Items where Author is "Xu, Y"
Article
Xu, Y; Wu, H; Chi, M; Lee, C Y; Chong, H Y and Skitmore, M (2026) Blockchain-enabled value co-creation in construction projects: Evidence from a moderated mediation model in China. Building Research & Information, 54(2), pp. 198-215. ISSN 0961-3218
Xu, Y; Chi, M; Lee, C Y; Chong, H Y and Wu, H (2025) Effects of the blockchain and artificial intelligence on value cocreation in construction projects: A mixed methods study. Journal of Construction Engineering and Management, 151(8): 04025091, ISSN 0733-9364
Guo, Z; Xu, X; Gao, X; Xu, Y; Liu, J; Zhang, M and Li, F (2025) Enhanced risk-based quality control for hydraulic engineering construction projects considering the risk-influencing mechanism. Journal of Construction Engineering and Management, 151(2): 04024204, ISSN 0733-9364
Xie, B; Wang, Z; Xu, Y and Cui, L (2025) How does bricolage drive knowledge innovation in engineering project organizations? Engineering, Construction and Architectural Management, 32(12), pp. 8571-8591. ISSN 0969-9988
Wang, J; Xu, Y; Fang, D and Liao, P C (2025) How project-based learning improves construction contract management training: Evidence from eye-tracking searching strategies for contract risk recognition performance. Journal of Construction Engineering and Management, 151(9): 04025125, ISSN 0733-9364
Yu, Y; Zhao, B; Yu, J; Xu, Y; Chang, W S; Chen, Y and Guo, H (2025) Study of phase change material on alleviating building overheating risk in cold regions of China. Building Research & Information, 53(1-2), pp. 183-203. ISSN 0961-3218
Zhao, B; Yu, Y; Xu, Y and Guo, H (2024) Bamboo as a sustainable construction material for residential buildings in the cold and severe cold regions of China. Architectural Engineering and Design Management, 20(6), pp. 1511-1528. ISSN 1745-2007
Tian, B; Fu, J; Xu, Y and Sun, L (2024) How does contract flexibility affect the sustainability performance of public–private partnership projects? A serial multiple mediator model. Engineering, Construction and Architectural Management, 31(1), pp. 28-47. ISSN 0969-9988
Ma, Z; Liu, W; Li, C; Sang, Y; Zhang, Y; Li, G and Xu, Y (2024) Research on energy-saving control strategy of loader based on intelligent identification of working stages. Journal of Construction Engineering and Management, 150(7): 04024075, ISSN 0733-9364
Gao, Q; Liu, B; Sun, J; Liu, C and Xu, Y (2023) Border-crossing frequencies of CO2 embodied in international trade of construction products for final demand. Engineering, Construction and Architectural Management, 30(6), pp. 2360-2380. ISSN 0969-9988
Xu, Y; Chong, H Y and Chi, M (2023) Modelling the blockchain adoption barriers in the AEC industry. Engineering, Construction and Architectural Management, 30(1), pp. 125-153. ISSN 0969-9988
Xu, Z; Liang, Y; Xu, Y; Fang, Z and Stilla, U (2022) Geometric modeling and surface-quality inspection of prefabricated concrete components using sliced point clouds. Journal of Construction Engineering and Management, 148(9): 04022087, ISSN 0733-9364
Xu, Y and Juan, Y K (2022) Optimal decision-making model for outdoor environment renovation of old residential communities based on well community standards in China. Architectural Engineering and Design Management, 18(5), pp. 571-592. ISSN 1745-2007
Gao, Q; Liu, B; Sun, J; Liu, C and Xu, Y (2022) Trade decomposition of CO2 emissions of global construction industries. Engineering, Construction and Architectural Management, 29(1), pp. 502-522. ISSN 0969-9988
Cheng, M; Liu, G and Xu, Y (2021) Can joint-contract functions promote PPP project sustainability performance? A moderated mediation model. Engineering, Construction and Architectural Management, 28(9), pp. 2667-2689. ISSN 0969-9988
Xu, Y; Shen, X; Lim, S and Li, X (2021) Three-dimensional object detection with deep neural networks for automatic as-built reconstruction. Journal of Construction Engineering and Management, 147(9): 04021098, ISSN 0733-9364
Wang, X; Wang, B; Xu, Y and Shi, L (2021) A chance constrained programming method to determine optimal capital structure for privatized infrastructure. Construction Management and Economics, 39(7), pp. 579-594. ISSN 01446193
Xu, Y and Turkan, Y (2020) BrIM and UAS for bridge inspections and management. Engineering, Construction and Architectural Management, 27(3), pp. 785-807. ISSN 0969-9988
Jiang, H; Xu, Y and Liu, C (2014) Market effects on forecasting construction prices using vector error correction models. International Journal of Construction Management, 14(2), pp. 101-112. ISSN 1562-3599
Jiang, H; Xu, Y and Liu, C (2013) Construction price prediction using vector error correction models. Journal of Construction Engineering and Management, 139(11): 4013022, ISSN 0733-9364
Xu, Y; Chan, A P C and Yeung, J F Y (2010) Developing a fuzzy risk allocation model for PPP projects in China. Journal of Construction Engineering and Management, 136(8), pp. 894-903. ISSN 0733-9364
Up a level