Items where Author is "Tam, C M"

Group by: Item Type | No Grouping
Jump to: Article | Thesis
Number of items: 49.

Article

Sing, C P; Love, P E D and Tam, C M (2012) Stock-flow model for forecasting labor supply. Journal of Construction Engineering and Management, 138(6), pp. 707-715. ISSN 0733-9364

Tam, C M and Tong, T K L (2011) Conflict analysis study for public engagement programme in infrastructure planning. Built Environment Project and Asset Management, 1(1), pp. 45-60. ISSN 2044-124X

Wong, C K; Fung, I W H and Tam, C M (2010) Comparison of using mixed-integer programming and genetic algorithms for construction site facility layout planning. Journal of Construction Engineering and Management, 136(10), pp. 1116-1128. ISSN 0733-9364

Tam, C M and Tong, T K L (2008) Locating large-scale harbour-front project developments using SIR method with grey aggregation approach. Construction Innovation, 8(2), pp. 120-136. ISSN 1471-4175

Tam, V W Y and Tam, C M (2008) Waste reduction through incentives: A case study. Building Research & Information, 36(1), pp. 37-43. ISSN 0961-3218

Tam, V W Y; Tam, C M and Ng, W C Y (2007) On prefabrication implementation for different project types and procurement methods in Hong Kong. Journal of Engineering, Design and Technology, 5(1), pp. 68-80. ISSN 1726-0531

Tam, C M; Tong, T K L and Wong, B W L (2007) An integrated system for earthmoving planning. Construction Management and Economics, 25(11), pp. 1127-1137. ISSN 01446193

Tam, V W Y; Tam, C M; Yiu, K T W and Cheung, S O (2006) Critical factors for environmental performance assessment (EPA) in the Hong Kong construction industry. Construction Management and Economics, 24(11), pp. 1113-1123. ISSN 1466433X

Tam, V W Y; Tam, C M; Shen, L Y; Zeng, S X and Ho, C M (2006) Environmental performance assessment: Perceptions of project managers on the relationship between operational and environmental performance indicators. Construction Management and Economics, 24(3), pp. 287-299. ISSN 01446193

Zhang, H; Li, H and Tam, C M (2006) Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects. Construction Management and Economics, 24(2), pp. 159-169. ISSN 01446193

Zhang, H; Li, H and Tam, C M (2006) Particle swarm optimization for preemptive scheduling under break and resource-constraints. Journal of Construction Engineering and Management, 132(3), pp. 259-267. ISSN 0733-9364

Zhang, H; Tam, C M; Li, H and Shi, J J (2006) Particle swarm optimization-supported simulation for construction operations. Journal of Construction Engineering and Management, 132(12), pp. 1267-1274. ISSN 0733-9364

Tam, C M; Tong, T K L and Chan, K K (2006) Rough set theory for distilling construction safety measures. Construction Management and Economics, 24(11), pp. 1199-1206. ISSN 1466433X

Zhang, H and Tam, C M (2005) Consideration of break in modeling of construction processes. Engineering, Construction and Architectural Management, 12(4), pp. 373-390. ISSN 0969-9988

Chan, J K W; Tam, C M and Cheung, R K C (2005) Construction firms at the crossroads in Hong Kong: Going insolvency or seeking opportunity. Engineering, Construction and Architectural Management, 12(2), pp. 111-124. ISSN 0969-9988

Chan, J K W; Tam, C M and Cheung, R (2005) Monitoring financial health of contractors at the aftermath of the Asian economic turmoil: A case study in Hong Kong. Construction Management and Economics, 23(5), pp. 451-458. ISSN 01446193

Tam, C M and Tong, T K L (2005) Multiple gmdh models for estimating resource requirements. Construction Innovation, 5(2), pp. 115-131. ISSN 1471-4175

Tam, C M; Tong, T K L; Lau, T C T and Chan, K K (2005) Selection of vertical formwork system by probabilistic neural networks models. Construction Management and Economics, 23(3), pp. 245-254. ISSN 01446193

Tam, C M; Tam, V W Y and Zeng, S X (2004) Environmental performance assessment in China and Hong Kong. Building Research & Information, 32(2), pp. 110-118. ISSN 0961-3218

Zhang, H; Li, H and Tam, C M (2004) Fuzzy discrete-event simulation for modeling uncertain activity duration. Engineering, Construction and Architectural Management, 11(6), pp. 426-437. ISSN 0969-9988

Shen, L Y; Tam, V W Y; Tam, C M and Drew, D (2004) Mapping approach for examining waste management on construction sites. Journal of Construction Engineering and Management, 130(4), pp. 472-481. ISSN 0733-9364

Tam, C M; Tong, T K L and Tse, S L (2004) Modelling hook times of mobile cranes using artificial neural networks. Construction Management and Economics, 22(8), pp. 839-849. ISSN 01446193

Tam, C M; Tong, T K L and Wong, Y W (2004) Selection of concrete pump using the superiority and inferiority ranking method. Journal of Construction Engineering and Management, 130(6), pp. 827-834. ISSN 0733-9364

Cheung, S O; Tam, C M; Tam, V; Cheung, K and Suen, H (2004) A web-based performance assessment system for environmental protection: Wepass. Construction Management and Economics, 22(9), pp. 927-935. ISSN 01446193

Tam, C M; Tong, T K L and Lau, C T (2003) ELECTRE III in evaluating performance of construction plants: Case study on concrete vibrators. Construction Innovation, 3(1), pp. 45-61. ISSN 1471-4175

Zhang, H and Tam, C M (2003) Fuzzy decision-making for dynamic resource allocation. Construction Management and Economics, 21(1), pp. 31-41. ISSN 01446193

Tong, T K L and Tam, C M (2003) Fuzzy optimisation of labour allocation by genetic algorithms. Engineering, Construction and Architectural Management, 10(2), pp. 146-155. ISSN 0969-9988

Tam, C M and Tong, T K L (2003) GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction. Construction Management and Economics, 21(3), pp. 257-266. ISSN 01446193

Tam, C M; Fung, I W H; Yeung, T C L and Tung, K C F (2003) Relationship between construction safety signs and symbols recognition and characteristics of construction personnel. Construction Management and Economics, 21(7), pp. 745-753. ISSN 01446193

Zhang, H; Shi, J J and Tam, C M (2002) Application of simulation related techniques to construction operations. Engineering, Construction and Architectural Management, 9(5-6), pp. 433-445. ISSN 0969-9988

Tam, C M; Tong, T K L and Tse, S L (2002) Artificial neural networks model for predicting excavator productivity. Engineering, Construction and Architectural Management, 9(5-6), pp. 446-452. ISSN 0969-9988

Tam, C M; Tam, V W Y and Zeng, S X (2002) Environmental performance evaluation (EPE) for construction. Building Research & Information, 30(5), pp. 349-361. ISSN 0961-3218

Tam, C M; Tong, T K L; Leung, A W T and Chiu, G W C (2002) Site layout planning using nonstructural fuzzy decision support system. Journal of Construction Engineering and Management, 128(3), pp. 220-231. ISSN 0733-9364

Chan, A P C; Lai, M K; Tam, C M and Akintoye, A (2001) Analysis of construction cost variation factors. Journal of Financial Management of Property and Construction, 6(1), pp. 51-60. ISSN 1366-4387

Chan, A P C; Yung, E H K; Lam, P T I; Tam, C M and Cheung, S O (2001) Application of Delphi method in selection of procurement systems for construction projects. Construction Management and Economics, 19(7), pp. 699-718. ISSN 01446193

Chan, A P C; Ho, D C K and Tam, C M (2001) Design and build project success factors: Multivariate analysis. Journal of Construction Engineering and Management, 127(2), pp. 93-100. ISSN 0733-9364

Chan, A P; Ho, D C K and Tam, C M (2001) Design and build: Views from some major public clients in Hong Kong. Construction Economics and Building, 1(1), pp. 22-31. ISSN 2204-9029

Tam, C M; Tong, T K L and Chan, W K W (2001) Genetic algorithm for optimizing supply locations around tower crane. Journal of Construction Engineering and Management, 127(4), pp. 315-320. ISSN 0733-9364

Tam, C M; Tong, T K L; Cheung, S O and Chan, A P C (2001) Genetic algorithm model in optimizing the use of labour. Construction Management and Economics, 19(2), pp. 207-215. ISSN 01446193

Tong, T K L; Tam, C M and Chan, A P C (2001) Genetic algorithm optimization in building portfolio management. Construction Management and Economics, 19(6), pp. 601-609. ISSN 01446193

Hong, Z; Tam, C M and Shi, J J (2001) Resource allocation heuristic in construction simulation. Construction Management and Economics, 19(6), pp. 643-651. ISSN 01446193

Tam, C M; Fung, I W H and Chan, A P C (2001) Study of attitude changes in people after the implementation of a new safety management system: The supervision plan. Construction Management and Economics, 19(4), pp. 393-403. ISSN 01446193

Cheung, S O; Tam, C M; Ndekugri, I and Harris, F C (2000) Factors affecting clients' project dispute resolution satisfaction in Hong Kong. Construction Management and Economics, 18(3), pp. 281-294. ISSN 01446193

Tam, C M; Deng, Z M; Zeng, S X and Ho, C S (2000) Quest for continuous quality improvement for public housing construction in Hong Kong. Construction Management and Economics, 18(4), pp. 437-446. ISSN 01446193

Leung, A W T and Tam, C M (1999) Models for assessing hoisting times of tower cranes. Journal of Construction Engineering and Management, 125(6), pp. 385-391. ISSN 0733-9364

Leung, A W T and Tam, C M (1999) Prediction of hoisting time for tower cranes for public housing construction in Hong Kong. Construction Management and Economics, 17(3), pp. 305-314. ISSN 01446193

Tam, C M and Fung, I W H (1998) Effectiveness of safety management strategies on safety performance in Hong Kong. Construction Management and Economics, 16(1), pp. 49-55. ISSN 01446193

Lam, K C; Runeson, G; Tam, C M and Lo, S M (1998) Modelling loan acquisition decisions. Engineering, Construction and Architectural Management, 5(4), pp. 359-375. ISSN 0969-9988

Thesis

Tam, C M (1992) Discriminant analysis model for predicting contractor performance in Hong Kong. PhD thesis, Loughborough University, UK.

This list was generated on Sat Aug 22 01:10:27 2026 UTC.