Items where Author is "Yang, J B"

Group by: Item Type | No Grouping
Number of items: 9.

Yang, J B and Chen, Y F (2025) S-curve adjustment approaches for a force majeure event: COVID-19 as an example. Engineering, Construction and Architectural Management, 32(3), pp. 1621-1642. ISSN 0969-9988

Vo, H M; Yang, J B and Rangasamy, V (2025) A comprehensive review of delay analysis techniques for solving concurrent delays. Engineering, Construction and Architectural Management, 32(5), pp. 3495-3521. ISSN 0969-9988

Yang, J B and Lai, T H (2024) Selecting EVM, esm and EDM(t) for managing construction project schedule. Engineering, Construction and Architectural Management, 31(12), pp. 4988-5006. ISSN 0969-9988

Zhou, Y; Yang, Y and Yang, J B (2019) Barriers to BIM implementation strategies in China. Engineering, Construction and Architectural Management, 26(3), pp. 554-574. ISSN 0969-9988

Yang, J B and Tsai, M K (2011) Computerizing ICBF method for schedule delay analysis. Journal of Construction Engineering and Management, 137(8), pp. 583-591. ISSN 0733-9364

Yang, J B and Yin, P C (2009) Isolated collapsed but-for delay analysis methodology. Journal of Construction Engineering and Management, 135(7), pp. 570-578. ISSN 0733-9364

Yang, J B (2004) Hybrid AI system for retaining wall selection. Construction Innovation, 4(1), pp. 33-52. ISSN 1471-4175

S Nmez, M; Yang, J B and Holt, G D (2001) Addressing the contractor selection problem using an evidential reasoning approach. Engineering, Construction and Architectural Management, 8(3), pp. 198-210. ISSN 0969-9988

Yau, N J; Yang, J B and Hsieh, T Y (1999) Inducing rules for selecting retaining wall systems. Construction Management and Economics, 17(1), pp. 91-98. ISSN 01446193

This list was generated on Sat Aug 22 01:16:42 2026 UTC.