Items where Author is "Ryu, H G"

Group by: Item Type | No Grouping
Number of items: 4.

Article

Lee, H S; Shin, J W; Park, M and Ryu, H G (2009) Probabilistic duration estimation model for high-rise structural work. Journal of Construction Engineering and Management, 135(12), pp. 1289-1298. ISSN 0733-9364

Lee, H S; Seo, J O; Park, M; Ryu, H G and Kwon, S S (2009) Transaction-cost-based selection of appropriate general contractor-subcontractor relationship type. Journal of Construction Engineering and Management, 135(11), pp. 1232-1240. ISSN 0733-9364

Lee, H S; Ryu, H G; Yu, J H and Kim, J J (2005) Method for calculating schedule delay considering lost productivity. Journal of Construction Engineering and Management, 131(11), pp. 1147-1154. ISSN 0733-9364

Conference Paper

Ryu, H G; Lee, H S and Yu, J H (2003) A method for analysing delay duration considering lost productivity through construction productivity data model. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.