Items where Author is "Saurin, T A"
Article
Ransolin, N; Saurin, T A; Clay-Williams, R; Formoso, C T; Rapport, F and Cartmill, J (2025) Beyond the operating room: Built environment design knowledge supportive of resilient surgical services. Engineering, Construction and Architectural Management, 32(6), pp. 3804-3831. ISSN 0969-9988
Marion, G L C; Saurin, T A and Viana, D D (2025) The cost-benefit of slack in production planning and control in construction projects. Construction Management and Economics, 43(11), pp. 883-900. ISSN 0144-6193
Comassetto Hamerski, D; Saurin, T A; Formoso, C T and Isatto, E L (2024) The Last Planner system as an emergent production planning and control method: The role of multiple representations. Journal of Construction Engineering and Management, 150(11): 04024155, ISSN 0733-9364
Tonetto, M S; Formoso, C T; Saurin, T A; Bonesi De Luca, F; Lora, F P and Lantelme, E (2024) Resilient performance on construction projects in the post-pandemic era: An organizational perspective. Engineering, Construction and Architectural Management, 31(12), pp. 5007-5028. ISSN 0969-9988
Fireman, M C T; Saurin, T A; Formoso, C T; Koskela, L and Tommelein, I D (2023) Slack in production planning and control: A study in the construction industry. Construction Management and Economics, 41(3), pp. 256-276. ISSN 01446193
Saurin, T A; Formoso, C T; Reck, R; Beck Da Silva Etges, B M and Ribeiro, J L D (2015) Findings from the analysis of incident-reporting systems of construction companies. Journal of Construction Engineering and Management, 141(9): 501500, ISSN 0733-9364
Saurin, T A; Formoso, C T and Cambraia, F B (2005) Analysis of a safety planning and control model from the human error perspective. Engineering, Construction and Architectural Management, 12(3), pp. 283-298. ISSN 0969-9988
Saurin, T A; Formoso, C T and Guimaraes, L B M (2004) Safety and production: An integrated planning and control model. Construction Management and Economics, 22(2), pp. 159-169. ISSN 01446193
Up a level