Items where Author is "Raftery, G M"
Group by: Item Type | No Grouping
Number of items: 2.
Poshdar, M; González, V A; Raftery, G M; Orozco, F; Romeo, J S and Forcael, E (2016) A probabilistic-based method to determine optimum size of project buffer in construction schedules. Journal of Construction Engineering and Management, 142(10): 04016046, ISSN 0733-9364
Poshdar, M; González, V A; Raftery, G M and Orozco, F (2014) Characterization of process variability in construction. Journal of Construction Engineering and Management, 140(11): 5014009, ISSN 0733-9364
Up a level