Items where Author is "Hertogh, M"
Kamps, M; van den Boomen, M; van den Bogaard, J and Hertogh, M (2024) Intergenerational transfer of engineering expertise: Knowledge continuity management in storm surge barrier engineering. Built Environment Project and Asset Management, 14(6), pp. 874-891. ISSN 2044-124X
Liu, Y; Amini-Abyaneh, A; Hertogh, M; Houwing, E J and Bakker, H (2021) Collaborate to learn and learn to collaborate: A case of exploitative learning in the inter-organizational project. Engineering, Construction and Architectural Management, 28(3), pp. 809-830. ISSN 0969-9988
Hoseini, E; Bosch-Rekveldt, M and Hertogh, M (2020) Cost contingency and cost evolvement of construction projects in the preconstruction phase. Journal of Construction Engineering and Management, 146(6): 05020006, ISSN 0733-9364
Zhu, J; Hertogh, M; Zhang, J; Shi, Q and Sheng, Z (2020) Incentive mechanisms in mega project-risk management considering owner and insurance company as principals. Journal of Construction Engineering and Management, 146(10): 04020120, ISSN 0733-9364
Demirel, H Ç; Volker, L; Leendertse, W and Hertogh, M (2019) Dealing with contract variations in PPPs: Social mechanisms and contract management in infrastructure projects. Journal of Construction Engineering and Management, 145(11): 04019073, ISSN 0733-9364
Hoseini, E; Bosch-Rekveldt, M and Hertogh, M (2018) Risk management maturity of construction projects in the Netherlands. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Koops, L; van Loenhout, C; Bosch-Rekveldt, M; Hertogh, M and Bakker, H (2017) Different perspectives of public project managers on project success. Engineering, Construction and Architectural Management, 24(6), pp. 1294-1318. ISSN 0969-9988
Demirel, H Ç; Leendertse, W; Volker, L and Hertogh, M (2017) Flexibility in PPP contracts: Dealing with potential change in the pre-contract phase of a construction project. Construction Management and Economics, 35(4), pp. 196-206. ISSN 0144-6193
Demirel, H C; Leendertse, W and Hertogh, M (2015) Pre-contract assumptions in practice: A qualitative study on the flexibility to changes in dbfm contracts: Blankenburgverbinding project case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Up a level