Items where Author is "Wang, Q"
Article
Wang, Q; Tang, R; Guo, Z and Wu, J (2026) Impacts of policy instrument combinations on the collaborative innovation of generic technology for green building: Tripartite evolutionary game analysis. Journal of Construction Engineering and Management, 152(4): 04026014, ISSN 0733-9364
Zuo, W; Li, Q; Wang, Q; Qiao, S; Mei, T and Guo, Z (2026) Lego voxelization method for arbitrary building information models to support path planning. Journal of Construction Engineering and Management, 152(2): 04025239, ISSN 0733-9364
Guo, Z; Wang, Q; Cao, X and Wang, Z (2026) Navigating BIM technological innovations for megaprojects: Insights from the toce framework. Journal of Construction Engineering and Management, 152(1): 04025235, ISSN 0733-9364
Yue, H; Wang, Q; Cui, L; Li, C; Fang, H and Cheng, J C P (2026) Transfer learning for deep learning-based point cloud tasks in construction scenes. Journal of Construction Engineering and Management, 152(6): 04026058, ISSN 0733-9364
Kong, R; Bai, S; Tang, C; Liang, Y; Wang, Q and Li, M (2026) A multidimensional factor evaluation method for tunnel contour quality assessment using lidar scanning data. Journal of Construction Engineering and Management, 152(3): 04025274, ISSN 0733-9364
Zhang, S; Liu, C; Feng, K; Xia, C; Wang, Y and Wang, Q (2025) Computer vision-based real-time monitoring for swivel construction of bridges: From laboratory study to a pilot application. Engineering, Construction and Architectural Management, 32(6), pp. 3630-3658. ISSN 0969-9988
Yue, H; Sun, Y; Zeng, N; Chen, S; Tan, Y and Wang, Q (2025) Legged robots for construction management: Applications and challenges. Journal of Construction Engineering and Management, 151(8): 03125006, ISSN 0733-9364
Chen, S; Zeng, N; Li, F; Yue, H; Wang, Q and Li, Q (2025) Proactive safety risk control system for deep foundation pit construction: Situational tailoring of integrated cybernetics and dual-system theory. Journal of Construction Engineering and Management, 151(4): 04025018, ISSN 0733-9364
Zhao, L; Wang, Q; Hwang, B G and Chang-Richards, A Y (2024) Analysis of critical factors influencing sustainable infrastructure vulnerabilities using an ISM-MICMAC approach. Engineering, Construction and Architectural Management, 31(9), pp. 3622-3652. ISSN 0969-9988
Wang, Q; Appolloni, A and Liu, J (2024) Does "low-carbon pilot policy" affect the carbon intensity of construction industry? Exploring the implementation mechanism and effectiveness in China. Engineering, Construction and Architectural Management, 31(8), pp. 3222-3248. ISSN 0969-9988
Liu, Z; Lu, Y; Nath, T; Wang, Q; Tiong, R L K and Peh, L L C (2022) Critical success factors for BIM adoption during construction phase: A Singapore case study. Engineering, Construction and Architectural Management, 29(9), pp. 3267-3287. ISSN 0969-9988
Bao, Z; Laovisutthichai, V; Tan, T; Wang, Q and Lu, W (2022) Design for manufacture and assembly (dfma) enablers for offsite interior design and construction. Building Research & Information, 50(3), pp. 325-338. ISSN 0961-3218
Li, P; Wang, Q; Guo, Z; Mei, T; Li, Q; Qiao, S and Zuo, W (2022) Identifying falling-from-height hazards in building information models: A voxelization-based method. Journal of Construction Engineering and Management, 148(2): 04021203, ISSN 0733-9364
Shi, Q; Wang, Q and Guo, Z (2022) Knowledge sharing in the construction supply chain: Collaborative innovation activities and BIM application on innovation performance. Engineering, Construction and Architectural Management, 29(9), pp. 3439-3459. ISSN 0969-9988
Qiao, S; Wang, Q; Guo, Z and Guo, J (2021) Collaborative innovation activities and BIM application on innovation capability in construction supply chain: Mediating role of explicit and tacit knowledge sharing. Journal of Construction Engineering and Management, 147(12): 04021168, ISSN 0733-9364
Wang, Q; Zuo, W; Guo, Z; Li, Q; Mei, T and Qiao, S (2020) BIM voxelization method supporting cell-based creation of a path-planning environment. Journal of Construction Engineering and Management, 146(7): 04020080, ISSN 0733-9364
Liu, B; Wang, Q; Wu, G; Zheng, J and Li, L (2020) How family-supportive supervisor affect Chinese construction workers' work-family conflict and turnover intention: Investigating the moderating role of work and family identity salience. Construction Management and Economics, 38(9), pp. 807-823. ISSN 01446193
Wang, Q; Guo, Z; Mintah, K; Li, Q; Mei, T and Li, P (2019) Cell-based transport path obstruction detection approach for 4D BIM construction planning. Journal of Construction Engineering and Management, 145(3): 04018141, ISSN 0733-9364
Du, J; Wang, Q and Shi, Q (2019) Description-experience gap under imperfect information: Information continuum and aggressive cost estimating in capital projects. Engineering, Construction and Architectural Management, 26(6), pp. 1151-1170. ISSN 0969-9988
Wang, Q and Shi, Q (2019) The incentive mechanism of knowledge sharing in the industrial construction supply chain based on a supervisory mechanism. Engineering, Construction and Architectural Management, 26(6), pp. 989-1003. ISSN 0969-9988
Wang, Q; Guo, Z; Mei, T; Li, Q and Li, P (2018) Labor crew workspace analysis for prefabricated assemblies' installation: A 4D-BIM-based approach. Engineering, Construction and Architectural Management, 25(3), pp. 374-411. ISSN 0969-9988
Mei, T; Wang, Q; Xiao, Y and Yang, M (2017) Rent-seeking behavior of BIM- and IPD-based construction project in China. Engineering, Construction and Architectural Management, 24(3), pp. 514-536. ISSN 0969-9988
Chen, C; Wang, Q; Martek, I and Li, H (2016) International market selection model for large Chinese contractors. Journal of Construction Engineering and Management, 142(10): 04016044, ISSN 0733-9364
Goh, Y M and Wang, Q (2015) Investigating the adequacy of horizontal lifeline system design through case studies from Singapore. Journal of Construction Engineering and Management, 141(7): 4015017, ISSN 0733-9364
Shen, Q; Lo, K K and Wang, Q (1998) Priority setting in maintenance management: A modified multi-attribute approach using analytic hierarchy process. Construction Management and Economics, 16(6), pp. 693-702. ISSN 01446193
Thesis
Wang, Q (2017) Automated geometry quality assessment of precast concrete elements using 3D laser scan data. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Up a level