Items where Author is "Sullivan, K T"

Group by: Item Type | No Grouping
Number of items: 21.

Article

Kassa, R; Ogundare, I; Lines, B; Smithwick, J B; Kepple, N J and Sullivan, K T (2025) Developing a construct to measure contractor project manager performance competencies. Engineering, Construction and Architectural Management, 32(3), pp. 2003-2021. ISSN 0969-9988

Aldossari, K M; Lines, B C; Smithwick, J B; Hurtado, K C and Sullivan, K T (2023) Alternative project delivery method adoption in the AEC industry: An organizational change perspective. International Journal of Construction Education and Research, 19(2), pp. 150-165. ISSN 1557-8771

Aldossari, K M; Lines, B C; Smithwick, J B; Hurtado, K C and Sullivan, K T (2023) Employee reactions to adoption of alternative project delivery methods within the AEC industry. International Journal of Construction Education and Research, 19(1), pp. 4-21. ISSN 1557-8771

Aldossari, K M; Lines, B C; Smithwick, J B; Hurtado, K C and Sullivan, K T (2021) Best practices of organizational change for adopting alternative project delivery methods in the AEC industry. Engineering, Construction and Architectural Management, 28(4), pp. 1060-1082. ISSN 0969-9988

Smithwick, J B; Schleifer, T C; Sawyer, J T and Sullivan, K T (2019) Quantifying the impact of the great recession on the AEC industry: A call to reevaluate home office overhead costs. International Journal of Construction Education and Research, 15(3), pp. 198-215. ISSN 1557-8771

Hurtado, K C; Smithwick, J B; Pesek, A E and Sullivan, K T (2018) Public school facility underfunding: A new tool to maximize construction dollars and improve performance outcomes. International Journal of Construction Education and Research, 14(3), pp. 218-231. ISSN 1557-8771

Perrenoud, A J and Sullivan, K T (2017) Analysis of executive succession planning in 12 construction companies. International Journal of Construction Education and Research, 13(1), pp. 64-80. ISSN 1557-8771

Lines, B C; Sullivan, K T and Wiezel, A (2016) Support for organizational change: Change-readiness outcomes among AEC project teams. Journal of Construction Engineering and Management, 142(2): 04015062, ISSN 0733-9364

Lines, B C; Perrenoud, A; Sullivan, K T and Smithwick, J (2015) Implementing new project delivery strategies: Development of a web-based multimedia tool to support owner project team training. International Journal of Construction Education and Research, 11(2), pp. 140-160. ISSN 1557-8771

Lines, B C; Sullivan, K T; Hurtado, K C and Savicky, J (2015) Planning in construction: Longitudinal study of pre-contract planning model demonstrates reduction in project cost and schedule growth. International Journal of Construction Education and Research, 11(1), pp. 21-39. ISSN 1557-8771

Sullivan, K T and Oates, H D (2012) Analysis of Arizona's LEED for new construction population's credits. Journal of Construction Engineering and Management, 138(12), pp. 1386-1393. ISSN 0733-9364

Oates, D and Sullivan, K T (2012) Postoccupancy energy consumption survey of Arizona's LEED new construction population. Journal of Construction Engineering and Management, 138(6), pp. 742-750. ISSN 0733-9364

Hanna, A S; Chang, C K; Sullivan, K T and Lackney, J A (2008) Impact of shift work on labor productivity for labor intensive contractor. Journal of Construction Engineering and Management, 134(3), pp. 197-204. ISSN 0733-9364

Hanna, A S; Chang, C K; Lackney, J A and Sullivan, K T (2007) Impact of overmanning on mechanical and sheet metal labor productivity. Journal of Construction Engineering and Management, 133(1), pp. 22-28. ISSN 0733-9364

Chang, C K; Hanna, A S; Lackney, J A and Sullivan, K T (2007) Quantifying the impact of schedule compression on labor productivity for mechanical and sheet metal contractor. Journal of Construction Engineering and Management, 133(4), pp. 287-296. ISSN 0733-9364

Hanna, A S; Menches, C L; Sullivan, K T and Sargent, J R (2005) Factors affecting absenteeism in electrical construction. Journal of Construction Engineering and Management, 131(11), pp. 1212-1218. ISSN 0733-9364

Hanna, A S; Taylor, C S and Sullivan, K T (2005) Impact of extended overtime on construction labor productivity. Journal of Construction Engineering and Management, 131(6), pp. 734-739. ISSN 0733-9364

Thesis

Sullivan, K T (2004) Quantification of the cumulative impact of change orders on sheet metal labor productivity. PhD thesis, University of Wisconsin - Madison, USA.

Conference Paper

Sullivan, K T; Kashiwagi, D; Savicky, J; Kashiwagi, M; Egbu, C and Chang, C K (2006) Increasing performance by minimizing the passing of information. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Sullivan, K T; Kashiwagi, M; Badger, W W; Kashiwagi, D; Egbu, C and Chang, C K (2006) Leadership, the information environment, and the performance measuring project manager. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Chang, C K and Sullivan, K T (2006) Workload ratio as an indicator of schedule acceleration and its relationship with labour efficiency. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

This list was generated on Sat Aug 22 01:04:39 2026 UTC.