Items where Author is "Kim, B C"
Article
Du, J; Kim, B C and Zhao, D (2016) Cost performance as a stochastic process: EAC projection by Markov chain simulation. Journal of Construction Engineering and Management, 142(6): 04016009, ISSN 0733-9364
Kim, B C and Kim, S J (2015) Credibility evaluation of project duration forecast using forecast sensitivity and forecast-risk compatibility. Journal of Construction Engineering and Management, 141(8): 04015023, ISSN 0733-9364
Shim, E and Kim, B C (2014) Batch-size based repetitive scheduling method (BRSM). International Journal of Construction Education and Research, 10(2), pp. 140-156. ISSN 1557-8771
Kim, B C and Kim, H J (2014) Sensitivity of earned value schedule forecasting to S-curve patterns. Journal of Construction Engineering and Management, 140(7): 04014023, ISSN 0733-9364
Kim, B C and Reinschmidt, K F (2011) Combination of project cost forecasts in earned value management. Journal of Construction Engineering and Management, 137(11), pp. 958-966. ISSN 0733-9364
Kim, B C and Reinschmidt, K F (2010) Probabilistic forecasting of project duration using Kalman filter and the earned value method. Journal of Construction Engineering and Management, 136(8), pp. 834-843. ISSN 0733-9364
Kim, B C and Reinschmidt, K F (2009) Probabilistic forecasting of project duration using bayesian inference and the beta distribution. Journal of Construction Engineering and Management, 135(3), pp. 178-186. ISSN 0733-9364
Thesis
Kim, B C (2007) Forecasting project progress and early warning of project overruns with probabilistic methods. PhD thesis, Texas A&M University, USA.