Items where Author is "Turkoglu, H"

Group by: Item Type | No Grouping
Number of items: 7.

Turkoglu, H; Arditi, D and Polat, G (2025) Golden eagle optimizer-based multi-objective optimization model for scheduling construction projects. Construction Management and Economics, 43(9), pp. 704-722. ISSN 0144-6193

Turkoglu, H; Sadikoglu, E; Demirkesen, S; Damci, A and Acar, S (2025) An integrated multi-criteria decision making approach for selecting the starting location of railroad projects. Engineering, Construction and Architectural Management, 32(10), pp. 7062-7085. ISSN 0969-9988

Turkoglu, H; Arditi, D and Polat, G (2024) Augmented time-cost trade-off optimization using particle swarm optimization. Journal of Construction Engineering and Management, 150(5): 04024031, ISSN 0733-9364

Selcuk, O; Turkoglu, H; Polat, G and Hajdu, M (2024) An integrative literature review on the causes of delays in construction projects: Evidence from developing countries. International Journal of Construction Management, 24(6), pp. 610-622. ISSN 1562-3599

Turkoglu, H; Polat, G and Akin, F D (2023) Crashing construction projects considering schedule flexibility: An illustrative example. International Journal of Construction Management, 23(4), pp. 619-628. ISSN 1562-3599

Turkoglu, H; Arditi, D and Polat, G (2023) Mathematical multiobjective optimization model for trade-offs in small-scale construction projects. Journal of Construction Engineering and Management, 149(7): 04023056, ISSN 0733-9364

Akin, F D; Polat, G; Turkoglu, H and Damci, A (2021) A crashing-based time-cost trade-off model considering quality cost and contract clauses. International Journal of Construction Management, 23(6), pp. 954-963. ISSN 1562-3599

This list was generated on Sun Aug 23 01:14:29 2026 UTC.