Items with Descriptive Scope: 2 CE
Agapaki, E and Brilakis, I (2021) Cloi: An automated benchmark framework for generating geometric digital twins of industrial facilities. Journal of Construction Engineering and Management, 147(11): 04021145, ISSN 0733-9364
Bernold, L E and Lee, T S (2010) Experimental research in construction. Journal of Construction Engineering and Management, 136(1), pp. 26-35. ISSN 0733-9364
Bhattacharya, A; Metcalf, A R; Nafchi, A M and Mousavi, E S (2021) Particle dispersion in a cleanroom–effects of pressurization, door opening and traffic flow. Building Research & Information, 49(3), pp. 294-307. ISSN 0961-3218
Blismas, N; Pasquire, C and Gibb, A (2006) Benefit evaluation for off-site production in construction. Construction Management and Economics, 24(2), pp. 121-130. ISSN 01446193
Díaz-Jimenez, D; Ruiz, J L; González-Lama, J and Verdejo-Espinosa, Á (2025) Assessing the sustainable alignment of a sensor-based connected health system with SDGs: An evaluation model and case study. Smart and Sustainable Built Environment, 14(7), pp. 2235-2259. ISSN 2046-6099
El-Ghandour, W and Al-Hussein, M (2004) Survey of information technology applications in construction. Construction Innovation, 4(2), pp. 83-98. ISSN 1471-4175
Eldin, N N (1999) Impact of employee, management, and process issues on constructability implementation. Construction Management and Economics, 17(6), pp. 711-720. ISSN 01446193
Huang, J; Abadi, M and Yeow, J (2022) Exploring dynamics in construction circular supply chains using a systematic literature review: New supply-push and demand-pull perspectives. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Hurtado, K C; Smithwick, J B; Pesek, A E and Sullivan, K T (2018) Public school facility underfunding: A new tool to maximize construction dollars and improve performance outcomes. International Journal of Construction Education and Research, 14(3), pp. 218-231. ISSN 1557-8771
Jalali Sohi, A (2018) Flexibility in project management: Towards improving project performance. PhD thesis, Delft University of Technology, Netherlands.
Jefferies, M; Chen, S E and Conway, J (2002) Assessment of professional competence in a construction management problem-based learning setting. Construction Economics and Building, 2(1), pp. 47-56. ISSN 2204-9029
Kamardeen, I (2013) Motivation-driven learning and teaching model for construction education. Construction Economics and Building, 13(1), pp. 36-49. ISSN 2204-9029
Kamardeen, I and Samaratunga, M (2020) Digiexplanation driven assignments for personalising learning in construction education. Construction Economics and Building, 20(3), pp. 103-123. ISSN 2204-9029
Lam, K C; Gibb, A G F and Sher, W D (1997) An analysis of building procurement factors affecting coordination of building services. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Li, L; Cheng, M; Tu, K; Ding, R; Zhang, J and Xu, B (2025) Human-machine interface based on constraint velocity polytope for safe and efficient operation of large-size hydraulic manipulator. Journal of Construction Engineering and Management, 151(7): 04025082, ISSN 0733-9364
Loosemore, M and Phua, F (2010) Untangling rhetoric and reality in the CSR debate: The role of corporate social responsibility in effective business strategy. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Mitropoulos, P and Guillama, V (2011) A framework of task demand factors for residential framing. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 19-27. ISSN 17514312
Nkado, R N (1995) Construction time-influencing factors: The contractor's perspective. Construction Management and Economics, 13(1), pp. 81-89. ISSN 01446193
Oliveira, S; Marco, E and Gething, B (2018) Towards an energy 'literate' architecture graduate? UK educators' and students' evaluation. Architectural Engineering and Design Management, 14(4), pp. 317-329. ISSN 1745-2007
Pishdad-Bozorgi, P (2012) Case-based study and analysis of integrated project delivery (IPD) approach and trust-building attributes. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Riley, M J (2001) Re-engineering the construction procurement process. PhD thesis, University of Southampton, UK.
Robinson, W G (2019) Servitization as an ongoing process of changing: the case of ConstructCo. PhD thesis, University of Manchester, UK.
Sillars, D N and Kangari, R (2004) Predicting organizational success within a project-based joint venture alliance. Journal of Construction Engineering and Management, 130(4), pp. 500-508. ISSN 0733-9364
Smallwood, J J and Emuze, F (2016) Factors that promote zero fatalities, injuries, and disease in construction. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Sundaraj, G and Eaton, D (2011) The anticipated robustness factors in a PFI project environment from the granting authority s perspective. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Tainter, J A and Taylor, T G (2014) Complexity, problem-solving, sustainability and resilience. Building Research & Information, 42(2), pp. 168-181. ISSN 0961-3218
Teo, A-L and Runeson, G (2001) Aspects of market differentiation in the building industry. Construction Economics and Building, 1(2), pp. 14-23. ISSN 2204-9029
Teo, E A L and Yingbin, F (2010) The moderated effect of safety investment on safety performance for building projects. International Journal of Construction Management, 10(3), pp. 45-61. ISSN 1562-3599
Ullah, F; Sepasgozar, S; Tahmasebinia, F; Sepasgozar, S M E and Davis, S (2020) Examining the impact of students' attendance, sketching, visualization, and tutors experience on students' performance: A case of building structures course in construction management. Construction Economics and Building, 20(3), pp. 78-102. ISSN 2204-9029
Uwakweh, B O (2006) Motivational climate of construction apprentice. Journal of Construction Engineering and Management, 132(5), pp. 525-532. ISSN 0733-9364
Willenbrock, J H; Thomas, H R and Francis, P J (1987) Factors affecting outage construction efficiency. Journal of Construction Engineering and Management, 113(1), pp. 99-116. ISSN 0733-9364
Williamson, M; Wilson, O; Skitmore, R M and Runeson, G (2004) Client abuses of the competitive tendering system: some general principles and a case study. Journal of Construction Research, 5(1), pp. 61-73. ISSN 1609-9451
Xu, F; Nguyen, T and Du, J (2024) Augmented reality for maintenance tasks with chatgpt for automated text-to-action. Journal of Construction Engineering and Management, 150(4): 04024015, ISSN 0733-9364
Ye, Y; You, H and Du, J (2024) Real-time muscle-level haptic feedback for enhanced welding learning: An semg-based approach. Journal of Construction Engineering and Management, 150(12): 04024178, ISSN 0733-9364
Up a level