Items where Author is "Kim, Y W"

Group by: Item Type | No Grouping
Jump to: Article
Number of items: 5.

Article

Kim, Y W and Rhee, B D (2026) An incentive scheme in GMP contracts using a game theory approach. Journal of Construction Engineering and Management, 152(4): 04026016, ISSN 0733-9364

Kim, Y W and Kim, S C (2011) Cost analysis of information technology-assisted quality inspection using activity-based costing. Construction Management and Economics, 29(2), pp. 163-172. ISSN 1466433X

Kim, Y W; Han, S; Shin, S and Choi, K (2011) A case study of activity-based costing in allocating rebar fabrication costs to projects. Construction Management and Economics, 29(5), pp. 449-461. ISSN 1466433X

Choi, K; Lee, E B; Ibbs, C W and Kim, Y W (2009) Multifaceted public outreach and cost-benefit analysis for its effectiveness validation. Construction Management and Economics, 27(8), pp. 771-782. ISSN 1466433X

Kim, Y W and Ballard, G (2002) Earned value method and customer earned value. Journal of Construction Research, 3(1), pp. 55-66. ISSN 1609-9451

This list was generated on Sat Aug 22 01:19:17 2026 UTC.