Items where Author is "Ndekugri, I"
Article
Ndekugri, I; Silverio, A K and Mason, J (2024) Enforcing payment obligations under construction contracts by insolvency proceedings. Journal of Financial Management of Property and Construction, 29(3), pp. 372-387. ISSN 1366-4387
Ndekugri, I; Ankrah, N A and Adaku, E (2023) Performance barriers for coordination of health and safety during the preconstruction phase of construction projects. Journal of Construction Engineering and Management, 149(7): 04023045, ISSN 0733-9364
Ndekugri, I; Ankrah, N A and Adaku, E (2022) The design coordination role at the pre-construction stage of construction projects. Building Research & Information, 50(4), pp. 452-466. ISSN 0961-3218
Ndekugri, I; Ankrah, N A; Adaku, E and Mzyece, D (2021) An analysis of health and safety provisions in NEC contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(2), pp. 65-75. ISSN 17514304
Ndekugri, I (2016) Late disputes and the NEC3 Engineering and Construction Contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(2), pp. 65-76. ISSN 17514304
Ndekugri, I (2013) The consulting engineer and corporate manslaughter risk. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(3), pp. 128-136. ISSN 17514312
Ndekugri, I; Daeche, H and Zhou, D (2013) The project insurance option in infrastructure procurement. Engineering, Construction and Architectural Management, 20(3), pp. 267-289. ISSN 0969-9988
Braimah, N and Ndekugri, I (2009) Consultants' perceptions on construction delay analysis methodologies. Journal of Construction Engineering and Management, 135(12), pp. 1279-1288. ISSN 0733-9364
Ndekugri, I; Braimah, N and Gameson, R (2008) Delay analysis within construction contracting organizations. Journal of Construction Engineering and Management, 134(9), pp. 692-700. ISSN 0733-9364
Ndekugri, I; Smith, N and Hughes, W P (2007) The engineer under FIDIC's conditions of contract for construction. Construction Management and Economics, 25(7), pp. 791-799. ISSN 1466433X
Ndekugri, I and Russell, V (2006) Disputing the existence of a dispute as a strategy for avoiding construction adjudication. Engineering, Construction and Architectural Management, 13(4), pp. 380-395. ISSN 0969-9988
Ndekugri, I and Russell, V (2005) Insolvency and resolution of construction contract disputes by adjudication in the UK construction industry. Construction Management and Economics, 23(4), pp. 399-408. ISSN 01446193
Cheung, S O; Tam, C M; Ndekugri, I and Harris, F C (2000) Factors affecting clients' project dispute resolution satisfaction in Hong Kong. Construction Management and Economics, 18(3), pp. 281-294. ISSN 01446193
Ndekugri, I and McDonnell, B (1999) Differing site conditions risks: A FIDIC/engineering and construction contract comparison. Engineering, Construction and Architectural Management, 6(2), pp. 177-187. ISSN 0969-9988
Ndekugri, I (1999) Performance bonds and guarantees: Construction owners and professionals beware. Journal of Construction Engineering and Management, 125(6), pp. 428-436. ISSN 0733-9364
Ndekugri, I and Turner, A (1994) Building procurement by design and build approach. Journal of Construction Engineering and Management, 120(2), pp. 243-256. ISSN 0733-9364
Conference Paper
Adjei, S D; Ankrah, N A; Adukpo, S E; Ndekugri, I and Searle, D (2024) Factors influencing the extent of waste management on construction sites. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Adjei, S D; Ankrah, N A; Ndekugri, I and Searle, D (2018) Sustainable construction and demolition waste management: Comparison of corporate and project level drivers. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Adjei, S; Ankrah, N; Ndekugri, I and Searle, D (2015) Investigating the extent to which waste management legislation affects waste management practices within the UK construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Mante, J; Ndekugri, I; Ankrah, N and Hammond, F (2012) The influence of procurement methods on dispute resolution mechanism choice in construction. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Braimah, N; Ndekugri, I and Gameson, R (2007) A systematic methodology for analysing disruption claims. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Braimah, N; Ndekugri, I and Gameson, R (2006) A review of industry standards and publications/charts for adjusting productivity losses in construction contracts. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.