Items where Author is "Kim, T W"
Jeong, E; Jang, J; Kim, T W and Lee, S (2025) Divide-and-conquer-based stratified models for predicting precast concrete installation times. Journal of Construction Engineering and Management, 151(9): 05025011, ISSN 0733-9364
Lee, G H; Kim, J I; Koo, C and Kim, T W (2022) Automated generation of precast concrete slab stacks for transportation in offsite construction projects. Journal of Construction Engineering and Management, 148(8): 04022072, ISSN 0733-9364
Choi, J O; Chen, X B and Kim, T W (2019) Opportunities and challenges of modular methods in dense urban environment. International Journal of Construction Management, 19(2), pp. 93-105. ISSN 1562-3599
Chen, X B and Kim, T W (2017) Automated mapping of user activities onto flexible space in space-use analysis. Journal of Construction Engineering and Management, 143(8): 04017034, ISSN 0733-9364
Choi, J O; O'Connor, J T and Kim, T W (2016) Recipes for cost and schedule successes in industrial modular projects: Qualitative comparative analysis. Journal of Construction Engineering and Management, 142(10): 04016055, ISSN 0733-9364
Kim, T W and Fischer, M (2014) Automated generation of user activity-space pairs in space-use analysis. Journal of Construction Engineering and Management, 140(5): 04014007, ISSN 0733-9364
Kim, T W and Fischer, M (2014) Ontology for representing building users' activities in space-use analysis. Journal of Construction Engineering and Management, 140(8): 04014035, ISSN 0733-9364
Kim, T W; Yu, J H and Lee, H S (2003) On-site productivity evaluation through productivity achievement ratio. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Up a level