Items where Author is "Kuppuswamy, A"

Group by: Item Type | No Grouping
Jump to: Article
Number of items: 3.

Article

Annamalaisami, C D and Kuppuswamy, A (2022) Reckoning construction cost overruns in building projects through methodological consequences. International Journal of Construction Management, 22(6), pp. 1079-1089. ISSN 1562-3599

Kannimuthu, M; Raphael, B; Ekambaram, P and Kuppuswamy, A (2020) Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem. Engineering, Construction and Architectural Management, 27(4), pp. 893-916. ISSN 0969-9988

Kannimuthu, M; Raphael, B; Palaneeswaran, E and Kuppuswamy, A (2019) Optimizing time, cost and quality in multi-mode resource-constrained project scheduling. Built Environment Project and Asset Management, 9(1), pp. 44-63. ISSN 2044-124X

This list was generated on Sat Aug 22 01:07:00 2026 UTC.