Items where Author is "Tommelein, I D"
Article
Zani, C M; Brandalise, F M P; Pedó, B; Formoso, C T; Tommelein, I D; Ortiz-Marcos, I; Viana, D D; Bataglin, F S and Koskela, L (2025) Devising a taxonomy for visual management requirements by considering different purposes and contexts. Construction Management and Economics, 43(7), pp. 518-536. ISSN 0144-6193
Fireman, M C T; Saurin, T A; Formoso, C T; Koskela, L and Tommelein, I D (2023) Slack in production planning and control: A study in the construction industry. Construction Management and Economics, 41(3), pp. 256-276. ISSN 01446193
Singh, V V and Tommelein, I D (2023) Visual workload leveling and zoning using work density method for construction process planning. Journal of Construction Engineering and Management, 149(10): 04023102, ISSN 0733-9364
Tommelein, I D (2022) Work density method for takt planning of construction processes with nonrepetitive work. Journal of Construction Engineering and Management, 148(12): 04022134, ISSN 0733-9364
Tommelein, I D (2020) Design science research in construction management: Multi-disciplinary collaboration on the SightPlan system. Construction Management and Economics, 38(4), pp. 340-354. ISSN 01446193
Milberg, C T and Tommelein, I D (2020) Methods for managing tolerance compatibility: Windows in cast-in-place concrete. Journal of Construction Engineering and Management, 146(2), ISSN 0733-9364
Martinez, E; Reid, C K and Tommelein, I D (2019) Lean construction for affordable housing: a case study in Latin America. Construction Innovation, 19(4), pp. 570-593. ISSN 1471-4175
Arroyo, P; Tommelein, I D and Ballard, G (2016) Selecting globally sustainable materials: A case study using choosing by advantages. Journal of Construction Engineering and Management, 142(2): 05015015, ISSN 0733-9364
Arroyo, P; Tommelein, I D and Ballard, G (2015) Comparing AHP and CBA as decision methods to resolve the choosing problem in detailed design. Journal of Construction Engineering and Management, 141(1): 04014063, ISSN 0733-9364
Tommelein, I D (2015) Journey toward lean construction: Pursuing a paradigm shift in the AEC industry. Journal of Construction Engineering and Management, 141(6): 04015005, ISSN 0733-9364
Tuholski, S J; Gursel, A P; Tommelein, I D and Bomba, G (2009) Lean comparison using process charts of complex seismic retrofit projects. Journal of Construction Engineering and Management, 135(4), pp. 330-339. ISSN 0733-9364
Gill, N; Tommelein, I D; Stout, A and Garrett, T (2005) Embodying product and process flexibility to cope with challenging project deliveries. Journal of Construction Engineering and Management, 131(4), pp. 439-448. ISSN 0733-9364
Walsh, K D; Hershauer, J C; Tommelein, I D and Walsh, T A (2004) Strategic positioning of inventory to match demand in a capital projects supply chain. Journal of Construction Engineering and Management, 130(6), pp. 818-826. ISSN 0733-9364
Gil, N; Tommelein, I D and Ballard, G (2004) Theoretical comparison of alternative delivery systems for projects in unpredictable environments. Construction Management and Economics, 22(5), pp. 495-508. ISSN 01446193
Tsao, C C Y; Tommelein, I D; Swanlund, E S and Howell, G A (2004) Work structuring to achieve integrated product-process design. Journal of Construction Engineering and Management, 130(6), pp. 780-789. ISSN 0733-9364
Arbulu, R J; Tommelein, I D; Walsh, K D and Hershauer, J C (2003) Value stream analysis of a re-engineered construction supply chain. Building Research & Information, 31(2), pp. 161-171. ISSN 0961-3218
Zouein, P P and Tommelein, I D (2001) Improvement algorithm for limited space scheduling. Journal of Construction Engineering and Management, 127(2), pp. 116-124. ISSN 0733-9364
Gil, N; Tommelein, I D; Kirkendall, R L and Ballard, G (2001) Leveraging specialty-contractor knowledge in design-build organizations. Engineering, Construction and Architectural Management, 8(5-6), pp. 355-367. ISSN 0969-9988
Zouein, P P and Tommelein, I D (1999) Dynamic layout planning using a hybrid incremental solution method. Journal of Construction Engineering and Management, 125(6), pp. 400-408. ISSN 0733-9364
Tommelein, I D; Riley, D R and Howell, G A (1999) Parade game: Impact of work flow variability on trade performance. Journal of Construction Engineering and Management, 125(5), pp. 304-310. ISSN 0733-9364
Choo, H J; Tommelein, I D; Ballard, G and Zabelle, T R (1999) Workplan: Constraint-based database for work package scheduling. Journal of Construction Engineering and Management, 125(3), pp. 151-160. ISSN 0733-9364
Tommelein, I D (1998) Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique. Journal of Construction Engineering and Management, 124(4), pp. 279-288. ISSN 0733-9364
Dzeng, R J and Tommelein, I D (1997) Boiler erection scheduling using product models and case-based reasoning. Journal of Construction Engineering and Management, 123(3), pp. 338-347. ISSN 0733-9364
Tommelein, I D; Carr, R I and Odeh, A M (1994) Assembly of simulation networks using designs, plans, and methods. Journal of Construction Engineering and Management, 120(4), pp. 796-815. ISSN 0733-9364
Tommelein, I D and Zouein, P P (1993) Interactive dynamic layout planning. Journal of Construction Engineering and Management, 119(2), pp. 266-287. ISSN 0733-9364
Tommelein, I D; Levitt, R E and Hayes-Roth, B (1992) Sightplan model for site layout. Journal of Construction Engineering and Management, 118(4), pp. 749-766. ISSN 0733-9364
Tommelein, I D; Levitt, R E and Hayes-Roth, B (1992) Site-layout modeling: How can artificial intelligence help? Journal of Construction Engineering and Management, 118(3), pp. 594-611. ISSN 0733-9364
Thesis
Tommelein, I D (1989) SightPlan: an expert system that models and augments human decision making for designing construction site layouts. PhD thesis, Stanford University, USA.
Conference Paper
Graham, D; Smith, S D and Tommelein, I D (2005) Cost of concrete placement for contractors. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Graham, D; Tommelein, I D and Smith, S D (2005) Cost reduction through vertical integration of the in-situ concrete supply chain. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Gil, N and Tommelein, I D (2003) Using product and process flexibility to cope with project delivery uncertainty. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Up a level