Items where Author is "Ng, T"

Group by: Item Type | No Grouping
Jump to: Article
Number of items: 7.

Article

Ng, T; Palaneeswaran, E and Kumaraswamy, M (2008) Costs and benefits of ISO 9000-based quality management systems to construction contractors. Construction Economics and Building, 8(2), pp. 23-29. ISSN 2204-9029

Lam, K C; Ning, X and Ng, T (2007) The application of the ant colony optimization algorithm to the construction site layout planning problem. Construction Management and Economics, 25(4), pp. 359-374. ISSN 1466433X

Ibbs, C W; Kwak, Y H; Ng, T and Murat Odabasi, A (2003) Project delivery systems and project change: Quantitative analysis. Journal of Construction Engineering and Management, 129(4), pp. 382-387. ISSN 0733-9364

Palaneeswaran, E; Kumaraswamy, M and Ng, T (2003) Targeting optimum value in public sector projects through "best value"-focused contractor selection. Engineering, Construction and Architectural Management, 10(6), pp. 418-431. ISSN 0969-9988

Ng, T; Luu, D and Chen, S (2002) Decision criteria and their subjectivity in construction procurement selection. Construction Economics and Building, 2(1), pp. 70-80. ISSN 2204-9029

Lam, K C; Song Hu, T I E; Ng, T; Yuen, R K K; Lo, S M and Wong, C T C (2001) Using an adaptive genetic algorithm to improve construction finance decisions. Engineering, Construction and Architectural Management, 8(1), pp. 31-45. ISSN 0969-9988

Lam, K C; So, A T P; Hu, T; Ng, T; Yuen, R K K; Lo, S M; Cheung, S O and Yang, H (2001) An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making. Construction Management and Economics, 19(1), pp. 63-76. ISSN 01446193

This list was generated on Sat Aug 22 01:06:18 2026 UTC.