Items where Author is "Ng, S T"

Group by: Item Type | No Grouping
Number of items: 55.

Article

Zhou, S; Wang, H; Ng, S T; Li, D; Xie, S; Chen, K and Wang, W (2025) Building a construction law knowledge repository to enhance general-purpose large language model performance on domain question-answering: A case of China. Engineering, Construction and Architectural Management, 32(13), pp. 518-546. ISSN 0969-9988

Amo-Larbi, J A; Tang, L C M; Antwi-Afari, P and Ng, S T (2025) Determining the optimal strategy for the adoption of digital technologies in the construction industry: Multicriteria decision-making process. Journal of Construction Engineering and Management, 151(11): 04025168, ISSN 0733-9364

Shao, Y; Yang, Y; Ng, S T; Xing, J and Kwok, C Y (2025) Revelation and enhancement for pedestrian evacuation at metro station: Metamodeling-based simulation optimization approach. Journal of Construction Engineering and Management, 151(2): 04024198, ISSN 0733-9364

Li, D; Zhou, H; Zhou, S; Huang, G; Ma, X; Zhao, Y; Wang, W and Ng, S T (2025) An eye-tracking-based approach to evaluate the usability of government portal websites in pilot smart cities. Engineering, Construction and Architectural Management, 32(4), pp. 2369-2396. ISSN 0969-9988

Zhou, S; Ng, S T; Lee, S H; Xu, F J and Yang, Y (2020) A domain knowledge incorporated text mining approach for capturing user needs on BIM applications. Engineering, Construction and Architectural Management, 27(2), pp. 458-482. ISSN 0969-9988

Fang, Y and Ng, S T (2019) Genetic algorithm for determining the construction logistics of precast components. Engineering, Construction and Architectural Management, 26(10), pp. 2289-2306. ISSN 0969-9988

Ng, S T; Zheng, D X M and Xie, J Z (2013) Allocation of construction resources through a pull-driven approach. Construction Innovation, 13(1), pp. 77-97. ISSN 1471-4175

Fang, Y and Ng, S T (2011) Applying activity-based costing approach for construction logistics cost analysis. Construction Innovation, 11(3), pp. 259-281. ISSN 1471-4175

Ng, S T; Fan, R Y C and Wong, J M W (2011) An econometric model for forecasting private construction investment in Hong Kong. Construction Management and Economics, 29(5), pp. 519-534. ISSN 1466433X

Chow, L K and Ng, S T (2010) Delineating the performance standards of engineering consultants at design stage. Construction Management and Economics, 28(1), pp. 3-11. ISSN 1466433X

Wong, J M W and Ng, S T (2010) Forecasting construction tender price index inm Hong Kong using vector error correction model. Construction Management and Economics, 28(12), pp. 1255-1268. ISSN 1466433X

Yeung, A T; Ng, S T; Tham, L G and Lee, P K K (2010) HKU's double professional civil engineering and law programme. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(2), pp. 77-85. ISSN 17514312

Fan, R Y C; Ng, S T and Wong, J M W (2010) Reliability of the Box-Jenkins model for forecasting construction demand covering times of economic austerity. Construction Management and Economics, 28(3), pp. 241-254. ISSN 1466433X

Ng, S T; Xie, J and Kumaraswamy, M M (2010) Simulating the effect of risks on equity return for concession-based public-private partnership projects. Engineering, Construction and Architectural Management, 17(4), pp. 352-368. ISSN 0969-9988

Ng, S T; Fan, R Y C; Wong, J M W; Chan, A P C; Chiang, Y H; Lam, P T I and Kumaraswamy, M (2009) Coping with structural change in construction: Experiences gained from advanced economies. Construction Management and Economics, 27(2), pp. 165-180. ISSN 1466433X

Ng, S T; Shi, J and Fang, Y (2009) Enhancing the logistics of construction materials through activity-based simulation approach. Engineering, Construction and Architectural Management, 16(3), pp. 224-237. ISSN 0969-9988

Ng, S T and Tang, Z (2008) Delineating the predominant criteria for subcontractor appraisal and their latent relationships. Construction Management and Economics, 26(3), pp. 249-259. ISSN 1466433X

Mak, M Y and Ng, S T (2008) Feng shui: An alternative framework for complexity in design. Architectural Engineering and Design Management, 4(1), pp. 58-72. ISSN 1745-2007

Ng, S T and Zhang, Y (2008) Optimizing construction time and cost using ant colony optimization approach. Journal of Construction Engineering and Management, 134(9), pp. 721-728. ISSN 0733-9364

Ng, S T and Xie, J (2008) A simulation model for evaluating the tariff stability of concession-based PPP proposals. Construction Innovation, 8(2), pp. 106-119. ISSN 1471-4175

Ng, S T and Wong, Y M W (2007) Payment and audit mechanisms for non private-funded PPP-based infrastructure maintenance projects. Construction Management and Economics, 25(9), pp. 915-923. ISSN 1466433X

Ng, S T and Wong, Y M W (2006) Adopting non-privately funded public-private partnerships in maintenance projects: A case study in Hong Kong. Engineering, Construction and Architectural Management, 13(2), pp. 186-200. ISSN 0969-9988

Kumaraswamy, M M; Miller, C J; Rahman, M M; Pickernell, D G; Ng, S T and Wong, I P Y (2006) Developing web-based tools for teaching, training, learning and development: The role of academic institutions. Architectural Engineering and Design Management, 2(1-2), pp. 123-135. ISSN 1745-2007

Zheng, D X M; Ng, S T and Kumaraswamy, M M (2005) Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization. Journal of Construction Engineering and Management, 131(1), pp. 81-91. ISSN 0733-9364

Ng, S T; Kong, H and Luu, C D T (2005) Capitalising experiential knowledge for guiding construction procurement selection. Construction Economics and Building, 5(1), pp. 32-40. ISSN 2204-9029

Leung, M Y; Ng, S T; Skitmore, M and Cheung, S O (2005) Critical stressors influencing construction estimators in Hong Kong. Construction Management and Economics, 23(1), pp. 33-44. ISSN 01446193

Ng, S T; Skitmore, R M and Leung, T K C (2005) Manageability of stress among construction project participants. Engineering, Construction and Architectural Management, 12(3), pp. 264-282. ISSN 0969-9988

Zheng, D X M and Ng, S T (2005) Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front. Journal of Construction Engineering and Management, 131(2), pp. 176-186. ISSN 0733-9364

Lam, K C; Hu, T S and Ng, S T (2005) Using the principal component analysis method as a tool in contractor pre-qualification. Construction Management and Economics, 23(7), pp. 673-684. ISSN 01446193

Zheng, D X M; Ng, S T and Kumaraswamy, M M (2004) Applying a genetic algorithm-based multiobjective approach for time-cost optimization. Journal of Construction Engineering and Management, 130(2), pp. 168-176. ISSN 0733-9364

Leung, M Y; Chong, A; Ng, S T and Cheung, M C K (2004) Demystifying stakeholders' commitment and its impacts on construction projects. Construction Management and Economics, 22(7), pp. 701-715. ISSN 01446193

Kumaraswamy, M M; Ng, S T; Ugwu, O O; Palaneeswaran, E and Rahman, M M (2004) Empowering collaborative decisions in complex construction project scenarios. Engineering, Construction and Architectural Management, 11(2), pp. 133-142. ISSN 0969-9988

Leung, M Y; Ng, S T and Cheung, S O (2004) Measuring construction project participant satisfaction. Construction Management and Economics, 22(3), pp. 319-331. ISSN 01446193

Ng, S T; Cheung, S O; Skitmore, M and Wong, T C Y (2004) An integrated regression analysis and time series model for construction tender price index forecasting. Construction Management and Economics, 22(5), pp. 483-493. ISSN 01446193

Lam, P T I; Kumaraswamy, M M and Ng, S T (2004) The use of construction specifications in Singapore. Construction Management and Economics, 22(10), pp. 1067-1079. ISSN 01446193

Palaneeswaran, E; Kumaraswamy, M M and Ng, S T (2003) Formulating a framework for relationally integrated construction supply chains. Journal of Construction Research, 4(2), pp. 189-205. ISSN 1609-9451

Luu, D T; Ng, S T and Chen, S E (2003) Parameters governing the selection of procurement system - An empirical survey. Engineering, Construction and Architectural Management, 10(3), pp. 209-218. ISSN 0969-9988

Skitmore, M and Ng, S T (2002) Analytical and approximate variance of total project cost. Journal of Construction Engineering and Management, 128(5), pp. 456-460. ISSN 0733-9364

Lam, K C; Cheung, S O; Tang, C M and Ng, S T (2002) Capital budgeting evaluation practices of building contractors in Hong Kong. Construction Economics and Building, 2(1), pp. 81-93. ISSN 2204-9029

Ng, S T; Luu, D T; Chen, S E and Lam, K C (2002) Fuzzy membership functions of procurement selection criteria. Construction Management and Economics, 20(3), pp. 285-296. ISSN 01446193

Lam, K C; Runeson, G; Ng, S T; Hu, T S; Cheung, S O and Deng, Z M (2001) Capital budget planning practices of building contractors in Hong Kong. Construction Management and Economics, 19(6), pp. 569-576. ISSN 01446193

Ng, S T; Chen, S E; McGeorge, D; Lam, K C and Evans, S (2001) Current state of IT usage by Australian subcontractors. Construction Innovation, 1(1), pp. 3-13. ISSN 1471-4175

Lam, K C; Hu, T; Ng, S T; Skitmore, M and Cheoung, S O (2001) A fuzzy neural network approach for contractor prequalification. Construction Management and Economics, 19(2), pp. 175-188. ISSN 01446193

Cheung, S O; Ng, S T; Lam, K C and Sin, W S (2001) A fuzzy sets model for construction dispute evaluation. Construction Innovation, 1(2), pp. 117-127. ISSN 1471-4175

Ng, S T; Mak, M M Y; Skitmore, R M; Lam, K C and Varnam, M (2001) The predictive ability of bromilow's time-cost model. Construction Management and Economics, 19(2), pp. 165-173. ISSN 01446193

Conference Paper

He, Q and Ng, S T (2017) Energy-efficient window retrofit for existing high-rise residential buildings with the consideration of mutual shading. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Ng, S T and Hon, W C W (2011) Concerns of the society on new mega infrastructure and construction projects in Hong Kong. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Li, T H Y; Ng, S T and Wong, K K W (2009) A study on the social impact assessment of infrastructure projects in China. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Chow, L K and Ng, S T (2005) Establishing a quantitaive performance evaluation framework through fuzzy membership functions. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ng, S T and Li, W (2004) A multiagent system for negotiating construction bidding decisions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Chow, L K and Ng, S T (2003) Performance-based evaluation for engineering consultants: A study of assessment criteria. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Zheng, D X M; Ng, S T and Kumaraswamy, M M (2002) Applying genetic algorithm techniques for time-cost optimization. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Ng, S T; Kumaraswamy, M and Chow, L K (2001) Selecting consultants through combined technical and fee assessment: A Hong Kong study. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Mak, M Y; Ng, S T; Chen, S E and Varnam, M (2000) The relationship between economic indicators and Bromilow's time-cost model: A pilot study. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Lam, G T W; Cheung, S O and Ng, S T (1999) The effectiveness of design and build conditions of contract. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

This list was generated on Sat Aug 22 01:06:06 2026 UTC.