Items where Author is "Markiz, N"
Group by: Item Type | No Grouping
Jump to: Article
Number of items: 1.
Article
Markiz, N and Jrade, A (2022) Integrating an expert system with brims, cost estimation, and linear scheduling at conceptual design stage of bridge projects. International Journal of Construction Management, 22(5), pp. 913-928. ISSN 1562-3599
Up a level