Items where Author is "Molenaar, K"

Group by: Item Type | No Grouping
Number of items: 8.

Franz, B; Leicht, R; El Asmar, M and Molenaar, K (2022) Methodological consistency for quantitative analysis and reporting in project delivery system performance research. Journal of Construction Engineering and Management, 148(9): 04022080, ISSN 0733-9364

Franz, B; Leicht, R; Molenaar, K and Messner, J (2017) Impact of team integration and group cohesion on project delivery performance. Journal of Construction Engineering and Management, 143(1): 04016088, ISSN 0733-9364

González, P; González, V; Molenaar, K and Orozco, F (2014) Analysis of causes of delay and time performance in construction projects. Journal of Construction Engineering and Management, 140(1): 04013027, ISSN 0733-9364

Xia, B; Molenaar, K; Chan, A; Skitmore, M and Zuo, J (2013) Determining optimal proportion of design in design-build request for proposals. Journal of Construction Engineering and Management, 139(6), pp. 620-627. ISSN 0733-9364

Xia, B; Chan, A; Molenaar, K and Skitmore, M (2012) Determining the appropriate proportion of owner-provided design in design-build contracts: Content analysis approach. Journal of Construction Engineering and Management, 138(9), pp. 1017-1022. ISSN 0733-9364

Chinowsky, P S; Molenaar, K and Bastias, A (2007) Measuring achievement of learning organizations in construction. Engineering, Construction and Architectural Management, 14(3), pp. 215-227. ISSN 0969-9988

Gransberg, D D and Molenaar, K (2003) A synthesis of design-builder selection methods for public infrastructure projects. Journal of Construction Procurement, 9(2), pp. 40-51. ISSN 1358-9180

Molenaar, K; Washington, S and Diekmann, J (2000) Structural equation model of construction contract dispute potential. Journal of Construction Engineering and Management, 126(4), pp. 268-276. ISSN 0733-9364