Items where Author is "Lewis, J"
Chen, L; Manley, K; Lewis, J; Helfer, F and Widen, K (2018) Procurement and governance choices for collaborative infrastructure projects. Journal of Construction Engineering and Management, 144(8): 04018071, ISSN 0733-9364
Nhat, M N; Lewis, J; Beer, M and Boussabaine, A (2014) A pilot-study investigating the assessment and allocation of risks in public-private partnership transportation projects in Vietnam. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Al Zarooni, S; Abdou, A and Lewis, J (2011) Improving the client briefing for UAE public healthcare projects: Space programming guidelines. Architectural Engineering and Design Management, 7(4), pp. 251-265. ISSN 1745-2007
Blyth, K; Lewis, J and Kaka, A (2004) Developing a framework for a standardized works programme for building projects. Construction Innovation, 4(4), pp. 193-210. ISSN 1471-4175
Abdou, A; Lewis, J and Alzarooni, S (2004) Modelling risk for construction cost estimating and forecasting: A review. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Blyth, K; Lewis, J and Kaka, A (2004) Predicting project and activity duration for buildings in the UK. Journal of Construction Research, 5(2), pp. 329-347. ISSN 1609-9451
Wanous, M; Boussabaine, H and Lewis, J (2004) A neurofuzzy decision-support model for mark-up estimation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Kaka, A and Lewis, J (2003) Development of a company-level dynamic cash flow forecasting model. Construction Management and Economics, 21(7), pp. 693-705. ISSN 01446193
Kaka, A P; Lewis, J and Petros, H (2003) The effects of the variability of project planning on cost commitment curves: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 15-26. ISSN 0969-9988
Abdou, A; Lewis, J and Radaideh, M (2003) An internet-based decision support system for healthcare project appraisal: A conceptual proposal. Construction Innovation, 3(3), pp. 145-155. ISSN 1471-4175
Wanous, M; Boussabaine, H A and Lewis, J (2003) A neural network bid/no bid model: The case for contractors in Syria. Construction Management and Economics, 21(7), pp. 737-744. ISSN 01446193
Cheetham, D W and Lewis, J (2001) Productivity, buildability and constructability: Is work study the missing link? In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Wanous, M; Boussabaine, A H and Lewis, J (2000) To bid or not to bid: A parametric solution. Construction Management and Economics, 18(4), pp. 457-466. ISSN 01446193
Wanous, M; Boussabaine, A H and Lewis, J (1999) A qualitative bidding model. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Wanous, M; Boussabaine, A H and Lewis, J (1998) Tendering factors considered by Syrian contractors. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Evans, R C; Kaka, A P and Lewis, J (1997) Adopting a semi-ideographic approach to cash flow forecasting. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.