 1960–1967. Journal of Construction Engineering and Management, 117(3), pp. 445-459. ISSN 0733-9364

Schuldt, S and El-Rayes, K (2018) Optimizing the planning of remote construction sites to minimize facility destruction from explosive attacks. Journal of Construction Engineering and Management, 144(5): 04018020, ISSN 0733-9364

Schultmann, F and Rentz, O (2002) Scheduling of deconstruction projects under resource constraints. Construction Management and Economics, 20(5), pp. 391-401. ISSN 01446193

Scott, B O B (1995) Competitive advantage through alliancing. Engineering, Construction and Architectural Management, 2(2), pp. 83-92. ISSN 0969-9988

Scott, D and Krishnan, V (1983) Appropriate technology for Fiji. Construction Papers, 2(1), pp. 51-61. ISSN 0144-8587

Scott, D and Yang, J (1991) Setting the pace with paces: A new concept of using an expert system for project analysis and control. Construction Management and Economics, 9(6), pp. 529-541. ISSN 01446193

Scott, J; Deveci, G; Edge, M and Martin, P (2004) Towards zero-heating: Affordable models for environmentally friendly housing in Scotland. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Scott, J R (2004) Optimising the relationship between passive solar design of new housing and the economics of construction and land value. PhD thesis, Robert Gordon University, UK.

Scott, J R; Edge, M; Laing, R and Martin, P (2004) Optimising the relationship between passive solar design of new housing and the economics of construction and land value. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Scrase, J I (2001) Curbing the growth in UK commercial energy consumption. Building Research & Information, 29(1), pp. 51-61. ISSN 0961-3218

Sebastian, R (2010) Integrated design and engineering using building information modelling: A pilot project of small-scale housing development in the Netherlands. Architectural Engineering and Design Management, 6(2), pp. 103-110. ISSN 1745-2007

Sebastian, R and Van Berlo, L (2010) Tool for benchmarking BIM performance of design, engineering and construction firms in the Netherlands. Architectural Engineering and Design Management, 6(4), pp. 254-263. ISSN 1745-2007

Seibert, J E and Evans, G W (1991) Time-constrained resource leveling. Journal of Construction Engineering and Management, 117(3), pp. 503-520. ISSN 0733-9364

Selinger, S (1983) Payment timing as a factor in bid evaluation. Journal of Construction Engineering and Management, 109(3), pp. 335-341. ISSN 0733-9364

Selinger, S and Stamler, H (1983) Computerized method for quantity surveying. Construction Management and Economics, 1(1), pp. 75-87. ISSN 01446193

Selvam, G and Tadepalli, T C M (2022) Genetic algorithm based optimization for resource leveling problem with precedence constrained scheduling. International Journal of Construction Management, 22(4), pp. 659-668. ISSN 1562-3599

Semple, C; Hartman, F T and Jergeas, G (1994) Construction claims and disputes: Causes and cost/time overruns. Journal of Construction Engineering and Management, 120(4), pp. 785-795. ISSN 0733-9364

Seneviratne, K; Amaratunga, D and Haigh, R (2017) Managing housing needs of post conflict housing reconstruction: Sri Lankan perspective. Engineering, Construction and Architectural Management, 24(2), pp. 275-288. ISSN 0969-9988

Senior, B A (1995) Late-time computation for task chains using discrete-event simulation. Journal of Construction Engineering and Management, 121(4), pp. 397-403. ISSN 0733-9364

Senouci, A and El-Rayes, K (2009) Time-profit trade-off analysis for construction projects. Journal of Construction Engineering and Management, 135(8), pp. 718-725. ISSN 0733-9364

Seo, S and Hwang, Y (2001) Estimation of CO2 emissions in life cycle of residential buildings. Journal of Construction Engineering and Management, 127(5), pp. 414-418. ISSN 0733-9364

Seo, Y C and Hyan, C T (2004) Procurement system selection model reflecting past performance. Journal of Construction Procurement, 10(2),

Sepasgozar, S M E; Forsythe, P and Shirowzhan, S (2018) Evaluation of terrestrial and mobile scanner technologies for part-built information modeling. Journal of Construction Engineering and Management, 144(12): 04018110, ISSN 0733-9364

Severson, G D; Russell, J S and Jaselskis, E J (1994) Predicting contract surety bond claims using contractor financial data. Journal of Construction Engineering and Management, 120(2), pp. 405-420. ISSN 0733-9364

Sexton, J C (1999) Craftsmen, clients, and buildings: The domestic architecture of Guilford, Connecticut, 1689-1789. PhD thesis, Yale University, USA.

Sexton, M and Barrett, P (2003) A literature synthesis of innovation in small construction firms: Insights, ambiquities and questions. Construction Management and Economics, 21(6), pp. 613-622. ISSN 01446193

Seydel, J F (1991) Development and implementation of multiple criteria approaches to optimization in construction bidding. PhD thesis, Texas A&M University, USA.

Sezer, A (2012) Environmental assessment tools and efficiency in housing and office refurbishment. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Sezer, A A (2013) Indicators of environmental and productivity performance for building refurbishment projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Shah, D D; Jain, S K and Prybella, R W (1993) Performance of remotely controlled fiberglass pipe jacking system. Journal of Construction Engineering and Management, 119(4), pp. 832-851. ISSN 0733-9364

Shah, M; Tang, L and Hughes, W P (2012) Exploring process, productivity and structure in design. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Shahin, A; Abourizk, S M and Mohamed, Y (2011) Modeling weather-sensitive construction activity using simulation. Journal of Construction Engineering and Management, 137(3), pp. 238-246. ISSN 0733-9364

Shakantu, W; Tookey, J E and Bowen, P A (2003) The hidden cost of transportation of construction materials: An overview. Journal of Engineering, Design and Technology, 1(1), pp. 103-118. ISSN 1726-0531

Shaked, O and Warszawski, A (1992) Consched: Expert system for scheduling of modular construction projects. Journal of Construction Engineering and Management, 118(3), pp. 488-506. ISSN 0733-9364

Shaked, O and Warszawski, A (1995) Knowledge-based system for construction planning of high-rise buildings. Journal of Construction Engineering and Management, 121(2), pp. 172-182. ISSN 0733-9364

Shalwani, A and Lines, B C (2021) An empirical analysis of the causes of cost and schedule growth for small healthcare and educational construction projects. International Journal of Construction Education and Research, 17(3), pp. 277-296. ISSN 1557-8771

Shalwani, A and Lines, B C (2021) An empirical analysis of issue management in small building construction projects. International Journal of Construction Education and Research, 17(4), pp. 352-372. ISSN 1557-8771

Shammas-Toma, M; Seymour, D E and Clark, L (1996) The effectiveness of formal quality management systems in achieving the required cover in reinforced concrete. Construction Management and Economics, 14(4), pp. 353-364. ISSN 01446193

Shamsollahi, D; Moselhi, O and Khorasani, K (2024) Automated detection and segmentation of mechanical, electrical, and plumbing components in indoor environments by using the yolact++ architecture. Journal of Construction Engineering and Management, 150(8): 04024100, ISSN 0733-9364

Shan, L; Garvin, M J and Kumar, R (2010) Collar options to manage revenue risks in real toll public-private partnership transportation projects. Construction Management and Economics, 28(10), pp. 1057-1069. ISSN 1466433X

Shanbari, H and Issa, R R A (2019) Use of video games to enhance construction management education. International Journal of Construction Management, 19(3), pp. 206-221. ISSN 1562-3599

Shapira, A and Glascock, J D (1996) Culture of using mobile cranes for building construction. Journal of Construction Engineering and Management, 122(4), pp. 298-307. ISSN 0733-9364

Shapira, A; Rosenfeld, Y and Mizrahi, I (2008) Vision system for tower cranes. Journal of Construction Engineering and Management, 134(5), pp. 320-332. ISSN 0733-9364

Shapira, A; Simcha, M and Goldenberg, M (2012) Integrative model for quantitative evaluation of safety on construction sites with tower cranes. Journal of Construction Engineering and Management, 138(11), pp. 1281-1293. ISSN 0733-9364

Shapiro Comte, B (1999) The architect's working drawings in context: Paris, 1791-1875. PhD thesis, Harvard University, USA.

Sharma, H; McIntyre, C; Gao, Z and Nguyen, T H (2009) Developing a traffic closure integrated linear schedule for highway rehabilitation projects. Journal of Construction Engineering and Management, 135(3), pp. 146-155. ISSN 0733-9364

Sharma, R (2021) Effect of wastes and admixtures on compressive strength of concrete. Journal of Engineering, Design and Technology, 19(1), pp. 219-244. ISSN 1726-0531

Sharma, S; Bansal, V K and Parti, R (2016) Location-based highway construction planning using geographic information systems. International Journal of Construction Management, 16(4), pp. 299-314. ISSN 1562-3599

Sharma, V; Caldas, C H and Mulva, S P (2021) Development of metrics and an external benchmarking program for healthcare facilities. International Journal of Construction Management, 21(6), pp. 615-630. ISSN 1562-3599

Shash, A A and Abdul-Hadi, N H (1992) Factors affecting a contractor's mark-up size decision in Saudi Arabia. Construction Management and Economics, 10(5), pp. 415-429. ISSN 01446193

Shaurette, M (2011) Safety and health education for demolition and reconstruction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(3), pp. 129-138. ISSN 17514312

Shealy, T and Klotz, L (2015) Well-endowed rating systems: How modified defaults can lead to more sustainable performance. Journal of Construction Engineering and Management, 141(10): 04015031, ISSN 0733-9364

Shehab-Eldeen, T (2002) An automated system for detection, classification and rehabilitation of defects in sewer pipes. PhD thesis, Concordia University, Canada.

Shen, W; Pan, Y; Guan, J and Guo, W (2026) Dual impact of relational embeddedness on expertise and administrative coordination. Journal of Construction Engineering and Management, 152(2): 04025260, ISSN 0733-9364

Shen, L; Drew, D and Zhang, Z (1999) Optimal bid model for price-time biparameter construction contracts. Journal of Construction Engineering and Management, 125(3), pp. 204-209. ISSN 0733-9364

Shen, L; Lee, R K H and Zhang, Z (1996) Application of BOT system for infrastructure projects in China. Journal of Construction Engineering and Management, 122(4), pp. 319-323. ISSN 0733-9364

Shen, L Y; Tam, V W Y; Tam, C M and Drew, D (2004) Mapping approach for examining waste management on construction sites. Journal of Construction Engineering and Management, 130(4), pp. 472-481. ISSN 0733-9364

Shen, L Y; Wu, M and Wang, J Y (2002) A model for assessing the feasibility of construction project in contributing to the attainment of sustainable development. Journal of Construction Research, 3(2), pp. 255-269. ISSN 1609-9451

Shen, Q and Spedding, A (1998) Priority setting in planned maintenance: practical issues in using the multi-attribute approach. Building Research & Information, 26(3), pp. 169-180. ISSN 0961-3218

Shen, W; Tang, W; Wang, Y; Duffield, C F; Hui, F K P and Zhang, L (2021) Managing interfaces in large-scale projects: The roles of formal governance and partnering. Journal of Construction Engineering and Management, 147(7): 04021064, ISSN 0733-9364

Shen, Y; Lin, Z and Wang, Z (2022) Single-side accumulative jacking construction method for large-span arched latticed shells. Journal of Construction Engineering and Management, 148(12): 06022001, ISSN 0733-9364

Shen, Y B and Luo, Y Z (2010) Accumulative sliding construction method for large-span latticed shells. Journal of Construction Engineering and Management, 136(10), pp. 1154-1157. ISSN 0733-9364

Shen, Z and Wu, J (2025) Multiobjective ant colony system algorithm for component-level construction schedule optimization. Journal of Construction Engineering and Management, 151(3): 04025002, ISSN 0733-9364

Sheng, Boyuan (2022) Enhancing green infrastructure management for flood-drought resilience in brisbane, Australia: An integrated approach. PhD thesis, Queensland University of Technology, Australia.

Shepley, M M; Peditto, K; Sachs, N A; Pham, Y; Barankevich, R; Crouppen, G and Dresser, K (2022) Staff and resident perceptions of mental and behavioural health environments. Building Research & Information, 50(1-2), pp. 89-104. ISSN 0961-3218

Sherif, M A and Price, A D F (1999) A framework for pre-project planning. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Sherman, P J (1988) Japanese construction R&D: Entrèe into U.S. Market. Journal of Construction Engineering and Management, 114(1), pp. 133-143. ISSN 0733-9364

Sherman, R; Gibson, G E; Merrow, E and Parrish, K (2021) Examining the impact of rate-of-return regulation on capital project planning. Journal of Construction Engineering and Management, 147(8): 04021080, ISSN 0733-9364

Sherman, R; Parrish, K and Lamanna, A (2021) Identifying and categorizing risks incumbent in us nuclear power plant construction. Journal of Construction Engineering and Management, 147(4): 02018, ISSN 0733-9364

Sherratt, F (2015) Legitimizing public health control on sites? A critical discourse analysis of the responsibility deal construction pledge. Construction Management and Economics, 33(5-6), pp. 444-452. ISSN 01446193

Sherratt, F and Sherratt, S (2017) The road to hell: Worker health, safety and wellbeing within UK corporate social responsibility practices. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Shi, J J (1999) Activity-based construction (ABC) modeling and simulation method. Journal of Construction Engineering and Management, 125(5), pp. 354-360. ISSN 0733-9364

Shi, M; Chen, C; Xiao, B and Seo, J (2024) Vision-based detection method for construction site monitoring by integrating data augmentation and semisupervised learning. Journal of Construction Engineering and Management, 150(5): 04024027, ISSN 0733-9364

Shiers, D; Rapson, D; Roberts, C and Keeping, M (2006) Sustainable construction: The development and evaluation of an environmental profiling system for construction products. Construction Management and Economics, 24(11), pp. 1177-1184. ISSN 1466433X

Shih, C S R; Arroyo, G A and Doro-on, A M (2004) Innovative sustainable design approaches for onsite sewage treatment. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Shih, N J and Huang, S T (2006) 3D scan information management system for construction management. Journal of Construction Engineering and Management, 132(2), pp. 134-142. ISSN 0733-9364

Shih, N J and Wang, P H (2004) Plumbing locator in an as-built building form. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Shih, R C S; Gayley, A and Doro-on, A M (2005) Risk analysis of terrorism on U.S. Cargo transportation infrastructure. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Shim, E and Kim, B C (2014) Batch-size based repetitive scheduling method (BRSM). International Journal of Construction Education and Research, 10(2), pp. 140-156. ISSN 1557-8771

Shimoda, Y (2003) Adaptation measures for climate change and the urban heat island in japan's built environment. Building Research & Information, 31(3-4), pp. 222-230. ISSN 0961-3218

Shohet, I M and Frydman, S (2003) Communication patterns in construction at construction manager level. Journal of Construction Engineering and Management, 129(5), pp. 570-577. ISSN 0733-9364

Shohet, I M and Laufer, A (1991) What does the construction foreman do? Construction Management and Economics, 9(6), pp. 565-576. ISSN 01446193

Shohet, I M and Perelstein, E (2004) Decision support model for the allocation of resources in rehabilitation projects. Journal of Construction Engineering and Management, 130(2), pp. 249-257. ISSN 0733-9364

Shohet, I M; Wei, H H; Skibniewski, M J; Tak, B and Revivi, M (2019) Integrated communication, control, and command of construction safety and quality. Journal of Construction Engineering and Management, 145(9): 04019051, ISSN 0733-9364

Shokri, S; Haas, C T; Haas, R C G and Lee, S H (2016) Interface-management process for managing risks in complex capital projects. Journal of Construction Engineering and Management, 142(2): 04015069, ISSN 0733-9364

Short, C A and Al-Maiyah, S (2009) Design strategy for low-energy ventilation and cooling of hospitals. Building Research & Information, 37(3), pp. 264-292. ISSN 0961-3218

Short, C A; Cook, M and Lomas, K J (2009) Delivery and performance of a low-energy ventilation and cooling strategy. Building Research & Information, 37(1), pp. 1-30. ISSN 0961-3218

Short, C A and Lomas, K J (2007) Exploiting a hybrid environmental design strategy in a US continental climate. Building Research & Information, 35(2), pp. 119-143. ISSN 0961-3218

Short, C A; Lomas, K J and Woods, A (2004) Design strategy for low-energy ventilation and cooling within an urban heat island. Building Research & Information, 32(3), pp. 187-206. ISSN 0961-3218

Shou, T.; Pan, Y. and Zhao, B. (2026) Vernacular ecological construction: A diagrammatic exploration on the composition modes of spatial-landscape in huizhou courtyard dwellings. Architectural Engineering and Design Management, 22(2), pp. 446-470. ISSN 1745-2007

Shou, T and Xu, H (2024) Climate adaptation in traditional dwelling typologies: the case of Southern Anhui, China. Architectural Engineering and Design Management, 20(5), pp. 1301-1322. ISSN 1745-2007

Shrestha, B K (2021) Relationship between standardization critical success factors (CSFs) and project performance. PhD thesis, University of Nevada, Las Vegas, USA.

Shtub, A (1988) The integration of CPM and material management in project management. Construction Management and Economics, 6(4), pp. 261-272. ISSN 01446193

Shuler, S and Nobe, M D (2007) Edge cracking in residential development hot mix asphalt pavements. International Journal of Construction Education and Research, 3(3), pp. 179-197. ISSN 1557-8771

Sidawi, B and Deakin, M (2013) Diabetes, built environments and (un)healthy lifestyles:The potential of smart city technologies. Smart and Sustainable Built Environment, 2(3), pp. 311-323. ISSN 2046-6099

Siddiqui, M K (2008) Coordination of distributed schedules in a heterogeneous environment: identification of conflicts using schedule mappings. PhD thesis, University of Texas at Austin, USA.

Sidoli del Ceno, J (2012) A process account of construction mediation. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Sidwell, A C (1982) A critical study of project team organisational forms within the building process. PhD thesis, Aston University, UK.

Sierra, F and Rodboonpha, C (2023) Building information modelling implementation models in Thailand: Drivers, benefits, barriers and lessons learned. Journal of Construction in Developing Countries, 28(2), pp. 37-55. ISSN 1823-6499

Siham, E Y (2024) Towards a 3D property valuation model: Conceptualization and BIM-CIM based data integrability. PhD thesis, Universite de Liege, Belgium.

Silva, A; Dias, J L; Gaspar, P L and De Brito, J (2011) Service life prediction models for exterior stone cladding. Building Research & Information, 39(6), pp. 637-653. ISSN 0961-3218

Silva, Tássia Farssura Lima da (2022) BIM and risk management interface in the design phase: A multi-method approach. PhD thesis, Universidade de São Paulo, Brazil.

Simpson, Y and Dye, J (2010) Measuring value for money on ministry of defence minor new works projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Simu, K (2009) The construction site manager's impact on risk management performance. PhD thesis, Luleå University of Technology, Sweden.

Singh, A (2002) Lean engineering for mass housing: Design, manufacture and site erection. Journal of Construction Research, 3(1), pp. 97-122. ISSN 1609-9451

Singh, A (2002) Behavioural perceptions of design and construction engineers. Engineering, Construction and Architectural Management, 9(2), pp. 66-80. ISSN 0969-9988

Singh, A (2003) Accelerated work-schedule design considering efficiency losses for overtime and overmanning. Engineering, Construction and Architectural Management, 10(5), pp. 312-321. ISSN 0969-9988

Singh, A; Connaughton, J and Davies, R (2015) Making sense of corporate social responsibility strategies in construction organisations in the UK. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Singh, K K and Sinha, M K (2017) Optimization of design parameters in a cylindrical heat sink with branched fins under natural convection. Journal of Engineering, Design and Technology, 15(2), pp. 242-253.

Singh, M M; Sawhney, A and Sharma, V (2017) Utilising building component data from BIM for formwork planning. Construction Economics and Building, 17(4), pp. 20-36. ISSN 2204-9029

Singh, S (1987) Cost models for approximate cost estimation of structural systems in commercial high rise buildings. PhD thesis, National University of Singapore, Singapore.

Singh, V V and Tommelein, I D (2023) Visual workload leveling and zoning using work density method for construction process planning. Journal of Construction Engineering and Management, 149(10): 04023102, ISSN 0733-9364

Sirimewan, Diani Chamathya (2025) Optimising construction and demolition waste handling using computer vision techniques. PhD thesis, Monash University, Australia.

Skaik, S (2017) Operational problems and solutions of statutory complex adjudication: Stakeholders' perspectives. International Journal of Law in the Built Environment, 9(2), pp. 162-175. ISSN 1756-1450

Skibniewski, M and Hendrickson, C (1988) Analysis of robotic surface finishing work on construction site. Journal of Construction Engineering and Management, 114(1), pp. 53-68. ISSN 0733-9364

Skibniewski, M and Molinski, J (1989) Modelling of building production activities for multifacility projects. Construction Management and Economics, 7(4), pp. 357-365. ISSN 01446193

Skibniewski, M J (1991) Information management system for new construction technologies. Construction Management and Economics, 9(1), pp. 39-49. ISSN 01446193

Skibniewski, M J and Kassouf, P J (1990) Potential for application of plastic liner plates in tunnelling works. Construction Management and Economics, 8(1), pp. 3-11. ISSN 01446193

Skitmore, M (2001) Raftery curves for tender price forecasting: Empirical probabilities and pooling. Journal of Financial Management of Property and Construction, 6(3), pp. 141-154. ISSN 1366-4387

Skitmore, M (2004) Predicting the probability of winning sealed bid auctions: The effects of outliers on bidding models. Construction Management and Economics, 22(1), pp. 101-109. ISSN 01446193

Skitmore, M and Lo, H P (2002) A method for identifying high outliers in construction contract auctions. Engineering, Construction and Architectural Management, 9(2), pp. 90-130. ISSN 0969-9988

Skitmore, R M (1986) A model of the construction project selection and bidding decision. PhD thesis, University of Salford, UK.

Skitmore, R M; Stradling, S G and Tuohy, A P (1989) Project management under uncertainty. Construction Management and Economics, 7(2), pp. 103-113. ISSN 01446193

Slater, K R and Robinson, J B (2023) Transformational climate actions by cities. Buildings & Cities, 4(1), pp. 74-82. ISSN 2632-6655

Slater, R and Radford, A (2008) Perceptions in the Australian building industry of deficiencies in architects' design documentation and the effects on project procurement. Construction Economics and Building, 8(1), pp. 23-33. ISSN 2204-9029

Slattery, K T and Slattery, D K (2013) Modeling earth surfaces for highway earthwork computation using terrestrial laser scanning. International Journal of Construction Education and Research, 9(2), pp. 132-146. ISSN 1557-8771

Slaughter, E S (1998) Models of construction innovation. Journal of Construction Engineering and Management, 124(3), pp. 226-231. ISSN 0733-9364

Slaughter, E S (2001) Design strategies to increase building flexibility. Building Research & Information, 29(3), pp. 208-217. ISSN 0961-3218

Sloan, B (1995) In search of excellence in learning: The strategic value of computer-assisted learning (CAL). Construction Management and Economics, 13(5), pp. 435-439. ISSN 01446193

Sloan Wood, O; Lupenza, E; Agnello, D M; Knudsen, J B; Msellem, M; Schiøler, K L and Saleh, F (2025) Co-creating interventions to prevent mosquito-borne disease transmission in hospitals. Buildings & Cities, 6(1), pp. 819-840. ISSN 2632-6655

Small, E P; Bakry, I and Ayyash, L (2021) Evaluating the effect of TQM on mep construction productivity and project delivery in Dubai. International Journal of Construction Management, 21(10), pp. 1061-1075. ISSN 1562-3599

Smallwood, J (1998) Client influence on contractor health and safety in South Africa. Building Research & Information, 26(3), pp. 181-189. ISSN 0961-3218

Smallwood, J J (2002) Best practice workers' compensation insurance performance: The related issues. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Smith, A and Wilkins, B (1996) Team relationships and related critical factors in the successful procurement of health care facilities. Journal of Construction Procurement, 2(1), pp. 30-40. ISSN 1358-9180

Smith, B W (2008) Temporary construction lighting of buildings: An evaluation of four techniques, both qualitative and quantitative. International Journal of Construction Education and Research, 4(2), pp. 132-149. ISSN 1557-8771

Smith, G and Ceranic, B (2008) Spatial layout planning in sub-surface rail station design for effective fire evacuation. Architectural Engineering and Design Management, 4(2), pp. 99-120. ISSN 1745-2007

Smith, G R and Roth, R D (1991) Safety programs and the construction manager. Journal of Construction Engineering and Management, 117(2), pp. 360-371. ISSN 0733-9364

Smith, J (2005) An approach to developing a performance brief at the project inception stage. Architectural Engineering and Design Management, 1(1), pp. 3-20. ISSN 1745-2007

Smith, J P; Miller, K; Christofferson, J and Hutchings, M (2011) Best practices for dealing with price volatility in utah's residential construction market. International Journal of Construction Education and Research, 7(3), pp. 210-225. ISSN 1557-8771

Smith, S (2014) Building information modelling: moving Crossrail, UK, forward. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(3), pp. 141-151. ISSN 17514304

Smith, S and Roy, R (2002) Product configuration in the house-building industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Smolders, A L (2019) Trust unravelled: In inter-organisational relationships in a regulated tender environment. PhD thesis, Delft University of Technology, Netherlands.

Smyth, H (2005) Procurement push and marketing pull in supply chain management: The conceptual contribution of relationship marketing as a driver in project financial performance. Journal of Financial Management of Property and Construction, 10(1), pp. 33-44. ISSN 1366-4387

Smyth, H; Anvuur, A M and Kusuma, I (2017) Integrated solutions for total asset management through "RIVANS". Built Environment Project and Asset Management, 7(1), pp. 5-18. ISSN 2044-124X

Smyth, H and Kioussi, S (2011) Architecture firms and the role of brand management. Architectural Engineering and Design Management, 7(3), pp. 205-217. ISSN 1745-2007

So, K L (2021) Integrated life-cycle management of highway bridges. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Soares, Bruno Cesarino (2021) Use of building information modeling to support built environment management. PhD thesis, Universidade Federal de Minas Gerais, Brazil.

Sodade, B A A (2011) Project management complexities in municipal projects. PhD thesis, University of Calgary, Canada.

Sohail, M and Baldwin, A N (2004) Performance indicators for 'micro-projects' in developing countries. Construction Management and Economics, 22(1), pp. 11-23. ISSN 01446193

Sohail, M and Maslyukivska, O (2009) Learning from water sector reforms in Europe and Asia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(3), pp. 107-116. ISSN 17514312

Sohoni, P; Ghaffar, A and Jha, K N (2017) Cost optimisation for high-rise buildings considering number of levels of shores and reshores. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Soibelman, L; Liu, L Y; Kirby, J G; East, E W; Caldas, C H and Lin, K Y (2003) Design review checking system with corporate lessons learned. Journal of Construction Engineering and Management, 129(5), pp. 475-484. ISSN 0733-9364

Solnosky, R; Parfitt, M K and Holland, R (2015) Delivery methods for a multi-disciplinary architectural engineering capstone design course. Architectural Engineering and Design Management, 11(4), pp. 305-324. ISSN 1745-2007

Soltani, A R (2004) A multi-objective intelligent transportation system in construction sites. PhD thesis, University of Salford, UK.

Soltani, A R (2005) An intelligent transportation system in construction sites. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Sommerville, J; Craig, N and Callaghan, N (2012) House building service quality and buyer expectations. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Son, P V H and Khoi, L N Q (2024) Application of slime mold algorithm to optimize time, cost and quality in construction projects. International Journal of Construction Management, 24(13), pp. 1375-1386. ISSN 1562-3599

Song, L and AbouRizk, S M (2005) Quantifying engineering project scope for productivity modeling. Journal of Construction Engineering and Management, 131(3), pp. 360-367. ISSN 0733-9364

Song, M H; Fischer, M and Theis, P (2017) Field study on the connection between BIM and daily work orders. Journal of Construction Engineering and Management, 143(5): 06016007, ISSN 0733-9364

Song, X; Carlsson, C and Nguyen, D (2025) Life cycle assessment of geotechnical works for high-rise building construction on soft clay in Sweden. Building Research & Information, 53(6), pp. 717-733. ISSN 0961-3218

Song, Y and Chua, D K H (2011) Requirement and availability time-window analysis of intermediate function. Journal of Construction Engineering and Management, 137(11), pp. 967-975. ISSN 0733-9364

Sooksil, N and Benjaoran, V (2015) Factors that affect construction safety equilibrium: Nakhon Ratchasima construction crews perspective. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Sousa, V; Almeida, N M; Dias, L A and Branco, F A (2014) Risk-informed time-cost relationship models for sanitation projects. Journal of Construction Engineering and Management, 140(5): 06014002, ISSN 0733-9364

Sozen, Z (1985) Size, technology and aspects of structure in contractor firms in Turkey. Construction Management and Economics, 3(3), pp. 233-247. ISSN 01446193

Spangenberg, S; Hannerz, H and Tüchsen, F (2005) Hospitalized injuries among bridge and tunnel construction workers. Construction Management and Economics, 23(3), pp. 237-240. ISSN 01446193

Sparkling, A E and Sengupta, R (2023) Mapping student’s perspective of a redesigned curriculum in construction management using self-determination theory. International Journal of Construction Education and Research, 19(4), pp. 443-459. ISSN 1557-8771

Sparks, David G (2018) Exploring public procurement as a mechanism for transitioning to low-carbon buildings. PhD thesis, Queensland University of Technology, Australia.

Spataru, C and Gauthier, S (2014) How to monitor people 'smartly' to help reducing energy consumption in buildings? Architectural Engineering and Design Management, 10(1-2), pp. 60-78. ISSN 1745-2007

Spence, R (2004) Risk and regulation: Can improved government action reduce the impacts of natural disasters? Building Research & Information, 32(5), pp. 391-402. ISSN 0961-3218

Spennemann, D H R; Pike, M and Watson, M J (2017) Effects of acid pigeon excreta on building conservation. International Journal of Building Pathology and Adaptation, 35(1), pp. 2-15.

Spentzou, E; Cook, M J and Emmitt, S (2022) Low-energy cooling and ventilation refurbishments for buildings in a mediterranean climate. Architectural Engineering and Design Management, 18(4), pp. 473-494. ISSN 1745-2007

Spielholz, P; Davis, G and Griffith, J (2006) Physical risk factors and controls for musculoskeletal disorders in construction trades. Journal of Construction Engineering and Management, 132(10), pp. 1059-1068. ISSN 0733-9364

Sridarran, P; Keraminiyage, K and Herszon, L (2017) Improving the cost estimates of complex projects in the project-based industries. Built Environment Project and Asset Management, 7(2), pp. 173-184. ISSN 2044-124X

Srisethanil, C (1996) Pedagogical framework for an engineering intelligent tutoring system. PhD thesis, Georgia Institute of Technology, USA.

Staab, G E (1989) Construction of port and facilities on horn of Africa: lessons learned. Journal of Construction Engineering and Management, 115(1), pp. 53-69. ISSN 0733-9364

Stafford, A (2011) Long-term monitoring and performance of ground source heat pumps. Building Research & Information, 39(6), pp. 566-573. ISSN 0961-3218

Stager, D K (1996) Organizing and managing a finance-design-build project in Turkey: Fourth Roebling lecture, 1995. Journal of Construction Engineering and Management, 122(3), pp. 199-211. ISSN 0733-9364

Stals, A; Elsen, C and Jancart, S (2022) Integration of parametric modeling tools in small architectural offices–between constraints and organizational strategies. Architectural Engineering and Design Management, 18(5), pp. 759-773. ISSN 1745-2007

Standing, Barry (2025) The link between internal integration and financial performance in engineering and construction companies. PhD thesis, Queensland University of Technology, Australia.

Staneff, S T (1997) A decision support system for infrastructure management. PhD thesis, University of California, Berkeley, USA.

Steed, A J (1996) Defining interaction within immersive virtual environments. PhD thesis, Queen Mary University of London, UK.

Steele, A and Sodhi, D (2004) Black and minority ethnic contractors and consultants and UK housing associations' contracting power. Construction Management and Economics, 22(2), pp. 151-157. ISSN 01446193

Steemers, K (2003) Towards a research agenda for adapting to climate change. Building Research & Information, 31(3-4), pp. 291-301. ISSN 0961-3218

Stella, C; Ceppi, G and D’Appolonia, E (1990) Temporary tunnel support using jet-grouted cylinders. Journal of Construction Engineering and Management, 116(1), pp. 35-53. ISSN 0733-9364

Stemp, B A and Walewski, J (2011) Lampson transi-lift mobile crane: Concept, design, and use. Journal of Construction Engineering and Management, 137, pp. 785-792. ISSN 0733-9364

Stevenson, F (2019) Embedding building performance evaluation in UK architectural practice and beyond. Building Research & Information, 47(3), pp. 305-317. ISSN 0961-3218

Stevenson, F and Rijal, H B (2010) Developing occupancy feedback from a prototype to improve housing production. Building Research & Information, 38(5), pp. 549-563. ISSN 0961-3218

Stewart, J; Minchin, R E; Jaselskis, E J; Dayal, V and Smith, G (2004) Potential construction applications for thermoset composite scrap material. Journal of Construction Engineering and Management, 130(2), pp. 199-205. ISSN 0733-9364

Stewart, J H (2024) The plastics crisis: Responsible recycling in civil engineering and infrastructure. PhD thesis, Mississippi State University, USA.

Stewart, P; Robinson, J and Low, S (2005) The business case for sustainable design: the city of Melbourne CH2 project. Construction Economics and Building, 5(2), pp. 58-70. ISSN 2204-9029

Stigson, B (1999) Sustainable development for industry and society. Building Research & Information, 27(6), pp. 424-430. ISSN 0961-3218

Stone, M L; Johnson, P W and Leopard, T A (2011) Using design-based change orders as a lessons learned metric in university dormitory construction. International Journal of Construction Education and Research, 7(3), pp. 226-240. ISSN 1557-8771

Stouffs, R (2001) Visualizing information structures and its impact on project teams: An information architecture for the virtual AEC company. Building Research & Information, 29(3), pp. 218-232. ISSN 0961-3218

Stoy, C and Kalusche, W (2006) The determination of occupancy costs during early project phases. Construction Management and Economics, 24(9), pp. 933-944. ISSN 1466433X

Strachan, Peter A (2001) Competitive pressures and environmental management systems in the Scottish construction and oil and gas industries. PhD thesis, Robert Gordon University, UK.

Straub, A (2002) Strategic technical management of housing stock: Lessons from Dutch housing associations. Building Research & Information, 30(5), pp. 372-381. ISSN 0961-3218

Straub, A D (2010) Competences of maintenance service suppliers servicing end-customers. Construction Management and Economics, 28(11), pp. 1187-1195. ISSN 1466433X

Stringfellow, P (2014) Construction contractors involvement in disaster management planning. Construction Economics and Building, 14(2), pp. 120-132. ISSN 2204-9029

Ströbele, B and Lützkendorf, T (2019) Communicating environmental information: Rethinking options for construction products. Building Research & Information, 47(6), pp. 681-696. ISSN 0961-3218

Stukhart, G (1987) Construction management responsibilities during design. Journal of Construction Engineering and Management, 113(1), pp. 90-98. ISSN 0733-9364

Sturges, J and Bates, M (2000) Thriving on chaos: The result of poor planning: Some views from the housebuilding sector. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Styhre, A; Brorström, S and Gluch, P (2022) The valuation of housing in low-amenity and low purchasing power city districts: Social and economic value entangled by default. Construction Management and Economics, 40(1), pp. 72-86. ISSN 01446193

Su, Y and Lucko, G (2015) Synthetic cash flow model with singularity functions for unbalanced bidding scenarios. Construction Management and Economics, 33(1), pp. 35-54. ISSN 01446193

Su, Y and Lucko, G (2015) Optimum present value scheduling based on synthetic cash flow model with singularity functions. Journal of Construction Engineering and Management, 141(11): 04015036, ISSN 0733-9364

Su, Y and Lucko, G (2015) Synthetic cash flow model with singularity functions. I: Theory for periodic phenomena and time value of money. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Su, Y and Lucko, G (2015) Synthetic cash flow model with singularity functions. II: Feasible prompt payment discount scenarios. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Su, Z X; Wei, H Y; Zou, X and Qi, J X (2019) Zero-one formulation for a partial resource-constrained project scheduling problem with generalized precedence relations. Journal of Construction Engineering and Management, 145(3): 04018142, ISSN 0733-9364

Subchan, B R; Tayeh, B A; Widayanto, E and Wiswamitra, K A (2024) Bamboo's evolution as a sustainable material: A comprehensive exploration and practical integration as a structural element in concrete, bridge frameworks, and architectural perspectives. Architectural Engineering and Design Management, 20(6), pp. 1566-1588. ISSN 1745-2007

Suckarieh, G (1984) Construction management control with microcomputers. Journal of Construction Engineering and Management, 110(1), pp. 72-78. ISSN 0733-9364

Sugimoto, F (1990) Globalization of international engineering and construction firms for building their competitiveness. PhD thesis, Massachusetts Institute of Technology, USA.

Sullivan, S (2007) Construction and behavior of precast bridge deck panel systems. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Sumanohar, Symon (2022) Statistical approach towards complexities resolution for design, building, and operation of data centers. DBA thesis, American Business Management and Technology College, Switzerland.

Sumner, M and Slattery, D (2010) The impact of leadership effectiveness and team processes on team performance in construction. International Journal of Construction Education and Research, 6(3), pp. 179-201. ISSN 1557-8771

Sun, M; Fleming, A; Senaratne, S; Motawa, I and Yeoh, M L (2006) A change management toolkit for construction projects. Architectural Engineering and Design Management, 2(4), pp. 261-271. ISSN 1745-2007

Sun, W (2023) A self-localized smart hardhat system for construction 4.0. PhD thesis, Columbia University, USA.

Sunarharum, Tri Mulyani (2016) Collaborative planning for disaster resilience: The role of community engagement for flood risk management. PhD thesis, Queensland University of Technology, Australia.

Sundaram, T K (1989) Contract management: a rational approach to construction contract pricing. PhD thesis, Indian Institute of Technology Delhi, India.

Sundararajan, S K (2004) Project performance-based optimal capital structure for privately financed infrastructure projects. PhD thesis, University of Maryland, College Park, USA.

Sundararajan, S K and Tseng, C L (2017) Managing project performance risks under uncertainty: Using a dynamic capital structure approach in infrastructure project financing. Journal of Construction Engineering and Management, 143(8): 04017046, ISSN 0733-9364

Sundquist, J (2004) Low innovation among building material suppliers: The natural level of the trade. Construction Economics and Building, 4(1), pp. 35-44. ISSN 2204-9029

Sundqvist, J (2008) From focus on price to the pyramid of innovation, information, cooperation, value and trust: A success story of five Swedish building material manufacturers. Construction Economics and Building, 8(2), pp. 11-22. ISSN 2204-9029

Sunikka-Blank, M and Galvin, R (2012) Introducing the prebound effect: The gap between performance and actual energy consumption. Building Research & Information, 40(3), pp. 260-273. ISSN 0961-3218

Suprapto, M (2016) Collaborative contracting in projects. PhD thesis, Delft University of Technology, Netherlands.

Suraji, A and Duff, A R (2000) Construction management actions: A stimulant of construction accident causation. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Suresh, R H and Egbu, C O (2004) Knowledge mapping: Concepts and benefits for a sustainable urban environment. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Svec, P; Berkebile, R and Todd, J A (2012) REGEN: Toward a tool for regenerative thinking. Building Research & Information, 40(1), pp. 81-94. ISSN 0961-3218

Swaffield, J A (1980) Building drainage system research: Past influences, current efforts and future objectives. Construction Papers, 1(1), pp. 45-61. ISSN 0144-8587

Swaffield, J A (2005) Transient identification of defective trap seals. Building Research & Information, 33(3), pp. 245-256. ISSN 0961-3218

Swaffield, L M and Pasquire, C L (1999) Examination of relationships between building form and function, and the cost of mechanical and electrical services. Construction Management and Economics, 17(4), pp. 483-492. ISSN 01446193

Swaffield, L M and Pasquire, C L (2000) Improving early cost advice for mechanical and electrical services by considering functions and client/design team communication. Journal of Financial Management of Property and Construction, 5(1-2), pp. 3-13. ISSN 1366-4387

Sweetnam, T; Spataru, C; Barrett, M and Carter, E (2019) Domestic demand-side response on district heating networks. Building Research & Information, 47(4), pp. 330-343. ISSN 0961-3218

Swenarton, M (2009) Research shortcomings in housing. Building Research & Information, 37(1), pp. 101-105. ISSN 0961-3218

Syal, M G (1992) Construction process knowledge model to assist method selection in project planning. PhD thesis, Pennsylvania State University, USA.

Syal, M G; Grobler, F; Willenbrock, J H and Parfitt, M K (1992) Construction project planning process model for small-medium builders. Journal of Construction Engineering and Management, 118(4), pp. 651-666. ISSN 0733-9364

Syed, A and Sonparote, R S (2020) Development and early-age performance of an innovative prestressed precast concrete pavement. Journal of Construction Engineering and Management, 146(2): 05019018, ISSN 0733-9364

Sylvie, J R; Thomas, S R; Lee, S H; Chapman, R E and Smith, R T (2013) Development and interpretation of the security rating index. Journal of Construction Engineering and Management, 139(2), pp. 185-194. ISSN 0733-9364

Sánchez Vivas, L; Costello, K; Mobley, S; Mihelcic, J R and Mullins, G (2022) Determination of safety factors for structural bamboo design applications. Architectural Engineering and Design Management, 18(1), pp. 26-37. ISSN 1745-2007

Taha, M (2022) Identifying legal frameworks impacting institutional investors' participation in infrastructure projects. LLD thesis, University of Dundee, UK.

Tainter, J A (2012) Regenerative design in science and society. Building Research & Information, 40(3), pp. 369-372. ISSN 0961-3218

Tait, P and Loosemore, M (2009) The corporate governance of Australian listed construction companies. Construction Economics and Building, 9(2), pp. 7-16. ISSN 2204-9029

Taku, A M (2021) Predicting modular efficiency in oil and gas capital projects using multi-criteria decision analysis. DEng thesis, George Washington University, USA.

Tallgren, M V (2018) Developing a collaborative planning tool for construction-a building information model-enhanced planning and scheduling tool for production. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Tam, C M; Deng, Z M; Zeng, S X and Ho, C S (2000) Quest for continuous quality improvement for public housing construction in Hong Kong. Construction Management and Economics, 18(4), pp. 437-446. ISSN 01446193

Tam, C M; Fung, I W H; Yeung, T C L and Tung, K C F (2003) Relationship between construction safety signs and symbols recognition and characteristics of construction personnel. Construction Management and Economics, 21(7), pp. 745-753. ISSN 01446193

Tam, C M and Tong, T K L (2003) GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction. Construction Management and Economics, 21(3), pp. 257-266. ISSN 01446193

Tam, C M and Tong, T K L (2008) Locating large-scale harbour-front project developments using SIR method with grey aggregation approach. Construction Innovation, 8(2), pp. 120-136. ISSN 1471-4175

Tam, C M; Tong, T K L and Chan, W K W (2001) Genetic algorithm for optimizing supply locations around tower crane. Journal of Construction Engineering and Management, 127(4), pp. 315-320. ISSN 0733-9364

Tam, C M; Tong, T K L; Leung, A W T and Chiu, G W C (2002) Site layout planning using nonstructural fuzzy decision support system. Journal of Construction Engineering and Management, 128(3), pp. 220-231. ISSN 0733-9364

Tam, C M; Tong, T K L and Wong, B W L (2007) An integrated system for earthmoving planning. Construction Management and Economics, 25(11), pp. 1127-1137. ISSN 01446193

Tam, V W Y and Hao, J J L (2019) Adaptive reuse in sustainable development. International Journal of Construction Management, 19(6), pp. 509-521. ISSN 1562-3599

Tam, V W Y; Kim, K and Brohier, A (2021) Life-cycle analysis by using the alternative sustainable water innovations in residential dwellings. International Journal of Construction Management, 21(11), pp. 1143-1155. ISSN 1562-3599

Tam, V W Y; Le, K N; Tran, C N N and Illankoon, I M C S (2021) A review on international ecological legislation on energy consumption: Greenhouse gas emission management. International Journal of Construction Management, 21(6), pp. 631-647. ISSN 1562-3599

Tam, V W Y; Zhang, X; Lee, W W Y and Shen, L Y (2011) Applications of extensive green-roof systems in contributing to sustainable development in densely populated cities: A Hong Kong study. Construction Economics and Building, 11(1), pp. 15-25. ISSN 2204-9029

Tamayo, M M S and Estrada, J D J (2022) Planning gaps: Unexpected urban expansion in five Colombian metropolitan areas. Buildings & Cities, 3(1), pp. 725-744. ISSN 2632-6655

Tamer, Z; Yoon, Y and Hastak, M (2012) Protocol for profitability analysis using internal entities in organizational structure of construction companies. Journal of Construction Engineering and Management, 138(12), pp. 1394-1402. ISSN 0733-9364

Tan, L; Zhang, Y; Chen, Y and Zhu, T (2023) A multiple-objective decision-support model for lighting maintenance routing considering carbon dioxide emissions and balanced workload. Journal of Construction Engineering and Management, 149(8): 04023063, ISSN 0733-9364

Tan, W (1989) Subsector fluctuations in construction. Construction Management and Economics, 7(1), pp. 41-51. ISSN 01446193

Tan, W and Elias, Y (2000) Learning-by-doing in Singapore construction. Journal of Construction Research, 1(2), pp. 151-158. ISSN 1609-9451

Taneja, S; Akinci, B; Garrett, J H; Soibelman, L; Ergen, E; Pradhan, A; Tang, P; Berges, M; Atasoy, G; Liu, X; Shahandashti, S M and Anil, E B (2011) Sensing and field data capture for construction and facility operations. Journal of Construction Engineering and Management, 137, pp. 870-881. ISSN 0733-9364

Tang, G; Zhao, Z; Cao, L; Qi, Y; Yu, X and Liu, W (2023) A simulation optimization approach to optimize dredger fleet schedule plan for dredging works in existing ports. Journal of Construction Engineering and Management, 149(2): 4022165, ISSN 0733-9364

Tang, S L; Ying, K C; Anson, M and Lu, M (2005) Rmcsim: A simulation model of a ready-mixed concrete plant serving multiple sites using multiple truckmixers. Construction Management and Economics, 23(1), pp. 15-31. ISSN 01446193

Tang, S L; Ying, K C; Chan, W Y and Chan, Y L (2004) Impact of social safety investments on social costs of construction accidents. Construction Management and Economics, 22(9), pp. 937-946. ISSN 01446193

Tang, Y (2006) Evolutionary and customer-oriented building design process. PhD thesis, Loughborough University, UK.

Tang, Y; Liu, R and Sun, Q (2014) Two-stage scheduling model for resource leveling of linear projects. Journal of Construction Engineering and Management, 140(7): 04014022, ISSN 0733-9364

Tanwani, R and Iseley, D T (1994) Tracking and steering systems in trenchless construction. Journal of Construction Engineering and Management, 120(1), pp. 65-76. ISSN 0733-9364

Tapia, Ricardo M (2017) Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects. PhD thesis, Iowa State University, USA.

Tapper, H (1997) Welfare assessment of public investment in a CGE model. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.

Tariq, S; Zhang, X and Leung, R H M (2019) An analytical review of failed water public-private partnerships in developing countries. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(2), pp. 60-69. ISSN 17514304

Tatum, C B (1983) Issues in professional construction management. Journal of Construction Engineering and Management, 109(1), pp. 112-119. ISSN 0733-9364

Tatum, C B (1984) Organizing large projects: How managers decide. Journal of Construction Engineering and Management, 110(3), pp. 346-358. ISSN 0733-9364

Tatum, C B (1986) Designing project organizations: An expanded process. Journal of Construction Engineering and Management, 112(2), pp. 259-272. ISSN 0733-9364

Tatum, C B (1987) Balancing engineering and management in construction education. Journal of Construction Engineering and Management, 113(2), pp. 264-272. ISSN 0733-9364

Tatum, C B (2011) Core elements of construction engineering knowledge for project and career success. Journal of Construction Engineering and Management, 137, pp. 745-750. ISSN 0733-9364

Tatum, C B (2018) Learning construction engineering: Why, what, and how? Journal of Construction Engineering and Management, 144(3): 04018004, ISSN 0733-9364

Tatum, C B; Bauer, M F and Meade, A W (1989) Process of innovation for up/down construction at Rowes Wharf. Journal of Construction Engineering and Management, 115(2), pp. 179-195. ISSN 0733-9364

Tatum, C B and Fawcett, R P (1986) Organizational alternatives for large projects. Journal of Construction Engineering and Management, 112(1), pp. 49-61. ISSN 0733-9364

Tatum, C B; Vorster, M and Klingler, M (2006) Innovations in earthmoving equipment: New forms and their evolution. Journal of Construction Engineering and Management, 132(9), pp. 987-997. ISSN 0733-9364

Tavakoli, A and Kakalia, A (1993) MMS: A materials management system. Construction Management and Economics, 11(2), pp. 143-148. ISSN 01446193

Tavares, d A C; Rocha, L J and Monetti, E (2017) São Paulo's office market: Scenario for the next years. Journal of Financial Management of Property and Construction, 22(2), pp. 154-173. ISSN 1366-4387

Taylor, J E; Levitt, R and Villarroel, J A (2009) Simulating learning dynamics in project networks. Journal of Construction Engineering and Management, 135(10), pp. 1009-1015. ISSN 0733-9364

Taylor, S; Fan, D and Rylatt, M (2014) Enabling urban-scale energymodelling: A new spatial approach. Building Research & Information, 42(1), pp. 4-16. ISSN 0961-3218

Taylor, T R B and Ford, D N (2008) Managing tipping point dynamics in complex construction projects. Journal of Construction Engineering and Management, 134(6), pp. 421-431. ISSN 0733-9364

Taylor, T R B; Ford, D N and Reinschmidt, K F (2012) Impact of public policy and societal risk perception on US civilian nuclear power plant construction. Journal of Construction Engineering and Management, 138(8), pp. 972-981. ISSN 0733-9364

Teicholz, P and Fischer, M (1994) Strategy for computer integrated construction technology. Journal of Construction Engineering and Management, 120(1), pp. 117-131. ISSN 0733-9364

Telem, D; Laufer, A and Shapira, A (2006) Only dynamics can absorb dynamics. Journal of Construction Engineering and Management, 132(11), pp. 1167-1177. ISSN 0733-9364

Teller, J (2001) An on-line glossary as a way to foster the construction of a common culture among urban experts, stakeholders and decision-makers. Construction Innovation, 1(4), pp. 259-271. ISSN 1471-4175

Tenpierik, M J and Cauberg, J J M (2010) Encapsulated vacuum insulation panels: Theoretical thermal optimization. Building Research & Information, 38(6), pp. 660-669. ISSN 0961-3218

Teo, S I E; Zhou, Y and Yeoh, J K W (2025) Indoor wifi path loss model to estimate indoor network coverage considering residential design. Smart and Sustainable Built Environment, 14(5), pp. 1407-1433. ISSN 2046-6099

Teo, H P (1990) Decision support and risk management system for competitive bidding in refurbishment work. PhD thesis, Heriot-Watt University, UK.

Tepeli, E; Taillandier, F and Breysse, D (2021) Multidimensional modelling of complex and strategic construction projects for a more effective risk management. International Journal of Construction Management, 21(12), pp. 1218-1239. ISSN 1562-3599

Tezel, A and Aziz, Z (2017) Benefits of visual management in construction: Cases from the transportation sector in England. Construction Innovation, 17(2), pp. 125-157. ISSN 1471-4175

Thabet, W Y and Beliveau, Y J (1994) Modeling work space to schedule repetitive floors in multistory buildings. Journal of Construction Engineering and Management, 120(1), pp. 96-116. ISSN 0733-9364

Thal Jr, A E; Cook, J J and White Iii, E D (2010) Estimation of cost contingency for Air Force construction projects. Journal of Construction Engineering and Management, 136(11), pp. 1181-1188. ISSN 0733-9364

Thangaraj, R K and Chan, T K (2012) The effects of the global financial crisis on the Australian building construction supply chain. Construction Economics and Building, 12(3), pp. 16-30. ISSN 2204-9029

Tharachai, T (2004) Multiple project resource scheduling for construction. PhD thesis, University of Michigan, USA.

Thelemaque, N A and Kaminsky, J A (2024) Corporate climate pledges of high-revenue design firms and contractors. Journal of Construction Engineering and Management, 150(2): 04023160, ISSN 0733-9364

Thevendran, Vicknayson (2003) Risk management in construction: A systemic approach towards managing human factors. PhD thesis, University of Nottingham, UK.

Thomas, H R (2002) 2000 Peurifoy lecture: Construction practices in developing countries. Journal of Construction Engineering and Management, 128(1), pp. 1-7. ISSN 0733-9364

Thomas, H R; Maloney, W F; Horner, R M W; Smith, G R; Handa, V K and Sanders, S R (1990) Modeling construction labor productivity. Journal of Construction Engineering and Management, 116(4), pp. 705-726. ISSN 0733-9364

Thomas, H R; Smith, G R and Mellott, R E (1994) Interpretation of construction contracts. Journal of Construction Engineering and Management, 120(2), pp. 321-336. ISSN 0733-9364

Thomas, H R; Smith, G R and Wright, D E (1990) Resolving disputes over contract notice requirements. Journal of Construction Engineering and Management, 116(4), pp. 738-755. ISSN 0733-9364

Thomas, H R; Smith, G R and Wright, D E (1991) Legal aspects of oral change orders. Journal of Construction Engineering and Management, 117(1), pp. 148-162. ISSN 0733-9364

Thomas, H R and Willenbrock, J H (1988) Managing construction research at universities. Journal of Construction Engineering and Management, 114(2), pp. 245-255. ISSN 0733-9364

Thomas, L; Woods, A; Powles, R; Kalali, P and Wilkinson, S (2022) Residential geothermal air-conditioning: Inhabitants' comfort, behaviour and energy use. Buildings & Cities, 3(1), pp. 226-249. ISSN 2632-6655

Thomas, L E (2010) Evaluating design strategies, performance and occupant satisfaction: A low carbon office refurbishment. Building Research & Information, 38(6), pp. 610-624. ISSN 0961-3218

Thomas, R; Keating, J M and Bluedorn, A C (1983) Authority structures for construction project management. Journal of Construction Engineering and Management, 109(4), pp. 406-422. ISSN 0733-9364

Thomas, S R; Tucker, R L and Kelly, W R (1998) Critical communications variables. Journal of Construction Engineering and Management, 124(1), pp. 58-66. ISSN 0733-9364

Thomas, W K (2013) The impact of RFP phase project scope development on the successful outcome of construction projects using the design build project delivery method. PhD thesis, University of Alabama in Huntsville, USA.

Thomson, D S; Austin, S A; Devine-Wright, H and Mills, G R (2003) Managing value and quality in design. Building Research & Information, 31(5), pp. 334-345. ISSN 0961-3218

Thormark, C (2000) Including recycling potential in energy use into the life-cycle of buildings. Building Research & Information, 28(3), pp. 176-183. ISSN 0961-3218

Thorpe, D (2003) Online remote construction management trials in Queensland department of main roads: A participant's perspective. Construction Innovation, 3(2), pp. 65-79. ISSN 1471-4175

Thwala, W D (2009) Experiences and challenges of community participation in urban renewal projects: The case of Johannesburg, South Africa. Journal of Construction in Developing Countries, 14(2), pp. 37-54. ISSN 1823-6499

Thyssen, M H; Emmitt, S; Bonke, S and Kirk-Christoffersen, A (2010) Facilitating client value creation in the conceptual design phase of construction projects: A workshop approach. Architectural Engineering and Design Management, 6(1), pp. 18-30. ISSN 1745-2007

Tian, B and Liu, K (2015) Semiotic approach to building information modelling based service model. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Tijani, B; Jin, X and Osei-Kyei, R (2025) Impact of AEC project organizational design on the mental health of project management practitioners (pmps) in Australia. International Journal of Building Pathology and Adaptation, 43(7), pp. 1660-1705. ISSN 2398-4708

Tino Balestra, C E; Alessi Reichert, T; Savaris, G; Pansera, W A and Medeiros-Junior, R A (2020) Nondestructive method for estimation of chloride profiles: Correlation between electrical resistivity and holliday-empirical equation. Journal of Construction Engineering and Management, 146(10): 04020119, ISSN 0733-9364

Tiong, R L; Yeo, K T and McCarthy, S C (1992) Critical success factors in winning BOT contracts. Journal of Construction Engineering and Management, 118(2), pp. 217-228. ISSN 0733-9364

Tiong, R L K (1990) BOT projects: Risks and securities. Construction Management and Economics, 8(3), pp. 315-328. ISSN 01446193

Tiong, R L K (1992) Strategies in risk management of on-demand guarantees. Journal of Construction Engineering and Management, 118(2), pp. 229-243. ISSN 0733-9364

Tiong, R L K (1995) Competitive advantage of equity in BOT tender. Journal of Construction Engineering and Management, 121(3), pp. 282-289. ISSN 0733-9364

Tiong, R L K (1995) Impact of financial package versus technical solution in a BOT tender. Journal of Construction Engineering and Management, 121(3), pp. 304-311. ISSN 0733-9364

Tiong, R L K (1995) Risks and guarantees in BOT tender. Journal of Construction Engineering and Management, 121(2), pp. 183-188. ISSN 0733-9364

Tiong, R L K (1996) CSFs in competitive tendering and negotiation model for BOT projects. Journal of Construction Engineering and Management, 122(3), pp. 205-211. ISSN 0733-9364

Tiong, R L K and Alum, J (1997) Final negotiation in competitive BOT tender. Journal of Construction Engineering and Management, 123(1), pp. 6-10. ISSN 0733-9364

Tiong, R L K and Alum, J (1997) Distinctive winning elements in BOT tender. Engineering, Construction and Architectural Management, 4(2), pp. 83-94. ISSN 0969-9988

Titus, S and Bröchner, J (2005) Managing information flow in construction supply chains. Construction Innovation, 5(2), pp. 71-82. ISSN 1471-4175

Tobin, A G V (2009) Conflict-resolution competencies for the construction professional. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 181-184. ISSN 17514312

Todd, J A; Crawley, D; Geissler, S and Lindsey, G (2001) Comparative assessment of environmental performance tools and the role of the green building challenge. Building Research & Information, 29(5), pp. 324-335. ISSN 0961-3218

Todd, J A and Geissler, S (1999) Regional and cultural issues in environmental performance assessment for buildings. Building Research & Information, 27(4-5), pp. 247-256. ISSN 0961-3218

Todd, J A; Pyke, C and Tufts, R (2013) Implications of trends in LEED usage: Rating system design and market transformation. Building Research & Information, 41(4), pp. 384-400. ISSN 0961-3218

Toliver, B L (2018) Implementing project management plans to control construction costs on military projects in Korea. DEng thesis, George Washington University, USA.

Tommelein, I D (1998) Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique. Journal of Construction Engineering and Management, 124(4), pp. 279-288. ISSN 0733-9364

Tommelein, I D; Carr, R I and Odeh, A M (1994) Assembly of simulation networks using designs, plans, and methods. Journal of Construction Engineering and Management, 120(4), pp. 796-815. ISSN 0733-9364

Tommelein, I D and Zouein, P P (1993) Interactive dynamic layout planning. Journal of Construction Engineering and Management, 119(2), pp. 266-287. ISSN 0733-9364

Tong, N; Domingo, N and Le, A (2025) Construction waste management in residential green buildings in New Zealand. Built Environment Project and Asset Management, 15(5), pp. 1073-1087. ISSN 2044-124X

Tong, T K L and Tam, C M (2003) Fuzzy optimisation of labour allocation by genetic algorithms. Engineering, Construction and Architectural Management, 10(2), pp. 146-155. ISSN 0969-9988

Tonimoghadam, F (2021) A predictive model for reducing cost and time for the detection of clashes in residential and commercial constructions projects. DEng thesis, George Washington University, USA.

Torbica, Ž M and Stroh, R C (2001) Customer satisfaction in home building. Journal of Construction Engineering and Management, 127(1), pp. 82-86. ISSN 0733-9364

Tork, A (2013) A real-time crane service scheduling decision support system (CSS-DSS) for construction tower cranes. PhD thesis, University of Central Florida, USA.

Torrington, J (2007) Evaluating quality of life in residential care buildings. Building Research & Information, 35(5), pp. 514-528. ISSN 0961-3218

Torriti, J (2012) Multiple-project discount rates for cost-benefit analysis in construction projects: A formal risk model for microgeneration renewable energy technologies. Construction Management and Economics, 30(9), pp. 739-747. ISSN 1466433X

Touran, A (2003) Probabilistic model for cost contingency. Journal of Construction Engineering and Management, 129(3), pp. 280-284. ISSN 0733-9364

Touran, A and Asai, T (1987) Simulation of tunneling operations. Journal of Construction Engineering and Management, 113(4), pp. 554-568. ISSN 0733-9364

Touran, A and Taher, K A H (1988) Optimum fleet size determination by queuing and simulation. Construction Management and Economics, 6(4), pp. 295-306. ISSN 01446193

Townsend, K; Loudoun, R and Markwell, K (2016) The role of line managers in creating and maintaining healthy work environments on project construction sites. Construction Management and Economics, 34(9), pp. 611-621. ISSN 01446193

Toğan, V; Mostofi, F and Tokdemir, O B (2026) Evaluating the resilience of graph neural network architectures to adversarial and noisy data in high-stakes construction project management. Journal of Construction Engineering and Management, 152(4): 04026029, ISSN 0733-9364

Trach, R; Pawluk, K and Lendo-Siwicka, M (2022) The assessment of the effect of BIM and IPD on construction projects in Ukraine. International Journal of Construction Management, 22(10), pp. 1844-1851. ISSN 1562-3599

Tran, C N N; Tam, V W Y; Le, K N and Illankoon, I M C S (2023) Environmental impacts assessment for Australian buildings: Thermal resistance and environmental impacts relationship. International Journal of Construction Management, 23(2), pp. 243-252. ISSN 1562-3599

Tran, C N N; Tat, T T H; Tam, V W Y and Tran, D H (2023) Factors affecting intelligent transport systems towards a smart city: A critical review. International Journal of Construction Management, 23(12), pp. 1982-1998. ISSN 1562-3599

Tran, D Q; Molenaar, K R and Kolli, B (2017) Implementation of best-value procurement for highway design and construction in the USA. Engineering, Construction and Architectural Management, 24(5), pp. 774-787. ISSN 0969-9988

Treloar, G; Fay, R; Love, P E D and Iyer-Raniga, U (2000) Analysing the life-cycle energy of an Australian residential building and its householders. Building Research & Information, 28(3), pp. 184-195. ISSN 0961-3218

Treloar, G J (2000) Streamlined life cycle assessment of domestic structural wall members. Journal of Construction Research, 1(1), pp. 69-76. ISSN 1609-9451

Treloar, G J; Love, P E D and Crawford, R H (2004) Hybrid life-cycle inventory for road construction and use. Journal of Construction Engineering and Management, 130(1), pp. 43-49. ISSN 0733-9364

Trethewy, R W (2003) OHS performance: improved indicators for construction contractors. Journal of Construction Research, 4(1), pp. 17-27. ISSN 1609-9451

Trethewy, R W and Atkinson, M (2003) Enhanced safety, health and environment outcomes through improved design. Journal of Engineering, Design and Technology, 1(2), pp. 187-201. ISSN 1726-0531

Trinder, L; Browne, J and Brocklebank, K (2018) A client's perspective of design for manufacture and assembly in the UK water industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 141-151. ISSN 17514304

Trinius, W and Sjöström, C (2005) Service life planning and performance requirements. Building Research & Information, 33(2), pp. 173-181. ISSN 0961-3218

Troive, S (1998) Structural LCC design of concrete bridges. DrTech thesis, Kungliga Tekniska Hogskolan, Sweden.

Troje, D (2022) Sustainable facilities management of housing properties in Sweden: Current challenges and future solutions. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Tsai, D M and Chiu, H N (1996) Two heuristics for scheduling multiple projects with resource constraints. Construction Management and Economics, 14(4), pp. 325-340. ISSN 01446193

Tse, R Y C (2000) A study of housing and real estate markets in Macau. Journal of Financial Management of Property and Construction, 5(1-2), pp. 33-40. ISSN 1366-4387

Tse, R Y C; Ganesan, S and So, H M (1998) Property cycles in Hong Kong: Causes and impacts. Journal of Financial Management of Property and Construction, 3(2), pp. 2-26. ISSN 1366-4387

Tse, R Y C and Raftery, J (2001) Infrastructure policy and economic growth: Case of Hong Kong. Construction Economics and Building, 1(1), pp. 66-79. ISSN 2204-9029

Tseng, C L; Zhao, T and Fu, C C (2009) Contingency estimation using a real options approach. Construction Management and Economics, 27(11), pp. 1073-1087. ISSN 1466433X

Tserng, H P; Yin, S Y L and Li, S (2006) Developing a resource supply chain planning system for construction projects. Journal of Construction Engineering and Management, 132(4), pp. 393-407. ISSN 0733-9364

Tucker, R and Abbasi, N (2015) The architecture of teamwork: Examining relationships between teaching, assessment, student learning and satisfaction with creative design outcomes. Architectural Engineering and Design Management, 11(6), pp. 405-422. ISSN 1745-2007

Tuholski, S J; Gursel, A P; Tommelein, I D and Bomba, G (2009) Lean comparison using process charts of complex seismic retrofit projects. Journal of Construction Engineering and Management, 135(4), pp. 330-339. ISSN 0733-9364

Tumbare, M J (2013) Sedimentation of small and medium sized dams: Discussion issues. Journal of Engineering, Design and Technology, 11(2), pp. 112-128. ISSN 1726-0531

Turkan, Y; Bosché, F; Haas, C T and Haas, R (2013) Toward automated earned value tracking using 3D imaging tools. Journal of Construction Engineering and Management, 139(4), pp. 423-433. ISSN 0733-9364

Turkoglu, H; Arditi, D and Polat, G (2023) Mathematical multiobjective optimization model for trade-offs in small-scale construction projects. Journal of Construction Engineering and Management, 149(7): 04023056, ISSN 0733-9364

Turner, R K (2006) Sustainability auditing and assessment challenges. Building Research & Information, 34(3), pp. 197-200. ISSN 0961-3218

Tutesigensi, A; Smith, N J and Moodley, K (1999) Effective group decision-making: A framework for the identification phase of building projects. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Tuzmen, A (2002) A distributed process management system for collaborative building design. Engineering, Construction and Architectural Management, 9(3), pp. 209-221. ISSN 0969-9988

Tweeddale, Anna (2021) Diffracting construction: A praxis of attentiveness to situated material entanglements of architecture and construction. PhD thesis, RMIT University, Australia.

Twinn, C (2013) Professionalism, sustainability and the public interest: What next? Building Research & Information, 41(1), pp. 123-128. ISSN 0961-3218

Tyvand, J and Blachly, A T (1986) Foamed plastic absorbs staged post-tensioning deflections. Journal of Construction Engineering and Management, 112(4), pp. 582-587. ISSN 0733-9364

Udeaja, C E and Tah, J H M (2001) Construction material supply chain management: Towards an agent-based technology. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Udomdech, P; Papadonikolaki, E and Davies, A (2018) An alternative project-based learning model for building information modelling using teams. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Ueki, M; Haas, C T and Seo, J (1999) Decision tool for microtunneling method selection. Journal of Construction Engineering and Management, 125(2), pp. 123-131. ISSN 0733-9364

Uhlemann, J; Stranghöner, N; Motevalli, M and Balzani, D (2020) Architectural woven polyester fabrics: Examination of possible classification of stiffness values in correlation with strength values. Architectural Engineering and Design Management, 17(3-4), pp. 1-18. ISSN 1745-2007

Umair, M; Seo, J; Luo, Y and Ahn, C R (2025) Investigating the impact of virtual reality accident experience on construction workers' risk habituation through individual behaviors. Journal of Construction Engineering and Management, 151(5): 04025032, ISSN 0733-9364

Umer, M; Wetzel, E M and Powell, C (2026) Advancing toward automated material counting and localization using RFID, a boston dynamics spot robot, and a Bayesian filter algorithm. Journal of Construction Engineering and Management, 152(1): 04025213, ISSN 0733-9364

Umer, W; Li, H; Szeto, G P Y and Wong, A Y L (2018) Proactive safety measures: Quantifying the upright standing stability after sustained rebar tying postures. Journal of Construction Engineering and Management, 144(4): 04018010, ISSN 0733-9364

Underwood, J; Alshawi, M A; Aouad, G; Child, T and Faraj, I Z (2000) Enhancing building product libraries to enable the dynamic definition of design element specifications. Engineering, Construction and Architectural Management, 7(4), pp. 373-388. ISSN 0969-9988

Uniacke, H (2001) Design of a low cost ventilated photovoltaic cladding. PhD thesis, Cardiff University, UK.

Unwin, S (2007) Analysing architecture through drawing. Building Research & Information, 35(1), pp. 101-110. ISSN 0961-3218

Vakili-Ardebili, A and Boussabaine, A H (2007) Creating value through sustainable building design. Architectural Engineering and Design Management, 3(2), pp. 83-92. ISSN 1745-2007

Valitabar, M; GhaffarianHoseini, A; GhaffarianHoseini, A and Attia, S (2022) Advanced control strategy to maximize view and control discomforting glare: A complex adaptive façade. Architectural Engineering and Design Management, 18(6), pp. 829-849. ISSN 1745-2007

Valizadeh Kiamahalleh, M.; Gholampour, A.; Tang, Y. and Ngo, T. D. (2026) Delithiated β-spodumene as a partial cement replacement in waste-based concrete with recycled aggregates and sugarcane fiber. International Journal of Construction Management, 26(10), pp. 2245-2257. ISSN 1562-3599

Van Der Bent, H S; Meijer, A; Visscher, H J and Mouter, N (2022) Benchmarking energy performance: Indicators and models for Dutch housing associations. Buildings & Cities, 3(1), pp. 417-432. ISSN 2632-6655

Van Der Bent, H S; Visscher, H J; Meijer, A and Mouter, N (2021) Monitoring energy performance improvement: Insights from Dutch housing association dwellings. Buildings & Cities, 2(1), pp. 779-796. ISSN 2632-6655

Van Noortwijk, J M (1996) Optimal maintenance decisions for hydraulic structures under isotropic deterioration. PhD thesis, Delft University of Technology, Netherlands.

Van Zyl, I J (1986) The role of standardization in the building industry. DSc thesis, University of Pretoria, South Africa.

Van der Heijden, J (2016) The new governance for low-carbon buildings: Mapping, exploring, interrogating. Building Research & Information, 44(5-6), pp. 575-584. ISSN 0961-3218

VanDemark, L P (2021) Mitigating risk of site development disputes. PhD thesis, University of Colorado at Denver, USA.

Vanhoucke, M (2006) Work continuity constraints in project scheduling. Journal of Construction Engineering and Management, 132(1), pp. 14-25. ISSN 0733-9364

Vargas, C A (1998) Investigating construction falls using fault tree analysis and developing a prototype tool to reduce falls using expert system and computer-assisted instruction methods. PhD thesis, Ohio State University, USA.

Varghese, K and O'Connor, J T (1995) Routing large vehicles on industrial construction sites. Journal of Construction Engineering and Management, 121(1), pp. 1-12. ISSN 0733-9364

Vaz, D; Al Bizri, S and Gray, C (2008) The management of the design of modern curtain wall cladding systems. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Vaziri, K; Carr, P G and Nozick, L K (2007) Project planning for construction under uncertainty with limited resources. Journal of Construction Engineering and Management, 133(4), pp. 268-276. ISSN 0733-9364

Venselaar, Marieke (2017) Work floor experiences of supply chain partnering in the Dutch housing sector. PhD thesis, Delft University of Technology, Netherlands.

Vick, S (2018) Automated spatial progress monitoring for asphalt road construction projects. PhD thesis, University of Cambridge, UK.

Vijverberg, G (2000) Basing maintenance needs on accommodation policy. Building Research & Information, 28(1), pp. 18-30. ISSN 0961-3218

Viriyaroj, B; Kuittinen, M and Gheewala, S H (2024) Life-cycle GHG emissions of standard houses in Thailand. Buildings & Cities, 5(1), pp. 247-267. ISSN 2632-6655

Visscher, H; Meijer, F; Majcen, D and Itard, L (2016) Improved governance for energy efficiency in housing. Building Research & Information, 44(5-6), pp. 552-561. ISSN 0961-3218

Vlatas, D A (1986) Owner and contractor review to reduce claims. Journal of Construction Engineering and Management, 112(1), pp. 104-111. ISSN 0733-9364

Volpintesta, Francesco (2024) New eco-sustainable construction materials derived from industrial wastes. PhD thesis, Università degli Studi di Camerino, Italy.

Vombatkere, S G (1986) Bridge resting on an ice body at high altitude. Journal of Construction Engineering and Management, 112(2), pp. 287-296. ISSN 0733-9364

Voordijk, H (2001) A cost-benefit analysis of tracking and tracing systems in road construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Vyčítal, M (2019) On BIM based automatized nD modelling for construction management. PhD thesis, Czech Technical University, Czech Republic.

Waara, F and Bröchner, J (2006) Price and nonprice criteria for contractor selection. Journal of Construction Engineering and Management, 132(8), pp. 797-804. ISSN 0733-9364

Waddell, H (2008) Sustainable construction and UK legislation and policy. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 127-132. ISSN 17514312

Wagner, H E; Hilger, A P and Flash, P (2014) Improving writing skills of construction management undergraduates: Developing tools for empirical analysis of writing to create writing-enriched construction management curriculum. International Journal of Construction Education and Research, 10(2), pp. 111-125. ISSN 1557-8771

Walimuni, P C; Samaraweera, A and De Silva, L (2017) Payment mechanisms for contractors for better environmental hazard controlling in road construction projects. Built Environment Project and Asset Management, 7(4), pp. 426-440. ISSN 2044-124X

Walker, A; Greenwood, D and Johansen, E (2009) The lack of design quality focus in UK construction: A case for examining suitable design processes. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Walker, D and Lloyd-Walker, B (2012) Understanding early contractor involvement (ECI) procurement forms. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Walker, D H T (1996) The contribution of the construction management team to good construction time performance: An Australian experience. Journal of Construction Procurement, 2(2), pp. 4-18. ISSN 1358-9180

Walker, D H T; Harley, J and Mills, A (2015) Performance of project alliancing in Australasia: A digest of infrastructure development from 2008 to 2013. Construction Economics and Building, 15(1), pp. 1-18. ISSN 2204-9029

Walker, D H T and Johannes, D (2001) Organizational learning intentions and joint ventures in Hong Kong infrastructure projects: A pilot study. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Wallace Jr., J T (2016) Risk system interrelationships over a construction project's life cycle: A correlational study. PhD thesis, Capella University, USA.

Walsh, E (2017) Public versus private land use controls in England and the USA. International Journal of Law in the Built Environment, 9(1), pp. 18-31. ISSN 1756-1450

Walsh, K D; Houston, W N and Houston, S L (1997) Field implications of current compaction specification design practices. Journal of Construction Engineering and Management, 123(4), pp. 363-370. ISSN 0733-9364

Walter, T and Mathew, P (2021) GHG policy impacts for seattle's buildings: Targets, timing, and scope. Buildings & Cities, 2(1), pp. 283-301. ISSN 2632-6655

Walters, R J (1983) An evaluation of user experience of CAAD: With particular reference to health buildings. PhD thesis, University of Strathclyde, UK.

Wamuziri, S (2023) Legislative framework for public-private partnerships in the Sultanate of Oman. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(3), pp. 150-156. ISSN 17514304

Wamuziri, S and Madan, S (2009) Improvement and innovation through collaborative partnerships. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(1), pp. 17-27. ISSN 17514312

Wan, H P; Zhang, W J; Ge, H B; Luo, Y and Todd, M D (2023) Improved vision-based method for detection of unauthorized intrusion by construction sites workers. Journal of Construction Engineering and Management, 149(7): 04023040, ISSN 0733-9364

Wandahl, S (2005) Power, interest and value in building project organisations. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Wang, L.; Yuan, J.; Su, S.; Weng, S. and Hu, F. (2026) Vision-based progress compliance and worker health monitoring in concrete pouring and vibration. Journal of Construction Engineering and Management, 152(10): 04026162, ISSN 0733-9364

Wang, B (2014) End user oriented BIM enabled multi-functional virtual environment supporting building emergency planning and evacuation. PhD thesis, Cardiff University, UK.

Wang, B; Zhang, S; Wang, X and Feng, Z (2018) The influence of quality benefit and marginal contribution on the optimal equity structure of the PPP projects: Balancing public and private benefits. Construction Management and Economics, 36(11), pp. 611-622. ISSN 01446193

Wang, C; Gao, F; Cui, B; Huang, M M; Wu, M; Mao, L and Zheng, A (2024) Geometric quality assessment of precast concrete (PC) elements based on 3D structural light scanning. Architectural Engineering and Design Management, 20(2), pp. 303-319. ISSN 1745-2007

Wang, C H and Huang, Y C (1998) Controlling activity interval times in LOB scheduling. Construction Management and Economics, 16(1), pp. 5-16. ISSN 01446193

Wang, C H; Tsai, C H and Cheng, Y Y (2007) Knowledge-based diagnosis model for PCM executing problems in public construction. Construction Management and Economics, 25(2), pp. 129-142. ISSN 1466433X

Wang, G (1998) Study of construction project cost control information system. Unpublished PhD thesis, Tongji University, China.

Wang, J; Li, H; Han, S; Wang, G and Ren, W (2025) Contactless vital-sign monitoring of construction machinery operators using millimeter-wave technology. Journal of Construction Engineering and Management, 151(1): 04024182, ISSN 0733-9364

Wang, J; Li, X; Memari, A; Skitmore, M; Zhong, Y and Ashuri, B (2023) Data-driven assessment on the corporate credit scoring mechanism for Chinese construction supervision companies. Construction Management and Economics, 41(11-12), pp. 961-975. ISSN 01446193

Wang, J; Wang, G; Li, H; Han, S and Zhang, J (2024) Intelligent construction activity identification for all-weather site monitoring using 4D millimeter-wave technology. Journal of Construction Engineering and Management, 150(11): 04024150, ISSN 0733-9364

Wang, M-T (1989) Knowledge processing for a construction management database. PhD thesis, Massachusetts Institute of Technology, USA.

Wang, N and Horner, M (2007) CSI model for estimating road maintenance projects. Construction Management and Economics, 25(12), pp. 1269-1281. ISSN 1466433X

Wang, Q; Zuo, W; Guo, Z; Li, Q; Mei, T and Qiao, S (2020) BIM voxelization method supporting cell-based creation of a path-planning environment. Journal of Construction Engineering and Management, 146(7): 04020080, ISSN 0733-9364

Wang, R and Gong, D (2025) Abnormal behavior recognition algorithm in small sample scenarios for a utility tunnel project based on dcgan. Journal of Construction Engineering and Management, 151(6): 04025043, ISSN 0733-9364

Wang, R C and Liang, T F (2004) Project management decisions with multiple fuzzy goals. Construction Management and Economics, 22(10), pp. 1047-1056. ISSN 01446193

Wang, S; Kim, M; Hae, H; Cao, M and Kim, J (2023) The development of a rebar-counting model for reinforced concrete columns: Using an unmanned aerial vehicle and deep-learning approach. Journal of Construction Engineering and Management, 149(11): 04023111, ISSN 0733-9364

Wang, S; Ni, Z; Qu, T; Wang, H and Pan, Q (2022) A novel index to evaluate the workability of conditioned coarse-grained soil for epb shield tunnelling. Journal of Construction Engineering and Management, 148(6): 04022028, ISSN 0733-9364

Wang, S Q; Tiong, R L K; Ting, S K and Ashley, D (2000) Foreign exchange and revenue risks: Analysis of key contract clauses in China's BOT project. Construction Management and Economics, 18(3), pp. 311-320. ISSN 01446193

Wang, S Q; Tiong, R L K; Ting, S K and Ashley, D (2000) Evaluation and management of foreign exchange and revenue risks in China's BOT projects. Construction Management and Economics, 18(2), pp. 197-207. ISSN 01446193

Wang, S Q; Tiong, R L K; Ting, S K; Chew, D and Ashley, D (1998) Evaluation and competitive tendering of BOT power plant project in China. Journal of Construction Engineering and Management, 124(4), pp. 333-341. ISSN 0733-9364

Wang, S; Park, S; Kim, J and Kim, J (2025) Safety helmet monitoring on construction sites using yolov10 and advanced transformer architectures with surveillance and body-worn cameras. Journal of Construction Engineering and Management, 151(11): 04025186, ISSN 0733-9364

Wang, W; Guo, J; Tian, Q; Peng, Y; Yu, B and Cao, Z (2024) Layout optimization for stormwater harvesting facilities in coal ports considering stochasticity of underlying surface types. Journal of Construction Engineering and Management, 150(10): 04024132, ISSN 0733-9364

Wang, W C (2004) Electronic-based procedure for managing unbalanced bids. Journal of Construction Engineering and Management, 130(3), pp. 455-460. ISSN 0733-9364

Wang, X; Wang, B; Xu, Y and Shi, L (2021) A chance constrained programming method to determine optimal capital structure for privatized infrastructure. Construction Management and Economics, 39(7), pp. 579-594. ISSN 01446193

Wang, Y; Chen, L and Zhuang, J (2023) Pricing of credit default swaps from the perspective of credit enhancement in PPP projects. Journal of Construction Engineering and Management, 149(6): 05023006, ISSN 0733-9364

Wang, Z; Jia, L; Lv, J and Huang, J (2024) Minimization of rebar cutting waste using BIM and cutting pattern-oriented multiobjective optimization. Journal of Construction Engineering and Management, 150(11): 04024166, ISSN 0733-9364

Wantanakorn, D; Mawdesley, M J and Askew, W H (1999) Management errors in construction. Engineering, Construction and Architectural Management, 6(2), pp. 112-120. ISSN 0969-9988

Ward, M J (2004) The capture and integration of construction site data. EngD thesis, Loughborough University, UK.

Ward, S and Chapman, C (2008) Stakeholders and uncertainty management in projects. Construction Management and Economics, 26(6), pp. 563-577. ISSN 1466433X

Ward, S C; Curtis, B and Chapman, C B (1991) Objectives and performance in construction projects. Construction Management and Economics, 9(4), pp. 343-353. ISSN 01446193

Warren-Myers, G and McRae, E (2017) Volume home building: The provision of sustainability information for new homebuyers. Construction Economics and Building, 17(2), pp. 24-40. ISSN 2204-9029

Warszawski, A (1983) Planning and organization of research in building. Journal of Construction Engineering and Management, 109(3), pp. 261-275. ISSN 0733-9364

Warszawski, A (1984) Construction management program. Journal of Construction Engineering and Management, 110(3), pp. 297-310. ISSN 0733-9364

Warszawski, A (1990) Expert systems for crane selection. Construction Management and Economics, 8(2), pp. 179-190. ISSN 01446193

Warszawski, A; Avraham, M and Carmel, D (1984) Utilization of precast concrete elements in building. Journal of Construction Engineering and Management, 110(4), pp. 476-485. ISSN 0733-9364

Warszawski, A and Sacks, R (2004) Practical multifactor approach to evaluating risk of investment in engineering projects. Journal of Construction Engineering and Management, 130(3), pp. 357-367. ISSN 0733-9364

Warszawski, A and Sangrey, D A (1985) Robotics in building construction. Journal of Construction Engineering and Management, 111(3), pp. 260-280. ISSN 0733-9364

Watermeyer, R B (2012) A framework for developing construction procurement strategy. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(4), pp. 223-237. ISSN 17514312

Watson, A and McInnes, S (1997) Small/medium scale construction logistics: A study into the factors affecting planning accuracy. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Watson, R; Lockley, S R and Shaaban, S (2002) Creating usable models for re-usable data: Managing electronic project specification information. Engineering, Construction and Architectural Management, 9(3), pp. 272-283. ISSN 0969-9988

Watt, K A (1990) Nineteenth century brickmaking innovations in britain: Building and technological change. PhD thesis, University of York, UK.

Watters, J S J (1985) The number of bidders, concentration ratios and markets in the highway construction industry. PhD thesis, University of Missouri - Columbia, USA.

Waugh, L M (1990) A construction planner. PhD thesis, Stanford University, USA.

Way, M and Bordass, B (2005) Making feedback and post-occupancy evaluation routine 2: Soft landings: involving design and building teams in improving performance. Building Research & Information, 33(4), pp. 353-360. ISSN 0961-3218

Webster, M A (2007) Willingness of employers in the Denver Metropolitan Area to hire released prisoners. DM thesis, University of Phoenix, USA.

Wedding, G C (2008) Understanding sustainability in real estate: A focus on measuring and communicating success in green building. PhD thesis, University of North Carolina at Chapel Hill, USA.

Weerasinghe, R P N P and Sandanayake, Y G (2017) Collaborative facilities management model: Sri Lankan perspective. Built Environment Project and Asset Management, 7(3), pp. 284-299. ISSN 2044-124X

Wei, H; Minggang, H and Qun, H (1999) Quasi-static testing of composite masonry construction. Building Research & Information, 27(2), pp. 120-123. ISSN 0961-3218

Wei, L; Liu, G; Liu, W; Li, W and Yuan, Y (2023) Airborne infection risk in classrooms based on environment and occupant behavior measurement under COVID-19 epidemic. Building Research & Information, 51(6), pp. 701-716. ISSN 0961-3218

Wei, Yi (2007) Factors influencing the success of virtual cooperation within Dutch-Chinese strategic alliances. PhD thesis, University of Twente, Netherlands.

Weidner, T J (1999) Higher education vertical infrastructure maintenance planning. PhD thesis, Rensselaer Polytechnic Institute, USA.

Weiss, A P W (2006) Value for money: defining and measuring 'value' in MoD's acquisition policy of obtaining best value for money. PhD thesis, University College London, UK.

Weiss, T (2021) Energy flexibility and shiftable heating power of building components and technologies. Smart and Sustainable Built Environment, 10(4), pp. 740-758. ISSN 2046-6099

Wen, Jing (2022) Assessing the impact of immersive storytelling in attracting female students to construction education using social cognitive career theory. PhD thesis, University of Florida, USA.

Werna, E (1993) The concomitant evolution and stagnation of the Brazilian building industry. Construction Management and Economics, 11(3), pp. 194-202. ISSN 01446193

Wernicke, B (2020) Diversity of flow in production improvements in house building. PhD thesis, Luleå University of Technology, Sweden.

Wernicke, B; Stehn, L; Sezer, A A and Thunberg, M (2023) Introduction of a digital maturity assessment framework for construction site operations. International Journal of Construction Management, 23(5), pp. 898-908. ISSN 1562-3599

Wessels, M (2014) Stimulating sustainable infrastructure development through public-private partnerships. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(5), pp. 232-241. ISSN 17514304

Westberg, K; Norén, J and Kus, H (2001) On using available environmental data in service life estimations. Building Research & Information, 29(6), pp. 428-439. ISSN 0961-3218

Wetzel, E M and Farrow, C B (2023) Active learning in construction management education: Faculty perceptions of engagement and learning. International Journal of Construction Management, 23(8), pp. 1417-1425. ISSN 1562-3599

Whang, S W and Flanagan, R (2015) Minimisation of risk exposure at the pre-production stage through the use of contractor-led design management. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Whelton, M G and Ballard, G (2002) Decriptive design study: A building facility renewal planning study. Journal of Construction Research, 3(1), pp. 17-33. ISSN 1609-9451

White, A (1985) The critical path method and construction contracts: A polemic. Construction Management and Economics, 3(1), pp. 15-24. ISSN 01446193

White, G and Jamshidi, A (2022) Resetting dense graded airport asphalt production and construction tolerances. International Journal of Construction Management, 22(4), pp. 632-643. ISSN 1562-3599

White, R R (2004) Managing and interpreting uncertainty for climate change risk. Building Research & Information, 32(5), pp. 438-448. ISSN 0961-3218

White III, R J (2014) Application of social impact bonds in built infrastructure sustainability projects. PhD thesis, Texas A&M University, USA.

Whittaker, J (1987) Equipment rates from revenue requirements. Journal of Construction Engineering and Management, 113(2), pp. 173-178. ISSN 0733-9364

Whyte, J; Davies, A and Sexton, C (2022) Systems integration in infrastructure projects: seven lessons from Crossrail. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(3), pp. 103-109. ISSN 17514304

Whyte, J K; Ewenstein, B; Hales, M and Tidd, J (2007) Visual practices and the objects used in design. Building Research & Information, 35(1), pp. 18-27. ISSN 0961-3218

Wibowo, A (2005) Estimating general threshold traffic levels of typical build, operate, and transfer toll road projects in Indonesia. Construction Management and Economics, 23(6), pp. 621-630. ISSN 01446193

Wibowo, A (2006) CAPM-based valuation of financial government supports to infeasible and risky private infrastructure projects. Journal of Construction Engineering and Management, 132(3), pp. 239-248. ISSN 0733-9364

Wijesundera, D A and Harris, F C (1989) The selection of materials handling methods in construction by simulation. Construction Management and Economics, 7(2), pp. 95-102. ISSN 01446193

Wild, A (2001) The Phillips Report on building: 1950. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Wild, A (2002) "False coherence" and "cohesive fragmentation" in construction's post-war corporatism 1945-70. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Wild, S; Gailius, A; Hansen, H; Pederson, L and Szwabowski, J (1997) Pozzolanic properties of a variety of European clay bricks. Building Research & Information, 25(3), pp. 170-175. ISSN 0961-3218

Wilkinson, R W (1984) Computerized specifications on a small project. Journal of Construction Engineering and Management, 110(3), pp. 337-345. ISSN 0733-9364

Wilkinson, S; Noktehdan, M; Shahbazpour, M and Cameron, R (2017) Creating an opportunity to innovate during disaster recovery. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Williams, E; Sherratt, F and Norton, E (2021) Exploring the value in near miss reporting for construction safety. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Williams, K (2012) Regenerative design as a force for change: Thoughtful, optimistic and evolving ideas. Building Research & Information, 40(3), pp. 361-364. ISSN 0961-3218

Williams, K; Gupta, R; Hopkins, D; Gregg, M; Payne, C; Joynt, J L R; Smith, I and Bates-Brkljac, N (2013) Retrofitting England's suburbs to adapt to climate change. Building Research & Information, 41(5), pp. 517-531. ISSN 0961-3218

Williams, T P (1987) Knowledge-based productivity analysis of construction operations. PhD thesis, Georgia Institute of Technology, USA.

Williams, T P (1991) Hypertext data base applications in construction. Journal of Construction Engineering and Management, 117(3), pp. 460-467. ISSN 0733-9364

Williams, T P (1994) Predicting changes in construction cost indexes using neural networks. Journal of Construction Engineering and Management, 120(2), pp. 306-320. ISSN 0733-9364

Williamson, D; Orr, J and Fulford, D (2017) Biogas dome construction using pneumatics. Journal of Construction in Developing Countries, 22(2), pp. 35-53. ISSN 1823-6499

Williamson, K C (2018) The effect of course time compression on academic performance in construction surveying. International Journal of Construction Education and Research, 14(4), pp. 277-294. ISSN 1557-8771

Williamson, K C and Anderson, A J (2019) Reasoning ability as a predictor of success in a construction surveying course. International Journal of Construction Education and Research, 15(1), pp. 42-61. ISSN 1557-8771

Willmer, G (1988) Development of risk models for engineering construction projects. PhD thesis, University of Manchester, UK.

Wilson, A J and Walker, D H T (2004) The strategy of information and communication technology diffusion. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Wilson, G and Kishk, M (2012) Key criteria of sustainable hospital refurbishment: A stakeholder review. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Winarno, S; Griffith, A and Stephenson, P (2010) Reducing earthquake risk to non-engineered buildings: A study of design and construction practices in Indonesia. International Journal of Construction Management, 10(1), pp. 75-86. ISSN 1562-3599

Winch, G and Schneider, E (1993) The strategic management of architectural practice. Construction Management and Economics, 11(6), pp. 467-473. ISSN 01446193

Winch, G M and North, S (2006) Critical space analysis. Journal of Construction Engineering and Management, 132(5), pp. 473-481. ISSN 0733-9364

Windapo, A and Moghayedi, A (2018) Building material price differentiation across geographic locations in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(6), pp. 243-254. ISSN 17514304

Winfield, M (2020) Construction 4.0 and ISO 19650: A panacea for the digital revolution? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(4), pp. 175-181. ISSN 17514304

Winter, M and Norman, T (2011) OHSAS 18001 in a UK county highways and transportation department. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 49-54. ISSN 17514312

Woldetsadik, E T (2025) A predictive model for estimating formwork and shoring removal time. DEngr thesis, George Washington University, USA.

Wong, F K W and Kong, L S P (1998) Marketization of state-owned housing in China: Comfortable housing project in Beijing. Journal of Financial Management of Property and Construction, 3(1), pp. 27-42. ISSN 1366-4387

Wong, I L; Perera, S and Eames, P C (2010) Goal directed life cycle costing as a method to evaluate the economic feasibility of office buildings with conventional and TI-façades. Construction Management and Economics, 28(7), pp. 715-735. ISSN 1466433X

Wong, J-M (2008) Extending performance-based design methods by applying structural engineering design patterns. PhD thesis, University of California, Berkeley, USA.

Wong, K; Unsal, H; Taylor, J E and Levitt, R E (2010) Global dimension of robust project network design. Journal of Construction Engineering and Management, 136(4), pp. 442-451. ISSN 0733-9364

Wong, K C and Albert, T P S (1995) A fuzzy expert system for contract decision making. Construction Management and Economics, 13(2), pp. 95-103. ISSN 01446193

Wong, K C; So, A T P and Yu, N H W (2001) The financial viablity of intelligent buildings: A Faustmann approach of assessment. Journal of Financial Management of Property and Construction, 6(1), pp. 41-50. ISSN 1366-4387

Wong Chong, Oscar (2022) IFC-based system and methods to support analysis of robot-assisted offsite construction. PhD thesis, Purdue University, USA.

Wood, B and Kenley, R (2004) The effectiveness of the bills of quantities in Australia. Journal of Construction Research, 5(2), pp. 291-309. ISSN 1609-9451

Woolery, J C (1994) Developing specifications for cellular-telephone base stations. Journal of Construction Engineering and Management, 120(3), pp. 593-602. ISSN 0733-9364

Wright, G B and Jack, L B (2013) Property-level stormwater drainage systems: Integrated flow simulation and whole-life costs. Building Research & Information, 41(2), pp. 223-236. ISSN 0961-3218

Wu, C; Brookes, N; Unterhitzenberger, C and Olson, N (2023) The role of lean information flows in disaster construction projects: Exploring the UK's COVID Surge hospital projects. Construction Management and Economics, 41(10), pp. 840-858. ISSN 01446193

Wu, C H; Hsieh, T Y; Cheng, W L and Lu, S T (2004) Grey relation analysis of causes for change orders in highway construction. Construction Management and Economics, 22(5), pp. 509-520. ISSN 01446193

Wu, H; Han, Y; Zhang, M; Abebe, B D; Legesse, M B and Jin, R (2023) Identifying unsafe behavior of construction workers: A dynamic approach combining skeleton information and spatiotemporal features. Journal of Construction Engineering and Management, 149(11): 04023115, ISSN 0733-9364

Wu, J and Liu, A M M (2006) A study on the relationship between organizational commitment and task performance in Chinese construction firms. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Wu, J; Ye, Y and Du, J (2024) Autonomous drones in urban navigation: Autoencoder learning fusion for aerodynamics. Journal of Construction Engineering and Management, 150(7): 04024067, ISSN 0733-9364

Wu, K and García De Soto, B (2021) Lifting sequence optimization of luffing tower cranes considering motion paths with dynamic programming. Journal of Construction Engineering and Management, 147(10): 04021126, ISSN 0733-9364

Wu, M; Wing Chau, K; Shen, Q and Yin Shen, L (2012) Net asset value-based concession duration model for BOT contracts. Journal of Construction Engineering and Management, 138(2), pp. 304-308. ISSN 0733-9364

Wyrick, D A and Eschenbach, T G (1989) Remote oil and gas facility construction. Journal of Construction Engineering and Management, 115(2), pp. 228-236. ISSN 0733-9364

Xenidis, Y and Angelides, D (2005) The legal risks in build-operate-transfer projects. Journal of Construction Research, 6(2), pp. 273-292. ISSN 1609-9451

Xiang, Y; Bu, J; Zhu, K; Ma, K; Opoku, A; Florez-Perez, L; Zhang, H and Wu, Y (2023) Reconsidering adaptive industrialized construction in Chinese rural areas: Responding to the challenge of COVID-19. Building Research & Information, 51(3), pp. 316-332. ISSN 0961-3218

Xiang, Z; Rashidi, A and Ou, G (2021) Automated framework to translate rebar spatial information from GPR into BIM. Journal of Construction Engineering and Management, 147(10): 04021120, ISSN 0733-9364

Xiang, Z; Rashidi, A and Ou, G (2023) Integrating inverse photogrammetry and a deep learning-based point cloud segmentation approach for automated generation of BIM models. Journal of Construction Engineering and Management, 149(9): 04023074, ISSN 0733-9364

Xiao, B; Wang, Y and Kang, S C (2022) Deep learning image captioning in construction management: A feasibility study. Journal of Construction Engineering and Management, 148(7): 04022049, ISSN 0733-9364

Xiao, Bo (2021) Deep learning-based framework of summarizing construction videos for vision-based monitoring of construction sites. PhD thesis, University of Alberta, Canada.

Xiao, F (2007) Game-theoretic models for competitive pricing and network design problems. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Xie, W; Zhao, T; Tang, J and Zhang, Y (2017) Arch first and beam later: Arch-rib integral installation construction technology for large-span tied-arch bridge. Journal of Construction Engineering and Management, 143(8): 04017059, ISSN 0733-9364

Xie, X; Qin, S; Gou, Z and Yi, M (2020) Engaging professionals in urban stormwater management: The case of China's Sponge City. Building Research & Information, 48(7), pp. 719-730. ISSN 0961-3218

Xu, J; Meng, J; Zeng, Z; Wu, S and Shen, M (2013) Resource sharing-based multiobjective multistage construction equipment allocation under fuzzy environment. Journal of Construction Engineering and Management, 139(2), pp. 161-173. ISSN 0733-9364

Xu, J and Smyth, H (2015) The value of trust in construction supply chains. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Xu, Ming (2010) The value of critical project decisions: measurement and modelling. PhD thesis, University of Melbourne, Australia.

Xu, T; Bower, D A and Smith, N J (2003) Forms of collaboration for foreign contractors in China. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Xu, T; Smith, N J and Bower, D A (2002) Improving the integration of international contractors in China. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Xu, Y; Shen, X; Lim, S and Li, X (2021) Three-dimensional object detection with deep neural networks for automatic as-built reconstruction. Journal of Construction Engineering and Management, 147(9): 04021098, ISSN 0733-9364

Xue, J; Shen, G Q; Li, Y; Han, S and Chu, X (2021) Dynamic analysis on public concerns in Hong Kong-zhuhai-macao bridge: Integrated topic and sentiment modeling approach. Journal of Construction Engineering and Management, 147(6): 04021049, ISSN 0733-9364

Yamaguchi, H; Uher, T E and Runeson, G (2001) Risk allocation in PFI projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Yamaguchi, K; Matsufuji, Y and Koyama, T (2007) A new structural system: Friction-resistant dry-masonry. Building Research & Information, 35(6), pp. 616-628. ISSN 0961-3218

Yamakawa, S (1997) The development of a framework for inter-diciplinary building design working, and the application of intelligent knowledge-base system techniques. PhD thesis, Cranfield University, UK.

Yamin, R A (2001) Cumulative effect of productivity rates in linear schedules. PhD thesis, Purdue University, USA.

Yan, H; Liu, C; Yang, X and Feng, K (2025) Real-time digital twin-driven 3D near-miss detection system at construction sites. Journal of Construction Engineering and Management, 151(4): 04025021, ISSN 0733-9364

Yan, Z; Liang, J; Bai, Y; Cao, L and Zhao, G (2021) Response of asphalt pavement structure layer and particle movement velocity based on particle flow theory. Journal of Construction Engineering and Management, 147(12): 04021170, ISSN 0733-9364

Yang, I T (2005) Chance-constrained time-cost tradeoff analysis considering funding variability. Journal of Construction Engineering and Management, 131(9), pp. 1002-1012. ISSN 0733-9364

Yang, I T (2007) Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis. Journal of Construction Engineering and Management, 133(7), pp. 498-505. ISSN 0733-9364

Yang, J and Price, A D F (2006) Innovative design and construction solutions for improved therapeutic healing environments. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Yang, L R (2007) Exploring the links between technology usage and project outcomes. Construction Management and Economics, 25(10), pp. 1041-1051. ISSN 1466433X

Yang, R J and Zou, P X W (2016) Building integrated photovoltaics (BIPV): Costs, benefits, risks, barriers and improvement strategy. International Journal of Construction Management, 16(1), pp. 39-53. ISSN 1562-3599

Yang, W; Zhang, F; Wang, H; Wu, J; Nie, Z and Li, L (2023) Synchronous control theory and first test of time-varying upper operation and chassis attitude maintenance for truck cranes. Journal of Construction Engineering and Management, 149(1): 04022156, ISSN 0733-9364

Yang, X; Wang, S; Jiang, Y; Wang, L; Li, P and Wang, S (2025) Theoretical and experimental analysis of stress variations in precast concrete segment linings during double-shield TBM excavation of subway tunnels. Journal of Construction Engineering and Management, 151(6): 04025040, ISSN 0733-9364

Yang, X; Zhong, H; Wang, Z; Du, P; Zhou, K; Zhou, H; Lai, X; Lau, Y L; Song, Y and Tang, L (2024) BEKG: A built environment knowledge graph. Building Research & Information, 52(1-2), pp. 19-37. ISSN 0961-3218

Yang, Y; Wei, Z; Zhang, Z and Xie, H (2025) Modeling the enablers for blockchain technology adoption in the construction supply chain. Journal of Construction Engineering and Management, 151(9): 04025113, ISSN 0733-9364

Yang, Z; Yuan, Y; Zhang, M; Zhao, X and Tian, B (2019) Assessment of construction workers' labor intensity based on wearable smartphone system. Journal of Construction Engineering and Management, 145(7): 04019039, ISSN 0733-9364

Yao, M; Wang, F; Chen, Z and Ye, H (2020) Optimal incentive contract with asymmetric cost information. Journal of Construction Engineering and Management, 146(6): 04020054, ISSN 0733-9364

Yates, I and Povall, J (2011) Managing uk highways act section 278 projects: a collaborative approach. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(3), pp. 117-128. ISSN 17514312

Yau, N-J (1992) An object-oriented project model for integrating building design, construction scheduling, and cost estimating for mid-rise construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ye, K; Lu, W and Jiang, W (2009) Concentration in the international construction market. Construction Management and Economics, 27(12), pp. 1197-1207. ISSN 1466433X

Ye, K; Shen, L and Tan, Y (2010) Response strategies to the competition in the Chinese construction market. Construction Management and Economics, 28(2), pp. 115-124. ISSN 1466433X

Ye, S and Tiong, R L K (2000) NPV-at-risk method in infrastructure project investment evaluation. Journal of Construction Engineering and Management, 126(3), pp. 227-233. ISSN 0733-9364

Ye, S and Tiong, R L K (2003) Tariff adjustment frameworks for privately financed infrastructure projects. Construction Management and Economics, 21(4), pp. 409-419. ISSN 01446193

Ye, Xuling (2025) Blockchain-based smart contract realization in BIM environment: Technical adoption for reliable and collaborative construction management. PhD thesis, Ruhr-Universität Bochum, Germany.

Yean, F and Ling, Y (2006) Design-build: How to increase its usage and its impact on architects and contractors in Singapore. Construction Economics and Building, 6(1), pp. 12-24. ISSN 2204-9029

Yeh, H H; Hsieh, T Y and Chen, J H (2017) Managing complex engineering interfaces of urban mass rapid transit projects. Journal of Construction Engineering and Management, 143(6): 05017001, ISSN 0733-9364

Yeh, I C (1998) Quantity estimating of building with logarithm-neuron networks. Journal of Construction Engineering and Management, 124(5), pp. 374-380. ISSN 0733-9364

Yemoh, O O; Opoku, R; Takyi, G; Adomako, E K; Uba, F and Obeng, G (2025) Green building adaptation in hot-humid climates: Assessment of coconut and corn husk fiber composite bricks as energy-efficient building envelopes. International Journal of Building Pathology and Adaptation, 43(6), pp. 1522-1540. ISSN 2398-4708

Yeo, J T L (2007) Application of FBG-based sensors in built environment. PhD thesis, City, University of London, UK.

Yeung, A T; Ng, S T; Tham, L G and Lee, P K K (2010) HKU's double professional civil engineering and law programme. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(2), pp. 77-85. ISSN 17514312

Yik, F W H and Lee, W L (2004) Partnership in building energy performance contracting. Building Research & Information, 32(3), pp. 235-243. ISSN 0961-3218

Yildirim, K; Lutfi Hidayetoglu, M and Sen, A (2012) Effects on sustainability of various skylight systems in buildings with an atrium. Smart and Sustainable Built Environment, 1(2), pp. 139-152. ISSN 2046-6099

Yilmaz, N and Donaldson, A B (2005) Consideration of wind barriers for an inner courtyard. Architectural Engineering and Design Management, 1(4), pp. 281-293. ISSN 1745-2007

Yilmaz, S; Kumar, D; Hada, S; Demirkesen, S; Zhang, C and Li, H (2025) A PMBOK-based construction cost management framework for BIM integration in construction projects. International Journal of Construction Management, 25(8), pp. 861-875. ISSN 1562-3599

Yin, H (2026) Construction project information system management framework strategy based on version control and collaboration. International Journal of Construction Management, 26(6), pp. 1033-1058. ISSN 1562-3599

Yogeswaran, K; Kumaraswamy, M M and Miller, D R A (1998) Claims for extensions of time in civil engineering projects. Construction Management and Economics, 16(3), pp. 283-293. ISSN 01446193

Yong, G; Liu, M and Lee, S (2026) Pose-aware image captioning for ergonomic problem and solution identification. Journal of Construction Engineering and Management, 152(5): 04026043, ISSN 0733-9364

Yong-Woo, K and Rhee, B-D (2024) Incentive-based coordination for scheduled delivery in prefab construction. Construction Management and Economics, 42(7), pp. 624-639. ISSN 01446193

Yoo, J.; Hwang, S.; Seo, J. and Choi, B. (2026) Feasibility of a wearable 360° camera for personalized proximity warning on construction sites. Journal of Construction Engineering and Management, 152(6): 04026079, ISSN 0733-9364

Yoon, S; Kim, Y; Park, M and Ahn, C R (2023) Effects of spatial characteristics on the human-robot communication using deictic gesture in construction. Journal of Construction Engineering and Management, 149(7): 04023049, ISSN 0733-9364

Yoon, S; Weidner, T and Hastak, M (2021) Erratum: Total-package-prioritization mitigation strategy for deferred maintenance of a campus-sized institution (journal of construction engineering and management DOI: 10.1061/(ASCE)CO.1943-7862.0001956). Journal of Construction Engineering and Management, 147(7): 08221001, ISSN 0733-9364

You, H; Zhou, T; Wu, J and Du, J (2026) Tebi-llama: Temporal binding foundation model for material property recognition via tactile sequence perception. Journal of Construction Engineering and Management, 152(4): 04026024, ISSN 0733-9364

Young-Corbett, D E (2014) Prevention through design: Health hazards in asphalt roofing. Journal of Construction Engineering and Management, 140(9): 06014007, ISSN 0733-9364

Yousefi, Elham (2023) Developing a data-driven design framework for mass customisation of multi-storey residential buildings. PhD thesis, University of Technology Sydney, Australia.

Yousefi, S; Hegazy, T; Capuru̧o, R A C and Attalla, M (2008) System of multiple anns for online planning of numerous building improvements. Journal of Construction Engineering and Management, 134(5), pp. 342-351. ISSN 0733-9364

Yu, K Q (2002) Computer integrated construction based on total project systems framework. PhD thesis, University of British Columbia, Canada.

Yu, W D and Wang, K W (2012) Best value or lowest bid? A quantitative perspective. Journal of Construction Engineering and Management, 138(1), pp. 128-134. ISSN 0733-9364

Yu, X and Ergan, S (2021) Key variables in determining energy shaving capacity of buildings during demand response events. Journal of Construction Engineering and Management, 147(1): 04020146, ISSN 0733-9364

Yuan, L L (1998) Analysing operating costs of town councils. Journal of Financial Management of Property and Construction, 3(1), pp. 83-92. ISSN 1366-4387

Yue, H; Sun, Y; Zeng, N; Chen, S; Tan, Y and Wang, Q (2025) Legged robots for construction management: Applications and challenges. Journal of Construction Engineering and Management, 151(8): 03125006, ISSN 0733-9364

Yusof, I H M; An, M and Barghi, M H (2015) Integration of lean construction considerations into design process of construction projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Yusof, N A; Lai, K S and Mustafa, K E (2017) Characteristics of innovation orientations in construction companies. Journal of Engineering, Design and Technology, 15(4), pp. 436-455.

Yuventi, J; Levitt, R and Robertson, H (2013) Organizational barriers to productivity and innovation in large-scale, U.S.-based photovoltaic system construction projects. Journal of Construction Engineering and Management, 139(10): 06013003, ISSN 0733-9364

Yıldız, B; Çağdaş, G and Zincir, I (2024) Architectural space classification considering topological and 3D visual spatial relations using machine learning techniques. Building Research & Information, 52(1-2), pp. 68-86. ISSN 0961-3218

Zaalouk, A; Altaf, M S and Han, S (2025) Operations-oriented supply chain master planning in panelized construction using hybrid multiagent simulation. Journal of Construction Engineering and Management, 151(10): 04025206, ISSN 0733-9364

Zaayman, L (2017) Optimisation of mechanised maintenance management of railway track infrastructure. PhD thesis, University of Johannesburg, South Africa.

Zakieh, R (1991) Quantity-significance and its application to construction project modelling. PhD thesis, University of Dundee, UK.

Zaneldin, E; Hegazy, T and Grierson, D (2001) Improving design coordination for building projects. II: A collaborative system. Journal of Construction Engineering and Management, 127(4), pp. 330-336. ISSN 0733-9364

Zantke, G and Mangels, B (1999) Public sector client-private sector project: Transferring the state construction administration into private hands. Engineering, Construction and Architectural Management, 6(1), pp. 78-87. ISSN 0969-9988

Zayed, T M and Halpin, D (2001) Simulation of concrete batch plant production. Journal of Construction Engineering and Management, 127(2), pp. 132-141. ISSN 0733-9364

Zeiler, W and Savanovic, P (2009) Integral morphological C-K design approach for multidisciplinary building design. Architectural Engineering and Design Management, 5(4), pp. 193-214. ISSN 1745-2007

Zemke, D M V and Pullman, M (2008) Assessing the value of good design in hotels. Building Research & Information, 36(6), pp. 543-556. ISSN 0961-3218

Zeng, Z (2007) Coordinated rescheduling of precast production. PhD thesis, National University of Singapore, Singapore.

Zerjav, V and Ceric, A (2009) Structuring communication within construction projects: A communication breakdown structure. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Zhai, X and Liu, A (2009) A framework for investigating the relationship of human resource practices and performance of the Chinese construction enterprises. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Zhai, X; Reed, R and Mills, A (2014) Embracing off-site innovation in construction in China to enhance a sustainable built environment in urban housing. International Journal of Construction Management, 14(3), pp. 123-133. ISSN 1562-3599

Zhang, C; Shen, W and Ye, Z (2022) Technical feasibility analysis on applying ultra-wide band technology in construction progress monitoring. International Journal of Construction Management, 22(15), pp. 2951-2965. ISSN 1562-3599

Zhang, C; Zhang, W; Shi, Y; Zhao, T and Zhang, Y (2025) Digital safety navigation for tower crane climbing process from a systematic perspective: Risk identification, safety information requirements, and related intelligent platform. Journal of Construction Engineering and Management, 151(8): 04025096, ISSN 0733-9364

Zhang, F; Liu, H; Chen, Z; Wang, L; Zhang, Q and Guo, L (2024) Collision risk warning model for construction vehicles based on YOLO and DeepSORT algorithms. Journal of Construction Engineering and Management, 150(6): 04024053, ISSN 0733-9364

Zhang, F; Liu, H; Wang, L; Chen, Z; Zhang, Q and Guo, L (2025) State awareness and collision risk assessment algorithm for tower crane based on bidirectional inverse perspective mapping and skeleton key points. Journal of Construction Engineering and Management, 151(2): 04024205, ISSN 0733-9364

Zhang, H; Arens, E and Pasut, W (2011) Air temperature thresholds for indoor comfort and perceived air quality. Building Research & Information, 39(2), pp. 134-144. ISSN 0961-3218

Zhang, H; Shi, J J and Tam, C M (2002) Application of simulation related techniques to construction operations. Engineering, Construction and Architectural Management, 9(5-6), pp. 433-445. ISSN 0969-9988

Zhang, H; Xing, F and Liu, J (2011) Rehabilitation decision-making for buildings in the Wenchuan area. Construction Management and Economics, 29(6), pp. 569-578. ISSN 1466433X

Zhang, H; Yan, X; Li, H; Jin, R and Fu, H (2019) Real-time alarming, monitoring, and locating for non-hard-hat use in construction. Journal of Construction Engineering and Management, 145(3): 04019006, ISSN 0733-9364

Zhang, J (2012) Developing a construction safety management and audit system. PhD thesis, National University of Singapore, Singapore.

Zhang, J; Wang, T and Zhang, L (2021) Legal risk assessment framework for international PPP projects based on metanetwork. Journal of Construction Engineering and Management, 147(8): 04021090, ISSN 0733-9364

Zhang, J; Zhou, N; Hinge, A; Feng, W and Zhang, S (2016) Governance strategies to achieve zero-energy buildings in China. Building Research & Information, 44(5-6), pp. 604-618. ISSN 0961-3218

Zhang, L; Fu, Y and Lu, W (2021) Contract enforcement for claimants' satisfaction with construction dispute resolution: Moderating role of shadow of the future, fairness perception, and trust. Journal of Construction Engineering and Management, 147(2): 04020168, ISSN 0733-9364

Zhang, L and Qi, J (2012) Controlling path and controlling segment analysis in repetitive scheduling method. Journal of Construction Engineering and Management, 138(11), pp. 1341-1345. ISSN 0733-9364

Zhang, L; Zou, X and Kan, Z (2014) Improved strategy for resource allocation in repetitive projects considering the learning effect. Journal of Construction Engineering and Management, 140(11): 4014053, ISSN 0733-9364

Zhang, M; Liu, X and Li, Y (2025) Identity-based proactive human intrusion management in hazardous areas at construction sites: A deep learning-based method. Journal of Construction Engineering and Management, 151(6): 04025045, ISSN 0733-9364

Zhang, P; Harris, F C; Olomolaiye, P O and Holt, G D (1999) Location optimization for a group of tower cranes. Journal of Construction Engineering and Management, 125(2), pp. 115-122. ISSN 0733-9364

Zhang, Q Q; Chen, Z G; Li, J L and Liu, S W (2021) Pressure-cast-in-situ pile with spray-expanded frustum: Construction equipment and process. Journal of Construction Engineering and Management, 147(6): 06021002, ISSN 0733-9364

Zhang, R (2014) Task characteristics, coordination modes and design coordination performance, an information processing perspective. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Zhang, S (2022) The development of a low carbon prefabricated house. PhD thesis, University of Nottingham, UK.

Zhang, S; Bogus, S M; Lippitt, C D and Migliaccio, G C (2017) Estimating location-adjustment factors for conceptual cost estimating based on nighttime light satellite imagery. Journal of Construction Engineering and Management, 143(1): 04016087, ISSN 0733-9364

Zhang, W R; Wang, S Q; Tiong, R L K; Ting, S K and Ashley, D (1998) Risk management of Shanghai's privately financed Yan'an Donglu tunnels. Engineering, Construction and Architectural Management, 5(4), pp. 399-409. ISSN 0969-9988

Zhang, X; Goulding, J S; Sexton, M G; Aouad, G and Kagioglou, M (2006) HyCon: Virtual prototyping in hybrid concrete construction frame design. Construction Innovation, 6(1), pp. 47-60. ISSN 1471-4175

Zhang, X; Sexton, M G; Goulding, J S; Aouad, G and Kagioglou, M (2005) Performance modelling for the design of a hybrid concrete structural frame. Architectural Engineering and Design Management, 1(2), pp. 83-91. ISSN 1745-2007

Zhang, X Q and Kumaraswamy, M M (2001) Hong Kong experience in managing BOT projects. Journal of Construction Engineering and Management, 127(2), pp. 154-162. ISSN 0733-9364

Zhang, X Q and Kumaraswamy, M M (2001) Procurement protocols for public-private partnered projects. Journal of Construction Engineering and Management, 127(5), pp. 351-358. ISSN 0733-9364

Zhang, Xuan (2025) Coordination and optimization of prefabricated building supply chain for sustainability development. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Zhang, Y; Zhang, M; Gao, F and Li, J (2025) Inverse problem method application in building physics numerical optimization: New insight into ideal envelope properties determination. Architectural Engineering and Design Management, 21(2), pp. 252-267. ISSN 1745-2007

Zhao, W.; Li, K.; Liu, G.; Chen, B.; Fan, M. and Yin, S. (2026) A three-stage intelligent crack detection method for concrete bridges based on deep neural networks. Journal of Construction Engineering and Management, 152(6): 04026067, ISSN 0733-9364

Zhao, J (2014) Performance modeling and optimization solutions for networking systems. PhD thesis, University of Hong Kong, Hong Kong.

Zhao, X (2014) Enterprise risk management in Chinese construction firms operating overseas. PhD thesis, National University of Singapore, Singapore.

Zhao, Y; Mourshed, M and Wright, J (2009) Factors influencing the design of spatial layouts in healthcare buildings. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Zhao, Z Y; You, W Y and Zuo, J (2010) Application of innovative critical chain method for project planning and control under resource constraints and uncertainty. Journal of Construction Engineering and Management, 136(9), pp. 1056-1060. ISSN 0733-9364

Zheng, X; Li, R; Han, Y; Xue, R and Bai, J (2023) The dilemma of operator selection in urban rail transit PPP project operations: A LASSO approach. Journal of Construction Engineering and Management, 149(7): 05023007, ISSN 0733-9364

Zhi, H (1992) The economic risk analysis in international construction markets. PhD thesis, University of Reading, UK.

Zhong, B; Shen, L; Pan, X; Zhong, X and He, W (2024) Dispute classification and analysis: Deep learning-based text mining for construction contract management. Journal of Construction Engineering and Management, 150(1): 04023151, ISSN 0733-9364

Zhong, D H and Zhang, J S (2003) New method for calculating path float in program evaluation and review technique (PERT). Journal of Construction Engineering and Management, 129(5), pp. 501-506. ISSN 0733-9364

Zhou, Z; Wei, C; Shen, G Q; Xue, J; Liu, Y; Wang, Y and Man, Q (2025) Citizens' acceptance of prefabricated housing in China: The role of procedural justice and uncertainty. Engineering, Construction and Architectural Management, 32(10), pp. 6867-6887. ISSN 0969-9988

Zhou, M; Liu, Y; Wang, K and Fahmi Hassanein, M (2020) New asynchronous-pouring rapid-construction method for long-span prestressed concrete box girder bridges with corrugated steel webs. Journal of Construction Engineering and Management, 146(2): 05019021, ISSN 0733-9364

Zhou, Q; Deng, X; Hwang, B G; Mahmoudi, A and Liu, Y (2023) Integrating the factors affecting knowledge transfer within international construction projects: Individual and team perspectives. Journal of Construction Engineering and Management, 149(11): 04023117, ISSN 0733-9364

Zhou, Xiaoyan (2023) A reinforcement learning neural network approach to online optimization of construction manufacturing processes. PhD thesis, University of Florida, USA.

Zhou, Y; Liu, J; Pu, X and Ding, Y (2025) Signaling game analysis of transfer mechanisms of PPP projects: Considering investors' moral hazard and adverse selection behavior. Journal of Construction Engineering and Management, 151(5): 04025030, ISSN 0733-9364

Zhu, H; Hu, X and Wang, Y (2001) China's construction regulatory systems. Building Research & Information, 29(4), pp. 265-269. ISSN 0961-3218

Zhu, Q; Zhou, T; Xia, P and Du, J (2022) Robot planning for active collision avoidance in modular construction: Pipe skids example. Journal of Construction Engineering and Management, 148(10): 04022114, ISSN 0733-9364

Zhu, W; Li, J; Shen, K and Li, X (2025) Carbon dioxide emission reduction assessments of recycled aggregate concrete applications for infrastructure by incorporating vegetation carbon sink. Journal of Construction Engineering and Management, 151(9): 04025132, ISSN 0733-9364

Zimmerman, A and Kibert, C J (2007) Forum: Informing LEED's next generation with the natural step. Building Research & Information, 35(6), pp. 681-689. ISSN 0961-3218

Zimmerman, A and Martin, M (2001) Post-occupancy evaluation: Benefits and barriers. Building Research & Information, 29(2), pp. 168-174. ISSN 0961-3218

Zimmermann, R K; Barjot, Z; Rasmussen, F N; Malmqvist, T; Kuittinen, M and Birgisdottir, H (2023) GHG emissions from building renovation versus new-build: Incentives from assessment methods. Buildings & Cities, 4(1), pp. 274-291. ISSN 2632-6655

Zokaei Ashtiani, M (2022) Data-driven sustainability assessment in roadway infrastructure construction. PhD thesis, University of Washington, USA.

Zoleykani, M. J. and Abbasianjahromi, H. (2026) Integrating ar and 4D-BIM for dynamic hazard management in construction projects. International Journal of Construction Management, 26(7), pp. 1239-1263. ISSN 1562-3599

Zou, P X W and Leslie-Carter, R (2010) Lessons learned from managing the design of the 'water cube' national swimming centre for the Beijing 2008 Olympic Games. Architectural Engineering and Design Management, 6(3), pp. 175-188. ISSN 1745-2007

Zouein, P P and Tommelein, I D (1999) Dynamic layout planning using a hybrid incremental solution method. Journal of Construction Engineering and Management, 125(6), pp. 400-408. ISSN 0733-9364

Zouein, P P and Tommelein, I D (2001) Improvement algorithm for limited space scheduling. Journal of Construction Engineering and Management, 127(2), pp. 116-124. ISSN 0733-9364

Zubairu, M (1990) Sites and services housing development: Strategies for improving the effective demand for projects by low-income families in the urban areas of Nigeria. PhD thesis, University of Strathclyde, UK.

Zuhaib, S; Manton, R; Hajdukiewicz, M; Keane, M M and Goggins, J (2017) Attitudes and approaches of Irish retrofit industry professionals towards achieving nearly zero-energy buildings. International Journal of Building Pathology and Adaptation, 35(1), pp. 16-40.

Zulu, S and Brown, A (2003) Project management process quality: A conceptual measurement model. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Zuluaga, C M; Albert, A and Arroyo, P (2018) Protecting bridge maintenance workers from falls: Evaluation and selection of compatible fall protection supplementary devices. Journal of Construction Engineering and Management, 144(8): 04018073, ISSN 0733-9364

Zuniga-Garcia, N; Machemehl, R B; Khwaja, N A; Pruner, K D and Fu, M (2021) Estimation of road user costs for work zones in data-limited or time-constrained environments. Journal of Construction Engineering and Management, 147(3): 04020182, ISSN 0733-9364

Zuo, W; Li, Q; Wang, Q; Qiao, S; Mei, T and Guo, Z (2026) Lego voxelization method for arbitrary building information models to support path planning. Journal of Construction Engineering and Management, 152(2): 04025239, ISSN 0733-9364

Zwick, D C and Miller, K R (2004) Project buyout. Journal of Construction Engineering and Management, 130(2), pp. 245-248. ISSN 0733-9364

de Blois, M and De Coninck, P (2008) The dynamics of actors' and stakeholders' participation: An approach of management by design. Architectural Engineering and Design Management, 4(3-4), pp. 176-188. ISSN 1745-2007

de Leeuw, C P (1988) The pre-estimation of compensation payable in accordance with the contract price adjustment provisions of the building industry advisory council. DSc thesis, University of Pretoria, South Africa.

de Souza, L. P.; Melo, A. P.; Triana, M. A. and Lamberts, R. (2026) Thermal resilience and life cycle assessment of social housing: A discussion about limitations in Brazil. Architectural Engineering and Design Management, 22(2), pp. 382-401. ISSN 1745-2007

de Vries, J (2023) A corrective justice account of building authority liability in Canadian negligence law. PhD thesis, University of Western Ontario, Canada.

de Waard, M (1992) Computer aided conformance checking: Checking residential building designs against building regulations with the aid of computers. PhD thesis, Delft University of Technology, Netherlands.

de Wilde, M and Spaargaren, G (2019) Designing trust: How strategic intermediaries choreograph homeowners' low-carbon retrofit experience. Building Research & Information, 47(4), pp. 362-374. ISSN 0961-3218

de la Garza, J M; Vorster, M C and Parvin, C M (1991) Total float traded as commodity. Journal of Construction Engineering and Management, 117(4), pp. 716-727. ISSN 0733-9364

li, H; Chen, Z; Wong, C T C and Love, P E D (2002) A quantitative approach to construction pollution control based on resource levelling. Construction Innovation, 2(2), pp. 71-81. ISSN 1471-4175

ng, S T; Skitmore, M; Deng, M Z M and Nadeem, A (2004) Improving existing delay analysis techniques for the establishment of delay liabilities. Construction Innovation, 4(1), pp. 3-17. ISSN 1471-4175

olde Scholtenhuis L L, D A G (2013) Welcoming high reliability organising in construction management. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

ter Haar, T (2012) Moses Mabhida stadium, Durban's icon of pride. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 65-69. ISSN 17514312

ter Huurne, R (2021) The role of risk attitudes: Discrepancies between human and computer-based risk analysis in the utility sector. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

van Nguyen, M V; Khanh, K D and Phan, C T (2025) What makes the reconstruction of old residential buildings complex? A study in Vietnamese urban areas. Engineering, Construction and Architectural Management, 32(10), pp. 7086-7110. ISSN 0969-9988

van Nguyen, M V; Thuc, L D and Nguyen, T T (2025) Pestel analysis of corporate social responsibility performance in construction organizations. Engineering, Construction and Architectural Management, 32(11), pp. 7266-7298. ISSN 0969-9988

van Oorschot, John (2020) On the adoption of innovation in the housing sector. PhD thesis, University of Twente, Netherlands.

van Someren, K and Larsen, G (2023) Money and mental health matters in UK construction workers. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

van den Adel, J F; Al-Jibouri, S H; Karim, U F A and Mawdesley, M (2003) Integrated foundation design of buildings: Case demonstration of a prototype expert system. Journal of Engineering, Design and Technology, 1(1), pp. 55-74. ISSN 1726-0531

van den Boomen, M (2020) Replacement optimisation for public infrastructure assets: Quantitative optimisation modelling taking typical public infrastructure related features into account. PhD thesis, Delft University of Technology, Netherlands.

van der Bent, H S (2022) Towards a future sustainable housing stock: Assessment of the energy performance of dwellings of non-profit housing associations. PhD thesis, Delft University of Technology, Netherlands.

van der Bent, H S; van den Brom, P I; Visscher, H J; Meijer, A and Mouter, N (2023) The energy performance of dwellings with heat pumps of Dutch non-profit housing associations. Building Research & Information, 51(2), pp. 192-202. ISSN 0961-3218

Çhoker, G B (1985) Information system for building products. Journal of Construction Engineering and Management, 111(4), pp. 411-425. ISSN 0733-9364

Özer, S and Jacoby, S (2022) Dwelling size and usability in London: A study of floor plan data using machine learning. Building Research & Information, 50(6), pp. 694-708. ISSN 0961-3218

Özer, S and Jacoby, S (2024) Space standards in affordable housing in England. Building Research & Information, 52(6), pp. 611-626. ISSN 0961-3218

Ürge-Vorsatz, D; Harvey, L D D; Mirasgedis, S and Levine, M D (2007) Mitigating CO2 emissions from energy use in the world's buildings. Building Research & Information, 35(4), pp. 379-398. ISSN 0961-3218

Ürge-Vorsatz, D; Koeppel, S and Mirasgedis, S (2007) Appraisal of policy instruments for reducing buildings' CO2 emissions. Building Research & Information, 35(4), pp. 458-477. ISSN 0961-3218

This list was generated on Sat Aug 22 02:55:56 2026 UTC.