Items where Author is "Hong, Y"
Article
Hong, Z; Hong, Y; Cai, H; Abraham, D M; Zhang, J and Dunston, P S (2025) BIM-based framework for in-plant quality control of precast concrete manufacturing. Journal of Construction Engineering and Management, 151(12): 05025017, ISSN 0733-9364
Xie, H; Hong, Y; Xin, M; Brilakis, I and Shi, O (2025) Identification and analysis of communication barriers for construction projects with time uncertainties. Engineering, Construction and Architectural Management, 32(1), pp. 305-331. ISSN 0969-9988
Feng, L; Liu, J; Wang, Z and Hong, Y (2025) Navigating compliance complexity: Insights from the moa framework in international construction. Engineering, Construction and Architectural Management, 32(9), pp. 6068-6094. ISSN 0969-9988
Hong, Y; Xie, H; Agapaki, E and Brilakis, I (2023) Graph-based automated construction scheduling without the use of BIM. Journal of Construction Engineering and Management, 149(2): 05022020, ISSN 0733-9364
Xie, H; Hong, Y and Brilakis, I (2022) Analysis of user needs in time-related risk management for holistic project understanding. Journal of Construction Engineering and Management, 148(4): 05022002, ISSN 0733-9364
Hong, Y; Xie, H; Bhumbra, G and Brilakis, I (2021) Comparing natural language processing methods to cluster construction schedules. Journal of Construction Engineering and Management, 147(10): 04021136, ISSN 0733-9364
Hong, Y; Hammad, A; Zhong, X; Wang, B and Akbarnezhad, A (2020) Comparative modeling approach to capture the differences in BIM adoption decision-making process in Australia and China. Journal of Construction Engineering and Management, 146(2): 04019099, ISSN 0733-9364
Hong, Y; Tian, Z and Sun, X (2020) Dynamic evaluation for compaction quality of roller compacted concrete based on reliability metrics. Journal of Construction Engineering and Management, 146(10): 04020123, ISSN 0733-9364
Hong, Y; Hammad, A W A; Sepasgozar, S and Akbarnezhad, A (2019) BIM adoption model for small and medium construction organisations in Australia. Engineering, Construction and Architectural Management, 26(2), pp. 154-183. ISSN 0969-9988
Hong, Y; Hammad, A W A and Akbarnezhad, A (2019) Impact of organization size and project type on BIM adoption in the Chinese construction market. Construction Management and Economics, 37(11), pp. 675-691. ISSN 01446193
Peng, Z; Deng, W and Hong, Y (2019) Materials consumption, indoor thermal comfort and associated energy flows of urban residential buildings: Case studies from the cold climate zone of China. International Journal of Building Pathology and Adaptation, 37(5), pp. 579-596. ISSN 23984708
Up a level