Items where Author is "Menesi, W"
Menesi, W; Golzarpoor, B and Hegazy, T (2013) Fast and near-optimum schedule optimization for large-scale projects. Journal of Construction Engineering and Management, 139(9), pp. 1117-1124. ISSN 0733-9364
Hegazy, T and Menesi, W (2012) Heuristic method for satisfying both deadlines and resource constraints. Journal of Construction Engineering and Management, 138(6), pp. 688-696. ISSN 0733-9364
Hegazy, T and Menesi, W (2010) Critical path segments scheduling technique. Journal of Construction Engineering and Management, 136(10), pp. 1078-1085. ISSN 0733-9364
Hegazy, T and Menesi, W (2008) Delay analysis under multiple baseline updates. Journal of Construction Engineering and Management, 134(8), pp. 575-582. ISSN 0733-9364
Up a level