Items where Author is "Thaheem, M J"

Group by: Item Type | No Grouping
Number of items: 17.

Aftab, U; Hassan, M U; Ullah, F; Nasir, A R and Thaheem, M J (2026) BIM-based search and selection of construction material suppliers: A dedicated framework and prototype. Construction Innovation, 26(3), pp. 892-915. ISSN 1471-4175

Shahid, M U; Thaheem, M J and Arshad, H (2023) Quantification and benchmarking of construction waste and its impact on cost: a case of Pakistan. Engineering, Construction and Architectural Management, 30(6), pp. 2304-2333. ISSN 0969-9988

Sami Ur Rehman, M; Thaheem, M J; Nasir, A R and Khan, K I A (2022) Project schedule risk management through building information modelling. International Journal of Construction Management, 22(8), pp. 1489-1499. ISSN 1562-3599

Rasul, N; Malik, M S A; Bakhtawar, B and Thaheem, M J (2021) Risk assessment of fast-track projects: A systems-based approach. International Journal of Construction Management, 21(11), pp. 1099-1114. ISSN 1562-3599

Maqsoom, A; Wazir, S J; Choudhry, R M; Thaheem, M J and Zahoor, H (2020) Influence of perceived fairness on contractors' potential to dispute: Moderating effect of engineering ethics. Journal of Construction Engineering and Management, 146(1): 4019090, ISSN 0733-9364

Maqsoom, A; Hamad, M; Ashraf, H; Thaheem, M J and Umer, M (2020) Managerial control mechanisms and their influence on project performance: An investigation of the moderating role of complexity risk. Engineering, Construction and Architectural Management, 27(9), pp. 2451-2475. ISSN 0969-9988

Javed, N; Thaheem, M J; Bakhtawar, B; Nasir, A R; Khan, K I A and Gabriel, H F (2020) Managing risk in green building projects: Toward a dedicated framework. Smart and Sustainable Built Environment, 9(2), pp. 156-173. ISSN 2046-6099

Arshad, M F; Thaheem, M J; Nasir, A R and Malik, M S A (2019) Contractual risks of building information modeling: Toward a standardized legal framework for design-bid-build projects. Journal of Construction Engineering and Management, 145(4): 04019010, ISSN 0733-9364

Ullah, F and Thaheem, M J (2018) Concession period of public private partnership projects: Industry-academia gap analysis. International Journal of Construction Management, 18(5), pp. 418-429. ISSN 1562-3599

Bakhtawar, B; Thaheem, M J; Arshad, H and Qadeer, A (2018) How to embrace the stakeholder in public private partnership decision-making? A theoretical discourse. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Babar, S; Thaheem, M J and Ayub, B (2017) Estimated cost at completion: Integrating risk into earned value management. Journal of Construction Engineering and Management, 143(3): 04016104, ISSN 0733-9364

Azeem, S; Naeem, M A; Waheed, A and Thaheem, M J (2017) Examining barriers and measures to promote the adoption of green building practices in Pakistan. Smart and Sustainable Built Environment, 6(3), pp. 86-100. ISSN 2046-6099

Naveed, M H; Thaheem, M J; Khurshid, M B and Farooqui, R U H (2017) Performance assessment of construction engineering and management degree program in developing countries: Case of Pakistan. International Journal of Construction Education and Research, 13(1), pp. 3-23. ISSN 1557-8771

Arshad, H; Qasim, M; Thaheem, M J and Gabriel, H F (2017) Quantification of material wastage in construction industry of Pakistan: An analytical relationship between building types and waste generation. Journal of Construction in Developing Countries, 22(2), pp. 19-34. ISSN 1823-6499

Ahmad, T; Thaheem, M J and Anwar, A (2016) Developing a green-building design approach by selective use of systems and techniques. Architectural Engineering and Design Management, 12(1), pp. 29-50. ISSN 1745-2007

De Marco, A; Rafele, C and Thaheem, M J (2016) Dynamic management of risk contingency in complex design-build projects. Journal of Construction Engineering and Management, 142(2): 04015080, ISSN 0733-9364

Ullah, F; Ayub, B; Siddiqui, S Q and Thaheem, M J (2016) A review of public-private partnership: Critical factors of concession period. Journal of Financial Management of Property and Construction, 21(3), pp. 269-300. ISSN 1366-4387