Items where Author is "Kim, J L"

Group by: Item Type | No Grouping
Jump to: Article
Number of items: 4.

Article

Kim, J L; Greene, M and Kim, S (2014) Cost comparative analysis of a new green building code for residential project development. Journal of Construction Engineering and Management, 140(5): 05014002, ISSN 0733-9364

Kim, J L (2013) Genetic algorithm stopping criteria for optimization of construction resource scheduling problems. Construction Management and Economics, 31(1), pp. 3-19. ISSN 1466433X

Kim, J L and Ellis, R D (2010) Comparing schedule generation schemes in resource-constrained project scheduling using elitist genetic algorithm. Journal of Construction Engineering and Management, 136(2), pp. 160-169. ISSN 0733-9364

Kim, J L and Ellis Jr, R D (2008) Permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling. Journal of Construction Engineering and Management, 134(11), pp. 904-913. ISSN 0733-9364

This list was generated on Sat Aug 22 01:11:17 2026 UTC.