Items where Author is "Lee, H S"

Group by: Item Type | No Grouping
Number of items: 31.

Article

Lee, J G; Lee, H S; Park, M and Seo, J (2022) Early-stage cost estimation model for power generation project with limited historical data. Engineering, Construction and Architectural Management, 29(7), pp. 2599-2614. ISSN 0969-9988

Moon, H; Kim, K; Lee, H S; Park, M; Williams, T P; Son, B and Chun, J Y (2020) Cost performance comparison of design-build and design-bid-build for building and civil projects using mediation analysis. Journal of Construction Engineering and Management, 146(9): 04020113, ISSN 0733-9364

Lee, J; Park, M; Lee, H S and Hyun, H (2019) Classification of modular building construction projects based on schedule-driven approach. Journal of Construction Engineering and Management, 145(5): 04019031, ISSN 0733-9364

Kwon, N; Cho, J; Lee, H S; Yoon, I and Park, M (2019) Compensation cost estimation model for construction noise claims using case-based reasoning. Journal of Construction Engineering and Management, 145(8): 04019047, ISSN 0733-9364

Kwon, N; Song, K; Lee, H S; Kim, J and Park, M (2018) Construction noise risk assessment model focusing on construction equipment. Journal of Construction Engineering and Management, 144(6): 04018034, ISSN 0733-9364

Lee, J I; Lee, H S and Park, M (2018) Contractor liquidity evaluation model for successful public housing projects. Journal of Construction Engineering and Management, 144(12): 04018109, ISSN 0733-9364

Kwon, N; Park, M; Lee, H S; Ahn, J and Kim, S (2017) Construction noise prediction model based on case-based reasoning in the preconstruction phase. Journal of Construction Engineering and Management, 143(6): 04017008, ISSN 0733-9364

Kwon, N; Park, M; Lee, H S; Ahn, J and Shin, M (2016) Construction noise management using active noise control techniques. Journal of Construction Engineering and Management, 142(7): 4016014, ISSN 0733-9364

Hwang, S; Park, M; Lee, H S and Lee, S (2016) Hybrid simulation framework for immediate facility restoration planning after a catastrophic disaster. Journal of Construction Engineering and Management, 142(8): 4016026, ISSN 0733-9364

Jung, M; Park, M; Lee, H S and Kim, H (2016) Weather-delay simulation model based on vertical weather profile for high-rise building construction. Journal of Construction Engineering and Management, 142(6): 04016007, ISSN 0733-9364

Lee, B; Lee, H S; Park, M and Kim, H (2015) Influence factors of learning-curve effect in high-rise building constructions. Journal of Construction Engineering and Management, 141(8): 04015019, ISSN 0733-9364

Hwang, S; Park, M; Lee, H S; Lee, S and Kim, H (2015) Postdisaster interdependent built environment recovery efforts and the effects of governmental plans: Case analysis using system dynamics. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Kim, H; Lee, H S; Park, M; Ahn, C R and Hwang, S (2015) Productivity forecasting of newly added workers based on time-series analysis and site learning. Journal of Construction Engineering and Management, 141(9): 5015008, ISSN 0733-9364

Choi, B; Lee, H S; Park, M; Cho, Y K and Kim, H (2014) Framework for work-space planning using four-dimensional BIM in construction projects. Journal of Construction Engineering and Management, 140(9): 04014041, ISSN 0733-9364

Hwang, S; Park, M; Lee, H S; Lee, S and Kim, H (2013) Dynamic feasibility analysis of the housing supply strategies in a recession: Korean housing market. Journal of Construction Engineering and Management, 139(2), pp. 148-160. ISSN 0733-9364

Hwang, S; Park, M; Lee, H S and Kim, H (2012) Automated time-series cost forecasting system for construction materials. Journal of Construction Engineering and Management, 138(11), pp. 1259-1269. ISSN 0733-9364

Ji, S H; Park, M and Lee, H S (2012) Case adaptation method of case-based reasoning for construction cost estimation in Korea. Journal of Construction Engineering and Management, 138(1), pp. 43-52. ISSN 0733-9364

Park, M; Lee, M H; Lee, H S and Hwang, S (2010) Boost, control, or both of Korean housing market: 831 countermeasures. Journal of Construction Engineering and Management, 136(6), pp. 693-701. ISSN 0733-9364

Ji, S H; Park, M and Lee, H S (2010) Data preprocessing-based parametric cost model for building projects: Case studies of Korean construction projects. Journal of Construction Engineering and Management, 136(8), pp. 844-853. ISSN 0733-9364

Lee, H S; Shin, J W; Park, M and Ryu, H G (2009) Probabilistic duration estimation model for high-rise structural work. Journal of Construction Engineering and Management, 135(12), pp. 1289-1298. ISSN 0733-9364

Park, M; Ji, S H; Lee, H S and Kim, W (2009) Strategies for design-build in Korea using system dynamics modeling. Journal of Construction Engineering and Management, 135(11), pp. 1125-1137. ISSN 0733-9364

Lee, H S; Seo, J O; Park, M; Ryu, H G and Kwon, S S (2009) Transaction-cost-based selection of appropriate general contractor-subcontractor relationship type. Journal of Construction Engineering and Management, 135(11), pp. 1232-1240. ISSN 0733-9364

Yu, J H; Lee, H S and Kim, W (2006) Evaluation model for information systems benefits in construction management processes. Journal of Construction Engineering and Management, 132(10), pp. 1114-1121. ISSN 0733-9364

Lee, H S; Ryu, H G; Yu, J H and Kim, J J (2005) Method for calculating schedule delay considering lost productivity. Journal of Construction Engineering and Management, 131(11), pp. 1147-1154. ISSN 0733-9364

Lee, H S; Yu, J H and Kim, S K (2004) Impact of labor factors on workflow. Journal of Construction Engineering and Management, 130(6), pp. 918-923. ISSN 0733-9364

Yi, K J; Lee, H S and Choi, Y K (2002) Network creation and development for repetitive-unit projects. Journal of Construction Engineering and Management, 128(3), pp. 257-264. ISSN 0733-9364

Kim, J C; Kim, D H; Kim, J J; Ye, J S and Lee, H S (2000) Segmenting the Korean housing market using multiple discriminant analysis. Construction Management and Economics, 18(1), pp. 45-54. ISSN 01446193

Lee, H S and Yi, K J (1999) Application of mathematical matrix to integrate project schedule and cost. Journal of Construction Engineering and Management, 125(5), pp. 339-346. ISSN 0733-9364

Lee, H S; Lee, J Y and Lee, J S (1999) Nonshored formwork system for top-down construction. Journal of Construction Engineering and Management, 125(6), pp. 392-399. ISSN 0733-9364

Conference Paper

Kim, T W; Yu, J H and Lee, H S (2003) On-site productivity evaluation through productivity achievement ratio. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Ryu, H G; Lee, H S and Yu, J H (2003) A method for analysing delay duration considering lost productivity through construction productivity data model. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.