Items where Author is "O'Connor, J T"

Group by: Item Type | No Grouping
Jump to: Article | Thesis
Number of items: 27.

Article

O'Connor, J T; Leite, F and Ma, J W (2023) Expanding advanced work packaging to include commissioning and startup for industrial projects. Construction Innovation, 23(5), pp. 939-960. ISSN 1471-4175

Koo, H J and O'Connor, J T (2022) A strategy for building design quality improvement through BIM capability analysis. Journal of Construction Engineering and Management, 148(8): 04022066, ISSN 0733-9364

O'Connor, J T and Koo, H J (2021) Proactive design quality assessment tool for building projects. Journal of Construction Engineering and Management, 147(2): 04020174, ISSN 0733-9364

O'Connor, J T; Shrestha, B K; Winkler, M and Ouk Choi, J (2021) Relationship between commissioning and start-up success factors achievement and performance in capital projects. Journal of Construction Engineering and Management, 147(3): 04021001, ISSN 0733-9364

O'Connor, J T and Mock, B (2020) Responsibilities and accountabilities for industrial facility commissioning and startup activities. Construction Innovation, 20(4), pp. 625-645. ISSN 1471-4175

O'Connor, J T and Mock, B D (2019) Construction, commissioning, and startup execution: Problematic activities on capital projects. Journal of Construction Engineering and Management, 145(4): 04019009, ISSN 0733-9364

Mock, B and O'Connor, J T (2019) High-value, low-effort industrial plant commissioning solution strategies. Construction Innovation, 19(4), pp. 653-671. ISSN 1471-4175

Leandro, R; O'Connor, J T and Khwaja, N (2018) Development and application of a production-rate resource for contract time determination. Journal of Construction Engineering and Management, 144(12): 06018005, ISSN 0733-9364

O'Connor, J T; Choi, J O and Winkler, M (2016) Critical success factors for commissioning and start-up of capital projects. Journal of Construction Engineering and Management, 142(11): 04016060, ISSN 0733-9364

Choi, J O; O'Connor, J T and Kim, T W (2016) Recipes for cost and schedule successes in industrial modular projects: Qualitative comparative analysis. Journal of Construction Engineering and Management, 142(10): 04016055, ISSN 0733-9364

O'Connor, J T; Torres, N and Woo, J (2016) Sustainability actions during the construction phase. Journal of Construction Engineering and Management, 142(7): 4016016, ISSN 0733-9364

O'Connor, J T; O'Brien, W J and Choi, J O (2015) Standardization strategy for modular industrial plants. Journal of Construction Engineering and Management, 141(9): 4015026, ISSN 0733-9364

O'Connor, J T; O'Brien, W J and Choi, J O (2014) Critical success factors and enablers for optimum and maximum industrial modularization. Journal of Construction Engineering and Management, 140(6): 4014012, ISSN 0733-9364

Shrestha, P P; O'Connor, J T and Gibson Jr, G E (2012) Performance comparison of large design-build and design-bid-build highway projects. Journal of Construction Engineering and Management, 138(1), pp. 1-13. ISSN 0733-9364

Chou, C C; Caldas, C H; O'Connor, J T; Sroka, A W and Goldman, G K (2009) Identification of decision drivers for the strategy of incorporating utility relocations into highway construction contracts. Journal of Construction Engineering and Management, 135(9), pp. 812-818. ISSN 0733-9364

Jarrah, R; Kulkarni, D and O'Connor, J T (2007) Cash flow projections for selected TxDoT highway projects. Journal of Construction Engineering and Management, 133(3), pp. 235-241. ISSN 0733-9364

O'Connor, J T and Huh, Y (2006) Crew production rates for contract time estimation: Beam erection, deck, and rail of highway bridges. Journal of Construction Engineering and Management, 132(4), pp. 408-415. ISSN 0733-9364

O'Connor, J T and Huh, Y (2005) Crew production rates for contract time estimation: Bent footing, column, and cap of highway bridges. Journal of Construction Engineering and Management, 131(9), pp. 1013-1020. ISSN 0733-9364

Cha, H S and O'Connor, J T (2005) Optimizing implementation of value management processes for capital projects. Journal of Construction Engineering and Management, 131(2), pp. 239-251. ISSN 0733-9364

O'Connor, J T and Yang, L R (2004) Project performance versus use of technologies at project and phase levels. Journal of Construction Engineering and Management, 130(3), pp. 322-329. ISSN 0733-9364

El-Diraby, T E and O'Connor, J T (2001) Model for evaluating bridge construction plans. Journal of Construction Engineering and Management, 127(5), pp. 399-405. ISSN 0733-9364

O'Connor, J T and El-Diraby, T E (2000) Urban freeway bridge reconstruction planning: Case of mockingbird bridge. Journal of Construction Engineering and Management, 126(1), pp. 61-67. ISSN 0733-9364

Cheng, M Y and O'Connor, J T (1996) Arcsite: Enhanced GIS for construction site layout. Journal of Construction Engineering and Management, 122(4), pp. 329-336. ISSN 0733-9364

Varghese, K and O'Connor, J T (1995) Routing large vehicles on industrial construction sites. Journal of Construction Engineering and Management, 121(1), pp. 1-12. ISSN 0733-9364

O'Connor, J T; Larimore, M A and Tucker, R L (1986) Collecting constructability improvement ideas. Journal of Construction Engineering and Management, 112(4), pp. 463-475. ISSN 0733-9364

O'Connor, J T and Tucker, R L (1986) Industrial project constructability improvement. Journal of Construction Engineering and Management, 112(1), pp. 69-82. ISSN 0733-9364

Thesis

O'Connor, J T (1983) Improving industrial project constructability (productivity, value engineering). PhD thesis, University of Texas at Austin, USA.