Items where Author is "Wang, Q"

Group by: Item Type | No Grouping
Jump to: Article | Thesis
Number of items: 26.

Article

Wang, Q; Tang, R; Guo, Z and Wu, J (2026) Impacts of policy instrument combinations on the collaborative innovation of generic technology for green building: Tripartite evolutionary game analysis. Journal of Construction Engineering and Management, 152(4): 04026014, ISSN 0733-9364

Zuo, W; Li, Q; Wang, Q; Qiao, S; Mei, T and Guo, Z (2026) Lego voxelization method for arbitrary building information models to support path planning. Journal of Construction Engineering and Management, 152(2): 04025239, ISSN 0733-9364

Guo, Z; Wang, Q; Cao, X and Wang, Z (2026) Navigating BIM technological innovations for megaprojects: Insights from the toce framework. Journal of Construction Engineering and Management, 152(1): 04025235, ISSN 0733-9364

Yue, H; Wang, Q; Cui, L; Li, C; Fang, H and Cheng, J C P (2026) Transfer learning for deep learning-based point cloud tasks in construction scenes. Journal of Construction Engineering and Management, 152(6): 04026058, ISSN 0733-9364

Kong, R; Bai, S; Tang, C; Liang, Y; Wang, Q and Li, M (2026) A multidimensional factor evaluation method for tunnel contour quality assessment using lidar scanning data. Journal of Construction Engineering and Management, 152(3): 04025274, ISSN 0733-9364

Zhang, S; Liu, C; Feng, K; Xia, C; Wang, Y and Wang, Q (2025) Computer vision-based real-time monitoring for swivel construction of bridges: From laboratory study to a pilot application. Engineering, Construction and Architectural Management, 32(6), pp. 3630-3658. ISSN 0969-9988

Yue, H; Sun, Y; Zeng, N; Chen, S; Tan, Y and Wang, Q (2025) Legged robots for construction management: Applications and challenges. Journal of Construction Engineering and Management, 151(8): 03125006, ISSN 0733-9364

Chen, S; Zeng, N; Li, F; Yue, H; Wang, Q and Li, Q (2025) Proactive safety risk control system for deep foundation pit construction: Situational tailoring of integrated cybernetics and dual-system theory. Journal of Construction Engineering and Management, 151(4): 04025018, ISSN 0733-9364

Zhao, L; Wang, Q; Hwang, B G and Chang-Richards, A Y (2024) Analysis of critical factors influencing sustainable infrastructure vulnerabilities using an ISM-MICMAC approach. Engineering, Construction and Architectural Management, 31(9), pp. 3622-3652. ISSN 0969-9988

Wang, Q; Appolloni, A and Liu, J (2024) Does "low-carbon pilot policy" affect the carbon intensity of construction industry? Exploring the implementation mechanism and effectiveness in China. Engineering, Construction and Architectural Management, 31(8), pp. 3222-3248. ISSN 0969-9988

Liu, Z; Lu, Y; Nath, T; Wang, Q; Tiong, R L K and Peh, L L C (2022) Critical success factors for BIM adoption during construction phase: A Singapore case study. Engineering, Construction and Architectural Management, 29(9), pp. 3267-3287. ISSN 0969-9988

Bao, Z; Laovisutthichai, V; Tan, T; Wang, Q and Lu, W (2022) Design for manufacture and assembly (dfma) enablers for offsite interior design and construction. Building Research & Information, 50(3), pp. 325-338. ISSN 0961-3218

Li, P; Wang, Q; Guo, Z; Mei, T; Li, Q; Qiao, S and Zuo, W (2022) Identifying falling-from-height hazards in building information models: A voxelization-based method. Journal of Construction Engineering and Management, 148(2): 04021203, ISSN 0733-9364

Shi, Q; Wang, Q and Guo, Z (2022) Knowledge sharing in the construction supply chain: Collaborative innovation activities and BIM application on innovation performance. Engineering, Construction and Architectural Management, 29(9), pp. 3439-3459. ISSN 0969-9988

Qiao, S; Wang, Q; Guo, Z and Guo, J (2021) Collaborative innovation activities and BIM application on innovation capability in construction supply chain: Mediating role of explicit and tacit knowledge sharing. Journal of Construction Engineering and Management, 147(12): 04021168, ISSN 0733-9364

Wang, Q; Zuo, W; Guo, Z; Li, Q; Mei, T and Qiao, S (2020) BIM voxelization method supporting cell-based creation of a path-planning environment. Journal of Construction Engineering and Management, 146(7): 04020080, ISSN 0733-9364

Liu, B; Wang, Q; Wu, G; Zheng, J and Li, L (2020) How family-supportive supervisor affect Chinese construction workers' work-family conflict and turnover intention: Investigating the moderating role of work and family identity salience. Construction Management and Economics, 38(9), pp. 807-823. ISSN 01446193

Wang, Q; Guo, Z; Mintah, K; Li, Q; Mei, T and Li, P (2019) Cell-based transport path obstruction detection approach for 4D BIM construction planning. Journal of Construction Engineering and Management, 145(3): 04018141, ISSN 0733-9364

Du, J; Wang, Q and Shi, Q (2019) Description-experience gap under imperfect information: Information continuum and aggressive cost estimating in capital projects. Engineering, Construction and Architectural Management, 26(6), pp. 1151-1170. ISSN 0969-9988

Wang, Q and Shi, Q (2019) The incentive mechanism of knowledge sharing in the industrial construction supply chain based on a supervisory mechanism. Engineering, Construction and Architectural Management, 26(6), pp. 989-1003. ISSN 0969-9988

Wang, Q; Guo, Z; Mei, T; Li, Q and Li, P (2018) Labor crew workspace analysis for prefabricated assemblies' installation: A 4D-BIM-based approach. Engineering, Construction and Architectural Management, 25(3), pp. 374-411. ISSN 0969-9988

Mei, T; Wang, Q; Xiao, Y and Yang, M (2017) Rent-seeking behavior of BIM- and IPD-based construction project in China. Engineering, Construction and Architectural Management, 24(3), pp. 514-536. ISSN 0969-9988

Chen, C; Wang, Q; Martek, I and Li, H (2016) International market selection model for large Chinese contractors. Journal of Construction Engineering and Management, 142(10): 04016044, ISSN 0733-9364

Goh, Y M and Wang, Q (2015) Investigating the adequacy of horizontal lifeline system design through case studies from Singapore. Journal of Construction Engineering and Management, 141(7): 4015017, ISSN 0733-9364

Shen, Q; Lo, K K and Wang, Q (1998) Priority setting in maintenance management: A modified multi-attribute approach using analytic hierarchy process. Construction Management and Economics, 16(6), pp. 693-702. ISSN 01446193

Thesis

Wang, Q (2017) Automated geometry quality assessment of precast concrete elements using 3D laser scan data. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

This list was generated on Sat Aug 22 01:17:50 2026 UTC.