Items with Descriptive Scope: 2 PA

Number of items: 37.

Adams, B J (1977) A study of the feasibility of using forecasting models to characterize the supply of contract construction labor. PhD thesis, Texas A&M University, USA.

Al-Sinaidi, A R (2005) Selecting the unit price bid: An analytical method. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Anjomshoa, E (2025) Investigation of lightweight gypsum based on montmorillonite nanoclay with enhanced insulation properties. International Journal of Building Pathology and Adaptation, 43(7), pp. 1637-1659. ISSN 2398-4708

Chan, P; Cooper, R; Carmichael, S; Tzortzopoulos, P; McDermott, P and Khalfan, M M A (2004) Does organisational learning create a learning organisation? Conceptual challenges from a project perspective. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Chen, W; Yu, M; Wang, Y; Lu, X and Hou, J (2025) Evolutionary analysis of value co-destruction in urban village renovation using SEM-FCM model. Engineering, Construction and Architectural Management, 32(11), pp. 7486-7506. ISSN 0969-9988

Chen, S and Jiang, Y (2008) Pavement reflective cracking control with coarse-aggregate asphalt mix interlayer. International Journal of Construction Education and Research, 4(3), pp. 200-209. ISSN 1557-8771

Cheng, E W L and Li, H (2004) Contractor selection using the analytic network process. Construction Management and Economics, 22(10), pp. 1021-1032. ISSN 01446193

Dunstone, Philip H (1977) The practical application of combinations of numbers and of combinations of shapes to buildings. PhD thesis, Aston University, UK.

Edwards, P J and Edwards, M (1995) A price-rationalized approach to item separation in the measurement of concrete work. Construction Management and Economics, 13(6), pp. 485-491. ISSN 01446193

Fellows, R and Liu, A M M (2020) Borrowing theories: Contextual and empirical considerations. Construction Management and Economics, 38(7), pp. 581-588. ISSN 01446193

Freeman, M (2010) How fire risks should be managed in enclosed Australian shopping centres. DBA thesis, Victoria University, Australia.

Gledson, B J and Phoenix, C (2017) Exploring organisational attributes affecting the innovativeness of UK SMEs. Construction Innovation, 17(2), pp. 224-243. ISSN 1471-4175

Green, S D; Kao, C C and Larsen, G D (2010) Contextualist research: Iterating between methods while following an empirically grounded approach. Journal of Construction Engineering and Management, 136(1), pp. 117-126. ISSN 0733-9364

Hammad, A W A; Tam, V W Y and Haddad, A N (2025) A bi-level mixed integer non-linear programming model to solve the billboard location problem in cities. International Journal of Construction Management, 25(16), pp. 1929-1937. ISSN 1562-3599

Hartman, F; Snelgrove, P and Ashrafi, R (1997) Effective wording to improve risk allocation in lump sum contracts. Journal of Construction Engineering and Management, 123(4), pp. 379-387. ISSN 0733-9364

Ishai, E (1989) Architectural and economic considerations in the design of prefabricated facade components (exterior walls). Construction Management and Economics, 7(3), pp. 189-202. ISSN 01446193

Kennedy, P and Milligan, J L (2000) Cost of the adjudication process in the UK since the introduction of the Housing Grants, Construction and Regeneration Act 1996. Journal of Financial Management of Property and Construction, 5(3), pp. 171-180. ISSN 1366-4387

Khosrowshahi, F (1991) Simulation of expenditure patterns of construction projects. Construction Management and Economics, 9(2), pp. 113-132. ISSN 01446193

Kinner, E B and Stimpson, W E (1983) Artesian pressure relief for Trident drydock. Journal of Construction Engineering and Management, 109(1), pp. 74-88. ISSN 0733-9364

Loosemore, M (1999) A grounded theory of construction crisis management. Construction Management and Economics, 17(1), pp. 9-19. ISSN 01446193

Lucke, T and Beecham, S (2010) Capacity loss in siphonic roof drainage systems due to aeration. Building Research & Information, 38(2), pp. 206-217. ISSN 0961-3218

Makul, N (2021) Modified cost-benefit analysis of the production of ready-mixed self-consolidating concrete prepared with a recycled concrete aggregate. Journal of Construction Engineering and Management, 147(4): 04021021, ISSN 0733-9364

Nam, C H and Tatum, C B (1989) Toward understanding of product innovation process in construction. Journal of Construction Engineering and Management, 115(4), pp. 517-534. ISSN 0733-9364

Nyström, J (2005) The definition of partnering as a wittgenstein family-resemblance concept. Construction Management and Economics, 23(5), pp. 473-481. ISSN 01446193

Obeng-Ahenkora, N K and Danso, H (2020) Principal component analysis of factors influencing pricing decisions of building materials in Ghana. International Journal of Construction Management, 20(2), pp. 122-129. ISSN 1562-3599

Oke, A E; Ogunsami, D R and Ogunlana, S (2012) Establishing a common ground for the use of structural equation modelling for construction related research studies. Construction Economics and Building, 12(3), pp. 89-94. ISSN 2204-9029

Olander, S (2007) Stakeholder impact analysis in construction project management. Construction Management and Economics, 25(3), pp. 277-287. ISSN 1466433X

Perera, S (1983) Resource sharing in linear construction. Journal of Construction Engineering and Management, 109(1), pp. 102-111. ISSN 0733-9364

Russell, J S; Hancher, D E and Skibniewski, M J (1992) Contractor prequalification data for construction owners. Construction Management and Economics, 10(2), pp. 117-135. ISSN 01446193

Sarkar, D and Singh, M (2021) Development of risk index for mass rapid transit system project in Western India through application of fuzzy analytical hierarchy process (FAHP). International Journal of Construction Management, 21(5), pp. 439-451. ISSN 1562-3599

Shen, F and Stewart, I (2022) Argument mapping of the proposed benefits of agility and agile practice adoption in construction projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Shi, J and Abourizk, S (1998) Continuous and combined event-process models for simulating pipeline construction. Construction Management and Economics, 16(4), pp. 489-498. ISSN 01446193

Shi, J J (1999) Mathematical models for maximizing aggregate plant production. Journal of Construction Engineering and Management, 125(1), pp. 53-60. ISSN 0733-9364

Thomas, H R; Mathews, C T and Ward, J G (1986) Learning curve models of construction productivity. Journal of Construction Engineering and Management, 112(2), pp. 245-258. ISSN 0733-9364

Whyte, A and Edge, H M (1999) Addressing discord in the team: Beyond third party management. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Ye, Y X; Shan, M; Gao, X; Li, Q and Zhang, H (2024) Examining causes of disputes in subcontracting litigation cases using text mining and natural language processing techniques. International Journal of Construction Management, 24(15), pp. 1617-1629. ISSN 1562-3599

Yiu, T W and Law, Y M (2011) Moderating effect of equity sensitivity on behavior-outcome relationships in construction dispute negotiation. Journal of Construction Engineering and Management, 137(5), pp. 322-332. ISSN 0733-9364

This list was generated on Sat Aug 22 02:56:15 2026 UTC.