Items with Descriptive Scope: 2 PA
Adams, B J (1977) A study of the feasibility of using forecasting models to characterize the supply of contract construction labor. PhD thesis, Texas A&M University, USA.
Al-Sinaidi, A R (2005) Selecting the unit price bid: An analytical method. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Anjomshoa, E (2025) Investigation of lightweight gypsum based on montmorillonite nanoclay with enhanced insulation properties. International Journal of Building Pathology and Adaptation, 43(7), pp. 1637-1659. ISSN 2398-4708
Chan, P; Cooper, R; Carmichael, S; Tzortzopoulos, P; McDermott, P and Khalfan, M M A (2004) Does organisational learning create a learning organisation? Conceptual challenges from a project perspective. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Chen, W; Yu, M; Wang, Y; Lu, X and Hou, J (2025) Evolutionary analysis of value co-destruction in urban village renovation using SEM-FCM model. Engineering, Construction and Architectural Management, 32(11), pp. 7486-7506. ISSN 0969-9988
Chen, S and Jiang, Y (2008) Pavement reflective cracking control with coarse-aggregate asphalt mix interlayer. International Journal of Construction Education and Research, 4(3), pp. 200-209. ISSN 1557-8771
Cheng, E W L and Li, H (2004) Contractor selection using the analytic network process. Construction Management and Economics, 22(10), pp. 1021-1032. ISSN 01446193
Dunstone, Philip H (1977) The practical application of combinations of numbers and of combinations of shapes to buildings. PhD thesis, Aston University, UK.
Edwards, P J and Edwards, M (1995) A price-rationalized approach to item separation in the measurement of concrete work. Construction Management and Economics, 13(6), pp. 485-491. ISSN 01446193
Fellows, R and Liu, A M M (2020) Borrowing theories: Contextual and empirical considerations. Construction Management and Economics, 38(7), pp. 581-588. ISSN 01446193
Freeman, M (2010) How fire risks should be managed in enclosed Australian shopping centres. DBA thesis, Victoria University, Australia.
Gledson, B J and Phoenix, C (2017) Exploring organisational attributes affecting the innovativeness of UK SMEs. Construction Innovation, 17(2), pp. 224-243. ISSN 1471-4175
Green, S D; Kao, C C and Larsen, G D (2010) Contextualist research: Iterating between methods while following an empirically grounded approach. Journal of Construction Engineering and Management, 136(1), pp. 117-126. ISSN 0733-9364
Hammad, A W A; Tam, V W Y and Haddad, A N (2025) A bi-level mixed integer non-linear programming model to solve the billboard location problem in cities. International Journal of Construction Management, 25(16), pp. 1929-1937. ISSN 1562-3599
Hartman, F; Snelgrove, P and Ashrafi, R (1997) Effective wording to improve risk allocation in lump sum contracts. Journal of Construction Engineering and Management, 123(4), pp. 379-387. ISSN 0733-9364
Ishai, E (1989) Architectural and economic considerations in the design of prefabricated facade components (exterior walls). Construction Management and Economics, 7(3), pp. 189-202. ISSN 01446193
Kennedy, P and Milligan, J L (2000) Cost of the adjudication process in the UK since the introduction of the Housing Grants, Construction and Regeneration Act 1996. Journal of Financial Management of Property and Construction, 5(3), pp. 171-180. ISSN 1366-4387
Khosrowshahi, F (1991) Simulation of expenditure patterns of construction projects. Construction Management and Economics, 9(2), pp. 113-132. ISSN 01446193
Kinner, E B and Stimpson, W E (1983) Artesian pressure relief for Trident drydock. Journal of Construction Engineering and Management, 109(1), pp. 74-88. ISSN 0733-9364
Loosemore, M (1999) A grounded theory of construction crisis management. Construction Management and Economics, 17(1), pp. 9-19. ISSN 01446193
Lucke, T and Beecham, S (2010) Capacity loss in siphonic roof drainage systems due to aeration. Building Research & Information, 38(2), pp. 206-217. ISSN 0961-3218
Makul, N (2021) Modified cost-benefit analysis of the production of ready-mixed self-consolidating concrete prepared with a recycled concrete aggregate. Journal of Construction Engineering and Management, 147(4): 04021021, ISSN 0733-9364
Nam, C H and Tatum, C B (1989) Toward understanding of product innovation process in construction. Journal of Construction Engineering and Management, 115(4), pp. 517-534. ISSN 0733-9364
Nyström, J (2005) The definition of partnering as a wittgenstein family-resemblance concept. Construction Management and Economics, 23(5), pp. 473-481. ISSN 01446193
Obeng-Ahenkora, N K and Danso, H (2020) Principal component analysis of factors influencing pricing decisions of building materials in Ghana. International Journal of Construction Management, 20(2), pp. 122-129. ISSN 1562-3599
Oke, A E; Ogunsami, D R and Ogunlana, S (2012) Establishing a common ground for the use of structural equation modelling for construction related research studies. Construction Economics and Building, 12(3), pp. 89-94. ISSN 2204-9029
Olander, S (2007) Stakeholder impact analysis in construction project management. Construction Management and Economics, 25(3), pp. 277-287. ISSN 1466433X
Perera, S (1983) Resource sharing in linear construction. Journal of Construction Engineering and Management, 109(1), pp. 102-111. ISSN 0733-9364
Russell, J S; Hancher, D E and Skibniewski, M J (1992) Contractor prequalification data for construction owners. Construction Management and Economics, 10(2), pp. 117-135. ISSN 01446193
Sarkar, D and Singh, M (2021) Development of risk index for mass rapid transit system project in Western India through application of fuzzy analytical hierarchy process (FAHP). International Journal of Construction Management, 21(5), pp. 439-451. ISSN 1562-3599
Shen, F and Stewart, I (2022) Argument mapping of the proposed benefits of agility and agile practice adoption in construction projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Shi, J and Abourizk, S (1998) Continuous and combined event-process models for simulating pipeline construction. Construction Management and Economics, 16(4), pp. 489-498. ISSN 01446193
Shi, J J (1999) Mathematical models for maximizing aggregate plant production. Journal of Construction Engineering and Management, 125(1), pp. 53-60. ISSN 0733-9364
Thomas, H R; Mathews, C T and Ward, J G (1986) Learning curve models of construction productivity. Journal of Construction Engineering and Management, 112(2), pp. 245-258. ISSN 0733-9364
Whyte, A and Edge, H M (1999) Addressing discord in the team: Beyond third party management. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Ye, Y X; Shan, M; Gao, X; Li, Q and Zhang, H (2024) Examining causes of disputes in subcontracting litigation cases using text mining and natural language processing techniques. International Journal of Construction Management, 24(15), pp. 1617-1629. ISSN 1562-3599
Yiu, T W and Law, Y M (2011) Moderating effect of equity sensitivity on behavior-outcome relationships in construction dispute negotiation. Journal of Construction Engineering and Management, 137(5), pp. 322-332. ISSN 0733-9364
Up a level