Items where Author is "Sawhney, A"

Group by: Item Type | No Grouping
Jump to: Article | Thesis
Number of items: 22.

Article

Anthony, R; K. S, A; Prasanna, K and Sawhney, A (2025) An exploratory study on the application of digital twins in the Indian construction industry. International Journal of Construction Management, 25(9), pp. 996-1007. ISSN 1562-3599

Kapogiannis, G; Palaios, P and Sawhney, A (2024) Digital construction led growth asymmetries in Europe: The need for collaborative culture. Construction Economics and Building, 24(1-2), pp. 50-76. ISSN 2204-9029

Bendi, D; Rana, M Q; Arif, M; Lamb, S M; Sawhney, A and Kaushik, A K (2022) Assessing off-site readiness in construction organisations: Cases from India. Construction Innovation, 22(2), pp. 320-341. ISSN 1471-4175

Bendi, D; Rana, M Q; Arif, M; Goulding, J S and Sawhney, A (2021) An off-site construction readiness maturity model for the Indian construction sector. Construction Innovation, 21(1), pp. 123-142. ISSN 1471-4175

Ahuja, R; Sawhney, A; Jain, M; Arif, M and Rakshit, S (2020) Factors influencing BIM adoption in emerging markets: the case of India. International Journal of Construction Management, 20(1), pp. 65-76. ISSN 1562-3599

Singh, M M; Sawhney, A and Borrmann, A (2019) Integrating rules of modular coordination to improve model authoring in BIM. International Journal of Construction Management, 19(1), pp. 15-31. ISSN 1562-3599

Ahuja, R; Sawhney, A and Arif, M (2018) Developing organizational capabilities to deliver lean and green project outcomes using BIM. Engineering, Construction and Architectural Management, 25(10), pp. 1255-1276. ISSN 0969-9988

Singh, M M; Sawhney, A and Sharma, V (2017) Utilising building component data from BIM for formwork planning. Construction Economics and Building, 17(4), pp. 20-36. ISSN 2204-9029

Ahuja, R; Jain, M; Sawhney, A and Arif, M (2016) Adoption of BIM by architectural firms in India: Technology-organization-environment perspective. Architectural Engineering and Design Management, 12(4), pp. 311-330. ISSN 1745-2007

Sawhney, A; Agnihotri, R and Paul, V K (2014) Grand challenges for the Indian construction industry. Built Environment Project and Asset Management, 4(4), pp. 317-334. ISSN 2044-124X

Alkilani, S Z; Jupp, J and Sawhney, A (2013) Issues of construction health and safety in developing countries: A case of Jordan. Construction Economics and Building, 13(3), pp. 141-156. ISSN 2204-9029

Doloi, H; Sawhney, A and Iyer, K C (2012) Structural equation model for investigating factors affecting delay in Indian construction projects. Construction Management and Economics, 30(10), pp. 869-884. ISSN 1466433X

Sawhney, A; Walsh, K D; Bashford, H H and Palaniappan, S (2009) Impact of inspected buffers on production parameters of construction processes. Journal of Construction Engineering and Management, 135(4), pp. 319-329. ISSN 0733-9364

Walsh, K D; Sawhney, A and Bashford, H H (2007) Production equations for unsteady-state construction processes. Journal of Construction Engineering and Management, 133(3), pp. 254-261. ISSN 0733-9364

Walsh, K D; Sawhney, A and Vachris, M A (2006) Improving inter-spatial comparison of construction costs. Engineering, Construction and Architectural Management, 13(2), pp. 123-135. ISSN 0969-9988

Walsh, K D; Sawhney, A and Brown Iv, A (2005) International comparison of cost for the construction sector: Purchasing power parity. Journal of Construction Engineering and Management, 131(2), pp. 160-167. ISSN 0733-9364

Bashford, H H; Walsh, K D and Sawhney, A (2005) Production system loading-cycle time relationship in residential construction. Journal of Construction Engineering and Management, 131(1), pp. 15-22. ISSN 0733-9364

Bashford, H H; Sawhney, A; Walsh, K D and Kot, K (2003) Implications of even flow production methodology for U.S. Housing industry. Journal of Construction Engineering and Management, 129(3), pp. 330-332. ISSN 0733-9364

Sawhney, A and Mund, A (2002) Adaptive probabilistic neural network-based crane type selection system. Journal of Construction Engineering and Management, 128(3), pp. 265-273. ISSN 0733-9364

Sawhney, A and Mund, A (2001) Intellicranes: An integrated crane type and model selection system. Construction Management and Economics, 19(2), pp. 227-237. ISSN 01446193

Sawhney, A and AbouRizk, S M (1995) HSM-simulation-based planning method for construction projects. Journal of Construction Engineering and Management, 121(3), pp. 297-303. ISSN 0733-9364

Thesis

Sawhney, A (1994) Simulation-based planning for construction. PhD thesis, University of Alberta, Canada.

This list was generated on Sat Aug 22 01:16:29 2026 UTC.