Items where Author is "Zou, P X W"

Group by: Item Type | No Grouping
Number of items: 31.

Article

Du, Q; Qi, X; Zou, P X W and Zhang, Y (2024) Bi-objective optimization framework for prefabricated construction service combination selection using genetic simulated annealing algorithm. Engineering, Construction and Architectural Management, 31(10), pp. 3921-3945. ISSN 0969-9988

Qi, X; Du, Q; Zou, P X W and Huang, N (2024) Developing a weighted synergy network-based model for selecting prefabricated construction services. Engineering, Construction and Architectural Management, 31(6), pp. 2306-2326. ISSN 0969-9988

Xu, S; Zhou, L and Zou, P X W (2024) What influences stakeholders' decision in adopting blockchain-based quality tracking systems in prefabricated construction. Engineering, Construction and Architectural Management, 31(6), pp. 2224-2247. ISSN 0969-9988

Huang, N; Du, Q; Zou, P X W and Huang, Y (2023) Analysis of key factors influencing green highway project development focusing on network interaction and project success: Evidence from China. Engineering, Construction and Architectural Management, 30(8), pp. 3203-3223. ISSN 0969-9988

Andrić, J M; Wang, J; Zou, P X W; Zhang, J and Zhong, R (2019) Fuzzy logic-based method for risk assessment of belt and road infrastructure projects. Journal of Construction Engineering and Management, 145(12): 4019082, ISSN 0733-9364

Yang, R J and Zou, P X W (2016) Building integrated photovoltaics (BIPV): Costs, benefits, risks, barriers and improvement strategy. International Journal of Construction Management, 16(1), pp. 39-53. ISSN 1562-3599

Sunindijo, R Y and Zou, P X W (2013) Conceptualizing safety management in construction projects. Journal of Construction Engineering and Management, 139(9), pp. 1144-1153. ISSN 0733-9364

Liu, J Y; Zou, P X W and Gong, W (2013) Managing project risk at the enterprise level: Exploratory case studies in China. Journal of Construction Engineering and Management, 139(9), pp. 1268-1274. ISSN 0733-9364

Sunindijo, R Y and Zou, P X W (2013) The roles of emotional intelligence, interpersonal skill, and transformational leadership on improving construction safety performance. Construction Economics and Building, 13(3), pp. 97-113. ISSN 2204-9029

Zou, P X W and Couani, P (2012) Managing risks in green building supply chain. Architectural Engineering and Design Management, 8(2), pp. 143-158. ISSN 1745-2007

Sunindijo, R Y and Zou, P X W (2012) Political skill for developing construction safety climate. Journal of Construction Engineering and Management, 138(5), pp. 605-612. ISSN 0733-9364

Li, J and Zou, P X W (2011) Fuzzy AHP-based risk assessment methodology for PPP projects. Journal of Construction Engineering and Management, 137(12), pp. 1205-1209. ISSN 0733-9364

Zou, P X W and Leslie-Carter, R (2010) Lessons learned from managing the design of the 'water cube' national swimming centre for the Beijing 2008 Olympic Games. Architectural Engineering and Design Management, 6(3), pp. 175-188. ISSN 1745-2007

Zou, P X W and Li, J (2010) Risk identification and assessment in subway projects: Case study of Nanjing Subway Line 2. Construction Management and Economics, 28(12), pp. 1219-1238. ISSN 1466433X

Zou, P X W; Chen, Y and Chan, T Y (2010) Understanding and improving your risk management capability: Assessment model for construction organizations. Journal of Construction Engineering and Management, 136(8), pp. 854-863. ISSN 0733-9364

Zou, P X W and Zhang, G (2009) Comparative study on the perception of construction safety risks in China and Australia. Journal of Construction Engineering and Management, 135(7), pp. 620-627. ISSN 0733-9364

Zou, P X W; Redman, S and Windon, S (2008) Case studies on risk and opportunity at design stage of building projects in australia: Focus on safety. Architectural Engineering and Design Management, 4(3-4), pp. 221-238. ISSN 1745-2007

Li, J and Zou, P X W (2008) Risk identification and assessment in PPP infrastructure projects using fuzzy analytical hierarchy process and life-cycle methodology. Construction Economics and Building, 8(1), pp. 34-48. ISSN 2204-9029

Zou, P X W; Wang, S and Fang, D (2008) A life-cycle risk management framework for PPP infrastructure projects. Journal of Financial Management of Property and Construction, 13(2), pp. 123-142. ISSN 1366-4387

Zhang, G and Zou, P X W (2007) Fuzzy analytical hierarchy process risk assessment approach for joint venture construction projects in China. Journal of Construction Engineering and Management, 133(10), pp. 771-779. ISSN 0733-9364

Zou, P X W and Darvish, H (2006) Group assignments and teamwork skills development in postgraduate construction management studies. Architectural Engineering and Design Management, 2(3), pp. 203-215. ISSN 1745-2007

Zou, P X W (2006) Strategies for minimizing corruption in the construction industry in China. Journal of Construction in Developing Countries, 11(2), pp. 15-29. ISSN 1823-6499

Zou, P X W and Roslan, B A (2005) Different perspectives towards using web-based project management systems in construction: Large enterprises versus small- and medium-sized enterprises. Architectural Engineering and Design Management, 1(2), pp. 127-143. ISSN 1745-2007

Chung, J K H; Shen, G Q P; Leung, B Y P; Hao, J J L; Hills, M J; Fox, P W and Zou, P X W (2005) Using e-learning to deliver construction technology for undergraduate students. A case study in Hong Kong. Architectural Engineering and Design Management, 1(4), pp. 295-308. ISSN 1745-2007

Zou, P X W (2004) Knowledge management practice in two Australian architecture-engineering-construction (AEC) companies. Construction Economics and Building, 4(2), pp. 19-32. ISSN 2204-9029

Drew, D S; Shen, L Y and Zou, P X W (2002) Developing an optimal bidding strategy in two-envelope fee bidding. Construction Management and Economics, 20(7), pp. 611-620. ISSN 01446193

Conference Paper

Yang, R J; Zou, P X W and Wang, J (2014) Stakeholder-associated risk networks in green buildings: China versus Australia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Sunindijo, R Y and Zou, P X W (2011) Influence of technical skill on safety task implementation and safety climate development in construction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Sun, A C S; Zou, P X W; Long, B and Marix-Evans, P (2010) Case studies of return on investment in contruction safety management. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Zou, P X W; Shi, V Y and Li, Z (2010) An econometric evaluation framework for investment in construction safety. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Leslie-Carter, R; Zou, P X W and Tan, E X (2009) Managing international projects: A case study of the water cube aquatic centre for Beijing 2008 olympic games. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

This list was generated on Sat Aug 22 01:16:50 2026 UTC.