Items where Author is "Wang, H"

Group by: Item Type | No Grouping
Number of items: 48.

Liu, Y; Junjia, Y; Wang, H and Alias, A H (2026) Bridging robotics implementation and operational efficiency via agile management: Evidence from commercial residential projects. Journal of Construction Engineering and Management, 152(4): 04026019, ISSN 0733-9364

Hou, Y and Wang, H (2026) Collusion prevention under different forms of performance-based subsidies during the operational period in PPP highway projects. Construction Management and Economics, 44(2), pp. 98-118. ISSN 0144-6193

Wang, H; Kamal, E M; Lou, E C W and Ulang, N M (2026) Enhancing construction workers' safety behavior in small- and medium-sized enterprises: Self-determination theory approach. Journal of Construction Engineering and Management, 152(3): 04025265, ISSN 0733-9364

Yi, W; Wang, H; Zhen, L; Song, Y and Xiao, B (2026) Strategic planning of modular construction hubs: A bilevel framework integrating governmental and industrial perspectives. Journal of Construction Engineering and Management, 152(5): 04026034, ISSN 0733-9364

Zhou, S; Wang, H; Ng, S T; Li, D; Xie, S; Chen, K and Wang, W (2025) Building a construction law knowledge repository to enhance general-purpose large language model performance on domain question-answering: A case of China. Engineering, Construction and Architectural Management, 32(13), pp. 518-546. ISSN 0969-9988

Wang, H; Yi, W; Zhen, L; Song, Y and Wu, P (2025) Designing optimal government-contractor subsidy policy for promoting modular construction: Bilevel stochastic program. Journal of Construction Engineering and Management, 151(10): 04025136, ISSN 0733-9364

Li, J; Chen, Y and Wang, H (2025) Human-machine system modeling and safety risk assessment in construction operations incorporating workers' performance variability. Journal of Construction Engineering and Management, 151(3): 04024209, ISSN 0733-9364

Wang, H; Chen, X; Wang, J; Guan, W and Wei, S (2025) Multiobjective trade-off optimization of time, cost, quality, and carbon emission in the building construction stage. Journal of Construction Engineering and Management, 151(4): 04025009, ISSN 0733-9364

Wang, L; Tao, M; An, X; Dong, G; Huang, Y and Wang, H (2025) Regulatory strategies of water environment treatment PPP projects operation. Engineering, Construction and Architectural Management, 32(2), pp. 1303-1329. ISSN 0969-9988

Wang, H; Yang, Q; Liu, Q; Zhao, C and Zhou, W (2024) Automatic planning for cable crane operations in concrete dam construction. Journal of Construction Engineering and Management, 150(12): 04024177, ISSN 0733-9364

Wang, H; Yi, W; Zhen, L and Chan, A P C (2024) Cost-optimized transport planning for prefabricated modules with the implementation of the just-in-time strategy. Journal of Construction Engineering and Management, 150(8): 04024093, ISSN 0733-9364

Guo, Q; Amin, S; Wang, H and Yan, H (2024) Coupling simulation of human-environmental safety risk factors in metro construction: A case study of Rongjiazhai Station at xi’an Metro Line 5 in China. International Journal of Construction Education and Research, 20(1), pp. 26-42. ISSN 15578771

Yuan, Z; Wang, H; Yang, Y; Chao, Y; Huang, D and Yu, D (2024) Improving the construction accuracy of precast components in prefabricated buildings by analyzing relevant factors from the perspective of supply chain: A system dynamics model. Architectural Engineering and Design Management, 20(2), pp. 230-248. ISSN 1745-2007

Hou, K; Guan, X; Wang, H; Hu, S; Lu, M and Liu, N (2024) Influence of functional boundary for corridor spaces in elderly facilities in China. Building Research & Information, 52(6), pp. 658-679. ISSN 0961-3218

Wang, H; Xu, S; Cui, D; Xu, H and Luo, H (2024) Information integration of regulation texts and tables for automated construction safety knowledge mapping. Journal of Construction Engineering and Management, 150(5): 04024034, ISSN 0733-9364

Ma, K; Wu, R; Xiao, Y and Wang, H (2024) Spherical dome: Design, digital twin manufacturing, and testing of a glubam structure. Architectural Engineering and Design Management, 20(6), pp. 1471-1488. ISSN 1745-2007

Yi, W; Wang, H; Zhen, L and Liu, Y (2023) Automated generation of horizontal precast slab stacking plans. Journal of Construction Engineering and Management, 149(12): 04023121, ISSN 0733-9364

Lu, H; Wang, H; Yu, D and Ye, J (2023) Sharp schedule compression in urgent emergency construction projects via activity crashing, substitution and overlapping: A case study of huoshengshan and leishenshan hospital projects in wuhan. Engineering, Construction and Architectural Management, 30(8), pp. 3696-3712. ISSN 0969-9988

Yang, W; Zhang, F; Wang, H; Wu, J; Nie, Z and Li, L (2023) Synchronous control theory and first test of time-varying upper operation and chassis attitude maintenance for truck cranes. Journal of Construction Engineering and Management, 149(1): 04022156, ISSN 0733-9364

Wang, N; Wang, H and Zhang, K (2022) The dynamics of changes in PPP projects: A meta-case analysis approach. Construction Management and Economics, 40(9), pp. 727-742. ISSN 01446193

Wang, S; Ni, Z; Qu, T; Wang, H and Pan, Q (2022) A novel index to evaluate the workability of conditioned coarse-grained soil for epb shield tunnelling. Journal of Construction Engineering and Management, 148(6): 04022028, ISSN 0733-9364

Wang, H (2021) BIM-based knowledge management for the use of construction and facilities management knowledge in construction projects. PhD thesis, Queen's University Belfast, UK.

Bai, L; Wang, Z; Wang, H; Huang, N and Shi, H (2021) Prediction of multiproject resource conflict risk via an artificial neural network. Engineering, Construction and Architectural Management, 28(10), pp. 2857-2883. ISSN 0969-9988

Shi, J; Hu, J; Ma, M and Wang, H (2021) An environmental impact analysis method of machine-tool cutting units based on LCA. Journal of Engineering, Design and Technology, 19(5), pp. 1192-1206. ISSN 1726-0531

Wang, H; Guo, T and Sun, H (2020) Bond–slip constitutive relation of mortar anchor under different loading rates. Journal of Engineering, Design and Technology, 18(4), pp. 761-772. ISSN 1726-0531

Cai, S; Ma, Z; Skibniewski, M J; Bao, S and Wang, H (2020) Construction automation and robotics for high-rise buildings: Development priorities and key challenges. Journal of Construction Engineering and Management, 146(8): 04020096, ISSN 0733-9364

Cheng, Z; Ke, Y; Yang, Z; Cai, J and Wang, H (2020) Diversification or convergence: An international comparison of PPP policy and management between the UK, India, and China. Engineering, Construction and Architectural Management, 27(6), pp. 1315-1335. ISSN 0969-9988

Li, J; Wang, H; Xie, Y and Zeng, W (2020) Human error identification and analysis for shield machine operation using an adapted tracer method. Journal of Construction Engineering and Management, 146(8): 04020095, ISSN 0733-9364

Lu, H; Qi, J; Li, J; Xie, Y; Xu, G and Wang, H (2020) Multi-agent based safety computational experiment system for shield tunneling projects. Engineering, Construction and Architectural Management, 27(8), pp. 1963-1991. ISSN 0969-9988

Ali, A; Wang, H; Soomro, M A and Islam, T (2020) Shared leadership and team creativity: Construction industry perspective. Journal of Construction Engineering and Management, 146(10): 04020122, ISSN 0733-9364

Wang, Y; Ye, G; Zhang, Y; Mu, P and Wang, H (2020) Total factor productivity growth and its contribution: Lessons from the Chinese construction industry pre- and post-2008 financial crisis. Engineering, Construction and Architectural Management, 27(10), pp. 2911-2929. ISSN 0969-9988

Wang, H; Shen, J and Gao, D (2019) Seismic damage of gravity abutment in liquefied ground. Journal of Engineering, Design and Technology, 17(1), pp. 53-76. ISSN 1726-0531

Wang, H; Meng, X and McGetrick, P J (2018) Incorporating knowledge of construction and facility management into the design in the BIM environment. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Liu, Z; Wang, H and Li, H (2018) Model of equipment sharing between contractors on construction projects. Journal of Construction Engineering and Management, 144(6): 04018039, ISSN 0733-9364

Li, J; Yu, M and Wang, H (2018) A taxonomy of performance shaping factors for shield tunnel construction. Engineering, Construction and Architectural Management, 25(4), pp. 574-596. ISSN 0969-9988

Zhang, S; Pan, F; Wang, C; Sun, Y and Wang, H (2017) BIM-based collaboration platform for the management of EPC projects in hydropower engineering. Journal of Construction Engineering and Management, 143(12): 04017087, ISSN 0733-9364

Wang, H (2017) Construction project performance improvement through radio frequency identification technology application on a project supply chain. PhD thesis, Purdue University, USA.

Xie, W; Zhao, T; Wang, H and Tang, J (2017) Construction techniques used to automatically pass standard box girders through special passenger-line tunnels. Journal of Construction Engineering and Management, 143(5): 05016027, ISSN 0733-9364

Chen, K; Lu, W; Wang, H; Niu, Y and Huang, G G (2017) Naming objects in BIM: A convention and a semiautomatic approach. Journal of Construction Engineering and Management, 143(7): 06017001, ISSN 0733-9364

Wang, H and Meng, X (2016) Improving information/knowledge management through the use of BIM: A literature review. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Wang, H; Sexton, M and Lu, S L (2016) The business logic of Chinese construction companies investing in the UK infrastructure sector. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Zheng, W; Shen, G; Wang, H and Lombardi, P (2015) Critical issues in spatial distribution of public housing estates and their implications on urban renewal in Hong Kong. Smart and Sustainable Built Environment, 4(2), pp. 172-187. ISSN 2046-6099

Wang, H (2015) The interplay of formal and informal institutions for procurement innovation: a social network approach. PhD thesis, University of Hong Kong, Hong Kong.

Zhao, J; Lam, K P; Biswas, T and Wang, H (2015) An online platform to automate LEED energy performance evaluation and submission process. Construction Innovation, 15(3), pp. 313-332. ISSN 1471-4175

Lu, W and Wang, H (2014) Organizational responses to institutional pressures in international infrastructure projects: A transnational pipeline project case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Shen, Q; Wang, H and Tang, B S (2014) A decision-making framework for sustainable land use in Hong Kong's urban renewal projects. Smart and Sustainable Built Environment, 3(1), pp. 35-53. ISSN 2046-6099

Wang, H; Hamilton, A; Song, Y and Tah, J (2007) Implementation of a data integration service for building and urban planning. Architectural Engineering and Design Management, 3(3), pp. 195-208. ISSN 1745-2007

Wang, H (2000) A follow-up study of workers with soft tissue injuries using the databases of the Ontario workplace safety and insurance board (WSIB). PhD thesis, University of Toronto, Canada.

This list was generated on Sat Aug 22 01:14:41 2026 UTC.