Items where Author is "Hyun, C"
Article
Jin, R; Han, S; Hyun, C and Cha, Y (2016) Application of case-based reasoning for estimating preliminary duration of building projects. Journal of Construction Engineering and Management, 142(2): 04015082, ISSN 0733-9364
Jin, R; Han, S; Hyun, C and Kim, J (2014) Improving accuracy of early stage cost estimation by revising categorical variables in a case-based reasoning model. Journal of Construction Engineering and Management, 140(7): 04014025, ISSN 0733-9364
Hong, T; Cho, K; Hyun, C and Han, S (2011) Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building. Journal of Construction Engineering and Management, 137(6), pp. 393-402. ISSN 0733-9364
Hyun, C; Cho, K; Koo, K; Hong, T and Moon, H (2008) Effect of delivery methods on design performance in multifamily housing projects. Journal of Construction Engineering and Management, 134(7), pp. 468-482. ISSN 0733-9364
Up a level