Items where Author is "Hu, H"
Article
Tao, Y; Hu, H; Xu, F and Zhang, Z (2025) Ergonomic risk mitigation through workforce planning for construction projects. Journal of Construction Engineering and Management, 151(4): 04025012, ISSN 0733-9364
Huang, H; Hu, H; Xu, F and Zhang, Z (2024) Kinesiology-inspired assessment of intrusion risk based on human motion features. Journal of Construction Engineering and Management, 150(7): 04024072, ISSN 0733-9364
Ding, S; Hu, H; Chai, Z and Wang, W (2024) Secure and formalized blockchain-IPFS information sharing in precast construction from the whole supply chain perspective. Journal of Construction Engineering and Management, 150(1): 04023150, ISSN 0733-9364
Tao, Y; Hu, H; Xu, F and Zhang, Z (2024) Work-rest schedule optimization of precast production considering workers' overexertion. Journal of Construction Engineering and Management, 150(5): 04024033, ISSN 0733-9364
Ding, S; Hu, H; Dai, L and Wang, W (2023) Blockchain adoption among multi-stakeholders under government subsidy: From the technology diffusion perspective. Journal of Construction Engineering and Management, 149(5): 04023016, ISSN 0733-9364
Hu, Z; Chan, W T; Hu, H and Xu, F (2023) Cognitive factors underlying unsafe behaviors of construction workers as a tool in safety management: A review. Journal of Construction Engineering and Management, 149(3): 03123001, ISSN 0733-9364
Tao, Y; Hu, H; Xu, F and Zhang, Z (2023) Ergonomic risk assessment of construction workers and projects based on fuzzy Bayesian network and D-S evidence theory. Journal of Construction Engineering and Management, 149(6): 04023034, ISSN 0733-9364
Hu, Z; Chan, W T and Hu, H (2023) Personalized construction safety interventions considering cognitive-related factors. Journal of Construction Engineering and Management, 149(12): 04023137, ISSN 0733-9364
Zhang, L; Hu, H; Fang, Y; Qiang, Z and Cai, Y (2023) Preliminary CSI specification localization methodology matrix in China. International Journal of Construction Management, 23(6), pp. 935-944. ISSN 1562-3599
Hu, H; Deng, X and Mahmoudi, A (2023) A cognitive model for understanding fraudulent behavior in construction industry. Engineering, Construction and Architectural Management, 30(4), pp. 1423-1443. ISSN 0969-9988
Wang, Z; Liu, Y; Hu, H and Dai, L (2021) Hybrid rescheduling optimization model under disruptions in precast production considering real-world environment. Journal of Construction Engineering and Management, 147(4): 04021012, ISSN 0733-9364
Zhu, F; Hu, H; Xu, F and Tang, N (2021) Predicting the impact of country-related risks on cost overrun for overseas infrastructure projects. Journal of Construction Engineering and Management, 147(2): 0012933, ISSN 0733-9364
Chen, T; Hu, H and Zhu, F (2020) Developing a hierarchical road layout method for large-scale construction site. Journal of Construction Engineering and Management, 146(9): 04020115, ISSN 0733-9364
Chen, H; Hu, H; Tang, M; Yang, X and Zhu, J (2018) Hybrid bored prestressed concrete cased piles: Equipment and construction procedures. Journal of Construction Engineering and Management, 144(12): 06018006, ISSN 0733-9364
Wang, Z; Hu, H and Gong, J (2018) Modeling worker competence to advance precast production scheduling optimization. Journal of Construction Engineering and Management, 144(11): 04018098, ISSN 0733-9364
Hu, H and Zhu, Y (2015) Social welfare-based concession model for build/operate/transfer contracts. Journal of Construction Engineering and Management, 141(1): 04014064, ISSN 0733-9364
Chan, W T and Hu, H (2002) Constraint programming approach to precast production scheduling. Journal of Construction Engineering and Management, 128(6), pp. 513-521. ISSN 0733-9364
Thesis
Hu, H (2014) Development of interoperable data protocol for integrated bridge project delivery. PhD thesis, State University of New York at Buffalo, USA.
Up a level