Items where Author is "Polat, G"
Article
Terzioglu, T and Polat, G (2026) Evaluating interactions between formwork system selection criteria for building construction projects: A rough DEMATEL approach. Journal of Construction Engineering and Management, 152(1): 04025225, ISSN 0733-9364
Turkoglu, H; Arditi, D and Polat, G (2025) Golden eagle optimizer-based multi-objective optimization model for scheduling construction projects. Construction Management and Economics, 43(9), pp. 704-722. ISSN 0144-6193
Bingol, B N; Arditi, D and Polat, G (2025) Subcontractor selection for a construction project: Optimal plan. Journal of Construction Engineering and Management, 151(12): 04025205, ISSN 0733-9364
Turkoglu, H; Arditi, D and Polat, G (2024) Augmented time-cost trade-off optimization using particle swarm optimization. Journal of Construction Engineering and Management, 150(5): 04024031, ISSN 0733-9364
Selcuk, O; Turkoglu, H; Polat, G and Hajdu, M (2024) An integrative literature review on the causes of delays in construction projects: Evidence from developing countries. International Journal of Construction Management, 24(6), pp. 610-622. ISSN 1562-3599
Bingol, B N; Arditi, D and Polat, G (2024) A performance-based subcontractor selection model. Journal of Construction Engineering and Management, 150(8): 04024079, ISSN 0733-9364
Turkoglu, H; Polat, G and Akin, F D (2023) Crashing construction projects considering schedule flexibility: An illustrative example. International Journal of Construction Management, 23(4), pp. 619-628. ISSN 1562-3599
Turkoglu, H; Arditi, D and Polat, G (2023) Mathematical multiobjective optimization model for trade-offs in small-scale construction projects. Journal of Construction Engineering and Management, 149(7): 04023056, ISSN 0733-9364
Polat, G and Bayhan, H G (2022) Selection of HVAC-ahu system supplier with environmental considerations using fuzzy edas method. International Journal of Construction Management, 22(10), pp. 1863-1871. ISSN 1562-3599
Akin, F D; Polat, G; Turkoglu, H and Damci, A (2021) A crashing-based time-cost trade-off model considering quality cost and contract clauses. International Journal of Construction Management, 23(6), pp. 954-963. ISSN 1562-3599
Bingol, B N and Polat, G (2020) Framework for evaluating quality performances of subcontractors: Case of Turkish contractors. Journal of Construction in Developing Countries, 25(1), pp. 163-179. ISSN 1823-6499
Damci, A; Arditi, D and Polat, G (2017) Civil engineers' personal values/demographics linkage in project team building. Engineering, Construction and Architectural Management, 24(6), pp. 1337-1349. ISSN 0969-9988
Damci, A; Arditi, D and Polat, G (2013) Multiresource leveling in line-of-balance scheduling. Journal of Construction Engineering and Management, 139(9), pp. 1108-1116. ISSN 0733-9364
Polat, G and Bingol, B N (2013) A comparison of fuzzy logic and multiple regression analysis models in determining contingency in international construction projects. Construction Innovation, 13(4), pp. 445-462. ISSN 1471-4175
Polat, G and Donmez, U (2010) ANP-based marketing activity selection model for construction companies. Construction Innovation, 10(1), pp. 89-111. ISSN 1471-4175
Polat, G (2010) Using ANP priorities with goal programming in optimally allocating marketing resources. Construction Innovation, 10(3), pp. 346-365. ISSN 1471-4175
Polat, G (2009) Simulation-based efficiency assessment approach for rebar supply chains in Turkey. Construction Innovation, 9(1), pp. 101-121. ISSN 1471-4175
Polat, G (2008) Factors affecting the use of precast concrete systems in the United States. Journal of Construction Engineering and Management, 134(3), pp. 169-178. ISSN 0733-9364
Algarni, A M; Arditi, D and Polat, G (2007) Build-operate-transfer in infrastructure projects in the United States. Journal of Construction Engineering and Management, 133(10), pp. 728-735. ISSN 0733-9364
Polat, G; Arditi, D and Mungen, U (2007) Simulation-based decision support system for economical supply chain management of rebar. Journal of Construction Engineering and Management, 133(1), pp. 29-39. ISSN 0733-9364
Polat, G; Arditi, D; Ballard, G and Mungen, U (2006) Economics of on-site vs off-site fabrication of rebar. Construction Management and Economics, 24(11), pp. 1185-1198. ISSN 1466433X
Polat, G and Arditi, D (2005) The JIT materials management system in developing countries. Construction Management and Economics, 23(7), pp. 697-712. ISSN 01446193
Al-Sobiei, O S; Arditi, D and Polat, G (2005) Managing owner's risk of contractor default. Journal of Construction Engineering and Management, 131(9), pp. 973-978. ISSN 0733-9364
Al-Sobiei, O S; Arditi, D and Polat, G (2005) Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques. Construction Management and Economics, 23(4), pp. 423-430. ISSN 01446193
Conference Paper
Bingol, B N and Polat, G (2015) Time-cost-quality trade-off model for subcontractor selection using discrete particle swarm optimization algorithm. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Up a level